HomeMy WebLinkAbout20253394 hnol 2€oad In
12/ 0 /zOZ5
Weld County Code Ordinance 2025-13 C MCA—
In the Matter of Repealing and Reenacting, with Amendments, Chapter 5 Revenue
and Finance, and Chapter 23 Zoning of the Weld County Code
Be it ordained by the Board of County Commissioners of the County of Weld, State
of Colorado:
Whereas, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
Whereas, the Board of County Commissioners, on December 28, 2000, adopted
Weld County Code Ordinance 2000-1, enacting a comprehensive Code for the County of
Weld, including the codification of all previously adopted ordinances of a general and
permanent nature enacted on or before said date of adoption, and
Whereas, the Weld County Code is in need of revision and clarification with regard to
procedures, terms, and requirements therein.
Now, therefore, be it ordained by the Board of County Commissioners of the County of
Weld, State of Colorado, that Chapter 5 of the Weld County Code be, and hereby is,
repealed and re-enacted, with amendments, to read as follows.
Chapter 5
Revenue and Finance
Amend Sec. 5-7-10. Permits, regulations and fees established.
The following permits, fees and regulations are determined by the Board of County
Commissioners:
A. through H. — No change.
Insert new I. Appendix G: Reserved
Renumber old I through S to become J through T.
U. Appendix 5-N: County-wide Road, Facilities, and Drainage Impact Fee Schedules
V. Appendix 5-0: Criminal Justice Records Retrieval
W. Appendix 5-P: Weld County Qualification-Based Selection Process
X. Appendix 5-Q: Request for Qualification (RFQ) Scoring Form
Y. Appendix 5-R: Request for Proposals (Best Value) Scoring Form
2025-3394
ORD2025-13
Final Reading
Page 2
Z. Appendix 5-S: Request for Proposals (Qualification-Based Selection Projects)
Scoring Form
AA. Appendix 5-T: Contract Provisions
AB. Appendix 5-U: Updated Federal Equal Opportunity Clause
AC. Appendix 5-V: Table 1 Guidelines for Purchases
AD. Appendix 5-W: Weld County Treasurer Fees
AE. Appendix 5-X: Weld County Public Trustee Schedule
Appendix 5-A Commercial Rental Schedule — No Change
Appendix 5-B Reserved
Appendix 5-C Missile Site Park Fees — No Change
Amend Appendix 5-D Weld County Government Fees — Attached
Appendix 5-E Rates for Clerk to the Board — No Change
Appendix 5-F GIS Fee Schedule — No Change
Appendix 5-G Reserved
Appendix 5-H Fees for Liquor Licenses and Permits, Fermented Malt Beverage Licenses,
and Fermented Malt Beverage and Wine Licenses — No Change
Amend Appendix 5-I Clerk and Recorder Fees — Attached
Amend Appendix 5-J Land Use Application Fees — Attached
Amend Appendix 5-K Building Permit and Inspection Fees — Attached
Amend Appendix 5-L Required Bid Amount— Attached
Appendix 5-M Department of Public Works Permit Application Fees — No Change
Amend Appendix 5-N Development Impact Fees — Attached
Appendix 5-0 Criminal Justice Records Retrieval — No Change
Appendix 5-P Qualification-Based Selection Process — No Change
Appendix 5-Q Request for Qualifications (RFQ) Scoring Form — No Change
Appendix 5-R Request for Proposals (Best Value) Scoring Form — No Change
Appendix 5-S Request for Proposals (Qualification-Based Selection Projects) Scoring
Form — No Change
Appendix 5-T Contract Provisions — No Change
Appendix 5-U Updated Federal Equality Opportunity Clause — No Change
Appendix 5-V Table 1 Guidelines for Purchase — No Change
Appendix 5-W County Treasurer Fees — No Change
Appendix 5-X Public Trustee Fee Schedule — No Change
2025-3394
ORD2025-13
Final Reading
Page 3
Chapter 23
Zoning
Amend Sec. 23-2-930. Hazardous waste disposal site and solid waste disposal site
fees.
The fees for hazardous waste disposal sites and solid waste disposal sites,
established by the Board of County Commissioners in Appendix 5-J of this Code, may be
refunded in whole or in part by decision of the Board of County Commissioners. The
amount of the refund, if any, shall be determined, in part, based upon the cost incurred
by the COUNTY in reviewing the application and shall include, but not be limited to,
outside consultant work, staff time, and state and local agency fees. The entire fee must
be submitted with the application and will be held and charged against by the COUNTY
based on the standard hourly rate for each department administering or reviewing the
permit. The departments shall include, but not be limited to, Planning Services, Public
Health, Public Works, and the County Attorney's Office. The standard hourly rate shall be
established by the Weld County Finance Department for the actual time spent on the
review of the application and facility. The rate shall be calculated on a full cost recovery
basis of the COUNTY's cost and shall include salary, fringe benefits, support costs
(services and supplies), and indirect costs calculated in accordance with the County-wide
cost allocation plan per Federal OMB-87 methodologies. The applicant must submit a
request for a refund to the Department of Planning Services within thirty (30) days of
recording the map, within thirty (30) days after denial of the application by the Board of
County Commissioners, or within thirty (30) days after the applicant submits a written
request to withdraw the application. The Department of Planning Services shall
coordinate with the Clerk to the Board for the Board of County Commissioners to consider
the request at a regular meeting of the Board and shall notify the applicant of the date of
the meeting at least ten (10) days prior.
Be it further ordained by the Board that the Clerk to the Board be, and hereby is, directed
to arrange for Municode to supplement the Weld County Code with the amendments
contained herein, to coincide with chapters, articles, divisions, sections, and subsections
as they currently exist within said Code; and to resolve any inconsistencies regarding
capitalization, grammar, and numbering or placement of chapters, articles, divisions,
sections, and subsections in said Code.
Be it further ordained by the Board, if any section, subsection, paragraph, sentence,
clause, or phrase of this Ordinance is for any reason held or decided to be
unconstitutional, such decision shall not affect the validity of the remaining portions
hereof. The Board of County Commissioners hereby declares that it would have enacted
this Ordinance in each and every section, subsection, paragraph, sentence, clause, and
phrase thereof irrespective of the fact that any one or more sections, subsections,
paragraphs, sentences, clauses, or phrases might be declared to be unconstitutional or
invalid.
2025-3394
ORD2025-13
Final Reading
Page 4
First Reading: November 3, 2025
Publication: November 7, 2025, in the Greeley Tribune
Second Reading: November 17, 2025
Publication: November 21, 2025, in the Greeley Tribune
Final Reading: December 10, 2025
Publication: December 17, 2025, in the Greeley Tribune
Effective: January 1, 2026
The Board of County Commissioners of Weld County, Colorado, adopted the above
and foregoing Ordinance, on motion duly made and seconded, by the following vote on
the 10th day of December, A.D., 2025:
[Insert Ordinance Attestation Block Post Meeting]
2025-3394
ORD2025-13
Final Reading
Page 5
Appendix 5-D Weld County Government Fees
Amend Table as shown below, and renumber as appropriate:
Service Provided Fee Established
29. Justice Services Department Work $17.00 per day
Release placement fee
34. 1041 Oil and Gas WOGLA Permit $15,000.00
Amendment $1,000.00
Addition to Amendment if hearing is 500.00
required
Cash in Lieu one-time payment, per $2,850.00
well, for gravel roads
Cash in Lieu one-time payment, per $4,270.00
well, for paved roads
Delete 35.
2025-3394
ORD2025-13
Final Reading
Page 6
Appendix 5-I Clerk and Recorder Fees
Amend Table as shown below:
Recording Department Fees
Description I Fee
General Recording:
Unlimited Pages $43.00 per document
Exceptions:
Documentary fee on all documents $0.01 per$100.00
granting or conveying title to real property consideration if consideration is greater
per C.R.S. § 39-13-102. than $500.00
Other General Recording Fees:
Military discharge No charge
Death Certificates $3.00 (some exceptions may apply)
UCCs (real estate only):
One or two pages $13.00
Three or more pages $18.00
All e-Recorded UCC statements $8.00
Marriage/Civil Union Fees:
Marriage licenses/Civil unions (cash only) $30.00
Copy of marriage license _ $3.00
Copy Fees:
Per page (Smaller than 8.5" x 14") $0.25
Oversized pages (larger than 8'/z" x $5.00
14")
Certification—per document $1.00
Certified school record $1.75
Military discharge No charge
Postage fees 1-7 pages $1.00
Postage fees 8-60 pages $3.00
Postage fees 61+ pages $5.00
To avoid paying a postage fee, please
include a self-addressed stamped
envelope with your request. The
envelope must be large enough to
accommodate the number of copies
requested.
Returned Checks (per check) $20.00
Special Services:
Share file (FTP per month) $500.00
Deed report subscription (per year) $200.00
2025-3394
ORD2025-13
Final Reading
Page 7
Paper reports—per page $0.05
Certificate of magistracy $2.00
Each additional year $2.00
Document images on compact disc
Daily $10.00
Weekly $25.00
Monthly $100.00
Self-Service Web:
One month subscription (unlimited $300.00
access)
Web copies without a subscription
First page $0.50
Each additional page $0.25
Passport Fees:
Adult passport book (16 years and older) $130.00 (U.S. Dept. of State by check or
money order)
Adult passport card (16 years and older) $30.00 (U.S. Dept. of State by check or
money order)
Child passport book (under 16 years) $100.00 (U.S. Dept. of State by check or
money order)
Child passport card (under 16 years) $15.00 (U.S. Dept. of State by check or
money order)
Expedite fee (per person) $60.00 (U.S. Dept. of State by check or
money order)
Agent acceptance fee (per applicant) $35.00 (Weld County by check, money order,
cash or credit card)
Passport photo $15.00 (Weld County by check, money order,
cash or credit card)
Election Department Fees
Description Fee
Voter certification $1.00
Electronic voter list on compact disc or $50.00
email (.csv or .txt format)
Voter list on paper (per page) $0.25
Locator (each) $30.00
Maps (each) colored copy $15.00
Copies (per page) $0.25
Certified copies (per page) $1 .25
Mail-in ballot status subscription (.csv $150.00
or .txt format) per election cycle
2025-3394
ORD2025-13
Final Reading
Page 8
Early voting list subscription (.csv or .txt $150.00
format) per election cycle
Voter address labels
Setup fee $50.00
Per label $0.02
2025-3394
ORD2025-13
Final Reading
Page 9
Appendix 5-J Land Use Application Fees
Inflation adjustment. The Board of County Commissioners shall annually consider
adjusting the following fee amounts by the rate of inflation. The rate of inflation shall mean
the percentage change from the prior calendar year in the United States Bureau of Labor
Statistics' Consumer Price Index for Denver-Aurora-Lakewood, all items, all urban
consumers (CPI-U), or its successor index.
Land Use Application Fee
1. Use by Special Review (USR)
- Mining permit $5,000.00 for the first 10 acres plus
$20.00 per acre or fraction thereof in
excess of 10 acres
- Solid waste disposal site' $20,000.00
(Certificate of Designation)
- Hazardous waste disposal site, $100,000.00
excluding injection wells' (Certificate
of Designation)
- Non-1041 major facility of a public $3,000.00
utility, other than sewage treatment
facilities
- Sewage treatment facility $12,000.00
- Minor amendment $600.00
- All other USR permits $3,000.00
2. 1041 facilities (Chapter 21) other than $12,000.00
applications made pursuant to
Articles V (WOGLA), which are listed
in Appendix 5-D
- 1041 application amendment $2,500.00
3. Flood Hazard Development Permit $300.00
(FHDP)
- Flood Hazard Development Permit $750.00
(FHDP) requiring extra analysis
- Flood Permit (FP) $100.00
4. Planned Unit Development (PUD)
- PUDZ (zoning) amendment $600.00
- PUDF (final plan) amendment $1,100.00
- PUDF submittal on phased $7,500.00
development
- PUDF amendment - building $300.00
envelope removal
5. Minor Subdivision (9 lots or fewer)
- Sketch plan $1,000.00
2025-3394
ORD2025-13
Final Reading
Page 10
- Final plan $3,300.00
6. Resubdivision
- Where the Resubdivision is for the $550.00
sole purpose of merging existing lots
together
- Where no right-of-way will be $1,100.00
vacated
- Where right-of-way is to be vacated $2,200.00
7. Public Facility Division (PFD) $1,200.00
8. Family Farm Division (FFD) $1,200.00
9. Rural Land Division (RLD)
- Sketch Plan $1,000.00
- Final Plan $3,300.00
10. Lot Line Adjustment (LLA) $1,100.00
11 . Vacation of a Plat or Map
- Partial vacation of exemption plat $1,000.00
- Complete vacation of a plat $300.00
- Partial vacation of a USR $300.00
- Complete vacation of a USR No fee
12. Zoning Permit
- Manufactured homes (ZPMH) $350.00
- Zoning Permit for Ag (ZPAG) $1,500.00
- Telecommunication Antenna Tower $550.00
(ZPTT)
- Noncommercial Tower (ZPNCT) $250.00
- Home Business (ZPHB) $50.00
- Wind Generator (ZPWG) $250.00
- Solar Energy Facility (ZPSF) $1,200.00
13. Board of Adjustment
- Variance $1 ,100.00
- Appeal $250.00
14. Change of Zone (COZ) $3,000.00
15. Site Plan Review (SPR)2
- Amendment $550.00
- Buildings <10,000 gross sq. ft. $1 ,500.00
- Buildings between 10,000-25,000 $3,200.00
gross sq. ft.
- Buildings >25,000 gross sq. ft. $6,000.00
16. Substantial Change Hearing $2,300.00
17. Resolution of illegal land division(s) $2,300.00
18. Grading Permit (SWMP Review) $600.00
2025-3394
ORD2025-13
Final Reading
Page 11
Grading Permit Amendment $300.00
Grading Permit Extension $50.00
19. Ag Field Leveling and Reservoir $100.00
Dredging Permit
20. Access Permit
- Field Access (agricultural only) No fee
- Temporary Access (expires within 6 $150.00
months)
- Residential access $200.00
- Commercial or Industrial access $400.00
- Inspection outside normal work $60.00/hour
hours
- Access permit requiring a variance Subtotal x 2
- Working prior to permit approval Subtotal x 2
21. Investigation Fee3 (for properties that 50% of the established application fee
have a zoning violation case in
process)
22. Limited Event Permit (LEP) (Without $150.00
liquor license)
23. Incidental, Nontechnical Land Use $100.00
Application Assistance (Zoning
Verification Letters)
24. Recording continuance $50.00 per 3 months
25. Outside Consultant for Professional Professional rate
Review. Necessity for Review to Be
Determined by the Director.4
26. For those applications for uses
identified to be of high complexity or
intensity where a determination is
made that County staff will be
committing time and resources. The
applicant shall deposit an estimated
amount of the costs prior to
assistance. The fee will be held and
charged against by the County based
on the standard hourly rate for each
department administering or
reviewing the permit. The
departments shall include, but not be
limited to, the Department of Planning
Services, Health Department, Public
Works and the County Attorney's
Office. The standard hourly rate shall
2025-3394
ORD2025-13
Final Reading •
Page 12
be established by the Finance
Department for the actual time spent
on the review of the application. The
rate shall be calculated on a full cost
recovery basis of the County's cost
and shall include salary, fringe
benefits, support costs (services and
supplies) and indirect costs calculated
in accordance with the County-wide
cost allocation plan per Federal OMB-
87 methodologies. The applicant shall
be provided copies of the billing 5
days prior to the cost actually being
billed. The applicant's sole remedy to
appeal any billing shall be to the
Board of County Commissioners. The
unused portion of the submitted
application fee shall be returned to
the applicant within 30 days of
recording the Special Review plan
map, within 30 days after denial of the
application by the Board of County
Commissioners, or 30 days after the
applicant submits a written request to
withdraw the application.
' See Section 23-2-930 of this code.
2 Public schools, as defined in Chapter 23, are exempt from Site Plan Review fees.
3 See Section 23-2-920 of this code.
° See Section 23-2-910.B of this code.
2025-3394
ORD2025-13
Final Reading
Page 13
Appendix 5-K Building Permit and Inspection Fee Schedule
Inflation adjustment. The Board of County Commissioners shall annually consider
adjusting the following fee amounts by the rate of inflation. The rate of inflation shall mean
the percentage change from the prior calendar year in the United States Bureau of Labor
Statistics' Consumer Price Index for Denver-Aurora-Lakewood, all items, all urban
consumers (CPI-U), or its successor index.
Valuation Data with Local Modifications (See Notes) by Building Group and
Construction Type (International Building Code) (per square foot construction
costs - U.S. Dollars)
Construction Classification
Building Use Group IA IB IIA IIB IIIA IIIB IV VA VB
A-1 Assembly,theaters,with stage 337.41 325.40 315.80 303.35 283.46 275.24 292.98 264.14 254.04
A-1 Assembly,theaters,without stage 309.77 297.76 288.16 275.71 256.07 247.85 265.35 236.75 226.65
A-2 Assembly,nightclubs 269.42 261.52 253.31 243.65 228.21 222.01 235.29 207.53 199.66
A-2 Assembly,restaurants,bars,
banquet halls 268.42 260.52 251.31 242.65 226.21 221.01 234.29 205.53 198.66
A-3 Assembly,churches 314.40 302.40 292.80 280.35 260.82 252.61 269.98 241.51 231.40
A-3 Assembly,general,community halls,
libraries,museums 264.03 252.03 241.42 229.98 209.33 202.12 219.61 190.01 180.91
A-4 Assembly,arenas 308.77 296.76 286.16 274.71 254.07 246.85 264.35 234.75 225.65
B Business 298.43 287.83 277.50 265.76 242.70 234.06 255.55 216.90 206.96
E Educational 282.06 272.26 263.65 252.74 235.87 223.82 244.04 206.65 200.02
F-1 Factory and industrial,moderate
hazard 164.17 156.25 146.41 140.89 125.45 119.36 134.33 104.02 96.87
F-2 Factory and industrial,low hazard 163.17 155.25 146.41 139.89 125.45 118.36 133.33 104.02 95.87
H-1 High hazard,explosives 153.17 145.25 136.41 129.89 115.76 108.67 123.33 94.33 N.P.
H-2,H-3,or H-4 High hazard 153.17 145.25 136.41 129.89 115.76 108.67 123.33 94.33 86.17
H-5 Hazardous production materials 298.43 287.83 277.50 265.76 242.70 234.06 255.55 216.90 206.96
I-1 Institutional,supervised environment 274.98 265.13 255.66 246.00 225.17 219.12 245.49 202.80 195.56
1-2 Institutional,hospitals 469.18 458.58 448.25 436.51 411.45 N.P. 426.30 385.65 N.P.
1-2 Institutional,nursing homes 323.68 313.08 302.75 291.01 269.45 N.P. 280.80 243.65 N.P.
1-3 Institutional,restrained 314.93 304.33 294.00 282.26 261.70 252.06 272.05 255.55 223.96
1-4 Institutional,day care facilities 274.98 265.13 255.66 246.00 225.17 219.12 245.49 202.80 195.56
M Mercantile 201.08 193.18 183.97 175.31 159.52 154.32 166.95 138.84 131.97
Oil and gas sites* 278.14 268.29 258.82 249.16 227.83 221.78 248.64 205.46 198.22
2025-3394
ORD2025-13
Final Reading
Page 14
R-1 Residential,hotels 314.93 304.33 294.00 282.26 261.70 252.06 272.05 255.55 223.96
R-2 Residential,multiple family 232.26 222.41 212.94 203.28 183.19 177.15 202.77 160.82 153.58
R-3 Residential,one-and two-family 215.90 210.16 205.11 200.73 194.02 187.11 204.78 180.41 169.09
R-4 Residential,care/assisted living
facilities 274.98 265.13 255.66 246.00 225.17 219.12 245.49 202.80 195.56
S-1 Storage,moderate hazard 152.17 144.25 134.41 128.89 113.76 107.67 122.33 92.33 85.17
5-2 storage,low hazard 151.17 143.25 134.41 127.89 113.76 106.67 121.33 92.33 84.17
U Utility,miscellaneous 117.65 110.72 103.00 98.58 87.79 82.02 93.83 69.49 66.20
Notes:
N.P. =Not Permitted
Private garages/storage:
Wood frame:$29.33 per square foot
Masonry:$36.25 per square foot
Structural steel:$42.94 per square foot
Unfinished basements(all use groups):$21.38 per square foot
Finished basements(all use groups):$28.03 per square foot
Manufactured homes/prefab structures: Deduct 30%of value per table above.
Move-in dwelling: Deduct 60%of value per table above.
Crawl space:$10.69 per square foot
Breezeway,enclosed porch, patio,covered deck, uncovered deck:$15.90 per square foot
Greenhouse:$11.93 per square foot
Carports:$19.94 per square foot
* Electrical and building fees apply on oil and gas sites.
Building Permit Fees
Total Valuation1 Fee
$1 to $500 $24.00
$501 to $2,000 $24.00 for the first $500 plus $3.00 for each additional $100 or
fraction thereof, to and including $2,000
$2,001 to $25,000 $69.00 for the first $2,000 plus $13.00 14.48 for each additional
$1,000 or fraction thereof, to and including $25,000
$25,001 to $50,000 $402.00 for the first $25,000 plus $10.25 10.32 for each
additional $1,000 or fraction thereof, to and including $50,000
$50,001 to $660.00 for the first $50,000 plus $7.25 7.34 for each additional
$100,000 $1,000 or fraction thereof, to and including $100,000
$100,001 to $1,027.00 for the first $100,000 plus $7.00 for each additional
$500,000 $1,000 or fraction thereof, to and including $500,000
2025-3394
ORD2025-13
Final Reading
Page 15
$500,001 to $3,827.00 for the first $500,000 plus $5.00 for each additional
$1,000,000 $1,000 or fraction thereof, to and including $1,000,000
$1,000,000 and up $6,327.00 for the first $1,000,000 plus $3.00 for each additional
$1,000 or fraction thereof
1 Calculated based on Valuation Table above. See also Section 29-3-210 of this Code.
Manufactured Structure Permit Fees
Structure Fee
Manufactured Homes Block and Tied in Established Park $460.00
(includes electric)
Manufactured Homes Temporarily Stored on Property $85.00
Commercial Manufactured Structures See the Valuation
Data table above
based on the Use
Group and
Construction
Classification
Manufactured Home Single-Family Dwelling See building
valuation per sq. ft.
Engineered Foundations (Crawlspace, Basement or Permanent See building
Installation) valuation per sq. ft.
Plan Check Fee for Building/Manufactured Home Permits
Major Plan Review 70% of building
- New single-family dwelling and all commercial buildings valuation fee
- New utility buildings over 3,000 sq. ft.
Minor Plan Review $80.00
- Residential additions/alterations and utility buildings
additions/alterations under 1,000 sq. ft.
- Manufactured home single-family dwelling on engineered
foundation
- New utility buildings under 3,000 sq. ft.
Note: No plan check fee is assessed on Grading Permits.
Premove Inspection Fees
Move-in Dwelling $230.00
Move-in Utility Structure $230.00
2025-3394
ORD2025-13
Final Reading
Page 16
Demolition Permit Fees
Dwelling/Manufactured Home/Utility Structure $80.00
Commercial Structure See table titled
Building, Plumbing
and Mechanical
Permit Fees Per
Cost of Job.
Electrical Permit Fees
Residential: This includes single-family residences, duplexes, condominiums,
townhouses and construction and extensive remodeling and additions to same
(based on enclosed living area)
0 to 500 sq. ft. $43.00
501 to 1,000 sq. ft. $60.00
1 ,001 to 1 ,500 sq. ft. $83.00
1,501 to 2,000 sq. ft. $90.00
Per 100 sq. ft. in excess of 2,000 sq. ft.1 $6.00
All other electrical fees, except for inspections in manufactured home parks, shall be
computed on the dollar value of the electrical installations, including labor and
materials (total cost to the customer), and such fees shall be computed as follows:
Valuation of work (actual cost to customer - labor and materials):
Not more than $300.00 $43.00
$301.00 to $2,000.00 $50.00
$2,001.00 to $3,000.00 $59.00
$3,001.00 to $50,000.00 $59.00 plus $20.00
per $1,000.00 or
fraction thereof of
total valuation over
$3,000.002
More than $50,000.00 Contact the
Building
Department
Construction Meter (Temporary) $43.00
1 Example: 2,100 sq. ft. = $90.00 + $6.00 = $96.00
2 Examples: $3,500: $59.00 + $20.00 = $79.00; $4,700: $59.00 + ($20.00 *2) = $99.00
Other Inspections and Fees
Inspections outside of normal business hours (minimum charge $80.00 per hour
- 2 hrs.)
Inspections for which no fee is specifically indicated $80.00 per hour
Reinspection fee $80.00 per hour
2025-3394
ORD2025-1 3
Final Reading
Page 17
Additional plan review required by changes, additions or $80.00 per hour
revisions to approved plans
Investigation fee (per Building Official)' 50% of the amount
of the permit fee
1 See Section 29-3-240 of this Code.
Building, Plumbing& Mechanical Permit Fees Per Cost of Job
Up to $20,001 $115.41
$20,001 to $40,000 $397.50
$40,001 to $60,000 $571.69
$60,001 to $80,000 $702.92 _
Over $80,000 $827.88
2025-3394
ORD2025-13
Final Reading
Page 18
Appendix 5-L Required Bid Amount
Pursuant to Article XIV, Section 14-9, Section 5 of the Weld County Home Rule Charter,
written, sealed bids and a ten-day period for consideration and investigation of the bids
are required for purchases in excess of an amount set annually by the Board of County
Commissioners by ordinance. Through repeal and reenactment of this Appendix, the
amount set for the year 2026is $50,000.00; however, the amount is $150,000.00 for all
contracts for a disaster emergency event in the case where a declaration of disaster is
made by the Board of County Commissioners.
2025-3394
ORD2025-13
Final Reading
Page 19
Appendix 5-N County-Wide Road, Facilities, and Drainage Impact Fee Schedules
Land Use Type Unit Fee per Unit According
to 6-year Plan
Implementation
Road Impact Fee
Schedule
Single-family detached Per dwelling $3,794.00
Multi-family Per dwelling $2,888.00
Mobile home park Per pad $2,049.00
Hotel/motel Per room $2,401.00
Shopping Per 1,000 sq. ft. of gross $5,353.00
center/commercial floor area
Office Per 1,000 sq. ft. of gross $3,200.00
floor area
Institutional/quasi-public Per 1,000 sq. ft. of gross $1,520.00
floor area
Manufacturing/industrial Per 1,000 sq. ft. of gross $2,561.00
floor area
Warehouse Per 1,000 sq. ft. of gross $963.00
floor area
Mini-warehouse Per 1,000 sq. ft. of gross $745.00
floor area
Agricultural commercial Per 1,000 sq. ft. of gross $1,186.00
floor area
County Facilities Impact Unit Fee Per Unit
Fee Schedule
Single-family detached Per dwelling $1,636.00
Multi-family Per dwelling $1,126.00
Mobile home park Per pad $1,696.00
Hotel/motel Per room $639.00
Shopping Per 1,000 sq. ft. of gross $1,261.00
center/commercial floor area
Office of gross floor area Per 1,000 sq. ft. $880.00
Institutional/quasi-public of Per 1,000 sq. ft. $343.00
gross floor area
Manufacturing/industrial of Per 1,000 sq. ft. $385.00
gross floor area
Warehouse of gross floor Per 1,000 sq. ft. $164.00
area
Mini-warehouse of gross Per 1,000 sq. ft. $83.00
floor area
2025-3394
ORD2025-13
Final Reading
Page 20
Agricultural commercial of Per 1,000 sq. ft. $330.00
gross floor area
Drainage Impact Fee Unit Fee Per Unit
Schedule
All land uses Per sq. ft. of impervious $0.22
cover
2025-3394
ORD2025-13
Hello