Loading...
HomeMy WebLinkAbout20093173.tiffCHANGE ORDER AM DOCUMENT G701 OWNER ARCHITECT CONTRACTOR FIELD OTI IER X x X RCI Project # 0818CO PROJECT: Weld County Social Services Building B CHANGE ORDER NUMBER: Three (name, address) 315 North 11th Avenue Greeley, CO 80631 TO CONTRACTOR: ROCHE CONSTRUCTORS, INC. Post Office Box 1727 Greeley, CO 80632 The Contract is changed as follows: DATE: ARCHITECTS PROJECT NO: CONTRACT DATE: 8/12/2008 CONTRACT FOR: Change Order Request No. 001 - Move Electrical Outlets in Office 126, 127 and 128 to accommodate new furniture layout Change Order Request No. 002 - New Wood Door, Frame and Hardware Between Open Office 1 and 2 and Remove Existing Windows and Infill in Existing Office 219 and 221 Total 11/24/2009 Construction $2,906.00 $1,554.00 $4,460.00 Not valid until signed by Owner, Architect, and Contractor The original (Contract Sum) was $4,776,700.00 Net change by previously -authorized Change Orders $281,303.00 The (Contract Sum)(Guaranteed Maximum Price) prior to this Change Order was $5,058,003.00 The (Contract Sum) will be increased by this Change Order in the amount of $4,460.00 The new (Contract Sum) including this Change Order will be $5,062,463.00 The Contract Time will be N/A by ( -0- ) days. The date of Substantial Completion as of the date of this Change Order thereof is NOTE: This summary does not reflect changes in the Contract Sum, Contract Time, or Guaranteed Maximum Price which have been authorized by Construction Change Directive. HAUSER ARCHITECTS, P.C. ARCHITECT Byl erc1 at -id/ Alan Hauser Date l I /24/C2 ROCHE CONSTRUCTORS, INC. WELD COUNTY CONTRACTOR OWNER P. O. Box 1727 Greeley, CO 80632 By Joey Mi Hierr� Date 11/24/2009 By 1naEna �,SJ}a, Chair Date AIA DOCUMENT G701 • CHANGE ORDER • 1987 EDITION • AIA® • ©1987 • THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., NW.. WASHINGTON, D.C. 20006 G701-1987 Po ..1,34Q3 --Et oQl PR oO.3 / I0I0-7 /0.7 2009-3173 � t0 -r r�( 7 ROCHE CONSTRUCTORS, INC. CHANGE ORDER REQUEST SUMMARY SHEET Weld County Social Services Building B Remodel 315 N. 111th Avenue Greeley, CO Roche Project No. 0818CO RCI's CORM 001 Date: November 20, 2009 Description of Change: Move electrical outlets from 16" to center up to 20" to center to accommodate new furniture layout in Office 126, 127 and 128 of first floor. Includes moving of outlets, patch and texture drywall patches and paint. Entire wall will require new texture to prevent patch from being visible. Painting to consist of new finish on all walls of offices mentioned Company KM Construction Services Paint -Rite, Inc. Warkentin Electric Sub -Total Amount 770.00 990.00 875.00 $ 2,635.00 Roche Constructors Breakdown: Sub -Totals $ Taxes (0% mat'I; 50.00% labor burden) Sub -Total $ RCI Total Material 0 Sub/Eauip Labor $ $ 0.00 0 0.00 $ 0.00 0.00 Summary: Subcontractor Totals Overhead on Sub Work (5%) Profit on Sub Work (5%) RCI Work Mark -Upon RCI Work (10%) Sub -Total Payment & Performance Bond (.8%) General Liability Insurance (.55%) 2,635.00 132.00 139.00 0.00 0.00 2,906.00 0.00 0.00 Total: Total This price is good for seven (7) days. Time extension required for this work: 0 days. Approved by Date $ 2,906.00 Joey Hiers From: Sent: To: Subject: Toby Taylor [TTaylor@co.weld.co.us] Tuesday, November 24, 2009 9:39 AM Joey Hiers RE: 0818CO Weld Co. Change Request 001 Please proceed with Change Request 001 as submitted. Toby Taylor Building Maintenance Coordinator Voice: (970) 304-6531 Fax: (970) 304-6532 1105 H Street P.O. Box 758 Greeley, CO 80632 Original Message From: Joey Hiers[mailto:jhiers@rocheconstructors.com] Sent: Friday, November 20, 2009 4:58 PM To: Toby Taylor Subject: 0818CO Weld Co. Change Request 001 Toby - Attached please find Change Order Request No. 001 and corresponding backup on Weld Co. Building B for the raising of the electrical outlets in Offices 126, 127 and 128. Please review and sign for approval as soon as possible so that we can move forward with the work. I will forward over COR's on Monday for the removal of the existing windows and new door in Open Office 2 that you have already approved. I want to get this all approved on Monday so we can get all the remaining costs we have outstanding in a Prime Change Order for approval for billing this month. Assuming we can get the Prime CO in front of the board for approval. Any questions, please give me a call. Have a good weekend. Thanks. Joey M. Hiers Project Manager Roche Constructors, Inc. Greeley, Colorado Phone 970.356.3611 Fax 970.356.3619 www.rocheconstructors.com <http://console.mxlogic.com/redir/?bZPhOYY-MyrppjvKesjdw0ERIj- RokD5KQWNFO-6XZuWrWbPNEVhsdTdy9enNE2ERIj- RokD5KQWNFOVJ5dVUsedEFLL3D4nQmjrblKXObMA63h00LDE6y0iHNEw4yuM8-g80nUITZ9Cy2ZQjs_ 3VU3zg9J4SOOC_ssyyrNWc3hWvO> P Do you need to print this email? Think green! 1 Construction Services, Inc. 6kt c -to Coq it- I 1333 W. 12151 -Avenue, Westminster, CO 80234 E -Mail Address: km-construction@msn.com Web Site Address: km-construction.com Telephone: (303) 561-0240 Facsimile: (303) 561-0207 REQUEST FOR PRICING NOVEMBER 20, 2009 ATTENTION: JOEY HIERS PROJECT: WELD COUNTY SOCIAL SERVICES REFERENCE: PATCH AND REPAIR @ RELOCATED ELECTRICAL BOXES Description: Provide labor and material to complete scope of work listed below. 1. Patch drywall where removed to relocate 5 electrical boxes. 2. Finish drywall to receive texture. 3. Texture drywall to match existing finish, Labor: $600.00 Material: $100.00 Sub Total: $700.00 10%: $ 70.00 TOTAL: $770.00 KM TYPICAL PATCH RATE IS $100.00 PER PATCH FOR SLICK WALL AND $150.00 FOR TEXTURED PATCHES. Ogifrco GoC M-1 PAINT -RITE, INC November 20, 2009 Proposal for: Roche Constructors, Inc. Attention: key Fliers Project: Weld County Social Services Building Painting of Rooms 126, 127, and 128 Total: $990.00 Mailing Address: P.O. Box 336, Eaton, CO 80615 Phone: (970) 356-0619 Fax: (970) 454-3096 WARKENTIN ELECTRIC 1531 4TH AVENUE GREELEY, CO 80631 NAME/ADDRESS ROCHE CONSTRUCTORS 361 71ST AVE GREELEY, CO 80634 O&1&La Coed I CHANGE ORDER DATE CHANGE OR... 11/20/2009 581 Project WELD COUNTY SOCIAL SERVICES P.O. NO. PROJECT DESCRIPTION QTY TOTAL MOVE OUTLETS UP TO 20 INCHES IN 3 WEST OFFICE ON 1ST FLOOR 875.00 TOTAL $875.00 SIGNATURE ROCHE CONSTRUCTORS, INC. CHANGE ORDER REQUEST SUMMARY SHEET Weld County Social Services Building B Remodel 315 N. 111th Avenue Greeley, CO Roche Project No. 0818CO RCI's COR # 002 Date: November 24, 2009 Description of Change: Add hollow metal frame, wood door with 6' x 22" lite kit and associated hardware to include hinges, deadbolt, push/pull, closer and wall stops between Open Office 1 and 2 within the 6' opening south of new window locations. Remove (2) existing windows in existing Office 219 and 221, infill openings with metal studs and drywall, tape, finish, texture and paint to match existing Company Amount Collins Door and Hardware [Material] $ 615.00 Roche Constructors, Inc. [Labor for Door Install] $ 200.00 KM Construction [Window Removal] $ 594.00 Sub -Total $ 1,409.00 Roche Constructors Breakdown: Material Sub/Equip Labor Sub -Totals $ $ $ 0.00 Taxes (0% matt 50.00% labor burden) 0 0 0.00 Sub -Total $ - $ - $ 0.00 RCI Total $ 0.00 Summary: Subcontractor Totals Overhead on Sub Work (5%) Profit on Sub Work (5%) RCI Work Mark -Up on RCI Work (10%) Sub -Total Payment & Performance Bond (.8%) General Liability Insurance (.55%) 1,409.00 71.00 74.00 0.00 0.00 1,554.00 0.00 0.00 Total: Total This price is good for seven (7) days. Time extension required for this work: 0 days. Approved by Date $ 1,554.00 Joey Hiers From: Sent: To: Subject: Toby Taylor [TTaylor@co.weld.co.us] Tuesday, November 24, 2009 9:40 AM Joey Hiers RE: Weld Co. Bldg. B Remodel COR 002 Change Request 002 is approved as submitted. Toby Taylor Building Maintenance Coordinator Voice: (970) 304-6531 Fax: (970) 304-6532 1105 H Street P.O. Box 758 Greeley, CO 80632 Original Message From: Joey Hiers[mailto:jhiers@rocheconstructors.com] Sent: Tuesday, November 24, 2009 9:23 AM To: Toby Taylor Subject: Weld Co. Bldg. B Remodel COR 002 Toby - Attached is Change Request No. 2 for the new door in Open Office 2 and removal of the windows on the second floor. You had already given prior approval. Thanks. Joey M. Hiers Project Manager Roche Constructors, Inc. Greeley, Colorado Phone 970.356.3611 Fax 970.356.3619 www.rocheconstructors.com <http://console.mxlogic.com/redir/?LTd7bPPX29JBBd- UVNcS02zmNfX1xismXjH6DbUrLRXFLELf6zB5MTsS8AVv6wazmNfX1xismXjH6DbCQmnDTTPqarVEVIKed78Usyrpjd wbVW1Ew4GYg81AZOzNEw6jh02_1GxVVEw4WM2PhluWpKvxYY1NJ4SyrppjvKehhdI2Nrow32> P Do you need to print this email? Think green! 1 NOV-02 _2009 MON 07:43 AM Collins Door & Hduee 0OL FAX NO. 9702213856 DOOR & HARDWARE INC. 394 Delozler Drive Fort Collins, Colorado 80524 CHANGE ORDER #2 TO: ROCHE CONSTRUCTORS PROJECT: WELD COUNTY SOCIAL SERVICES BLDG B DESCRIPTION OF CHANGE OR MODIFICATION: JOEY ADD DOOR, FRAME, & HARDWARE #111 - PER EUGENE HOLLOW METAL 1 FRAME WOOD DOORS 1 OAK DOOR W/ LITE KIT HARDWARE INCLUDES HINGES, DEADBOLT, PUSH/PULL, CLOSER, & WALL STOP, \ n ,q eir ADD ADD ADD SUBTOTAL TAX-EXEMPT TOTAL TOTAL OF THIS CHANGE ORDER TOTAL OF THIS CHANGE ORDER t PREVIOUS PENDING CHANGE ORDERS f TOTAL OF ORIGINAL CONTRACT TOTAL OF APPROVED CHANGES TOTAL REVISED CONTRACT PENDING O / Co COl PHONE #970-221-2396 FAX #970-221-3856 DATE: 10/27/2009 APPROVED P. 01/01 $ 135.00 $ 236.00 $ 244.00 $ 615.00 $ 615.00 $ 615.00 l$ 10,874.00 462.00 11,336.00 Nothing will be ordered without signed copy of this change order All terms and original contract apply to this change INCREASE IN BOND NOT INCLUDED IN ABOVE CHANGE ORDER PRICING. order Return one signed copy promptly to Collins Door & Hardware, Accepted this day of 2009 By: Title: KELLY HEATH Collins Door & Hardware Kelly Heath kelly( COllinsdoor.net Company: Jai Construction Services, Inc. og Got 1333 W. 121" Avenue, Westminster, CO 80234 E -Mail Address: km-construction©msn.com Web Site Address: km-construction.com Telephone: (303) 561-0240 Facsimile: (303) 561-0207 REQUEST FOR PRICING NOVEMBER 2, 2009 ATTENTION: JOEY HIERS PROJECT: WELD COUNTY SOCIAL SERVICES REFERENCE: WINDOW INFILL PRICING Description: Provide labor and material to complete scope of work listed below. 1, Removal of (2) existing windows. 2. Infill openings with metal studs and drywall, 3. Finish drywall and texture to match existing. Labor: Material: Sub Total: 10%: TOTAL: $400.00 $140.00 $540.00 Hello