Loading...
HomeMy WebLinkAbout20093527.tiffFIELD CHECK CASE NUMBER: AmUSR-625 DATE OF INSPECTION: q 0 APPLICANT'S NAME: AKA Energy Group, LLC PLANNER: Chris Gathman REQUEST: A Site Specific Development Plan and an Amended Use by Special Review Permit for oil and gas support and service (natural gas processing facility amended to include an additional compressor and storage areas) in the A (Agricultural) Zone District. LEGAL DESCRIPTION: Part SW4NW4 of Section 27, T5N, R64W of the 6th P.M., Weld County, Colorado. LOCATION: East of and adjacent to CR 55 and approximately 1/4 mile south of CR 54. LAND USE: N-Pasfure. E S ?i}u.rt W ?a s}wrQ— ZONING: N A (Agricultural) E A (Agricultural) S A (Agricultural) W A (Agricultural) COMMENTS: lone) nR pi or Cl.Dai Ate J- .50 eVISI:r/4 c+fluduref and c ) cue SY- i O Aai v I A' re -tic 17 '- Jn ;/c 4Dwf (-lie, / -I4,I re ate n0 Coin r'rrn f t..> ,Pl 4/ arn°c 0.11P le I Ci Ma il#. eit1/ b CRH74 1400 -ever 411 ILO Wr;n;tn;7e any nu is on err 11314, souni eft CR c - c- hat is; Irrt/6kr/ f'S- P.C. ber aoo' - 3 sa7 -j [_af_Dug Wilk COLORADO April 8, 2009 Steve Szabo Gilcrest System Manager AKA Energy Group, LLC 13472 County Road 40 Platteville, CO 80651 Dear Mr. Szabo, DEPARTMENT OF PLANNING SERVICES 918 10th St. GREELEY, COLORADO 80631 WEBSITE: www.co.weld.co.us E-MAIL: cgathman @co.weld.co.us PHONE (970) 353-6100, EXT. 3540 FAX (970) 304-6498 The Department of Planning Services met with you on March 27, 2009 re: the installation of a compressor and metal framed portable building (covering the compressor) at the Kersey Compressor Station Facility (USR-625). At that meeting you had indicated that the compressor was temporary and would remain on site for 6 -months or less. The Department of Planning Services has determined that this would not be a substantial change to the existing facility and an Amended Use by Special Review Permit would not be required. Sincerely, Chris Gathman Planner III 'ooq 35Q7 191.o5-10 f� By signing this letter you acknowledge that the compressor will remain on site for 6 months or less and if the compressor remains for longer than B months on the site an Amended Use by Special Review application will be required. / Steve Szabo, AKA Energy Hello