HomeMy WebLinkAbout20100772.tiff RESOLUTION RE: ACTION OF BOARD CONCERNING USE BY SPECIAL REVIEW PERMIT #1723 FOR A MAJOR FACILITY OF A PUBLIC UTILITY (A WIND ENERGY FACILITY WITH A GENERATING CAPACITY UP TO 250.5 MEGAWATTS (MW) ALONG WITH A 230-KILOVOLT (KV) ELECTRIC TRANSMISSION LINE, AN INTERCONNECTION FACILITY TO TIE INTO AN EXISTING 72-MILE TRANSMISSION LINE, EXISTING COLLECTOR TRANSMISSION LINES,1-3 PERMANENT 80-METER METEOROLOGICAL TOWERS, ONE (1) SUBSTATION,AN OPERATIONS AND MAINTENANCE BUILDING/ FACILITY,ALONG WITH ONE(1)TEMPORARY BATCH PLANT AND CONSTRUCTION FACILITY) IN THE A(AGRICULTURAL)ZONE DISTRICT-CEDAR CREEK II, LLC, C/O BP WIND ENERGY NORTH AMERICA, INC. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board of County Commissioners held a public hearing on the 14th day of April, 2010, at the hour of 10:00 a.m. in the Chambers of the Board for the purpose of hearing the application of Cedar Creek II, LLC, c/o BP Wind Energy North America, Inc.,Attn: David Gonzalez, 700 Louisiana Street, 33rd Floor, Houston,Texas 77002, for a Site Specific Development Plan and Use by Special Review Permit#1723 for a Major Facility of a Public Utility(a wind energy facility with a generating capacity up to 250.5 megawatts (MW) along with a 230-kilovolt (kV) electric transmission line, an interconnection facility to tie into an existing 72-mile transmission line,existing collector transmission lines, 1-3 permanent 80-meter meteorological towers, one (1)substation,an operations and maintenance building/facility, along with one (1) temporary batch plant and construction facility) in the A (Agricultural)Zone District on the following described real estate,to-wit: Wind Energy Facility: Section 6, Township 10 North, Range 67 West; Sections 1, 2,3,4,5, Township 10 North, Range 58 West; Sections 5, 6, 8, 17, Township 11 North, Range 56 West; Sections 1, 2, 3, 5, 6, 7, 8, 9, 10, 11, 14, 15, 17, 18, 19, 20, 21, 22, 23, 26, 27, 28, 29, 30, 31, 32, 33, Township 11 North, Range 57 West; Sections 3, 4, 10, 11, 12, 13, 14, 15, 16, 17, 24, 25, 27, 34, 36, Township 11 North, Range 58 West; Sections 28, 32, 33, Township 12 North, Range 56 West; and Sections 25, 27, 32, 33, 35, Township 12 North, Range 57 West of the 6th P.M., Weld County Colorado Transmission Line: Sections 1, 2, 3 (on section lines), Township 10 North, Range 58 West; Section 4, Township 10 North, Range 58 West; Sections 5, 6 (on section lines), Township 10 North, Range 58 West; Sections 1, 2, 3 (on section lines), Township 10 North, Range 59 West; Section 4, Township 10 North, Range 59 West; Sections 5, 6(on section lines), Township 10 North, Range 59 West; Section 2, Township 10 North, Range 60 West; Sections 1, 2,6, 7, 8, 9, 11, 14, 15, 16, Township 11 2010-0772 CC r` tJ fI L PL2059 RE: CONTINUANCE (USR#1723) - CEDAR CREEK II, LLC, C/O BP WIND ENERGY NORTH AMERICA, INC. PAGE 2 North, Range 57 West; Sections 12, 13, 24, 25, 36, Township 11 North, Range 58 West; Sections 31, 32 (on section lines), Township 11 North, Range 59 West; and Sections 35, 36, Township 11 North, Range 60 West of the 6th P.M., Weld County, Colorado WHEREAS, at said hearing the Board deemed it advisable to continue said matter to May 19, 2010,to allow adequate time for the case to be republished to correct the legal description, and to be reconsidered by the Planning Commission on May 18, 2010, and WHEREAS, the Board heard all of the testimony and statements of those present and reviewed the request of the applicant and, having been fully informed, finds that this request be approved and the matter should be continued to May 19, 2010, at 10:00 a.m. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the abovementioned matter be, and hereby is, continued to May 19, 2010,at 10:00 a.m. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 14th day of April, A.D., 2010. BOARD OF COUNTY COMMISSIONERS ` WELD COUNTY, CO •RADO / ATTEST • #Y.. o , las ademacher C ir Weld County Clerk to the � rbara�'' Kirkmeyer, Pr.-Tem BY. / �, / Dep Clerk o the oard �► / way AP• ' •�EDA • %/ W' F. Garcia my (�Attorney % cJ ` 11 David E. Long Date of signature: 4124/0 2010-0772 PL2059 Hello