Loading...
HomeMy WebLinkAbout20091557.tiffMEMORANDUM 4044 111k. COLORADO TO: Clerk to the Board DATE: July I, 2009 FROM: Wayne Howard, County Engineer/CIP, Public Works SUBJECT: CONSENT AGENDA ITEM Work Order Form ($HEr7) for the WCR 74 Mill and Overlay (ARRA Project) with Short Elliott Hendrickson in the amount of $19,762.84. Attached are two original Work Orders; please return one signed Work Order to Public Works. M \FrannieAAgenda Wayne Howard.doc &L ' t (iv gib--lL,i J///aOUof A:7-106 et, 2009-1557 . /ALI(IGt,t_) t'"7 /-2 - O7 WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND SHORT ELLIOTT HENDRICKSON INC. DATED: 6-16-09 Work Order Number: SEH-7 Project Title: WCR 74 Mill and Overlay (ARRA Project) Commencement Date: July 27, 2009 Completion Date: August 28, 2009 Limitations on compensation: Total Contract Not to Exceed $19,762.84. This cost will be 100% reimbursed with American Recovery and Reinvestment Act (ARRA) funds. Project Description: Assisting Weld County with Construction Inspection services. This Federal -Aid project requires the services of an inspector with sufficient knowledge and certifications to fulfill all of the required duties. The same inspector recently assisted Weld County with the construction of Federal - Aid bridges --13/54A and 27/66A. -It is anticipated that this project will be awarded for construction in July, 2009. Scope of Services: See attached Construction Services Estimate Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. Professional Short Elliott Hendrickson Inc. 2000 South Colorado Blvd., 6000 Colorado Center Tower One Denver, C 222-7 By: /� Tit�e: K(G/o..-) OBIS. I Date: /6.09 The attached forms are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Weld County By: Michael Bedell, P.E. - Senior Engineer Colt(olo % Date: By: ,e Department Head Date: G — / r- o By:.1:126()47(>1/L,jl ,l6JZ>:q Director of jUL1 6100,(lministratio- Date: �L ytl JJ By: Chairman, Weld Cu n 2009 Commissioners Date: JUL u -7- atcet- /S57 Weld County Weld County Road 74 Mill and Overlay Federal Aid Project No. ES4 C030-035, SA 17325 Construction Services Estimate Construction Inspection Project Time: 25 Calendar Days Per Mike Bedell's Estimate, assume 180 inspector hours Inspection Time = 180 hours Michael Shrout's Billing Rate = 87.00 $/hour Total: $15,660.00 PM, Review, & Admin PM Review Admin Hildahl Davis O' Conner Hours 8 8 4 Rate $153.82 $166.95 $107.42 $1,230.56 $1,335.60 $429.68 Michael lives nearby, so no per diem is needed. 6/16/2009 Total: $15,660.00 Total: $2,995.84 Vehicle: $4.50 /hour + Mileage: 540 miles (15 miles each way 180 hours $0.550 /mile per day, 18 days) $810.00 $297.00 Total: $1,107.00 Material Testing Material Testing will be provided under a separate contract, and is not included. Shop Drawing Review & Technical Assistance It is assumed that shop drawing review and technical assistance will be provided by the design engineer, and are not included. Total Construction Management Estimate: $19,762.84 Hello