HomeMy WebLinkAbout20090203.tiff• • • COLORADO MEMORANDUM TO: CHRIS GATHMAN, PLANNING SERVICES FROM: LAUREN LIGHT, ENVIRONMENTAL HEALTH SUBJECT:USR-1679 JLW INVESTMENT, LLC DATE: 11/17/2008 Environmental Health Services has reviewed this proposal for an oil and gas support operation consisting of an injection well facility. There is an existing residential well however the applicants have submitted a change in use application to the Division of Water Resources for a commercial well. The application states that a portable toilet will be utilized for a restroom. As this is not a seasonal or temporary facility a septic system is required. A septic permit was applied for, by the applicant, on July 7, 2008 but has not been issued. A design and operations plan for the facility was not submitted with this proposal. Prior to final approval of building permits this department will review and approve the design and operations plan. We have no objections to the proposal, however, we do recommend that the following conditions be part of any approval: We recommend that the following requirements be met prior to allowing the plat to be recorded: 1. The applicant shall file an Air Pollution Emission Notice (A.P.E.N.) with the Colorado Department of Health and Environment's (CDPHE) Air Pollution Control Division. 2. A Ground Water Monitoring Plan shall be submitted to the Weld County Department of Public Health & Environment (WCDPHE) for review and approval. 3. If appropriate, Stormwater Discharge Permit coverage shall be obtained from the CDPHE Water Quality Control Division. 4. The applicant shall submit evidence to the Weld County Department of Public Health and Environment and the Department of Planning Services, from the Colorado Division of Water Resources, demonstrating that the water supply well is appropriately permitted for the commercial use. 2009-0203 EXHIBIT • We recommend that the following requirements be met prior to receiving final approval of building permits: 1. A concrete secondary containment structure (floor and walls) surrounding each tank or battery of tanks shall be constructed. The volume retained by the structure shall be 150% greater than the volume of the largest tank inside this structure. A registered professional engineer shall design the structure. The structure shall prevent any release from the tank system from reaching land or waters outside of the containment area. The operator shall provide evidence from the engineer to the Weld County Dept. of Public Health and Environment (WCDPHE) indicating that the structure has been constructed to meet this criterion. • • 2. A detailed design of the "concrete unloading pad" shall be submitted to WCDPHE for review and approval. The design shall demonstrate how all spilled waste, stormwater and wash down water will be contained within the receiving area and concrete sump. The design shall also include the method in which seams will be sealed to prevent leakage through the pad. A leak detection system shall be designed and installed beneath the "concrete unloading pad". The "concrete unloading pad" shall be constructed and operated in accordance with the approved design. 3. The applicant shall submit evidence to the WCDPHE, Weld County Planning Services and the Colorado Oil and Gas Conservation Commission (COGCC) that the facility was constructed in accordance with application materials. 4. A copy of the drilling log shall be submitted to the WCDPHE. 5. An individual sewage disposal system (I.S.D.S.) permit is required for sewage flow from the proposed operations building. The system must be designed by a Colorado Registered Professional Engineer and in accordance with Weld County I.S.D.S. Regulations. 6. Solids and sediment will accumulate in the storage tanks. The facility shall submit a detailed plan to WCDPHE for approval that describes the method of solids removal, including all on -site handling procedures and disposal. Any amendments to the approved plan shall be submitted in writing to WCDPHE for approval. 7. A Detailed Closure Plan shall be submitted to the Weld County Department of Public Health and Environment and the Colorado Oil and Gas Conservation Commission. The Closure Plan shall include a description of the manner in 2 • • • which the well will be plugged and abandoned, as well as specific details regarding reclamation of the property. No structures or equipment associated with the facility shall remain on the property following closure. 8. The facility shall post financial assurance with the COGCC. The financial assurance shall be adequate to cover a third -party closure of the facility, including the plugging and abandonment of the well, in accordance with industry standards, and the removal of all structures (including concrete) on the facility. The site shall be returned to its original grade. In the event the COGCC does not have the authority to require financial assurance for the entire cost required for the third -party closure, the facility shall post the remainder of the financial assurance with Weld County. The facility shall submit evidence, in writing, to the WCDPHE that the appropriate financial assurance has been obtained. We recommend that the following requirements be incorporated into the permit as development standards: 1. The facility shall be constructed and operated to ensure that contamination of soil and groundwater does not occur. 2. A manager, knowledgeable in operating an injection well, shall be on site when the facility is receiving waste. 3. No disposal of waste, other than Class II, as defined by the Environmental Protection Agency, is permitted. Any changes from the approved Class II use would require an amendment to this Special Use Permit. 4. Any wastes generated on the facility shall be disposed of in accordance with the Colorado Solid Waste Act, Section 30-20-100.5, C.R.S., or other appropriate rule, regulation or law. 5. This facility shall adhere to the maximum permissible noise level of 70 dBA as allowed in the industrial Zone as delineated in 25-12-103 C.R.S. 6. Fugitive dust and fugitive particulate emissions shall be controlled on this site. 7. All chemicals must be stored secure, on an impervious surface, and in accordance with manufacturer's recommendations. 8. The facility shall comply with Colorado Air Quality Control Commission Regulations and any air permits issued by the CDPHE Air Pollution Control Division. 9. All liquid wastes received at the facility shall be unloaded on the unloading pad. The concrete unloading pad shall be cleaned at a frequency that prevents oils 3 • • • and other wastes from building up on the pad. At a minimum, the pad shall be pressure washed daily to remove any waste build-up. During winter months, the facility shall maintain the unloading pad free of ice. 10.Any analysis of waste shall be forwarded to the WCDPHE, who reserves the right to require additional, more extensive monitoring at a later date. 11.AII liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 12.Any petroleum contaminated soils on the facility shall be removed, treated or disposed of in accordance with all applicable rules and regulations. 13.The property owner or operator shall be responsible for complying with all of the Development Standards. Noncompliance with any of the Development Standards may be reason for revocation of the Permit by the Weld County Board of County Commissioners. 14. The facility shall comply with the approved groundwater monitoring plan. 15.All storm water, which has come into contact with waste materials on the site, shall be confined on the site. In the event that storm water is not adequately controlled on the site, upon written notification from the WCDPHE or CDPHE, a comprehensive site -wide storm water plan shall be developed and implemented. The plan must be approved, in writing, prior to implementation by WCDPHE and CDPHE. 16.All contaminated soils shall be stored on an impervious surface where any stormwater that comes into contact with the soils would be contained. 17.Adequate drinking water, hand washing, and toilet facilities shall be provided. 18. Any individual sewage disposal system (I.S.D.S.) on the property shall be permitted, installed, maintained and operated in compliance with all provisions of the Weld County Code, pertaining to I.S.D.S. 19. The facility shall operate in compliance with the rules and regulations of the Colorado Oil and Gas Conservation Commission. 20.The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. 4 Weld County Planning Department GREELEY OFFICE MemorancMTivED COLORADO TO: Chris Gathman, W.C. Planning DATE: December 15, 2008 FROM: Lauren Light, W.C. Department of Public Health and Environment CASE NO.: USR-1679 NAME: JLW investment, LLC The Department recommends the following conditions, included under prior to building permits issued, to be replaced as follows: 1. A concrete secondary containment structure (floor and walls) surrounding each tank or battery of tanks shall be constructed. The volume retained by the structure shall be 150% greater than the volume of the largest tank inside this structure. A registered professional engineer shall design the structure. The structure shall prevent any release from the tank system from reaching land or waters outside of the containment area. The operator shall provide evidence from the engineer to the Weld County Department of Public Health and Environment (WCDPHE) indicating that the structure has been constructed to meet this criterion. The Department will consider structures other than those constructed of concrete so long as a registered professional engineer provides a certification indicating that the proposed structure meets or exceeds the expected functionality of a concrete structure in regard to containment, spills, unintended releases, etc. 2. A detailed design of the receiving area and containment system shall be submitted to WCDPHE for review and approval. The receiving area shall be concrete, include a chemical resistant coating, and shall be able to contain all spilled wastes, stormwater, wash down water, and the volume of 150% of the largest truck/container disposing at the facility. The design shall also include the method in which seams/cracks will be sealed to prevent leakage through the pad. The receiving area and containment system shall be constructed and operated in accordance with the approved design. COLORADO • • MEMORANDUM TO: Chris Gathman, Planning Dept. DATE: November 13, 2008 FROM: David Snyder, E.I., Public Works ig SUBJECT: USR-1679, JLW Investment LLC Highway 392 is under the maintenance and jurisdiction of CDOT. The Colorado Department of Transportation (CDOT) has jurisdiction over all accesses to the state highways. Please contact Gloria Hice-Idler at the Greeley office (970-350-2148 or 970- 350-2163) to verify the access permit or for any additional requirements that may be needed to obtain or upgrade the permit. (State Highway 392) Radiuses for the drive shall be 60 feet to accommodate large trucks. Drainage Report: The historical flow patterns and run-off amounts will be maintained on site in such a manner that it will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and velocity increases, diversions, concentration and/or unplanned ponding of storm run-off. Retention is not allowed by Weld County Code. before retention will be accepted for this project. Please revise ponding limits to take into account show onsite 100 year flows. Soils Report: Appears acceptable. A variance must be requested and approved offsite flows. Ponding on map appears to only Pursuant to Chapter 15, Articles I and II of the Weld County Code, if noxious weeds exist on the property or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds. pc: USR-1670 M:\PLANNING — DEVELOPMENT REVIEW\USR-Use by Special Review\USR-1670 Northern Co Disposal\USR-1670.doc WELD COUNTY ROAD ACCESS INFORMATION SHEET Weld County Department of Public Works 111 H St PO Box 758 Greeley CO 80632 Phone: (970 )356-4000 x3750 Fax: (970) 304-6497 a9 D Road File #: Other Case #: RE#: Phone(303) 349-7586 1. Applicant Name SLW Investment, LLC Address 351 Glencoe St. City Denver State CO Zip 80220 37525 Hwy 392 2. Address or Location of Access Block Lot Section 18 Township 6N Range 63W SubdivisionBlock from nearest intersection 1880' Weld County Road #: Hwy 392 Side of Road N 1 3. Is there an existing access(es) to the property? Yes X No # of Accesses 4. Proposed Use: Permanent 0 Residential/Agricultural Industrial 0 Temporary 0 Subdivision 0 Commercial 0 Other lit*** ,.**** t t***tit********tit**.*id *tt*1111**fix*i*tt*****if*»>*****-»a*******t******x****t**********t*******i*********x*****i* 5. Site Sketch Legend for Access Description: AG = Agricultural RES = Residential O&G = Oil & Gas D.R. = Ditch Road = House 0 = Shed A = Proposed Access = Existing Access *1***** * *t*** *** **1,111 * *******t * *t* * * * OFFICE USE ONLY: Road ADT Date Accidents Date Road ADT Date Accidents Date Drainage Requirement Culvert Size Length Special Conditions Reviewed By. • 0 Installation Authorized 0 Information Insufficient Title: Aitotri Mac COLORADO Weld County Referral October 14, 2008 The Weld County Department of Planning Services has received the following item for review: Applicant JLW Investment, LLC Case Number USR-1679 Please Reply By November 14, 2008 Planner Chris Gathman Project A Site Specific Development Plan and a Special Review Permit for an Oil and Gas Support Facility (Class II - Oilfield Waste Disposal Facility) in the A (Agricultural) Zone District. Legal Lot B of RE -748; Part NE4 of Section 18, T6N, R63W of the 6th P.M., Weld County, Colorado. Location North of and adjacent to State Highway 392 and approximately 1/4 mile east of CR 61. Parcel Number 0799 18 000021 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined. ❑ We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because ❑ -We have reviewed the request and find no conflicts with our interests. 'ffid See attached letter. Comments: Signature Agency • +Weld County Planning Dept. +918 10th Street, Greeley, CO. 80631 O(970) 353-6100 ext.3540 +(970) 304-6498 fax Date IC) -,'r-' -OS MEMORANDUM To: Chris Gathman, Planner From: Ann Siron, Zoning Compliance Officer Subject: USR-1679 Referral October 15, 2008 Upon review of my case files and computer, an active Violation (ZCV08-00110) was noted. This violation was issued due to commercial activity in relation to an Oil and Gas Support Facility taking place on the property without having submitted a Use by Special Review permit. This case has not yet been presented to the Board of County Commissioners. This application, if approved, will correct the violation. If for any reason, this application is denied, the Violation Case will proceed accordingly through a violation hearing and possibly district court. • cc: ZCV08-00110 • SERVICE, TEAMWORK, INTEGRITY, QUALITY WI�Yc. • COLORADO • • DEPARTMENT OF PLANNING SERVICES Weld County Administrative Offices 918 10th St Greeley CO 80631 Phone (970) 353- 6100 Ext 3575 WEBSITE: www.co.weld.co.us Applicant: JLW Investment, LLC. November 14, 2008 Case Number: USR-1677 Project: A Site Specific Development Plan and a Special Review Permit for Oil and Gas Support Facility (Class II - Oilfield Waste Disposal Facility) in the A (Agricultural) Zone District Legal: Lot B of RE -748; Part NE4 of Section 18, T6N, R63W of the 6th P.M., Weld County, Colorado. Location: North of and adjacent to State Hwy 392 an approximately 1/4 mile east of CR 61. Parcel Numbers: 0799 18 000021 There are five permits on record for this parcel; OLG07-01178, OLG07-01261, OLG08-00360, are final, OLG08-00429 & OLG08-00430 are issued. Prior to the start of any construction, alterations, or change of occupancy; 1 A building permit application must be completed and two complete sets of plans including engineered foundation plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A geotechnical engineering report preformed by a registered State of Colorado engineer shall be required. 2 A plan review shall be approved and a permit must be issued prior to the start of construction. 3 Setback and offset distances shall be determined by the 2006 International Building Code (Offset and setback distances are measured from the farthest projection from the structure). 4 The 2006 International Building, Residential, Plumbing, Mechanical, Fuel Gas and Energy Conservation Codes, the 2008 National Electrical Code, and Chapter 23 of the Weld County Code are being enforced. 5 Buildings located within a 100 year flood plain require a Flood Hazard Development Plan. 6 A letter from the Fire District to ascertain if a FPD permit is required. Sicrely 'ini� Robert Powell Plans Examiner II Service, Teamwork, Integrity, Quality 11/12/2008 10:47 970-350-2207 CD0T UTL SAFETY PAGE 02/05 'YJt.W vel a'% t \/y va;1t 4.0 cJ3i ok ' Weld County Referral October 14, 2008 OCT s 2008 COLORADO a1°n wee 4Thee sesta The Weld County Department of Planning Services has received the following Item for review: Applicant JLW Investment, LW Case Number USR-1879 Please Reply By November 14, 2008 Planner Chris Gathman Project A Site Specific Development Plan and a Special Review Permit for an Oil and Gas Support Facility - Oilfield Waste Disposal Facility) in the A (Agricultural) Zone District. Legal Lot B of RE -748; Part NE4 of Section 18, TBN, R83W of the 8th P.M., Weld County, Colorado. Location North of and adjacent to State Highway 392 and approximately 114 mile east of CR 81. Parcel Number 079918 000021 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined. ❑ We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because O We have reviewed the request and find no conflicts with our interests. CI See attached letter. Lazo) Nale, vticr Signature Agency cZaaeL Date \\ Ic1 \ *Weld County Planning Dept. 091810" Street Greeley, CO. 50631 4(970) 3534100 ext3540 4(970) 3044498 fax Hello