Loading...
HomeMy WebLinkAbout20092768.tiff• • • BEFORE THE WELD COUNTY, COLORADO, PLANNING COMMISSION RESOLUTION OF RECOMMENDATION TO THE BOARD OF COUNTY COMMISSIONERS Moved by Roy Spitzer, that the following resolution be introduced for passage by the Weld County Planning Commission. Be it resolved by the Weld County Planning Commission that the application for: CASE NUMBER: USR-1712 APPLICANT: Petro -Canada Resources (USA) Inc. PLANNER: Kim Ogle REQUEST: A Site Specific Development Plan and Use by Special Review Permit for a Mineral Resource Development Facility including Oil and Gas Support and Services (equipment storage) in the A (Agricultural) Zone District. LEGAL DESCRIPTION: NW4NE4/E2NE4/SE4 of Section 5, T8N, R58W of the 6th P.M., Weld County, Colorado. LOCATION: North of and adjacent to CR 96 and approximately 1 3/4 miles west of CR 127.5. be recommended favorably to the Board of County Commissioners for the following reasons: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. It is the opinion of the Planning Commission that the applicant has shown compliance with Section 23-2-220 of the Weld County Code as follows: A. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other applicable code provisions or ordinance in effect. Section 22-5-100.A.2 (OG.Policy 1.2) states, "Oil and gas support facilities which do not rely on geology for locations should locate in commercial and industrial areas, when possible ... " The request is for a Site Specific Development Plan and a Special Review Permit for a Mineral Resource Development Facility including an obsolete equipment storage area (boneyard) in the Agricultural zone district. This existing equipment storage area (boneyard) was obtained by Petro -Canada in December 2008 from Walsh Production, Inc. The existing facility is utilized for the storage of old equipment related to the oilfield. The boneyard is utilized to maintain, repair, store and replace oil and gas related equipment such as separators, tanks, pipe, pumping units, et cetera. B. Section 23-2-220.A.2 -- The proposed use is consistent with the intent of the A (Agricultural) Zone District. Section 23-3-40.A.2 of the Weld County Code provides for Oil and Gas Support and Service as a Use by Special Review in the A (Agricultural) Zone District, more specifically described as a Site Specific Development Plan and a Special Review Permit for a Mineral Resource Development Facility for Oil and Gas Support and Service, including an obsolete equipment storage area (boneyard). C. Section 23-2-220.A.3 -- The uses which will be permitted will be compatible with the existing surrounding land uses. The facility is on a two -acre parcel utilized as a boneyard. The property is fenced with three strand barb wire on wood posts. Adjoining lands to the existing facility are used for grazing, limited agricultural development and oil and gas production, including the Lilli Gas Plat to the east (AmUSR-861). Aside from Bringleson Ranches, LLC there is one property owner within five hundred feet of this application, with the nearest residence located 4 miles south of the facility. Staff has received no correspondence (electronic and/ or letters), telephone inquiries or inspection of the case file by interested parties. D. Section 23-2-220.A.4 -- The uses which will be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected by Chapter 22 of the Weld County Code and any other applicable code provisions or ordinances in effect, or the adopted Master Plans of affected municipalities. The existing facility is not within the three mile referral area for a municipality. The Town of New Raymer is approximately 5 miles to the northwest. The facility is remote in location with limited access. 2009-2768 • • • Resolution USR-1712 Petro -Canada Resources (USA) Inc. Page 2 E. Section 23-2-220.A.5 -- The application complies with Section 23-5 of the Weld County Code. Effective January 1, 2003, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County Road Impact Program. (Ordinance 2002-11) Effective August 1, 2005, Building permits issued on the subject site will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/ Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40) F. Section 23-2-220.A.6 -- The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use. This facility is sited on a 2 acre site within a 308 acre parcel on lands utilized by Walsh Production, Inc. The site continues to be utilized as a Petro -Canada obsolete equipment storage area (boneyard). G. Section 23-2-220.A.7 -- The Design Standards (Section 23-2-240, Weld County Code), Operation Standards (Section 23-2-250, Weld County Code), Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Planning Commission recommendation for approval is conditional upon the following: 1. Prior to recording the plat: A. The plat shall be amended to delineate the following: 1) All sheets of the plat shall be labeled USR-1712. (Department of Planning Services) 2) The plat shall be prepared per Section 23-2-260.D of the Weld County Code. (Department of Planning Services) 3) The attached Development Standards. (Department of Planning Services) 4) County Road 125 is a Section Line Access which has 30 -feet of right-of-way west side of section line. All setbacks shall be measured from the edge of future right-of-way. If the right- of-way cannot be verified, it shall be dedicated. This road is not maintained by Weld County. (Department of Public Works) 5) County Road 96 is a Section Line Access which has 30 -feet of right-of-way north side of section line. All setbacks shall be measured from the edge of future right-of-way. If the right- of-way cannot be verified, it shall be dedicated. This road is not maintained by Weld County. (Department of Public Works) 6) The water quality feature in the drainage easement must be delineated. The water quality feature must be labeled on the plat as "Water Quality Feature — No Build/ or Storage Area". (Department of Public Works) 7) The screened trash enclosure for the facility. (Department of Planning Services) • • • Resolution USR-1712 Petro -Canada Resources (USA) Inc. Page 3 8) A graphic key and or symbol serving to identify each component that is located within the USR Boundary. The key and corresponding component shall be summarized in tabular format and be clearly delineated on the plat. (Department of Planning Services) 9) The applicant shall delineate contours for the site and 200 feet offsite with a minimum of 2 - foot contour intervals. (Department of Public Works) 10) The existing buildings and storage areas need to be shown on the plat. The proposed storage areas also need to be shown on the plat. (Department of Public Works) 11) The water quality feature is shown outside the USR boundary. The water quality feature needs to be located within the USR boundary. The water quality feature needs to be located such that it captures all the runoff from the site. (Department of Public Works) 12) The water quality feature must be labeled as "Water Quality Feature — No build/storage area". (Department of Public Works) 13) A legend needs to be added to the plat identifying all symbols that are used. (Department of Public Works) 14) The distance to the section line and section corner needs to be identified for the access point. (Department of Public Works) B. The applicant shall submit a dust abatement plan, on site dust, for review and approval, to the Environmental Health Services, Weld County Department of Public Health & Environment. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Public Health and Environment) C. In the event washing of vehicles or equipment will occur on site the applicant shall ensure that any washing area shall capture all effluent and prevent discharges from the washing of vehicles in accordance with the Rules and Regulations of the Water Quality Control Commission, and the Environmental Protection Agency. Vehicle or equipment washing areas should be designated on the plat. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Public Health and Environment) D. The applicant shall submit a waste handling plan, for approval, to the Environmental Health Services Division of the Weld County Department of Public Health & Environment. The plan shall include at a minimum, the following: 1) A list of wastes which are expected to be generated on site (this should include expected volumes and types of waste generated). 2) A list of the type and volume of chemicals expected to be stored on site. 3) The waste handler and facility where the waste will be disposed (including the facility name, address, and phone number). Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Public Health and Environment) E. The applicant shall submit a noxious weed and re -vegetation management plan for all areas where there will be ground disturbances due to construction activities for review and approval by the Departments of Public Works and Planning Services. (Colorado Division of Wildlife) • • Resolution USR-1712 Petro -Canada Resources (USA) Inc. Page 4 F. The applicant shall submit two (2) paper copies of the plat for preliminary approval to the Weld County Department of Planning Services. (Department of Planning Services) 2. Upon completion of 1. above the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The Mylar plat and additional requirements shall be submitted within sixty (60) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 3. The Department of Planning Services respectively requests the surveyor provide a digital copy of this Fourth Amended Use by Special Review. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are ArcView shapefiles, Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif (Group 4). (Group 6 is not acceptable). This digital file may be sent to dhuerter(a)co.weld.co.us. (Department of Planning Services) 4. In accordance with Weld County Code Ordinance 2005-7 approved June 1, 2005, should the plat not be recorded within the required thirty (30) days from the date of the Board of County Commissioners resolution a $50.00 recording continuance charge shall be added for each additional 3 month period. (Department of Planning Services) 5. The Special Review activity shall not occur nor shall any building or electrical permits be issued on the property until the Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder. (Department of Planning Services) Motion seconded by Erich Ehrlich. VOTE: For Passage Robert Grand Bill Hall Tom Holton Alexander Zauder Erich Ehrlich Roy Spitzer Mark Lawley Nick Berryman Jason Maxey Against Passage Absent The Chair declared the resolution passed and ordered that a certified copy be forwarded with the file of this case to the Board of County Commissioner's for further proceedings. CERTIFICATION OF COPY I, Kristine Ranslem, Recording Secretary for the Weld County Planning Commission, do hereby certify that the above and foregoing resolution is a true copy of the resolution of the Planning Commission of Weld County, Colorado, adopted on October 6, 2009. q ted the 6'" of O ober, 2009. Kristine a�m Secretary • • SITE SPECIFIC DEVELOPMENT PLAN AMENDED SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS Petro -Canada Resources, Inc. — Boneyard USR-1712 1. The Site Specific Development Plan and an Amended Special Review Permit for a Mineral Resource Development Facility for Oil and Gas Support and Service, an obsolete equipment storage area (boneyard) in the A (Agricultural) Zone District, and subject to the Development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) 4. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. (Department of Public Health and Environment) 5. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. (Department of Public Health and Environment) 6. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be operated in accordance with the approved "dust abatement plan" at all times. (Department of Public Health and Environment) 7. The facility shall adhere to the maximum permissible noise levels allowed in the (Industrial) Zone District as delineated in Section 14-9-30 of the Weld County Code. (Department of Public Health and Environment) 8. Adequate drinking, handwashing and toilet facilities shall be provided for personnel utilizing the facility. The sanitary facilities located at the Lilli gas plant (AmUSR-861) shall be available for use. (Department of Public Health and Environment) 9. The applicant shall operate in accordance with the approved "waste handling plan" at all times. (Department of Public Health and Environment) 10. Any vehicle or equipment washing area shall capture all effluent and prevent discharges from the washing of vehicles or equipment in accordance with the Rules and Regulations of the Water Quality Control Commission, and the Environmental Protection Agency. (Department of Public Health and Environment) 11. If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. (Department of Public Health and Environment) 12. The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. (Department of Public Health and Environment) • 13. A plan review is required for each building for which a building permit is required. Two complete sets of plans are required when applying for each permit. Include a Code Analysis Data sheet provided by the Weld County Building Department with each Building permits Submittal plans shall include a floor • s Resolution USR-1712 Petro -Canada Resources (USA) Inc. Page 6 plan showing the specific uses of each area for the building. The Occupancy Classification will be determined by Chapter 3 of the 2006 International Building Code. The plans shall also include the design for fire separation and occupancy separation walls, when required by Chapter 5 and 7 of the 2006 International Building Code. Fire Protection shall conform to Chapter 9 and exiting requirements by Chapter 10. (Department of Planning Services) 14. A plan review shall be approved and a permit must be issued prior to the start of construction. (Department of Planning Services) 15. Buildings shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2006 International Building Code; 2006 International Mechanical Code; 2006 International Plumbing Code; 2006 International Fuel Gas Code; and the 2008 National Electrical Code and Chapter 29 of the Weld County Code. (Department of Planning Services) 16. All building plans shall be submitted to the New Raymer Fire Protection District for review and approval prior to issue of Building Permits. (Department of Planning Services) 17. Setback and offset distance shall be determined by the Weld County Code. (Department of Building Inspection) 18. Effective January 1, 2003, Building Permits issued on the lot will be required to adhere to the fee structure of the County Road Impact Fee Program. (Department of Planning Services) 19. Effective August 1, 2005, Building permits issued on the subject site will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40) 20. The property owner or operator shall be responsible for complying with the Design Standards of Section 23-2-240, Weld County Code. (Department of Planning Services) 21. The property owner or operator shall be responsible for complying with the Operation Standards of Section 23-2-250, Weld County Code. (Department of Planning Services) 22. Personnel from Weld County Government shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) 23. The Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. (Department of Planning Services) 24. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. (Department of Planning Services) 25. The applicant is required to comply with all Colorado Oil and Gas Conservation Commission (COGCC) rules and regulations including drill pad construction, storm water controls, and reclamation. (Department of Planning Services) • • • Resolution USR-1712 Petro -Canada Resources (USA) Inc. Page 7 26. Contact the Utility Coordinator for Weld County Public Works, for a Right -of -Way permit for any work that may be required in the right-of-way on County Road 127.5, County Road 125 and County Road 96. A special transport permit will be required for any oversized or overweight vehicles that may access the site. (Department of Public Works) 27. County Road 96 is a Section Line Access. A blue and white sign identifying section line access and non -county maintenance has been installed at the intersection of County Road 96 section line and County Road 127.5. This sign will provide identification for location of the Lilli Gas Plant for emergency access such as fire and EMT responders. This sign shall be maintained by Petro -Canada. (Department of Planning Services) 28. The facility shall maintain compliance with the approved noxious weed and re -vegetation management plan for all areas associated with the equipment storage facility. (Department of Public Works, Department of Planning Services) 10 (a 0`! • • • LOCATION: North of and adjacent to CR 96 and approximately 1 'A miles west of CR 127.5. Kim Ogle, Planning Services, stated that the applicant requested that this case remain on the consent agenda. The Chair asked if there was anyone in the audience who wished to speak for or against this application. No one wished to speak. CASE NUMBER: USR-1712 APPLICANT: Petro -Canada Resources (USA) Inc. PLANNER: Kim Ogle REQUEST: A Site Specific Development Plan and Use by Special Review Permit for a Mineral Resource Development Facility including Oil and Gas Support and Services (equipment storage) in the A (Agricultural) Zone District. LEGAL DESCRIPTION: NW4NE4/E2NE4/SE4 of Section 5, T8N, R58W of the 6th P.M., Weld County, Colorado. LOCATION: North of and adjacent to CR 96 and approximately 1 3/4 miles west of CR 127.5. Kim Ogle, Planning Services, stated that the applicant requested that this case remain on the consent agenda. The Chair asked if there was anyone in the audience who wished to speak for or against this application. No one wished to speak. CASE NUMBER: USR-1711 APPLICANT: Tri-State Generation & Transmission Association, Inc PLANNER: Chris Gathman REQUEST: A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a Public Utility (a double -circuit 230-KV Transmission Line extending .55 miles) in the A (Agricultural) Zone District. LEGAL DESCRIPTION: NE4 and NE4SE4 of Section 27, Ti N, R66W of the 6th P.M., Weld County, Colorado. LOCATION: Approximately 1/4 mile North of CR 4 and approximately 1 mile (5,000 feet) East of CR 31. Chris Gathman, Planning Services, stated that staff would like for this case to remain on the consent agenda. The Chair asked if the applicant is available and if they wish for this item to remain on the consent agenda. The applicant replied yes. The Chair asked if there was anyone in the audience who wished to speak for or against this application. No one wished to speak. CASE NUMBER: USR-1710 APPLICANT: Tanner & Sarah Hill PLANNER: Kim Ogle REQUEST: A Site Specific Development Plan and Use by Special Review Permit for a Kennel (up to 39 dogs of a non-specific breed to include doggie daycare and boarding) in the A (Agricultural) Zone District. LEGAL DESCRIPTION: Lot A RE -1593 located in Part of the SW4 of Section 5, Ti N, R68W of the 6th P.M., Weld County, Colorado. LOCATION: Approximately 3/4 miles south of State Hwy 52 and east of and adjacent to CR 3. Kim Ogle, Planning Services, stated that the applicant, Tanner Hill, wishes for this case to remain on the consent agenda. The Chair asked if there was anyone in the audience who wished to speak for or against this application. No one wished to speak. • • • Roy Spitzer moved that Cases USR-1707, AmUSR-861, USR-1712, USR-1711, and USR-1710, be forwarded to the Board of County Commissioners along with the Conditions of Approval and Development Standards with the Planning Commission's recommendation of approval, seconded by Erich Ehrlich. Motion carried unanimously. The Chair read the following case into record. CASE NUMBER: USR-1709 APPLICANT: Suncor Energy Inc PLANNER: Chris Gathman REQUEST: A Site Specific Development Plan and Use by Special Review Permit for an Oil and Gas Support Facility (Crude Oil Truck Unloading Facility) in the A (Agricultural) Zone District. LEGAL DESCRIPTION: Lot A of AmRE-2918 being Part of the NW4 of Section 20, T2N, R66W of the 6th P.M., Weld County, Colorado. LOCATION: South of and adjacent to CR 20 and East of State Hwy 85. Lauren Light, Environmental Health, stated that previously to working with Weld County she worked at Tetra Tech and had worked on the Suncor project. She said that she has no ties to that project now. The Chair asked the applicant if they have any concerns with Ms. Light reviewing this case. The applicant indicated that they had no concerns. Chris Gathman, Planning Services, stated that the injection well facility will encompass approximately 6 acres of the 37.3 acre property it is located on and will be located at the eastern end of the site adjacent to existing oil and gas tank batteries. The site is located to the east of three existing commercial/industrial/oil and gas use by special review permits. SUP -359 (pump station facility) is located approximately 1,000 feet to the west of the site, USR-1459 (vehicle sales and detailing) and USR-1227 (manufacturing facility) along with the Union Pacific Railroad are located approximately 1,500 to 1,800 feet to the west of the site. An existing single-family residence is located approximately 900 -feet to the west of the proposed site (across County Road 20). The proposed main access to the facility will be located approximately 850 feet from the access to this single-family residence. Agricultural land is located immediately to the north, south and east of the site. No phone calls or letters have been received from surrounding property owners. However, there was a property owner who came in earlier today with questions of hauling and asked if there would be any trucks that would be coming from the east on County Road 20 versus coming from the west from Highway 85. Fourteen Referrals were sent out and six referrals and comments were received in regards to this case. Referral responses were not received from: State of Colorado, Oil & Gas Conservation Commission Weld County Code Compliance Weld County Sheriffs Office State of Colorado, Division of Wildlife Weld County Ambulance Services Platte Valley Fire Protection District Union Pacific Railroad Platteville Ditch There are several Conditions of Approval and Development Standards attached to the staff report attempting to address and mitigate concerns: • A screening plan will need to be submitted and approved by the Department of Planning Services prior to recording the plat. 4 Hello