Loading...
HomeMy WebLinkAbout20091345.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 1 BETWEEN COUNTY ROAD 20.5 (PIKE) AND STATE HIGHWAY 119 FOR FOURTEEN WEEKS, AT THE REQUEST OF THE CITY OF LONGMONT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close to through traffic and to regulate, warn and guide vehicular traffic on said County roads by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 1, between County Roads 20.5 (Pike) and State Highway 119, be temporarily closed, with said closure being effective June 23, 2009, for approximately fourteen weeks, at the request of the City of Longmont, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. 2009-1345 EG0024 e'/A7A' ROAD CLOSURE - CR 1 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 15th day of June, A.D., 2009. BOARD OF COY COMMISSIONERS WELD,COUt9'OLORADO Iliam F. Garcia, Chair Weld County Clerk to the ounty Attorney Date of signature 2009-1345 EG0024 a "De. COLORADO MEMORANDUM TO: Clerk to the Board DATE: June 5, 2009 FROM: Janet Carter E.I., Public Works SUBJECT: Road Construction WCR 13 between WCR 20.5 & SH 119 The City of Longmont is requesting permission to detour traffic off of WCR 13 between WCR 20.5 (Pike) and SH 119 to a bypass road maintained by the City of Longmont. This detour will occur from June 23 - October 2. The bypass road will be paved, so not dust control will be required. Standard road signs and barricades will be used during the detour. The ADT for WCR 13 is 4203. Page - 1 - of 1 C:\Documents and Settings\jvanegdom\Local Settings Temporary Internet Files \OLK164\Detour St Vrain Greenway.DOC June 5, 2009 2009-1345 www.invarion.com Date: 4/23/2009 Author: Heather J. Pifer ATSSA Certified Project: St. Vrain Greenway Phase 7b & 8 Golden Triangle (303) 772 - 4051 Hugh Sigler (720) 323 - 5484 Your Way Safety & Sign Supply 970 - 263 - 4520 Comments: This Traffic Control Plan shows a Truck Route Detour. This Detour will be marked with Detour Advisories. This Plan can be used TCP# 1, 2, 3 & 5. All signing will be in accordance with MUTCD Standards. Field adjustment may be necessary. This Plan is not to Scale. A TCP 4 TRUCK ROUTE PROJECT: ST. VRAIN www.invarion.com Date: 4/23/2009 Author: Heather J. Pifer ATSSA Certified Project: St. Vrain Greenway Phase 7B & 8 Golden Triangle (3030) 772 - 4051 Hugh Sigler (720) 323 - 5484 Your Way Safety & Sign Supply 970 - 263 - 4520 Comments: This Traffic Control Plan shows a Truck Route Detour. This Detour will be marked with Detour Advisories. This Plan can be used in conjunction with TCP # 1, 2, 3 & 4. All signing will be in accordance with MUTCD Standards. Field adjustment may be necessary. This Plan is not to Scale. A PHASE 2 TCP 5 DETOUR E. COUNTY LINE RD. QUICKSILVER RD. PROJECT: ST. VRAIN III Water Mod Banter O 0 Bartels I Concrete Barrier SPEED LIMIT 25 [}] Hello