HomeMy WebLinkAbout20091345.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 1 BETWEEN COUNTY ROAD 20.5 (PIKE) AND STATE
HIGHWAY 119 FOR FOURTEEN WEEKS, AT THE REQUEST OF THE CITY OF
LONGMONT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion thereof
for a period not to exceed a specified number of work days for
project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
to through traffic and to regulate, warn and guide vehicular traffic on said County roads by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads
and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control
devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the
safety of the general public and that said traffic control devices shall conform to the Federal Manual
on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 1, between County Roads 20.5 (Pike) and
State Highway 119, be temporarily closed, with said closure being effective June 23, 2009, for
approximately fourteen weeks, at the request of the City of Longmont, and further, that standard
official traffic control devices shall be erected at said closure giving notice of the restrictions.
2009-1345
EG0024
e'/A7A'
ROAD CLOSURE - CR 1
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted by
the following vote on the 15th day of June, A.D., 2009.
BOARD OF COY COMMISSIONERS
WELD,COUt9'OLORADO
Iliam F. Garcia, Chair
Weld County Clerk to the
ounty Attorney
Date of signature
2009-1345
EG0024
a
"De.
COLORADO
MEMORANDUM
TO: Clerk to the Board DATE: June 5, 2009
FROM: Janet Carter E.I., Public Works
SUBJECT: Road Construction WCR 13 between WCR 20.5 & SH 119
The City of Longmont is requesting permission to detour traffic off of WCR 13 between WCR
20.5 (Pike) and SH 119 to a bypass road maintained by the City of Longmont. This detour
will occur from June 23 - October 2. The bypass road will be paved, so not dust control
will be required. Standard road signs and barricades will be used during the detour.
The ADT for WCR 13 is 4203.
Page - 1 - of 1
C:\Documents and Settings\jvanegdom\Local Settings Temporary Internet Files \OLK164\Detour St Vrain Greenway.DOC
June 5, 2009
2009-1345
www.invarion.com
Date: 4/23/2009 Author: Heather J. Pifer ATSSA Certified Project: St. Vrain Greenway Phase 7b & 8
Golden Triangle (303) 772 - 4051 Hugh Sigler (720) 323 - 5484 Your Way Safety & Sign Supply 970 - 263 - 4520
Comments:
This Traffic Control Plan shows a Truck Route Detour.
This Detour will be marked with Detour Advisories.
This Plan can be used TCP# 1, 2, 3 & 5.
All signing will be in accordance with MUTCD Standards.
Field adjustment may be necessary.
This Plan is not to Scale.
A
TCP 4
TRUCK ROUTE
PROJECT:
ST. VRAIN
www.invarion.com
Date: 4/23/2009 Author: Heather J. Pifer ATSSA Certified Project: St. Vrain Greenway Phase 7B & 8
Golden Triangle (3030) 772 - 4051 Hugh Sigler (720) 323 - 5484 Your Way Safety & Sign Supply 970 - 263 - 4520
Comments:
This Traffic Control Plan shows a Truck Route Detour.
This Detour will be marked with Detour Advisories.
This Plan can be used in conjunction with TCP # 1, 2, 3 & 4.
All signing will be in accordance with MUTCD Standards.
Field adjustment may be necessary.
This Plan is not to Scale.
A
PHASE 2
TCP 5
DETOUR
E. COUNTY LINE RD.
QUICKSILVER RD.
PROJECT:
ST. VRAIN
III
Water Mod Banter
O 0 Bartels
I Concrete Barrier
SPEED
LIMIT
25
[}]
Hello