HomeMy WebLinkAbout20093527.tiffFIELD CHECK
CASE NUMBER: AmUSR-625 DATE OF INSPECTION:
q 0
APPLICANT'S NAME: AKA Energy Group, LLC
PLANNER: Chris Gathman
REQUEST: A Site Specific Development Plan and an Amended Use by Special Review Permit for oil
and gas support and service (natural gas processing facility amended to include an
additional compressor and storage areas) in the A (Agricultural) Zone District.
LEGAL DESCRIPTION: Part SW4NW4 of Section 27, T5N, R64W of the 6th P.M., Weld County,
Colorado.
LOCATION: East of and adjacent to CR 55 and approximately 1/4 mile south of CR 54.
LAND USE:
N-Pasfure.
E
S ?i}u.rt
W ?a s}wrQ—
ZONING: N A (Agricultural)
E A (Agricultural)
S A (Agricultural)
W A (Agricultural)
COMMENTS:
lone)
nR pi or
Cl.Dai
Ate J-
.50 eVISI:r/4 c+fluduref and c ) cue SY- i O Aai v I
A'
re -tic 17 '- Jn ;/c 4Dwf (-lie, / -I4,I re ate n0
Coin r'rrn f t..> ,Pl 4/ arn°c 0.11P le I Ci Ma il#. eit1/ b CRH74
1400 -ever 411 ILO Wr;n;tn;7e any nu is on err
11314, souni eft CR c - c-
hat is; Irrt/6kr/
f'S-
P.C. ber
aoo' - 3 sa7
-j [_af_Dug
Wilk
COLORADO
April 8, 2009
Steve Szabo
Gilcrest System Manager
AKA Energy Group, LLC
13472 County Road 40
Platteville, CO 80651
Dear Mr. Szabo,
DEPARTMENT OF PLANNING SERVICES
918 10th St.
GREELEY, COLORADO 80631
WEBSITE: www.co.weld.co.us
E-MAIL: cgathman @co.weld.co.us
PHONE (970) 353-6100, EXT. 3540
FAX (970) 304-6498
The Department of Planning Services met with you on March 27, 2009 re: the installation of a compressor
and metal framed portable building (covering the compressor) at the Kersey Compressor Station Facility
(USR-625). At that meeting you had indicated that the compressor was temporary and would remain on
site for 6 -months or less. The Department of Planning Services has determined that this would not be a
substantial change to the existing facility and an Amended Use by Special Review Permit would not be
required.
Sincerely,
Chris Gathman
Planner III
'ooq 35Q7
191.o5-10 f�
By signing this letter you acknowledge that the compressor will remain on site for 6 months or less and if
the compressor remains for longer than B months on the site an Amended Use by Special Review
application will be required.
/
Steve Szabo, AKA Energy