Loading...
HomeMy WebLinkAbout760698 r \ RESOLUTION RE: ACCEPTANCE OF CONCEPT OF COUNTY-WIDE SYSTEM FOR ROADS AND BRIDGES AS RECOMMENDED BY THE WELD COUNTY ENGINEER. WHEREAS, the Board of County Commissioners of Weld County, Colorado, are vested with the responsibility of administering the affairs of Weld County, Colorado, and WHEREAS, the Weld County Engineer has submitted to the Board of County Commissioners of Weld County, Colorado, a proposal for a County-wide system for roads and bridges, as set forth in the attached Exhibits hereto, and WHEREAS, the Board of County Commissioners of Weld County, Colorado, believes it to be in the best interest of Weld County, Colorado, to adopt the concept of the County- wide system for roads and bridges, subject to any alteration in said system that the Board of County Commissioners may desire to make in the future. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the County of Weld, State of Colorado does hereby adopt the concept of a County-wide system for roads and bridges as set forth in the attached Exhibits and recommended by the Weld County Engineer, subject to the power of the Board of County Commissioners of Weld County, Colorado, to make whatever changes it may deem necessary in said County-wide roads and bridges system as the needs of Weld County may change in the future. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 27th day of October, A.D. , 1976. n t- . BOARD OF COUNTY COMMISSIONERS ATTEST:' f t" 1 ' ' WELD COUNTY, COLORADO Weld County Clerk and Recorder ctl., Clerk to AAthe Bo d BY 3e� nA..nJX G / p County erk P yED AS T ••4 g ea Ss) ,,frfr 7L._. County Attorney E.n .rt 2.fait ' ' ,�^�' 760698 ma c : i jf� - 2O . /�S 45-s0= . fee,An C0£k's`° ,2) - i • ~ • I f t Under a County System the following is the organizational system. 1. The Board of County Commissioners 2.. The Engineering or Highway Coordinator 3 . The .Department. of Engineering or Highways 4. Materials or Quality Control Division 5. Main shop with 3 maintenance shops 6 . Construction Division 7. Paving' Division with Aggregate Division 8. Bridge Division 9 . Traffic Division 10 . Maintenance Division with three districts From the budget requested the following equipment should be purchased. 1 . 1 new crusher 2. 1 vibratory smooth drum compactor 3. 2 vibratory sheepsfoot compactors 4 . 1 3000 gallon distributor Total cost of above (estimated) is $378 , 000. There would be no need to purchase any additional vehicles unless they are replacements . There should be no units purchased to increase the number of units now in operation. To implement this program starting January 1 , 1977 it would be necessary to utilize the present asphalt plant and asphalt equip- ment for the 1977 budget year. A new portable asphalt plant with „ new compaction equipment would have to be scheduled for the 1978 budget year . The present day estimated cost would be $339 ,000. 00. Under the present requirements to achieve this , the 1977 year would be utilized to properly rebuild existing roads up to standards required now. This would be accomplished by the Construction Division on a County wide basis . The Paving Division with presently owned equipment except as mentioned would overlay and chip and seal . There would be approximately 15 miles of new pavement placed in the year of 1977. The Aggregate Production unit would work at maximum capacity to produce specification material for subbase , base course , chips , and plant mix material for the 1977 and 1978 budget years. It is the desire to have all aggregate in available areas crushed. A new portable crusher averaging 75% of maximum capacity could produce approximately 500 ,000 tons of aggregate at a cost of approximately 20¢/ton. The Paving Division would have to purchase some material from local suppliers as was done this year to hold costs within the budget for the year of 1977. The decision to either trade or move the existing asphalt plant to the Davis Farm area would be made at the end of the paving season next year ( 1977) . The feasibility of such a decision will have to be determined through the next year. The ideal situation would be to purchase the portable asphalt plant and place it in operation , with the crusher going into production the first of January 1977 and the asphalt plant into production May 1 , 1977. To accomplish this we would have to have ideal conditions and. the budget would have to allow the expenditures. When accurate record keeping and reporting is achieved there could be a decision made as to the efficiency of the County wide operation , and whether maintenance and 'construction equipment could be decreased in quanity. This would also apply to District operation. It is of the opinion that there would be a decrease in County owned equipment on a County wide system. • It is of the opinion that under the district system there would be a gradual increase in equipment and personnel or else we would have a static condition in maintenance and construction. • • • Under the Present District Organization The crusher and portable asphalt plant would still need to be. purchased. To assure quality construction in all three districts the following pieces of equipment would be needed. 1 vibratory flat wheel compactor/district 1 vibratory sheepsfoot compactor/district 1 asphalt distributor ( 1 district only) The cost in addition to the $378, 000 for the 1977 budget year is $71 ,000. With justification for three more tandem trucks at $63-$6500. 00. With the district operation there should be a vibratory asphalt compactor available to at least two districts at any time the estimated cost is $100,000 .00 . With three districts it would require at least one additional materials man in the Engineering Department and one additional survey crew ( 3 men) with additional equipment and two vehicles . Estimated cost for the first year : Personnel $ 40 ;000. Equipment $ 17,000 . t'1 • • . SUMMARY The County System for the 1977 budget year would require an expenditure of approximately $ 378, 000 . 00. The budget would not require expenditures for purchase of ad- ditional vehicles to increase the number of units now in oper- ation, replace units only. Purchase the crusher in the budget year of 1977. The Construction Division would rebuild and construct roads to desired standards and get ahead of the Paving Division for 'the ' year 1978. The crusher would stockpile for the ' 77 and ' 78 construction seasons . The Paving Division will do the new paving scheduled, the overlay , and chipping and sealing. The Maintenance Division will maintain the graveled roads and other roads only. The Bridge Division with two culvert crews will construct bridges , install culverts and maintain same . The culvert crews will act as additional Bridge crews. The Main Shop would act as the master shop , with the district shops doing preventative maintenance only. District shops would receive their parts and supplies through the Main Shop . The •Traffic Division would perform all traffic and sign control over the entire County as they are now doing . Equipment requested by the Bridge and Traffic Divisions_ is needed to meet their demands . Should the District System remain , the expenditures requested for the County System would need to be expended plus an additional $ 292 ,000.00 for the 1977 budget . The new portable asphalt plant would be purchased in the 1978 budget year at an estimated cost of $290 , 000. 00. It is of the opinion that a gradual increase in- equipment and personnel would be needed to meet future demands . The County System should promote better production efficiency , and quality by using specialized Divisions to do their particular speciality. It is not anticipated that additional personnel will be needed. Weld County has the personnel now to implement the. County System. J H [� a yi CD rn U CC 7. E �— z Z. M yaw z - CO E w r w 0 < -, q Z Q., w0 �• 0i z UO w H W [y H xw E 00 P.4 %z 0 FY f Q 7, wE Qw Ww E C y L' • CC 7 � tg7w Ew qw Cki P4 r U � C O qC^ W q z. O 7. O G7 U W z F C CE C.- C O zV] C:: H H q > 0 O w ". E Ci Cat q ; a co aw a E 124 La C E a z < u C ... q F U 7.. a O 0.: F CC u1 w 9 C O I-4 Uq 1 • • w'. • January 14, 1977 Engineering Department - County System f1Road and Bridge • Attendance • WRI CUM farAISIIIS Commissioner June Steinmark „} Commissioner Victor Jacobucci !, Commissioner Ed Dunbar JAN 181977 Barton Buss - Finance Director I. Bob Martin - County Council • t 'Chuck Lucia - Personnel Director .EY. COLO. Object of meeting to let Road and Bridge personnel know of reorganization, to explain what the County wide system is supposed to be, what it is supposed to do, and how it will effect the employee. Supervisors of the Divisions will work with the Engineering Department, Engineering Coordinator, and Commissioners to work out details . County wide system is to reorganize personnel to increase the County' s efficiency and get a better product in the field. Once program is operating it will make things easier for men in the field. The biggest change that will be made for the employee is that he will work in different locations around the County. Employees will not have to move or relocate. Some kind of transportation system will be worked out. - No one is to be laid off. The system hopes to promote supervisors to be on the job more hours a day so that problems can be straightened out faster and easier. Everybody still is going to be doing the same job. System will desire better input from field men so that problems can be knownand the situation corrected. Materials will be on the job when needed. It will be the Engineering Department's responsibility to see that the work gets done, this will be done through the Supervisors Of the Divisions. Under the County System the Divisions are set up as follows : Main 'Shop - with District Shops - Andy Root, Supervisor. Personnel previously doing this type of work will be able to organize this division. Have better control over parts and determine what is needed and what needs to be replaced. Should facilitate better reporting for Cost Accounting. Construction - Bob Sitzman , Supervisor Division will pool all construction equipment for basic construction of a road, whether building a new road .or rebuilding. Will spend less time on one job. Design standards for roads will be according to Colorado Department of Highway Specifications with flexibility to change design where County sees fit . • f 2 Paving - includes Aggregate - George Margheim, Supervisor This Division will be responsible for paving, overlay, chipping and sealing, patching , rock crusher. Trucks will more or less be under this division. Equipment will be available to do work as needed. Bridge -includes Culverts - Gene White, Supervisor Culvert installation will be through the Bridge Department. Will consist of two bridge crews Traffic -Bud Schmuhl , Supervisor This Division will remain as in the past . Signing is the biggest responsibility of this Division. Division needs the cooperation of the other divisions to work effectively. Road Maintenance - include the 3 districts- Ray Moser, Supervisor District. No. 1 - Dean Jackson , District Supervisor District No. 2 - Ed Glendenning, District Supervisor District No. 3 - Orval Neighbors ,District Supervisor Duties will be maintenance only, such as blading, grading, snow removal, etc. Divisions established with chain of command headed by the Commissioners, Engineering Coordinator, and the Engineering Department. Working hours will be that the County crews will come to work on their own time and be there at 8:00 a.m. and will quit on County time. The Personnel Director stated that a questionaire will be used for classification of new system and should be completed in 1977: Each employee will complete , explaining 'his job and the supervisor will review. Classification , title and pay will be • determined by this questionaire. Personnel Director, Chuck Lucia, explained that there are two types of probation. One that all new employees have for the first six months , the other that is a probation created by • promotion to a different level of employment. If an individual was unable to achieve at the higher level he would be able to go back to his old position. Hello