Loading...
HomeMy WebLinkAbout20101862.tiff Kim Ogle m: sullivan15 [sullivanl5@mindspring.com] t: Sunday, June 13, 2010 8:58 PM o: Kim Ogle Cc: jsully0l@yahoo.com; Dave Long; Douglas Rademacher; Sean Conway; William Garcia Subject: case#USR1747 Kim Ogle, I live at 38125 WCR 69, Briggsdale and today observed a sign on property located at the intersections of co rd 74,69 and hwy 392 indicating the"future home of C-7. I then found information on this web site that a proposal to build a oil field waste disposal site-salt water injection facility and water recycling facility on this location has been submitted. I wish to voice my objection to any of these facilities being built on this site in the interest of health and safety, increased truck traffic, noise, odor and ground contamination. I find no benefit to the citizens of Colorado, Weld County or my neighborhood to change this fine agricultural land into a waste facility for oil fields. I behoove the planning department to stop this construction and deny any change in zoning. I also want to be advised of any hearings or movements on this action as well as have all neighbors affected notified in writing of this plan. Jim and Debby Sullivan jsully0l(o�yahoo.com • EXHIBIT • I C ; 1 2010-1862 Kim Ogle om: Janet Carter t: Tuesday, August 03, 2010 3:33 PM Kim Ogle; Julie Wittow; Bruce Barker; Donald Carroll Subject: FW: Language for Conquest No parking or staging of commercial vehicles on the county road is allowed. Use on-site parking area. Janet L Carter Traffic Engineer Weld County Public Works Dept. P.O. Box 758, Greeley,CO 80632 Tele-970.356.4000 ext 3726 Fax-970.304.6497 From: Janet Carter Sent:Tuesday, August 03, 2010 3:26 PM To: Kim Ogle; Julie Wittow; Donald Carroll; Bruce Barker Subject: Language for Conquest Public Works will require a right acceleration and right deceleration lane be constructed on WCR 74 when traffic volumes meet the triggers of 25vph turning right into the facility during a peak hour and 50vph during right out of the facility during the peak hour. Public Works will require a left deceleration lane be constructed when traffic volumes eet triggers of 10 vph turning left into the facility during the peak hour. This requirement will be included in the rovements Agreement. Prior to the start of construction of the auxiliary lanes, final construction drawings will be required to be reviewed and accepted by Public Works. Janet L Carter Traffic Engineer Weld County Public Works Dept. P.O. Box 758, Greeley, CO 80632 Tele-970.356.4000 ext 3726 Fax-970.304.6497 • EXHIBIT I (j2 , (5 1 Hello