Loading...
HomeMy WebLinkAbout20100773.tiff HEARING CERTIFICATION DOCKET NO. 2010-14 RE: SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT#1723 FOR A MAJOR FACILITY OF A PUBLIC UTILITY (A WIND ENERGY FACILITY WITH A GENERATING CAPACITY UP TO 250.5 MEGAWATTS (MW) ALONG WITH A 230-KILOVOLT (KV) ELECTRIC TRANSMISSION LINE, AN INTERCONNECTION FACILITY TO TIE INTO AN EXISTING 72-MILE TRANSMISSION LINE, EXISTING COLLECTOR TRANSMISSION LINES, 1-3 PERMANENT 80-METER METEOROLOGICAL TOWERS, ONE (1) SUBSTATION, AN OPERATIONS AND MAINTENANCE BUILDING/FACILITY, ALONG WITH ONE (1) TEMPORARY BATCH PLANT AND CONSTRUCTION FACILITY) IN THE A (AGRICULTURAL) ZONE DISTRICT - CEDAR CREEK II, LLC, C/O BP WIND ENERGY NORTH AMERICA, INC. A public hearing was conducted on April 14, 2010, at 10:00 a.m., with the following present: Commissioner Douglas Rademacher, Chair Commissioner Barbara Kirkmeyer, Pro-Tern Commissioner Sean P. Conway Commissioner William F. Garcia Commissioner David E. Long Also present: Acting Clerk to the Board, Jennifer VanEgdom County Attorney, Bruce Barker Planning Department representative, Chris Gathman Public Works representative, Don Carroll The following business was transacted: I hereby certify that pursuant to a notice dated March 1, 2010, and duly published March 4, 2010, in the Windsor Beacon, a public hearing was conducted to consider the request of Cedar Creek II, LLC, c/o BP Wind Energy North America, Inc., for a Site Specific Development Plan and Use by Special Review Permit #1723 for a Major Facility of a Public Utility (a wind energy facility with a generating capacity up to 250.5 megawatts (MW) along with a 230-kilovolt (kV) electric transmission line, an interconnection facility to tie into an existing 72-mile transmission line, existing collector transmission lines, 1-3 permanent 80-meter meteorological towers, one (1) substation, an operations and maintenance building/facility, along with one (1) temporary batch plant and construction facility) in the A (Agricultural) Zone District. Bruce Barker, County Attorney, made this a matter of record. Chris Gathman, Department of Planning Services, indicated it has come to the attention of staff that it is necessary to continue the matter so that a notice may be republished with the correct legal description. He stated, through subsequent discussions, the applicant has also requested to slightly amend the uses within the application to include two additional meteorological towers on the site, for a total of five towers, which was not included within the original notice. He confirmed the new legal notice has been prepared by staff, and will be published in advance of a new Planning Commission hearing date set for May 18, 2010, and he recommended the matter be continued to May 19, 2010, at 10:00 a.m. He clarified a Planning Commission CC . Pt P(3 I1 PP` 2010-0773 y_�p - /O PL2059 HEARING CERTIFICATION - CEDAR CREEK II, LLC, C/O BP WIND ENERGY NORTH AMERICA, INC. (USR-1723) PAGE 2 hearing was previously held concerning this matter; however, the matter will be reconsidered by the Planning Commission to address any additional comments which may be provided concerning the addition of the proposed towers, and Mr. Barker concurred. Mr. Gathman indicated the location of the transmission line will also be slightly modified, to be relocated outside of several existing drill envelopes; however, the line will not move outside of the listed Sections of the legal description. Mr. Barker confirmed staff sent out a courtesy notification of the continuation request to those who appeared at the previous Planning Commission hearing. No public testimony was offered concerning this matter. Commissioner Conway moved to continue the request of Cedar Creek II, LLC, do BP Wind Energy North America, Inc., for a Site Specific Development Plan and Use by Special Review Permit #1723 for a Major Facility of a Public Utility (a wind energy facility with a generating capacity up to 250.5 megawatts (MW) along with a 230-kilovolt (kV) electric transmission line, an interconnection facility to tie into an existing 72-mile transmission line, existing collector transmission lines, 1-3 permanent 80-meter meteorological towers, one (1) substation, an operations and maintenance building/facility, along with one (1) temporary batch plant and construction facility) in the A (Agricultural) Zone District, to May 19, 2010, at 10:00 a.m. The motion was seconded by Commissioner Long, and it carried unanimously. There being no further discussion, the hearing was completed at 10:10 a.m. This Certification was approved on the 19th day of April, 2010. OARD OF COUNTY COMMISSIONERS .41 wa I� LD COUNTY, CO RADO \A ATTEST: ,,r' ¢a,. S�iw✓ltilr 4\4' it ro as ademach Chair Weld County Clerk to the Boa f '` USED DATE OF APPROVAL �J(J✓i,4,y arbara Kirkmeyer, Pro-Tem BY. De y Cler o the Boar EXCUSED DATE OF APPROVAL Sean P. �� ilh 7. ;la € OLy David E. Long 2010-0773 PL2059 Hello