HomeMy WebLinkAbout750745.tiff HENSEL PHELPS CONSTRUCTION COMPANY
• April 2, 1975
Board of County Commissioners -
Weld County, Colorado
Health Facility
1516 Hospital Road
Greeley, Colorado 80631
•
Attention Mr. Barton A. Buss
Director of Management & Budget
Subject: Weld County Services Complex
Greeley, Colorado
Serial Letter No. 93
Gentlemen:
At 10:00 A.M. on 25 March 1975, bids were received and opened on behalf of
Weld County for Bid Package No. 6 with the following results:
(Note: All bids have been analyzed and adjusted for double-up or exclusions
and all sales tax and other adjustments have been included to obtain an
equal bid comparison.)
Budget Bids
A. Cast-In-Place Concrete Topping $ 7,210.00
1. Hensel Phelps Construction Co. $ 7,200.00
2. Northern Colorado Constructors No Bid
B. Rough Carpentry and Miscellaneous Millwork • $25,178.00
1. Hensel Phelps Construction Co. $24,700.00 *". : - - -(
2, Northern Colorado Constructors No Bid
C. Building Insulation Work $24,688.00
1. Hensel Phelps Construction Co. $24,500.00 *( ;y
2. Construction Specialties No Bid {'
3. Sutton Insulation Company No Bid
D. Bi-Folding Wood Doors Complete $ 500.00
1. Hensel Phelps Construction Co. $ 475.00 *
2. Northern Colorado Constructors No Bid
3. Intermountain Specialty Equipment Co. No Bid
E. Wood Coiling Pass-Thru Window $ 1,200.00
1. Intermountain Specialty Equipment Co. $ 1,462.00 *(7, c,{
2. Hausman Corporation No Bid /�
3. Colorado Building Specialties No Bid
4. Dahl Sales No Bid
G R E E L E Y, C O L O R A n
750745
'sibC POST OFFICE BOX 0 OFFICE AND WAREHOUSE AT 420 SIXTH AVENUE AREA
•3i"u�
•
HENSEL PHELPS CONSTRUCTION COMPANY NM
Board of County Commissioners
April 2, 1975
Page 2
Budget Bids
F. Gypsum Drywall (including thermal & sound batt) $128,000.00
1. Sam Radulovich $121,185.00 *
2. Gardineer Drywall $123,220.00
3. Denver Drywall $126, 169.00
$. Colorado Partitions & Drywall $130,327.00
5. Great Northern Drywall $138,816.00
6. Yocum Plastering $146,300.00
7. Richard O'Brien Plastering $164,231.00.
I. Acoustical Ceiling System $ 34,500.00
1. Architectural Acoustics $ 33,868.00 *
(Based on Conwed Rock-Faced Tile) •
2. Acoustics & Specialties $ 35,029.00 c c(
(Based on Armstrong Boldface Tile)
3. 0'Mary Acoustics, Inc. $ 40,940.00
(Based on Glacier Acoustone by U.S. Gypsum)
J. Resilient Flooring and Base $ 5, 160.00
1. Decor Limited $ 4,799.00 *T'!2
2. El Paso Flooring $ 5,200.00 /'
3. Lenon Tile & Carpet $ 5,480.00
4. Monarch Interiors $ 6,206.00
L. Painting and Wall Covering $ 39,230.00
1. Ben Edgin Painting Co. $ 39,713.00 *12-- '
2. Heggen-Lundquist Paint Co. $ 43,375.00
3. Decor Limited $ 47,018.00
4. N & J Inc. $ 52,828.00
5. Gardineer Drywall $ 53,530.00
6. House Beautiful $ 54,669.00
M. Metal Toilet Partitions - $ 3,200.00
1. Simpson & Simpson Sales & Service $ 2,829.00 * •
2. Builders Service Bureau $ 3,159.00 (1"(' -( /
3. Intermountain Specialty Equipment Co. $ 3, 180.00 c -/-6
4. American Builders $ 3,333.00
N. Metal Lockers and Locker Benches $ 660.00
1. Simpson & Simpson Sales & Service $ 1,244.00 p. /
2. Intermountain Specialty Equipment Co. $ 1,558.00-
3. American Builders $ 2,250.00
G R E E L E Y , COLORADO 6 0 6 3 1
/\\r
J POST OFFICE BOX 0 ' OFFICE ANO WAREHOUSE AT 420 SIXTH AVENUE AREA CODE 303 352-6565
,.-. .`
HENSEL PHELPS CONSTRUCTION COMPANY
Board of County Commissioners
April 2, 1975
Page 3
Budget Bids
0. Panel Folding Partition $ 3,000.00
1. Dahl Sales Inc. $ 3,340.00 sec/d/ /�
2. Intermountain Specialty Equipment Co. $ 3,581.00 1/
P. Wood/Multi-Fold Partition $ 750.00
1. Intermountain Specialty Equipment Co. $ 1,088.00 t -=
2. Dahl Sales Inc. No Bid
Q. and R. Combined Bid - Toilet Accessories Material
and Toilet Accessories Installation $ 11,000.00
1. Simpson & Simpson Sales & Service $ 7,634.00 *`'r/
2. Dale B. Andrews & Associates $ 9,278.00
3. Intermountain Specialty Equipment Co. $ 9,316.00
4. Builders Service Bureau $ 9,449.00
5. American Builders Supply $ 10,143.00
G. Ceramic Tile Work $ 31,750.00
/1 1. Pike's Peak Tile Company $ 25,777.00 #9/ c
2. Colorado Tile Company $ 26,587.00
3. El Paso Floor Company $ 28,900.00
4. Monarch Interiors $ 39,563.00
i
K. Brick Pavers $ 23,610.00 d
/ 1. Pike's Peak Tile Co. i " $ 15,777.00.( 4'-Y
2. Colorado Tile Co. $ 17,352.00
3. Hensel Phelps Construction Co. $ 24,500.00
Note: Grinding of Pavers (except stairs) add $5,000.00)
\\ G./K. Combined Bids
1. Pike's Peak Tile Company $ 41,554.00
2. Ace Tile Company $ 45,410.00
H. Terrazzo Flooring Alternate (Same as Pavers)
Alternate No. 1 - Terrazzo in lieu of brick
pavers except in the solarium. '
K. Brick Pavers $ 3,564.00
(Colorado Tile) _ , >
H. Terrazzo $ 24,001.Q0 ,, ./
(Ace Tile)
Less Brick Paver Low Bid ($ 15,777.00)
(Pike's Peak)
/,/�, Total Add $ 11,788.00
/
TOTALS $339,636.00 $315,591.00 *
/
�JS\\\ G R E E L E Y, COLORADO 8 0 6 3 1
.i: $ POST OFFICE BOX O OFFICE ANO WAREHOUSE AT 420 SIXTH AVENUE AREA CODE 303 352-6565
L✓0'
•
.-. .�.
•
HENSEL PHELPS CONSTRUCTION COMPANY
•
Board of County Commissioners
April 2, 1975
Page 4
The aggregate total of all low bids (excluding the terrazzo alternates) would
be $315,591.00. Our budget estimate for the work covered by this Bid Package
was $339,636.00. This resulted in an overall savings of $24,045.00. We
therefore recommend that all approved bids be accepted and that contracts be
issued to each of the approved bidders.
A tabulation of all Bid Packages to date, including approved Change Orders,
will be submitted at a later date.
If you have any questions regarding this Bid Package No. 6, please contact
our office.
Very truly yours,
HENSEL PHELPS CONSTRUCTION CO.
Larry K. Mineer
Estimator, Special Projects
ch
17485. 1
cc: John Haley, NHPQ
Bob Shreve, NHPQ
Jerry Pope, HPCC
Jim Sibert, HPCC
G R E E L E Y , C ❑ L ❑ R A ❑ ❑ 8 0 601
POST OFFICE BOX 0 OFFICE ANO WAREHOUSE AT 420 SIXTH AVENUE AREA CODE 303362-6565
o
Hello