HomeMy WebLinkAbout20100989.tiff (itMEMORANDUM
ViDcs TO: Clerk to the Board DATE: May 6, 2010
COLORADO
FROM: Wayne Howard, County Engineer, CIP
SUBJECT: Consent Agenda Item
Attached are two original signed Work Orders #10 with Terracon for asphalt testing for the Weld
County overlay program not to exceed $19,789.00.
This issue was discussed and approved at a Work Session on May 5, 2010.
Please return one original Work Order#10 to Public Works.
Reference: Doc #2007-1652 (original Agreement for Professional Services)
M\FrancieVAgendaChairSignature.doc
,�st Off,A cl LL" Cel ; PIA)
(hell)GCltGC) 2010-0989
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
TERRACON
DATED: April 14th, 2010
Work Order Number: Terracon - 10
Project Title: Asphalt testing for Weld County Public Works overlay program.
Commencement Date: April 26`h, 2010
Completion Date: December 31st,2010
Limitations on compensation: Not to exceed $19,789.00
Project Description: See proposal dated April 5th, 2010
Professional agrees to perform the services The attached forms are hereby accepted and
identified above and on the attached forms in incorporated herein, by this reference, and
accordance with the terms and conditions Notice to Proceed is hereby given.
contained herein and in the Professional
Services Agreement between the parties. In the
event of a conflict between or ambiguity in the Weld County
terms of the Professional Services Agreement and this work order (including the attached By: S-
forms) the Professional Services Agreement Project Manager
shall control. Date: di PI-pia
Professional By: / —
Department Head
Terracon Consulting Engineers Date: `/ /V-/6
•
By: et
_ Bou cA �
Director o`Finance and Administration
Title: C� /(Q AAu(3e r Date: MA 1 2 2010
Date: L� /YA //0 -- B
Chairman, eld Coun ommissioners
Date: MAY 1 2 2010
•
BOARD OF COUNTY COMMISSIONERS
REVIEW/WORK SESSION REQUEST
RE: Terracon Work order#10
DEPARTMENT: WELD COUNTY PUBLIC WORKS DATE:4-14-2010
PERSON REQUESTING: Josh Holbrook,Weld County Public Works
Brief description of the problem/issue:
Work Order No. 10—Weld County-Public Works will be placing approximately 85,000 tons of asphalt for the
2010 Overlay Program. This Work Order is designed to cover the testing of aggregate material/asphalt content.
Test samples will be taken at the asphalt plant prior to delivery to ensure that the asphalt meets our construction
specifications.
We have selected Terracon to perform these services under the On-Call Geotechnical Contract. Attached are
Work Order #10 and the outlining scope of work proposed by Terracon. This work order will not exceed
$19,789.
What options exist for the Board? (Include consequences,impacts,costs,etc.of options)
BOCC can either approve Work Order No. 10 or deny it.
•
Recommendation to the Board: I recommend approval of Work Order No. 10 for Terracon under the On-Call
Geotechnical Contract.
•
Approve Schedule
Recommendation Work Session Comments
Douglas Rademacher, Chair
Barbara Kirkmeyer, Pro-Tem
Sean P. Conway _ --_ •_. - _
William F. Garcia
David E. Long _ V
Attachments 00110.cA—Eg�\ �cYW • e `CrDY \n(101`01 5 )?O\O a-J�,Fm
pc:
M:\-Active Projects\Engineering On-Call Services\Geotechnical On-Call\Terracon\WO 10-HMA overlay Testing 2010\Work Session Request doc
lierracon
April 5, 2010
Weld County Public Works
1111 H Street,
P.O. Box 758
Greeley, Colorado 80632-0758
Attn: Mr. Josh Holbrook
Re: Proposal for Construction Materials Engineering and Testing Services
2010 Weld County Hot Mix Asphalt Projects
Various Locations
Weld County,Colorado
Weld County Project No.AN-6
Terracon Proposal No. P21100024
Terracon is pleased to submit this proposal to provide quality control testing, observation, and laboratory
engineering services during new Hot Mix Asphalt(HMA) paving and overlay projects as scheduled by Weld
County Public Works during the 2010 calendar year.
If required in the project specifications, Terracon's Greeley and/or Fort Collins office,which is accredited by
AASHTO/CCRL in bituminous mixtures, soils, aggregate and Portland cement concrete and meets ASTM
E329 "Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in
Construction" criteria. R18 accreditation documentation is available upon request for your review or can be
viewed by visiting their website at htto://amrtnet/Portal/DesktooDefault.aspx?tabindex=0&tabid=20 for
current accreditation status. This proposal outlines our understanding of the scope of services to be
performed by Terracon for this project, our proposed schedule, and provides an estimated fee for our
services.
A. PROJECT INFORMATION
Terracon understands that the proposed schedule of paving consists of approximately 84,000 total tons on
various separate jobsites located in the Weld County area. The construction and improvements are
assumed to consist of both new paving and existing milling overlay projects depending on location and
condition. Terracon understands that County personnel will be performing all sampling of material and will
deliver HMA samples to Terracon's Greeley Office.
Construction activities for Terracon services may include, but not necessarily limited to: Asphalt sampling
and laboratory asphalt testing including extraction-gradation, L.A. Abrasion, Lottman, fractured face
determination, maximum theoretical specific gravity (Rice), mix design bulk unit weight & Hveem stability
verification, ignition method of asphalt binder content calibration, and other professional services.
Terracon is familiar with the planned construction testing criteria based upon similar work in the area and
look forward to providing these services on your project.
This proposal is to provide materials testing and observation services during construction activities only
when specifically requested and scheduled to do so by our client and/or authorized representative during
construction on the project site. Additional testing/observation services not referenced are not
Terracon Consultants, Inc. 1289 First Avenue Greeley,Colorado 80631
P 19701 351 0460 F 19701353 8639 terracon.com
Geoteclinical ■ Environmental • Construction Materials • Facilities
2010 Weld County Asphalt Projects Construction Terracon
Weld County,Colorado
Proposal No.21100024
Page 2
included in the scope of this proposal. The proposed scopes of services and estimated costs for the
construction materials testing services are included herein.
B. SCOPE OF SERVICES
Our scope is based on "take off'quantities provided to Terracon by a representative of Weld County(dated
March 30, 2010) for the proposed scope of services. It is requested that the scope be reviewed by our
client, design team and contractor for meeting the project intent and construction schedule anticipated. If •
changes are necessary, it is requested that Terracon be notified so that appropriate changes can be
implemented prior to and during the project duration.
Terracon services will be provided only when specifically requested and scheduled to do so. The
responsibility to call or schedule our services and direct Terracon will be by our client and/or designated
authorized representative, herein referred to as "client". It is the client's responsibility to meet specified
testing frequencies, and to review the Terracon estimated budget versus actual services performed with
respect to the construction performed to-date.
Since our personnel will not be at the site on a resident basis, it will be imperative that we be advised when
to provide services on the project. Unless other arrangements are made,scheduling of personnel will be on
an as available basis,which may require changes in personnel assigned to the project. The detailed scope
of services envisioned to be performed is as follows:
Hot-Mix Asphalt(HMA)Paving Testing: Field sampling is available upon request.
The number of client requested laboratory tests are as follows:
Ignition Method of Asphalt Binder Content Calibration(Colorado Procedure—Laboratory 5120)
• It is anticipated that three (3) separate hot plant/suppliers with three (3) separate mixes will be
utilized during paving operations and therefore calibration will be provided for the three (3) mix
designs designated by Weld County Public Works. Each laboratory mix design calibration is
estimated to include: Preparation of each aggregate by drying and manually prepare the test
samples to the mix design blend proportions with the addition of liquid asphalt and then performing
the ignition oven/aggregate gradation testing and to include review/coordination by the
Department/Project Manager. Terracon understands that County personnel will be performing all
sampling of material and will deliver two (2) of the samples to Terracon's Greeley Office.
Additionally, Terracon understands that we will sample one (1) of the materials at the hot plant (2
hours/trip);
•
2010 Weld County Asphalt Projects Construction lrerracon
Weld County,Colorado
Proposal No. 21100024
Page 3
HMA and Aggregate Laboratory Testing
• Determination of Bitumen Content by Extraction, Gradation Analysis of Extracted Aggregate—45 to
be delivered by client;
• Maximum theoretical specific gravity for air voids(rice)—16 tests to be delivered by client;
• Lottman (TSR)—4 tests to be delivered by client;
• L.A.Abrasion—4 tests to be delivered by client;
• Ignition method of asphalt binder content calibration— 3 tests (2 tests to be delivered by client and
1 test to be sampled by consultant);
• Fractured face determination—4 tests to be delivered by client; and
• Mix design bulk unit weight&Hveem stability verification—4 tests to be delivered by client.
> Project Management/Coordination
• Department/Project Manager—25 hours;
Y Other/Additional Professional Services Anticipated
• Based upon project contractor performance additional testing and/or consultation may be requested
by Weld County and has been estimated to be included in the proposal for budgetary purposes.
C. COMPENSATION
The cost for our services including all field work, laboratory testing, engineering analyses and report
preparation has been estimated on the basis of unit rates especially prepared for this project. For testing
and observation services, our costs are based on the following rates as defined in the 2009 Weld County
Department of Public Works On-Call Geotechnical Testing Services Cost Sheet:
COMPENSATION SCHEDULE
PERSONNEL/REPORTS
Principal Engineer. $103/hour
Department/Project Manager $88/hour
Field Engineer/Geologist $73.50/hour
Senior Field Technician $49.50/hour
Field Technician $49.50/hour
2010 Weld County Asphalt Projects Construction lferracon
Weld County,Colorado
Proposal No. 21100024
Page 4
LABORATORY TESTING
Determination of Bitumen content by Extraction, Gradation Analysis of Extraction $185 each
Maximum Theoretical Specific Gravity(rice) $88 each
Fractured Face Determination $46.50 each
Lottman (TSR)Test $248 each
L.A.Abrasion $124 each
Mix Design Bulk Unit Weight& Hveem Stability Verification $258 each
Ignition Method of Asphalt Binder Content Calibration (excluding sampling) $650 each
As Required Sampling $200/trip
Note: Items not addressed above will be invoiced per the negotiated, "2009 Weld County Public Works On-
Call Geotechnical Testing Services Cost Sheet"(attached)
The estimated cost for providing the above services on the project is as follows:
> Project Description Estimated Cost:
• HMA/Oven Calibration—Lab(3@$650 ea.) $1,950
• HMA/Oven Calibration—Sampling (1 trip@$200 ea.) $200
• Extraction Gradation(45@ $185 ea.) $8,325
• Rice Specific Gravity(16@$88 ea.) $1,408
• Lottman (4@$248 ea.) $992
• Fractured Face Determination (4@$46.50 ea.) $186
• L.A.Abrasion (4@$124 ea.) $496
• Mix Design Bulk Unit Weight&Hveem Stability Verification (4@$258 ea.) $1,032
• Project Management(25 hrs.@$88/hr.) $2,200
• Other Professional Services $3,000
• Total Estimated Cost $19,789
Additional services required beyond the scope outlined above will be invoiced based on the applicable unit
rates as presented in the Compensation' Schedule above, 2009 Weld County Public Works On-Call
Geotechnical Testing Services Cost Sheet; or, Professional Services Fee Schedule.
Our estimated fees are based upon our understanding of the project based on the information provided.
Additionally, the following assumptions were used in preparing our estimated fees:
The time required for construction materials testing on the project will be directly related to the schedule and
performance of the various contractors on the site. As a result, total fees for the construction materials
2010 Weld County Asphalt Projects Construction lferracon
Weld County,Colorado
Proposal No.21100024
Page 5
testing services will include only those services outlined in this section of the proposal. Additional services
required for testing services beyond the on-site times outlined above will be invoiced based on the
applicable unit rates as presented on the attached fee schedule(s). Our estimated fees are based upon our
understanding of the project based on the information provided.
Additionally,the following assumptions were used in preparing our estimated fees:
• We have assumed that contractors on the site will work a single-shift,five-day week schedule;
• All work performed before 7am, after 5 pm Monday through Friday and/or on Saturdays, Sundays and
holidays will be billed at 1.5 times applicable hourly rates;
• Should additional services be required beyond the scope of work outlined above, our standard unit
rates will be applicable;
• The contractor will schedule testing and inspection services with 24 hours notice and inspection
services with 72 hours notice(7:00 a.m.to 5:00 p.m., Monday through Friday);
• The contractor is responsible to perform the work in accordance with the plans and specifications, and
our testing of the work does not relieve them of their responsibility to perform the work properly.
• If a change or request of services is made with less than the above requested hours, Terracon will
make every effort reasonable to accommodate,but cannot guarantee having personnel available;
• Unit rates will be applicable for on-site duration's in excess of those outlined; and
• Invoices for the project will be submitted on a monthly basis, with the dollar amount of services
performed to-date versus the project estimated amount or authorized amount with an amount
remaining; if applicable, it is the client's responsibility to monitor this amount with respect to the
construction performed to-date and future services anticipated.
We appreciate your consideration of Terracon for this work and look forward to working as your materials
consultant on this and future projects. Please forward 'copies of your Weld County Work Order
Authorization for Services to Terracon for signature and we will return one copy to Weld County if
acceptable. Commencement of services by Terracon will be considered formal acceptance of this
proposal. Please be aware that we will be unable to distribute field and laboratory reports until a signed
contract is received. If you have any questions or need additional information, please contact us at your
convenience.
Sincerely,
Terracon Consultants, Inc.
Todd A.Turney Reviewed by: Mike L. Walker, CET
Greeley Office Manager Manager of Construction Services
Copies: Via e-mail and constitutes the original. A hard copy will not be mailed.
Enclosure: 2009 Weld County Public Works, On-Call Geotechnical Testing Services Cost Sheet
lierracon
Weld County Department of Public Works
2009 On-Call Geotechnical Testing Services: Cost Sheet
ITEM NO. DESCRIPTION Unit PRICE
SOILS
101 Atterberg Limits; Classification, Liquid Limit, Plastic Limit, Plasticity Index Ea. Test 72.00
102 Hveem Stabilometer-"R"Value Ea. 310.00
103 Proctor-Standard Ea. 119.00
104 Proctor-Modified Ea. 129.00
105 Nuclear Field Density Test 3 or More Tests Per Trip Ea. Test 29.00
107 Sieve Analysis -(Plus#4 Material) Ea.Test 41.00
108 Sieve Analysis-(#4 to minus 200 Material) Ea. Test 46.00
CONCRETE
201 Standard Concrete Cylinders(Including sampling in Field, Slump, Unit Set of 4 227.00
Weight,Yield,Air Content, Temperature,Casting, Curing,Testing and
Reporting)
202 Compression Test(Cap, Cure and Break FOB Lab) Ea.Test 14.50
ASPHALT
301 Sieve Analysis-(Plus#4 Material) Ea. Test 46.00
302 Sieve Analysis-(Minus#4 Material) Ea. Test 51.00
303 Specific Gravity and Absorption(Plus#4 Material) Ea. Test 67.00
304 Specific Gravity and Absorption(Minus#4 Material) Ea.Test 67.00
305 L.A.Abrasion Test Ea.Test 124.00
306 Fractured Face Determination Ea.Test 46.50
307 Flat and Elongated Particles Ea.Test 46.50 •
308 Maximum Theoretical Specific Gravity for Air Voids (Rice) Ea.Test 88.00
309 Lottman (TSR)Test Ea.Test 248.00
310 Mix Design Bulk Unit Weight and Hveem Stability Verification Ea.Test 258.00
311 Determination of Bitumen Content by Extraction, Gradation Analysis of Ea. Sample 185.00
Extraction(To be sampled by Consultant)
312 Determination of Bitumen Content by Extraction (To be sampled by Ea. Sample 124.00
Consultant)
313 Nuclear Field Density Tests(3 or More Tests per Trip) Ea.Test 27.00
314 Core Field Samples Per Hour 46.00
Per Inch 5.00
HOURLY RATES
401 Principal Engineer Per Hour 103.00
402 Geotechnical Engineer/Department Manager/Project Manager Per Hour 88.00
403 Senior Field Technician Per Hour 49.50
404 Field Technician Per Hour 46.50
405 Other: Field Engineer/Geologist Per Hour 73.50