HomeMy WebLinkAbout20082164WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
FELSBURG HOLT & ULLEVIG
DATED: 7-24-08
Work Order Number: FHU-13
Project Title: Weld/Adams WCR 49 Alignment Study
Commencement Date: August 1, 2008
Completion Date: December 1, 2008
Limitations on compensation: Total Contract Not to Exceed $10.000.00. Weld County Portion Not to
Exceed $5,000.00. See attached cost breakdown (Exhibit A).
Project Description: Assisting Weld County and Adams County in assessing future alignment of WCR 49
between WCR 4 and Imboden Road in Adams County. This study will identify alternative alignments
which will serve the best interests of the two Counties, as well as the adjacent "Estates at Horse Creek"
development which is currently being planned for this area..
Scope of Services: See attached Scope of Work
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Professional
Services Agreement between the parties. In the
event of a conflict between or ambiguity in the
terms of the Professional Services Agreement
and this work order (including the attached
forms) the Professional Services Agreement
shall control.
Professional:
Felsburg Holt & Ullevig
6300 South Syracuse Way, Suite 600
Centennial, O 80111
By:
Title:
Date:
•,Ac•psl
The attached forms are hereby accepted and
incorporated herein, by this reference, and
Notice to Proceed is hereby given.
Weld County
By: Wayne Hoyardf opnty Engineer - OP
B
By:
Departmentl lead
Date: :p 'S -O S1, _
By: 'PI/ V/vim_
Three or of Fij r,Cce,agd.ddministration
Date: IWO l LUU�
By:
Chairman, Weld County Commissioners
Date: AUG 1 1 2008
ted e45-4'
C'(I ;/30(io-i)) 0 h - O?a"`7/65
Weld/Adams County Line Crossroads
Alignment Study
Scope of Work
County Road 49 is one of seven roadways identified as strategic roadway
corridors in Weld County. Due to the significance of County Road 49 extending
from State Highway 2 to Interstate 70, coordination and planning needs to occur
between Weld County and Adams County. This scope of work describes a study
that will connect County Road 49 at County Road 4 to Imboden Road at 160
Avenue. This alignment will cross many features including the Box Elder Nursery,
Box Elder Creek, the Estates at Horse Creek development and an irrigation
canal. This study will identify different alternative alignments for the study area
along with a "preferred" alignment that will give transportation engineers and
planners the tools they need to help preserve the right-of-way required for the
improvements or work with incoming development to construct the
improvements.
Through their existing on call services contract with Weld County, the consulting
firm of Felsburg, Holt and Ullevig (FHU) will be required to coordinate the work
with representatives from Adams County and Weld County. Weld County will be
the lead agency on the project.
Purpose
The information gathered and compiled in this task will serve as the basis for
creating and evaluating alternative alignments. The intent is to utilize available
information to the maximum extent possible and to conduct new data collection
only as necessary.
Subtask 1.1
FHU will assemble pertinent data and information in order to have a thorough
understanding of current and projected conditions for the study area. All available
land use plans, transportation plans, and specific development plans will be
compiled and reviewed. Other collected data will include aerial photography,
right-of-way and parcel ownership information, access and intersecting roads
inventory, environmental considerations, roadway geometrics, utility information,
drainage and flood studies and USGS topographic information. All of this
information will be summarized in both graphic and tabular forms to produce a
comprehensive representation of the physical characteristics of the study area.
Subtask 1.2
In this task, all of the information compiled in Subtask 2.1 will be reviewed and
interpreted in order to identify opportunities and constraints related to potential
alternative alignments.
County Line Crossroads Alignment Study
Page 1 of 3
Purpose
The purpose of this task is to identify up to four possible alternative alignments
for the study area. This work will draw to a large degree on the data,
opportunities and constraints compiled in Task 1.
Subtask 2.1
In this first step, key crossing/intersecting features will be identified. These will
include such features as current land improvements, alignment restrictions or
obstacles, and major drainageways. Based on criteria such as topographic
conditions, physical characteristics, intersection spacing, geometric conditions,
and drainageway widths, possible points at which these features could be
reasonably crossed or intersected will be established.
Purpose
The purpose of this task is to establish evaluation measures and to apply those
measures to each alternative to identify the preferred alignment.
Subtask 3.1
Using a standard roadway cross-section, the various alternatives for the study
area will be assessed through an evaluation process to determine the
advantages and disadvantages of the developed alternatives. It is envisioned
that the evaluation parameters will include but not be limited to the following:
• Horizontal and Vertical Geometry
• Community Impacts
• Land Use Consequences
• Traffic Operations
• Environmental Impacts
• Right -of -Way Impacts
• Safety
• Constructability
• Cost and Economic Feasibility
Subtask 3.2
Information on each alternative will be compiled into an evaluation matrix. A
comparative review of the data will be conducted independently by each member
of the project team to identify a preferred alternative alignment for the study area.
Purpose
In this task, FHU will refine the recommended alignment for the study area. This
information will be documented in a final report.
County Line Crossroads Alignment Study
Page 2 of 3
Subtask 4.1
The selected alignments will be refined to reflect any review comments received
through the public input review process. Such refinements are not expected to be
significant, but they should reflect the best knowledge about the alignment.
Subtask 4.2
The findings of the study will be documented in a draft report which will be
distributed with 5 bound copies and one electronic version to the local agencies
for review. The report will include data collected, analyses conducted, findings of
the analyses, and the recommendations of the study process. After review of the
draft report, FHU will prepare and deliver 5 copies and electronic version of the
final report.
Purpose
In order to reach a corridor consensus regarding the alignments, it will be critical
that the work be closely coordinated between the project team, local agency
representatives, elected officials and affected property owners/developers. This
task will include a series of meetings to achieve close and continuous
coordination.
Subtask 5.1
Monthly (and more frequently if necessary) coordination meetings with both
County's representatives will be utilized to review and coordinate the work efforts
and to resolve problems as they arise. It is anticipated that there will be three
monthly coordination meetings conducted for this project.
Subtask 5.2
The study process will be divided into an initial phase and final phase. Local
agency meetings and public open houses will be conducted for each phase.
Public open houses may not be required if individual meetings with affected
property meetings is sufficient for the study.
County Line Crossroads Alignment Study
Page 3 of 3
V
N
a
V
61
0
G
0
O
U
co
9
Q
J
t N
W N
$
u.OO pa!O.a IO
our.y .alu.s lruaue.lwd
»»»
«»
O
i-
H
Rf
«»
at
n
el
ul
gg
N E ,.§v
ri n m
raj w .aas auapo
n«»
13 RI
«»
N
a,lWtl m
W
rue.* r+!uag Iruoln.p/d n i7'0 0 0
Ct
argrga!uIwptl
^ at
to
p.usi.ra io!u.sl
.euaaaa xr..oaoa peal 0
6u!pu.au.O P.'S
0
N
paau6ud aoiuesl
ia6ruryl laa(wtl ^ n
a'd'6uueuwyu.a wr
al
p
(l l.dauud)
>y6pJaO °Paul l pajoJd el N 4 a
Id'6uryawd UINO
el
6
yi
Z
E
p.d 0
Fees calculated using FHU's 2007 Rate Schedule for Weld County On -Call Services.
MEMORANDUM
1111D
C.
COLORADO
TO: Clerk to the Board DATE: August 5, 2008
FROM: Mike Bedell, Public Works
SUBJECT: Consent Agenda Item
Two original Work Order Forms No. FHU-13 with Felsburg Holt & Ullevig dated 7/24/2008
Please send one signed original Agreement to Public Works.
Enclosures
M 9Franc ie'Ageeda M ikeBedell.doc
eNsett1 AffiIda
2008-2164
otry;
wIiDc.
COLORADO
MEMORANDUM
TO: Clerk to the Board DATE: February 23, 2009
FROM: Mike Bedell, Public Works
SUBJECT: Consent Agenda Item
Change Order No. l with FHU for the WCR 49/Imboden Road Alignment Study.
Attached are two originals, please return a signed original to Public Works.
Enclosures
M:FrancieAAgendaMikeBedell doe
CHANGE ORDER NO.1
WCR 49/Imboden Road Alignment Study
Project Description: This transportation study will result in a preferred future alignment for an arterial
roadway that will connect WCR 49 to Imboden Road in Adams County. The two agencies are sharing the
costs associated with the engineering services.
Owner: Weld County Public Works Department, 1111 H Street, Greeley, CO 80632
Consultant: F.H.U., 6300 South Syracuse Way, Suite 600, Centennial, CO 80111
The following change is hereby made to the Contract Documents:
Contract Time Extension: The original Contract (work order #FHU-13) is extended 4 months for
inclusion of additional meetings and coordination with affected landowners. The anticipated study
completion date will change from December 1, 2008 to April 1, 2009.
Change to Contract Scope: Unforeseen additional design services, meetings, and coordination with
affected landowners caused added expenses. In addition, the team underestimated the original scope of
work requirements. The recently completed "O Street" Study cost $48,000. The WCR 49/Imboden Study
is similar in length of roadway and scope of work, and will cost $36,630. Each agency will be responsible
for 50% of the costs. A description and scope of work of the additional services is attached.
CHANGE TO CONTRACT PRICE:
Original Contract Amount
Change Order No.1 Costs
Revised Contract Amount
RECOMMENDED:
Owner Representative:
Engineer:
William F. Garcia, Chair
APPROVALS:
Consultant: F.H.U. Ire.
By:
$20,000.00
$16,630.00
$36,630.00
ayne Howard, County Engineer CIP
V
Title: PY�^c`Qti�
Date:
Date:
02/25/2009
Date: ' -
,?O4P- g/
Weld County Road 49/Imboden Road
Alignment Study
Change Order #1
This study is encountering numerous additional required tasks that need to be
completed in order to properly evaluate the generated alternatives and complete the
study of the Weld County Road 49 and Imboden Road corridor. In order to complete the
additional tasks as well as those identified below, FHU is requesting Weld County and
Adams County to approve this Change Order #1.
The following tasks and anticipated budget is FHU's best attempt to anticipate the
required work remaining to complete this study along with preparing the final report.
There may be circumstances that will be encountered during the completion of the final
tasks associated with this project that may not be captured with this estimation.
October/November 2008
Initial Open House and Local Agency Meeting — an initial open house will be conducted
with the public to present the findings of the alternatives to be evaluated and the
anticipated evaluation process that will be followed. The history of Weld County Road
49 as a strategic roadway as well as Imboden Road as a strategic roadway corridor will
also be generated to give the public the required background information for the
purpose of this study. This task includes the labor to create the "initial" final open house
graphics as well.
Anticipated Budget — $4,030
24 hours for a Senior Engineer
8 hours for a Senior Designer (Open House Displays/Graphics)
Other Direct Costs (Handouts, Plots, Copies, etc.)
December 2008
Local Agency Meeting — a local agency meeting will be conducted to discuss the
evaluation results. This task will also include the compilation of the received scoring
results.
Anticipated Budget — $800
6 hours for a Senior Engineer
Other Direct Costs (Plots, Copies, etc.)
January 2008
Local Agency Meeting — a local agency meeting will be conducted to review the
proposed final open house graphics. This task will include the labor required to generate
the "draft" final open house graphics as well.
Weld County Road 49/Imboden Road Alignment Study — Change Order #1
Page 1 of 2
Anticipated Budget - $2,300
12 hours for a Senior Engineer
8 hours for a Senior Designer (Open House Displays/Graphics)
Other Direct Costs (Plots, Copies, etc.)
January 2008
Final Open House — a final open house will be conducted with the public to present the
findings of the evaluation process and the "preferred alignment". This task will include
the labor to create the "final" final open house graphics as well.
Anticipated Budget — $4,000
24 hours for a Senior Engineer
8 hours for a Senior Designer (Open House Displays/Graphics)
Other Direct Costs (Plots, Copies, etc.)
February 2008
Report Preparation — a report will be created that displays the study process and the
results of the evaluation process. It is anticipated that a "draft" report will be generated
and submitted to the Counties for review, and then a "final" report will be assembled that
incorporates that Counties' comments.
Anticipated Budget — $5,500
30 hours for a Senior Engineer
4 hours for a Senior Designer (Report Graphics)
20 hours for Administrative (Word Processor)
Other Direct Costs (Plots, Copies, etc.)
Based on the above -described work, it is estimated that $16,630 is required for this
effort. Therefore, FHU is requesting an additional $16,630 to be added to the existing
contract amount of $20,000 for a new revised contract amount of $36,630.
Weld County Road 49/Imboden Road Alignment Study — Change Order #1