Loading...
HomeMy WebLinkAbout20092979.tiffWeld County Planning Departmed GREELEY OFFICE • 0 *itz, 111k COLORADO MEMORANDUM Jut 732009 TO: Chris Gathman, Planning Services DATE: July 1 FROM: Donald Carroll, Engineering Administrator e Clay Kimmi, P.E., CFM, Public Works SUBJECT: USR-1705, Land Airport LLC, c/o Lloyd Land ,c2vED The Weld County Public Works Department reviewed the submitted application for critical items, including but not limited to Site Plan, Traffic Study, Preliminary Drainage Report, Geotechnical Soils Report, and Flood Hazard Development Permit. A detailed review of these items was not complete at this step in process. Comments made during this stage of the review process will not be all inclusive, as revised materials are submitted other concerns or issues may arise. All issues of concern and critical issues during further review must be resolved with the Public Works Department. Weld County Road Classification Plan (FHU): (June 2002) WCR 51 is a local paved road and requires a 60 -foot right-of-way at full build out. There is presently a 60 -foot right-of-way. This road is maintained by Weld County. Pursuant to the definition of SETBACK in the Weld County Zoning (23-1-90), the required setback is measured from the future right-of-way line. Our most recent average daily traffic count for WCR 51 between WCR 16 and the 1-76 Frontage Road reflect 277 vehicles taken 7/9/2009. The 85th percentile reflects 62 mph, 31% are trucks. Access: The applicant shall utilize the existing paved access to the facility with no additional accesses granted. Off-street parking spaces including the access drive shall be surfaced with asphalt, concrete or the equivalent and shall be graded to prevent drainage problems. Adjacent to the equipment storage is a gravel parking lot for trucks and equipment of the farming operation or the airport. The main runway, taxi ways, and the cross wind runway are either asphalt or concrete. Residential Houses: House No. 1 accesses from the paved driveway with a secondary gravel access back to WCR 51. The distance between the two access points is approximately 100 feet. Road Access Policy: (Policy Established Sec. 8-2-10) Direct access from a public road will be limited to one (1) per legal parcel, except as further limited or restricted by zoning or subdivision regulations. Additional accesses may be approved by the Department of Public Works or the Board of County Commissioners. This policy shall apply to all new and existing accesses within the unincorporated areas of the County. Properties within municipalities or other counties which access County roads are subject to this policy. Justify in writing the need for a second access for a small parcel. House #2 has direct access to WCR 51 with a paved approach and adequate parking. 2009-2979 EXHIBIT • • • Access: The main access to the Land Airport has been paved. No. 1 and 2 both share this existing access point. The paved section leads to the office, hanger areas, equipment shed, and taxi ways. Utilize this main access for your farming operation and airport facility. Pursuant to Chapter 15, Articles I and II of the Weld County Code, if noxious weeds exist on the property or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds. All vegetation, other than grasses, needs to be maintained at a maximum height of 12 inches until the area is completely developed. Utilize the existing agricultural, oil and gas, and ditch roads that are necessary for your agricultural operation. Traffic Study: No traffic study will be required at this time. The applicant is indicating that during the weekends, the average vehicle traffic count is approximately 10 cars or light trucks per day with an additional four trips in and out by heavy trucks or farming equipment. There is also additional truck traffic during harvest season. Vehicle traffic related to the airport averages about four car trips per day. There are eight airplanes currently houses in the enclosed hangers. This number is expected to increase to 15 or more. Storm Drainage: The Weld County Public Works Department reviewed the submitted application for critical items, including but not limited to Site Plan, Traffic Study, Preliminary Drainage Report, Geotechnical Soils Report, and Flood Hazard Development Permit. Comments made during this stage of the review process will not be all inclusive, as revised materials are submitted other concerns or issues may arise. All issues of concern and critical issues during further review must be resolved with the Public Works Department. Preliminary Drainage Report: A preliminary drainage report was not required. However a water quality control feature is being required. The applicant submitted calculations indicating that a water quality control feature needed to be 0.0129 ac -ft in size. The applicant appears to have used a 12 -hour drain time for the calculations. Typically, the 40 -hour drain time should be utilized. Please resubmit the calculations using a 40 -hour drain time. The water quality feature needs to be placed in a drainage easement so that it is not removed with future site development activities. Please revise the map to show the water quality feature in a drainage easement. Please provide a metes and bounds description for the easement on the map. Please add a not to the map stating "Weld County is not responsible for the maintenance of drainage related features." Floodplain: The northern end of the property is located in the Jim Creek floodplain as mapped by FEMA. A note on the map indicates that all grading of the runways will be at grade. Future development of the site that occurs in the FEMA mapped floodplain will require a flood hazard development permit. pc: USR-1705 • • WE�Y COLORADO MEMORANDUM TO: Chris Gathman, Planning Services FROM: Lauren Light, Environmental Health SUBJECT:USR-1705 Land Airport LLC DATE: 9/28/2009 Environmental Health Services has reviewed this proposal for a private airport. Water for the house (6509 CR 51) and the office (6511 CR 51) is provided by a domestic well (permit 90875) which specifically states "This well is approved for domestic use, including drinking and sanitary facilities in an associated small office". Water for the house addressed as 6513 CR 51 is provided by a domestic well (permit 186153). Individual sewage disposal systems (ISDS) provide sewer provisions for the three structures. The residence located at 6509 CR 51 is served by ISDS permit G-19950066 and is sized for 4 people. The office located at 6511 CR 51 is served by ISDS permit SE -0400036 and is sized for one person. The residence located at 6513 CR 51 is served by ISDS permit SP -9900303 and is sized for 4 people. The application indicates there are 6 people who are associated with the airport. If the restroom facilities in the office or existing residences will be used for those people, the system must be evaluated by an engineer for the increased flow. Dust abatement and waste handling plans are required. In addition, all products must be stored in compliance with manufactures recommendations. We have no objections to the proposal; however, we do recommend that the following conditions be part of any approval: We recommend that the following requirements be met prior to allowing the plat to be recorded: 1. The applicant shall submit a dust abatement plan, for on site dust, for review and approval, to the Environmental Health Services, Weld County Department of Public Health & Environment. • • • • 2. In the event the applicant intends to utilize the existing septic system at the office or one of the existing residences, for the airport, the septic system shall be reviewed by a Colorado Registered Professional Engineer. The review shall consist of observation of the system and a technical review describing the systems ability to handle the proposed hydraulic load. The review shall be submitted to the Environmental Health Services Division of the Weld County Department of Public Health and Environment. In the event the system is found to be inadequately sized or constructed the system shall be brought into compliance with current Regulations. 3. The applicant shall submit a waste handling plan, for approval, to the Environmental Health Services Division of the Weld County Department of Public Health & Environment. The plan shall include at a minimum, the following: 1) A list of wastes which are expected to be generated on site (this should include expected volumes and types of waste generated). 2) A list of the type and volume of chemicals expected to be stored on site. 3) The waste handler and facility where the waste will be disposed (including the facility name, address, and phone number). We recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. 4. The applicant shall operate in accordance with the approved "waste handling plan", at all times. 5. Any airplane or equipment washing areas shall capture all effluent and prevent 2 • • • discharges in accordance with the Rules and Regulations of the Water Quality Control Commission, and the Environmental Protection Agency. 6. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be operated in accordance with the approved "dust abatement plan", at all times. 7. This facility shall adhere to the maximum permissible noise levels allowed in the Industrial Zone as delineated in Section 14-9-30 of the Weld County Code. 8. Sewage disposal for the facility shall be by septic system. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. 9. Adequate hand washing and toilet facilities shall be provided for employees and patrons of the facility, at all times. 10.A permanent, adequate water supply shall be provided for drinking and sanitary purposes. The facility shall utilize the existing commercial well. (Permit 90875) 11. The applicant shall comply with all provisions of the State Underground and Above Ground Storage Tank Regulations. 12.All potentially hazardous chemicals must be stored secure, on an impervious surface and handled in a safe manner in accordance with product labeling and in a method that minimizes the release of hazardous air pollutants (HAP's) and volatile organic compounds (VOC's). 13. If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. 14. This application is proposing a well as its source of water. The applicant should be made aware that while they may be able to obtain a well permit from the Office of the State Engineer, Division of Water Resources, the quantity of water available for usage may be limited to specific uses, i.e. domestic use only, etc. Also, the applicant should be made aware that groundwater may not meet all drinking water standards as defined by the Colorado Department of Public Health and Environment. We strongly encourage the applicant to test their drinking water prior to consumption and periodically test it over time. 15. The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. 3 COLORADO Weld County Referral June 23, 2009 The Weld County Department of Planning Services has received the following item for review: Applicant Please Reply By Project Legal Location Parcel Number Land Airport LLC Case Number USR-1705 (Lloyd Land) July 22, 2009 Planner Chris Gathman A Site Specific Development Plan and Use by Special Review Permit for an extension or expansion of a non -conforming use (private airstrip/airport) in the A (Agricultural) Zone District. Parcel 1-5, located in the E2 of Section 31, T2N, R64W of the 6th P.M., Weld County, Colorado. South of and adjacent to CR 16 and west of and adjacent to CR 51. 1305 31 000026, 1305 31 000027, 1305 31 000028, 1305 31 100032, & 1305 31 400035 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined. ❑ We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because ❑ We have reviewed the request and find no conflicts with our interests. See attached letter. Comments: Signature Agency Date a00y +Weld County Planning Dept. +918 10t Street, Greeley, CO. 80631 +(970) 353-6100 ext.3540 +(970) 304-6498 fax • ia Wilk COLORADO • • Robert Powell Plans Examiner II DEPARTMENT OF PLANNING SERVICES Weld County Administrative Offices 918 10th Street Greeley CO 80631 Phone (970) 353- 6100 Ext 3575 WEBSITE: www.co.weld.co.us Applicant: Land Airport LLC, (Lloyd Land) July 9, 2009 Case Number: USR-1705 Project: A Site Specific Development Plan and a Use by Special Review Permit for an extension or expansion of a non -conforming use (private airstrip/airport) in the A (Agricultural) Zone District. Legal: Parcels 1-5 located in the E2 of Section 31, T2N, R64W; of the 6th P.M., Weld County, Colorado. Location: South of and adjacent to CR 16 and west of and adjacent to CR 51. Parcel Numbers: 1305 31 000026, 1305 31 000027, 1305 31 000028, 1305 31 100032, and 1305 31 400035 There are numerous permits on record for these parcels. Prior to the start of any construction, alterations, or change of occupancy; 1 A building permit application must be completed and two complete sets of plans including engineered foundation plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A geotechnical engineering report preformed by a registered State of Colorado engineer shall be required. 2 A plan review shall be approved and a permit must be issued prior to the start of construction. 3 Setback and offset distances shall be determined by the 2006 International Building Code (Offset and setback distances are measured from the farthest projection from the structure). 4 Buildings located within a 100 year flood plain require a Flood Hazard Development Plan. 5 A letter is required from the Fire District to ascertain if a FPD permit is required. Service, Teamwork, Integrity, Quality • iazt, 11111Dc. COLORADO • Weld County Referral July 22, 2009 The Weld County Department of Planning Services has received the following item for review: Applicant Land Airport LLC Case Number USR-1705 (Lloyd Land) Please Reply By July 22, 2009 Planner Chris Gathman Project A Site Specific Development Plan and Use by Special Review Permit for an extension or expansion of a non -conforming use (private airstrip/airport) in the A (Agricultural) Zone District. Legal Parcel 1-5, located in the E2 of Section 31, T2N, R64W of the 6th P.M., Weld County, Colorado. Location South of and adjacent to CR 16 and west of and adjacent to CR 51. Parcel Number 1305 31 000026, 1305 31 000027, 1305 31 000028, &1305 31 100032 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined. ❑ We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because X We have reviewed the request and find no conflicts with our interests. ❑ See attached letter.• (? Comments: Up -n rC ACLU (}5 I cu «2C, G tai off -opt pt I t / rn P (�� i vE vi t51n , trn WOK__ __ reM c9 . Signature Agency Date ,- eR +Weld County Planning Dept. +918 10th Street, Greeley, CO. 80631 O(970) 353-6100 ext.3540 O(970) 304-6498 fax Fax sent by : 13035364753 TOWN OF HUDSON 07-09-09 00:30 Pg 1/1 • a:zri W�iPC COLORADO • • Weld County Referral July 1, 2009 The Weld County Department of Planning Services has received the following item for review: Applicant Please Reply Ry Project Legal Location Parcel Number Land Airport LLC (Lloyd Land) July 22, 2009 Case Number USR-1705 Planner Chris Gathman A Site Specific Development Plan and Use by Special Review Permit for an extension or expansion of a non -conforming use (private airstrip/airport) In the A (Agricultural) Zone District. Parcel 1-5, located in the E2 of Section 31, T2N, R64W of the 5th P.M., Weld County, Colorado. South of and adjacent to CR 16 and west of and adjacent to CR 51. 1305 31 000026. 1305 31 000027, 1305 31 000028, &1305 31 100032 The application iS submitted to you for review and recommendation. My comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. My response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined- ❑ We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because we have reviewed the request and find no conflicts with our interests. O See attached letter. Comments: Act/ .44 04.../eortifil TV tic Pectin USie. iF 77/6" V DyiisziePs 1 We innnc e /.1KF 7U nisrUss Adele Signature Agency Date 7_1, O *Weld County Planning Dept. 091810"' Sweet, Greeley, CO. 80631 0(970) 353-6100 ext.3540 0(970) 304-6498 fax Kim, this is in regard to a Notice received from your office regarding Parcel # 13... Page 1 of 1 Kim Ogle From: Joe Racine [manager@hudsoncolorado.org] Sent: Wednesday, March 11, 2009 3:10 PM To: Kim Ogle Cc: land391957@aol.com Subject: Notice of Inquiry, proposed Use by Special Review Kim, this is in regard to a Notice received from your office regarding Parcel # 130531000027, owned by Mr. Lloyd Land, Ale Partnership. On October 8, 2008, the Hudson Planning Commission considered the matter and asked that I advise you that we do not have an immediate interest in pursuing annexation of this property. We have no objection to the USR proposal. However, in the future if Mr. Land develops the site further we would again like to consider annexation. I cannot find our record of responding to the Notice last October. I apologize for the confusion. Please call if you require additional documentation from the Town. Joe Racine Town Administrator Town of Hudson (303) 536-9311 3/12/2009 Jun 23 09 09:30a Vicki 3035360162 p.1 • hiDeCOL • • Weld County Referral June 23, 2009 The Weld County Department of Planning Services has received the following item for review: Applicant Land Airport LLC Case Number USR-1705 (Lloyd Land) Please Reply By July 22, 2009 Planner Chris Gathman .Project A Site Specific Development Plan and Use by Special Review Permit for an extension or expansion of a non -conforming use (private airstrip/airport) in the A (Agricultural) Zone District. Legal Parcel 1-5, located in the E2 of Section 31, T2N, R64W of the 6th P.M., Weld County, Colorado. Location ,Pamel Number South of and adjacent to CR 16 and west of and adjacent to CR 51. 1305 31 000026, 1305 31 000027, 1305 31 000028, &1305 31 100032 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please calf the Planner associated with the request Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined. ❑ We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because ❑ We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Cnmmantc•Ic train any plan to add morn hanrjarc nn tha aiba, le Mama any plans in and fueling arna9 rnr the planes. What is going to be the largest aircraft on the site. Are there going to be added run ways. Is Mere currently any water supply for fire on me sere. Wnar are me access roans Mr -ft equipment entering the site. What rs the current supply of fuel on the site what are the intentions of adding more fuel and how much. J Blackston Signature 09 Date Jun 23 09 09:30a Vicki 1 3035360162 p.2 • • • Agency Hudson Fire Protection District weld County Planning DepL 0918 10th Street, Greeley, CO. 80631 0(970) 353-6100 e43540 0(970) 3046498 fax Weld County Planning Department GREELEY OFFICE I! IN 29 7R(iq DEPARTMENT OF NATURAL RESOURCES RECEIVED DIVISION OF WATER RESOURCES June 25, 2009 Mr. Chris Gathman Weld County Planning Department 918 10th Street Greeley, Co 80631 Bill Ritter, Jr. Governor Harris D. Sherman Executive Director Dick Wolfe, P.E. Director Re: Land Airport, LLC-A Site Specific Development Plan and Use by Special Review Permit for an extension or expansion of non -conforming use (private airstrip/airport) in the A (Agricultural) Zone District Case No. USR-1705 E1/2 Sec. 31, T2N, R64W, 6th P.M. Water Division 1, Water District 2 Dear Mr. Gathman: We have reviewed the above referenced proposal for an extension or expansion of the non- conforming use (private strip/airport) for the property located in the E 1/2 of Section 31, Township 2 North, Range 64 West of the 6th P.M. Since the submitted material does not appear to qualify as a "subdivision" as defined in §30-28- 101(10)(a), C.R.S., pursuant to the State Engineer's March 4, 2005 memorandum to county planning directors, this office will only perform a cursory review of the referral information and provide comments. The comments will not address the adequacy of the water supply plan for this development or the ability of the water supply plan to satisfy any County regulations or requirements. In addition, the comments provided herein cannot be used to guarantee a viable water supply plan or infrastructure, the issuance of a well permit, or the physical availability of water. According to the submitted information, there are two existing wells that supply water to the property. The wells were identified as permit nos. 90875 and 186153. Well permit no. 90875 is being used for an office at 6511 WCR 51 and the south house at 6509 WCR 51. Well permit no. 186153 is used to supply the north house at 6513 WCR 51. Well permit no. 90875 is permitted for a pumping rate of 15 GPM, annual withdrawal of 5 acre-feet and use of domestic including drinking and sanitary facilities in an associated small office and 1/4 acres of lawn irrigation. Well permit no. 90875 was permitted for the nontributary Laramie -Fox Hills aquifer and the well was constructed on July 28, 1977. Note that the status of well permit no. 90875 as currently permitted is as exempt commercial well. For your information, pursuant to Section 37-92-602, C.R.S., permits for commercial exempt wells are available for small businesses that either are on lots that were created prior to June 1, 1972 or by exemption to the subdivision regulations or are on tracts of land of 35 -acres or more where the proposed well will be the only exempt well on that tract and the only well servicing that business. The use of the ground water from this type of well is limited to drinking and sanitary facilities inside a commercial business. Water from this type of well shall not be used for lawn or landscape irrigation or for any other purposes outside the business building structure. Commercial uses that would not qualify under the exempt statutory provision are motels, kennels, horse -boarding operations, feedlots and business with outside uses. Since, well permit no. 90875 also allowed for 1/4 -acre of lawn irrigation, this well does not qualify under the commercial exempt statutory provision therefore the applicant needs to apply to the State Engineer's Office to change the status of this permit from commercial exempt to commercial non-exempt, by submitting the General Purpose application Office of the State Engineer 1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303-866-3581 • Fax: 303-866-3589 www.water.state.co.us • • • Weld County Planning Department Land Airport, LLC USR-1705 June 25, 2009 Page 2 (form GWS-45), Non -tributary Ground Water Landownership Statement (form GWS-1) and the Non -tributary Landownership of Consent Verification Notice (form GWS 43) with the appropriate fee of $100. The permit application forms may be downloaded from the Division of Water Resources web site at: www.water.state.co.us. As an option, if well permit no. 90875 is used solely for drinking and sanitary purposes and the well is not, and will not, be used for irrigation proposes the applicant can request to have the irrigation use removed from the existing permit. If the irrigation use is removed then the well would qualify as commercial exempt and this office would have no objection to the use of well permit no. 90875 to supply water to the office at 6511 WCR 51 and the south house at 6509 WCR51. Well permit no. 186153 is permitted for a pumping rate of 15 GPM, annual withdrawal of 0.55 acre- feet and use for ordinary household purposes inside one single-family dwelling, the watering of not more than four (4) large non-commercial domestic animals and the irrigation of not more than 4,000 square -feet of home gardens and lawns. Well permit no. 186153 was permitted for the non tributary Laramie -Fox Hills aquifer and the well was constructed on October 9, 1995. This office has no objection to use well permit no. 186153 to supply the north house at 6513 WCR 51, as long as the well is being used within the conditions of approval of the well permit. If you have any questions in this matter, please contact loana Comaniciu of this office. Sincerely, Cc: Jim Hall, Division Engineer Scott Edgar, Water Commissioner, Water District 2 JMW/IDC/Land Airport Special Use (Weld) Williams, P.E. Resource Engineer Hello