HomeMy WebLinkAbout20100643.tiff -
�j Weld County Planning Department
• MS R. - 55 , GREELEY OFFICE/cMAY ? fi 70,18CIZZr BasZcs, Inc Fr
Eh/ED E
542 High Street • Denver, Colorado 80218 • (303) 329-9295 • Maggieairhasics@comcast.net
May 15, 2008
Mr. Brad Mueller, Lone-Range Planner
Weld County Dept. Planning Services
918 10th Street
Greeley, CO 80631
Dear Mr. Mueller,
When reviewing my files, I realized that your office had possibly not received copies of
the initial Air Pollutant Emission Notices (APENs) filed with the Air Pollution Control
Division for Great Western Oil & Gas Company's Mershon tank batteries. These
documents are apparently required as part of the county USR permit. So, enclosed are
copies of the APEN for your files.
Please contact Mr. Jeff Reale at(970) 686-8831 if you have any questions on this
submittal.
Thank you,
Maggie Scher
Air Quality Specialist
, � -�-` 2010-0643
�L0W it/ae t it,
OIL AND GAS EXPLORATION AND PRODUCTION CONDENSATE STORAGE TANK BATTERY
Air Pollutant Emiss Notice(OPEN)—and—Application fol nstruction Permit
Current Status(Check all that apply) Reason for APEN Submittal(Check all that apply)
AIRS ID#1: New ❑ APEN update only`
• New or previously unreported battery ❑ Modification to existing sources
❑ Previously grandfathered battery ❑ Registration for coverage under general permit no.GPO I and
• Synthetic minor facility cancellation request for individual permit6:
• Located in the 8-hr Ozone Control Area' ■ Application for/Modification of an individual permit
❑ Registered under general permit no.GPOI ❑ Administrative permit amendment'
❑ Permitted under individual permit: ❑ Other:
For individual permit applications,check if you wane: 0 A copy of the preliminary analysis conducted by the Division
■ To review a draft of the permit prior to issuance
Company Name9: Great Western Oil& Gas Company OGCC Operator#: 10110
Mailing Address10: 252 Clayton Street
City: Denver State: CO Zip: 80206 E-mail:
Contact Name: Mr.Jeff Reale Phone: (970)686-7581 Fax:
Tank Battery Name": Mershon Tank Batteries Number of tanks: 3
Location12(QQ Sec.Twp.Range.): SWSE 26 6N 67W County: Weld Total tank capacity[bbl]: 3 z 300
Calendar year for which"Actual"data applies": 2006 Year(s)tank(s)were placed in service": 2006
Control Description's: Combustor Control Efficiency": 95%
Condensate Throughput"[bbl/year] Requested": 18,500(est) Maximum for PTE calculation19: 20,400(est)
Actual2D: 17,000(est) While Controls Operational21 12,000(est)
Other equipment at facility32:
Comments:
Estimated emissions at throughputs listed above. Use N/A for requested throughput/emission values unless requesting an individual permit
❑Check if the Division is to calculate emissions. ❑Check if standard state emission factors used to calculate emissions".
Emission Factor Battery Requested Emissions" Actual Emissions%
Pollutant" [Ib/bbl] PTE Uncont olled26 Controlled" Uncontrolled26 Controlled2r
VOC[tons/year] 13.7 139.7 .—49r.'--�. 34.3 4.1
NOx[tons/year] 0.05 , . 4ECEIVF' ' De minimus
CO[tons/year] 0.13 FEB24 De minimus
Benzene[Ibs/year] 0.024 120 14
A'-i.J
n-Hexane[lbs/year) 0.21 . -.-. 1050 126
Wells serviced by this tank or tank battery"
API#: 05-123-23134 Name: MERSHON 26-33 ■Newly Reported Well
API#: 05-123-23133 Name: MERSHON 26.43 ■Newly Reported Well
API#: 05-123-23135 Name: MERSHON 26-54 ■Newly Reported Well
API#: Name: 0 Newly Reported Well
API#: Name 0 Newly Reported Well
API#: Name: ❑Newly Reported Well
API#: Name: ❑Newly Reported Well
The signature below indicates that I have knowledge of the bets herein set forth and that die same are true,accurate,and complete to the best of
my knowledge and belief. If this is a registration for coverage under general permit GPI,I further certify that this source is and will be operated
in full compli on of general permit GP 1.
aa- eG
Signature/of Legally Authorized Person(not a vendor or consultant) Date
l7retriftrn 111 op gee c0-s
Type or Print Name of Person Signing Above Official Titld
Submit this form,along with$119.96 for each Colorado Department of Public Health and Environment For information call:
filing of up to 5 tank battery APENS. Include Air Pollution Control Division,APCD-SS-BI (303)692-3150
Dec 15 2006 4: 07PM BROE LAND 9706862014 p. 2
WE'-12
OIL AND GAS EXPLORATION AND PRODUCTION CONDENSATE STL_AGE TANK BATTERY
Mr Pollutant Essi sioa Notice(APEN)—sad—Application for Coustneioa$ Permit In K.-. l 6 S
Curran Status(Check all that tpply) Reason for ANN Submittal(Check ail that apply)
ADS Me: New O APEN update only,
• New orprcviastye®epmtedbeteCy O ModMallo,mckiamgsources
❑ Previously gmdfathertd battery' ■ Registration for coverage under geaerat permits.GPOI and
• Synthetic minor fbdgry cancellation request for individual pen»es:
• Located in the 84w Ozone Control Areas ❑ Application for/Modification eta Mdividkal penult
❑ Registered under general permit DO.OPOt ❑ Ad®isla dvepaint amendment'
❑ Permitted unda individual permit ❑ Ott:
For individual pe nitappliradons dtoS if you nit': ❑Acopyof the preliminary analysis condoaedby the Divmn
B To review a drdt of the permit prior to Sturm
Company Name': Great Western OR a Galt Company OOCC()pawnor 8: 10110
Mailing Addressro: 503 Meter Street
City: Windsor State: CO Zip: 00510 E-mail: Inch- brw.aa
COMM Name: Mr.Jeff Reale Phase: (P70)606-0831 Inc
Tank Battery Name": Gnat Watasa V.44 Batten' Nombsofinem 3
Leaelea'r(QQ Sec.Top.Rage* NWSW 26 el 67W Cady: Weld Taal ah capacity INA: 3z300
l4
Calendar year for which"Actual des apples": 2006 Yea(a)teak®were placed in arvtoe 2006
Description": Combustor Control Eiticdaey": 95%
CandrawareThtrol rooa : ' NA 1 for PTE talealMion'a: 43,240 0007 ant)
CaodmsareTl ' 1>tb ) mss: While ControlsOpaatiooal" 10,500 test)
Acne: 10,500(eat)
Other equipment at Waite:
CommmtG
Eadnaed antedates at throughputs listed above. Use Midi,re seartits,agepat/adadsw wawa mien►g tSSgaw faiitealpale
❑Cheek if the phial%nratadMeemidoas. ❑Chock if award saute emission factors need m admit emfaioos"•
Eatission Factor I= Embalm? Actual Emissions"
Pollutant" {bbb[l Unc Requested
Controlled" Uncamolbds' Connotive
39A 3.6
VOC{toosryer] 13.7 stain
NO*Doe tsj 0` 5 De stainhain
CO{tomh'ea) 4 Desti
13 De*Siam
ra
Bauxite(ptyyeal 0.024 De Saimaa
Lmalyer) 0.21
Wass aeniesd by As taker teak bdttry"
API II: 05.12344051 Now GREAT WESTERN26-13 ■Newly Reported Well
Ant 05-123-24053 Nemec GREAT WESTERN 26-14 a Newly Repotted Well
API it: 05-123-24052 Name: GREAT WESTERN 2623 ID Newly Repotted Well
ANC OS-123-24061 Nair GREAT WESTERN 26-24 ■Newly Repotted Weil
API ft: 05-123-94054 Name GREAT WESTERN 26-53 /Newly Repotted Well
API+x: Name: O Newly Reported Well
API t. Name: ❑Newly Reported Well
The signature below inffeamtbat 1 bave knowledge of the WA herein set that and that the same are ins;accurate,end complete to thebeftif-,_,
mykmrwtedgemid ' I hsisa Rrcovmagetmder Baneful pant GPI,I farther catiC'thatissouceisa dwillbe
in full Nest co t GPI. `Ft 1
{;
..� /2,s7off EA S 7 �
Strauss of LegallyAmhorlsed Penton(not vendor aawadtart) Date -co
Neil to V.P.Opaedems .
h-Typeor Print Name of Person SOBS Above Official Thin
Sabmit this form,Moog with 511936 brash Colmrto Department of Min Reda eel Bafflement For miomiMiai q8:
fihigMap to5 teat brtsyAYERS. Include Air PelhtdakContra Division.APCI>SS-DI (303)692-3I30
$250 General Pama(be for each new OP 4300 Chew Creek Drive Such
Revised January 2005
AIL
%aA
" we Weld County nning Department
GREELEPlaY OffICE
GREAT WESTERN OIL AND GAS, LLC ��� 1 g 2006
5O3 MAIN STREET
WINDSOR, CO 8O55O RECEIVED
970.686.8831
Captain Mike L. Davis
Fire Prevention Division
Windsor- Severance Fire Protection District
100 7th Street
Windsor, Co. 80550
RE: USR 1551 Great Western Oil and Gas Company
Dear Captain Davis,
Pursuant to Condition of Approval 1(b) of the above referenced Site Specific
Development Plan and Use by Special Review permit may this correspondence serve as
notice that Great Western Oil and Gas Company has addressed the requirements of the
Windsor- Severance Fire Protection District. As discussed in a telephone conversation with
Bill Crews on March 16, 2006; Great Western Oil and Gas will comply with all applicable
regulations of the Colorado Oil and Gas Conservation Commission in the construction of
the Great Western Pad 4 tank battery and all equipment,pipe and fittings comply with
COGCC and API specifications. All of the wells flow lines and the batteries gas gathering
line will be constructed with compliant equipment and in accordance with applicable DOT
regulations. All of the construction activities will be supervised by either Great Western Oil
and Gas employees or their authorized representative. The condensate storage tanks will be
placarded with NFPA placards and MSD's for condensate, natural gas and produced water
are available upon request.
Great Western Oil and Gas Company is anxious to build a strong working relationship
with the Windsor- Severance Fire Protection District. If there are any concerns or questions
that remain regarding this matter,please contact the undersigned at (970) 686-7581.
Very Trul ours
e f Reale
Vice President of Operations
Great Western Oil and Gas
CC: Brad Mueller
Weld County Department of Planning Services
Bill Crews
Crews and Zeren
446
542 High Street • Den\er. Colorado S(12 IS - (303) 329-9295 • Maggiea irbasicswcomcast.net
April 26, 2006
Mr. Jeff Reale
Great Western Oil & Gas Company
252 Clayton Street
Denver, CO 80206
Dear Jeff,
APENs on your new wells aren't due yet—not until after production starts. In fact, they
are not due until 30 days after the report of first production (well completion report?) is
filed. But no later than 90 days after the first day of production.
A construction permit (either an individual permit or the General Permit) will be issued in
response to the APEN. You can keep producing in the meantime—you do not have to
wait until the permit is issued. However, in order to meet the Reg. 7 VOC reduction
requirements this year(47.5% on a daily basis May 1 — September 30, then 38% the rest
of the year), the next several batteries need to be controlled (unless condensate
production is < 730 bbl/year).
Attached are some APEN exemptions from AQCC Regulation 3 Part A.II.D. I've
marked a few of the ones that pertain to oil & gas E&P operations.
Please let me know if you have any other questions at Maggieairbasicsrcomcast.net.
Sincerely,
Maggie Dolan Scher
Air Quality Specialist
WINDSOR
Town of Windsor
=
301 Walnut Street • Wind„Jr. Colorado 80550 • 970-686 7 e6• ar: 970-686-7180• ww�.u.0 soryoe.co
COLDld Count
m
Planning ind Department
GREELEY OFFICE
APR 2; 2006
April 21, 2006 RECEIVED
Ms. Sheri Lockman, Weld County Planner
Weld County Dept. of Planning Services
918 - 10th Street
Greeley, Colorado 80631
Subject: Weld County referral—Use by Special Review (USR-1551)—Great Western Oil
and Gas Company, LLC
Dear Ms. Lockman:
The Town of Windsor Planning Commission reviewed this referral at its regular meeting of April
19, 2006. With the recent adoption of the East Side Industrial Subarea Plan (ESISP) update to the
Town's Land Use Plan map, the subject property is now located within the Town's Growth
Management Area (GMA) and is depicted as Heavy Industrial on the Town's Land Use Plan map.
However, the subject property is not part of any pending annexations and the Kodak campus is not
currently planned to be annexed to the Town. The applicant has indicated that they plan to establish
drill sites located on Kodak property in order to directional drill to other portions of the property,
thereby preserving surface development potential on the property that is proposed for annexation to
the Town.
Therefore, the Planning Commission recommends approval of USR-1551 to the Weld County
Department of Planning Services.
Thank you for the opportunity to review this proposal.
Sincerely,
Scott alls adt, AICP
Senior Planner
pc: Gale Schick, Chairman
Windsor Planning Commission
Joseph Plummer, AICP,Director of Planning
Great Western Oil and Gas Company, LLC, applicant
William G. Crews, applicant's representative
Hello