• Jennifer VanEgdom From: Chris Gathman Sent: Monday, April 12, 2010 9:13 AM To: Jennifer VanEgdom Subject: FW: Cedar Creek II wind farm Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue, Greeley CO. 80631 Ph: (970)353-6100 ext. 3537 Fax: (970)304-6498 Original Message From: Indlobmeyer [mailto:lndlobmeyer@juno.com] Sent: Monday, April 12, 2010 8:05 AM To: Chris Gathman Subject: Cedar Creek II wind farm TO: Chris Gathman • FROM: Dianne Lobmeyer 536 30th Ave. Greeley, CO 80634 970-308-2886 RE: BP's Cedar Creek II Wind Farm As a land owner in the area of the planned wind project and as a resident of Weld County, I am writing in support of the Cedar Creek II wind project. I feel this project would be beneficial to our area, the state and our country. It would be an environmental and economical asset to our county. I would urge the Weld County Commissioners to vote for the approval of this project. Thank you for your consideration. Penny Stock Jumping 2000% Sign up to the #1 voted penny stock newsletter for free today! htto://thirdoartvoffers.j u no.com/TGL3141/4bc328d248cf2215839st01vuc • EXHIBIT cN II! - -723 1 2010-1016 • Jennifer VanEgdom From: Chris Gathman Sent: Monday, April 12, 2010 4:14 PM To: Kristine Ranslem; Jennifer VanEgdom Subject: FW: RE:CEDAR CREEK II FYI: updated SPO address. Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue, Greeley CO. 80631 Ph: (970)353-6100 ext. 3537 Fax: (970)304-6498 Original Message From: Joann Stephenson [mailto:joann@Ivwn.com] Sent: Monday, April 12, 2010 1:45 PM To: Chris Gathman Subject: RE:CEDAR CREEK II Hi Chris • I was at the Planning Meeting in March 2010. Could you please see if my property is one that scheduled for turbines? The property is listed Josephine A Stephenson, PO Box 335, Brighton CO 80601. The PO Box on the envelope I received is 355 which is incorrect. Thanks JoAnn • EXHIBIT 1 • Jennifer VanEgdom From: Chris Gathman Sent: Thursday, April 22, 2010 9:53 AM To: Gonzalez, David; Cohen, Matthew; David Bauer; Lauren Light; Jensen, Sarah Cc: Jennifer VanEgdom; Kristine Ranslem Subject: Suggested revisions to the USR-1723 Cedar Creek II resolution Attachments: Resolution USR-1723 CG edits (7) (2).doc Here is a marked up copy of the Planning Commission resolution with recommended changes. This is mainly to clarify the conditions from the Planning Commission resolution (since a lot of the resolution was modified at the hearing). Main items are - calling out the Drainage Report and Traffic Study as separate conditions of approval. No additional conditions of approval have been added - these are simply clarifications. Let me know if you have any questions. FYI: I will be out of the office next week. Sincerely, Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue, Greeley CO. 80631 Ph: (970)353-6100 ext. 3537 • Fax: (970)304-6498 • EXHIBIT • BEFORE THE WELD COUNTY,COLORADO,PLANNING COMMISSION RESOLUTION OF RECOMMENDATION TO THE BOARD OF COUNTY COMMISSIONERS Moved by Robert Grand,that the following resolution be introduced for passage by the Weld County Planning Commission. Be it resolved by the Weld County Planning Commission that the application for: CASE NUMBER: USR-1723 APPLICANT: Cedar Creek II LLC PLANNER: Chris Gathman REQUEST: A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a Public Utility(A wind energy facility with a generating capacity up to 250.5 megawatts(MW)along with a 230-kilovolt(kV)electric transmission line,an interconnection facility to tie into an existing 72-mile transmission line,existing collector transmission lines,4-3-uo to five(5)permanent 80-meter meteorological towers,one(1)substation,an operations and maintenance building/facility,along with one(1)temporary batch plant and construction facility)in the A(Agricultural) Zone District. LEGAL DESCRIPTION: Wind Energy Facility Transmission Line of the 6th P.M.,Weld County,Colorado. LOCATION: Wind Generator facility is generally located in an irregularly shaped area south of and adjacent to CR 138;North of and adjacent to CR 120 and west of CR 153. The section of transmission line lying outside of the boundaries of the Wind Generator Facility is located north of CR 118 and west of and adjacent to CR 382. be recommended favorably to the Board of County Commissioners for the following reasons: 1. The submitted materials are in compliance with the application requirements of Chapter 21 of the Weld County Code 2. It is the opinion of the Planning Commission that the applicant has shown compliance with Section 21-3-340.A of the Weld County Code,as follows: • Section 21-3-340.A.1—The health,welfare and safety of the citizens of the County will be protected and served. Section 21-3-340.A.2-The natural and socio-economic environment of the County will be protected and enhanced. Section 21-3-340.A.3—All reasonable alternatives to the proposed action,including use of existing tights-of-way and joint use of rights-of-way wherever uses are compatible,have been adequately assessed and the proposed action is compatible with and represents the best interests of the people of the County and represents a fair and reasonable utilization of resources in the impact area. Section 21-3-340.A.4--A satisfactory program to mitigate and minimize adverse impacts has been presented. Section 21-3-340.A.5—The nature and location or expansion of the facilitycomplies with all applicable provisions of the master plan of this County,and other applicable regional,metropolitan,state and national plans. Section 21-3-340.A.6 --The nature and location or expansion of the facility does not unduly or unreasonably impact existing community services. Section 21-3-340.A.7--The nature and location or expansion of the facility will not create an expansion of the demand for govemment services beyond the reasonable capacity of the community or region to provide such services,as determined by the Board of County Commissioners. Section 21-3-340.A.9--The nature and location of the facility or expansion will not adversely affect the water rights of any upstream,downstream oragricultural users,adjacent communities or other water users. Section 21-3-340.A.10—Adequate water supplies are available for facility needs. • Resolution USR-1723 Cedar Creek II LLC Page 2 Section 21-3-340.A.11—The nature and location of the facility or expansion will not unduly interfere with existing easements,rights-of-way,other utilities,canals,mineral claims or roads. Section 21-3-340.A.12--Adequate electric,gas,telephone,water,sewage and other utilities exist or shall be developed to service the site. Section 21-3-340.A.13-The nature and location for expansion of the facility will not unduly interfere with any significant wildlife habitat or adversely affect any endangered wildlife species,unique natural resource or historic landmark within the impact area. Section 21-3-340.A.14—The nature and location or expansion of the facility, including expected growth and development related to the operation and provision of service, will not significantly deteriorate water or air quality in the impact area. Section 21-3-340.A.15— The geological and topographic features of the site are adequate for all construction, clearing,grading,drainage, vegetation and other needs of the facility construction or expansion. Section 21-3-340.A.16—The existing water quality of affected state waters will not be degraded below state and federa/standards or established baseline levels. Section 21-3-340.A.17—The proposed project will not have a significantly adverse net effect on the capacities or functioning of streams,lakes and reservoirs in the impact area,nor on the permeability, volume,recharge capability and depth of aquifers in the impact area. • Section 21-3-340.A.18— The benefits of the proposed developments outweigh the losses of any natural resources or reduction of productivity of agricultural lands as a result of the proposed development. Section 21-3-340.A.19— The applicant has obtained or will obtain all property rights,permits and approvals necessary for the proposed project, including surface, mineral and water rights and easements for drainage,disposal,utilities,access,etc. If the applicant has not obtained all necessary property rights,permits and approvals,the Board may,at its discretion,grant the permit conditioned upon completion of the acquisition of such rights prior to issuance of a zoning or building permit by the County. Section 21-3-340.A.20—The proposed project(nonlinear facilities)will not present an unreasonable risk of exposure to or release of toxic or hazardous substances within the impact area. The determination of effects of the project shall include the following considerations: a. The means by which outdoor storage facilities for fuel, raw materials, equipment and related items are adequately enclosed by a fence or wall. b. The likelihood of hazardous materials or wastes being moved off the site by natural causes or forces. c. Containment of inflammable or explosive liquids,solids or gases. Section 21-3-340.A.21 — The scope and nature of the proposed project will not unnecessarily duplicate existing services within the County. Section 21-3-340.A.22—If the purpose and need for the proposed project are to meet the needs of an increasing population within the County,the area and community development plans and population trends demonstrate clearly a need for such development This recommendation is based,in part,upon a review of the application materials submitted by the applicant, • • other relevant information regarding the request, and responses from referral entities. Resolution USR-1723 Cedar Creek II LLC Page 3 The Planning Commission recommendation for approval is conditional upon the following: 1 . The Special Review activity shall not occur nor shall any grading. building, or electrical permits be issued on the property until the Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder. (Department of Planning Services) 2. Prior to recording the plat: A. The applicant shall provide graphic and written documentation addressing the location and identification of all public rights-of-way, existing and proposed structures, utility easements, irrigation ditches, etcetera per Section 21 -3-330.B.4 of the Weld County Code. This document shall be prepared for recording in the Clerk and Recorder's office. (Department of Planning Services) B. The applicant shall demonstrate attempted compliance with the Colorado Division of Wildlife as stated in their referral dated/received December 7, 2009. (Colorado Division of Wildlife) C. The applicant shall demonstrate attempted compliance with the United States Fish and Wildlife Service as stated in their referral received December 7, 2009. (United States Fish and Wildlife) D. The applicant shall submit four (4) copies of a UEiecommissioning Pplan to the Department of Planning Services for review and approval. (Department of Planning Services) E. The applicant shall submit a dust abatement plan, addressing addressing on_ site and off site dust contcel, for review and approval, to the Environmental Health Services, Weld County Department of Public Health & Environment. (Department of Public Health & Environment) • F. The applicant shall submit evidence of an Air Pollution Emission Notice (A.P.E.N.) and Emissions Permit application from the Air Pollution Control Division, Colorado Department of Health and Environment for the concrete batch plants and any other operations required by CDPHE to have an APEN. (Department of Public Health & Environment) G. In the event washing of vehicles or equipment will occur on site the applicant shall ensure that any washing areas shall capture all effluent and prevent discharges from the washing of vehicles in accordance with the Rules and Regulations of the Water Quality Control Commission, and the Environmental Protection Agency. Washing areas should be designated on the plat. (Department of Public Health & Environment) H. The applicant shall submit a waste handling plan, for approval, to the Environmental Health Services Division of the Weld County Department of Public Health and Environment. The plan shall include at a minimum, the following: 1 . A list of wastes which are expected to be generated on site (this should include expected volumes and types of waste generated). 2. A list of the type and volume of chemicals expected to be stored on site. 3. The waste handler and facility where the waste will be disposed (including the facility name, address, and phone number). Written evidence of such shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) I. The applicant will sign and collateralize aAn Improvements Agreement that will-addresses the following issues-(Department of Public Works): • • 1 . On-site and Off-site Improvements, Road Maintenance 4, Collateral Formatted: Indent: Left: 0.81", No bullets o 2, An acceptable Final-Drainage-Report numbering Resolution USR-1723 Cedar Creek II LLC Page 4 3- An acceptable Final Traffic-Study `- - - Formatted: Indent: Left: 0.81", No bullets o 2 Construction Ddrawings •- numbering 5:3 Construction Sschedule '' % Formatted: No bullets or numbering (i: 4 Haul routes • • - - 5 Haul route amendment process . Formatted: Numbered + Level: 1 + Numbering Style: 1, 2, 3, ... + Start at: 3 + Alignment: Left + Aligned at: 0.79" + Indent And the applicant will provide: at: 1.04" J. The applicant will provide aAn acceptable Final Drainage Report t tFormatbed: No bullets or numbering . Formatted: No bullets or numbering, Tab Written evidence of Public Works approval shall be provided to the Department of Planning l stops: 0.5", Left + Not at 0.75" Services. (Department of Planning Services) • Formatted: Indent: Left: 0.81", No bullets o numbering K. The applicant will provide aAn acceptable Final Traffic Study (Department of Public Works)• Formatted: No bullets or numbering, Tab ' stops: 0.5", Left + Not at 0.75" Written evidence of Public Works approval shall be provided to the Department of Planning Formatted: Indent: Left: 1", No bullets or Services. (Department of Planning Services) numbering 7- -- JL. Weld County-Public-Works has received a Traffic Study for USR 1723 Cedar Creek II Wind Farm prepared and stamped by Eugene Coppola, P.E. After reviewing the project site the following comments must be reviewed and accepted by Public Works: Formatted: Normal, Indent: Left: 0.06", • t The Colorado Department of Transportation (CDOT) has jurisdiction over all State highways. Hanging: 0.75", Tab stops: 0.81", Left + 1.5' Please contact Gloria Hice-ldler at the Greeley office (970-350-2148 or 970-350-2148) to Left + Not at 1" verify if any improvements will be required at the intersection of State Highway 71 with CR 132 and CR 120 to accommodate traffic from the Cedar Creek II project. A stop sign will be required--te-be-inctalled-at all project accesses -before traffic-wilt-enter onto weld county roadways. Written evidence of Public Works approval shall be provided to the Department of Planning Services. (Department of Planning Services) KM. The applicant shall submit written evidence to the Department of Planning Services that Federal Aviation Administration (FAA) requirements have been met for the proposed facility. (Department of Planning Services) LN. Written evidence from the applicant indicating all requirements and agreements between the surface developer and the mineral owners and/or lessees have been completed shall be submitted or evidence that an adequate attempt has been made to mitigate their concerns. Delineating drill envelopes on the plat can be submitted to the Department of Planning Services in lieu of agreement as evidence of an adequate attempt. (Department of Planning Services) M-O. The applicant shall provide written evidence from the applicable (Pawnee and Southeast Weld) Fire Protection District that there is adequate access for emergency equipment and the width, usually twenty (20) feet, is adequate and designed for appropriate weight capacity. (Department of Planning Services) NTP. The applicants shall provide written evidence from the applicable Fire Protection District (Pawnee and Southeast Weld) that there is a coordinated plan in place for emergency responders during construction of the facilities and a plan for post construction activities. The applicants shall submit plot plans to the applicable Fire Protection Districts for their review and comment. (Department of Planning Services) S • 3. Upon completion of 2. above the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within sixty (60) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 4. The Plat shall delineate the following: A. All sheets shall be prepared in accordance with Section 23-2-260.D of the Weld County Code. (Department of Planning Services) B. All sheets shall be labeled USR-1723. (Department of Planning Services) Resolution USR-1723 Cedar Creek II LLC Page 5 C. The Development Standards associated with this application shall be set forth on the plat. (Department of Planning Services) D. Final locations of wind turbines shall be delineated on the plat. (Department of Planning Services) E. The final transmission line alignment as approved by the Board of County Commissioners shall be delineated on the plat. (Department of Planning Services) F. The boundaries of USR-1723 shall not overlap the boundaries of USR-1213 (located on 5.5 • 5. acres in the NE4 of Section 21 and the NW4 of Section 22 T11 R57W). Prior to the commencement of construction activities and/or hauling of materials: A. A pre-construction meeting between the applicant. the applicant's designated contractors, and the applicable Weld County Departments (Building Inspection, Planning Services, Public Works. Environmental Health) shall be held to discuss the requirements, timing. . . regarding construction of the site. (Department of Planning Services/Department of Public Works) B. The applicant shall obtain a grading permit for any project improvements that disturb more than one acre of land. The grading permit application shall include an erosion and sediment control plan, a grading plan, installation details for BMPs to be used, and a copy of the stormwater construction permit from the Colorado Department of Public Health and Environment. Please note that construction activities will not be allowed to begin until tile Improvements Agreement has been signed and collateral posted, and a grading permit has been issued. (Department of Public Works) C. The applicant shall obtain overweight and/or over width special transport permits from Public Works for all applicable trucks. _Please contact Amy Burry at 970-381 -3779 if there are any questions re: the special transport permits. The applicant shall obtain access permits from ' Comment (ii]: This may be a little late to add bi Public Works for all temporary and permanent accesses. Please contact Janet Carter at this has been discussed in all of our meetings and at 970-304-6496 ext 3726 if there are any questions regarding the access permits. (Department the PC hearing of Public Works) (Department of Public Works) D. The applicant shall obtain right of way permits before installation and/or construction of any above ground or buried features in or crossing Weld County road rights-of-way. (Department of Public Works) E. The applicant shall provide three (3) gravel stockpile locations and stock each with 1 ,000 cubic yards of gravel that can be used for road repairs. (Department of Public Works) • i F. The applicant shall provide evidence showing that an on-call contractor has been contracted to handle emergency road repairs. (Department of Public Works) G. The applicant shall provide a power purchase agreement or other documentation/agreement/evidence that power to be generated by this facility has been or is agreed to be purchased. (Department of Planning Services) H. The subdivision exemption plat for the proposed main substation and Cedar Creek I substation tap shall be submitted for recording to the Department of Planning Services. (Department of Planning Services) 6. Prior to Release of Building Permits: A. A building permit shall be obtained prior to the construction of the wind turbines and any other buildings or structures on site. (Department of Building Inspection) Resolution USR-1723 Cedar Creek II LLC Page 6 B. A plan review is required for each building for which a building permit is required. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. Building plans shall also be submitted to the New Raymer Fire Protection District. (Department of Building Inspection) C. The applicant shall provide written evidence of compliance with the U.S. Army, Corps of • Engineers (USACOE), Section 404 of the Clean Water Act Permit. (check what-was-received foc.41SR 1562) D. Buildings shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2006 International Building Code; 2006 International Mechanical Code; 2006 International Plumbing Code; 2006 International Fuel Gas Code; and the 2008 National Electrical Code, 2006 International Energy Code and Chapter 29 of the Weld County Code. (Department of Building Inspection) E. Each structure will require an engineered foundation based on a site specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. All plans and specifications prepared by architects or engineer sub-disciplines shall be designated and shall bear the seal and signature of the architect or engineer of the sub-discipline. (Department of Building Inspection) F. The structure will probably-be classified as a-U (Turbine) occupancy. The maintenance structures and offices will be B occupancy. Temporary structures will be classed accordingly. Fire resistance of walls and openings, construction requirements, maximum building height and allowable areas will be reviewed at the plan review. Setback and offset distances shall be determined Chapter 23 of the Weld County Code. (Department of Building Inspection) G. All building plans shall be submitted to the applicable Fire Protection District (Southeast Weld or Pawnee) for review and approval. (Department of Building Inspection) H. The applicant shall submit written evidence detailing where the hauled water will be obtained. (Department of Public Health & Environment) • • 7. One month prior to construction activities: A. A State stormwater discharge permit may be required for a development /,_redevelopment/ construction site where a contiguous or non-contiguous land disturbance is greater than or equal to one acre in area. Contact the Water Quality Control Division of the Colorado Department of Public Health and Environment at www.cdphe.state.co.us/wg/PermitsUnit for application more information. (Department of Public Health and Environment) A. A Pre ConstFuctioo-meeting-shall-be require44Depactments of PlanningrPublie-Works;Public Health and-€nvironment—Building Inspection) 8-7. Prior to issuance of Certificate of Occupancy: Formatted: No bullets or numbering, Tab stops: 0.13", Left + 0.5", Left + Not at 1" + A. An individual sewage disposal system is required for the proposed temporary office trailer ` 1.5" complex and the permanent 0 & M Building and shall be installed according to the Weld County Individual Sewage Disposal Regulations. (Department of Public Health and Environment) B. The septic system is required to be designed by a Colorado Registered Professional Engineer according to the Weld County Individual Sewage Disposal Regulations. (Department of Public Health and Environment) Motion seconded by Erich Ehrlich. Resolution USR-1723 Cedar Creek II LLC Page 7 VOTE: • For Passage Against Passage Absent Robert Grand Bill Hall Tom Holton Alexander Zauder Erich Ehrlich Roy Spitzer Mark Lawley Nick Berryman Jason Maxey The Chair declared the resolution passed and ordered that a certified copy be forwarded with the file of this case to the Board of County Commissioner's for further proceedings. CERTIFICATION OF COPY I, Kristine Ranslem, Recording Secretary for the Weld County Planning Commission, do hereby certify that the above and foregoing resolution is a true copy of the resolution of the Planning Commission of Weld County, Colorado, adopted on March 162, 2010. Dated the 1.7 2n`' of March, 2010. Kristine Ranslem Secretary i • - ( Formatted: Left Formatted: Left, Indent: First line: 0" SITE SPECIFIC DEVELOPMENT PLAN SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS CEDAR CREEK WIND ENERGY II , LLC USR-1723 • 1 . A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a Public Utility (A wind energy facility with a generating capacity up to 300 megawatts (MW) along with a 230- kilovolt (kV) electric transmission line, 1 substation, 1-3 permanent 80-meter meteorological towers, along with one (1) temporary batch plant and construction facilities), as indicated in the application materials on file in the Department of Planning Services and subject to the Development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health & Environment) 4. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. (Department of Public Health & Environment) 5. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate conditions, blowing debris and other potential nuisance conditions. (Department of Public Health & Environment) 6. The applicant shall operate in accordance with the approved "waste handling plan". (Department of Planning Services) 7. Fugitive dust and fugitive particulate emissions shall be controlled on the site. along the-approved construction haul routes and other designated roads and-areas as-described in the Improvements Agreement as well as after construction is completed. The facility shall be operated in accordance with the approved "dust abatement plan" at all times. (Department of Public Health & Environment) • • 8. The applicant shall adhere to the maximum permissible noise levels allowed in the industrial Zone as delineated in Section 14-9-30 of the Weld County Code. (Department of Public Health & Environment) 9. A permanent, adequate water supply shall be provided for drinking and sanitary purposes for the permanent facility. (Department of Public Health and Environment) 10. This application is proposing a well as its source of water. The applicant should be made aware that while they may be able to obtain a well permit from the Office of the State Engineer, Division of Water Resources, the quantity of water available for usage may be limited to specific uses, i.e. domestic use only, etc. Also, the applicant should be made aware that groundwater may not meet all drinking water standards as defined by the Colorado Department of Public Health & Environment. We strongly encourage the applicant to test their drinking water prior to consumption and periodically test it over time. (Department of Public Health & Environment) 11 . Sewage disposal for the facility shall be by septic system. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. (Department of Public Health & Environment) 12. Bottled water shall be utilized for drinking during construction of the project. (Department of Public Health & Environment) 13. Adequate portable toilet facilities (portable toilets) and hand washing units shall be provided during the construction of the project. (Department of Public Health & Environment) Resolution USR-1723 Cedar Creek II Page 9 14. Any vehicle or equipment washing areas shall capture all effluent and prevent discharges from drum • washing and the washing of vehicles in accordance with the Rules and Regulations of the Water Quality Control Commission, and the Environmental Protection Agency. (Department of Public Health & Environment) 15. All chemicals must be stored secure, on an impervious surface, and in accordance with manufacturer's recommendations. (Department of Public Health & Environment) 16. If applicable,3- If applicable. the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. (Department of Public Health & Environment) 17. Any time the applicant would utilize the right-of-way or cross the right-of-way, a Weld County right-of- way permit shall be required. This permit shall also be required for transporting overweight or overwidth items utilizing county roads or rights-of-way. Contact Amy Burry, Weld County Public Works Department, P.O. Box 758, Greeley, Colorado, 80632 at (970)381 -3779. This permit shall be in place prior to any work being done within the right-of-way. (Department of Public Works) 18. The Develepec-applicant will comply with the terms and conditions of the Improvements Agreement. (Department of Public Works) 19. There will be no staging or parking of equipment or vehicles on maintained county roads. Utilize on- site locations and private rights-of-way. (Department of Public Works) 20. If a drain culvert is required, a 15-inch corrugated metal pipe is the County's minimum size requirement. If the applicant chooses to place a larger culvert, please contact the Weld County Department of Public Works to adequately size the culvert. (Department of Public Works) 21 . The location of access roads shall be addressed in the Improvements Agreement and through the access permitting process. (Department of Public Works) 22. Adequate turning radiuses shall be installed at all entrances to accommodate large truck movement. • • (Department of Public Works) 23. The off-street parking and loading zones shall be surfaced with gravel or the equivalent and shall be graded to prevent drainage problems. (Department of Public Works) 24. Pursuant to Chapter 15, Articles I and II of the Weld County Code, if noxious weeds exist on the property or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling noxious weeds. (Department of Public Works) 25. Utilize the fMUTCD) Traffic Manual to appropriately sign construction zones and crossings adjacent to county roads. (Department of Public Works) 26. The historical flow patterns and run-off amounts will be maintained on site in such a manner that it will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and velocity increases, diversions, concentration and/or unplanned ponding of storm run-off. (Department of Public Works) 27. The applicant must take into consideration storm water capture/quantity and provide accordingly for best management practices. (Department of Public Works) 28. The applicant shall utilize an erosion control plans until vegetation is established in disturbed the areas. (Department of Public Works) Resolution USR-1723 Cedar Creek II Page 10 29. Tracking pads are required at all construction locations where there is heavy traffic coming from • theexits construction areas-site onto a County road. The purpose of the tracking pads is to keep mud and debris from leaving the site and tracking on existing county roads contaminating the existing gravel road(s) with mud and debris. (Department of Public Works) 30. A building permit shall be obtained prior to the construction of the wind turbines and any other buildings or structures on site. (Department of Building Inspection) 31 . In areas where sensitive historic, paleontological, or archeological resources are known to occur the applicant will coordinate with State Historic Preservation Office to conduct on-site preconstruction surveys or monitor during construction to minimize and/or avoid impacts to cultural resources. (Department of Planning Services) 32. Construction and development of the site shall be mitigated in accordance with the Construction Practices and Mitigation Measures as outlined in the application materials. (Department of Planning Services) 33. Effective January 1 , 2003, Building Permits issued on the lot will be required to adhere to the fee structure of the County wide Road Impact Fee Program. (Department of Planning Services) 34. Effective August 1 , 2005, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40) 35. The property owner or operator shall be responsible for complying with the Design Standards of Section 23-2-240, Weld County Code. 36. The property owner or operator shall be responsible for complying with the Operation Standards of Section 23-2-250, Weld County Code. 37. The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. • • 38. Personnel from Weld County Government shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) 39. The Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. 40. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. • • • Jennifer VanEgdom From: Chris Gathman Sent: Wednesday, May 12, 2010 5:00 PM To: Kristine Ranslem; Jennifer VanEgdom Subject: USR-1723 (Cedar Creek II) resolution Attachments: Resolution USR-1723 CG edits (7) (2) (3).doc Here is the final marked up version of the resolution. I made some additions/corrections highlighted in yellow in response to requested changes from the applicant. These changes have been OK'd by Bruce Barker. Let me know if you have any questions. Sincerely, Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue, Greeley CO. 80631 Ph : (970)353-6100 ext. 3537 Fax: (970)304-6498 • EXHIBIT • 1 agl ?' - l ? a3 1 • BEFORE THE WELD COUNTY, COLORADO, PLANNING COMMISSION RESOLUTION OF RECOMMENDATION TO THE BOARD OF COUNTY COMMISSIONERS Moved by Robert Grand, that the following resolution be introduced for passage by the Weld County Planning Commission. Be it resolved by the Weld County Planning Commission that the application for: CASE NUMBER: USR-1723 APPLICANT: Cedar Creek II LLC PLANNER: Chris Gathman REQUEST: A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a Public Utility (A wind energy facility with a generating capacity up to 250,g5 megawatts (MW) along with a 230-kilovolt (kV) electric transmission line, Formatted: Highlight an interconnection facility to tie into an existing 72-mile transmission line, existing collector transmission lines, 1-3-up to five (5) permanent 80-meter meteorological towers. one (1 ) substation. an operations and maintenance building/facility, along with one (1) temporary batch plant and construction facility) in the A (Agricultural) Zone District. LEGAL DESCRIPTION: Wind Energy Facility Transmission Line of the 6th P.M., Weld County, Colorado. LOCATION: Wind Generator facility is generally located in an irregularly shaped area south of and adjacent to CR 138.5; North of and adjacent to CR 120 and west of CR 153. The section of transmission line lying outside of the boundaries of the Wind Generator Facility is located north of CR 118 and west east of and adjacent to CR - - Formatted: Highlight 382.1See Legal Description forprecise location)_ -LFormatted: Highlight be recommended favorably to the Board of County Commissioners for the following reasons: 1 . The submitted materials are in compliance with the application requirements of Chapter 21 of the Weld County Code 2. It is the opinion of the Planning Commission that the applicant has shown compliance with Section 21-3-340. A of the Weld County Code, as follows: 1111 Section 21-3-340.A. 1 - The health, welfare and safety of the citizens of the County will be protected and served. Section 21-3-340.A.2-The natural and socio-economic environment of the County will be protected and enhanced. Section 21-3-340.A.3 — All reasonable alternatives to the proposed action, including use of existing rights-of-way and joint use of rights-of-way wherever uses are compatible, have been adequately assessed and the proposed action is compatible with and represents the best interests of the people of the County and represents a fair and reasonable utilization of resources in the impact area. Section 21-3-340.A.4--A satisfactory program to mitigate and minimize adverse impacts has been presented. Section 21-3-340.A.5—The nature and location or expansion of the facility complies with all applicable provisions of the master plan of this County, and other applicable regional, metropolitan, state and national plans. Section 21-3-340.A.6 —The nature and location or expansion of the facility does not unduly or unreasonably impact existing community services. Section 21-3-340.A. 7--The nature and location or expansion of the facility will not create an expansion of the demand for government services beyond the reasonable capacity of the community or region to provide such services. as determined by the Board of County Commissioners. ,Section 21-3-340.A.8--The facility site or expansion area is not in an area with general meteorological - ( Formatted: Highlight and climatological conditions which would unreasonably interfere with or obstruct normal operations and maintenance. EXHIBIT • Section 21-3-340.A.9--The nature and location of the facility or expansion will not adversely affect the water rights of any upstream, downstream or agricultural users, adjacent communities or other water users. Section 21-3-340.A. 10--Adequate water supplies are available for facility needs. Resolution USR-1723 Cedar Creek II LLC Page 2 Section 21-3-340.A. 11- The nature and location of the facility or expansion will not unduly interfere with existing easements, rights-of-way, other utilities, canals, mineral claims or roads. Section 21-3-340.A. 12--Adequate electric, gas, telephone, water, sewage and other utilities exist or shall be developed to service the site. Section 21-3-340.A. 13-The nature and location for expansion of the facility will not unduly interfere with any significant wildlife habitat or adversely affect any endangered wildlife species. unique natural resource or historic landmark within the impact area. Section 21-3-340.A. 14— The nature and location or expansion of the facility, including expected growth and development related to the operation and provision of service. will not significantly deteriorate water or air quality in the impact area. Section 21-3-340.A. 15 - The geological and topographic features of the site are adequate for all construction, clearing, grading, drainage, vegetation and other needs of the facility construction or expansion. Section 21-3-340.A. 16 - The existing water quality of affected state waters will not be degraded below state and federal standards or established baseline levels. Section 21-3-340.A. 17 - The proposed project will not have a significantly adverse net effect on the capacities or functioning of streams, lakes and reservoirs in the impact area, nor on the permeability, volume, recharge capability and depth of aquifers in the impact area. Section 21-3-340.A. 18 - The benefits of the proposed developments outweigh the losses of any natural resources or reduction of productivity of agricultural lands as a result of the proposed development. Section 21-3-340.A. 19 - The applicant has obtained or will obtain all property rights, permits and approvals necessary for the proposed project, including surface, mineral and water rights and easements for drainage. disposal, utilities, access, etc. If the applicant has not obtained all necessary property rights, permits and approvals, the Board may, at its discretion. grant the permit conditioned upon completion of the acquisition of such rights prior to issuance of a zoning or building permit by the County. Section 21-3-340.A.20 — The proposed project (nonlinear facilities) will not present an unreasonable risk of exposure to or release of toxic or hazardous substances within the impact area. The determination of effects of the project shall include the following considerations: a. The means by which outdoor storage facilities for fuel, raw materials, equipment and related items are adequately enclosed by a fence or wall. b. The likelihood of hazardous materials or wastes being moved off the site by natural causes or forces. c. Containment of inflammable or explosive liquids, solids or gases. Section 21-3-340.A.21 — The scope and nature of the proposed project will not unnecessarily duplicate existing services within the County. • • Section 21-3-340.A.22 — If the purpose and need for the proposed project are to meet the needs of an increasing population within the County, the area and community development plans and population trends demonstrate clearly a need for such development. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. Resolution USR-1723 Cedar Creek II LLC Page 3 The Planning Commission recommendation for approval is conditional upon the following: 1 . The Special Review activity shall not occur nor shall any grading, buildings or electrical permits be issued on the property until the Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder. (Department of Planning Services) 2. Prior to recording the plat: A. The applicant shall provide graphic and written documentation addressing the location and identification of all public rights-of-way, existing and proposed structures, utility easements, irrigation ditches, etcetera per Section 21 -3-330.B.4 of the Weld County Code. This document shall be prepared for recording in the Clerk and Recorder's office. (Department of Planning Services) B. The applicant shall demonstrate attempted compliance with the Colorado Division of Wildlife as stated in their referral dated/received December 7, 2009 and March 8, 2010. (Colorado Division _ • Formatted: Highlight of Wildlife) C. The applicant shall demonstrate attempted compliance with the United States Fish and Wildlife Service as stated in their referral received December 7, 2009. (United States Fish and Wildlife) • D. The applicant shall submit four (4) copies of a ,Ddecommissioning P Ian to the Department of Formatted: Highlight Planning Services for review and approval. (Department of Planning Services) - Formatted: Highlight E. The applicant shall submit a dust abatement plan, addressinq-addressinq_on_site and-off-site dust-control, for review and approval. to the Environmental Health Services, Weld County Department of Public Health & Environment. (Department of Public Health & Environment) F. The applicant shall submit evidence of an Air Pollution Emission Notice (A.P.E.N.) and Emissions Permit application from the Air Pollution Control Division, Colorado Department of Health and Environment for the concrete batch plants and any other operations required by CDPHE to have an APEN. (Department of Public Health & Environment) G. In the event washing of vehicles or equipment will occur on site the applicant shall ensure that any washing areas shall capture all effluent and prevent discharges from the washing of vehicles in accordance with the Rules and Regulations of the Water Quality Control Commission, and the Environmental Protection Agency. Washing areas should be designated on the plat. (Department of Public Health & Environment) J-1. The applicant shall submit written evidence detailing where the hauled water will be obtained. LFormatted: Highlight Department of Public Health & Environmentl IH. The applicant shall submit a waste handling plan, for approval, to the Environmental Health Services Division of the Weld County Department of Public Health and Environment. The plan shall include at a minimum, the following: 1 . A list of wastes which are expected to be generated on site (this should include expected volumes and types of waste generated). 2. A list of the type and volume of chemicals expected to be stored on site. • • 3. The waste handler and facility where the waste will be disposed (including the facility name, address, and phone number). Written evidence of such shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) The applicant will sign and collateralize aAn Improvements Agreement that will-addresses the following issues (Department of Public-Wecks): —1 . On-site and Off-site Improvements, Road Maintenance 4 Formatted: Indent: Left: 0.81", No bullets o ,Collateral numbering 2- An acceptable Final Drainage Report Formatted: Highlight Resolution USR-1723 -- Cedar Creek II LLC ' Formatted: Indent: Left: 0.81", No bullets c Page 4 numbering 3- An acceptable Final Traffic Study ' Formatted: Indent: Left: 0.81", No bullets c 4. 3.2 Construction Ddrawings 4 numbering 4. Construction Sschedule Formatted: No bullets or numbering 5.4 Haul routes 6.5 Haul route amendment process Formatted: No bullets or numbering Formatted: No bullets or numbering And the applicant-will provide: K. The applicant will provide aAn acceptable Final Drainage Report • I Formatted: No bullets or numbering, Tab stops: 0.5", Left + Not at 0.75" Written evidence of Public Works approval shall be provided to the Department of Planning • Formatted: Indent: Left: 0.81", No bullets o Services. (Department of Planning Services) numbering 41I._. The applicant will provide aAn acceptable Final Traffic Study (Department of Public Works)^ Formatted: No bullets or numbering, Tab stops: 0.5", Left + Not at 0.75" Written evidence of Public Works approval shall be provided to the Department of Planning Formatted: Indent: Left: 1", No bullets or Services. (Department of Planning Services) [ numbering 1. Weld County Public Works has received a Traffic Study for USR 1723 Cedar Creek II Wind Eacm prepared and stamped by Eugene Coppola, P.E. After reviewing the project site the following comments must be reviewed and accepted-by Public Works: Formatted: Normal, Indent: Left: 0.06", 4—The Colorado Department of Transportation (CDOT) has jurisdiction over all State highways. Hanging: 0.75", Tab stops: 0.81", Left + 1.5 Please contact Gloria Hice-Idler at the Greeley office (970-350-2148 or 970-350-2148) to Left + Not at 1" verify if any improvements will be required at the intersection of State Highway 71 with CR 132 and CR 120 to accommodate traffic from the Cedar Creek II project. A stop sign will-be required to be installed at all pr-eject accesses-before-traffic will enter onto weld county roadways: ,Written evidence of CDOT approval shall be provided to the Departments of Public Works 'Formatted: Highlight and Planning Services. (Department of Public Works) Written evidence of Public Works approval shall be provided to the Department of Planning Services. (Department of Planning Services) ' The applicant shall submit written evidence to the Department of Planning Services that Federal Aviation Administration (FAA) requirements have been met for the proposed facility. (Department of Planning Services) N Written evidence from the applicant indicating all requirements and agreements between the surface developer and the mineral owners and/or lessees have been completed shall be submitted or evidence that an adequate attempt has been made to mitigate their concerns. Delineating drill envelopes on the plat can be submitted to the Department of Planning Services in lieu of agreement as evidence of an adequate attempt. (Department of Planning • • Services) The applicant shall provide written evidence from the applicable (Pawnee and Southeast Weld) Fire Protection District that there is adequate access for emergency equipment and the width, usually twenty (20) feet, is adequate and designed for appropriate weight capacity. (Department of Planning Services) - The applicants shall provide written evidence from the applicable Fire Protection District (Pawnee and Southeast Weld) that there is a coordinated plan in place for emergency responders during construction of the facilities and a plan for post construction activities. The applicants shall submit plot plans to the applicable Fire Protection Districts for their review and comment. (Department of Planning Services) 3. Upon completion of 2. above the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section s�23 2.260.D-21 -3-330.B.3 and 4 of the Weld County ` Formatted: Highlight Code. The Mylar plat and additional requirements shall be submitted within sixty (60) days from the Formatted: Highlight date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 4. The Plat shall delineate the following: A- All sheets shall be prepared in accordance with Section 2-3-2-260.D 21-3-330.6.3 and 4 of - { Formatted: Highlight the Weld County Code. (Department of Planning Services) Formatted: Highlight B. All sheets shall be labeled USR-1723. (Department of Planning Services) Resolution USR-1723 Cedar Creek II LLC • Page 5 C. The Development Standards associated with this application shall be set forth on the plat. (Department of Planning Services) D. Final locations of wind turbines shall be delineated on the plat. (Department of Planning Services) E. The final transmission line alignment as approved by the Board of County Commissioners shall be delineated on the plat. (Department of Planning Services) F. The boundaries of USR-1723 shall not overlap the boundaries of USR-1213 (located on 5.5 acres in the NE4 of Section 21 and the NW4 of Section 22 T11 R57W). 5. Prior to the commencement of construction activities and/or hauling of materials: A. A pre-construction meeting between the applicant, the applicant's designated contractors, and the applicable Weld County Departments (Building Inspection, Planning Services, Public Works, Environmental Health) shall be held to discuss the requirements, timing. . . regarding construction of the site. (Department of Planning Services/Department of Public Works) B. The applicant shall obtain a grading permit for any project improvements that disturb more than one acre of land. The grading permit application shall include an erosion and sediment control plan, a grading plan, installation details for BMPs to be used, and a copy of the storrnwater construction permit from the Colorado Department of Public Health and Environment. Please note that construction activities will not be allowed to begin until the Improvements Agreement has been signed and collateral posted, and a grading permit has been issued. (Department of Public Works) C. The applicant shall obtain overweight and/or over width special transport permits from Public Works for all applicable trucks. _Please contact Amy Burry at 970-381-3779 if there are any • S questions re: the special transport permits. The applicant shall obtain access_7ermits from Comment DU: This may be a little late to add bui Public Works for all temporary and permanent accesses. Please contact Janet Carter at this has been discussed in all of our meetings and at 970-304-6496 ext 3726 if there are any questions regarding the access permits. (Department the PC hearing. of Public Works) (Department of Public Works) D. The applicant shalt obtain right of way permits before installation and/or construction of any above ground or buried features in or crossing Weld County road rights-of-way. (Department of Public Works) E. The applicant shall provide three (3) gravel stockpile locations and stock each with 1 ,000 cubic yards of gravel that can be used for road repairs. (Department of Public Works) F. The applicant shall provide evidence showing that an on-call contractor has been cont acted to handle emergency road repairs. (Department of Public Works) G. The applicant shall provide a power purchase agreement or other documentation/agreement/evidence that power to be generated by this facility has been or is agreed to be purchased. (Department of Planning Services) H. The subdivision exemption plat for the proposed main substation and Cedar Creek I substation tap shall be submitted for recording to the Department of Planning Services. (Department of Planning Services) 6. Prior to Release of Building Permits: A. A building permit shall be obtained prior to the construction of the wind turbines and any other buildings or structures on site. (Department of Building Inspection) Resolution USR-1723 Cedar Creek II LLC Page 6 B. A plan review is required for each building for which a building permit is required. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. Building plans shall also be submitted to the New Raymer Fire Protection District. (Department of Building Inspection) C. The applicant shall provide written evidence of compliance with the U.S. Army, Corps of Engineers (USACOE), Section 404 of the Clean Water Act Permit. {sheer-what was received for USR 15624 D. Buildings shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2006 International Building Code; 2006 International Mechanical Code; 2006 International Plumbing Code; 2006 International Fuel Gas Code; and the 2008 National Electrical Code, 2006 International Energy Code and Chapter 29 of the Weld County Code. (Department of Building Inspection) E. Each structure will require an engineered foundation based on a site specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. All plans and specifications prepared by architects or engineer sub-disciplines shall be designated and shall bear the seal and signature of the architect or engineer of the sub-discipline. (Department of Building Inspection) F. The structure will probably be classified as a U (Turbine) occupancy. The maintenance structures and offices will be B occupancy. Temporary structures will be classed accordingly. S • Fire resistance of walls and openings, construction requirements, maximum building height and allowable areas will be reviewed at the plan review. Setback and offset distances shall be determined Chapter 23 of the Weld County Code. (Department of Building Inspection) G. All building plans shall be submitted to the applicable Fire Protection District (Southeast Weld or Pawnee) for review and approval. (Department of Building Inspection) H. The applicant shall submit written evidence detailing where the hauled water will be obtained. (Department of Public Health & Environment) 7. One month prior to construction activities: A. A State stormwater discharge permit may be required for a development /_redevelopment l construction site where a contiguous or non-contiguous land disturbance is greater than or equal to one acre in area. Contact the Water Quality Control Division of the Colorado Department of Public Health and Environment at www.cdphe.state.co.us/wq/PermitsUnit for application more information. (Department of Public Health and Environment) A. A Pre-Construction meeting-shall be required (Departments of-Planning, Public Works;-Public Health and Environment, Building Inspection-) 8,7. Prior to issuance of Certificate of Occupancy: • - - f Formatted: No bullets or numbering, Tab stops: 0.13", Left + 0.5", Left + Not at 1" + A. An individual sewage disposal system is required for the proposed temporary office trailer 1.5" complex and the permanent 0 & M Building and shall be installed according to the Weld County Individual Sewage Disposal Regulations. (Department of Public Health and Environment) • B. The septic system is required to be designed by a Colorado Registered Professional Engineer according to the Weld County Individual Sewage Disposal Regulations. (Department of Public Health and Environment) Motion seconded by Erich Ehrlich. Resolution USR-1723 Cedar Creek II LLC Page 7 VOTE: For Passage Against Passage Absent Robert Grand Bill Hall Tom Holton Alexander Zauder Erich Ehrlich Roy Spitzer Mark Lawley Nick Berryman Jason Maxey The Chair declared the resolution passed and ordered that a certified copy be forwarded with the file of this case to the Board of County Commissioner's for further proceedings. CERTIFICATION OF COPY • • I, Kristine Ranslem, Recording Secretary for the Weld County Planning Commission, do hereby certify that the above and foregoing resolution is a true copy of the resolution of the Planning Commission of Weld County, I Colorado, adopted on March 162, 2010. Dated the 172"� of March, 2010. Kristine Ranslem Secretary • • - - Formatted: Left • - Formatted: Left, Indent: First line: 0" SITE SPECIFIC DEVELOPMENT PLAN SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS CEDAR CREEK WIND ENERGY II , LLC USR-1723 1 . ,A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a Public UtilityiA_ - Formatted: Highlight wind energy facility with a generating capacity up to 250_8 megawatts (MW) along with a 230-kilovolt (kV1 electric transmission line, an interconnection facility to tie into an existing 72-mile transmission line, existing collector transmission lines. up to five (5) permanent 80-meter meteorological towers, one (1) substation, an operations and maintenance building/facility. along with one (1) temporary batch plant and construction facilityl in the A (Agricultural) Zone District. A Site Speci€rc-Development Plan and Use by Special Review Permit for a-Major Facility-of-a--Public Utility (A wind energy facility with- a generating capacity up to 300 megawatts (MW) along with a 23O-kilovolt-(1O/ -transmission line, 1 substation, 1 -3 permanent 80 meter meteorological towers, along with one-(-1-) temporary batch plant and construction facilities); as indicated in the application materials on file in the Department of Planning Services and subject to the Development Standards-stated hereon. (Department-of-Piaening Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health & • • Environment) 4. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. (Department of Public Health & Environment) 5. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate conditions, blowing debris and other potential nuisance conditions. (Department of Public Health & Environment) 6. The applicant shall operate in accordance with the approved "waste handling plan". (Department of Planning Services) 7. Fugitive dust and fugitive particulate emissions shall be controlled on the site. along the approved construction--haul routes and other designated roads and areas-as-clesoribed in-the-improvements Agreement as well as after construction is completed. The facility shall be operated in accordance with the approved "dust abatement plan" at all times. (Department of Public Health & Environment) 8. The applicant shall adhere to the maximum permissible noise levels allowed in the industrial Zone as delineated in Section 14-9-30 of the Weld County Code. (Department of Public Health & Environment) 9. A permanent, adequate water supply shall be provided for drinking and sanitary purposes for the permanent facility. (Department of Public Health and Environment) 10. This application is proposing a well as its source of water. The applicant should be made aware that while they may be able to obtain a well permit from the Office of the State Engineer, Division of Water Resources, the quantity of water available for usage may be limited to specific uses, i.e. domestic use only, etc. Also, the applicant should be made aware that groundwater may not meet all drinking water standards as defined by the Colorado Department of Public Health & Environment. We strongly • encourage the applicant to test their drinking water prior to consumption and periodically test it over time. (Department of Public Health & Environment) 11 . Sewage disposal for the facility shall be by septic system. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. (Department of Public Health & Environment) 12. Bottled water shall be utilized for drinking during construction of the project. (Department of Public Health & Environment) 13. Adequate portable toilet facilities (portable toilets) and hand washing units shall be provided during the construction of the project. (Department of Public Health & Environment) Resolution USR-1723 Cedar Creek II Page 9 14. Any vehicle or equipment washing areas shall capture all effluent and prevent discharges from drum washing and the washing of vehicles in accordance with the Rules and Regulations of the Water Quality Control Commission, and the Environmental Protection Agency. (Department of Public Health & Environment) 15. All chemicals must be stored secure, on an impervious surface, and in accordance with manufacturer's recommendations. (Department of Public Health & Environment) 16. If applicable,T If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. (Department of Public Health & Environment) 17. Any time the applicant would utilize the right-of-way or cross the right-of-way, a Weld County right-of- way permit shall be required. This permit shall also be required for transporting overweight or overwidth items utilizing county roads or rights-of-way. Contact Amy Burry, Weld County Public • • Works Department, P.O. Box 758, Greeley, Colorado, 80632 at (970)381 -3779. This permit shall be in place prior to any work being done within the right-of-way. (Department of Public Works) 18. The Developer applicant will comply with the terms and conditions of the Improvements Agreement. (Department of Public Works) 19. There will be no staging or parking of equipment or vehicles on maintained county roads. Utilize on- site locations and private rights-of-way. (Department of Public Works) 20. If a drain culvert is required, a 15-inch corrugated metal pipe is the County's minimum size requirement. If the applicant chooses to place a larger culvert, please contact the Weld County Department of Public Works to adequately size the culvert. (Department of Public Works) 21 . The location of access roads shall be addressed in the Improvements Agreement and through the access permitting process. (Department of Public Works) 22. Adequate turning radiuses shall be installed at all entrances to accommodate large truck movement. (Department of Public Works) 23. The off-street parking and loading zones shall be surfaced with gravel or the equivalent and shall be graded to prevent drainage problems. (Department of Public Works) 24. Pursuant to Chapter 15, Articles I and II of the Weld County Code, if noxious weeds exist on the property or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling noxious weeds. (Department of Public Works) 25. Utilize the fMUTCD) Traffic Manual to appropriately sign construction zones and crossings adjacent to county roads. (Department of Public Works) 26. The historical flow patterns and run-off amounts will be maintained on site in such a manner that it will • reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and velocity increases, diversions, concentration and/or unplanned ponding of storm run-off. (Department of Public Works) 27. The applicant must take into consideration storm water capture/quantity and provide accordingly for best management practices. (Department of Public Works) 28. The applicant shall utilize an erosion control plans until vegetation is established in disturbed the areas. (Department of Public Works) Resolution USR-1723 Cedar Creek II Page 10 29. Tracking pads are required at all construction locations where there is heavy traffic coming from tPeexitinaE• construction areas-site onto a County road. The purpose of the tracking pads is to keep mud and debris from leaving the site and tracking on existing county roads contaminating the existing gravel road(s) with mud and debris. (Department of Public Works) 30. A building permit shall be obtained prior to the construction of the wind turbines and any other buildings or structures on site. (Department of Building Inspection) 31 . In areas where sensitive historic, paleontological, or archeological resources are known to occur the applicant will coordinate with State Historic Preservation Office to conduct on-site preconstruction surveys or monitor during construction to minimize and/or avoid impacts to cultural resources. (Department of Planning Services) 32. Construction and development of the site shall be mitigated in accordance with the Construction Practices and Mitigation Measures as outlined in the application materials. (Department of Planning • Services) 33. Effective January 1 , 2003, Building Permits issued on the lot will be required to adhere to the fee structure of the County wide Road Impact Fee Program. (Department of Planning Services) 34. Effective August 1 , 2005, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40) 35. The property owner or operator shall be responsible for complying with the Design Standards of Section 23-2-240, Weld County Code. 36. The property owner or operator shall be responsible for complying with the Operation Standards of Section 23-2-250, Weld County Code. 37. The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. 38. Personnel from Weld County Government shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) 39. The Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. • 40. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. • TETRATECH E:+ . INC. • Transmittal Cover Sheet To: Chris Gathman, Weld County Planning Department Phone: (970) 353-6100 ext. 3540 eV°{unwn� From: Sarah McCall Jensen Wald h � E�E'l�(Y' Date: May 14, 2010 ‘ft.`t ly c LAN) Project: Cedar Creek II Wind Farm Project - y Tetra Tech Project# 106-4002 Subject: Construction and Additional Studies Documents Enclosed please find attached hard copies of the following documents: • Name of Document No.of copies Decommissioning Plan 4 Dust Abatement Plan (letter) 2 Dust Abatement Plan 2 Waste Management Plan 2 SPCC Plan 2 USACE Strategy Memo 1 Noxious Weed Management Plan 2 A CD is attached that contains the electronic files for these documents, including an electronic file of the Right-of-Way Permit attachments that was forwarded to Amy Bury under separate cover. EXHIST 1 II Tel Fax - SGS go/ c T 1ahbo Waste Handling Plan, 2010 Blattner Energy, Inc • April 07, 2010 Weld County Environmental Health Services Attn: Ms. Lauren Light 1555 N. 17th Avenue Greeley, Colorado 80631 RE: Blattner Energy, Inc. —Waste Handling Plan Dear Ms. Light: Blattner Energy, Inc. (BEI) will be implementing a Waste Handling Plan for our proposed wind project. Wastes will be generated throughout the construction of the Cedar Creek Wind Project and be stored in standard dumpsters located at the project laydown yard next to the jobsite office trailers. The expected volume of waste generated will be trash from the construction of the wind project and the employees of the wind project(i.e. woods, plastic products, tarps, cardboard boxes, empty bags, bottles, lunch containers, beverage containers, etc.). The volume will be collected in 30 cubic yard dumpsters; and collected bi-weekly by the waste handler. The proposed operation will have motor oil, mineral oil, vegetable oil, a 1,000 gallon tank of • off-road diesel, a 500 gallon tank of unleaded gas, and a 500 gallon tank of on-road diesel. All oils and fuel tanks will be located within a secondary containment system located in the project laydown yard. A spill Prevention Control and Countermeasures (SPCC) plan will also be in place for the fuel storage. The SPCC plan will be available at the site at all times. The fuel storage tanks will be permitted through the State of Colorado—Department of Labor and Employment—Division of Oil and Public Safety if it falls within their regulations. The tanks will also be permitted with the New Raymer Fire Protection District if they require a permit. The following company will be disposing of the waste material above for the Cedar Creek Wind Project: Facility Name: Peetz Farmers CO-OP Waste Management Address: 35647 Highway 113 18211 Iris Drive Peetz, CO 80747 Sterling, CO Phone Number: (907) 334-2347 (970) 522-3061 If you need additional information please do not hesitate to contact myself at (320) 260-0950 or Craig Arneson at (320) 761-0201. Sincerely, Brandon Kraus • Project Engineer • April 06, 2010 Weld County Environmental Health Services Attn: Ms. Lauren Light 1555 N 17th Avenue Greeley, Colorado, 80631 RE: Blattner Energy, Inc.—Cedar Creek Dust Abatement Plan Blattner Energy, Inc. (BEI) will provide dust abatement for the proposed Wind Farm project. A water truck and dust palliative (Calcium Chloride) will be used to treat the on-site areas (haul roads, access roads, aggregate processing areas, etc) in order to suppress dust. A water truck and dust palliative will be used to control dust in circulation areas and material handling/stockpile areas. Construction vehicle speeds will be reduced on graveled county roads to 45 mph, speeds will also be reduced to 25 mph on all project access road going into the Wind Farm to aid dust suppression. On a daily basis prior to starting up project operations all haul roads, stock pile areas, and circulation areas will be inspected to determine if wetting the surfaces are needed. If the roads and stockpiles are dry where dust could be generated they will be wetted using a water truck. • The same areas will be inspected throughout the day to determine if wetting the areas is needed. If at any time during the day the project begins to generate dust that is leaving the site, BEI will have the water truck on stand-by such that an area can be wetted as soon as possible. If you need additional information please do not hesitate to contact myself at (320) 260-0950 or Craig Arneson at (320) 761-0201. Sincerely, Brandon Kraus Project Engineer • Dust Abatement Plan,2010 Blattner Energy, Inc • Dust Abatement Plan Cedar Creek II Wind Project Prepared by Blattner Energy, Inc 392 County Road 50 Avon, Minnesota 56310 • • Dust Abatement Plan,2010 Blattner Energy, Inc TABLE OF CONTENTS • 1 . INTRODUCTION a. Responsible Personnel b. Sources of fugitive dust 2. RECOMMENDED BEST MANAGEMENT PRACTICES a. Water b. Chemical Dust Suppression c. Stabilization d. Load Control Measures ATTACHEMENTS 1 . Site map 1. Introduction Blattner Energy, Inc. is committed to work within the parameters of all federal, state and local environmental protection policies and regulations at all project locations. This long -standing commitment includes activities that take place at our corporate office and any other office location. We also require any subcontractor, vendor and any other applicable or effected entity to conform to our `standard of commitment' while they are associated with our operations. In the event of a conflict within the coordination of requirements of applicable promulgated standards, the stricter of those laws will be applied and enforced. Dust can affect the health of people, property or business. Dust can also represent a risk to safety when conditions are allowed to inhibit visibility. Operators of a construction site must take reasonable precautions to prevent dust from becoming airborne and from being tracked onto paved public roads. 1.a. Responsible Personnel Craig Arneson, (320) 761-0201 Brandon Kraus, (320) 260-0950 • Dust Abatement Plan, 2010 Blattner Energy, Inc. • 1.b. Sources of Dust Construction sites generate dust from a variety of sources. These sources include: • Vehicle and equipment traffic on unpaved roads • Wind erosion from disturbed and exposed soils • Materials handling Please refer to section 2 for recommended Best Management Practices (BMP) for each of these sources. 2. Recommended Best Management Practices Dust abatement procedures are a significant concern on Blattner Energy, Inc. projects. Blattner Energy, Inc. incorporates a variety of abatement procedures as conditions dictate. Abatement techniques include preventing the creation of fugitive dust, binding dust particles together, and reducing wind speed at ground level. Dust abatement efforts shall be monitored and recorded during the stormwater inspection conducted on a weekly basis and after rain events. 3.a. Water • During the duration of the project, Blattner Energy, Inc. will have two 4,000-gallon water trucks in operation. This will be the primary method of dust control. Additional water trucks will be employed during the peak summer season when evaporations rates are highest. Water trucks will operate the full length of the shift(s) so that fugitive dust emissions do not interfere with safety or neighboring property lines. Blattner Energy, Inc. will apply water so that the surface is visibly moist on trafficked roads and in the areas where work is taking place. 3.b. Chemical Dust Suppressant Blattner Energy, Inc. recognizes that extreme conditions may require additional dust control methods. Blattner Energy Inc. may employ the use of a Colorado State approved dust palliative applied using the admix method and/or to the surface of gravel access roads at the application rate and frequency specified by the manufacturer. Dust palliative will be applied 100' in each direction of a public road intersection and 1/4 mile in each direction of a private driveway and public road. 3.c. Stabilization Blattner Energy, Inc. will take preventative measures to limit dust from disturbed • soils. Disturbed surface areas will be controlled via construction sequencing and clearing will be kept to a minimum width within the right ways. Topsoil will be Blattner Energy, Inc. Blattner Energy, Inc Fugitive Dust Control Plan,2010 Confidential Document Page 3 of 4 Dust Abatement Plan, 2010 Blattner Energy, Inc. stockpiled according to the construction drawings. • 3.d. Load Control Measures Blattner Energy, Inc enforces a strict speed limit of 25 mph on all project access roads. Construction vehicle speed limits are also enforced throughout graveled county roads that run through the project jobsite limiting their speed to 45 mph. Limiting the speed limit to 25 and 45 mph reduces dust emissions from loads and dust from the road. • • Blattner Energy, Inc. Blattner Energy, Inc Fugitive Dust Control Plan, 2010 Confidential Document Page 4 of 4 ar it TETRA TECH Wel4&mazy flaming tl00011IIIM GREELEY wet MAY I 1 ZUID Memorandum RECEIVED To: Chris Gathman, Weld County Planning Department From: Sarah Jensen, Tetra Tech EC Date: May 14, 2010 Project: Cedar Creek II Wind Farm Project (USR-1723) Subject: Strategy for U.S. Army Corps of Engineers Compliance Distribution: David Gonzalez, BP Wind Energy North America, Inc. (BPWENA) Bridgette Miranda, BPWENA Project File As part of the draft conditions of approval of the Cedar Creek II Wind Farm Project(USR-1723), Cedar Creek II, LLC is required to provide written evidence of compliance with the U.S. Army Corps of Engineers (USACE), Section 404 of the Clean Water Act Permit. Tetra Tech wetland scientists, working on behalf of Cedar Creek II, LLC, completed a delineation of waters of the United States, including wetlands and playa lakes in the Project area. A total of 26 ephemeral drainages, 26 playa lakes, and 7 wetlands were delineated. Cedar Creek II, LLC used these • data to design the Project in a manner that avoided potential waters of the U.S. to the maximum extent practicable. One exception was a playa lake that is bisected by Weld County Road 126 (CR 126), one of the proposed haul routes for Project construction. Cedar Creek II, LLC will comply with USACE requirements to conduct road improvements along CR 126. Cedar Creek II, LLC is currently working with the USACE Denver Regulatory Office to obtain a preliminary jurisdictional determination for this playa lake. If the USAGE determines this feature is not a"jurisdictional water of the U.S."then no permit under the Clean Water Act will be necessary. If the USACE determines that the playa site is a jurisdictional water of the U.S., the USACE has tentatively recommended that the project apply for a Nationwide 14 Permit. A Nationwide Permit 14 is written for linear transportation projects that result in fill to waters of the U.S. As a backup plan, the Project may change the haul route to avoid this playa lake altogether. Tetra Tech submitted a request for a preliminary jurisdictional determination to the USACE Denver Regulatory Office on May 12, 2010. Cedar Creek II, LLC will supply Weld County with the response from the USAGE as soon as it is received. Per conversation with you and David Bauer on May 10, 2010, a copy of this correspondence with the USACE will satisfy the condition of approval to provide written evidence of compliance with the USACE. • Tel Fax SGS bp BP Wind Energy S David Gonzalez BP Wind Energy North America Inc. 700 Louisiana, 33'°Floor Houston,TX 77002 Direct 713-354-2138 Direct Fax:713-354-2120 Email: david.gonzalez2@bp.com May 14,2010 Chris Gathman Weld counts ?lar;ung Depattmenl Weld County Planning Department GREELEY OFFICE 1555 N. 17th Avenue zu�O Greeley, CO 80631h� Re: USR-1723 Decommissioning Plan RECEIVED a\/ ED Dear Chris, As we discussed via conference call on March 23,2010, this letter contains the Cedar Creek II,LLC decommissioning plan. • • Upon termination of this Land Lease and Wind Easement or decommissioning of the Wind Facilities located on the Premises, Lessee(Cedar Creek II,LLC) shall bear all costs and expenses to remove all of the Wind Turbines,roads, substations, transmission lines,and met towers from property. • All wind facilities will be removed within 240 days of termination of the Land Lease and Wind Easement. • All wind facilities will be removed to a depth of 4 feet below the surface of the ground. • All non-salvageable waste material will be disposed in an environmentally sound manner in a landfill that is legally approved to accept waste of this volume and characterization. • Lessee will use reasonable commercial efforts to restore the land to its original condition. If you have any questions regarding any of this information,please feel free to call me at my office at(713) 354-2138 or on my cell phone at (832) 434-9338. Thank you. Sincerely, 1N • David Gonzalez, P.E. Noxious Weed Mgmt Plan, 2010 Blattner Energy, Inc Noxious Weed Management Plan Cedar Creek II Wind Project Prepared by Blattner Energy, Inc 392 County Road 50 Avon, Minnesota 56310 ePetttc'elt 14OGREI t� , 4 Nit 7,61 • • Noxious Weed Mgmt Plan,2010 Blattner Energy, Inc • Introduction: Noxious weed management for this project will be accomplished in two phases. Phase One will occur during facility construction. Phase Two will be applied following completion of construction activities as an on-going effort during the active life of the project. Each phase will incorporate appropriate management objectives and control strategies. Integrated weed management (IWM) will serve as the foundation for all management actions associated with this project. Phase One: Weed Management During Facility Construction During this phase of the project, weed management will focus on prevention of weed spread and introduction of new weed populations. Weed prevention is addressed by: • limiting opportunities for weed propagules (e.g. seeds, shoots, root fragments) to enter an area or move between areas; • reducing negative human impacts to existing vegetation; • maintaining healthy and vigorous plant communities that can exclude weeds, should they enter the local system. Site workers will be briefed with descriptions of weeds common to the area primarily those on the Weld County "B" noxious weed list during their first day orientation. Observations of any populations in facility construction areas will be recorded and communicated to a project location database. In order to prevent spread of seed or other propagules, in areas where noxious weeds do occur, care will be taken on a daily basis to inspect, remove, and dispose of noxious weeds and propagules found attached to vehicles prior to leaving that particular site. All construction site vehicles/ heavy equipment will be washed prior entering the jobsite for the first time to prevent spread of Noxious weeds. This and any other removed weed material will be collected in large, durable plastic bags and disposed of in a manner and at a location approved by the Weld County Weed Coordinator. Several sources have noted the thick cover of a healthy, strongly competing native plant community can be an important component of weed control. Management practices that minimize disturbance to native plant communities reduce opportunities for weeds to invade the site. This includes careful use of off-road vehicles and limiting soil disturbances in natural vegetation areas whenever possible. 411 Blattner Energy,Inc. Blattner Energy, Inc Weed Mgmt Plan, 2010 Confidential Document Page 2 of 5 Noxious Weed Mgmt Plan, 2010 Blattner Energy, Inc • Careful revegetation of surface disturbed areas will also help prevent new weed infestations by using certified weed-free fill, topsoil, seeds, mulch, and vigorous native plant materials. A seed mix of native grasses found to grow well in the vicinity of the Cedar Creek II site will be developed for revegetation of disturbed areas. Construction activities for the Cedar Creek II Wind Farm will be conducted in a manner that supports the goal of preventing new weed infestations. The following Best Management Practices (BMPs) will be employed during construction. • Other than vehicles essential to construction activities, no motorized vehicles will be allowed within construction zones and corridors. • Soil from areas identified as supporting noxious weed populations will not be introduced to the construction site, to avoid transport of weed seeds or other propagules. • Before construction activities commence within areas of noxious weeds, weed plants will be chemically treated by a state licensed contractor or cut/mown and the materials removed and disposed of before plants set seed to prevent release of weed seed. • • All seed, top soil, and mulch materials imported onto the Cedar Creek II site will be certified as weed-free. • All excavations, placement of fill soil, or other areas of surface disturbance will be revegetated with the site seed mix surface in order to facilitate establishment of desirable vegetation and discourage weed infestation. All revegetation seeding will incorporate the project revegetation plan, BMPs, and seed mixes. • Revegetation and weed treatment— Construction disturbance may require weed treatment over the summer and revegetation in the fall when there is sufficient moisture to ensure success. The results of the disturbance should be monitored to determine what noxious weed species are appearing, and whether a seeding will be necessary or whether natural revegetation is sufficient to out-compete weed species. Only native species should be used in re-vegetating disturbances; exotic species such as crested wheat, yellow sweetclover, alfalfa, or smooth brome should be strictly forbidden. A seed mix including species such as blue grama, buffalo grass, western wheatgrass, sideoats grama, sand dropseed, needle and thread grass, Indian rice grass, and little bluestem would be appropriate, as long as percentages of the species are appropriate (i.e. not too much sideoat grama that might completely dominate the mix). All • noxious weeds that appear within 200 yards of the wind turbines and maintenance roads should be monitored and reported to Blattner Energy. Blattner Energy, Inc. Blattner Energy,Inc Weed Mgmt Plan,2010 Confidential Document Page 3 of 5 Noxious Weed Mgmt Plan, 2010 Blattner Energy, Inc Post-Construction Weed Management • Post-construction weed management objectives will be eradiction of incipient weed populations, suppression of existing populations, and restoration of temporarily disturbed existing plant communities. Monitoring known weed populations and checking for new introductions will be done on a regular schedule throughout post-construction growing seasons. Monitoring efforts will concentrate on those weed species listed on the Weld County "A", "B", and "C" noxious weed lists. IWM control techniques appropriate to individual species and specific sites will be developed and employed in consultation with the Weld County Weed Division. These will include mechanical and chemical weed control. Revegetation techniques and BMPs discussed above will be implemented during this phase of project weed management as well. • • Blattner Energy, Inc Blattner Energy, Inc Weed Mgmt Plan,2010 Confidential Document Page 4 of 5 elTETRA TECH ! . . Memorandum To: Chris Gathman, Weld County Planning Department From: Sarah Jensen, Tetra Tech EC Date: May 12, 2010 Project: Cedar Creek II Wind Farm Project (USR-1723) Subject: Revisions to Use by Special Review Application to Address Setbacks Distribution: David Gonzalez, BP Wind Energy North America Project File Attached is a minor revision to page 38 of the Use by Special Review application for the Cedar Creek II Wind Farm Project (USR-1723) submitted in May 2009. Modifications include changing the language regarding setbacks from the site boundary of the wind energy facility and county roads. No revisions to project maps previously submitted are necessary. • • 19ThTel Fax SGS Weld County 1041 Permit Application Cedar Creek II Wind Farm Project . Wind Energy Facility and 230kV Transmission Line • 21-3-330.B.5.k—Total Acreage of the Parcel, Right-of-Way, or Corridor under Consideration Total acreage of the proposed site for the wind energy facility is approximately 26,927 acres. The acreage of the permanent footprint of the facility(e.g., roads, turbine foundations, substations, O&M building, etc.) for all three phases (300 MW)would be approximately 146 acres or less than 0.5 percent of the total site. Total acreage of the proposed permanent right-of-way for the electric transmission line is approximately 331 acres, and the total permanent disturbance of the transmission line poles and access roads is less than 1 acre. A survey of the alignment would be completed once all easements are secured. 21-3-33O.B.5.I—Existing Land Use Wind Energy Facility The existing land use within the proposed site for the wind energy facility is agricultural, including a mix of dryland farming, grazing, and CRP land as shown in Figure 4. Residential buildings and outbuildings are scattered in low density throughout the proposed site along with missile silos, which are actively managed by the U.S. Department of Defense (DOD). In designing and micro-siting the wind energy facility, Cedar Creek II, LLC would comply with • the following setbacks regarding placement of the wind turbines to provide adequate buffers to adjacent land uses. Towers shall be located at least: • 1,500 feet from occupied residences (excluding barns and other outbuildings), unless written permission for a shorter distance is received by the landowner • 250 to 460 feet from the edge of the site boundary for the wind energy facility • 400 to 460 feet from existing county roads (measured from road centerline) • 30 feet from section lines where roads are not developed (outside the county's 60-foot right-of-way) • 2,000 feet from missile silos (measured from center of missile silo plot) unless approved by Francis E. Warren Air Force Base • 100 feet from DOD missile silo communications cabling • 150 feet from the tip of the turbine blade to escarpment features where raptor nests have been identified • 1,320 to 2,640 feet (based on species)from raptor nests identified during 2007 and 2008 monitoring Land enrolled in the CRP program would maintain CRP status, with the exception of the permanent disturbance within the turbine tower and new access road footprints (see Figure 4), which would either comply with allowed exclusions to the CRP program or would be withdrawn from the program. • 38 TETRA TECH EC, INC. • Transmittal Cover Sheet To: Chris Gathman, Weld County Planning Department F' pemk r e�Phone: (970) 353-6100 ext. 3540 pe Otve `J+o"totwt""E� t)FF�G� From: Dan Shea (1°1Date: May 14, 2010 O`i \i t9 Project: Cedar Creek II Wind Farm Project �` Tetra Tech Project# 106-4002 `v Subject: Final Drainage Report Enclosed please find four(4) hard copies and one(1) CD of the Cedar Creek II Wind Farm Final Drainage Report. • EXHIBIT I • l' "nto), '3 � Tel _ Fax SGS II ! I Ii I✓ v A i I 012i fieC ,; ,�� t k , ,:„.„ ,h,„ r , c„, , k 4 L k4 ,, m fi I $ r y. Y • Cedar Creek II Wind Farm Project Cedar Creek II, LLC, a wholly owned subsidiary of BP Wind Energy North America Inc. Final Drainage Report for Wind Energy Generation Facility and 230-kV Transmission Line USR 1723 May 2010 • Prepared bp for: BP Wind Energy North America Inc., 700 Louisiana, 33rd Floor, Houston, Texas 77002 Prepared by: TETRATECH EC,INC. 7350 East Progress Place, Greenwood Village, Colorado 80111 OPpDO �CFN ;'��ELC • • a<(,yf 9 • 5-14—(0.11,T • /Il '\." NAL•tiY�\-� Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 Contents Page 1. General Location and Description 1.1 1.1 Location 1-1 1.1.1 Township, Range, Section, /-Section 1-1 1.1.2 Local Streets 1-1 1.1.3 Major Open Channels, Lakes, Streams, Irrigation, and Other Water Resource Facilities 1-1 1.1.4 Surrounding Developments 1-1 1.2 Description of Property 1-2 1.2.1 Size of Project Area in Acres 1-2 1.2.2 Ground Cover and Soil Types 1-2 1.2.3 Major Open Channels and Ownership 1-3 1.2.4 Project Description 1-3 1.2.5 Irrigation Facilities 1-4 1.2.6 Groundwater Characteristics 1-4 2. Drainage Basins and Sub-Basins 2.1 2.1 Major Basin Description 2-1 • 2.1.1 Applicable Weld County Master Drainage Plans 2-1 2.1.2 Major Basin Drainage Characteristics 2-1 2.1.3 FEMA-Defined Floodplains and Floodways 2-1 2.1.4 On-Site Contours 2-1 2.2 Sub-Basin Description 2-2 2.2.1 Historical Drainage Patterns 2-2 2.2.2 Off-Site Drainage Flow Patterns 2-2 3. Drainage Design Criteria 3.1 3.1 Development Criteria Reference and Constraints 3-1 3.1.1 Previous Drainage Studies 3-1 3.1.2 Site Constraints 3-1 3.2 Hydrological Criteria 3-1 3.2.1 Design Rainfall 3-1 3.2.2 Design Storm Recurrence 3-1 3.2.3 Runoff Calculation Methods and Models 3-2 3.2.4 Detention Discharge and Storage Calculation Methods and Computer Models 3-3 3.3 Hydraulic Criteria 3-4 3.3.1 Conveyance Capacities 3-4 3.3.2 Detention Outlet Type 3-6 3.3.3 Water Quality Outlet Configuration 3-7 3.4 Justification of Criteria or Calculation Methods 3-7 • Cedar Creek II Wind Farm Project Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 4. Drainage Facility Design 4.1 • 4.1 On-Site Drainage Patterns 4-1 4.2 Off-Site Runoff Compliance 4-1 4.3 Summary of Hydrology and Hydraulic Structures 4-2 4.4 Riprap and Erosion Protection 4-2 4.5 Copies of Permit Applications 4-4 5. Conclusions 5-1 5.1 Compliance with the Weld County Code 5-1 5.2 Drainage Concept 5-1 5.2.1 Effectiveness of Design 5-1 5.2.2 Influence of Proposed Development 5-1 5.2.3 Irrigation Company Approvals 5-1 6. References 6.1 Tables Table 1: Time of Concentration and Runoff—Historical Condition and Drainage Area South of CR 132 Table 2: Time of Concentration and Runoff—Developed Condition Including Off-Site Runoff • Table 3: Time of Concentration and Runoff—Developed Condition Not Including Off-Site Runoff Table 4: Drainage Channel Summary—Developed Condition Table 5: Emergency Spillway and Weir Summary Table 6: Riprap Summary1 Table 7: Design Storm Precipitation Depths • ii Cedar Creek II Wind Farm Project Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 . Appendices Appendix A: Hydrologic Computations Appendix B: Hydraulic Computations Appendix C: Design Drawings Appendix D: USDCM Volume 1, Chapter 5—Time of Concentration Details Appendix E: USDCM Volume 1, Chapter 7—Drainage Channel Design Criteria Appendix F: USDCM Volume 1, Chapter 7—Riprap Design Criteria and Gradation Appendix G: NOAA Atlas 2, Volume III—Precipitation Depths Appendix H: USDCM Volume 1, Chapter 4—Conversion Factor(1-Hour to 2-Hour Storm) Appendix I: NRCS Soil Reports Appendix J: WINTR-55 Curve Numbers Appendix K: Site Photos Appendix L: FEMA Flood Maps for Weld County Appendix M: NAG Erosion Controls Appendix N: CDPHE Permit Application • • Cedar Creek II Wind Farm Project iii Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 1 . General Location and Description This Final Drainage Report was prepared in support of the 1041 Use by Special Review Permit application (USR 1723)for the proposed Cedar Creek II (CCII)Wind Energy Facility and 230-kilovolt(kV) Transmission Line Project(Project). This Final Drainage Report and the associated drawings were prepared by a registered professional engineer licensed to practice in the state of Colorado. This Final Drainage Report addresses stormwater management for the proposed Project site development(Project Site). The proposed development includes an Operations and Maintenance (O&M) Building area, Substation area, and temporary facilities required only for construction including a Batch Plant, construction parking, office trailers, and material laydown areas. 1.1 Location 1.1.1 Township, Range, Section, %Section The Project Site will be located in the SW/4 SW/4 of Section 5, Township 11N, Range 57W, on privately owned land. For additional information regarding the Project location, refer to the cover sheet of the design drawings in Appendix C. 1.1.2 Local Streets • The Project is to be constructed within the northeastern quadrant of the intersection of County Roads (CR) 132 and CR 135. No other local streets are located within or adjacent to the Project Site. 1.1.3 Major Open Channels, Lakes, Streams, Irrigation, and Other Water Resource Facilities The Project Site is located at the upper edge (or headwater)of a large unnamed ephemeral drainage that flows to the north and then northwest off the site. The drainage passes under CR 135 through two 4-foot- diameter corrugated metal pipes approximately 2,000 feet north of the site. Refer to Appendix K for photographs depicting the culvert crossings. There are no other major open channels, lakes, streams, or other water resource facilities located near the Project Site. 1.1.4 Surrounding Developments The Project Site is located in unincorporated Weld County on agricultural land with no immediately surrounding developments,jurisdictions, towns, or municipalities. • Cedar Creek II Wind Farm Project 1-1 Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 1.2 Description of Property • 1.2.1 Size of Project Area in Acres The overall Project Site is 20.15 acres in size. The Project Site has been divided into four major sub-areas as follows: 1 O&M Building Area 2.58 acres 2 Substation Area 2.92 acres 3 Concrete Batch Plant 3.50 acres 4 Construction Parking, Contractor Trailers, Materials Storage 8.00 acres Containers, and Laydown Areas Total 17.00 acres The remaining 3.15 acres of the Project Site are allocated for the installation of the proposed stormwater drainage channels and detention basin located on the northern side of the site. 1.2.2 Ground Cover and Soil Types The Project Site is located on agricultural land that is currently used for livestock grazing. The area can • be categorized as typical prairie, pasture, or rangeland in fair condition with approximately 50 to 75 percent ground cover(typically short grasses). This evaluation is based on the site visit performed by Tetra Tech in December 2009 (see site photographs in Appendix K). The soils types for the Project Site and surrounding/adjacent areas were obtained from the National Resources Conservation Service (NRCS)Web Soil Survey database (NRCS 2009)for the Project Site (dated April 30, 2009). The Project Site primarily consists of clay loams and sandy clay loams with slopes of 0.5 to 2 percent that grade from south to north across the site. The hydrologic soil group classification/ rating calculated by the NRCS database survey for the entire Project Site is Group B and the erosion factor K for the Project area ranges from 0.15 to 0.17, which indicates a low erosion potential for the soils. For additional information, refer to the soils reports from the NRCS database presented in Appendix I. Based on these ground cover and soil type characteristics, a curve number (CN) of 69 was used for the historical condition of the Project Site in the NRCS hydrologic modeling program Technical Release 55, WinTR-55, which is applicable for pastures, grasslands, or rangelands in fair hydrologic condition (NRCS 2003). A list of CN values and the respective cover type and hydrologic conditions for use in the WinTR-55 program are provided in Appendix J. • 1-2 Cedar Creek II Wind Farm Project Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • 1.2.3 Major Open Channels and Ownership The Project Site is located at the headwaters of a large unnamed ephemeral drainage that flows to the north and then northwest off the site (see Section 1.1.3). No other major open channels are located on or adjacent to the Project Site. The land for the Project Site is currently owned by Gary Lavern Sheffler and Jean Marie Sheffler. The Shefflers also own the adjacent property located on the western side of CR 135. The property located southwest of the site and intersection of CR 135/132 is owned by the Rolland W. Hoops and Charlotte M. Hoops Trust. The property located southeast of the intersection of CR 132/135 is owned by the United States of America and is managed by the U.S. Forest Service. 1.2.4 Project Description The Project Site will consist of both temporary and permanent facilities that are required for the construction and subsequent operation of the CCII Wind Energy Facility. In the Preliminary Drainage Report and associated drawings (Tetra Tech 2010), these facilities were grouped together into two distinct sub-sites of the overall Project Site. This was done so that the temporary facilities and associated drainage structures (including a second separate detention basin)could be sized appropriately and then removed upon completion of the initial 250.5-megawatt(MW)construction phase of the CCII Wind Energy Project. However, after submittal of the Preliminary Drainage Report, Mr. Sheller(landowner) requested to keep all of the stormwater drainage structures in place after completion of construction (discussion with Cedar Creek II, LLC Project Manager David Gonzalez on April 19, 2010), and the construction contractor • for the Project also provided modifications to the proposed layout of the facility areas. Therefore, the Project Site layout has been revised/reconfigured within the original footprint and will only require one detention basin; the gravel stockpile/storage area for maintenance and repair of Project roads has been moved out of the Project Site as described below. A description of the Project facilities is provided below. The permanent facilities (to be utilized during the operations phase of the Project)will include the following: • O&M Building (approximately 7,200 square feet [sf])with two small covered storage areas and 10 parking spaces • Electrical substation for transmission of the power generated and collected from the wind turbine facility • Stormwater collection channels (3-feet-deep, grass-lined/triangular-type—T1 and P2)located on the northern edge of the Project Site • Detention Basin P(with 10-inch polyvinyl chloride [PVC] outlet pipe with an 8-inch orifice plate at the discharge of the pipe) • One permanent driveway access point located on CR 132 for both the O&M Building and Electrical Substation areas The O&M Building and Substation areas will consist of a Colorado Department of Transportation (CDOT) Class 5 gravel surface (6-inch thickness)with gated access and permanent, full-perimeter fencing as shown on the design drawings in Appendix C. • Cedar Creek II Wind Farm Project 1-3 Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 The temporary construction facilities/areas (to be removed after construction)will include the following: • Concrete Batch Plant—mixing equipment, water and cement storage, and small sand and gravel stockpiles • Parking for construction personnel and visitors (total of 284 spaces) • Contractor trailers • Material storage containers • Equipment laydown area • Two temporary driveway access points—one driveway access located on CR 132 for the Concrete Batch Plant and one driveway access located on CR 135 for the construction parking, trailers, and storage/laydown area. The temporary construction facilities will also consist of a CDOT Class 5 gravel surface (6-inch thickness) as shown on the design drawings in Appendix C. In addition to the Project Site facilities described above, three gravel storage/stockpile areas will be located throughout the entire CCII Wind Energy Project, as shown in the design drawings located in Appendix C. Each gravel storage area will consist of approximately 1,000 cubic yards (CY)of CDOT Class 6 aggregate-base coarse materials. These materials will be available for use in the repair and maintenance of the Project haul roads during the construction phase of the Project. Details regarding the existing site features (e.g., utilities, roads, ownership, etc.) and proposed site layout, lot sizes, existing and proposed grading, stormwater structures (channels, detention basins, etc.), and proposed development information/appurtenances are shown on the design drawings in Appendix C. 1.2.5 Irrigation Facilities There are no known irrigation facilities within 200 feet of Project Site property. 1.2.6 Groundwater Characteristics Groundwater in the Project Site is contained in the High Plains aquifer underlying 174,000 square miles in Colorado, Nebraska, Wyoming, Kansas, Oklahoma, Texas, and New Mexico. The proposed facilities will not affect the hydrologic flow of groundwater or affect groundwater recharge. I 1-4 Cedar Creek II Wind Farm Project Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 2. Drainage Basins and Sub-Basins 2.1 Major Basin Description 2.1.1 Applicable Weld County Master Drainage Plans According to Mr. Clayton Kimmi of the Weld County Department of Public Works on January 15, 2009, no applicable Weld County Master Drainage Plans have been developed for the Project Site. 2.1.2 Major Basin Drainage Characteristics The major basin area for the Project Site consists of eight upland areas (slopes range from 10 to 15 percent)that transition to gently sloped pasture land (slopes range from 0.5 to 3 percent) and then drain into the large ephemeral drainage located to the north of the proposed site. The Project Site is located in the pasture lands of the southern portion of the drainage basin at distances from the uplands ranging from 0.25 mile to 1 mile. The drainage basin is largely agricultural and rangeland and consists of similar soil types and ground cover conditions as described in Section 1.2.2 of this report. In general, most of the upland areas naturally drain to the large ephemeral drainage located north of the Project area without passing through the Project Site as described in Sections 1.1.3 and 1.2.3 of this report. A small volume of the stormwater runoff generated from the southern uplands, which does not naturally circumvent the site, passes through the Project Site. Section 2.2.2 presents a discussion of off-site drainage impacts to the Project Site. • 2.1.3 FEMA-Defined Floodplains and Floodways Upon viewing the Federal Emergency Management Agency(FEMA)floodplain index map for Weld County on the FEMA Map Service Center website (www.msc.fema.00v), it is apparent that there are six FEMA floodplain map areas that comprise the entire CC II Wind Energy Project Area. It is estimated that the Project Site is located within Map Number*080266 0125C or*080266 0150C. Each map number is denoted with an asterisk. At the bottom of the index map, there is a corresponding asterisk that states, "Panel Not Printed—Area in Zone D." Based on the definitions of FEMA Flood Zone Designations, the definition of Zone D is, "Areas with possible, but undetermined flood hazards. No flood hazard analysis has been conducted." Based upon subsequent discussions between Matt Smith (Tetra Tech)and a representative at the FEMA Map Service Center on May 3, 2010, it was confirmed that no FEMA analysis of flood hazards has been conducted for these areas and that these six maps (including the maps listed above)were not produced and are not available. See Appendix L for the FEMA Floodplain Index Map for Weld County, floodplain map for the Project area, and Zone D description. 2.1.4 On-Site Contours Topographic contours for both the existing (historical) and developed (proposed) condition have been provided for the Project Site at 2-foot vertical intervals. The Grading and Drainage Plan in Appendix C presents additional details regarding the contours and developed grading of the Project Site. • Cedar Creek II Wind Farm Project 2-1 Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 2.2 Sub-Basin Description • Z2.1 Historical Drainage Patterns The Project Site consists of gentle grades that slope from the south to the north at approximately 0.5 to 2 percent and connect to the headwater of the ephemeral drainage located north of the site. The historical on-site drainage pattern for the Project Site, therefore, is the conveyance of stormwater runoff from the south to the north across the site to the headwaters of the existing ephemeral drainage located north of/ adjacent to the Project Site. 2.2.2 Off-Site Drainage Flow Patterns The Project Site is bordered by CR 135 to the west, CR 132 to the south, and an unnamed ephemeral drainage to the north. The unnamed ephemeral drainage passes under CR 135 through two 4-foot-diameter corrugated metal pipes approximately 2,000 feet north of the site. For photos of the culvert crossings, refer to Appendix K. To the east of the Project Site is an abandoned borrow pit (previously used for mining of gravel)and then further east, a low-lying pasture land that slopes gently from south to north at a slope of approximately 0.5 percent. From the south, off-site stormwater runoff is generated by the northern side of CR 132 (because of the existing crown of the road)and is conveyed through the Project Site to the drainage north of the site. Off-site runoff generated from the uplands directly south of CR 132 is conveyed east along the southern side of CR 132, which acts as a berm (centerline elevation of road elevation increases from east to west)to prevent off-site runoff from entering the Project Site, and is then conveyed across CR 132 east of the Project Site and northward to the existing pasture land located east of the site. For additional details regarding evaluation of the CR 132 road berm, see the explanation at the end of this section. A majority of the off-site runoff from the southwest and west of the Project Site is conveyed to either the existing drainage located northwest of the Project Site (approximately 400 feet west of CR 135)or along the southern side of CR 132 as previously described. A portion of this off-site runoff is conveyed northeast across the intersection of CR 132 and CR 135 and onto the Project Site. In addition, runoff generated from the eastern half of CR 135 (because of the crown of the road) along the western and northwestern portion of the site also enters and is conveyed across the Project Site. To the east, a small amount of off-site runoff is conveyed across the northeastern portion of the Project Site and then into the headwater of the northern drainage. Overall, the off-site drainage runoff that flows through the Project Site is relatively small (total of approximately 3.85 acres). These off-site flows have been accounted for in the design of the Project Site grading and drainage channels to provide for safe conveyance of the off-site flows through the Project Site. The design also routes the off-site flows through the emergency spillway of the proposed detention basin. The developed drainage areas (DAs)for the Project Site, including delineation of the off-site areas that drain across the site, are shown in the design drawing in Appendix C. As requested by Mr. Kimmi in his comments on the Preliminary Drainage Report(dated February 10, 2010), Tetra Tech performed a hydrologic analysis to evaluate the volume of the runoff generated from south of CR 132 in order to demonstrate that the 100-year stormwater runoff flow would not overtop CR 132 and drain across the Project Site. 2-2 Cedar Creek II Wind Farm Project Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • The following is a summary of the procedure used to perform this evaluation: 1. Identify the lowest elevation for potential overtopping of CR 132 that would cause off-site runoff to flow across the Project Site. The lowest elevation along the crown of CR 132, which borders the developed condition DAs for the Project Site, was determined to be 5,140.67 feet mean sea level (msl). 2. Delineate the 5,140.67-foot contour along the southern side of CR 132. This elevation acts as the crest of the storage area that is bound by CR 132 to the north and upland slope to the south. The surface area for this contour was calculated to be 1.67 acres. 3. Delineate the lowest contour within the storage area, which is the bottom elevation of the existing drainage channel located adjacent/south of CR 132 (channel has very slight bottom slope of 0.01 percent and drains from west to east). A contour elevation of 5,140 feet msl was identified, which serves as the bottom elevation of the storage area. The surface area for this contour was calculated to be 0.72 acres. 4. Delineate the DA south of CR 132 that contributes runoff to the potential road crossing area. The size of the CR 132 South DA was calculated to be 151.94 acres of existing grasslands. 5. Identify the effective weir length for the outlet of storage area. At the intersection of the storage area and CR 132 DA to the east, the bottom width of the 5,140-foot contour elevation was determined to be 20 feet and the top width of the 5,140.67-foot contour at the intersection of the contour to the south was determined to be 125 feet. Therefore, it was estimated that the equivalent weir length is the average of these two lengths or 72.5 feet. 6. Perform WinTR-55 modeling of the 100-year stormwater event runoff for the CR 132 DA. The runoff • flow rate calculated for the DA is 59.46 cubic feet per second (cfs) (see Section 3.2.3 for additional details regarding WinTR-55 runoff modeling procedure). 7. Route the 100-year storm hydrograph through the effective storage area and weir outlet. The calculated peak flow rate through the effective weir outlet is 58.90 cfs, with a maximum depth stage (or depth of flow)of 0.41 feet above the bottom elevation, and a storage volume of 0.44 acre-feet (see Section 3.2.4 for additional details regarding WinTR-55 routing procedure). 8. Compare the calculated depth of flow through the weir (elevation of 5,140.41 ft msl)and the lowest elevation along the crown of CR 132 (elevation of 5,140.67 ft msl). 9. Conclusion: The top elevation of the flow based on calculated depth along the southern side of CR 132 (through the effective weir) is 5,140.41 feet msl, which is approximately 3 inches less than the CR 132 crown elevation of 5,140.67 feet msl. Based on this evaluation, it was determined that the 100-year flow from the DA south of CR 132 does not overtop the road and drain across the Project Site. Therefore, the proposed stormwater drainage structures designed for the Project Site do not need to include this runoff from this DA. Refer to Table 1 for the calculation of the time of concentration (Tc), Table 5 for a summary of the weir flow parameters, Appendix A for the WinTR-55 hydrology modeling output, Appendix B for the hydraulic calculations, and Appendix C for the CR 132 Drainage Area Map. • Cedar Creek II Wind Farm Project 2-3 Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • 3. Drainage Design Criteria The criteria developed for the design of the stormwater management system for the Project Site are based on the guidance provided in Volumes 1, 2, and 3 of the 2008 Urban Storm Drainage Criteria Manual(USDCM) published by the Urban Drainage and Flood Control District (UD&FCD)and the 2006 Weld County Urban Storm Drainage Criteria Addendum to the USDCM (Weld County Addendum). 3.1 Development Criteria Reference and Constraints 3.1.1 Previous Drainage Studies No previous drainage studies (i.e., project Master Drainage Plans)for the Project Site have been prepared that would influence or be influenced by the proposed drainage design for the site. 3.1.2 Site Constraints Existing constraints (e.g., drainages, slopes, streets, utilities, existing structures, irrigation ditches, etc.) for the Project Site are considered minimal. An existing overhead electrical distribution line runs parallel to CR 135 and approximately 100 feet inside the western boundary of the site; however, the site plan facilities and structures have been arranged so that no impacts from the overhead lines will occur. 3.2 Hydrological Criteria • 3.2.1 Design Rainfall The design storm depth information was obtained from the National Oceanic and Atmospheric Administration (NOAA)Atlas 2, Volume III, Figures 26 through 31 (NOAA 1973). NOAA Atlas figures that depict the Project Site location are provided in Appendix G. 3.2.2 Design Storm Recurrence The design storm recurrence intervals used for the historical and developed site conditions for the Project are the 2-, 5-, and 100-year events with 24-hour storm durations, respectively.The rainfall depths for each of these design storm events are shown in Table 7. In addition, this table also provides the 2- and 100-year depths for the 1-, 2-, and 6-hour storm durations, respectively. Since the Project Site is located outside of the rainfall data/curves provided in the USDCM (Volume 1, Chapter 4—Rainfall), the 1-hour depths were calculated using the equations for Region 1 provided in NOAA Atlas 2 figures (see Appendix G), which use both the 6-and 24-hour storm values as shown in the table. The 1-hour storm values were then used to calculate the 2-hour storm depth values based on the conversion factors provided in Table RA-2 from Volume 1, Chapter 4—Rainfall (see Appendix H). These calculated 1-and 2-hour storm depths have been provided for reference purposes since these values are input parameters for the design storm calculation procedure provided in the USDCM. It should be noted that each of the 1-and 2-hour depth values range from 0.75 to 1.28 inches less than the corresponding 24-hour duration depths. • Cedar Creek II Wind Farm Project 3-1 Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 3.2.3 Runoff Calculation Methods and Models The historical and developed condition runoff calculations for the Project Site were performed using WinTR-55 hydrologic modeling program and the standard unit hydrograph method. The WinTR-55 program was used to calculate the stormwater hydrographs with corresponding runoff flow rates and volumes for the delineated DAs (T1, T2, P1, and P2)for the 5-year/24-hour and 100-year/24-hour storm events associated with both the historical and developed drainage conditions for the Project Site. These hydrographs and output data were then used to size the project drainage channels, detention basin and outlet structure/pipe (see Section 3.2.4), and erosion controls. The following are the model inputs required for the WinTR-55 Program: • Land Use Details—Input for each individual project DA including cover description, hydrologic soil group, curve number, and corresponding surface area • Time of Concentration (TO—Time required for water to travel along the longest hydraulic flow path to the outlet(or design point)for each project DA, which accounts for slope, length, and ground condition/cover(see T,discussion below) • Storm Data—Input precipitation data for 2-year through 100-year, 24-hour duration storm events. • Mapping of the project DAs to the designated outfall point—Detention Basin P Based on comments on the Preliminary Design Report by Mr. Kimmi (comments dated February 10, 2010), the T,values for the project DAs were calculated using the procedure described in the USDCM Volume 1 Chapter 5—Runoff, with T,equal to the sum of the initial flow time (q)and overland flow time (ti), rather than the WinTR-55 method. These values were then input directly into the WinTR-55 model for calculation of the design storm runoff rates, hydrographs, and volumes. The 5-year stormwater runoff rate (QS_y,r)for the historical condition was calculated for the DA that included the overall Project Site boundary(or footprint)without inclusion of off-site runoff and assuming a zero percent impervious surface (USDCM allows for up to 2 percent impervious surface), which reduced the runoff coefficient C-value to 0.08. The calculated Q5_yr for the historical condition is 2.79 cfs. This 5- year value is critical since it denotes the maximum discharge rate that is allowed from the proposed Detention Basin P for the developed site condition. The 100-year stormwater runoff rates (Qioo_yr1 for the developed condition used in the design of proposed Channels T1 and P2 and the emergency spillway for Detention Basin P were calculated for the contributing DAs with T,values that include the off-site runoff that drains across the Project Site as required by the USDCM. The runoff generated from DAs T1 and P2 was used to design Channels T1 and P2, respectively, and the aggregate of runoff flows from all of the project DAs T1, T2, P1, and P2 (with off-site runoff)were used for the design of the emergency spillway(see Section 3.3.1 for additional details regarding design of the drainage channels and emergency spillway). The Qioo-yr for the developed condition used to design the Detention Basin P was calculated as a sum of the runoff flows for the contributing DAs with T,values that exclude off-site runoff in accordance with the USDCM. The aggregate of runoff flows from all Project DAs T1, T2, P1, and P2 (without off-site runoff) was used for the design of Detention Basin P(see Section 3.2.4 for additional details regarding design of the detention basin). It should be noted that based on the reconfiguration and grading of the Project Site I 3-2 Cedar Creek II Wind Farm Project Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 layout, the runoff generated by DAs T2 and P1 flows directly into the detention basin without the need for conveyance through a drainage channel. The T,values for the developed condition Qioo-yr without off-site flow were calculated using the same hydraulic flow paths (or routes) used for design of the channels and spillway(with off-site runoff). However, the initial sheet flow lengths (maximum allowable length of 500 feet in accordance with USDCM procedure)corresponding to flow paths originating from off site were truncated at the edge of the Project Site boundary with only the remaining on-site sheet flow length up to the allowable 500-foot length accounted for in the equation. The remaining on-site hydraulic flow path length beyond the sheet flow limit was modeled as overland shallow concentrated and/or channel flow. This method is most representative of the hydraulic path from point of origin and the subsequent transformation of the flow characteristics from sheet flow to shallow concentrated and/or channelized flow. A summary table that includes the calculations for the Tr and the corresponding DA sizes and runoff flow rates has been provided in Table 1 for the historical condition, Table 2 for the developed condition including off-site runoff, and Table 3 for the developed condition not including off-site runoff.The historical and developed drainage area maps, including separate drawings of the developed DAs for the channels/emergency spillway and Detention Basin P, have been provided in the design drawings located in Appendix C. The USDCM T,design equations and corresponding figures and coefficients used for the runoff modeling have been provided in Appendix A. 3.2.4 Detention Discharge and Storage Calculation Methods and Computer Models • The Detention Basin P discharge flow rate and storage volume calculations for the Project design were calculated using WinTR-55 hydrologic modeling program and the standard unit hydrograph method. As previously discussed, the detention basin was sized for receipt and controlled discharge of the Qioo.yr flows for the developed condition excluding off-site runoff that drains across the Project Site. This is achieved by conveying the off-site runoff flow into the basin and then allowing the flow to pass through the emergency spillway, which was designed with the capacity to convey the developed condition Qioo-yr with off-site flow as described in Section 3.2.3. Based on the guidance provided in the USDCM and Weld County Addendum, the maximum allowable discharge rate from the proposed Detention Basin P for the developed site condition is equal to the OS_yr for the historical condition and must completely drain within 72 hours. Once the Q1oo-yr storm runoff hydrographs were calculated as described in Section 3.2.3, the WinTR-55 model was then used to hydraulically route the composite hydrograph through the proposed Detention Basin P configuration with associated outlet structure/pipe. The following are the WinTR-55 model inputs and outputs for the storage routing and design of the detention basin: • Basin Surface Area—Input of area (in acres)for the basin bottom and contour above bottom to define the basin storage geometry. Detention Basin P bottom area covers 2.142 acres with next higher 1-foot contour area covering 2.257 acres.The basin has been constructed with 4:1 (horizontal to vertical side slopes). • Outlet Type (Weir or Orifice)—Orifice flow was selected for this design. • Cedar Creek II Wind Farm Project 3-3 Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Outlet Diameter—An 8-inch-diameter outlet has been selected for this design; however, based on comments from Mr. Kimmi (dated February 10, 2010)a 10-inch PVC outlet pipe will be installed with an 8-inch orifice at the outlet of the pipe to facilitate future O&M of the detention facility. • Vertical Height from Invert of Outlet Pipe at Discharge Point to Bottom of Basin—Input of vertical distance from the start invert of the outlet pipe (bottom of basin)to the downstream invert of the outlet pipe at the discharge point is 0.5 feet for this design. Therefore, the slope of the discharge pipe is equal to the vertical height/length of 0.50 feet/57.5 feet, or 0.87 percent. • Outputs calculated by the model include peak outflow rate from the basin outlet pipe (1.83 cfs), basin storage volume(2.32 acre-feet), and maximum stage (or elevation)above basin bottom (1.05 feet). • Inflow and Outflow Hydrographs—the outflow hydrograph for the Qioo-yr event shows that the detention basin will drain the storage volume in 56.75 hours. The calculated 100-year storm event discharge rate (Q1oo-yr)through the Detention Basin P outlet pipe discharge orifice is 1.83 cfs, which is 0.96 cfs less than the maximum allowable Q5-yr of 2.79 cfs calculated for the historical condition of the Project Site as explained in Section 3.2.3. The maximum time required to drain the basin is 56.75 hours, which is less than the maximum allowable time of 72 hours. The detention basin embankment has also been designed to an elevation of 5,133.75 feet msl, which provides the required 1-foot freeboard distance above the 100-year water surface when the emergency spillway is conveying the maximum/emergency flow(see Section 3.3.1 for discussion of the emergency spillway). Therefore, the design for Detention Basin P meets the requirements as stipulated in the Weld County Addendum. As discussed in Sections 1.2.4 and 3.2.3, the Project Site was reconfigured after submission of the Preliminary Drainage Report. As a result, the site grading and detention basin layout/location were also modified to accommodate this revised configuration. In order to achieve a cost-effective, balanced cut to fill ratio for the Project Site, Detention Basin P has been designed as a relatively shallow basin (maximum 100-year stage of 1.05 feet deep)with a larger surface area to accommodate the 100-year storm event for the developed condition of the entire Project Site as shown in the design drawings in Appendix C. Based on a request by Mr. Sheffler(landowner), the detention basin outlet pipe has been designed to discharge to a 100-foot-long vegetated level spreader. The vegetated level spreader converts the concentrated pipe flow back to sheet flow through a zero percent bottom-sloped channel, which then gently discharges the stormwater as sheet flow over a newly constructed, low-lying, vegetated side slope (12:1 side slope)to the existing/vegetated pasture land. Refer to Sections 3.3.2, 3.3.3, and 4.4 for additional details regarding the outlet pipe, water quality, and vegetated level spreader, respectively. The WinTR-55 modeling output has also been provided in Appendix A. 3.3 Hydraulic Criteria 3.3.1 Conveyance Capacities The design for the Project Site proposes grass-lined, triangular channels (Channels T1 and P2)with a 3-foot constructed depth to collect both 100-year on-site and off-site runoff that passes through the 3-4 Cedar Creek II Wind Farm Project Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Project Site in DAs T1 and P2 and then convey that runoff along the northern edges of the site to the proposed Detention Basin P. The 100-year on-site and off-site runoff that passes through DAs T2 and P1 will be conveyed via overland flow directly into the Detention Basin P. Detention Basin P will provide controlled outlet/release of these flows and also provide an emergency spillway capable of passing the 100-year flow(including off-site runoff)as described in Sections 3.2.3 and 3.2.4. All of the hydraulic modeling (dimensions and flow characteristics)for this drainage design was performed using the Bentley Systems Flowmaster program (Version 08.01.68.00), which applies Manning's equation. The dimensions and flow characteristics were determined by entering Manning's roughness coefficient(n), slope (ft/ft), left and right side slopes, and designated 100-year discharge flows. Based on the guidance provided in the Weld County Addendum and USDCM, the newly constructed, grass-lined channels have been designed using the two different Manning's roughness "n"values calculated from the Retardance Curves provided in USDCM Volume 1, Chapter 7, Figure MD-9b (see Appendix E). This figure uses the product of velocity and hydraulic radius (R =flow area/wetted perimeter)to determine the respective Manning's "n"values corresponding to the selected retardance conditions: • Retardance C Condition—used for determining the maximum required channel capacity(or depth) with the assumption that the channel vegetation is fully grown. • Retardance D Condition—used for determining the maximum channel velocity(or controlling velocity) for newly constructed grass-lined channels with the assumption that the newly vegetated channels will not have mature grass and velocities will be higher that of the Retardance C condition. In accordance with the design procedure described in USDCM Volume 1, Chapter 7, each of the proposed Channels T1 and P2 have been designed for conveyance of the 100-year storm flow and satisfy the following UD&FCD channel hydraulic requirements: • Maximum flow velocity of less than 5 feet per second [fps]: Assuming the Retardance D condition, the maximum velocity for Channel T1 is 1.23 fps and for Channel P2 is 0.74 fps. • Maximum Froude Number of less than 0.5: Assuming the Retardance D condition, the maximum Froude number for Channel T1 is 0.24 and for Channel P2 is 0.16. • Maximum longitudinal slope of less than 0.6 percent: The maximum slope for Channel T1 is 0.32 percent and for Channel P2 is 0.29 percent. • Maximum side slopes of 4:1 (horizontal to vertical): maximum side slopes for Channels T1 and P2 are 4:1. • Minimum 1-foot freeboard: Each channel will be constructed to a depth of 3 feet. Assuming the Retardance C condition, the freeboard for Channel T1 is 1.0 foot and for Channel P2 is 1.24 feet. A freeboard variance request to Weld County is not required for this Project. Table 4 provides a summary of the proposed drainage channels' dimensions and flow characteristics and the Flowmaster Modeling Output for the channels has been provided in Appendix B • Cedar Creek II Wind Farm Project 3-5 Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 In accordance with the USDCM and Weld County Addendum, the proposed Detention Basin P has been • designed with an emergency spillway that satisfies the following requirements: • Capable of conveying the peak 100-year storm discharge(including off-site runoff) draining into the detention basin: The emergency spillway has been designed for the Q100-yr flow(including off site flow) of 37.66 cfs. • Invert of the emergency spillway set equal to or above the 100-year water surface elevation: The emergency spillway invert has been set equal to the 100-year surface elevation in the detention basin at an elevation of 5,132.25 feet msl. • Depth of flow out the emergency spillway shall be less than 6 inches: The calculated flow depth for the emergency spillway is 0.46 feet(or 5.52 inches). The constructed dimensions of the spillway will be a width of 40 feet, invert elevation of 5,132.25 feet msl, and 4:1 side slopes to the top of the detention basin embankment elevation of 5,133.75 feet msl. • Minimum of 1-foot freeboard above the 100-year water surface elevation when the emergency spillway is conveying the maximum/emergency flow: The calculated freeboard for the emergency spillway(equal to the difference between the top of detention basin embankment and the surface elevation of the flow through the spillway) is 5,133.75 feet-(5,132.25 feet + 0.46 feet) or 1.04 feet, which is greater than the 1-foot minimum. • Effective erosion protection installed: See Section 4.4 for details regarding the emergency spillway erosion protection. Table 5 provides a summary of the proposed emergency spillway dimensions and flow characteristics, Table 6 provides a summary of the riprap calculations for the spillway, and Appendix B provides the • Flowmaster Modeling Output for the emergency spillway. 3.3.2 Detention Outlet Type The design for the Project Site will consist of one drainage basin, Detention Basin P. The proposed outlet type for the basin is 10-inch PVC outlet pipe (with a trash rack) and an 8-inch orifice at the discharge end of the pipe. The 10-inch pipe size and trash rack will facilitate future O&M of the detention facility. As described in Section 3.2.4, the Qioo-yr flow through the 8-inch outlet pipe orifice is 1.83 cfs and the slope of the outlet pipe is 0.50 feet in 57.5 feet or 0.87 percent. Based on the equation of flow rate equals velocity times flow area (or Q =VA), the velocity(V)through the outlet pipe (full-flow condition)for the 100-year storm is Q/A = 1.83 cfs/0.352 sf, or 5.20 fps. In accordance with the USDCM Volume 1, Chapter 7, Section 7.3, this outlet velocity of 5.20 fps is less than the maximum allowable velocity before riprap erosion protection is required for pipe outlets (maximum allowable velocity ranges from 5.5 to 7.7 fps depending on the erosive nature of the soils). Refer to Section 4.4 for additional explanation and details regarding erosion protection. Therefore, no riprap erosion protection is required for the outlet of the pipe. Based on a request by Mr. Sheffler(landowner), the detention basin outlet pipe has been designed to discharge to a 100-foot-long vegetated level spreader. The vegetated level spreader converts the concentrated pipe flow back to sheet flow through a zero percent bottom-sloped channel, which then gently discharges the stormwater as sheet flow over a newly constructed, low-lying, vegetated side slope (12:1 side slope) to the existing vegetated pasture land. Refer to Sections 3.2.4, 3.3.3, and 4.4 for • 3-6 Cedar Creek II Wind Farm Project Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 . additional details regarding the detention basin, water quality, and use of level spreader and vegetated erosion protection, respectively. 3.3.3 Water Quality Outlet Configuration As stated in the Weld County Addendum to the USDCM, within Weld County the water quality capture volume(WQCV) shall be considered a portion of the total 100-year detention basin volume and must completely drain within 72 hours. The USDCM also recommends incorporating the capture and treatment of smaller-sized, less frequent storms (for sediment removal) into the design of the detention basin. It is recommended that these smaller storm volumes be captured and released in a minimum of 40 hours, but completely drained in less than 72 hours. For purposes of the Detention Basin P design, the 2-year storm event has been used as the smaller, more frequent storm to demonstrate compliance with this requirement. In order to satisfy the water quality and volume discharge criteria for both large (100-year storm)and smaller, more frequent storm events (2-year storm), Detention Basin P has been designed using the WinTR-55 hydrograph modeling method to capture, detain, and completely drain the detention basin through the 10-inch PVC outlet pipe with an 8-inch orifice at the discharge end for the 2-year and 100- year storm events. For the 100-year storm, Detention Basin P drains completely in 56.75 hours, which is less than the maximum allowable time of 72 hours. For the 2-year storm, Detention Basin P drains in 40.46 hours, which is greater than the minimum of 40 hours and less than the maximum of 72 hours. Therefore, based on this information the detention outlet type for Detention Basin P satisfies the water • quality outlet configuration for the 2-year and 100-year storm events. For data regarding the detention (or drain)times for the 2-year and 100-year developed condition in Detention Basin P, refer to the WinTR-55 model output and outlet hydrographs (graphical representation) provided in Appendix A. In addition to the minimum detention time of 40 hours for sediment removal as described above, the outlet flow from the detention basin also passes through a vegetated level spreader as previously described in this report. The vegetated level spreader converts the concentrated pipe flow back to sheet flow through a zero percent bottom-sloped, 6-inch deep channel, which then gently discharges the storm water as sheet flow over a newly constructed, low-lying, vegetated side slope(12:1 side slope)to the existing/vegetated pasture land. Therefore, this level spreader provides additional water quality treatment (or sediment removal)to the Project Site flows prior to discharge to the pasture lands and ephemeral drainage located to the north of the Project Site. Refer to Sections 3.2.4 and 4.4 for additional details regarding the detention basin and level spreader designs, respectively, and Appendix C design drawings for details regarding the vegetated level spreader. 3.4 Justification of Criteria or Calculation Methods The hydraulic structures proposed for the Project Site were designed in accordance with the guidance presented in the Weld County Code and associated USDCM. No other design criteria were applied to this design. • Cedar Creek II Wind Farm Project 3-7 Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • 4. Drainage Facility Design 4.1 On-Site Drainage Patterns The runoff from the Temporary Construction Facilities Area (DA T1)drains from the southwestern corner to the northern edge of the Project Site at slopes ranging from approximately 0.8 to 1.0 percent. The runoff from DA T1 is then collected and conveyed through the grass-lined, triangular Channel T1 into the Detention Basin P, which is centrally located along the northern edge of the Project Site. The runoff from the Electrical Substation Area (DA T2) drains from the southwestern portion of the site to the northeast at slopes ranging from 0.8 to 0.9 percent with the runoff draining directly into Detention Basin P. The runoff from the O&M Building Area (DA P1)drains from the center of the Project Site starting along the southern edge and travels directly north at slopes ranging from 0.9 to 1.0 percent. The runoff from DA P1 also drains directly into Detention Basin P without the need for conveyance through a drainage channel. The runoff from the Concrete Batch Plant Area (DA P2) drains from the southeastern edge of the Project Site directly north at slopes ranging from 0.7 to 0.8 percent. The runoff from DA P2 is then collected and conveyed through the grass-lined, triangular Channel P2 into Detention Basin P. 4.2 Off-Site Runoff Compliance The Weld County Addendum and associated USDCM state that a proposed development must provide for safe conveyance of off-site flows through the Project Site and that off-site flows may be routed through • the emergency spillway or around the proposed detention facilities. As previously stated in Sections 2.3.3 and 2.3.4, Channels T1 and P2 and the detention basin emergency spillway have been designed to account for the safe and effective collection, conveyance, and controlled discharge of both on-site and off-site(combined/aggregate)flows for the 100-year stormwater event. The aggregate (or combined) 100- year flow rate from all of the drainage areas (including off-site runoff)for the emergency spillway is 37.66 cfs. Detention Basin P captures, detains, and releases the 100-year on-site runoff volume for the Project Site through the detention basin outlet pipe at a peak flow rate of 1.83 cfs, which is 0.96 cfs less than the 5-year historical condition peak flow rate of 2.79 cfs. The Project Site is located at the upper edge (or headwater)of a large unnamed ephemeral drainage that flows to the north and then northwest off the site.The aforementioned runoff generated from the Project Site that passes through the Detention Basin P outlet pipe (or the emergency spillway)will discharge to this unnamed drainage. This drainage passes under CR 135 through two, 4-foot-diameter corrugated metal pipes approximately 2,000 feet north of the site. As discussed with Mr. Kimmi on March 4, 2010, it is assumed that these two culverts have the hydraulic capacity to safely pass the existing runoff flows from the contributing areas of the major drainage basin (as described in Section 2.1.2)with both the Detention Basin P outlet pipe flow(which is 0.96 cfs less than the historical/existing flow condition) and the emergency spillway discharge from Detention Basin P. Therefore, there are no off-site runoff compliance issues identified for the Project site. For photographs of the downstream culvert crossings at CR 135, refer to Appendix K. • Cedar Creek II Wind Farm Project 4-1 Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 4.3 Summary of Hydrology and Hydraulic Structures • The site plan layout(including the features described in Section 1.2.4), developed/proposed grading, detailed channel/basin/outlet pipe/spillway information, and the historical and developed DAs (including land use/surface details, developed condition slopes, hydraulic flow paths, etc.) are provided in the design drawings in Appendix C. The hydrologic and hydraulic design of the Project Site drainage structures have been previously discussed and summarized in Section 3.0. The O&M instructions for the proposed stormwater drainage facilities and erosion control measures have been provided in the design drawings in Appendix C. 4.4 Riprap and Erosion Protection As stated in the USDCM Volume 1, Chapter 7, the following are the maximum allowable velocities prior to required use of riprap erosion protection measures: • Grass-Lined Drainage Channels: 5.0 fps for erosive soils and 7.0 fps for erosive-resistant soils • Pipe Outlets: 5.5 fps for very erosive soils and 7.7 for erosive-resistant soils. As stated in Section 1.2.2, erosion factor K values for the Project area range from 0.15 to 0.17, which indicate a low erosion potential for the project soils. Although the Project soils are relatively erosive- resistant, Channels T1 and P2, the emergency spillway for Detention Basin P, and the outlet pipe for Detention Basin P have been designed so that the Qioo_Yr velocities have been kept below the velocity criteria for the erosive soils condition. The following is a summary of the drainage structure, associated flow velocity, and erosion protection • measures. • Drainage Channel T1: Q1oo_yr maximum velocity= 1.23 fps < 5.0 fps; construct with grass lining (see explanation of stabilization and re-vegetation below) • Drainage Channel P2: D100-yr maximum velocity= 0.74 fps < 5.0 fps; construct with grass lining (see explanation of stabilization and re-vegetation below) • Detention Basin P Emergency Spillway: Q1oo_yr maximum velocity= 2.04 fps < 5.0 fps; construct with grass lining to outlet downstream side slope (see details regarding riprap protection and re-vegetation of the outlet downstream side slope below) • Detention Basin P Outlet(8-inch Orifice): Qioo-yr maximum velocity = 5.20 fps < 5.5 fps; construct with outlet to grass-lined level spreader(see explanation of level spreader below) As required by the Weld County Addendum, in order to protect the emergency spillway from catastrophic erosion failure, buried riprap shall be placed from the emergency spillway downhill to the embankment toe of slope and covered with 6 inches of topsoil. The downstream side slope of the emergency spillway for Detention Basin P has been designed with Type L (D50 =9 inches) riprap erosion protection. The riprap size(Type L)was calculated using the procedure for riprap erosion protection at rectangular conduit (USDCM Volume 1, Figure MD-22)and with the gradation for Type Las shown in Table MD-7. The thickness of the riprap lining is two times the D50 diameter, or 1.50 feet. As required by the Weld County Addendum and USDCM, Type L riprap shall be mixed with 35 percent topsoil by volume and buried with 4-2 Cedar Creek II Wind Farm Project Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • 6 inches of topsoil, vibrated, compacted, and then re-vegetated with an Weld County-approved vegetation seed mix(see explanation of re-vegetation below).Table 6 provides a summary of the riprap calculations for the downstream erosion protection of the emergency spillway. Refer to Appendix F for Figure MD-22 and Table MD-7. As previously described in this report, the detention basin outlet pipe has been designed to discharge through an 8-inch orifice to a 100-foot-long vegetated level spreader.The vegetated level spreader effectively converts the concentrated outlet pipe flow back to sheet flow for gentle discharge over the existing vegetated pasture land. The level spreader shall be constructed as follows: • Triangular channel configuration • Length = 100 feet • Depth of level spreader=6 inches • Zero percent bottom-slope (installed parallel to existing surface grade) • Upstream cut side slope =4:1 • Downstream outlet cut side slope = 12:1 • End of level spreader side slope up to existing grade =4:1 • Elevation of downstream edge (or outlet rim) < lowest elevation of upstream side slope • Erosion matting stabilization (see explanation of erosion matting below) • Re-vegetated grass lining of all cut slopes (see explanation of re-vegetation below) This level spreader configuration allows for the receipt of the outlet pipe discharge into a zero percent • grade, grass-lined, triangular channel that is constructed as described above.The water flow is then collected until it reaches a depth of 6 inches and is then gently discharged as sheet flow over the outlet edge/rim of the downstream outlet side slope to the existing vegetated pasture land. For construction details regarding the level spreader, refer to Sheet C104 of the design drawings in Appendix C. The following temporary and permanent soil erosion and sediment controls, stabilization, and re- vegetation measures will be used for the construction of the Project Site. • Re-vegetation—All disturbed areas, other than the gravel and impervious areas shown on the design drawings, will be re-vegetated using the seed mix as described in the Weld County Addendum for Areas North of Highway 14. The three road maintenance gravel stockpile areas will also be re- vegetated at the completion of construction. It is expected that the construction contractor will apply this seed mix using the hydroseeding method or other Weld County-approved method, if required. For areas that receive concentrated flows, a soil stabilization erosion mat will be used in conjunction with the seed (see erosion control/stabilization matting below). North American Green (NAG) is the suggested manufacturer of the hydroseeding product(HydraCM)that includes mechanically processed straw fibers, reclaimed cotton plant material, and proprietary performance-enhancing tackifiers to mitigate wind/water erosion and promote vegetative growth. The Weld County seed mix will be added to this product prior to application in the field. The areas to be re-vegetated and the specification for the Weld County seed mix are shown on the design drawings in Appendix C. • Temporary Erosion Control/Stabilization Matting—Temporary, biodegradable erosion control/stabilization matting will be installed in all disturbed areas that are to be re-vegetated and • Cedar Creek II Wind Farm Project 4-3 Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 expected to receive concentrated stormwater flow(i.e., inner side slopes of the detention basin • adjacent to DAs T2 and P1 that receive overland flow directly from the Project Site, drainage channels T1 and P2, and the level spreader). The erosion matting will be installed in conjunction with re-vegetation measures using the seed mix specified by the Weld County Addendum as described above. NAG is the suggested manufacturer of the erosion matting product(Biodegradable Erosion Matting— Model S75); however, alternative erosion matting may be selected by the construction contractor, if approved by Weld County prior to installation. The stabilization calculations (permissible and calculated sheer stress)for the erosion matting were performed using NAG's proprietary engineering software. These calculations and product information have been provided in Appendix M. The erosion matting locations and installation details have been provided on the design drawings in Appendix C. • Temporary Silt fencing—Silt fencing will be installed on the downstream side of all disturbed Project areas to prevent transport of sediment from the Project site to the surrounding areas and ephemeral drainages. In addition, silt fencing will also be installed at the three road maintenance gravel stockpile areas during the construction phase of the Project. Temporary silt fencing will be inspected and maintained as described on the design drawings and removed from the designated areas only after the vegetation has matured and adequately stabilized the area. The locations of the temporary silt fence and the soil erosion and sediment control details and notes are shown on the design drawings in Appendix C. 4.5 Copies of Permit Applications Based on the design for the Project Site as described in this report, no Concentrated Animal Feeding . Operations; Division of Reclamation, Mining and Safety; or State Engineer's permit applications are required. A Colorado Department of Public Health and Environment (CDPHE) Stormwater Construction Permit is required for the Project. A copy of the CDPHE permit application has been provided in Appendix N. • 4-4 Cedar Creek II Wind Farm Project Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 5. Conclusions 5.1 Compliance with the Weld County Code The design for the Project Site stormwater drainage facilities meets the intent of the Weld County Code. 5.2 Drainage Concept 5.2.1 Effectiveness of Design The design as presented throughout this report was prepared in accordance with the Weld County drainage design requirements or other engineering methods and procedures as documented in this report. Based on the hydrologic and hydraulic calculations and modeling output(i.e., flow rates, velocities, and other flow characteristics), this design is effective in the mitigation and control of storm runoff damage. 5.2.2 Influence of Proposed Development As previously stated in this report, there is no Weld County Master Drainage Plan for this Project Site. 5.2.3 Irrigation Company Approvals Weld County may require that the applicant provide evidence that off-site impacted jurisdictions have been notified of the development.This requirement is not applicable to the Project. • Cedar Creek II Wind Farm Project 5-1 Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • 6. References Bentley Systems, Inc. Version 08.01.68.00. Flowmaster Hydraulic Program. Kimmi, Clayton. 2010. Comments to Draft Preliminary Drainage Report for Wind Energy Generation Facility and 230-kV Transmission Line. Cedar Creek II Wind Farm Project. February 10, 2010. . 2009. Personal communication between Clayton Kimmi (Weld County Department of Public Works)and Dan Shea (Tetra Tech)on January 15, 2009. FEMA(Federal Emergency management Agency). 2010. Map Index, Flood Insurance Rate Map, Unincorporated Area, Weld County. Revised September 22, 1999. Accessed at: http://www.msc.fema.gov. NOM(National Oceanic and Atmospheric Administration). 1973. Atlas 2, Volume III, Figures 26 through 31. NRCS (National Resources Conservation Service)Web Soil Survey. 2009. . 2003. Technical Release 55 (WinTR-55). Sheffler, Gary Lavern. 2010. Personal communication between Gary Sheffler(landowner)and David Gonzalez(Cedar Creek II, LLC Project Manager) on April 19, 2010. • Smith, Matt. 2010. Personal communication between Matt Smith (Tetra Tech) and Federal Emergency Management Agency Map Service Center representative on May 3, 2010. Tetra Tech. 2010. Preliminary Drainage Report for Wind Energy Generation Facility and 230-kV Transmission Line. Cedar Creek II Wind Farm Project. Draft. January. UD&FCD (Urban Drainage and Flood Control District). 2008. Urban Storm Drainage Criteria Manual. Volumes 1, 2, and 3. Revised April 2008. Weld County. 2006. Weld County Storm Drainage Criteria Addendum to the Urban Storm Drainage Criteria Manuals. 2008. • Cedar Creek II Wind Farm Project 6-1 Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Tables • Cedar Creek II Wind Farm Project .\ p *% 2J� « _ _ ; _ ! 2' In /\ , \ / 2 ! 0}( 2 z } , CV ell @ CO \ 0 ) \ Of { \ \ ) C r� — / \ ,• 6a > 6 Viiin ) co _ / el t= & ] \ } ( } 13 - - - • \ k S. r.-- \ \\ \ \ \\ \ 3 co# \ 6 { { ) \ \ C �� OD Cri CJ� OD 0 \ � \ \ \ \ \ 79 15 Cr) CV / ] { / ) � CD 0 p !_ \ co , c k \ % u _ \ / \ 3f / \ ) \ Co co CD o \ '- oo8 E2 7 [\ / § . C + re \ O. o CO 2 rna_ � / co a _ a : > : _ \ -J Co CoID \ \ \ \o \ 0 CD f - w ; - 2E a0 > ) rt! m / } � � \ \ \\ /\\ al co) - .- \ \ \ cbr CD o CDC S ® ' C_ N N N CCD Y. 3 r CO rCO C > r o= cr y O N 8.0 V m 0) c0 a) O 0 0) N CI) a LL Ca`v In 0) CV L U C m ' 0 c E _ a o N m .en 'El co a L _0 U 0 03 CU m H = qt.-- r CO v ' o 'm E N 3 `J N 0) r L - C > Y R N O LL y A .• 1n Cr) ca ti) o a 0 C — G 0 a) c — O 0 o Oct C C co '0 C U 00 u o a .O 0 10 ~ .. t CO CO r- N -0 a CO 0 II r t a6 co 10 r y o ; 'a 73 w C O 0 0 0 0 h y y COl E .qa. o 3 s a m 3 H d o rn v r a) c o 0 0) U m co r co O 0_ x U 0 E o c u 5 cy v E rn w 0 E M v CD v c o. a a`)) o -O U Q V a) c a c O t.. IN 2i O = d .E a g co x 0 r m m 0 -a- (7, a"Ti a > O L C E o r 1ri - 'Oct N o. M C ') Z a ₹ a co O c o < 0 x i 1.` 1 K U `o c 3 b coo m co 6 a a Lc? o m O r o ca.— '- x — N U 0 6 (" d a N N r r "O ~ II aJ w y Q I▪I 0 1n 0 tC N C a E a `m m m c -0 v ✓ ¢ a w c o a) O E CO ._0 r w E E V 3 v z o c. En o d o in to co co r O co x • c CC v N ? E a) IC a o Q c c u a:' CO x w �° O o O �ri a t• o a— co m CO o O 2 -Pi' y y r a d C '(q O 0 0 0 0 c U a :2 o ¢ 'c 9 y ... 0 0 0 o F O y ~ c U 3 O 0 N0 > No 01 C NE O) O a) co 'o a m e 0 CC E co = w r o CO') a t a = 0 0 a) = 0 c C m N 60 m U a co O -5 a i v r N 1LOO 00) (O a D ~ > O C J `) O N 0 E O `m > CO `m o c = 0 g a) R n O T.) CF Te V V OJ r 6 > a) j c k U • 0 EO O E O E 6 rn ao v M o o N u) V „' m m N Cc) ow,j J O y) �� rOn K r N 0 = e a 11 0 0 0 0 a) a 6 = d a co N a O at o m m co co a = L O co o C -y E 0 0 0 0 0 0 ? c 0 m > a S..--'E >i > o -o dE a) ;CI c 0 0 -o '' _ U at 0 o co o O O— 0 o 0 o o E U �) u) a II > - d LL c U D C > _ ti c Ce i. 10 L II o d ~ o N O o O O E ? I I co O O �... 0 0 0 0 0 E 0 j.00) 0 =O II 3 C c cc 0 0 0 0 `o E ` co 3 1n "c) co co a) o o E C J v0) co0 ton o E. 0 y ti .a o o a E E c' m Co O .� "y -) w 0 U o d a) 0 3 IL ryp -a= V p) ca c C G C_ C co U d a) 0) p ca d _O a7 0 am u d t M t0 `y j _ N O 0 = C Q c `0 co E 2 c c m a) `m Y o d co N ` -0 C a a) O N j E a) a) o o_ d H H a) o a .= 2 O o >. N_ N O C II U C0 p "W II II L II II II ca 0 N y A L.0 co a `a co F C..) _co F H r N a E o` 0 • co I- F c.i ri v Sri 1ri r 0 0 CO C CA fIKCD ; , «w_ = co , � ) - a ! ,ameb = a co , OL -aa : � $ a ® k \ 2 U 1E \J\ ( § ) ) 0 \ II En ca ■ k x Ill FT ch _ Eb c U ®ij \ - CNI-- o ; II } _40 , , , »fq § L67>22 cciK ;C? 11— e 0C \ ) \ ! $3 , , , , t - < ; _ - CC % / _ 4(15 X • / § a_ , co , _ \ \ \ \ \ _a / ak § / 2 \ \ \ \ � \ \ \ ® \ j \ } \ ) ) \ E \ oa { ) ) ) / { ) \ / a \ _ - co \ n _ 2 § a _cr) : 3 , f SZ-,7, k \ k = aII � § � - ) dd t / ) I } %\ I % ;_ - ma ,_ C = > t - = $ a▪ _ CO0 & m ik { { & ) / § / - � , , , ) \ / = - ; •: Bta2 > >al ° $ a) J - ct,o ac o . � �r (N _ { a aIIa j / \ \ \ , 0 \ / • •� a) CO N O C N 99 ›+ E d in 0 II C cu r TO m O �",r N N O C CC o N 5 N Nr:taa CO q y -- V _ to LO @ 7 0 {L N c U - -;13 a U r _ C , d O N 0 m d E H To > Ya c '�.. 2 a o 2 = o lc Y O— ci O co O fh C L O Ol N to d 0 U N 0 U a E '� E o 0 w 5 0 o ? U) C O D to N L O > > T > d E W d O N O C a 0 0 to = a — O co 00 N LO E C U = O (O U 11 $ = o 0 0 o a 0 a 0 = D a >-. LL = a) U O r a) C N a) a) a a) =ED E C d-o co = Co - O 9 a O C gp f� V N O7 U N N C_ a r IO a r O alrlii 03 = 0 a N O LO c C a - N Co = x x 0 00 L U a C C a C O _0 O• a C) CO [D o Ln CD = N < H 0 a) o_ O. O N IL a "" r r r N E C c - 0 :l- ¢ Q co E O U C C N y >. 3 - o a "ma c > E E 3 0 0 c 0 N 3 3 a :c o ns r r r r o co " a 2 E m L E E y O = V V O V 0 a d a a c N 0 E CO _ a a L 0 = C U U a O. to :c. • _ 3 8 U E 3 0 a L 0 = a O] Ol N N L O N N a N N C) C' U _ O O L E d o o 0 0 o a0 m o `)) o 3 3 on f/J — o o 0 0 O c o.4D o o - o o E co • c m o g m o. 2 c c .T. 173--- N C O N N N a) O co U _ G O• co co to O =a) E 2 grow ,20- V t CO d 0 i v c LC)) 0 U o 0 0 m aU c c w > J N N N in ELL en U C .0 = a) r O 0 a) l> 2 N (o o '.' N a) N 'EJ U U co C C N N N N 0 j E on c E O a, 0 to ao co N N L > a "C W C C') C' N co ma L c-40 C x E N a )n )n in LL7 .5 N _ EPEE E E N m o `L' 3 o oE g• L o m ' on .c Y 0 Ca 0 0 E E N c o C 0 $' 2 d a s c M M M co M E E : 3 > L a o. a co C 7) 7, N Lo M E a L 2 ] N V N C L o E E � co U .- N 3 E m o a 'Cl Cill m a) Dtr. E D d o 0 E E a m a an a to y C `) `) N CO 0 O. 0 cn N 0 O ` a O q -co_• c d N C) O7 O) C C o N C N On p LL I U- o U 9 C C L U o co _ o O .C C E C N a) N 8 a) a) L � - WT, o 0 o d E E o) m o L 0 £ L I d m w O N L a a) �° (° rn m r 3 a On U 2 K U cu a) 2 a) C aaj c c N a`o a d a) _ "c �a E E o, > > L o) o o o E co —,_) co .w v U co o t I -lc o "E 8'o v v ") "' aa) 5i m -`o a D0 C E - ≥ - a 2 co . Li. a... Ui LLi D D ^ E __ m ti m m E O _ o 0 3 • 16 a o 0 0 o a o d EC C _ O c N > -0 N 2 p j V 9 E vc m co m m 2 2-a 'a ,3„ m 0 E L a°1i 3 3 > i -0 E d LL. N W Y o o o 0 O O C > 0 a c > ≥ 0 c a Cru _ C E -c/o E Va U L G a) L L L5. — C N w o N o a) o U 3 U N L o > U _ t K V cc IY a) o o 2 co rn o ca) o a o) m 0 V D a m e E N "a) C tip, E E N O) d y m m 0 = 3 m -o0 0 i = E CO U d CO C CI N IY K ≥ d 2 s 0 N LL U 200 m a .O w - a p a m t E 0 HCi 0 r oi Ci v ui o r m of a § afk a\ ? ! |#a« m ! to 0 ! _; ■ ce § ` ate / cE 2 ,+ •- / k}g 2 � ›.- \ , co ca / k( § & EP 5 E \ ) ( {i = y \ / 2 taw = & _ O \ } 0 }E % 3 \ \ \ E co \ ■ ID ca ff ] on 6 0) z in ) ii • 3 \ � ~ - co la co co \ « « { \� : & r- - _5. ) \ ! „ } \ \ ol ' \ � �9 en n- o o \ \ \0 c3 \ o \ C a o 0r— „ / — it Cu z ,« 22 - - aE !° { \ \ \ \ \ \ \ ! 7 } ) ii2 ) ) a { O.CO t= ; ® CD ! 0I 3c.) ) ) / iri E ccn c ) UD0 co • _ ! & = wa , w tE/k $« § a.! Cr) -I I �vi to � ti O.CC 0 cc \ k � \ \co 2 ca $ mac in e co 2 05 f to 5 CNI kII 0 L=`— ® CO ■ & CL t ■ /�° _ f ° CL E _ { ( ) \ C co i-70 CL \ \ \ } \ \ co 2 - \ ) .co ra cco a ',5 ) § { ) th = k k « > , 0 co co CO o co 0 an 0 g 02 \o \ E \\ } i0 2§C # - J � ° en - f \ oCL l- S co m up / $� ° 31) O� .53 ` (} / ( \ 73 15 o %� & 0 Cn / \ \ { / /_ 5 corn - an 3 _ ) oj aq tn 02 - / ` �� ` - \ kk \ \ \ \ / / } \ 4scii CO-0 \ \ \{ ( / \ \ \ f / } __.- --e, _ k _ - e � R �# -., , e » + = ± a : ! � ° ; 2r / J ) ) / ) ± 2 ) / 2t 0 GI k inj }2 } • , „ , r = 2 � ® e :e . . . . . . . . lig \ @ Oa � /) D � 2 \ � \ ] / \ k \ \ x a co c � f CD 0 cn co cn co 0 aco a \ 2 � cn co 0 _ E ni IC 0 co } ) - ` # I § . ; \ } � � - , ) « 3 § � cci cdo • ±� \ \ \ \ )I o cu (in E ° 7... 0", \ ) \\ • \/ \ o � \ \ - ® f \ k } > _ ) {/ ) z 0lZ ± § § ® — « _ \ 0t4 \ \ \\ \ / — _ Eit ; [ / { 0 $ ] } \ i § § Co 00 oaq , .. A E r ._=76 7 § ( / \ \ \ �\ \ 0 S Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Appendix A: Hydrologic Computations • • Cedar Creek II Wind Farm Project Cedar Creek II Wind Project Site Historical Condition 5-YR Storm Runoff Calculations • WinTR-55 Current Data Description --- Identification Data --- User: Tetra Tech Date: 5/11/2010 Project: Cedar Creek II Wind Project Units: English SubTitle: Historic Condition - CCII Wind Project Site Area Areal Units: Acres State: Colorado County: Weld Filename: P:\BPAE Wind\Colorado\Cedar Creek II\Engineering\Hydrology Modeling\CCII - Final Historic Ru --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc CCII Site CCII Site - Historical Outlet 20.15 69 0.941 Total area: 20.15 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr -Yr (in) (in) (in) (in) (in) (in) (in) 1.8 2.35 2.7 3.2 3.6 4.0 .0 • Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:53:53 AM Tetra Tech Cedar Creek II Wind Project • Historic Condition - CCII Wind Project Site Area Weld County, Colorado Storm Data Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr -Yr (in) (in) (in) (in) (in) (in) (in) 1.8 2.35 2.7 3.2 3.6 4.0 .0 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:53:53 AM • • Tetra Tech Cedar Creek II Wind Project Historic Condition - CCII Wind Project Site Area Weld County, Colorado Watershed Peak Table Sub-Area Peak Flow by Rainfall Return Period or Reach 5-Yr Identifier (cfs) SUBAREAS CCII Site 2.79 REACHES OUTLET 2.79 • • WinTR-55, Version 1.00.08 Page I 5/11/2010 10:53:53 AM Tetra Tech Cedar Creek II Wind Project • Historic Condition - CCII Wind Project Site Area Weld County, Colorado Hydrograph Peak/Peak Time Table Sub-Area Peak Flow and Peak Time (hr) by Rainfall Return Period or Reach 5-Yr Identifier (cfs) (hr) SUBAREAS CCII Site 2.79 12.57 REACHES OUTLET 2.79 • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:53:53 AM • • Tetra Tech Cedar Creek II Wind Project Historic Condition - CCII Wind Project Site Area Weld County, Colorado Sub-Area Summary Table Sub-Area Drainage Time of Curve Receiving Sub-Area Identifier Area Concentration Number Reach Description (ac) (hr) CCII Site 20.15 0.941 69 Outlet CCII Site - Historical Total Area: 20.15 (ac) • • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:53:53 AM Tetra Tech Cedar Creek II Wind Project • Historic Condition - CCII Wind Project Site Area Weld County, Colorado Sub-Area Time of Concentration Details Sub-Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) CCII Site User-provided 0.941 Time of Concentration 0.941 • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:53:53 AM • • Tetra Tech Cedar Creek II Wind Project Historic Condition - CCII Wind Project Site Area Weld County, Colorado Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) CCII Site Pasture, grassland or range (fair) B 20.15 69 Total Area / Weighted Curve Number 20.15 69 • • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:53:53 AM Cedar Creek II Wind Project • Historic Condition - CCII Wind Project Site Area Name of printed page file: TR20.out STORM 5-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) CCII Site 0.031 0.354 12.57 2.79 88.53 Line Start Time Flow Values @ time increment of 0.059 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 11.915 0.07 0.18 0.36 0.62 0.95 1.34 1.74 12.331 2.11 2.39 2.60 2.73 2.79 2.78 2.72 12.747 2.60 2.45 2.28 2.12 1.98 1.86 1.75 13.163 1.65 1.56 1.47 1.39 1.32 1.26 1.20 13.579 1.15 1.10 1.06 1.02 0.98 0.94 0.91 13.995 0.88 0.85 0.83 0.80 0.78 0.76 0.74 14.411 0.72 0.70 0.69 0.67 0.66 0.64 0.63 14.827 0.62 0.61 0.60 0.59 0.58 0.58 0.57 15.243 0.56 0.56 0.55 0.54 0.54 0.53 0.52 15.659 0.52 0.51 0.51 0.50 0.49 0.49 0.48 16.075 0.48 0.47 0.46 0.46 0.45 0.45 0.44 16.491 0.44 0.43 0.43 0.42 0.42 0.41 0.41 16.907 0.41 0.41 0.40 0.40 0.40 0.39 0.39 17.323 0.39 0.39 0.38 0.38 0.38 0.38 0.38 17.739 0.37 0.37 0.37 0.37 0.36 0.36 0.36 18.155 0.36 0.36 0.35 0.35 0.35 0.35 0.34 18.571 0.34 0.34 0.34 0.34 0.33 0.33 0.33 18.987 0.33 0.32 0.32 0.32 0.32 0.31 0.31 19.403 0.31 0.31 0.30 0.30 0.30 0.30 0.29 • 19.819 0.29 0.29 0.29 0.28 0.28 0.28 0.28 20.235 0.27 0.27 0.27 0.27 0.27 0.26 0.26 20.651 0.26 0.26 0.26 0.26 0.26 0.25 0.25 21.067 0.25 0.25 0.25 0.25 0.25 0.25 0.25 21.483 0.25 0.25 0.25 0.25 0.25 0.25 0.25 21.899 0.25 0.24 0.24 0.24 0.24 0.24 0.24 22.315 0.24 0.24 0.24 0.24 0.24 0.24 0.24 22.731 0.24 0.24 0.24 0.24 0.24 0.24 0.24 23.148 0.24 0.24 0.24 0.24 0.24 0.23 0.23 23.564 0.23 0.23 0.23 0.23 0.23 0.23 0.23 23.980 0.23 0.23 0.23 0.23 0.22 0.21 0.20 24.396 0.19 0.17 0.16 0.14 0.12 0.11 0.09 24.812 0.08 0.07 0.06 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) OUTLET 0.031 0.354 12.57 2.79 88.53 WinTR-20 Version 1.0 Page 1 05/11/2010 10:52 Cedar Creek II Wind Project Historic Condition - CCII Wind Project Site Area Line Start Time Flow Values @ time increment of 0.059 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:54:38 AM • • Cedar Creek II Wind Project Historic Condition - CCII Wind Project Site Area Name of printed page file: TR20.nut (continued) STORM 5-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 11.915 0.07 0.18 0.36 0.62 0.95 1.34 1.74 12.331 2.11 2.39 2.60 2.73 2.79 2.78 2.72 12.747 2.60 2.45 2.28 2.12 1.98 1.86 1.75 13.163 1.65 1.56 1.47 1.39 1.32 1.26 1.20 13.579 1.15 1.10 1.06 1.02 0.98 0.94 0.91 13.995 0.88 0.85 0.83 0.80 0.78 0.76 0.74 14.411 0.72 0.70 0.69 0.67 0.66 0.64 0.63 14.827 0.62 0.61 0.60 0.59 0.58 0.58 0.57 15.243 0.56 0.56 0.55 0.54 0.54 0.53 0.52 15.659 0.52 0.51 0.51 0.50 0.49 0.49 0.48 16.075 0.48 0.47 0.46 0.46 0.45 0.45 0.44 16.491 0.44 0.43 0.43 0.42 0.42 0.41 0.41 16.907 0.41 0.41 0.40 0.40 0.40 0.39 0.39 17.323 0.39 0.39 0.38 0.38 0.38 0.38 0.38 17.739 0.37 0.37 0.37 0.37 0.36 0.36 0.36 18.155 0.36 0.36 0.35 0.35 0.35 0.35 0.34 18.571 0.34 0.34 0.34 0.34 0.33 0.33 0.33 18.987 0.33 0.32 0.32 0.32 0.32 0.31 0.31 19.403 0.31 0.31 0.30 0.30 0.30 0.30 0.29 19.819 0.29 0.29 0.29 0.28 0.28 0.26 0.28 20.235 0.27 0.27 0.27 0.27 0.27 0.26 0.26 20.651 0.26 0.26 0.26 0.26 0.26 0.25 0.25 21.067 0.25 0.25 0.25 0.25 0.25 0.25 0.25 • 21.483 0.25 0.25 0.25 0.25 0.25 0.25 0.25 21.899 0.25 0.24 0.24 0.24 0.24 0.24 0.24 22.315 0.24 0.24 0.24 0.24 0.24 0.24 0.24 22.731 0.24 0.24 0.24 0.24 0.24 0.24 0.24 23.148 0.24 0.24 0.24 0.24 0.24 0.23 0.23 23.564 0.23 0.23 0.23 0.23 0.23 0.23 0.23 23.960 0.23 0.23 0.23 0.23 0.22 0.21 0.20 24.396 0.19 0.17 0.16 0.14 0.12 0.11 0.09 24.812 0.08 0.07 0.06 WinTR-20 Version 1.0 Page 2 05/11/2010 10:52 Cedar Creek II Wind Project • WinTR-55, Version 1.00.08 Page 2 5/11/2010 10:54:38 AM Cedar Creek II Wind Project Historic Condition - CCII Wind Project Site Area • Name of printed page file: TR20.out (continued) STORM 5-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Historic Condition - CCII Wind Project Site Area Area or Drainage Peak Flow by Storm Reach Area Alternate 5-Yr Identifier (sq mi) (cfs) (cfs) (cfs) (cfs) (cfs) CCII Site 0.03 2.8 OUTLET 0.03 2.8 • WinTR-55, Version 1.00.08 Page 3 5/11/2010 10:54:38 AM • • Cedar Creek II Wind Project Historic Condition - CCII Wind Project Site Area Name of printed page file: TR20.out (continued) STORM 5-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (ens) (csm) WinTR-20 Version 1.0 Page 3 05/11/2010 10:52 0 IWinTR-55, Version 1.00.06 Page 4 5/11/2010 10:54:38 AM Cedar Creek II Wind Project Site Developed Condition 2-YR Storm Runoff Calculations for Detention Basin P • WinTR-55 Current Data Description --- Identification Data --- User: Tetra Tech Date: 5/10/2010 Project: Cedar Creek II Wind Project Units: English SubTitle: Developed Condition - 2-Yr for Basin P w/o Offsite Runoff Areal Units: Acres State: Colorado County: Weld Filename: P:\BPAE Wind\Colorado\Cedar Creek II\Engineering\Hydrology Modeling\CCII - Final Developed Runc --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc DA P1 DA P1 w/o Offsite Runon Basin P 4.76 85 0.587 DA P2 DA P2 w/o Offsite Runon Basin P 2.67 85 0.562 DA Ti DA Ti w/o Offsite Runon Basin P 5.95 85 0.581 DA T2 DA T2 w/o Offsite Runon Basin P 4.26 86 0.334 Total area: 17.64 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period • 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr -Yr (in) (in) (in) (in) (in) (in) (in) 1.8 2.35 2.7 3.2 3.6 4.0 .0 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> • WinTR-55, Version 1.00.08 Page 1 5/10/2010 5:47:16 PM Tetra Tech Cedar Creek II Wind Project • Developed Condition - 2-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Storm Data Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr -Yr (in) (in) (in) (in) (in) (in) (in) 1.8 2.35 2.7 3.2 3.6 4.0 .0 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> • • WinTR-55, Version 1.00.08 Page 1 5/10/2010 5:47:16 PM • Tetra Tech Cedar Creek II Wind Project Developed Condition - 2-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Watershed Peak Table Sub-Area Peak Flow by Rainfall Return Period or Reach 2-Yr Identifier (cfs) SUBAREAS DA P1 2.36 DA P2 1.36 DA Ti 2.98 DA T2 3.22 REACHES Basin P 9.16 Down 0.84 OUTLET 0.84 • • WinTR-55, Version 1.00.08 Page 1 5/10/2010 5:47:16 PM Tetra Tech Cedar Creek II Wind Project • Developed Condition - 2-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Hydrograph Peak/Peak Time Table Sub-Area Peak Flow and Peak Time (hr) by Rainfall Return Period or Reach 2-Yr Identifier (cfs) (hr) SUBAREAS DA P1 2.36 12.27 DA P2 1.36 12.22 DA Tl 2.98 12.25 DA T2 3.22 12.11 REACHES Basin P 9.16 12.19 Down 0.84 14.19 OUTLET 0.84 • WinTR-55, Version 1.00.08 Page 1 5/10/2010 5:47:16 PM • • Tetra Tech Cedar Creek II Wind Project Developed Condition - 2-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Structure Output Table Reach Peak Flow (PF) , Storage Volume (SV) , Stage (STG) Identifier by Rainfall Return Period Structure Identifier 2-Yr Reach: Basin P Pipe : Basin P 8(in) PF (cfs) 0.84 SV (ac ft) .51 STG (ft) .23 • • WinTR-55, Version 1.00.08 Page 1 5/10/2010 5:47:16 PM Tetra Tech Cedar Creek II Wind Project • Developed Condition - 2-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Sub-Area Summary Table Sub-Area Drainage Time of Curve Receiving Sub-Area Identifier Area Concentration Number Reach Description (ac) (hr) DA P1 4.76 0.587 85 Basin P DA P1 w/o Offsite Runon DA P2 2.67 0.562 85 Basin P DA P2 w/o Offsite Runon DA Ti 5.95 0.581 85 Basin P DA Ti w/o Offsite Runon DA T2 4.26 0.334 86 Basin P DA T2 w/o Offsite Runon Total Area: 17.64 (ac) • • WinTR-55, Version 1.00.08 Page 1 5/10/2010 5:47:16 PM • Tetra Tech Cedar Creek II Wind Project Developed Condition - 2-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Reach Summary Table Receiving Reach Routing Reach Reach Length Method Identifier Identifier (ft) Basin P Outlet STRUCTURE(Basin P) • • WinTR-55, Version 1.00.08 Page 1 5/10/2010 5:47:16 PM Tetra Tech Cedar Creek II Wind Project • Developed Condition - 2-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Sub-Area Time of Concentration Details Sub-Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) DA P1 User-provided 0.587 Time of Concentration 0.587 DA P2 User-provided 0.562 Time of Concentration 0.562 DA T1 User-provided 0.581 Time of Concentration 0.581 DA T2 User-provided 0.334 Time of Concentration 0.334 • • WinTR-55, Version 1.00.08 Page 1 5/10/2010 5:47:16 PM • Tetra Tech Cedar Creek II Wind Project Developed Condition - 2-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) DA P1 Open space; grass cover < 50% (poor) B .077 79 Paved parking lots, roofs, driveways B .162 98 Gravel (w/ right-of-way) B 4.5 85 Total Area / Weighted Curve Number 4.76 85 DA P2 Open space; grass cover < 50% (poor) B .133 79 Paved parking lots, roofs, driveways B .074 96 Gravel (w/ right-of-way) a 2.459 85 Total Area / Weighted Curve Number 2.67 85 DA Ti Open space; grass cover < 50% (poor) B .307 79 Paved parking lots, roofs, driveways B .322 98 Gravel (w/ right-of-way) B 5.321 85 Total Area / Weighted Curve Number 5.95 85 DA T2 Open space; grass cover < 50% (poor) B .065 79 Paved parking lots, roofs, driveways B .2 98 • Gravel (w/ right-of-way) B 3.997 85 Total Area / Weighted Curve Number 4.26 86 • WinTR-55, Version 1.00.08 Page 1 5/10/2010 5:47:16 PM Tetra Tech Cedar Creek II Wind Project • Developed Condition - 2-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Reach Channel Rating Details Reach Reach Reach Friction Bottom Side Identifier Length Manning's Slope Width Slope (ft) n (ft/ft) (ft) Basin P (This reach is a structure: Basin P) Reach End Top Friction Identifier Stage Flow Area Width Slope (ft) (cfs) (sq ft) (ft) (ft/ft) Basin P (This reach is a structure: Basin P) • • WinTR-55, Version 1.00.08 Page 1 5/10/2010 5:47:16 PM • Tetra Tech Cedar Creek II Wind Project Developed Condition - 2-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Structure Description - User Entered Surface Height Surface Reach Area @ Above Area @ Pipe Head on Weir Identifier Crest Crest Ht Above Diameter Pipe Length lac) (ft) (ac) (in) )ft) (ft) Basin P 2.142 1 2.257 8 0.5 • • WinTR-55, Version 1.00.08 Page 1 5/10/2010 5:47:16 PM Tetra Tech Cedar Creek II Wind Project • Developed Condition - 2-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Structure Rating Details - Computed Reach Pool Flows (cfs) @ Pipe Diameter Idendifier Stage Storage Dia #1 Dia #2 Dia #3 (ft) (ac ft) Bin in in Basin P 0 0.00 0.000 0.33 0.72 1.185 0.67 1.45 1.530 1.33 2.96 2.052 3.33 7.78 3.135 6.67 16.84 4.380 13.33 36.78 6.156 • • WinTR-55, Version 1.00.08 Page 1 5/10/2010 5:47:16 PM • WinTR-55 Output Hydrograph Project: Cedar Creek II Wind Project 511112010 Subarea:(Outlet) Storm:2-Yr ItldCobraOOCeciarC leek IPEegbeerbg'nprobgy ModeIllgCCII-FIlal Dew kpea RIIaR2TRO'brtn wltloetO1tl Reeottbr Bab Pa65 OUTLET(cfs) .7 .6 0 U .5 0 .4 .3- .2 .1 • .0 4. 8. 12. 16. 20. 24. 28. 32. 36. 40. TIME(hrs) • Cedar Creek II Wind Project • Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) DA P1 0.007 0.647 12.27 2.36 317.05 Line Start Time Flow Values @ time increment of 0.037 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 11.454 0.05 0.06 0.07 0.07 0.08 0.10 0.11 11.713 0.14 0.17 0.22 0.29 0.39 0.53 0.70 11.973 0.92 1.17 1.44 1.71 1.95 2.15 2.29 12.232 2.36 2.36 2.30 2.21 2.08 1.93 1.77 12.492 1.62 1.47 1.34 1.22 1.13 1.04 0.96 12.751 0.89 0.82 0.77 0.71 0.67 0.63 0.59 13.011 0.56 0.53 0.51 0.48 0.46 0.44 0.43 13.270 0.41 0.40 0.38 0.37 0.36 0.35 0.34 13.530 0.33 0.32 0.31 0.31 0.30 0.29 0.28 13.789 0.28 0.27 0.27 0.26 0.26 0.25 0.25 14.049 0.24 0.24 0.24 0.23 0.23 0.23 0.22 14.308 0.22 0.22 0.21 0.21 0.21 0.21 0.20 14.568 0.20 0.20 0.20 0.20 0.19 0.19 0.19 14.827 0.19 0.19 0.19 0.19 0.18 0.18 0.18 15.087 0.18 0.18 0.18 0.18 0.17 0.17 0.17 15.346 0.17 0.17 0.17 0.17 0.17 0.16 0.16 15.606 0.16 0.16 0.16 0.16 0.16 0.15 0.15 • 15.865 0.15 0.15 0.15 0.15 0.15 0.14 0.14 16.125 0.14 0.14 0.14 0.14 0.14 0.14 0.13 16.384 0.13 0.13 0.13 0.13 0.13 0.13 0.13 16.644 0.13 0.13 0.13 0.13 0.13 0.13 0.13 16.903 0.12 0.12 0.12 0.12 0.12 0.12 0.12 17.163 0.12 0.12 0.12 0.12 0.12 0.12 0.12 17.422 0.12 0.12 0.12 0.12 0.12 0.12 0.11 17.682 0.11 0.11 0.11 0.11 0.11 0.11 0.11 17.941 0.11 0.11 0.11 0.11 0.11 0.11 0.11 18.201 0.11 0.11 0.11 0.11 0.11 0.11 0.10 18.460 0.10 0.10 0.10 0.10 0.10 0.10 0.10 18.720 0.10 0.10 0.10 0.10 0.10 0.10 0.10 18.979 0.10 0.10 0.10 0.10 0.10 0.09 0.09 19.239 0.09 0.09 0.09 0.09 0.09 0.09 0.09 19.498 0.09 0.09 0.09 0.09 0.09 0.09 0.09 19.758 0.09 0.09 0.09 0.08 0.08 0.08 0.08 20.018 0.08 0.08 0.08 0.08 0.08 0.08 0.08 20.277 0.08 0.08 0.08 0.08 0.08 0.08 0.08 20.537 0.08 0.08 0.08 0.08 0.08 0.08 0.08 20.796 0.08 0.08 0.08 0.08 0.08 0.08 0.08 21.056 0.08 0.08 0.07 0.07 0.07 0.07 0.07 21.315 0.07 0.07 0.07 0.07 0.07 0.07 0.07 21.575 0.07 0.07 0.07 0.07 0.07 0.07 0.07 WinTR-20 Version 1.0 Page 1 05/10/2010 17:49 . Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.037 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 21.834 0.07 0.07 0.07 0.07 0.07 0.07 0.07 • 22.094 0.07 0.07 0.07 0.07 0.07 0.07 0.07 WinTR-55, Version 1.00.08 Page 1 5/10/2010 5:49:55 PM • Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 22.353 0.07 0.07 0.07 0.07 0.07 0.07 0.07 22.613 0.07 0.07 0.07 0.07 0.07 0.07 0.07 22.872 0.07 0.07 0.07 0.07 0.07 0.07 0.07 23.132 0.07 0.07 0.07 0.07 0.07 0.07 0.07 23.391 0.07 0.07 0.07 0.07 0.07 0.07 0.07 23.651 0.07 0.07 0.07 0.07 0.07 0.07 0.07 23.910 0.07 0.07 0.07 0.07 0.07 0.07 0.06 24.170 0.06 0.06 0.06 0.05 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) DA P2 0.004 0.572 12.22 1.36 326.79 Line Start Time Flow Values @ time increment of 0.035 hr (hr( (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 11.619 0.05 0.06 0.07 0.09 0.11 0.14 0.19 11.868 0.25 0.33 0.43 0.56 0.70 0.86 1.01 12.116 1.15 1.26 1.33 1.36 1.36 1.32 1.26 12.364 1.19 1.10 1.01 0.92 0.84 0.76 0.70 • 12.613 0.64 0.59 0.55 0.51 0.47 0.44 0.41 12.861 0.38 0.36 0.34 0.32 0.30 0.29 0.28 13.110 0.26 0.25 0.24 0.23 0.23 0.22 0.21 13.358 0.21 0.20 0.19 0.19 0.18 0.18 0.18 13.607 0.17 0.17 0.16 0.16 0.16 0.15 0.15 13.855 0.15 0.15 0.14 0.14 0.14 0.14 0.13 14.104 0.13 0.13 0.13 0.13 0.12 0.12 0.12 14.352 0.12 0.12 0.12 0.12 0.11 0.11 0.11 14.601 0.11 0.11 0.11 0.11 0.11 0.11 0.11 14.849 0.11 0.10 0.10 0.10 0.10 0.10 0.10 15.098 0.10 0.10 0.10 0.10 0.10 0.10 0.10 15.346 0.10 0.09 0.09 0.09 0.09 0.09 0.09 15.595 0.09 0.09 0.09 0.09 0.09 0.09 0.09 15.843 0.09 0.08 0.08 0.08 0.08 0.08 0.06 16.091 0.08 0.08 0.08 0.08 0.08 0.08 0.08 16.340 0.08 0.07 0.07 0.07 0.07 0.07 0.07 16.588 0.07 0.07 0.07 0.07 0.07 0.07 0.07 16.837 0.07 0.07 0.07 0.07 0.07 0.07 0.07 17.085 0.07 0.07 0.07 0.07 0.07 0.07 0.07 17.334 0.07 0.07 0.07 0.07 0.07 0.07 0.06 17.582 0.06 0.06 0.06 0.06 0.06 0.06 0.06 17.831 0.06 0.06 0.06 0.06 0.06 0.06 0.06 18.079 0.06 0.06 0.06 0.06 0.06 0.06 0.06 16.328 0.06 0.06 0.06 0.06 0.06 0.06 0.06 18.576 0.06 0.06 0.06 0.06 0.06 0.06 0.06 18.825 0.06 0.06 0.05 0.05 0.05 0.05 0.05 WinTR-20 Version 1.0 Page 2 05/10/2010 17:49 Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.035 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) WinTR-55, Version 1.00.08 Page 2 5/10/2010 5:49:55 PM Cedar Creek II Wind Project • Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (osm) 19.073 0.05 0.05 0.05 0.05 0.05 0.05 0.05 19.321 0.05 0.05 0.05 0.05 0.05 0.05 0.05 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (cam) DA Ti 0.009 0.648 12.25 2.98 320.26 Line Start Time Flow Values @ time increment of 0.037 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 11.369 0.05 0.06 0.07 0.07 0.08 0.09 0.10 11.626 0.12 0.13 0.16 0.20 0.26 0.33 0.44 11.882 0.59 0.79 1.04 1.33 1.66 2.01 2.33 12.139 2.61 2.82 2.94 2.98 2.94 2.84 2.69 12.396 2.51 2.32 2.12 1.93 1.75 1.60 1.47 12.653 1.35 1.25 1.16 1.07 0.99 0.93 0.87 12.910 0.81 0.76 0.72 0.68 0.65 0.62 0.59 13.167 0.57 0.54 0.52 0.50 0.49 0.47 0.46 13.424 0.44 0.43 0.42 0.41 0.40 0.39 0.38 13.681 0.37 0.36 0.35 0.35 0.34 0.33 0.33 13.937 0.32 0.32 0.31 0.31 0.30 0.30 0.29 III 14.194 0.29 0.28 0.28 0.27 0.27 0.27 0.26 14.451 0.26 0.26 0.25 0.25 0.25 0.25 0.24 14.708 0.24 0.24 0.24 0.24 0.24 0.23 0.23 14.965 0.23 0.23 0.23 0.22 0.22 0.22 0.22 15.222 0.22 0.22 0.22 0.21 0.21 0.21 0.21 15.479 0.21 0.21 0.20 0.20 0.20 0.20 0.20 15.735 0.20 0.19 0.19 0.19 0.19 0.19 0.19 15.992 0.18 0.18 0.18 0.18 0.18 0.18 0.17 16.249 0.17 0.17 0.17 0.17 0.17 0.17 0.16 16.506 0.16 0.16 0.16 0.16 0.16 0.16 0.16 16.763 0.16 0.16 0.16 0.16 0.16 0.15 0.15 17.020 0.15 0.15 0.15 0.15 0.15 0.15 0.15 17.277 0.15 0.15 0.15 0.15 0.15 0.15 0.15 17.533 0.15 0.14 0.14 0.14 0.14 0.14 0.14 17.790 0.14 0.14 0.14 0.14 0.14 0.14 0.14 18.047 0.14 0.14 0.14 0.14 0.13 0.13 0.13 18.304 0.13 0.13 0.13 0.13 0.13 0.13 0.13 18.561 0.13 0.13 0.13 0.13 0.13 0.13 0.12 18.818 0.12 0.12 0.12 0.12 0.12 0.12 0.12 19.075 0.12 0.12 0.12 0.12 0.12 0.12 0.12 19.332 0.12 0.11 0.11 0.11 0.11 0.11 0.11 19.588 0.11 0.11 0.11 0.11 0.11 0.11 0.11 19.845 0.11 0.11 0.11 0.10 0.10 0.10 0.10 20.102 0.10 0.10 0.10 0.10 0.10 0.10 0.10 20.359 0.10 0.10 0.10 0.10 0.10 0.10 0.10 20.616 0.10 0.10 0.10 0.10 0.10 0.09 0.09 20.873 0.09 0.09 0.09 0.09 0.09 0.09 0.09 WinTR-20 Version 1.0 Page 3 05/10/2010 17:49 Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.037 hr • WinTR-55, Version 1.00.08 Page 3 5/10/2010 5:49:55 PM • Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 21.130 0.09 0.09 0.09 0.09 0.09 0.09 0.09 21.386 0.09 0.09 0.09 0.09 0.09 0.09 0.09 21.643 0.09 0.09 0.09 0.09 0.09 0.09 0.09 21.900 0.09 0.09 0.09 0.09 0.09 0.09 0.09 22.157 0.09 0.09 0.09 0.09 0.09 0.09 0.09 22.414 0.09 0.09 0.09 0.09 0.09 0.09 0.09 22.671 0.09 0.09 0.09 0.09 0.09 0.09 0.09 22.928 0.09 0.09 0.09 0.09 0.09 0.09 0.09 23.184 0.09 0.09 0.09 0.09 0.09 0.09 0.09 23.441 0.09 0.09 0.09 0.09 0.09 0.09 0.09 23.698 0.09 0.09 0.09 0.09 0.08 0.08 0.08 23.955 0.08 0.08 0.08 0.08 0.08 0.08 0.08 24.212 0.07 0.07 0.06 0.06 0.05 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) DA T2 0.007 0.695 12.11 3.22 484.21 Line • Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 11.157 0.05 0.05 0.06 0.06 0.06 0.07 0.07 11.305 0.07 0.08 0.08 0.08 0.09 0.09 0.10 11.452 0.10 0.10 0.11 0.11 0.12 0.13 0.14 11.600 0.15 0.16 0.16 0.21 0.24 0.28 0.33 11.748 0.39 0.47 0.55 0.65 0.77 0.91 1.08 11.895 1.28 1.51 1.76 2.03 2.30 2.57 2.80 12.043 2.99 3.13 3.21 3.22 3.17 3.05 2.89 12.191 2.69 2.49 2.28 2.08 1.89 1.72 1.57 12.338 1.44 1.32 1.23 1.14 1.07 1.00 0.94 12.486 0.89 0.84 0.79 0.75 0.71 0.68 0.64 12.634 0.61 0.59 0.56 0.54 0.52 0.50 0.48 12.781 0.47 0.45 0.44 0.43 0.42 0.41 0.40 12.929 0.39 0.38 0.38 0.37 0.36 0.36 0.35 13.077 0.35 0.34 0.34 0.33 0.33 0.32 0.32 13.224 0.31 0.31 0.31 0.30 0.30 0.29 0.29 13.372 0.29 0.29 0.28 0.28 0.28 0.27 0.27 13.520 0.27 0.26 0.26 0.26 0.26 0.25 0.25 13.667 0.25 0.25 0.24 0.24 0.24 0.24 0.23 13.815 0.23 0.23 0.23 0.23 0.22 0.22 0.22 13.963 0.22 0.21 0.21 0.21 0.21 0.21 0.20 14.110 0.20 0.20 0.20 0.20 0.20 0.19 0.19 14.258 0.19 0.19 0.19 0.19 0.19 0.19 0.19 14.406 0.18 0.18 0.18 0.16 0.18 0.18 0.18 14.553 0.16 0.18 0.18 0.18 0.18 0.18 0.17 14.701 0.17 0.17 0.17 0.17 0.17 0.17 0.17 14.849 0.17 0.17 0.17 0.17 0.17 0.17 0.17 14.996 0.16 0.16 0.16 0.16 0.16 0.16 0.16 WinTR-20 Version 1.0 Page 4 05/10/2010 17:49 Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff • WinTR-55, Version 1.00.08 Page 4 5/10/2010 5:49:55 PM Cedar Creek II Wind Project • Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 15.144 0.16 0.16 0.16 0.16 0.16 0.16 0.16 15.292 0.15 0.15 0.15 0.15 0.15 0.15 0.15 15.439 0.15 0.15 0.15 0.15 0.15 0.15 0.15 15.587 0.14 0.14 0.14 0.14 0.14 0.14 0.14 15.735 0.14 0.14 0.14 0.14 0.14 0.14 0.14 15.882 0.13 0.13 0.13 0.13 0.13 0.13 0.13 16.030 0.13 0.13 0.13 0.13 0.13 0.13 0.13 16.178 0.12 0.12 0.12 0.12 0.12 0.12 0.12 16.325 0.12 0.12 0.12 0.12 0.12 0.12 0.12 16.473 0.12 0.12 0.12 0.12 0.12 0.12 0.12 16.621 0.12 0.12 0.12 0.12 0.12 0.12 0.12 16.768 0.12 0.12 0.11 0.11 0.11 0.11 0.11 16.916 0.11 0.11 0.11 0.11 0.11 0.11 0.11 17.064 0.11 0.11 0.11 0.11 0.11 0.11 0.11 17.211 0.11 0.11 0.11 0.11 0.11 0.11 0.11 17.359 0.11 0.11 0.11 0.11 0.11 0.11 0.11 17.507 0.11 0.11 0.11 0.11 0.11 0.11 0.10 17.654 0.10 0.10 0.10 0.10 0.10 0.10 0.10 17.802 0.10 0.10 0.10 0.10 0.10 0.10 0.10 17.950 0.10 0.10 0.10 0.10 0.10 0.10 0.10 • 18.097 0.10 0.10 0.10 0.10 0.10 0.10 0.10 18.245 0.10 0.10 0.10 0.10 0.10 0.10 0.10 18.393 0.10 0.10 0.09 0.09 0.09 0.09 0.09 18.540 0.09 0.09 0.09 0.09 0.09 0.09 0.09 18.688 0.09 0.09 0.09 0.09 0.09 0.09 0.09 18.836 0.09 0.09 0.09 0.09 0.09 0.09 0.09 18.983 0.09 0.09 0.09 0.09 0.09 0.09 0.09 19.131 0.09 0.09 0.09 0.09 0.08 0.08 0.08 19.279 0.08 0.08 0.08 0.08 0.08 0.08 0.08 19.426 0.08 0.08 0.08 0.08 0.08 0.08 0.08 19.574 0.08 0.08 0.08 0.08 0.08 0.08 0.08 19.722 0.08 0.08 0.08 0.08 0.08 0.08 0.08 19.869 0.08 0.08 0.08 0.08 0.08 0.08 0.07 20.017 0.07 0.07 0.07 0.07 0.07 0.07 0.07 20.165 0.07 0.07 0.07 0.07 0.07 0.07 0.07 20.312 0.07 0.07 0.07 0.07 0.07 0.07 0.07 20.460 0.07 0.07 0.07 0.07 0.07 0.07 0.07 20.608 0.07 0.07 0.07 0.07 0.07 0.07 0.07 20.755 0.07 0.07 0.07 0.07 0.07 0.07 0.07 20.903 0.07 0.07 0.07 0.07 0.07 0.07 0.07 21.051 0.07 0.07 0.07 0.07 0.07 0.07 0.07 21.198 0.07 0.07 0.07 0.07 0.07 0.07 0.07 21.346 0.07 0.07 0.07 0.07 0.07 0.07 0.07 21.494 0.07 0.07 0.07 0.07 0.07 0.07 0.07 21.641 0.07 0.07 0.07 0.07 0.07 0.07 0.07 21.789 0.07 0.07 0.07 0.07 0.07 0.07 0.07 21.937 0.07 0.07 0.07 0.07 0.07 0.07 0.07 22.084 0.07 0.07 0.07 0.07 0.07 0.07 0.07 22.232 0.07 0.07 0.07 0.07 0.07 0.07 0.07 22.380 0.07 0.07 0.07 0.07 0.07 0.07 0.07 22.527 0.07 0.07 0.07 0.07 0.07 0.07 0.07 WinTR-20 Version 1.0 Page 5 05/10/2010 17:49 Cedar Creek II Wind Project • WinTR-55, Version 1.00.08 Page 5 5/10/2010 5:49:55 PM • Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (c£s) (csm) Developed Condition - 2-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 22.675 0.07 0.07 0.07 0.07 0.07 0.07 0.07 22.823 0.07 0.07 0.07 0.07 0.07 0.06 0.06 22.970 0.06 0.0E 0.06 0.06 0.06 0.06 0.06 23.118 0.06 0.06 0.06 0.06 0.06 0.06 0.06 23.265 0.06 0.06 0.06 0.06 0.06 0.06 0.06 23.413 0.06 0.06 0.06 0.06 0.06 0.06 0.06 23.561 0.06 0.06 0.06 0.06 0.06 0.06 0.06 23.708 0.06 0.06 0.06 0.06 0.06 0.06 0.06 23.856 0.06 0.06 0.06 0.06 0.06 0.06 0.06 24.004 0.06 0.0E 0.06 0.06 0.06 0.06 0.05 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Basin P 0.028 Upstream 0.647 12.19 9.16 332.34 • Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 11.157 0.05 0.05 0.06 0.06 0.06 0.07 0.07 11.305 0.07 0.08 0.10 0.13 0.15 0.15 0.16 11.452 0.19 0.23 0.25 0.26 0.28 0.29 0.31 11.600 0.36 0.42 0.47 0.52 0.58 0.67 0.77 11.748 0.89 1.04 1.22 1.43 1.68 1.99 2.35 11.895 2.78 3.28 3.82 4.44 5.08 5.75 6.41 12.043 7.05 7.62 8.13 8.54 8.85 9.06 9.14 12.191 9.16 9.08 8.94 8.76 8.52 8.27 7.97 12.338 7.67 7.36 7.04 6.71 6.38 6.06 5.74 12.486 5.44 5.15 4.88 4.62 4.39 4.17 3.97 12.634 3.79 3.61 3.45 3.30 3.16 3.03 2.90 12.781 2.78 2.67 2.57 2.48 2.39 2.31 2.23 12.929 2.16 2.09 2.02 1.97 1.91 1.86 1.81 13.077 1.76 1.72 1.68 1.64 1.61 1.57 1.54 13.224 1.51 1.48 1.45 1.42 1.40 1.37 1.35 13.372 1.33 1.31 1.29 1.27 1.25 1.23 1.21 13.520 1.20 1.18 1.16 1.15 1.13 1.11 1.10 13.667 1.09 1.07 1.06 1.05 1.03 1.02 1.01 13.815 1.00 0.99 0.98 0.97 0.96 0.95 0.94 13.963 0.93 0.92 0.91 0.90 0.90 0.89 0.88 14.110 0.87 0.86 0.85 0.85 0.84 0.83 0.82 14.258 0.82 0.81 0.80 0.80 0.79 0.79 0.78 14.406 0.78 0.77 0.77 0.76 0.76 0.75 0.75 14.553 0.75 0.74 0.74 0.73 0.73 0.73 0.72 14.701 0.72 0.72 0.71 0.71 0.71 0.70 0.70 14.849 0.70 0.70 0.69 0.69 0.69 0.68 0.68 14.996 0.68 0.68 0.67 0.67 0.67 0.66 0.66 15.144 0.66 0.66 0.65 0.65 0.65 0.64 0.64 15.292 0.64 0.64 0.63 0.63 0.63 0.62 0.62 15.439 0.62 0.62 0.61 0.61 0.61 0.60 0.60 • WinTR-20 Version 1.0 Page 6 05/10/2010 17:49 WinTR-55, Version 1.00.08 Page 6 5/10/2010 5:49:55 PM Cedar Creek II Wind Project • Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 15.587 0.60 0.60 0.59 0.59 0.59 0.58 0.58 15.735 0.58 0.58 0.57 0.57 0.57 0.56 0.56 15.882 0.56 0.56 0.55 0.55 0.55 0.54 0.54 16.030 0.54 0.54 0.53 0.53 0.53 0.52 0.52 16.178 0.52 0.52 0.51 0.51 0.51 0.51 0.50 16.325 0.50 0.50 0.50 0.50 0.49 0.49 0.49 16.473 0.49 0.49 0.49 0.48 0.48 0.48 0.48 16.621 0.48 0.48 0.48 0.48 0.47 0.47 0.47 16.768 0.47 0.47 0.47 0.47 0.47 0.47 0.46 16.916 0.46 0.46 0.46 0.46 0.46 0.46 0.46 17.064 0.46 0.45 0.45 0.45 0.45 0.45 0.45 17.211 0.45 0.45 0.45 0.45 0.44 0.44 0.44 17.359 0.44 0.44 0.44 0.44 0.44 0.44 0.44 17.507 0.43 0.43 0.43 0.43 0.43 0.43 0.43 17.654 0.43 0.43 0.42 0.42 0.42 0.42 0.42 • 17.802 0.42 0.42 0.42 0.42 0.42 0.41 0.41 17.950 0.41 0.41 0.41 0.41 0.41 0.41 0.41 18.097 0.41 0.40 0.40 0.40 0.40 0.40 0.40 18.245 0.40 0.40 0.40 0.39 0.39 0.39 0.39 18.393 0.39 0.39 0.39 0.39 0.39 0.39 0.38 18.540 0.38 0.38 0.38 0.38 0.38 0.38 0.38 18.688 0.38 0.37 0.37 0.37 0.37 0.37 0.37 18.836 0.37 0.37 0.37 0.36 0.36 0.36 0.36 18.983 0.36 0.36 0.36 0.36 0.36 0.36 0.35 19.131 0.35 0.35 0.35 0.35 0.35 0.35 0.35 19.279 0.35 0.34 0.34 0.34 0.34 0.34 0.34 19.426 0.34 0.34 0.34 0.33 0.33 0.33 0.33 19.574 0.32 0.29 0.28 0.28 0.28 0.28 0.27 19.722 0.27 0.27 0.27 0.27 0.27 0.27 0.27 19.869 0.27 0.27 0.27 0.26 0.26 0.26 0.26 20.017 0.26 0.26 0.26 0.26 0.26 0.26 0.26 20.165 0.25 0.25 0.25 0.25 0.25 0.25 0.25 20.312 0.25 0.25 0.25 0.25 0.25 0.25 0.25 20.460 0.25 0.25 0.24 0.24 0.24 0.24 0.24 20.608 0.24 0.24 0.24 0.24 0.24 0.24 0.24 20.755 0.24 0.24 0.24 0.24 0.24 0.24 0.24 20.903 0.24 0.24 0.24 0.24 0.24 0.24 0.24 21.051 0.24 0.24 0.24 0.24 0.24 0.24 0.24 21.198 0.24 0.24 0.24 0.24 0.24 0.24 0.24 21.346 0.24 0.24 0.24 0.24 0.24 0.24 0.24 21.494 0.23 0.23 0.23 0.23 0.23 0.23 0.23 21.641 0.23 0.23 0.23 0.23 0.23 0.23 0.23 21.789 0.23 0.23 0.23 0.23 0.23 0.23 0.23 21.937 0.23 0.23 0.23 0.23 0.23 0.23 0.23 22.084 0.23 0.23 0.23 0.23 0.23 0.23 0.23 22.232 0.23 0.23 0.23 0.23 0.23 0.23 0.23 22.380 0.23 0.23 0.23 0.23 0.23 0.23 0.23 22.527 0.23 0.23 0.23 0.23 0.23 0.23 0.23 22.675 0.23 0.23 0.23 0.22 0.22 0.22 0.22 22.823 0.22 0.22 0.22 0.22 0.22 0.22 0.22 • 22.970 0.22 0.22 0.22 0.22 0.22 0.22 0.22 WinTR-55, Version 1.00.08 Page 7 5/10/2010 5:49:55 PM • Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) WinTR-20 Version 1.0 Page 7 05/10/2010 17:49 Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 23.118 0.22 0.22 0.22 0.22 0.22 0.22 0.22 23.265 0.22 0.22 0.22 0.22 0.22 0.22 0.22 23.413 0.22 0.22 0.22 0.22 0.22 0.22 0.22 23.561 0.22 0.22 0.22 0.22 0.22 0.22 0.22 23.708 0.22 0.22 0.22 0.22 0.22 0.22 0.22 23.856 0.22 0.22 0.22 0.22 0.21 0.21 0.21 24.004 0.21 0.21 0.21 0.21 0.21 0.20 0.20 24.151 0.19 0.14 0.14 0.13 0.13 0.12 0.12 24.299 0.10 0.07 0.05 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) • Basin P 0.028 Downstream 0.626 0.23 14.19 0.84 30.39 Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 11.895 0.05 0.06 0.07 0.06 0.10 0.11 0.13 12.043 0.15 0.17 0.19 0.21 0.24 0.26 0.29 12.191 0.31 0.34 0.36 0.39 0.41 0.43 0.46 12.338 0.48 0.50 0.52 0.54 0.55 0.57 0.58 12.486 0.60 0.61 0.62 0.64 0.65 0.66 0.67 12.634 0.68 0.69 0.69 0.70 0.71 0.72 0.72 12.761 0.73 0.73 0.74 0.74 0.75 0.75 0.76 12.929 0.76 0.77 0.77 0.77 0.78 0.78 0.78 13.077 0.79 0.79 0.79 0.79 0.80 0.80 0.80 13.224 0.80 0.80 0.81 0.81 0.81 0.81 0.81 13.372 0.81 0.82 0.82 0.82 0.82 0.82 0.82 13.520 0.82 0.82 0.83 0.83 0.83 0.83 0.83 13.667 0.83 0.83 0.83 0.83 0.83 0.63 0.83 13.815 0.83 0.83 0.83 0.84 0.84 0.84 0.84 13.963 0.84 0.84 0.84 0.84 0.84 0.84 0.84 14.110 0.84 0.84 0.84 0.84 0.84 0.84 0.84 14.258 0.84 0.84 0.84 0.84 0.84 0.84 0.84 14.406 0.84 0.84 0.64 0.64 0.84 0.84 0.84 14.553 0.84 0.84 0.63 0.83 0.83 0.63 0.83 14.701 0.83 0.83 0.83 0.83 0.83 0.63 0.83 14.849 0.83 0.83 0.83 0.83 0.83 0.83 0.83 14.996 0.83 0.83 0.83 0.83 0.83 0.83 0.83 15.144 0.82 0.82 0.82 0.82 0.62 0.82 0.82 15.292 0.82 0.82 0.62 0.82 0.82 0.82 0.82 15.439 0.62 0.82 0.62 0.82 0.82 0.81 0.81 15.587 0.81 0.81 0.81 0.81 0.81 0.81 0.81 15.735 0.81 0.81 0.81 0.81 0.81 0.81 0.80 15.882 0.80 0.80 0.80 0.80 0.80 0.80 0.80 • 16.030 0.80 0.80 0.80 0.80 0.60 0.80 0.79 WinTR-55, Version 1.00.08 Page 8 5/10/2010 5:49:55 PM Cedar Creek II Wind Project • Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 16.176 0.79 0.79 0.79 0.79 0.79 0.79 0.79 16.325 0.79 0.79 0.79 0.79 0.78 0.76 0.78 WinTR-20 Version 1.0 Page 8 05/10/2010 17:49 Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 16.473 0.78 0.78 0.76 0.78 0.78 0.78 0.78 16.621 0.78 0.78 0.77 0.77 0.77 0.77 0.77 16.768 0.77 0.77 0.77 0.77 0.77 0.77 0.77 16.916 0.76 0.76 0.76 0.76 0.76 0.76 0.76 17.064 0.76 0.76 0.76 0.76 0.75 0.75 0.75 17.211 0.75 0.75 0.75 0.75 0.75 0.75 0.75 17.359 0.75 0.75 0.74 0.74 0.74 0.74 0.74 17.507 0.74 0.74 0.74 0.74 0.74 0.74 0.73 17.654 0.73 0.73 0.73 0.73 0.73 0.73 0.73 17.802 0.73 0.73 0.73 0.72 0.72 0.72 0.72 17.950 0.72 0.72 0.72 0.72 0.72 0.72 0.72 16.097 0.72 0.71 0.71 0.71 0.71 0.71 0.71 • 18.245 0.71 0.71 0.71 0.71 0.71 0.70 0.70 18.393 0.70 0.70 0.70 0.70 0.70 0.70 0.70 18.540 0.70 0.70 0.69 0.69 0.69 0.69 0.69 18.688 0.69 0.69 0.69 0.69 0.69 0.69 0.66 18.836 0.68 0.68 0.68 0.68 0.68 0.68 0.68 18.983 0.66 0.68 0.68 0.67 0.67 0.67 0.67 19.131 0.67 0.67 0.67 0.67 0.67 0.67 0.67 19.279 0.66 0.66 0.66 0.66 0.66 0.66 0.66 19.426 0.66 0.66 0.66 0.66 0.65 0.65 0.65 19.574 0.65 0.65 0.65 0.65 0.65 0.65 0.65 19.722 0.64 0.64 0.64 0.64 0.64 0.64 0.64 19.869 0.64 0.64 0.63 0.63 0.63 0.63 0.63 20.017 0.63 0.63 0.63 0.63 0.63 0.62 0.62 20.165 0.62 0.62 0.62 0.62 0.62 0.62 0.62 20.312 0.61 0.61 0.61 0.61 0.61 0.61 0.61 20.460 0.61 0.61 0.61 0.60 0.60 0.60 0.60 20.608 0.60 0.60 0.60 0.60 0.60 0.60 0.59 20.755 0.59 0.59 0.59 0.59 0.59 0.59 0.59 20.903 0.59 0.59 0.58 0.58 0.58 0.58 0.58 21.051 0.58 0.58 0.58 0.58 0.58 0.57 0.57 21.198 0.57 0.57 0.57 0.57 0.57 0.57 0.57 21.346 0.57 0.56 0.56 0.56 0.56 0.56 0.56 21.494 0.56 0.56 0.56 0.56 0.56 0.55 0.55 21.641 0.55 0.55 0.55 0.55 0.55 0.55 0.55 21.789 0.55 0.55 0.54 0.54 0.54 0.54 0.54 21.937 0.54 0.54 0.54 0.54 0.54 0.54 0.53 22.084 0.53 0.53 0.53 0.53 0.53 0.53 0.53 22.232 0.53 0.53 0.53 0.53 0.52 0.52 0.52 22.380 0.52 0.52 0.52 0.52 0.52 0.52 0.52 22.527 0.52 0.52 0.51 0.51 0.51 0.51 0.51 22.675 0.51 0.51 0.51 0.51 0.51 0.51 0.51 22.823 0.50 0.50 0.50 0.50 0.50 0.50 0.50 22.970 0.50 0.50 0.50 0.50 0.50 0.50 0.49 23.116 0.49 0.49 0.49 0.49 0.49 0.49 0.49 23.265 0.49 0.49 0.49 0.49 0.49 0.48 0.48 • WinTR-55, Version 1.00.08 Page 9 5/10/2010 5:49:55 PM • Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 23.413 0.48 0.48 0.48 0.48 0.48 0.48 0.48 23.561 0.48 0.48 0.48 0.48 0.47 0.47 0.47 23.708 0.47 0.47 0.47 0.47 0.47 0.47 0.47 23.856 0.47 0.47 0.47 0.47 0.46 0.46 0.46 WinTR-20 Version 1.0 Page 9 05/10/2010 17:49 Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (c£s) (cfs) (cfs) (cfs) (cfs) 24.004 0.46 0.46 0.46 0.46 0.46 0.46 0.46 24.151 0.46 0.46 0.46 0.45 0.45 0.45 0.45 24.299 0.45 0.45 0.45 0.45 0.45 0.44 0.44 24.447 0.44 0.44 0.44 0.44 0.44 0.44 0.43 24.594 0.43 0.43 0.43 0.43 0.43 0.43 0.43 24.742 0.42 0.42 0.42 0.42 0.42 0.42 0.42 24.890 0.42 0.42 0.41 0.41 0.41 0.41 0.41 25.037 0.41 0.41 0.41 0.40 0.40 0.40 0.40 25.185 0.40 0.40 0.40 0.40 0.40 0.39 0.39 • 25.333 0.39 0.39 0.39 0.39 0.39 0.39 0.39 25.480 0.38 0.38 0.38 0.38 0.38 0.36 0.38 25.628 0.38 0.38 0.37 0.37 0.37 0.37 0.37 25.776 0.37 0.37 0.37 0.37 0.36 0.36 0.36 25.923 0.36 0.36 0.36 0.36 0.36 0.36 0.36 26.071 0.35 0.35 0.35 0.35 0.35 0.35 0.35 26.219 0.35 0.35 0.35 0.34 0.34 0.34 0.34 26.366 0.34 0.34 0.34 0.34 0.34 0.34 0.33 26.514 0.33 0.33 0.33 0.33 0.33 0.33 0.33 26.662 0.33 0.33 0.33 0.32 0.32 0.32 0.32 26.809 0.32 0.32 0.32 0.32 0.32 0.32 0.32 26.957 0.31 0.31 0.31 0.31 0.31 0.31 0.31 27.105 0.31 0.31 0.31 0.31 0.30 0.30 0.30 27.252 0.30 0.30 0.30 0.30 0.30 0.30 0.30 27.400 0.30 0.30 0.29 0.29 0.29 0.29 0.29 27.548 0.29 0.29 0.29 0.29 0.29 0.29 0.29 27.695 0.28 0.28 0.28 0.28 0.28 0.2B 0.28 27.843 0.28 0.28 0.28 0.28 0.28 0.27 0.27 27.991 0.27 0.27 0.27 0.27 0.27 0.27 0.27 28.138 0.27 0.27 0.27 0.27 0.26 0.26 0.26 28.286 0.26 0.26 0.26 0.26 0.26 0.26 0.26 28.434 0.26 0.26 0.26 0.25 0.25 0.25 0.25 28.581 0.25 0.25 0.25 0.25 0.25 0.25 0.25 28.729 0.25 0.25 0.25 0.24 0.24 0.24 0.24 28.877 0.24 0.24 0.24 0.24 0.24 0.24 0.24 29.024 0.24 0.24 0.24 0.24 0.23 0.23 0.23 29.172 0.23 0.23 0.23 0.23 0.23 0.23 0.23 29.320 0.23 0.23 0.23 0.23 0.23 0.22 0.22 29.467 0.22 0.22 0.22 0.22 0.22 0.22 0.22 29.615 0.22 0.22 0.22 0.22 0.22 0.22 0.22 29.763 0.21 0.21 0.21 0.21 0.21 0.21 0.21 29.910 0.21 0.21 0.21 0.21 0.21 0.21 0.21 30.058 0.21 0.21 0.21 0.20 0.20 0.20 0.20 30.206 0.20 0.20 0.20 0.20 0.20 0.20 0.20 30.353 0.20 0.20 0.20 0.20 0.20 0.20 0.19 • 30.501 0.19 0.19 0.19 0.19 0.19 0.19 0.19 WinTR-55, Version 1.00.08 Page 10 5/10/2010 5:49:55 PM Cedar Creek II Wind Project . Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 30.649 0.19 0.19 0.19 0.19 0.19 0.19 0.19 30.796 0.19 0.19 0.19 0.18 0.18 0.18 0.18 30.944 0.18 0.18 0.18 0.18 0.18 0.18 0.18 31.092 0.18 0.18 0.16 0.18 0.18 0.18 0.18 31.239 0.18 0.18 0.17 0.17 0.17 0.17 0.17 31.387 0.17 0.17 0.17 0.17 0.17 0.17 0.17 WinTR-20 Version 1.0 Page 10 05/10/2010 17:49 Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 31.535 0.17 0.17 0.17 0.17 0.17 0.17 0.17 31.682 0.17 0.16 0.16 0.16 0.16 0.16 0.16 31.830 0.16 0.16 0.16 0.16 0.16 0.16 0.16 31.978 0.16 0.16 0.16 0.16 0.16 0.16 0.16 32.125 0.16 0.16 0.15 0.15 0.15 0.15 0.15 32.273 0.15 0.15 0.15 0.15 0.15 0.15 0.15 32.421 0.15 0.15 0.15 0.15 0.15 0.15 0.15 32.568 0.15 0.15 0.15 0.15 0.14 0.14 0.14 • 32.716 0.14 0.14 0.14 0.14 0.14 0.14 0.14 32.864 0.14 0.14 0.14 0.14 0.14 0.14 0.14 33.011 0.14 0.14 0.14 0.14 0.14 0.14 0.14 33.159 0.14 0.13 0.13 0.13 0.13 0.13 0.13 33.307 0.13 0.13 0.13 0.13 0.13 0.13 0.13 33.454 0.13 0.13 0.13 0.13 0.13 0.13 0.13 33.602 0.13 0.13 0.13 0.13 0.13 0.13 0.13 33.750 0.12 0.12 0.12 0.12 0.12 0.12 0.12 33.897 0.12 0.12 0.12 0.12 0.12 0.12 0.12 34.045 0.12 0.12 0.12 0.12 0.12 0.12 0.12 34.193 0.12 0.12 0.12 0.12 0.12 0.12 0.12 34.340 0.12 0.11 0.11 0.11 0.11 0.11 0.11 34.468 0.11 0.11 0.11 0.11 0.11 0.11 0.11 34.636 0.11 0.11 0.11 0.11 0.11 0.11 0.11 34.783 0.11 0.11 0.11 0.11 0.11 0.11 0.11 34.931 0.11 0.11 0.11 0.11 0.11 0.10 0.10 35.079 0.10 0.10 0.10 0.10 0.10 0.10 0.10 35.226 0.10 0.10 0.10 0.10 0.10 0.10 0.10 35.374 0.10 0.10 0.10 0.10 0.10 0.10 0.10 35.522 0.10 0.10 0.10 0.10 0.10 0.10 0.10 35.669 0.10 0.10 0.10 0.10 0.10 0.09 0.09 35.817 0.09 0.09 0.09 0.09 0.09 0.09 0.09 35.965 0.09 0.09 0.09 0.09 0.09 0.09 0.09 36.112 0.09 0.09 0.09 0.09 0.09 0.09 0.09 36.260 0.09 0.09 0.09 0.09 0.09 0.09 0.09 36.408 0.09 0.09 0.09 0.09 0.09 0.09 0.09 36.555 0.09 0.08 0.08 0.08 0.08 0.08 0.08 36.703 0.08 0.08 0.08 0.08 0.08 0.08 0.08 36.851 0.08 0.08 0.08 0.08 0.08 0.08 0.08 36.998 0.08 0.08 0.08 0.08 0.08 0.06 0.08 37.146 0.08 0.08 0.08 0.08 0.08 0.08 0.08 37.293 0.08 0.08 0.08 0.08 0.08 0.08 0.08 37.441 0.08 0.08 0.08 0.07 0.07 0.07 0.07 37.589 0.07 0.07 0.07 0.07 0.07 0.07 0.07 37.736 0.07 0.07 0.07 0.07 0.07 0.07 0.07 • WinTR-55, Version 1.00.08 Page 11 5/10/2010 5:49:55 PM • Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) )ft) (hr) (cfs) (csm) 37.884 0.07 0.07 0.07 0.07 0.07 0.07 0.07 38.032 0.07 0.07 0.07 0.07 0.07 0.07 0.07 38.179 0.07 0.07 0.07 0.07 0.07 0.07 0.07 38.327 0.07 0.07 0.07 0.07 0.07 0.07 0.07 38.475 0.07 0.07 0.07 0.07 0.06 0.06 0.06 38.622 0.06 0.06 0.06 0.06 0.06 0.06 0.06 38.770 0.06 0.06 0.06 0.06 0.06 0.06 0.06 38.918 0.06 0.06 0.06 0.06 0.06 0.06 0.06 WinTR-20 Version 1.0 Page 11 05/10/2010 17:49 Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 39.065 0.06 0.06 0.06 0.06 0.06 0.06 0.06 39.213 0.06 0.06 0.06 0.06 0.06 0.06 0.06 39.361 0.06 0.06 0.06 0.06 0.06 0.06 0.06 39.508 0.06 0.06 0.06 0.06 0.06 0.06 0.06 39.656 0.06 0.06 0.06 0.06 0.06 0.06 0.05 • 39.804 0.05 0.05 0.05 0.05 0.05 0.05 0.05 39.951 0.05 0.05 0.05 0.05 0.05 0.05 0.05 40.099 0.05 0.05 0.05 0.05 0.05 0.05 0.05 40.247 0.05 0.05 0.05 0.05 0.05 0.05 0.05 40.394 0.05 0.05 0.05 0.05 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) OUTLET 0.028 0.626 14.19 0.84 30.39 Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 11.895 0.05 0.06 0.07 0.08 0.10 0.11 0.13 12.043 0.15 0.17 0.19 0.21 0.24 0.26 0.29 12.191 0.31 0.34 0.36 0.39 0.41 0.43 0.46 12.338 0.48 0.50 0.52 0.54 0.55 0.57 0.58 12.486 0.60 0.61 0.62 0.64 0.65 0.66 0.67 12.634 0.68 0.69 0.69 0.70 0.71 0.72 0.72 12.781 0.73 0.73 0.74 0.74 0.75 0.75 0.76 12.929 0.76 0.77 0.77 0.77 0.78 0.78 0.78 13.077 0.79 0.79 0.79 0.79 0.80 0.80 0.80 13.224 0.80 0.80 0.81 0.81 0.81 0.81 0.81 13.372 0.81 0.82 0.82 0.82 0.82 0.82 0.82 13.520 0.82 0.82 0.83 0.83 0.83 0.83 0.83 13.667 0.83 0.83 0.83 0.83 0.83 0.83 0.83 13.815 0.83 0.83 0.83 0.84 0.84 0.84 0.84 13.963 0.84 0.84 0.84 0.84 0.84 0.84 0.84 14.110 0.84 0.84 0.84 0.84 0.84 0.84 0.84 14.258 0.84 0.84 0.84 0.84 0.84 0.84 0.84 14.406 0.84 0.84 0.84 0.84 0.84 0.84 0.84 14.553 0.84 0.84 0.83 0.83 0.83 0.83 0.83 • 14.701 0.83 0.63 0.83 0.83 0.83 0.83 0.83 WinTR-55, Version 1.00.08 Page 12 5/10/2010 5:49:55 PM Cedar Creek II Wind Project • Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm( 14.849 0.83 0.83 0.83 0.83 0.83 0.83 0.83 14.996 0.83 0.83 0.83 0.83 0.83 0.83 0.83 15.144 0.82 0.82 0.82 0.82 0.82 0.82 0.82 15.292 0.82 0.82 0.82 0.82 0.82 0.82 0.82 15.439 0.82 0.82 0.82 0.82 0.82 0.81 0.81 15.587 0.81 0.61 0.81 0.81 0.81 0.81 0.81 15.735 0.81 0.81 0.81 0.81 0.81 0.81 0.80 15.882 0.80 0.80 0.80 0.80 0.80 0.80 0.80 16.030 0.80 0.80 0.80 0.80 0.80 0.80 0.79 16.178 0.79 0.79 0.79 0.79 0.79 0.79 0.79 WinTR-20 Version 1.0 Page 12 05/10/2010 17:49 Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs( (cfs) 16.325 0.79 0.79 0.79 0.79 0.78 0.78 0.78 16.473 0.78 0.78 0.78 0.78 0.78 0.78 0.78 16.621 0.78 0.78 0.77 0.77 0.77 0.77 0.77 16.768 0.77 0.77 0.77 0.77 0.77 0.77 0.77 • 16.916 0.76 0.76 0.76 0.76 0.76 0.76 0.76 17.064 0.76 0.76 0.76 0.76 0.75 0.75 0.75 17.211 0.75 0.75 0.75 0.75 0.75 0.75 0.75 17.359 0.75 0.75 0.74 0.74 0.74 0.74 0.74 17.507 0.74 0.74 0.74 0.74 0.74 0.74 0.73 17.654 0.73 0.73 0.73 0.73 0.73 0.73 0.73 17.802 0.73 0.73 0.73 0.72 0.72 0.72 0.72 17.950 0.72 0.72 0.72 0.72 0.72 0.72 0.72 18.097 0.72 0.71 0.71 0.71 0.71 0.71 0.71 18.245 0.71 0.71 0.71 0.71 0.71 0.70 0.70 18.393 0.70 0.70 0.70 0.70 0.70 0.70 0.70 18.540 0.70 0.70 0.69 0.69 0.69 0.69 0.69 18.688 0.69 0.69 0.69 0.69 0.69 0.69 0.68 18.836 0.68 0.68 0.68 0.68 0.68 0.68 0.68 18.983 0.68 0.68 0.68 0.67 0.67 0.67 0.67 19.131 0.67 0.67 0.67 0.67 0.67 0.67 0.67 19.279 0.66 0.66 0.66 0.66 0.66 0.66 0.66 19.426 0.66 0.66 0.66 0.66 0.65 0.65 0.65 19.574 0.65 0.65 0.65 0.65 0.65 0.65 0.65 19.722 0.64 0.64 0.64 0.64 0.64 0.64 0.64 19.869 0.64 0.64 0.63 0.63 0.63 0.63 0.63 20.017 0.63 0.63 0.63 0.63 0.63 0.62 0.62 20.165 0.62 0.62 0.62 0.62 0.62 0.62 0.62 20.312 0.61 0.61 0.61 0.61 0.61 0.61 0.61 20.460 0.61 0.61 0.61 0.60 0.60 0.60 0.60 20.608 0.60 0.60 0.60 0.60 0.60 0.60 0.59 20.755 0.59 0.59 0.59 0.59 0.59 0.59 0.59 20.903 0.59 0.59 0.58 0.58 0.58 0.58 0.58 21.051 0.58 0.58 0.58 0.58 0.58 0.57 0.57 21.198 0.57 0.57 0.57 0.57 0.57 0.57 0.57 21.346 0.57 0.56 0.56 0.56 0.56 0.56 0.56 21.494 0.56 0.56 0.56 0.56 0.56 0.55 0.55 21.641 0.55 0.55 0.55 0.55 0.55 0.55 0.55 21.789 0.55 0.55 0.54 0.54 0.54 0.54 0.54 21.937 0.54 0.54 0.54 0.54 0.54 0.54 0.53 • WinTR-55, Version 1.00.08 Page 13 5/10/2010 5:49:55 PM • Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 22.084 0.53 0.53 0.53 0.53 0.53 0.53 0.53 22.232 0.53 0.53 0.53 0.53 0.52 0.52 0.52 22.380 0.52 0.52 0.52 0.52 0.52 0.52 0.52 22.527 0.52 0.52 0.51 0.51 0.51 0.51 0.51 22.675 0.51 • 0.51 0.51 0.51 0.51 0.51 0.51 22.823 0.50 0.50 0.50 0.50 0.50 0.50 0.50 22.970 0.50 0.50 0.50 0.50 0.50 0.50 0.49 23.118 0.49 0.49 0.49 0.49 0.49 0.49 0.49 23.265 0.49 0.49 0.49 0.49 0.49 0.48 0.48 23.413 0.48 0.48 0.48 0.48 0.48 0.48 0.48 23.561 0.48 0.48 0.48 0.48 0.47 0.47 0.47 23.708 0.47 0.47 0.47 0.47 0.47 0.47 0.47 WinTR-20 Version 1.0 Page 13 05/10/2010 17:49 Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 23.856 0.47 0.47 0.47 0.47 0.46 0.46 0.46 • 24.004 0.46 0.46 0.46 0.46 0.46 0.46 0.46 24.151 0.46 0.46 0.46 0.45 0.45 0.45 0.45 24.299 0.45 0.45 0.45 0.45 0.45 0.44 0.44 24.447 0.44 0.44 0.44 0.44 0.44 0.44 0.43 24.594 0.43 0.43 0.43 0.43 0.43 0.43 0.43 24.742 0.42 0.42 0.42 0.42 0.42 0.42 0.42 24.890 0.42 0.42 0.41 0.41 0.41 0.41 0.41 25.037 0.41 0.41 0.41 0.40 0.40 0.40 0.40 25.185 0.40 0.40 0.40 0.40 0.40 0.39 0.39 25.333 0.39 0.39 0.39 0.39 0.39 0.39 0.39 25.480 0.38 0.38 0.38 0.38 0.38 0.38 0.38 25.628 0.38 0.38 0.37 0.37 0.37 0.37 0.37 25.776 0.37 0.37 0.37 0.37 0.36 0.36 0.36 25.923 0.36 0.36 0.36 0.36 0.36 0.36 0.36 26.071 0.35 0.35 0.35 0.35 0.35 0.35 0.35 26.219 0.35 0.35 0.35 0.34 0.34 0.34 0.34 26.366 0.34 0.34 0.34 0.34 0.34 0.34 0.33 26.514 0.33 0.33 0.33 0.33 0.33 0.33 0.33 26.662 0.33 0.33 0.33 0.32 0.32 0.32 0.32 26.809 0.32 0.32 0.32 0.32 0.32 0.32 0.32 26.957 0.31 0.31 0.31 0.31 0.31 0.31 0.31 27.105 0.31 0.31 0.31 0.31 0.30 0.30 0.30 27.252 0.30 0.30 0.30 0.30 0.30 0.30 0.30 27.400 0.30 0.30 0.29 0.29 0.29 0.29 0.29 27.548 0.29 0.29 0.29 0.29 0.29 0.29 0.29 27.695 0.28 0.28 0.28 0.28 0.28 0.28 0.26 27.843 0.28 0.28 0.28 0.28 0.28 0.27 0.27 27.991 0.27 0.27 0.27 0.27 0.27 0.27 0.27 28.138 0.27 0.27 0.27 0.27 0.26 0.26 0.26 28.286 0.26 0.26 0.26 0.26 0.26 0.26 0.26 28.434 0.26 0.26 0.26 0.25 0.25 0.25 0.25 28.581 0.25 0.25 0.25 0.25 0.25 0.25 0.25 28.729 0.25 0.25 0.25 0.24 0.24 0.24 0.24 28.877 0.24 0.24 0.24 0.24 0.24 0.24 0.24 29.024 0.24 0.24 0.24 0.24 0.23 0.23 0.23 • 29.172 0.23 0.23 0.23 0.23 0.23 0.23 0.23 WinTR-55, Version 1.00.08 Page 14 5/10/2010 5:49:55 PM Cedar Creek II Wind Project . Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 29.320 0.23 0.23 0.23 0.23 0.23 0.22 0.22 29.467 0.22 0.22 0.22 0.22 0.22 0.22 0.22 29.615 0.22 0.22 0.22 0.22 0.22 0.22 0.22 29.763 0.21 0.21 0.21 0.21 0.21 0.21 0.21 29.910 0.21 0.21 0.21 0.21 0.21 0.21 0.21 30.058 0.21 0.21 0.21 0.20 0.20 0.20 0.20 30.206 0.20 0.20 0.20 0.20 0.20 0.20 0.20 30.353 0.20 0.20 0.20 0.20 0.20 0.20 0.19 30.501 0.19 0.19 0.19 0.19 0.19 0.19 0.19 30.649 0.19 0.19 0.19 0.19 0.19 0.19 0.19 30.796 0.19 0.19 0.19 0.18 0.16 0.18 0.18 30.944 0.18 0.18 0.18 0.18 0.18 0.18 0.18 31.092 0.18 0.18 0.18 0.18 0.18 0.18 0.18 31.239 0.18 0.18 0.17 0.17 0.17 0.17 0.17 WinTR-20 Version 1.0 Page 14 05/10/2010 17:49 Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (ofs) 31.387 0.17 0.17 0.17 0.17 0.17 0.17 0.17 • 31.535 0.17 0.17 0.17 0.17 0.17 0.17 0.17 31.682 0.17 0.16 0.16 0.16 0.16 0.16 0.16 31.830 0.16 0.16 0.16 0.16 0.16 0.16 0.16 31.978 0.16 0.16 0.16 0.16 0.16 0.16 0.16 32.125 0.16 0.16 0.15 0.15 0.15 0.15 0.15 32.273 0.15 0.15 0.15 0.15 0.15 0.15 0.15 32.421 0.15 0.15 0.15 0.15 0.15 0.15 0.15 32.568 0.15 0.15 0.15 0.15 0.14 0.14 0.14 32.716 0.14 0.14 0.14 0.14 0.14 0.14 0.14 32.864 0.14 0.14 0.14 0.14 0.14 0.14 0.14 33.011 0.14 0.14 0.14 0.14 0.14 0.14 0.14 33.159 0.14 0.13 0.13 0.13 0.13 0.13 0.13 33.307 0.13 0.13 0.13 0.13 0.13 0.13 0.13 33.454 0.13 0.13 0.13 0.13 0.13 0.13 0.13 33.602 0.13 0.13 0.13 0.13 0.13 0.13 0.13 33.750 0.12 0.12 0.12 0.12 0.12 0.12 0.12 33.897 0.12 0.12 0.12 0.12 0.12 0.12 0.12 34.045 0.12 0.12 0.12 0.12 0.12 0.12 0.12 34.193 0.12 0.12 0.12 0.12 0.12 0.12 0.12 34.340 0.12 0.11 0.11 0.11 0.11 0.11 0.11 34.488 0.11 0.11 0.11 0.11 0.11 0.11 0.11 34.636 0.11 0.11 0.11 0.11 0.11 0.11 0.11 34.783 0.11 0.11 0.11 0.11 0.11 0.11 0.11 34.931 0.11 0.11 0.11 0.11 0.11 0.10 0.10 35.079 0.10 0.10 0.10 0.10 0.10 0.10 0.10 35.226 0.10 0.10 0.10 0.10 0.10 0.10 0.10 35.374 0.10 0.10 0.10 0.10 0.10 0.10 0.10 35.522 0.10 0.10 0.10 0.10 0.10 0.10 0.10 35.669 0.10 0.10 0.10 0.10 0.10 0.09 0.09 35.817 0.09 0.09 0.09 0.09 0.09 0.09 0.09 35.965 0.09 0.09 0.09 0.09 0.09 0.09 0.09 36.112 0.09 0.09 0.09 0.09 0.09 0.09 0.09 36.260 0.09 0.09 0.09 0.09 0.09 0.09 0.09 36.408 0.09 0.09 0.09 0.09 0.09 0.09 0.09 • WinTR-55, Version 1.00.08 Page 15 5/10/2010 5:49:55 PM • Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) Ihr( Icfs) (csm) 36.555 0.09 0.08 0.08 0.08 0.08 0.08 0.08 36.703 0.08 0.08 0.08 0.08 0.08 0.08 0.08 36.851 0.08 0.08 0.08 0.08 0.08 0.08 0.08 36.998 0.08 0.08 0.08 0.08 0.08 0.08 0.08 37.146 0.08 0.08 0.08 0.08 0.08 0.08 0.08 37.293 0.08 0.08 0.08 0.08 0.08 0.08 0.08 37.441 0.08 0.08 0.08 0.07 0.07 0.07 0.07 37.589 0.07 0.07 0.07 0.07 0.07 0.07 0.07 37.736 0.07 0.07 0.07 0.07 0.07 0.07 0.07 37.884 0.07 0.07 0.07 0.07 0.07 0.07 0.07 38.032 0.07 0.07 0.07 0.07 0.07 0.07 0.07 38.179 0.07 0.07 0.07 0.07 0.07 0.07 0.07 38.327 0.07 0.07 0.07 0.07 0.07 0.07 0.07 38.475 0.07 0.07 0.07 0.07 0.06 0.06 0.06 38.622 0.06 0.06 0.06 0.06 0.06 0.06 0.06 38.770 0.06 0.06 0.06 0.06 0.06 0.06 0.06 WinTR-20 Version 1.0 Page 15 05/10/2010 17:49 Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Line • Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs( (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 38.918 0.06 0.06 0.06 0.06 0.06 0.06 0.06 39.065 0.06 0.06 0.06 0.06 0.06 0.06 0.06 39.213 0.06 0.0E 0.06 0.06 0.06 0.06 0.06 39.361 0.06 0.06 0.06 0.06 0.06 0.06 0.06 39.508 0.06 0.0E 0.06 0.06 0.06 0.06 0.06 39.656 0.06 0.06 0.06 0.06 0.06 0.06 0.05 39.804 0.05 0.05 0.05 0.05 0.05 0.05 0.05 39.951 0.05 0.05 0.05 0.05 0.05 0.05 0.05 40.099 0.05 0.05 0.05 0.05 0.05 0.05 0.05 40.247 0.05 0.05 0.05 0.05 0.05 0.05 0.05 40.394 0.05 0.05 0.05 0.05 • WinTR-55, Version 1.00.08 Page 16 5/10/2010 5:49:56 PM Cedar Creek II Wind Project • Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) WinTR-20 Version 1.0 Page 16 05/10/2010 17:49 Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Area or Drainage Peak Flow by Storm • Reach Area Alternate 2-Yr Identifier (sq mi) (cfs) (cfs) (cfs) (cfs) (cfs) DA P1 0.744E-02 2.4 DA P2 0.417E-02 1.4 DA T1 0.930E-02 3.0 DA T2 0.666E-02 3.2 Basin P 0.03 9.2 DOWNSTREAM 0.B OUTLET 0.03 0.8 • WinTR-55, Version 1.00.08 Page 17 5/10/2010 5:49:56 PM • Cedar Creek II Wind Project Developed Condition - 2-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 2-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) WinTR-20 Version 1.0 Page 17 05/10/2010 17:49 • • WinTR-55, Version 1.00.08 Page 18 5/10/2010 5:49:56 PM Cedar Creek II Wind Project Site Developed Condition 100-YR Storm Runoff Calculations for Detention Basin P • WinTR-55 Current Data Description --- Identification Data --- User: Tetra Tech Date: 5/11/2010 Project: Cedar Creek II Wind Project Units: English SubTitle: Developed Condition - 100-Yr for Basin P w/o Offsite Runoff Areal Units: Acres State: Colorado County: Weld Filename: P:\BPAE_Wind\Colorado\Cedar Creek II\Engineering\Hydrology Modeling\CCII - Final Developed Ru --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc DA P1 DA P1 w/o Offsite Runon Basin P 4.76 85 0.587 DA P2 DA P2 w/o Offsite Runon Basin P 2.67 85 0.562 DA T1 DA T1 w/o Offsite Runon Basin P 5.95 85 0.581 DA T2 DA T2 w/o Offsite Runon Basin P 4.26 86 0.334 Total area: 17.64 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period • 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr -Yr (in) (in) (in) (in) (in) (in) (in) 1.8 2.35 2.7 3.2 3.6 4.0 .0 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:35:58 AM Tetra Tech Cedar Creek II Wind Project . Developed Condition - 100-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Storm Data Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr -Yr (in) (in) (in) (in) (in) (in) (in) 1.8 2.35 2.7 3.2 3.6 4.0 .0 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> • • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:35:58 AM • Tetra Tech Cedar Creek II Wind Project Developed Condition - 100-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Watershed Peak Table Sub-Area Peak Flow by Rainfall Return Period or Reach 100-Yr Identifier (cfs) SUBAREAS DA P1 9.38 DA P2 5.38 DA Tl 11.76 DA T2 11.88 REACHES Basin P 35.86 Down 1.83 OUTLET 1.63 • • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:35:58 AM Tetra Tech Cedar Creek II Wind Project • Developed Condition - 100-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Hydrograph Peak/Peak Time Table Sub-Area Peak Flow and Peak Time (hr) by Rainfall Return Period or Reach 100-Yr Identifier (cfs) (hr) SUBAREAS DA P1 9.38 12.23 DA P2 5.38 12.20 DA T1 11.76 12.21 DA T2 11.88 12.09 REACHES Basin P 35.86 12.15 Down 1.83 15.46 OUTLET 1.83 • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:35:58 AM • Tetra Tech Cedar Creek II Wind Project Developed Condition - 100-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Structure Output Table Reach Peak Flow (PF) , Storage Volume (SV) , Stage (STG) Identifier by Rainfall Return Period Structure Identifier 100-Yr Reach: Basin P Pipe : Basin P 8(in) PP (cfs) 1.83 SV (ac ft) 2.32 STG (ft) 1.05 • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:35:58 AM Tetra Tech Cedar Creek II Wind Project • Developed Condition - 100-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Sub-Area Summary Table Sub-Area Drainage Time of Curve Receiving Sub-Area Identifier Area Concentration Number Reach Description (ac) (hr) DA P1 4.76 0.587 85 Basin P DA P1 w/o Offsite Runon DA P2 2.67 0.562 85 Basin P DA P2 w/o Offsite Runon DA Ti 5.95 0.581 85 Basin P DA Ti w/o Offsite Runon DA T2 4.26 0.334 86 Basin P DA T2 w/o Offsite Runon Total Area: 17.64 (ac) • • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:35:58 AM • Tetra Tech Cedar Creek II Wind Project Developed Condition - 100-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Reach Summary Table Receiving Reach Routing Reach Reach Length Method Identifier Identifier (ft) Basin P Outlet STRUCTURE(Basin P) • • WinTR-55, Version 1.00.OB Page 1 5/11/2010 10:35:58 AM Tetra Tech Cedar Creek II Wind Project • Developed Condition - 100-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Sub-Area Time of Concentration Details Sub-Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time (ft) (ft/ft) (sq ft) (ft( (ft/sec) (hr) DA P1 User-provided 0.587 Time of Concentration 0.587 DA P2 User-provided 0.562 Time of Concentration 0.562 DA T1 User-provided 0.581 Time of Concentration 0.581 DA T2 User-provided 0.334 Time of Concentration 0.334 • • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:35:58 AM • Tetra Tech Cedar Creek II Wind Project Developed Condition - 100-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) DA P1 Open space; grass cover < 50% (poor) B .077 79 Paved parking lots, roofs, driveways B .182 98 Gravel (w/ right-of-way) B 4.5 85 Total Area / Weighted Curve Number 4.76 85 DA P2 Open space; grass cover < 50% (poor) B .133 79 Paved parking lots, roofs, driveways B .074 98 Gravel (w/ right-of-way) B 2.459 85 Total Area / Weighted Curve Number 2.67 85 DA Tl Open space; grass cover < 50% (poor) B .307 79 Paved parking lots, roofs, driveways B .322 98 Gravel (w/ right-of-way) B 5.321 85 Total Area / Weighted Curve Number 5.95 85 DA T2 Open space; grass cover < 50% (poor) B .065 79 Paved parking lots, roofs, driveways B .2 98 • Gravel (w/ right-of-way) B 3.997 85 Total Area / Weighted Curve Number 4.26 86 • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:35:58 AM Tetra Tech Cedar Creek II Wind Project • Developed Condition - 100-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Reach Channel Rating Details Reach Reach Reach Friction Bottom Side Identifier Length Manning's Slope Width Slope (ft) n (ft/ft) (ft) Basin P (This reach is a structure: Basin P) Reach End Top Friction Identifier Stage Flow Area Width Slope (ft) (cfs) (sq ft) (ft) (ft/ft) Basin P (This reach is a structure: Basin P) • • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:35:58 AM • Tetra Tech Cedar Creek II Wind Project Developed Condition - 100-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Structure Description - User Entered Surface Height Surface Reach Area @ Above Area @ Pipe Head on Weir Identifier Crest Crest Ht Above Diameter Pipe Length (ac) (ft) (ac) (in) (ft) (ft) Basin P 2.142 1 2.257 B 0.5 • • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:35:58 AM Tetra Tech Cedar Creek II Wind Project • Developed Condition - 100-Yr for Basin P w/o Offsite Runoff Weld County, Colorado Structure Rating Details - Computed Reach Pool Flows (cfs) @ Pipe Diameter Idendifier Stage Storage Dia #1 Dia #2 Dia #3 (ft) (ac ft) 8in in in Basin P 0 0.00 0.000 0.33 0.72 1.185 0.67 1.45 1.530 1.33 2.96 2.052 3.33 7.78 3.135 6.67 16.84 4.380 13.33 38.78 6.156 • WinTR-55, version 1.00.08 Page 1 5/11/2010 10:35:58 AM • • WInTR-55 Outputttydrograph Project Cedar Creek II Wind Project 5.172070 Subarea:(Outlet) Storm:100-Yr ivriCobraloCeciarC reek IPEkg beefllgktc1robgr Male IIfgCC II-Fifal Bev.bpeO Rmat 10:1-YR Cban WllOItO*I RIIORbf Bac is P.W55 OUTLET(cfs) 1.5 0 U 0 li 1.0 .5 • .0 6. 12. 18. 24. 30. 35. 42. 48. 54. TIME(hrs) • Cedar Creek II Wind Project111 Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sg mi) Location (in) (ft) (hr) (cfs) (csm) DA P1 0.007 2.449 12.23 9.38 1260.23 Line Start Time Flow Values @ time increment of 0.037 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 8.337 0.05 0.05 0.05 0.06 0.06 0.06 0.06 8.597 0.07 0.07 0.07 0.07 0.08 0.08 0.08 8.856 0.08 0.09 0.09 0.09 0.09 0.10 0.10 9.116 0.10 0.11 0.11 0.11 0.12 0.12 0.12 9.375 0.13 0.13 0.13 0.13 0.14 0.14 0.14 9.635 0.15 0.15 0.15 0.15 0.16 0.16 0.16 9.894 0.17 0.17 0.17 0.16 0.18 0.19 0.19 10.154 0.20 0.20 0.21 0.22 0.22 0.23 0.24 10.413 0.24 0.25 0.26 0.27 0.27 0.28 0.29 10.673 0.30 0.31 0.32 0.33 0.34 0.35 0.37 10.932 0.38 0.39 0.41 0.42 0.44 0.45 0.47 11.192 0.49 0.50 0.53 0.55 0.57 0.60 0.62 11.451 0.65 0.69 0.72 0.76 0.81 0.88 0.98 11.711 1.11 1.30 1.56 1.90 2.36 2.95 3.67 11.970 4.52 5.47 6.47 7.42 8.25 8.88 9.26 12.230 9.38 9.25 8.92 8.45 7.88 7.23 6.56 12.489 5.95 5.37 4.85 4.40 4.02 3.68 3.37 12.749 3.10 2.85 2.63 2.44 2.27 2.12 1.98 • 13.006 1.86 1.76 1.66 1.58 1.50 1.44 1.37 13.266 1.32 1.27 1.22 1.18 1.14 1.10 1.07 13.527 1.04 1.01 0.98 0.95 0.93 0.90 0.88 13.787 0.86 0.85 0.83 0.81 0.80 0.78 0.77 14.046 0.75 0.74 0.73 0.71 0.70 0.69 0.68 14.306 0.67 0.66 0.65 0.64 0.63 0.63 0.62 14.565 0.61 0.61 0.60 0.59 0.59 0.58 0.58 14.825 0.57 0.57 0.56 0.56 0.56 0.55 0.55 15.084 0.54 0.54 0.53 0.53 0.53 0.52 0.52 15.344 0.51 0.51 0.50 0.50 0.50 0.49 0.49 15.604 0.48 0.48 0.47 0.47 0.47 0.46 0.46 15.863 0.45 0.45 0.44 0.44 0.44 0.43 0.43 16.123 0.42 0.42 0.42 0.41 0.41 0.40 0.40 16.382 0.40 0.40 0.39 0.39 0.39 0.39 0.36 16.642 0.38 0.38 0.38 0.38 0.37 0.37 0.37 16.901 0.37 0.37 0.37 0.36 0.36 0.36 0.36 17.161 0.36 0.36 0.35 0.35 0.35 0.35 0.35 17.420 0.35 0.35 0.34 0.34 0.34 0.34 0.34 17.680 0.34 0.33 0.33 0.33 0.33 0.33 0.33 17.939 0.33 0.32 0.32 0.32 0.32 0.32 0.32 18.199 0.31 0.31 0.31 0.31 0.31 0.31 0.31 18.456 0.30 0.30 0.30 0.30 0.30 0.30 0.30 WinTR-20 Version 1.0 Page 1 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.037 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 18.718 0.29 0.29 0.29 0.29 0.29 0.29 0.28 18.977 0.28 0.28 0.28 0.28 0.28 0.28 0.27 • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:36:54 AM • Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 19.237 0.27 0.27 0.27 0.27 0.27 0.26 0.26 19.496 0.26 0.26 0.26 0.26 0.26 0.25 0.25 19.756 0.25 0.25 0.25 0.25 0.24 0.24 0.24 20.015 0.24 0.24 0.24 0.24 0.23 0.23 0.23 20.275 0.23 0.23 0.23 0.23 0.23 0.22 0.22 20.534 0.22 0.22 0.22 0.22 0.22 0.22 0.22 20.794 0.22 0.22 0.22 0.22 0.22 0.22 0.22 21.053 0.22 0.22 0.22 0.22 0.22 0.21 0.21 21.313 0.21 0.21 0.21 0.21 0.21 0.21 0.21 21.572 0.21 0.21 0.21 0.21 0.21 0.21 0.21 21.832 0.21 0.21 0.21 0.21 0.21 0.21 0.21 22.091 0.21 0.21 0.21 0.21 0.21 0.21 0.21 22.351 0.21 0.21 0.21 0.21 0.20 0.20 0.20 22.610 0.20 0.20 0.20 0.20 0.20 0.20 0.20 22.870 0.20 0.20 0.20 0.20 0.20 0.20 0.20 23.129 0.20 0.20 0.20 0.20 0.20 0.20 0.20 23.389 0.20 0.20 0.20 0.20 0.20 0.20 0.20 23.649 0.20 0.20 0.19 0.19 0.19 0.19 0.19 23.908 0.19 0.19 0.19 0.19 0.19 0.19 0.18 24.168 0.18 0.17 0.16 0.15 0.13 0.12 0.10 24.427 0.09 0.08 0.07 0.06 Area or Drainage Rain Gage Runoff Peak Flow • Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) )hr) (cfs) (csm) DA P2 0.004 2.439 12.20 5.38 1290.86 Line Start Time Flow Values @ time increment of 0.035 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 8.931 0.05 0.05 0.05 0.06 0.06 0.06 0.06 9.179 0.06 0.06 0.07 0.07 0.07 0.07 0.07 9.428 0.07 0.08 0.06 0.08 0.08 0.08 0.08 9.676 0.08 0.09 0.09 0.09 0.09 0.09 0.09 9.925 0.10 0.10 0.10 0.10 0.11 0.11 0.11 10.173 0.11 0.12 0.12 0.12 0.13 0.13 0.13 10.422 0.14 0.14 0.15 0.15 0.16 0.16 0.17 10.670 0.17 0.18 0.18 0.19 0.19 0.20 0.21 10.919 0.21 0.22 0.23 0.24 0.24 0.25 0.26 11.167 0.27 0.28 0.29 0.30 0.31 0.33 0.34 11.416 0.36 0.37 0.39 0.41 0.43 0.46 0.50 11.664 0.55 0.62 0.72 0.85 1.03 1.26 1.56 11.913 1.94 2.39 2.90 3.46 4.02 4.53 4.94 12.161 5.23 5.38 5.38 5.25 5.02 4.73 4.37 12.409 4.00 3.63 3.28 2.96 2.68 2.44 2.23 12.658 2.04 1.87 1.72 1.59 1.47 1.36 1.27 12.906 1.18 1.11 1.05 0.99 0.94 0.89 0.85 WinTR-20 Version 1.0 Page 2 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.035 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) • WinTR-55, Version 1.00.08 Page 2 5/11/2010 10:36:54 AM Cedar Creek II Wind Project • Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 13.155 0.81 0.78 0.75 0.72 0.69 0.67 0.65 13.403 0.63 0.61 0.59 0.57 0.56 0.54 0.53 13.652 0.52 0.51 0.49 0.48 0.48 0.47 0.46 13.900 0.45 0.44 0.43 0.43 0.42 0.41 0.40 14.149 0.40 0.39 0.39 0.38 0.37 0.37 0.36 14.397 0.36 0.35 0.35 0.35 0.34 0.34 0.34 14.646 0.33 0.33 0.33 0.33 0.32 0.32 0.32 14.894 0.32 0.31 0.31 0.31 0.31 0.30 0.30 15.143 0.30 0.30 0.29 0.29 0.29 0.29 0.29 15.391 0.28 0.28 0.28 0.28 0.27 0.27 0.27 15.639 0.27 0.26 0.26 0.26 0.26 0.26 0.25 15.888 0.25 0.25 0.25 0.24 0.24 0.24 0.24 16.136 0.24 0.23 0.23 0.23 0.23 0.23 0.22 16.385 0.22 0.22 0.22 0.22 0.22 0.22 0.21 16.633 0.21 0.21 0.21 0.21 0.21 0.21 0.21 16.882 0.21 0.21 0.20 0.20 0.20 0.20 0.20 17.130 0.20 0.20 0.20 0.20 0.20 0.20 0.20 17.379 0.19 0.19 0.19 0.19 0.19 0.19 0.19 17.627 0.19 0.19 0.19 0.19 0.19 0.19 0.18 17.876 0.18 0.18 0.18 0.18 0.18 0.18 0.18 18.124 0.18 0.18 0.18 0.18 0.17 0.17 0.17 18.373 0.17 0.17 0.17 0.17 0.17 0.17 0.17 18.621 0.17 0.17 0.16 0.16 0.16 0.16 0.16 18.869 0.16 0.16 0.16 0.16 0.16 0.16 0.16 • 19.118 0.15 0.15 0.15 0.15 0.15 0.15 0.15 19.366 0.15 0.15 0.15 0.15 0.15 0.14 0.14 19.615 0.14 0.14 0.14 0.14 0.14 0.14 0.14 19.863 0.14 0.14 0.14 0.13 0.13 0.13 0.13 20.112 0.13 0.13 0.13 0.13 0.13 0.13 0.13 20.360 0.13 0.13 0.13 0.13 0.12 0.12 0.12 20.609 0.12 0.12 0.12 0.12 0.12 0.12 0.12 20.857 0.12 0.12 0.12 0.12 0.12 0.12 0.12 21.106 0.12 0.12 0.12 0.12 0.12 0.12 0.12 21.354 0.12 0.12 0.12 0.12 0.12 0.12 0.12 21.603 0.12 0.12 0.12 0.12 0.12 0.12 0.12 21.851 0.12 0.12 0.12 0.12 0.12 0.12 0.12 22.099 0.12 0.12 0.12 0.12 0.12 0.12 0.12 22.348 0.12 0.12 0.12 0.11 0.11 0.11 0.11 22.596 0.11 0.11 0.11 0.11 0.11 0.11 0.11 22.845 0.11 0.11 0.11 0.11 0.11 0.11 0.11 23.093 0.11 0.11 0.11 0.11 0.11 0.11 0.11 23.342 0.11 0.11 0.11 0.11 0.11 0.11 0.11 23.590 0.11 0.11 0.11 0.11 0.11 0.11 0.11 23.839 0.11 0.11 0.11 0.11 0.11 0.11 0.11 24.087 0.11 0.10 0.10 0.10 0.09 0.08 0.08 24.336 0.07 0.06 0.05 WinTR-20 Version 1.0 Page 3 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate • WinTR-55, Version 1.00.08 Page 3 5/11/2010 10:36:54 AM • Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) DA T1 0.009 2.451 12.21 11.76 1264.28 Line Start Time Flow Values @ time increment of 0.037 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 8.098 0.05 0.05 0.06 0.06 0.06 0.06 0.06 8.354 0.07 0.07 0.07 0.07 0.07 0.08 0.08 8.611 0.08 0.09 0.09 0.09 0.10 0.10 0.10 8.868 0.11 0.11 0.11 0.12 0.12 0.12 0.13 9.125 0.13 0.14 0.14 0.14 0.15 0.15 0.16 9.382 0.16 0.16 0.17 0.17 0.17 0.18 0.18 9.639 0.18 0.19 0.19 0.19 0.20 0.20 0.20 9.896 0.21 0.21 0.22 0.22 0.23 0.24 0.24 10.152 0.25 0.26 0.26 0.27 0.28 0.29 0.29 10.409 0.30 0.31 0.32 0.33 0.34 0.35 0.36 10.666 0.37 0.39 0.40 0.41 0.43 0.44 0.45 10.923 0.47 0.49 0.50 0.52 0.54 0.56 0.58 11.180 0.60 0.63 0.65 0.68 0.71 0.74 0.77 11.437 0.81 0.85 0.89 0.94 0.99 1.07 1.17 11.694 1.32 1.52 1.80 2.18 2.68 3.33 4.15 • 11.951 5.13 6.26 7.50 8.73 9.86 10.79 11.43 12.207 11.76 11.75 11.47 10.96 10.31 9.53 8.71 12.464 7.90 7.14 6.44 5.83 5.31 4.85 4.44 12.721 4.08 3.75 3.46 3.20 2.97 2.76 2.58 12.978 2.42 2.28 2.15 2.04 1.94 1.85 1.77 13.235 1.69 1.63 1.56 1.51 1.46 1.41 1.37 13.492 1.33 1.29 1.25 1.22 1.18 1.15 1.12 13.749 1.10 1.08 1.05 1.03 1.01 0.99 0.98 14.005 0.96 0.94 0.92 0.91 0.89 0.88 0.86 14.262 0.85 0.84 0.82 0.81 0.80 0.79 0.78 14.519 0.77 0.77 0.76 0.75 0.74 0.74 0.73 14.776 0.72 0.72 0.71 0.71 0.70 0.70 0.69 15.033 0.68 0.68 0.67 0.67 0.66 0.66 0.65 15.290 0.65 0.64 0.64 0.63 0.63 0.62 0.62 15.547 0.61 0.61 0.60 0.60 0.59 0.58 0.58 15.803 0.57 0.57 0.56 0.56 0.55 0.55 0.54 16.060 0.54 0.53 0.53 0.52 0.52 0.51 0.51 16.317 0.50 0.50 0.50 0.49 0.49 0.49 0.48 16.574 0.48 0.48 0.48 0.47 0.47 0.47 0.47 16.831 0.46 0.46 0.46 0.46 0.46 0.45 0.45 17.088 0.45 0.45 0.45 0.44 0.44 0.44 0.44 17.345 0.44 0.44 0.43 0.43 0.43 0.43 0.43 17.602 0.42 0.42 0.42 0.42 0.42 0.41 0.41 17.858 0.41 0.41 0.41 0.41 0.40 0.40 0.40 18.115 0.40 0.40 0.39 0.39 0.39 0.39 0.39 18.372 0.38 0.38 0.38 0.38 0.38 0.38 0.37 18.629 0.37 0.37 0.37 0.37 0.36 0.36 0.36 18.886 0.36 0.36 0.35 0.35 0.35 0.35 0.35 19.143 0.34 0.34 0.34 0.34 0.34 0.34 0.33 19.400 0.33 0.33 0.33 0.33 0.32 0.32 0.32 WinTR-20 Version 1.0 Page 4 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff • WinTR-55, Version 1.00.08 Page 4 5/11/2010 10:36:54 AM Cedar Creek II Wind Project • Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Line Start Time Flow Values @ time increment of 0.037 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 19.656 0.32 0.32 0.31 0.31 0.31 0.31 0.31 19.913 0.30 0.30 0.30 0.30 0.30 0.30 0.29 20.170 0.29 0.29 0.29 0.29 0.28 0.28 0.28 20.427 0.28 0.28 0.28 0.28 0.28 0.28 0.28 20.684 0.28 0.27 0.27 0.27 0.27 0.27 0.27 20.941 0.27 0.27 0.27 0.27 0.27 0.27 0.27 21.198 0.27 0.27 0.27 0.27 0.27 0.27 0.27 21.454 0.27 0.27 0.27 0.27 0.26 0.26 0.26 21.711 0.26 0.26 0.26 0.26 0.26 0.26 0.26 21.968 0.26 0.26 0.26 0.26 0.26 0.26 0.26 22.225 0.26 0.26 0.26 0.26 0.26 0.26 0.26 22.482 0.26 0.26 0.26 0.25 0.25 0.25 0.25 22.739 0.25 0.25 0.25 0.25 0.25 0.25 0.25 22.996 0.25 0.25 0.25 0.25 0.25 0.25 0.25 23.253 0.25 0.25 0.25 0.25 0.25 0.25 0.25 23.509 0.25 0.25 0.24 0.24 0.24 0.24 0.24 23.766 0.24 0.24 0.24 0.24 0.24 0.24 0.24 24.023 0.24 0.24 0.24 0.23 0.22 0.21 0.20 24.280 0.18 0.16 0.15 0.13 0.11 0.10 0.08 24.537 0.07 0.06 • Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (cam) DA T2 0.007 2.536 12.09 11.88 1784.42 Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) )cfs) 7.912 0.05 0.05 0.05 0.05 0.05 0.05 0.05 8.060 0.06 0.06 0.06 0.06 0.06 0.06 0.06 8.208 0.06 0.06 0.06 0.06 0.07 0.07 0.07 8.355 0.07 0.07 0.07 0.07 0.07 0.08 0.08 8.503 0.08 0.08 0.08 0.08 0.08 0.09 0.09 8.651 0.09 0.09 0.09 0.09 0.10 0.10 0.10 8.798 0.10 0.10 0.10 0.11 0.11 0.11 0.11 8.946 0.11 0.11 0.12 0.12 0.12 0.12 0.12 9.094 0.13 0.13 0.13 0.13 0.13 0.14 0.14 9.241 0.14 0.14 0.14 0.14 0.14 0.15 0.15 9.389 0.15 0.15 0.15 0.15 0.15 0.15 0.16 9.537 0.16 0.16 0.16 0.16 0.16 0.16 0.16 9.684 0.17 0.17 0.17 0.17 0.17 0.18 0.18 9.832 0.18 0.18 0.19 0.19 0.19 0.19 0.20 9.980 0.20 0.20 0.21 0.21 0.21 0.22 0.22 10.127 0.22 0.23 0.23 0.23 0.24 0.24 0.25 10.275 0.25 0.25 0.26 0.26 0.27 0.27 0.28 10.423 0.28 0.29 0.29 0.30 0.30 0.31 0.31 10.570 0.32 0.32 0.33 0.33 0.34 0.35 0.35 10.718 0.36 0.37 0.37 0.38 0.39 0.40 0.40 WinTR-20 Version 1.0 Page 5 05/11/2010 10:36 Cedar Creek II Wind Project • WinTR-55, Version 1.00.08 Page 5 5/11/2010 10:36:54 AM • Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 10.866 0.41 0.42 0.43 0.44 0.45 0.45 0.46 11.013 0.47 0.48 0.49 0.50 0.51 0.52 0.53 11.161 0.55 0.56 0.57 0.59 0.60 0.62 0.63 11.309 0.65 0.67 0.69 0.71 0.73 0.75 0.77 11.456 0.79 0.82 0.84 0.86 0.89 0.93 0.98 11.604 1.04 1.13 1.25 1.39 1.56 1.77 2.03 11.752 2.33 2.68 3.06 3.51 4.02 4.61 5.28 11.899 6.04 6.88 7.77 8.68 9.57 10.37 11.04 12.047 11.52 11.80 11.88 11.75 11.37 10.80 10.11 12.195 9.35 8.56 7.79 7.07 6.39 5.78 5.24 12.342 4.78 4.39 4.05 3.75 3.49 3.25 3.04 12.490 2.85 2.68 2.52 2.38 2.25 2.13 2.03 12.638 1.93 1.84 1.75 1.68 1.61 1.55 1.49 12.785 1.44 1.40 1.36 1.32 1.28 1.25 1.22 12.933 1.20 1.17 1.15 1.13 1.11 1.09 1.07 13.081 1.05 1.03 1.02 1.00 0.99 0.97 0.96 13.228 0.95 0.93 0.92 0.91 0.90 0.89 0.88 • 13.376 0.87 0.86 0.85 0.84 0.83 0.82 0.81 13.524 0.80 0.79 0.78 0.78 0.77 0.76 0.75 13.671 0.74 0.73 0.73 0.72 0.71 0.70 0.70 13.819 0.69 0.68 0.68 0.67 0.66 0.66 0.65 13.967 0.64 0.64 0.63 0.62 0.62 0.61 0.61 14.114 0.60 0.60 0.59 0.58 0.58 0.56 0.57 14.262 0.57 0.56 0.56 0.56 0.55 0.55 0.55 14.410 0.54 0.54 0.54 0.54 0.53 0.53 0.53 14.557 0.53 0.52 0.52 0.52 0.52 0.52 0.51 14.705 0.51 0.51 0.51 0.50 0.50 0.50 0.50 14.853 0.50 0.49 0.49 0.49 0.49 0.49 0.48 15.000 0.48 0.48 0.48 0.47 0.47 0.47 0.47 15.148 0.47 0.46 0.46 0.46 0.46 0.46 0.45 15.295 0.45 0.45 0.45 0.44 0.44 0.44 0.44 15.443 0.44 0.43 0.43 0.43 0.43 0.42 0.42 15.591 0.42 0.42 0.42 0.41 0.41 0.41 0.41 15.738 0.40 0.40 0.40 0.40 0.40 0.39 0.39 15.886 0.39 0.39 0.39 0.38 0.38 0.38 0.38 16.034 0.37 0.37 0.37 0.37 0.37 0.36 0.36 16.181 0.36 0.36 0.36 0.36 0.35 0.35 0.35 16.329 0.35 0.35 0.35 0.35 0.35 0.34 0.34 16.477 0.34 0.34 0.34 0.34 0.34 0.34 0.34 16.624 0.34 0.34 0.34 0.33 0.33 0.33 0.33 16.772 0.33 0.33 0.33 0.33 0.33 0.33 0.33 16.920 0.33 0.33 0.32 0.32 0.32 0.32 0.32 17.067 0.32 0.32 0.32 0.32 0.32 0.32 0.32 17.215 0.32 0.31 0.31 0.31 0.31 0.31 0.31 17.363 0.31 0.31 0.31 0.31 0.31 0.31 0.31 17.510 0.30 0.30 0.30 0.30 0.30 0.30 0.30 17.658 0.30 0.30 0.30 0.30 0.30 0.30 0.29 17.806 0.29 0.29 0.29 0.29 0.29 0.29 0.29 17.953 0.29 0.29 0.29 0.29 0.28 0.28 0.28 18.101 0.28 0.28 0.28 0.28 0.28 0.28 0.28 18.249 0.28 0.28 0.28 0.27 0.27 0.27 0.27 • WinTR-20 Version 1.0 Page 6 05/11/2010 10:36 WinTR-55, Version 1.00.08 Page 6 5/11/2010 10:36:54 AM Cedar Creek II Wind Project • Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) )cfs) (cfs) (cfs) (cfs) 18.396 0.27 0.27 0.27 0.27 0.27 0.27 0.27 18.544 0.27 0.27 0.26 0.26 0.26 0.26 0.26 18.692 0.26 0.26 0.26 0.26 0.26 0.26 0.26 18.839 0.25 0.25 0.25 0.25 0.25 0.25 0.25 18.987 0.25 0.25 0.25 0.25 0.25 0.25 0.24 19.135 0.24 0.24 0.24 0.24 0.24 0.24 0.24 19.282 0.24 0.24 0.24 0.24 0.23 0.23 0.23 19.430 0.23 0.23 0.23 0.23 0.23 0.23 0.23 19.578 0.23 0.23 0.23 0.22 0.22 0.22 0.22 19.725 0.22 0.22 0.22 0.22 0.22 0.22 0.22 19.873 0.22 0.21 0.21 0.21 0.21 0.21 0.21 20.021 0.21 0.21 0.21 0.21 0.21 0.21 0.21 20.168 0.20 0.20 0.20 0.20 0.20 0.20 0.20 20.316 0.20 0.20 0.20 0.20 0.20 0.20 0.20 20.464 0.20 0.20 0.20 0.20 0.20 0.20 0.20 20.611 0.20 0.20 0.20 0.20 0.20 0.20 0.20 • 20.759 0.20 0.20 0.20 0.20 0.20 0.20 0.20 20.907 0.20 0.20 0.20 0.20 0.20 0.20 0.20 21.054 0.20 0.19 0.19 0.19 0.19 0.19 0.19 21.202 0.19 0.19 0.19 0.19 0.19 0.19 0.19 21.350 0.19 0.19 0.19 0.19 0.19 0.19 0.19 21.497 0.19 0.19 0.19 0.19 0.19 0.19 0.19 21.645 0.19 0.19 0.19 0.19 0.19 0.19 0.19 21.793 0.19 0.19 0.19 0.19 0.19 0.19 0.19 21.940 0.19 0.19 0.19 0.19 0.19 0.19 0.19 22.088 0.19 0.19 0.19 0.19 0.19 0.19 0.19 22.236 0.19 0.19 0.19 0.19 0.19 0.19 0.19 22.383 0.19 0.19 0.18 0.18 0.18 0.18 0.18 22.531 0.18 0.18 0.18 0.18 0.18 0.18 0.18 22.679 0.18 0.18 0.18 0.18 0.18 0.18 0.18 22.826 0.18 0.18 0.18 0.18 0.18 0.18 0.18 22.974 0.18 0.18 0.18 0.18 0.18 0.18 0.18 23.122 0.18 0.18 0.18 0.18 0.18 0.18 0.18 23.269 0.18 0.18 0.18 0.18 0.18 0.18 0.18 23.417 0.18 0.18 0.18 0.18 0.18 0.18 0.18 23.565 0.18 0.18 0.18 0.18 0.18 0.18 0.18 23.712 0.18 0.18 0.18 0.17 0.17 0.17 0.17 23.860 0.17 0.17 0.17 0.17 0.17 0.17 0.17 24.008 0.17 0.17 0.17 0.17 0.16 0.16 0.15 24.155 0.13 0.12 0.11 0.10 0.08 0.07 0.06 24.303 0.05 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Basin P 0.028 Upstream 2.469 12.15 35.86 1300.54 WinTR-55, Version 1.00.08 Page 7 5/11/2010 10:36:54 AM • • Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) WinTR-20 Version 1.0 Page 7 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 7.912 0.05 0.05 0.05 0.05 0.05 0.05 0.05 8.060 0.06 0.06 0.09 0.11 0.11 0.11 0.12 8.208 0.12 0.12 0.12 0.12 0.13 0.13 0.14 8.355 0.18 0.19 0.19 0.20 0.20 0.21 0.21 8.503 0.21 0.22 0.22 0.23 0.23 0.23 0.24 8.651 0.24 0.25 0.25 0.26 0.26 0.27 0.27 8.798 0.28 0.28 0.29 0.29 0.30 0.32 0.35 8.946 0.37 0.37 0.38 0.39 0.39 0.40 0.41 9.094 0.42 0.42 0.43 0.44 0.44 0.45 0.46 9.241 0.46 0.47 0.46 0.48 0.49 0.50 0.50 9.389 0.51 0.51 0.52 0.52 0.53 0.54 0.54 9.537 0.55 0.55 0.56 0.56 0.57 0.57 0.58 9.684 0.58 0.59 0.60 0.60 0.61 0.62 0.63 • 9.832 0.63 0.64 0.65 0.66 0.67 0.68 0.69 9.980 0.70 0.71 0.72 0.73 0.74 0.75 0.76 10.127 0.77 0.78 0.80 0.81 0.82 0.84 0.85 10.275 0.86 0.88 0.89 0.91 0.92 0.94 0.95 10.423 0.97 0.99 1.01 1.02 1.04 1.06 1.08 10.570 1.10 1.12 1.13 1.15 1.18 1.20 1.22 10.718 1.24 1.2E 1.29 1.31 1.34 1.36 1.39 10.866 1.42 1.44 1.47 1.50 1.53 1.56 1.59 11.013 1.63 1.66 1.69 1.73 1.76 1.80 1.84 11.161 1.88 1.92 1.96 2.01 2.05 2.10 2.16 11.309 2.21 2.27 2.33 2.39 2.45 2.52 2.59 11.456 2.66 2.73 2.81 2.89 2.98 3.09 3.22 11.604 3.38 3.57 3.83 4.13 4.50 4.95 5.48 11.752 6.14 6.88 7.76 8.77 9.95 11.34 12.87 11.899 14.70 16.68 18.84 21.14 23.48 25.87 28.13 12.047 30.21 32.03 33.60 34.72 35.50 35.86 35.85 12.195 35.62 34.98 34.24 33.26 32.16 30.97 29.68 12.342 28.41 27.07 25.74 24.39 23.07 21.78 20.55 12.490 19.37 18.25 17.21 16.23 15.36 14.53 13.78 12.638 13.09 12.43 11.83 11.27 10.74 10.25 9.78 12.785 9.36 8.95 8.58 8.24 7.91 7.61 7.33 12.933 7.07 6.83 6.60 6.39 6.19 6.01 5.64 13.081 5.68 5.53 5.38 5.25 5.12 5.00 4.89 13.228 4.76 4.67 4.58 4.48 4.40 4.31 4.23 13.376 4.16 4.08 4.01 3.95 3.88 3.82 3.76 13.524 3.70 3.64 3.59 3.54 3.48 3.43 3.38 13.671 3.34 3.29 3.25 3.21 3.17 3.13 3.10 13.819 3.06 3.03 3.00 2.96 2.93 2.90 2.87 13.967 2.84 2.81 2.78 2.75 2.73 2.70 2.67 14.114 2.64 2.62 2.59 2.57 2.54 2.52 2.50 14.262 2.48 2.45 2.43 2.41 2.40 2.38 2.36 14.410 2.35 2.33 2.31 2.30 2.29 2.27 2.26 14.557 2.25 2.23 2.22 2.21 2.20 2.19 2.18 14.705 2.17 2.16 2.15 2.14 2.13 2.12 2.11 14.853 2.10 2.09 2.08 2.07 2.06 2.05 2.04 • 15.000 2.03 2.02 2.01 2.00 1.99 1.99 1.98 WinTR-55, Version 1.00.08 Page 8 5/11/2010 10:36:54 AM Cedar Creek II Wind Project • Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 15.148 1.97 1.96 1.95 1.94 1.93 1.92 1.91 15.295 1.90 1.90 1.89 1.88 1.87 1.86 1.85 WinTR-20 Version 1.0 Page 8 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 15.443 1.84 1.83 1.82 1.82 1.81 1.80 1.79 15.591 1.78 1.77 1.76 1.75 1.74 1.73 1.73 15.738 1.72 1.71 1.70 1.69 1.68 1.67 1.66 15.886 1.65 1.65 1.64 1.63 1.62 1.61 1.60 16.034 1.59 1.58 1.57 1.57 1.56 1.55 1.54 16.181 1.53 1.52 1.52 1.51 1.50 1.49 1.49 16.329 1.48 1.47 1.47 1.46 1.46 1.45 1.45 16.477 1.44 1.44 1.43 1.43 1.42 1.42 1.41 16.624 1.41 1.41 1.40 1.40 1.39 1.39 1.39 16.772 1.38 1.38 1.38 1.37 1.37 1.37 1.36 16.920 1.36 1.36 1.35 1.35 1.35 1.34 1.34 17.067 1.34 1.33 1.33 1.33 1.32 1.32 1.32 . 17.215 1.31 1.31 1.31 1.30 1.30 1.30 1.29 17.363 1.29 1.29 1.28 1.28 1.28 1.27 1.27 17.510 1.27 1.26 1.26 1.26 1.25 1.25 1.25 17.658 1.25 1.24 1.24 1.24 1.23 1.23 1.23 17.806 1.22 1.22 1.22 1.21 1.21 1 .21 1.20 17.953 1.20 1.20 1 .19 1.19 1.19 1.16 1.16 16.101 1.18 1.17 1.17 1.17 1.17 1.16 1.16 18.249 1.16 1.15 1.15 1.15 1.14 1.14 1.14 16.396 1.13 1.13 1.13 1.12 1.12 1.12 1.11 18.544 1.11 1.11 1.10 1.10 1.10 1.09 1.09 18.692 1.09 1.08 1.08 1.08 1.07 1.07 1.07 18.639 1.07 1 .06 1.06 1.06 1.05 1.05. 1.05 18.987 1.04 1.04 1.04 1.03 1.03 1.03 1.02 19.135 1.02 1.02 1.01 1.01 1.01 1.00 1.00 19.282 1.00 0.99 0.99 0.99 0.98 0.98 0.96 19.430 0.97 0.97 0.97 0.96 0.96 0.96 0.95 19.578 0.95 0.95 0.94 0.94 0.94 0.93 0.93 19.725 0.93 0.93 0.92 0.92 0.92 0.91 0.91 19.873 0.91 0.90 0.90 0.90 0.89 0.89 0.89 20.021 0.88 0.88 0.88 0.87 0.87 0.87 0.86 20.168 0.86 0.86 0.85 0.85 0.85 0.85 0.84 20.316 0.84 0.84 0.84 0.84 0.83 0.83 0.83 20.464 0.83 0.83 0.83 0.83 0.82 0.82 0.82 20.611 0.82 0.82 0.82 0.82 0.82 0.82 0.81 20.759 0.81 0.81 0.81 0.81 0.81 0.81 0.81 20.907 0.81 0.81 0.81 0.81 0.81 0.80 0.80 21.054 0.80 0.80 0.80 0.80 0.80 0.80 0.80 21.202 0.80 0.80 0.80 0.80 0.80 0.60 0.80 21.350 0.79 0.79 0.79 0.79 0.79 0.79 0.79 21.497 0.79 0.79 0.79 0.79 0.79 0.79 0.79 21.645 0.79 0.78 0.78 0.78 0.78 0.78 0.78 21.793 0.78 0.78 0.78 0.78 0.78 0.78 0.78 21.940 0.78 0.78 0.7B 0.77 0.77 0.77 0.77 22.088 0.77 0.77 0.77 0.77 0.77 0.77 0.77 22.236 0.77 0.77 0.77 0.77 0.77 0.76 0.76 . WinTR-55, Version 1.00.08 Page 9 5/11/2010 10:36:54 AM • Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) )ft) (hr) )cfs) (csm) 22.383 0.76 0.76 0.76 0.76 0.76 0.76 0.76 22.531 0.76 0.76 0.76 0.76 0.76 0.76 0.76 22.679 0.75 0.75 0.75 0.75 0.75 0.75 0.75 22.826 0.75 0.75 0.75 0.75 0.75 0.75 0.75 WinTR-20 Version 1.0 Page 9 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 22.974 0.75 0.74 0.74 0.74 0.74 0.74 0.74 23.122 0.74 0.74 0.74 0.74 0.74 0.74 0.74 23.269 0.74 0.74 0.74 0.73 0.73 0.73 0.73 23.417 0.73 0.73 0.73 0.73 0.73 0.73 0.73 23.565 0.73 0.73 0.73 0.73 0.72 0.72 0.72 23.712 0.72 0.72 0.72 0.72 0.72 0.72 0.72 23.860 0.72 0.72 0.72 0.72 0.72 0.72 0.71 24.008 0.71 0.71 0.71 0.70 0.69 0.68 0.66 24.155 0.64 0.62 0.59 0.56 0.53 0.50 0.47 . 24.303 0.44 0.40 0.34 0.31 0.29 0.27 0.25 24.451 0.22 0.18 0.15 0.14 0.13 0.11 0.07 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Basin P 0.028 Downstream 2.447 1.06 15.46 1.63 66.55 Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 9.410 0.05 0.05 0.05 0.05 0.06 0.06 0.06 9.558 0.06 0.06 0.06 0.06 0.07 0.07 0.07 9.705 0.07 0.07 0.07 0.07 0.08 0.08 0.08 9.653 0.08 0.08 0.08 0.09 0.09 0.09 0.09 10.001 0.09 0.09 0.10 0.10 0.10 0.10 0.10 10.148 0.11 0.11 0.11 0.11 0.11 0.12 0.12 10.296 0.12 0.12 0.12 0.13 0.13 0.13 0.13 10.444 0.14 0.14 0.14 0.14 0.15 0.15 0.15 10.591 0.15 0.16 0.16 0.16 0.17 0.17 0.17 10.739 0.17 0.18 0.18 0.18 0.19 0.19 0.19 10.887 0.20 0.20 0.21 0.21 0.21 0.22 0.22 11.034 0.22 0.23 0.23 0.24 0.24 0.25 0.25 11.182 0.26 0.26 0.27 0.27 0.28 0.28 0.29 11.330 0.29 0.30 0.30 0.31 0.32 0.32 0.33 11.477 0.34 0.34 0.35 0.36 0.37 0.37 0.38 11.625 0.39 0.40 0.41 0.42 0.43 0.45 0.46 11.773 0.48 0.50 0.52 0.55 0.56 0.61 0.65 11.920 0.69 0.74 0.79 0.86 0.92 1.00 1.08 12.066 1.17 1.21 1.23 1.26 1.29 1.32 1.35 12.216 1.37 1.40 1.43 1.45 1.48 1.50 1.52 12.363 1.54 1.56 1.57 1.58 1.60 1.61 1.62 12.511 1.63 1.64 1.65 1.66 1.67 1.67 1.68 • 12.659 1.69 1.69 1.70 1.70 1.71 1.71 1.72 WinTR-55, Version 1.00.08 Page 10 5/11/2010 10:36:54 AM Cedar Creek II Wind Project • Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 12.806 1.72 1.73 1.73 1.74 1.74 1.74 1.75 12.954 1.75 1.75 1.76 1.76 1.76 1.76 1.77 13.102 1.77 1.77 1.77 1.77 1.78 1.78 1.78 13.249 1.78 1.78 1.79 1.79 1.79 1.79 1.79 13.397 1.79 1.79 1.80 1.80 1.80 1.80 1.80 13.545 1.80 1.80 1.80 1.80 1.81 1.81 1.81 WinTR-20 Version 1.0 Page 10 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 13.692 1.81 1.81 1.81 1.81 1.81 1.81 1.81 13.840 1.81 1.81 1.82 1.82 1.82 1.82 1.82 13.968 1.82 1.82 1.82 1.82 1.82 1.82 1.82 14.135 1.82 1.82 1.82 1.82 1.82 1.82 1.83 14.283 1.83 1.83 1.83 1.83 1.83 1.83 1.83 14.431 1.83 1.83 1.83 1.83 1.83 1.83 1.83 14.578 1.83 1.83 1.83 1.83 1.83 1.63 1.83 14.726 1.83 1.83 1.63 1.83 1.83 1.83 1.63 14.874 1.63 1.63 1.83 1.83 1.83 1.83 1.83 • 15.021 1.83 1.83 1.83 1.83 1.63 1.83 1.83 15.169 1.83 1.83 1.83 1.83 1.63 1.83 1.83 15.317 1.83 1.83 1.83 1.83 1.83 1.83 1.83 15.464 1.83 1.83 1.83 1.63 1.83 1.63 1.83 15.612 1.83 1.83 1.83 1.83 1.83 1.63 1.83 15.760 1.83 1.83 1.83 1.83 1.83 1.83 1.83 15.907 1.83 1.63 1.83 1.83 1.83 1.83 1.63 16.055 1.83 1.63 1.83 1.83 1.83 1.83 1.83 16.203 1.83 1.83 1.83 1.83 1.83 1.63 1.83 16.350 1.83 1.83 1.83 1.83 1.83 1.83 1.83 16.498 1.83 1.83 1.83 1.83 1.83 1.83 1.83 16.646 1.83 1.83 1.83 1.83 1.83 1.63 1.83 16.793 1.82 1.82 1.82 1.82 1.82 1.62 1.82 16.941 1.82 1.82 1.82 1.82 1.82 1.82 1.82 17.089 1.82 1.82 1.82 1.82 1.82 1.82 1.82 17.236 1.82 1.82 1.82 1.82 1.82 1.82 1.82 17.384 1.82 1.82 1.82 1.82 1.82 1.82 1.81 17.532 1.81 1.81 1.81 1.81 1.81 1.81 1.81 17.679 1.81 1.81 1.81 1.81 1.81 1.81 1.81 17.827 1.81 1.81 1.81 1.81 1.81 1.81 1.81 17.975 1.81 1.81 1.81 1.81 1.81 1.81 1.80 18.122 1.80 1.80 1.80 1.80 1.80 1.80 1.80 18.270 1.80 1.80 1.80 1.80 1.80 1.80 1.80 18.418 1.80 1.80 1.80 1.80 1.80 1.80 1.80 18.565 1.80 1.80 1.80 1.79 1.79 1.79 1.79 16.713 1.79 1.79 1.79 1.79 1.79 1.79 1.79 18.861 1.79 1.79 1.79 1.79 1.79 1.79 1.79 19.008 1.79 1.79 1.79 1.79 1.79 1.78 1.78 19.156 1.78 1.78 1.78 1.78 1.78 1.78 1.78 19.303 1.78 1.78 1.78 1.78 1.78 1.76 1.78 19.451 1.78 1.78 1.76 1.78 1.78 1.77 1.77 19.599 1.77 1.77 1.77 1.77 1.77 1.77 1.77 19.746 1.77 1.77 1.77 1.77 1.77 1.77 1.77 19.894 1.77 1.77 1.77 1.77 1.76 1.76 1.76 • WinTR-55, Version 1.00.08 Page 11 5/11/2010 10:36:54 AM • Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 20.042 1.76 1.76 1.76 1.76 1.76 1.76 1.76 20.189 1.76 1.76 1.76 1.76 1.76 1.76 1.76 20.337 1.76 1.75 1.75 1.75 1.75 1.75 1.75 20.485 1.75 1.75 1.75 1.75 1.75 1.75 1.75 20.632 1.75 1.75 1.75 1.75 1.75 1.74 1.74 20.780 1.74 1.74 1.74 1.74 1.74 1.74 1.74 20.928 1.74 1.74 1.74 1.74 1.74 1.74 1.74 21.075 1.74 1.74 1.73 1.73 1.73 1.73 1.73 WinTR-20 Version 1.0 Page 11 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 21.223 1.73 1.73 1.73 1.73 1.73 1.73 1.73 21.371 1.73 1.73 1.73 1.73 1.73 1.73 1.72 21.518 1.72 1.72 1.72 1.72 1.72 1.72 1.72 21.666 1.72 1.72 1.72 1.72 1.72 1.72 1.72 21.814 1.72 1.72 1.71 1.71 1.71 1.71 1.71 • 21.961 1.71 1.71 1.71 1.71 1.71 1.71 1.71 22.109 1.71 1.71 1.71 1.71 1.71 1.71 1.70 22.257 1.70 1.70 1.70 1.70 1.70 1.70 1.70 22.404 1.70 1.70 1.70 1.70 1.70 1.70 1.70 22.552 1.70 1.70 1.70 1.69 1.69 1.69 1.69 22.700 1.69 1.69 1.69 1.69 1.69 1.69 1.69 22.847 1.69 1.69 1.69 1.69 1.69 1.69 1.68 22.995 1.68 1.68 1.68 1.68 1.68 1.68 1.68 23.143 1.66 1.68 1.66 1.68 1.68 1.68 1.68 23.290 1.68 1.66 1.68 1.67 1.67 1.67 1.67 23.438 1.67 1.67 1.67 1.67 1.67 1.67 1.67 23.586 1.67 1.67 1.67 1.67 1.67 1.67 1.67 23.733 1.66 1.66 1.66 1.66 1.66 1.66 1.66 23.881 1.66 1.66 1.66 1.66 1.66 1.66 1.66 24.029 1.66 1.66 1.66 1.65 1.65 1.65 1.65 24.176 1.65 1.65 1.65 1.65 1.65 1.65 1.65 24.324 1.65 1.65 1.65 1.65 1.64 1.64 1.64 24.472 1.64 1.64 1.64 1.64 1.64 1.64 1.64 24.619 1.64 1.63 1.63 1.63 1.63 1.63 1.63 24.767 1.63 1.63 1.63 1.63 1.62 1.62 1.62 24.915 1.62 1.62 1.62 1.62 1.62 1.62 1.62 25.062 1.61 1.61 1.61 1.61 1.61 1.61 1.61 25.210 1.61 1.61 1.61 1.61 1.60 1.60 1.60 25.356 1.60 1.60 1.60 1.60 1.60 1.60 1.60 25.505 1.59 1.59 1.59 1.59 1.59 1.59 1.59 25.653 1.59 1.59 1.59 1.58 1.58 1.58 1.58 25.801 1.58 1.58 1.56 1.58 1.58 1.58 1.58 25.948 1.57 1.57 1.57 1.57 1.57 1.57 1.57 26.096 1.57 1.57 1.57 1.57 1.56 1.56 1.56 26.244 1.56 1.56 1.56 1.56 1.56 1.56 1.56 26.391 1.55 1.55 1.55 1.55 1.55 1.55 1.55 26.539 1.55 1.55 1.55 1.55 1.54 1.54 1.54 26.687 1.54 1.54 1.54 1.54 1.54 1.54 1.54 26.834 1.54 1.53 1.53 1.53 1.53 1.53 1.53 26.982 1.53 1.53 1.53 1.52 1.52 1.52 1.52 III 27.130 1.52 1.52 1.52 1.52 1.51 1.51 1.51 WinTR-55, Version 1.00.08 Page 12 5/11/2010 10:36:54 AM Cedar Creek II Wind Project • Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 27.277 1.51 1.51 1.51 1.51 1.51 1.50 1.50 27.425 1.50 1.50 1.50 1.50 1.50 1.50 1.49 27.573 1.49 1.49 1.49 1.49 1.49 1.49 1.49 27.720 1.48 1.48 1.48 1.48 1.48 1.48 1.48 27.868 1.48 1.48 1.47 1.47 1.47 1.47 1.47 28.016 1.47 1.47 1.47 1.46 1.46 1.46 1.46 28.163 1.46 1.46 1.46 1.46 1.45 1.45 1.45 26.311 1.45 1.45 1.45 1.45 1.45 1.44 1.44 28.459 1.44 1.44 1.44 1.44 1.44 1.44 1.44 28.606 1.43 1.43 1.43 1.43 1.43 1.43 1.43 WinTR-20 Version 1.0 Page 12 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 28.754 1.43 1.42 1.42 1.42 1.42 1.42 1.42 28.902 1.42 1.42 1.42 1.41 1.41 1.41 1.41 29.049 1.41 1.41 1.41 1.41 1.41 1.40 1.40 29.197 1.40 1.40 1.40 1.40 1.40 1.40 1.39 29.345 1.39 1.39 1.39 1.39 1.39 1.39 1.39 • 29.492 1.39 1.38 1.38 1.38 1.38 1.38 1.38 29.640 1.38 1.38 1.38 1.37 1.37 1.37 1.37 29.788 1.37 1.37 1.37 1.37 1.37 1.36 1.36 29.935 1.36 1.36 1.36 1.36 1.36 1.36 1.35 30.083 1.35 1.35 1.35 1.35 1.35 1.35 1.35 30.231 1.35 1.34 1.34 1.34 1.34 1.34 1.34 30.378 1.34 1.34 1.34 1.34 1.33 1.33 1.33 30.526 1.33 1.33 1.33 1.33 1.33 1.33 1.32 30.674 1.32 1.32 1.32 1.32 1.32 1.32 1.32 30.821 1.32 1.31 1.31 1.31 1.31 1.31 1.31 30.969 1.31 1.31 1.31 1.30 1.30 1.30 1.30 31.117 1.30 1.30 1.30 1.30 1.30 1.29 1.29 31.264 1.29 1.29 1.29 1.29 1.29 1.29 1.29 31.412 1.29 1.28 1.28 1.28 1.28 1.28 1.28 31.560 1.28 1.28 1.28 1.27 1.27 1.27 1.27 31.707 1.27 1.27 1.27 1.27 1.27 1.27 1.26 31.855 1.26 1.26 1.26 1.26 1.26 1.26 1.26 32.003 1.26 1.26 1.25 1.25 1.25 1.25 1.25 32.150 1.25 1.25 1.25 1.25 1.24 1.24 1.24 32.298 1.24 1.24 1.24 1.24 1.24 1.24 1.24 32.446 1.23 1.23 1.23 1.23 1.23 1.23 1.23 32.593 1.23 1.23 1.23 1.22 1.22 1.22 1.22 32.741 1.22 1.22 1.22 1.22 1.22 1.22 1.21 32.889 1.21 1.21 1.21 1.21 1.21 1.21 1.21 33.036 1.21 1.21 1.20 1.20 1.20 1.20 1.20 33.184 1.20 1.20 1.20 1.20 1.20 1.19 1.19 33.331 1.19 1.19 1.19 1.19 1.19 1.19 1.19 33.479 1.19 1.18 1.18 1.18 1.17 1.17 1.17 33.627 1.16 1.16 1.16 1.15 1.15 1.15 1.14 33.774 1.14 1.14 1.13 1.13 1.13 1.12 1.12 33.922 1.12 1.11 1.11 1.11 1.11 1.10 1.10 34.070 1.10 1.09 1.09 1.09 1.08 1.06 1.08 34.217 1.07 1.07 1.07 1.06 1.06 1.06 1.06 34.365 1.05 1.05 1.05 1.04 1.04 1.04 1.03 • WinTR-55, Version 1.00.08 Page 13 5/11/2010 10:36:54 AM • Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 34.513 1.03 1.03 1.03 1.02 1.02 1.02 1.01 34.660 1.01 1.01 1.01 1.00 1.00 1.00 0.99 34.808 0.99 0.99 0.99 0.98 0.98 0.98 0.97 34.956 0.97 0.97 0.97 0.96 0.96 0.96 0.95 35.103 0.95 0.95 0.95 0.94 0.94 0.94 0.94 35.251 0.93 0.93 0.93 0.93 0.92 0.92 0.92 35.399 0.91 0.91 0.91 0.91 0.90 0.90 0.90 35.546 0.90 0.89 0.89 0.89 0.89 0.88 0.88 35.694 0.88 0.88 0.87 0.87 0.87 0.87 0.86 35.842 0.86 0.86 0.86 0.85 0.85 0.65 0.85 35.989 0.84 0.84 0.84 0.84 0.83 0.63 0.83 36.137 0.83 0.82 0.82 0.82 0.82 0.82 0.81 WinTR-20 Version 1.0 Page 13 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 36.285 0.61 0.61 0.61 0.80 0.80 0.80 0.80 • 36.432 0.79 0.79 0.79 0.79 0.79 0.76 0.78 36.580 0.76 0.78 0.77 0.77 0.77 0.77 0.77 36.728 0.76 0.76 0.76 0.76 0.75 0.75 0.75 36.875 0.75 0.75 0.74 0.74 0.74 0.74 0.74 37.023 0.73 0.73 0.73 0.73 0.72 0.72 0.72 37.171 0.72 0.72 0.71 0.71 0.71 0.71 0.71 37.318 0.70 0.70 0.70 0.70 0.70 0.69 0.69 37.466 0.69 0.69 0.69 0.68 0.68 0.68 0.68 37.614 0.68 0.67 0.67 0.67 0.67 0.67 0.67 37.761 0.66 0.6E 0.66 0.66 0.66 0.65 0.65 37.909 0.65 0.65 0.65 0.64 0.64 0.64 0.64 38.057 0.64 0.64 0.63 0.63 0.63 0.63 0.63 38.204 0.62 0.62 0.62 0.62 0.62 0.62 0.61 38.352 0.61 0.61 0.61 0.61 0.61 0.60 0.60 38.500 0.60 0.60 0.60 0.59 0.59 0.59 0.59 38.647 0.59 0.59 0.58 0.58 0.58 0.58 0.58 38.795 0.58 0.57 0.57 0.57 0.57 0.57 0.57 38.943 0.56 0.56 0.56 0.56 0.56 0.56 0.56 39.090 0.55 0.55 0.55 0.55 0.55 0.55 0.54 39.238 0.54 0.54 0.54 0.54 0.54 0.53 0.53 39.386 0.53 0.53 0.53 0.53 0.53 0.52 0.52 39.533 0.52 0.52 0.52 0.52 0.52 0.51 0.51 39.681 0.51 0.51 0.51 0.51 0.50 0.50 0.50 39.829 0.50 0.50 0.50 0.50 0.49 0.49 0.49 39.976 0.49 0.49 0.49 0.49 0.49 0.48 0.48 40.124 0.48 0.48 0.48 0.48 0.48 0.47 0.47 40.272 0.47 0.47 0.47 0.47 0.47 0.46 0.46 40.419 0.46 0.46 0.46 0.46 0.46 0.46 0.45 40.567 0.45 0.45 0.45 0.45 0.45 0.45 0.45 40.715 0.44 0.44 0.44 0.44 0.44 0.44 0.44 40.862 0.43 0.43 0.43 0.43 0.43 0.43 0.43 41.010 0.43 0.43 0.42 0.42 0.42 0.42 0.42 41.158 0.42 0.42 0.42 0.41 0.41 0.41 0.41 41.305 0.41 0.41 0.41 0.41 0.40 0.40 0.40 41.453 0.40 0.40 0.40 0.40 0.40 0.40 0.39 • 41.601 0.39 0.39 0.39 0.39 0.39 0.39 0.39 WinTR-55, Version 1.00.08 Page 14 5/11/2010 10:36:54 AM Cedar Creek II Wind Project • Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 41.748 0.39 0.38 0.38 0.38 0.38 0.38 0.38 41.896 0.38 0.38 0.38 0.37 0.37 0.37 0.37 42.044 0.37 0.37 0.37 0.37 0.37 0.37 0.36 42.191 0.36 0.36 0.36 0.36 0.36 0.36 0.36 42.339 0.36 0.35 0.35 0.35 0.35 0.35 0.35 42.487 0.35 0.35 0.35 0.35 0.34 0.34 0.34 42.634 0.34 0.34 0.34 0.34 0.34 0.34 0.34 42.782 0.34 0.33 0.33 0.33 0.33 0.33 0.33 42.930 0.33 0.33 0.33 0.33 0.32 0.32 0.32 43.077 0.32 0.32 0.32 0.32 0.32 0.32 0.32 43.225 0.32 0.31 0.31 0.31 0.31 0.31 0.31 43.373 0.31 0.31 0.31 0.31 0.31 0.30 0.30 43.520 0.30 0.30 0.30 0.30 0.30 0.30 0.30 43.668 0.30 0.30 0.30 0.29 0.29 0.29 0.29 WinTR-20 Version 1.0 Page 14 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (c£s) (cfs) (cfs) (cfs) (cfs) (cfs) 43.816 0.29 0.29 0.29 0.29 0.29 0.29 0.29 • 43.963 0.29 0.28 0.28 0.28 0.28 0.28 0.28 44.111 0.28 0.28 0.28 0.28 0.28 0.28 0.27 44.259 0.27 0.27 0.27 0.27 0.27 0.27 0.27 44.406 0.27 0.27 0.27 0.27 0.27 0.26 0.26 44.554 0.26 0.26 0.26 0.26 0.26 0.26 0.26 44.702 0.26 0.26 0.26 0.26 0.26 0.25 0.25 44.849 0.25 0.25 0.25 0.25 0.25 0.25 0.25 44.997 0.25 0.25 0.25 0.25 0.25 0.24 0.24 45.145 0.24 0.24 0.24 0.24 0.24 0.24 0.24 45.292 0.24 0.24 0.24 0.24 0.24 0.23 0.23 45.440 0.23 0.23 0.23 0.23 0.23 0.23 0.23 45.588 0.23 0.23 0.23 0.23 0.23 0.23 0.22 45.735 0.22 0.22 0.22 0.22 0.22 0.22 0.22 45.883 0.22 0.22 0.22 0.22 0.22 0.22 0.22 46.031 0.22 0.21 0.21 0.21 0.21 0.21 0.21 46.178 0.21 0.21 0.21 0.21 0.21 0.21 0.21 46.326 0.21 0.21 0.21 0.21 0.20 0.20 0.20 46.474 0.20 0.20 0.20 0.20 0.20 0.20 0.20 46.621 0.20 0.20 0.20 0.20 0.20 0.20 0.20 46.769 0.19 0.19 0.19 0.19 0.19 0.19 0.19 46.917 0.19 0.19 0.19 0.19 0.19 0.19 0.19 47.064 0.19 0.19 0.19 0.19 0.18 0.18 0.18 47.212 0.18 0.18 0.18 0.18 0.18 0.18 0.18 47.359 0.18 0.18 0.18 0.18 0.18 0.18 0.18 47.507 0.18 0.18 0.16 0.17 0.17 0.17 0.17 47.655 0.17 0.17 0.17 0.17 0.17 0.17 0.17 47.802 0.17 0.17 0.17 0.17 0.17 0.17 0.17 47.950 0.17 0.17 0.16 0.16 0.16 0.16 0.16 48.098 0.16 0.16 0.16 0.16 0.16 0.16 0.16 48.245 0.16 0.16 0.16 0.16 0.16 0.16 0.16 48.393 0.16 0.16 0.16 0.15 0.15 0.15 0.15 48.541 0.15 0.15 0.15 0.15 0.15 0.15 0.15 48.688 0.15 0.15 0.15 0.15 0.15 0.15 0.15 48.836 0.15 0.15 0.15 0.15 0.15 0.14 0.14 • WinTR-55, Version 1.00.08 Page 15 5/11/2010 10:36:54 AM • Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 48.984 0.14 0.14 0.14 0.14 0.14 0.14 0.14 49.131 0.14 0.14 0.14 0.14 0.14 0.14 0.14 49.279 0.14 0.14 0.14 0.14 0.14 0.14 0.14 49.427 0.14 0.14 0.13 0.13 0.13 0.13 0.13 49.574 0.13 0.13 0.13 0.13 0.13 0.13 0.13 49.722 0.13 0.13 0.13 0.13 0.13 0.13 0.13 49.870 0.13 0.13 0.13 0.13 0.13 0.13 0.13 50.017 0.13 0.12 0.12 0.12 0.12 0.12 0.12 50.165 0.12 0.12 0.12 0.12 0.12 0.12 0.12 50.313 0.12 0.12 0.12 0.12 0.12 0.12 0.12 50.460 0.12 0.12 0.12 0.12 0.12 0.12 0.12 50.608 0.12 0.12 0.11 0.11 0.11 0.11 0.11 50.756 0.11 0.11 0.11 0.11 0.11 0.11 0.11 50.903 0.11 0.11 0.11 0.11 0.11 0.11 0.11 51.051 0.11 0.11 0.11 0.11 0.11 0.11 0.11 51.199 0.11 0.11 0.11 0.11 0.11 0.11 0.10 WinTR-20 Version 1.0 Page 15 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line • Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 51.346 0.10 0.10 0.10 0.10 0.10 0.10 0.10 51.494 0.10 0.10 0.10 0.10 0.10 0.10 0.10 51.642 0.10 0.10 0.10 0.10 0.10 0.10 0.10 51.789 0.10 0.10 0.10 0.10 0.10 0.10 0.10 51.937 0.10 0.10 0.10 0.10 0.10 0.10 0.09 52.085 0.09 0.09 0.09 0.09 0.09 0.09 0.09 52.232 0.09 0.09 0.09 0.09 0.09 0.09 0.09 52.380 0.09 0.09 0.09 0.09 0.09 0.09 0.09 52.528 0.09 0.09 0.09 0.09 0.09 0.09 0.09 52.675 0.09 0.09 0.09 0.09 0.09 0.09 0.09 52.823 0.09 0.09 0.08 0.08 0.08 0.08 0.06 52.971 0.08 0.08 0.08 0.08 0.08 0.08 0.08 53.118 0.08 0.08 0.08 0.08 0.08 0.08 0.08 53.266 0.06 0.08 0.06 0.08 0.08 0.08 0.08 53.414 0.08 0.08 0.08 0.08 0.08 0.08 0.08 53.561 0.08 0.08 0.08 0.08 0.08 0.08 0.08 53.709 0.08 0.08 0.08 0.08 0.07 0.07 0.07 53.857 0.07 0.07 0.07 0.07 0.07 0.07 0.07 54.004 0.07 0.07 0.07 0.07 0.07 0.07 0.07 54.152 0.07 0.07 0.07 0.07 0.07 0.07 0.07 54.300 0.07 0.07 0.07 0.07 0.07 0.07 0.07 54.447 0.07 0.07 0.07 0.07 0.07 0.07 0.07 54.595 0.07 0.07 0.07 0.07 0.07 0.07 0.07 54.743 0.07 0.07 0.07 0.07 0.07 0.06 0.06 54.890 0.06 0.06 0.06 0.06 0.06 0.06 0.06 55.038 0.06 0.06 0.06 0.06 0.06 0.06 0.06 55.186 0.06 0.06 0.06 0.06 0.06 0.06 0.06 55.333 0.06 0.06 0.06 0.06 0.06 0.06 0.06 55.481 0.06 0.06 0.06 0.06 0.06 0.06 0.06 55.629 0.06 0.06 0.06 0.06 0.06 0.06 0.06 55.776 0.06 0.06 0.06 0.06 0.06 0.06 0.06 55.924 0.06 0.06 0.06 0.06 0.06 0.06 0.06 • 56.072 0.05 0.05 0.05 0.05 0.05 0.05 0.05 WinTR-55, Version 1.00.08 Page 16 5/11/2010 10:36:54 AM Cedar Creek II Wind Project • Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 56.219 0.05 0.05 0.05 0.05 0.05 0.05 0.05 56.367 0.05 0.05 0.05 0.05 0.05 0.05 0.05 56.515 0.05 0.05 0.05 0.05 0.05 0.05 0.05 56.662 0.05 0.05 0.05 0.05 0.05 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) OUTLET 0.028 2.447 15.46 1.83 66.55 Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 9.410 0.05 0.05 0.05 0.05 0.06 0.06 0.06 9.558 0.06 0.06 0.06 0.06 0.07 0.07 0.07 9.705 0.07 0.07 0.07 0.07 0.08 0.08 0.08 WinTR-20 Version 1.0 Page 16 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line • Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 9.853 0.08 0.08 0.08 0.09 0.09 0.09 0.09 10.001 0.09 0.09 0.10 0.10 0.10 0.10 0.10 10.148 0.11 0.11 0.11 0.11 0.11 0.12 0.12 10.296 0.12 0.12 0.12 0.13 0.13 0.13 0.13 10.444 0.14 0.14 0.14 0.14 0.15 0.15 0.15 10.591 0.15 0.16 0.16 0.16 0.17 0.17 0.17 10.739 0.17 0.18 0.18 0.18 0.19 0.19 0.19 10.887 0.20 0.20 0.21 0.21 0.21 0.22 0.22 11.034 0.22 0.23 0.23 0.24 0.24 0.25 0.25 11.182 0.26 0.26 0.27 0.27 0.28 0.28 0.29 11.330 0.29 0.30 0.30 0.31 0.32 0.32 0.33 11.477 0.34 0.34 0.35 0.36 0.37 0.37 0.38 11.625 0.39 0.40 0.41 0.42 0.43 0.45 0.46 11.773 0.48 0.50 0.52 0.55 0.58 0.61 0.65 11.920 0.69 0.74 0.79 0.86 0.92 1.00 1.08 12.066 1.17 1.21 1.23 1.26 1.29 1.32 1.35 12.216 1.37 1.40 1.43 1.45 1.48 1.50 1.52 12.363 1.54 1.56 1.57 1.58 1.60 1.61 1.62 12.511 1.63 1.64 1.65 1.66 1.67 1.67 1.68 12.659 1.69 1.69 1.70 1.70 1.71 1.71 1.72 12.806 1.72 1.73 1.73 1.74 1.74 1.74 1.75 12.954 1.75 1.75 1.76 1.76 1.76 1.76 1.77 13.102 1.77 1.77 1.77 1.77 1.78 1.78 1.78 13.249 1.78 1.78 1.79 1.79 1.79 1.79 1.79 13.397 1.79 1.79 1.80 1.80 1.80 1.80 1.80 13.545 1.80 1.80 1.80 1.80 1.81 1.61 1.81 13.692 1.81 1.81 1.81 1.81 1.81 1.81 1.81 13.840 1.81 1.81 1.82 1.82 1.82 1.82 1.82 13.988 1.82 1.82 1.62 1.82 1.82 1.82 1.82 14.135 1.82 1.82 1.82 1.82 1.82 1.82 1.83 14.283 1.83 1.83 1.83 1.83 1.83 1.83 1.83 • WinTR-55, Version 1.00.08 Page 17 5/11/2010 10:36:54 AM • Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 14.431 1.83 1.83 1.83 1.83 1.83 1.63 1.83 14.578 1.83 1.83 1.83 1.83 1.83 1.83 1.83 14.726 1.83 1.83 1.83 1.83 1.83 1.83 1.83 14.874 1.83 1.83 1.83 1.83 1.83 1.83 1.83 15.021 1.83 1.83 1.83 1.83 1.83 1.63 1.83 15.169 1.83 1.83 1.83 1.83 1.83 1.63 1.83 15.317 1.83 1.83 1.83 1.83 1.83 1.83 1.83 15.464 1.83 1.83 1.83 1.83 1.83 1.83 1.83 15.612 1.83 1.83 1.83 1.83 1.83 1.83 1.83 15.760 1.83 1.83 1.83 1.83 1.83 1.83 1.83 15.907 1.83 1.83 1.83 1.83 1.83 1.83 1.83 16.055 1.83 1.83 1.83 1.83 1.83 1.83 1.83 16.203 1.83 1.83 1.83 1.83 1.83 1.83 1.83 16.350 1.83 1.83 1.83 1.83 1.83 1.83 1.83 16.498 1.83 1.83 1.83 1.83 1.83 1.83 1.83 16.646 1.83 1.83 1.83 1.83 1.83 1.83 1.83 16.793 1.82 1.82 1.82 1.82 1.82 1.82 1.82 16.941 1.82 1.82 1.82 1.82 1.82 1.82 1.82 17.089 1.82 1.62 1.82 1.82 1.82 1.82 1.82 17.236 1.82 1.62 1.82 1.82 1.82 1.82 1.82 WinTR-20 Version 1.0 Page 17 05/11/2010 10:36 • Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 17.384 1.82 1.82 1 .82 1.62 1.82 1.82 1.81 17.532 1.81 1.81 1.81 1.81 1.81 1.81 1.81 17.679 1.81 1.81 1.81 1.81 1.81 1.81 1.81 17.827 1.81 1.81 1.81 1.81 1.81 1.81 1.81 17.975 1.81 1.81 1.81 1.61 1.81 1.81 1.60 18.122 1.80 1.80 1.80 1.80 1.80 1.80 1.80 18.270 1.80 1.80 1.80 1.80 1.80 1.60 1.80 18.418 1.80 1.80 1.80 1.80 1.80 1.80 1.80 18.565 1.80 1.80 1.80 1.79 1.79 1.79 1.79 18.713 1.79 1.79 1.79 1.79 1.79 1.79 1.79 18.861 1.79 1.79 1.79 1.79 1.79 1.79 1.79 19.008 1.79 1.79 1.79 1.79 1.79 1.78 1.78 19.156 1.78 1.78 1.78 1.78 1.78 1.78 1.78 19.303 1.78 1.78 1.78 1.78 1.78 1.78 1.78 19.451 1.78 1.78 1.78 1.78 1.78 1.77 1.77 19.599 1.77 1.77 1.77 1.77 1.77 1.77 1.77 19.746 1.77 1.77 1.77 1.77 1.77 1.77 1.77 19.894 1.77 1.77 1.77 1.77 1.76 1.76 1.76 20.042 1.76 1.76 1.76 1.76 1.76 1.76 1.76 20.189 1.76 1.76 1.76 1.76 1.76 1.76 1.76 20.337 1.76 1.75 1.75 1.75 1.75 1.75 1.75 20.485 1.75 1.75 1.75 1.75 1.75 1.75 1.75 20.632 1.75 1.75 1.75 1.75 1.75 1.74 1.74 20.780 1.74 1.74 1.74 1.74 1.74 1.74 1.74 20.928 1.74 1.74 1.74 1.74 1.74 1.74 1.74 21.075 1.74 1.74 1.73 1.73 1.73 1.73 1.73 21.223 1.73 1.73 1.73 1.73 1.73 1.73 1.73 21.371 1.73 1.73 1.73 1.73 1.73 1.73 1.72 • 21.518 1.72 1.72 1.72 1.72 1.72 1.72 1.72 WinTR-55, Version 1.00.08 Page 18 5/11/2010 10:36:54 AM Cedar Creek II Wind ProjectIII Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 21.666 1.72 1.72 1.72 1.72 1.72 1.72 1.72 21.814 1.72 1.72 1.71 1.71 1.71 1.71 1.71 21.961 1.71 1.71 1.71 1.71 1.71 1.71 1.71 22.109 1.71 1.71 1.71 1.71 1.71 1.71 1.70 22.257 1.70 1.70 1.70 1.70 1.70 1.70 1.70 22.404 1.70 1.70 1.70 1.70 1.70 1.70 1.70 22.552 1.70 1.70 1.70 1.69 1.69 1.69 1.69 22.700 1.69 1.69 1.69 1.69 1.69 1.69 1.69 22.847 1.69 1.69 1.69 1.69 1.69 1.69 1.68 22.995 1.68 1.68 1.68 1.68 1.68 1.68 1.68 23.143 1.68 1.68 1.68 1.68 1.68 1.68 1.68 23.290 1.68 1.68 1.68 1.67 1.67 1.67 1.67 23.438 1.67 1.67 1.67 1.67 1.67 1.67 1.67 23.586 1.67 1.67 1.67 1.67 1.67 1.67 1.67 23.733 1.66 1.66 1.66 1.66 1.66 1.66 1.66 23.881 1.66 1.66 1.66 1.66 1.66 1.66 1.66 24.029 1.66 1.66 1.66 1.65 1.65 1.65 1.65 24.176 1.65 1.65 1.65 1.65 1.65 1.65 1.65 24.324 1.65 1.65 1.65 1.65 1.64 1.64 1.64 24.472 1.64 1.64 1.64 1.64 1.64 1.64 1.64 24.619 1.64 1.63 1.63 1.63 1.63 1.63 1.63 24.767 1.63 1.63 1.63 1.63 1.62 1.62 1.62 WinTR-20 Version 1.0 Page 18 05/11/2010 10:36 • Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 24.915 1.62 1.62 1.62 1.62 1.62 1.62 1.62 25.062 1.61 1.61 1.61 1.61 1.61 1.61 1.61 25.210 1.61 1.61 1.61 1.61 1.60 1.60 1.60 25.358 1.60 1.60 1.60 1.60 1.60 1.60 1.60 25.505 1.59 1.59 1.59 1.59 1.59 1.59 1.59 25.653 1.59 1.59 1.59 1.58 1.58 1.58 1.58 25.801 1.58 1.58 1.58 1.58 1.58 1.58 1.58 25.948 1.57 1.57 1.57 1.57 1.57 1.57 1.57 26.096 1.57 1.57 1.57 1.57 1.56 1.56 1.56 26.244 1.56 1.56 1.56 1.56 1.56 1.56 1.56 26.391 1.55 1.55 1.55 1.55 1.55 1.55 1.55 26.539 1.55 1.55 1.55 1.55 1.54 1.54 1.54 26.687 1.54 1.54 1.54 1.54 1.54 1.54 1.54 26.834 1.54 1.53 1.53 1.53 1.53 1.53 1.53 26.982 1.53 1.53 1.53 1.52 1.52 1.52 1.52 27.130 1.52 1.52 1.52 1.52 1.51 1.51 1.51 27.277 1.51 1.51 1.51 1.51 1.51 1.50 1.50 27.425 1.50 1.50 1.50 1.50 1.50 1.50 1.49 27.573 1.49 1.49 1.49 1.49 1.49 1.49 1.49 27.720 1.48 1.48 1.48 1.48 1.48 1.48 1.48 27.868 1.48 1.48 1.47 1.47 1 .47 1.47 1.47 28.016 1.47 1.47 1.47 1.46 1.46 1.46 1.46 28.163 1.46 1.46 1.46 1.46 1.45 1.45 1.45 28.311 1.45 1.45 1.45 1.45 1.45 1.44 1.44 28.459 1.44 1.44 1.44 1.44 1.44 1.44 1.44 28.606 1.43 1.43 1.43 1.43 1.43 1.43 1.43 28.754 1.43 1.42 1.42 1.42 1.42 1.42 1.42 • WinTR-55, Version 1.00.08 Page 19 5/11/2010 10:36:54 AM • Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 28.902 1.42 1.42 1.42 1.41 1.41 1.41 1.41 29.049 1.41 1.41 1.41 1.41 1.41 1.40 1.40 29.197 1.40 1.40 1.40 1.40 1.40 1.40 1.39 29.345 1.39 1.39 1.39 1.39 1.39 1.39 1.39 29.492 1.39 1.38 1.38 1.38 1.38 1.38 1.38 29.640 1.38 1.38 1.38 1.37 1.37 1.37 1.37 29.788 1.37 1.37 1.37 1.37 1.37 1.36 1.36 29.935 1.36 1.36 1.36 1.36 1.36 1.36 1.35 30.083 1.35 1.35 1.35 1.35 1.35 1.35 1.35 30.231 1.35 1.34 1.34 1.34 1.34 1.34 1.34 30.378 1.34 1.34 1.34 1.34 1.33 1.33 1.33 30.526 1.33 1.33 1.33 1.33 1.33 1.33 1.32 30.674 1.32 1.32 1.32 1.32 1.32 1.32 1.32 30.821 1.32 1.31 1.31 1.31 1.31 1.31 1.31 30.969 1.31 1.31 1.31 1.30 1.30 1.30 1.30 31.117 1.30 1.30 1.30 1.30 1.30 1.29 1.29 31.264 1.29 1.29 1.29 1.29 1.29 1.29 1.29 31.412 1.29 1.28 1.28 1.28 1.28 1.28 1.28 31.560 1.28 1.28 1.28 1.27 1.27 1.27 1.27 31.707 1.27 1.27 1.27 1.27 1.27 1.27 1.26 31.855 1.26 1.26 1.26 1.26 1.26 1.26 1.26 32.003 1.26 1.26 1.25 1.25 1.25 1.25 1.25 32.150 1.25 1.25 1.25 1.25 1.24 1.24 1.24 • 32.298 1.24 1.24 1.24 1.24 1.24 1.24 1.24 WinTR-20 Version 1.0 Page 19 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 32.446 1.23 1.23 1.23 1.23 1.23 1.23 1.23 32.593 1.23 1.23 1.23 1.22 1.22 1.22 1.22 32.741 1.22 1.22 1.22 1.22 1.22 1.22 1.21 32.889 1.21 1.21 1.21 1.21 1.21 1.21 1.21 33.036 1.21 1.21 1.20 1.20 1.20 1.20 1.20 33.184 1.20 1.20 1.20 1.20 1.20 1.19 1.19 33.331 1.19 1.19 1.19 1.19 1.19 1.19 1.19 33.479 1.19 1.18 1.18 1.18 1.17 1.17 1.17 33.627 1.16 1.16 1.16 1.15 1.15 1.15 1.14 33.774 1.14 1.14 1.13 1.13 1.13 1.12 1.12 33.922 1.12 1.11 1.11 1.11 1.11 1.10 1.10 34.070 1.10 1.09 1.09 1.09 1.08 1.08 1.08 34.217 1.07 1.07 1.07 1.06 1.06 1.06 1.06 34.365 1.05 1.05 1.05 1.04 1.04 1.04 1.03 34.513 1.03 1.03 1.03 1.02 1.02 1.02 1.01 34.660 1.01 1.01 1.01 1.00 1.00 1.00 0.99 34.808 0.99 0.99 0.99 0.98 0.98 0.96 0.97 34.956 0.97 0.97 0.97 0.96 0.96 0.96 0.95 35.103 0.95 0.95 0.95 0.94 0.94 0.94 0.94 35.251 0.93 0.93 0.93 0.93 0.92 0.92 0.92 35.399 0.91 0.91 0.91 0.91 0.90 0.90 0.90 35.546 0.90 0.89 0.89 0.89 0.89 0.88 0.88 35.694 0.88 0.88 0.87 0.87 0.87 0.87 0.86 35.842 0.86 0.86 0.86 0.85 0.85 0.85 0.85 • 35.989 0.84 0.84 0.84 0.84 0.83 0.83 0.83 WinTR-55, Version 1.00.08 Page 20 5/11/2010 10:36:54 AM Cedar Creek II Wind Project . Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 36.137 0.83 0.62 0.82 0.82 0.82 0.82 0.81 36.285 0.81 0.81 0.81 0.80 0.80 0.80 0.80 36.432 0.79 0.79 0.79 0.79 0.79 0.78 0.78 36.580 0.78 0.78 0.77 0.77 0.77 0.77 0.77 36.728 0.76 0.76 0.76 0.76 0.75 0.75 0.75 36.875 0.75 0.75 0.74 0.74 0.74 0.74 0.74 37.023 0.73 0.73 0.73 0.73 0.72 0.72 0.72 37.171 0.72 0.72 0.71 0.71 0.71 0.71 0.71 37.318 0.70 0.70 0.70 0.70 0.70 0.69 0.69 37.466 0.69 0.69 0.69 0.68 0.68 0.68 0.68 37.614 0.68 0.67 0.67 0.67 0.67 0.67 0.67 37.761 0.66 0.66 0.66 0.66 0.66 0.65 0.65 37.909 0.65 0.65 0.65 0.64 0.64 0.64 0.64 38.057 0.64 0.64 0.63 0.63 0.63 0.63 0.63 38.204 0.62 0.62 0.62 0.62 0.62 0.62 0.61 38.352 0.61 0.61 0.61 0.61 0.61 0.60 0.60 38.500 0.60 0.60 0.60 0.59 0.59 0.59 0.59 38.647 0.59 0.59 0.58 0.58 0.58 0.58 0.58 38.795 0.58 0.57 0.57 0.57 0.57 0.57 0.57 38.943 0.56 0.56 0.56 0.56 0.56 0.56 0.56 39.090 0.55 0.55 0.55 0.55 0.55 0.55 0.54 39.238 0.54 0.54 0.54 0.54 0.54 0.53 0.53 39.386 0.53 0.53 0.53 0.53 0.53 0.52 0.52 39.533 0.52 0.52 0.52 0.52 0.52 0.51 0.51 39.681 0.51 0.51 0.51 0.51 0.50 0.50 0.50 • 39.829 0.50 0.50 0.50 0.50 0.49 0.49 0.49 WinTR-20 Version 1.0 Page 20 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 39.976 0.49 0.49 0.49 0.49 0.49 0.48 0.48 40.124 0.48 0.48 0.48 0.48 0.48 0.47 0.47 40.272 0.47 0.47 0.47 0.47 0.47 0.46 0.46 40.419 0.46 0.46 0.46 0.46 0.46 0.46 0.45 40.567 0.45 0.45 0.45 0.45 0.45 0.45 0.45 40.715 0.44 0.44 0.44 0.44 0.44 0.44 0.44 40.862 0.43 0.43 0.43 0.43 0.43 0.43 0.43 41.010 0.43 0.43 0.42 0.42 0.42 0.42 0.42 41.158 0.42 0.42 0.42 0.41 0.41 0.41 0.41 41.305 0.41 0.41 0.41 0.41 0.40 0.40 0.40 41.453 0.40 0.40 0.40 0.40 0.40 0.40 0.39 41.601 0.39 0.39 0.39 0.39 0.39 0.39 0.39 41.748 0.39 0.38 0.38 0.38 0.38 0.38 0.38 41.896 0.38 0.38 0.38 0.37 0.37 0.37 0.37 42.044 0.37 0.37 0.37 0.37 0.37 0.37 0.36 42.191 0.36 0.36 0.36 0.36 0.36 0.36 0.36 42.339 0.36 0.35 0.35 0.35 0.35 0.35 0.35 42.487 0.35 0.35 0.35 0.35 0.34 0.34 0.34 42.634 0.34 0.34 0.34 0.34 0.34 0.34 0.34 42.782 0.34 0.33 0.33 0.33 0.33 0.33 0.33 42.930 0.33 0.33 0.33 0.33 0.32 0.32 0.32 43.077 0.32 0.32 0.32 0.32 0.32 0.32 0.32 43.225 0.32 0.31 0.31 0.31 0.31 0.31 0.31 III WinTR-55, Version 1.00.08 Page 21 5/11/2010 10:36:54 AM • Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o 0ffsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 43.373 0.31 0.31 0.31 0.31 0.31 0.30 0.30 43.520 0.30 0.30 0.30 0.30 0.30 0.30 0.30 43.668 0.30 0.30 0.30 0.29 0.29 0.29 0.29 43.816 0.29 0.29 0.29 0.29 0.29 0.29 0.29 43.963 0.29 0.28 0.28 0.28 0.28 0.28 0.28 44.111 0.28 0.28 0.28 0.28 0.28 0.28 0.27 44.259 0.27 0.27 0.27 0.27 0.27 0.27 0.27 44.406 0.27 0.27 0.27 0.27 0.27 0.26 0.26 44.554 0.26 0.26 0.26 0.26 0.26 0.26 0.26 44.702 0.26 0.26 0.26 0.26 0.26 0.25 0.25 44.849 0.25 0.25 0.25 0.25 0.25 0.25 0.25 44.997 0.25 0.25 0.25 0.25 0.25 0.24 0.24 45.145 0.24 0.24 0.24 0.24 0.24 0.24 0.24 45.292 0.24 0.24 0.24 0.24 0.24 0.23 0.23 45.440 0.23 0.23 0.23 0.23 0.23 0.23 0.23 45.588 0.23 0.23 0.23 0.23 0.23 0.23 0.22 45.735 0.22 0.22 0.22 0.22 0.22 0.22 0.22 45.883 0.22 0.22 0.22 0.22 0.22 0.22 0.22 46.031 0.22 0.21 0.21 0.21 0.21 0.21 0.21 46.178 0.21 0.21 0.21 0.21 0.21 0.21 0.21 46.326 0.21 0.21 0.21 0.21 0.20 0.20 0.20 46.474 0.20 0.20 0.20 0.20 0.20 0.20 0.20 46.621 0.20 0.20 0.20 0.20 0.20 0.20 0.20 • 46.769 0.19 0.19 0.19 0.19 0.19 0.19 0.19 46.917 0.19 0.19 0.19 0.19 0.19 0.19 0.19 47.064 0.19 0.19 0.19 0.19 0.18 0.18 0.18 47.212 0.18 0.18 0.18 0.18 0.18 0.18 0.18 47.359 0.18 0.18 0.18 0.18 0.18 0.18 0.18 WinTR-20 Version 1.0 Page 21 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 47.507 0.18 0.18 0.18 0.17 0.17 0.17 0.17 47.655 0.17 0.17 0.17 0.17 0.17 0.17 0.17 47.802 0.17 0.17 0.17 0.17 0.17 0.17 0.17 47.950 0.17 0.17 0.16 0.16 0.16 0.16 0.16 48.098 0.16 0.16 0.16 0.16 0.16 0.16 0.16 48.245 0.16 0.16 0.16 0.16 0.16 0.16 0.16 48.393 0.16 0.16 0.16 0.15 0.15 0.15 0.15 48.541 0.15 0.15 0.15 0.15 0.15 0.15 0.15 48.688 0.15 0.15 0.15 0.15 0.15 0.15 0.15 48.836 0.15 0.15 0.15 0.15 0.15 0.14 0.14 48.984 0.14 0.14 0.14 0.14 0.14 0.14 0.14 49.131 0.14 0.14 0.14 0.14 0.14 0.14 0.14 49.279 0.14 0.14 0.14 0.14 0.14 0.14 0.14 49.427 0.14 0.14 0.13 0.13 0.13 0.13 0.13 49.574 0.13 0.13 0.13 0.13 0.13 0.13 0.13 49.722 0.13 0.13 0.13 0.13 0.13 0.13 0.13 49.870 0.13 0.13 0.13 0.13 0.13 0.13 0.13 50.017 0.13 0.12 0.12 0.12 0.12 0.12 0.12 50.165 0.12 0.12 0.12 0.12 0.12 0.12 0.12 50.313 0.12 0.12 0.12 0.12 0.12 0.12 0.12 • 50.460 0.12 0.12 0.12 0.12 0.12 0.12 0.12 WinTR-55, Version 1.00.08 Page 22 5/11/2010 10:36:54 AM Cedar Creek II Wind Project • Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 50.608 0.12 0.12 0.11 0.11 0.11 0.11 0.11 50.756 0.11 0.11 0.11 0.11 0.11 0.11 0.11 50.903 0.11 0.11 0.11 0.11 0.11 0.11 0.11 51.051 0.11 0.11 0.11 0.11 0.11 0.11 0.11 51.199 0.11 0.11 0.11 0.11 0.11 0.11 0.10 51.346 0.10 0.10 0.10 0.10 0.10 0.10 0.10 51.494 0.10 0.10 0.10 0.10 0.10 0.10 0.10 51.642 0.10 0.10 0.10 0.10 0.10 0.10 0.10 51.789 0.10 0.10 0.10 0.10 0.10 0.10 0.10 51.937 0.10 0.10 0.10 0.10 0.10 0.10 0.09 52.085 0.09 0.09 0.09 0.09 0.09 0.09 0.09 52.232 0.09 0.09 0.09 0.09 0.09 0.09 0.09 52.380 0.09 0.09 0.09 0.09 0.09 0.09 0.09 52.528 0.09 0.09 0.09 0.09 0.09 0.09 0.09 52.675 0.09 0.09 0.09 0.09 0.09 0.09 0.09 52.823 0.09 0.09 0.08 0.08 0.08 0.08 0.08 52.971 0.08 0.08 0.08 0.08 0.08 0.08 0.08 53.118 0.08 0.08 0.06 0.08 0.08 0.08 0.08 53.266 0.08 0.08 0.06 0.08 0.08 0.0B 0.08 53.414 0.08 0.08 0.08 0.08 0.08 0.08 0.08 53.561 0.08 0.08 0.08 0.08 0.08 0.08 0.08 53.709 0.08 0.08 0.08 0.08 0.07 0.07 0.07 53.857 0.07 0.07 0.07 0.07 0.07 0.07 0.07 54.004 0.07 0.07 0.07 0.07 0.07 0.07 0.07 54.152 0.07 0.07 0.07 0.07 0.07 0.07 0.07 • 54.300 0.07 0.07 0.07 0.07 0.07 0.07 0.07 54.447 0.07 0.07 0.07 0.07 0.07 0.07 0.07 54.595 0.07 0.07 0.07 0.07 0.07 0.07 0.07 54.743 0.07 0.07 0.07 0.07 0.07 0.06 0.06 54.890 0.06 0.06 0.06 0.06 0.06 0.06 0.06 WinTR-20 Version 1.0 Page 22 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Line Start Time Flow Values @ time increment of 0.021 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 55.038 0.06 0.06 0.06 0.06 0.06 0.06 0.06 55.186 0.06 0.06 0.06 0.06 0.06 0.06 0.06 55.333 0.06 0.06 0.06 0.06 0.06 0.06 0.06 55.481 0.06 0.06 0.06 0.06 0.06 0.06 0.06 55.629 0.06 0.0E 0.06 0.06 0.06 0.06 0.06 55.776 0.06 0.06 0.06 0.06 0.06 0.06 0.06 55.924 0.06 0.06 0.06 0.06 0.06 0.06 0.06 56.072 0.05 0.05 0.05 0.05 0.05 0.05 0.05 56.219 0.05 0.05 0.05 0.05 0.05 0.05 0.05 56.367 0.05 0.05 0.05 0.05 0.05 0.05 0.05 56.515 0.05 0.05 0.05 0.05 0.05 0.05 0.05 56.662 0.05 0.05 0.05 0.05 0.05 • WinTR-55, Version 1.00.08 Page 23 5/11/2010 10:36:54 AM • Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) III WinTR-20 Version 1.0 Page 23 05/11/2010 10:36 Cedar Creek II Wind Project Developed Condition - 100-YR for Basin P w/o Offsite Runoff Area or Drainage Peak Flow by Storm Reach Area Alternate 100-Yr Identifier (sq mi) (cfs) (cfs) (cfs) (cfs) (cfs) DA P1 0.744E-02 9.4 DA P2 0.417E-02 5.4 DA Ti 0.930E-02 11.8 DA T2 0.666E-02 11.9 Basin P 0.03 35.9 DOWNSTREAM 1.8 OUTLET 0.03 1.8 • WinTR-55, Version 1.00.08 Page 24 5/11/2010 10:36:54 AM Cedar Creek II Wind Project • Developed Condition - 100-YR for Basin P w/o Offsite Runoff Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) • WinTR-20 version 1.0 Page 24 05/11/2010 10:36 •WinTR-55, Version 1.00.08 Page 25 5/11/2010 10:36:54 AM • Cedar Creek II Wind Project Site Developed Condition 100-YR Storm Runoff Calculations for Drainage Channels and Emergency Spillway • WinTR-55 Current Data Description --- Identification Data --- User: Tetra Tech Date: 5/11/2010 Project: Cedar Creek II Wind Project Units: English SubTitle: Developed - CCII with Offsite Runoff for Channels & Spillway Areal Units: Acres State: Colorado County: Weld Filename: P:\BPAE_Wind\Colorado\Cedar Creek II\Engineering\Hydrology Modeling\CCII - Final Developed F --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc DA P1 DA P1 w/Offsite Runon Outlet 5.22 85 0.569 DA P2 DA P2 w/Offsite Runon Outlet 3.2 84 0.688 DA T1 DA Ti w/Offsite Runon Outlet 6.95 84 0.575 DA T2 DA T2 w/Offsite Runon Outlet 6.12 82 0.752 Total area: 21.49 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr -Yr III (in) (in) (in) (in) (in) (in) (in) 1.8 2.35 2.7 3.2 3.6 4.0 .0 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:47:46 AM Tetra Tech Cedar Creek II Wind Project • Developed - CCII with Offsite Runoff for Channels & Spillway Weld County, Colorado Storm Data Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr -Yr (in) (in) (in) (in) (in) (in) (in) 1.8 2.35 2.7 3.2 3.6 4.0 .0 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:47:46 AM • • Tetra Tech Cedar Creek II Wind Project Developed - CCII with Offsite Runoff for Channels & Spillway Weld County, Colorado Watershed Peak Table Sub-Area Peak Flow by Rainfall Return Period or Reach 100-Yr Identifier (cfs) SUBAREAS DA P1 10.46 DA P2 5.47 DA T1 13.39 DA T2 9.13 REACHES OUTLET 37.66 • • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:47:46 AM Tetra Tech Cedar Creek II Wind Project • Developed - CCII with Offsite Runoff for Channels & Spillway Weld County, Colorado Hydrograph Peak/Peak Time Table Sub-Area Peak Flow and Peak Time (hr) by Rainfall Return Period or Reach 100-Yr Identifier (cfs) (hr) SUBAREAS DA P1 10.46 12.23 DA P2 5.47 12.29 DA Ti 13.39 12.22 DA T2 9.13 12.32 REACHES OUTLET 37.66 • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:47:47 AM • • Tetra Tech Cedar Creek II Wind Project Developed - CCII with Offsite Runoff for Channels & Spillway Weld County, Colorado Sub-Area Summary Table Sub-Area Drainage Time of Curve Receiving Sub-Area Identifier Area Concentration Number Reach Description (ac) (hr) DA P1 5.22 0.569 85 Outlet DA P1 w/Offsite Runon DA P2 3.20 0.688 84 Outlet DA P2 w/Offsite Runon DA T1 6.95 0.575 84 Outlet DA T1 w/Offsite Runon DA T2 6.12 0.752 82 Outlet DA T2 w/Offsite Runon Total Area: 21.49 (ac) • • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:47:47 AM Tetra Tech Cedar Creek II Wind Project Developed - CCII with Offsite Runoff for Channels & Spillway • Weld County, Colorado Sub-Area Time of Concentration Details Sub-Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) DA P1 User-provided 0.569 Time of Concentration 0.569 DA P2 User-provided 0.688 Time of Concentration 0.688 DA T1 User-provided 0.575 Time of Concentration 0.575 DA T2 User-provided 0.752 Time of Concentration 0.752 • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:47:47 AM • • Tetra Tech Cedar Creek II Wind Project Developed - CCII with Offsite Runoff for Channels & Spillway Weld County, Colorado Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) DA P1 Open space; grass cover < 50% (poor) B .077 79 Paved parking lots, roofs, driveways B .182 98 Gravel (w/ right-of-way) B 4.958 85 Total Area / Weighted Curve Number 5.22 85 DA P2 Open space; grass cover < 50% (poor) B .133 79 Paved parking lots, roofs, driveways B .074 98 Gravel (w/ right-of-way) B 2.7 85 Pasture, grassland or range (fair) B .291 69 Total Area / Weighted Curve Number 3.2 84 DA Ti Open space; grass cover < 50% (poor) B .307 79 Paved parking lots, roofs, driveways B .322 98 Gravel (w/ right-of-way) B 5.685 85 Pasture, grassland or range (fair) B .632 69 Total Area / Weighted Curve Number 6.95 84 DA T2 Open space; grass cover < 50% (poor) B .065 79 • Paved parking lots, roofs, driveways B .2 98 Gravel (w/ right-of-way) B 4.465 85 Pasture, grassland or range (fair) B 1.389 69 Total Area / Weighted Curve Number 6.12 82 • WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:47:47 AM Cedar Creek II Wind Project • Developed - CCII with Offsite Runoff for Channels & Spillway Name of printed page file: TR20.out STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) DA P1 0.008 2.450 12.23 10.46 1262.46 Line Start Time Flow Values @ time increment of 0.036 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 6.207 0.05 0.05 0.05 0.06 0.06 0.06 0.06 8.459 0.06 0.07 0.07 0.07 0.07 0.08 0.08 8.710 0.08 0.08 0.09 0.09 0.09 0.10 0.10 8.962 0.10 0.10 0.11 0.11 0.11 0.12 0.12 9.213 0.13 0.13 0.13 0.14 0.14 0.14 0.14 9.465 0.15 0.15 0.15 0.16 0.16 0.16 0.16 9.717 0.17 0.17 0.17 0.18 0.18 0.18 0.19 9.966 0.19 0.20 0.20 0.21 0.21 0.22 0.22 10.220 0.23 0.24 0.24 0.25 0.26 0.27 0.27 10.471 0.28 0.29 0.30 0.31 0.32 0.33 0.34 10.723 0.35 0.36 0.37 0.38 0.39 0.41 0.42 10.974 0.44 0.45 0.47 0.48 0.50 0.52 0.54 11.226 0.56 0.58 0.60 0.63 0.66 0.69 0.72 11.477 0.75 0.79 0.83 0.88 0.95 1.05 1.18 11.729 1.36 1.60 1.93 2.36 2.93 3.64 4.50 11.981 5.48 6.56 7.66 8.67 9.51 10.11 10.43 12.232 10.46 10.24 9.82 9.25 8.57 7.84 7.12 • 12.484 6.44 5.81 5.25 4.78 4.37 4.00 3.67 12.735 3.38 3.11 2.87 2.67 2.48 2.32 2.17 12.987 2.04 1.93 1.83 1.74 1.66 1.58 1.52 13.238 1.45 1.40 1.35 1.30 1.26 1.22 1.18 13.490 1.15 1.12 1.09 1.06 1.03 1.00 0.98 13.741 0.96 0.94 0.92 0.91 0.89 0.87 0.86 13.993 0.84 0.83 0.81 0.80 0.79 0.77 0.76 14.245 0.75 0.74 0.73 0.71 0.71 0.70 0.69 14.496 0.68 0.67 0.67 0.66 0.65 0.65 0.64 14.748 0.64 0.63 0.63 0.62 0.62 0.61 0.61 14.999 0.60 0.60 0.59 0.59 0.59 0.58 0.58 15.251 0.57 0.57 0.56 0.56 0.55 0.55 0.54 15.502 0.54 0.54 0.53 0.53 0.52 0.52 0.51 15.754 0.51 0.50 0.50 0.50 0.49 0.49 0.48 16.006 0.48 0.47 0.47 0.46 0.46 0.46 0.45 16.257 0.45 0.44 0.44 0.44 0.43 0.43 0.,43 16.509 0.43 0.42 0.42 0.42 0.42 0.41 0.41 16.760 0.41 0.41 0.41 0.40 0.40 0.40 0.40 17.012 0.40 0.40 0.39 0.39 0.39 0.39 0.39 17.263 0.39 0.38 0.38 0.38 0.38 0.38 0.38 17.515 0.38 0.37 0.37 0.37 0.37 0.37 0.37 17.766 0.36 0.36 0.36 0.36 0.36 0.36 0.35 18.018 0.35 0.35 0.35 0.35 0.35 0.34 0.34 WinTR-20 Version 1.0 Page 1 05/11/2010 10:45 Cedar Creek II Wind Project Developed - CCII with Offsite Runoff for Channels & Spillway Line Start Time Flow Values @ time increment of 0.036 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 18.270 0.34 0.34 0.34 0.34 0.34 0.33 0.33 18.521 0.33 0.33 0.33 0.33 0.32 0.32 0.32 WinTR-55, Version 1.00.08 Page 1 5/11/2010 10:46:40 AM IIII • Cedar Creek II Wind Project Developed - CCII with Offsite Runoff for Channels & Spillway Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 18.773 0.32 0.32 0.32 0.31 0.31 0.31 0.31 19.024 0.31 0.31 0.30 0.30 0.30 0.30 0.30 19.276 0.30 0.29 0.29 0.29 0.29 0.29 0.29 19.527 0.28 0.28 0.28 0.28 0.28 0.28 0.27 19.779 0.27 0.27 0.27 0.27 0.27 0.26 0.26 20.030 0.26 0.26 0.26 0.26 0.26 0.25 0.25 20.282 0.25 0.25 0.25 0.25 0.25 0.25 0.24 20.534 0.24 0.24 0.24 0.24 0.24 0.24 0.24 20.785 0.24 0.24 0.24 0.24 0.24 0.24 0.24 21.037 0.24 0.24 0.24 0.24 0.24 0.24 0.24 21.288 0.24 0.23 0.23 0.23 0.23 0.23 0.23 21.540 0.23 0.23 0.23 0.23 0.23 0.23 0.23 21.791 0.23 0.23 0.23 0.23 0.23 0.23 0.23 22.043 0.23 0.23 0.23 0.23 0.23 0.23 0.23 22.294 0.23 0.23 0.23 0.23 0.23 0.22 0.22 22.546 0.22 0.22 0.22 0.22 0.22 0.22 0.22 22.798 0.22 0.22 0.22 0.22 0.22 0.22 0.22 23.049 0.22 0.22 0.22 0.22 0.22 0.22 0.22 23.301 0.22 0.22 0.22 0.22 0.22 0.22 0.22 23.552 0.22 0.21 0.21 0.21 0.21 0.21 0.21 23.804 0.21 0.21 0.21 0.21 0.21 0.21 0.21 24.055 0.21 0.21 0.20 0.20 0.19 0.17 0.16 24.307 0.15 0.13 0.11 0.10 0.09 0.07 0.06 24.558 0.05 • Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) DA P2 0.005 2.356 12.29 5.47 1094.96 Line Start Time Flow Values @ time increment of 0.043 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 9.070 0.05 0.05 0.06 0.06 0.06 0.06 0.06 9.374 0.07 0.07 0.07 0.07 0.08 0.08 0.08 9.678 0.08 0.08 0.09 0.09 0.09 0.09 0.10 9.982 0.10 0.10 0.10 0.11 0.11 0.11 0.12 10.286 0.12 0.13 0.13 0.14 0.14 0.15 0.15 10.590 0.16 0.16 0.17 0.18 0.18 0.19 0.20 10.895 0.21 0.22 0.23 0.24 0.25 0.26 0.27 11.199 0.28 0.29 0.31 0.32 0.34 0.36 0.38 11.503 0.40 0.42 0.45 0.49 0.55 0.63 0.75 11.807 0.91 1.14 1.46 1.87 2.37 2.94 3.56 12.111 4.17 4.70 5.12 5.38 5.47 5.42 5.25 12.415 4.99 4.65 4.28 3.89 3.51 3.17 2.86 12.720 2.60 2.37 2.17 1.99 1.82 1.68 1.55 13.024 1.44 1.34 1.25 1.17 1.10 1.04 0.99 WinTR-20 Version 1.0 Page 2 05/11/2010 10:45 Cedar Creek II Wind Project Developed - CCII with Offsite Runoff for Channels & Spillway Line Start Time Flow Values @ time increment of 0.043 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) • WinTR-55, Version 1.00.08 Page 2 5/11/2010 10:48:40 AM Cedar Creek II Wind Project . Developed - CCII with Offsite Runoff for Channels & Spillway Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 13.328 0.94 0.89 0.85 0.81 0.78 0.75 0.72 13.632 0.70 0.68 0.65 0.63 0.61 0.60 0.58 13.936 0.56 0.54 0.53 0.52 0.50 0.49 0.48 14.240 0.47 0.46 0.45 0.45 0.44 0.43 0.42 14.545 0.42 0.41 0.41 0.40 0.40 0.39 0.39 14.849 0.39 0.38 0.38 0.37 0.37 0.37 0.36 15.153 0.36 0.36 0.35 0.35 0.35 0.34 0.34 15.457 0.34 0.33 0.33 0.33 0.32 0.32 0.32 15.761 0.31 0.31 0.31 0.30 0.30 0.30 0.29 16.065 0.29 0.29 0.28 0.28 0.28 0.27 0.27 16.370 0.27 0.27 0.26 0.26 0.26 0.26 0.26 16.674 0.25 0.25 0.25 0.25 0.25 0.25 0.25 16.978 0.24 0.24 0.24 0.24 0.24 0.24 0.24 17.282 0.24 0.23 0.23 0.23 0.23 0.23 0.23 17.586 0.23 0.23 0.22 0.22 0.22 0.22 0.22 17.890 0.22 0.22 0.22 0.22 0.21 0.21 0.21 18.195 0.21 0.21 0.21 0.21 0.21 0.20 0.20 18.499 0.20 0.20 0.20 0.20 0.20 0.20 0.20 18.803 0.19 0.19 0.19 0.19 0.19 0.19 0.19 19.107 0.19 0.18 0.18 0.18 0.18 0.18 0.18 19.411 0.18 0.18 0.18 0.17 0.17 0.17 0.17 19.715 0.17 0.17 0.17 0.17 0.16 0.16 0.16 20.020 0.16 0.16 0.16 0.16 0.16 0.15 0.15 20.324 0.15 0.15 0.15 0.15 0.15 0.15 0.15 20.628 0.15 0.15 0.15 0.15 0.15 0.15 0.15 20.932 0.14 0.14 0.14 0.14 0.14 0.14 0.14 • 21.236 0.14 0.14 0.14 0.14 0.14 0.14 0.14 21.540 0.14 0.14 0.14 0.14 0.14 0.14 0.14 21.845 0.14 0.14 0.14 0.14 0.14 0.14 0.14 22.149 0.14 0.14 0.14 0.14 0.14 0.14 0.14 22.453 0.14 0.14 0.14 0.14 0.14 0.14 0.13 22.757 0.13 0.13 0.13 0.13 0.13 0.13 0.13 23.061 0.13 0.13 0.13 0.13 0.13 0.13 0.13 23.366 0.13 0.13 0.13 0.13 0.13 0.13 0.13 23.670 0.13 0.13 0.13 0.13 0.13 0.13 0.13 23.974 0.13 0.13 0.13 0.13 0.12 0.12 0.11 24.278 0.11 0.10 0.09 0.08 0.07 0.06 0.05 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) DA 11 0.011 2.366 12.22 13.39 1232.61 Line Start Time Flow Values @ time increment of 0.036 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 8.263 0.05 0.05 0.05 0.06 0.06 0.06 0.06 8.517 0.07 0.07 0.07 0.08 0.08 0.08 0.09 8.771 0.09 0.09 0.10 0.10 0.10 0.11 0.11 WinTR-20 Version 1.0 Page 3 05/11/2010 10:45 Cedar Creek II Wind Project Developed - CCII with Offsite Runoff for Channels & Spillway Line Start Time Flow Values @ time increment of 0.036 hr • WinTR-55, Version 1.00.08 Page 3 5/11/2010 10:48:41 AM • Cedar Creek II Wind Project Developed - CCII with 0ffsite Runoff for Channels & Spillway Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 9.025 0.12 0.12 0.12 0.13 0.13 0.14 0.14 9.280 0.14 0.15 0.15 0.16 0.16 0.16 0.17 9.534 0.17 0.18 0.16 0.18 0.19 0.19 0.19 9.788 0.20 0.20 0.21 0.21 0.22 0.22 0.23 10.042 0.23 0.24 0.25 0.26 0.26 0.27 0.28 10.296 0.29 0.30 0.30 0.31 0.32 0.33 0.35 10.551 0.36 0.37 0.38 0.39 0.40 0.42 0.43 10.805 0.45 0.46 0.48 0.50 0.51 0.53 0.55 11.059 0.57 0.59 0.61 0.64 0.66 0.69 0.72 11.313 0.75 0.78 0.82 0.86 0.90 0.94 0.99 11.567 1.05 1.12 1.22 1.36 1.56 1.83 2.19 11.822 2.68 3.32 4.15 5.17 6.36 7.72 9.14 12.076 10.50 11.69 12.61 13.19 13.39 13.23 12.78 12.330 12.13 11.32 10.40 9.47 8.58 7.75 7.00 12.584 6.36 5.81 5.31 4.87 4.48 4.13 3.81 12.838 3.53 3.28 3.06 2.87 2.70 2.54 2.41 13.093 2.29 2.18 2.08 1.99 1.91 1.84 1.77 13.347 1.71 1.65 1.60 1.55 1.51 1.46 1.42 13.601 1.38 1.35 1.31 1.28 1.26 1.23 1.21 13.855 1.18 1.16 1.14 1.12 1.10 1.08 1.06 14.110 1.04 1.02 1.01 0.99 0.97 0.96 0.95 14.364 0.93 0.92 0.91 0.90 0.89 0.88 0.87 • 14.618 0.86 0.85 0.85 0.84 0.83 0.83 0.82 14.872 0.81 0.81 0.80 0.79 0.79 0.78 0.77 15.126 0.77 0.76 0.76 0.75 0.74 0.74 0.73 15.381 0.73 0.72 0.72 0.71 0.70 0.70 0.69 15.635 0.69 0.68 0.67 0.67 0.66 0.66 0.65 15.889 0.64 0.64 0.63 0.63 0.62 0.62 0.61 16.143 0.60 0.60 0.59 0.59 0.58 0.58 0.57 16.397 0.57 0.56 0.56 0.56 0.55 0.55 0.55 16.652 0.55 0.54 0.54 0.54 0.54 0.53 0.53 16.906 0.53 0.53 0.52 0.52 0.52 0.52 0.51 17.160 0.51 0.51 0.51 0.51 0.50 0.50 0.50 17.414 0.50 0.50 0.49 0.49 0.49 0.49 0.48 17.666 0.48 0.48 0.48 0.48 0.47 0.47 0.47 17.923 0.47 0.47 0.46 0.46 0.46 0.46 0.46 18.177 0.45 0.45 0.45 0.45 0.44 0.44 0.44 18.431 0.44 0.44 0.43 0.43 0.43 0.43 0.43 18.685 0.42 0.42 0.42 0.42 0.41 0.41 0.41 18.940 0.41 0.41 0.40 0.40 0.40 0.40 0.40 19.194 0.39 0.39 0.39 0.39 0.38 0.38 0.38 19.448 0.38 0.38 0.37 0.37 0.37 0.37 0.36 19.702 0.36 0.36 0.36 0.36 0.35 0.35 0.35 19.956 0.35 0.35 0.34 0.34 0.34 0.34 0.33 20.211 0.33 0.33 0.33 0.33 0.33 0.32 0.32 20.465 0.32 0.32 0.32 0.32 0.32 0.32 0.32 20.719 0.32 0.32 0.31 0.31 0.31 0.31 0.31 20.973 0.31 0.31 0.31 0.31 0.31 0.31 0.31 21.227 0.31 0.31 0.31 0.31 0.31 0.31 0.31 21.482 0.31 0.31 0.31 0.30 0.30 0.30 0.30 21.736 0.30 0.30 0.30 0.30 0.30 0.30 0.30 WinTR-20 Version 1.0 Page 4 05/11/2010 10:45 Cedar Creek II Wind Project Developed - CCII with Offsite Runoff for Channels & Spillway • WinTR-55, Version 1.00.08 Page 4 5/11/2010 10:48:41 AM Cedar Creek II Wind Project • Developed - CCII with Offsite Runoff for Channels & Spillway Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Line Start Time Flow Values @ time increment of 0.036 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 21.990 0.30 0.30 0.30 0.30 0.30 0.30 0.30 22.244 0.30 0.30 0.30 0.30 0.30 0.30 0.29 22.498 0.29 0.29 0.29 0.29 0.29 0.29 0.29 22.753 0.29 0.29 0.29 0.29 0.29 0.29 0.29 23.007 0.29 0.29 0.29 0.29 0.29 0.29 0.29 23.261 0.29 0.29 0.28 0.28 0.28 0.28 0.28 23.515 0.28 0.28 0.28 0.28 0.28 0.28 0.28 23.770 0.28 0.28 0.28 0.28 0.26 0.28 0.26 24.024 0.28 0.27 0.27 0.26 0.26 0.24 0.23 24.278 0.21 0.19 0.17 0.15 0.13 0.11 0.09 24.532 0.08 0.07 0.06 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) DA T2 0.010 2.198 12.32 9.13 955.43 Line Start Time Flow Values @ time increment of 0.047 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) • 9.044 0.05 0.05 0.06 0.06 0.07 0.07 0.07 9.376 0.08 0.08 0.09 0.09 0.09 0.10 0.10 9.709 0.10 0.11 0.11 0.12 0.12 0.13 0.13 10.041 0.14 0.14 0.15 0.15 0.16 0.17 0.16 10.374 0.18 0.19 0.20 0.21 0.22 0.23 0.24 10.706 0.25 0.26 0.28 0.29 0.31 0.32 0.34 11.039 0.35 0.37 0.39 0.41 0.43 0.46 0.49 11.371 0.51 0.55 0.58 0.62 0.66 0.72 0.60 11.704 0.91 1.07 1.30 1.65 2.14 2.81 3.64 12.036 4.61 5.68 6.75 7.70 8.46 8.93 9.13 12.368 9.08 6.81 8.39 7.85 7.23 6.57 5.94 12.701 5.35 4.84 4.40 4.02 3.68 3.37 3.10 13.033 2.86 2.65 2.46 2.29 2.14 2.01 1.89 13.366 1.79 1.69 1.61 1.53 1.46 1.40 1.35 13.698 1.29 1.25 1.20 1.16 1.12 1.09 1.05 14.031 1.02 0.99 0.96 0.93 0.91 0.69 0.86 14.363 0.85 0.83 0.81 0.80 0.78 0.77 0.76 14.696 0.75 0.74 0.73 0.72 0.71 0.70 0.70 15.028 0.69 0.68 0.67 0.67 0.66 0.65 0.65 15.361 0.64 0.63 0.63 0.62 0.61 0.61 0.60 15.693 0.59 0.59 0.58 0.57 0.57 0.56 0.55 16.026 0.55 0.54 0.53 0.53 0.52 0.52 0.51 16.358 0.50 0.50 0.49 0.49 0.48 0.48 0.48 16.690 0.47 0.47 0.47 0.46 0.46 0.46 0.45 17.023 0.45 0.45 0.45 0.44 0.44 0.44 0.44 17.355 0.43 0.43 0.43 0.43 0.42 0.42 0.42 17.688 0.42 0.41 0.41 0.41 0.41 0.40 0.40 18.020 0.40 0.40 0.40 0.39 0.39 0.39 0.39 18.353 0.38 0.38 0.38 0.38 0.37 0.37 0.37 WinTR-20 Version 1.0 Page 5 05/11/2010 10:45 Cedar Creek II Wind Project • WinTR-55, Version 1.00.08 Page 5 5/11/2010 10:48:41 AM • Cedar Creek II Wind Project Developed - CCII with Offsite Runoff for Channels & Spillway Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Developed - CCII with Offsite Runoff for Channels & Spillway Line Start Time Flow Values @ time increment of 0.047 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 18.685 0.37 0.36 0.36 0.36 0.36 0.36 0.35 19.018 0.35 0.35 0.35 0.34 0.34 0.34 0.34 19.350 0.33 0.33 0.33 0.33 0.32 0.32 0.32 19.683 0.32 0.31 0.31 0.31 0.31 0.30 0.30 20.015 0.30 0.30 0.30 0.29 0.29 0.29 0.29 20.348 0.28 0.28 0.28 0.28 0.26 0.28 0.27 20.680 0.27 0.27 0.27 0.27 0.27 0.27 0.27 21.012 0.27 0.27 0.27 0.27 0.27 0.27 0.26 21.345 0.26 0.26 0.26 0.26 0.26 0.26 0.26 21.677 0.26 0.26 0.26 0.26 0.26 0.26 0.26 22.010 0.26 0.26 0.26 0.26 0.26 0.25 0.25 22.342 0.25 0.25 0.25 0.25 0.25 0.25 0.25 22.675 0.25 0.25 0.25 0.25 0.25 0.25 0.25 23.007 0.25 0.25 0.25 0.25 0.25 0.25 0.24 23.340 0.24 0.24 0.24 0.24 0.24 0.24 0.24 23.672 0.24 0.24 0.24 0.24 0.24 0.24 0.24 24.005 0.24 0.24 0.23 0.23 0.22 0.22 0.20 24.337 0.19 0.17 0.15 0.14 0.12 0.10 0.09 . 24.670 0.07 0.06 0.05 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) OUTLET 0.034 2.337 12.27 37.66 1121.42 Line Start Time Flow Values @ time increment of 0.036 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) )cfs) 8.207 0.05 0.08 0.10 0.11 0.11 0.12 0.12 6.459 0.13 0.13 0.14 0.14 0.15 0.15 0.16 8.710 0.16 0.17 0.18 0.18 0.19 0.20 0.20 8.962 0.21 0.22 0.27 0.34 0.35 0.36 0.37 9.213 0.39 0.40 0.41 0.42 0.43 0.45 0.46 9.465 0.47 0.48 0.49 0.50 0.51 0.52 0.53 9.717 0.55 0.56 0.57 0.58 0.60 0.61 0.62 9.968 0.64 0.66 0.68 0.69 0.71 0.73 0.75 10.220 0.78 0.80 0.82 0.85 0.87 0.90 0.93 10.471 0.96 0.99 1.02 1.05 1.09 1.12 1.16 10.723 1.20 1.24 1.28 1.32 1.37 1.42 1.47 10.974 1.52 1.57 1.63 1.69 1.75 1.82 1.88 11.226 1.96 2.04 2.12 2.21 2.31 2.42 2.53 11.477 2.65 2.78 2.93 3.12 3.35 3.66 4.09 11.729 4.68 5.48 6.54 7.96 9.82 12.16 14.95 11.981 18.21 21.85 25.61 29.22 32.43 35.00 36.77 12.232 37.64 37.66 36.93 35.65 33.91 31.85 29.65 12.464 27.42 25.25 23.18 21.29 19.57 18.00 16.57 12.735 15.30 14.16 13.13 12.20 11.38 10.64 9.96 12.987 9.36 8.82 8.33 7.89 7.50 7.14 6.81 13.238 6.51 6.23 5.99 5.76 5.55 5.35 5.18 • WinTR-20 Version 1.0 Page 6 05/11/2010 10:45 WinTR-55, Version 1.00.08 Page 6 5/11/2010 10:48:41 AM Cedar Creek II Wind Project • Developed - CCII with Offsite Runoff for Channels & Spillway Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Cedar Creek II Wind Project Developed - CCII with Offsite Runoff for Channels & Spillway Line Start Time Flow Values @ time increment of 0.036 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 13.490 5.01 4.86 4.71 4.57 4.44 4.33 4.22 13.741 4.11 4.02 3.93 3.84 3.76 3.68 3.61 13.993 3.53 3.46 3.39 3.33 3.27 3.21 3.15 14.245 3.09 3.04 3.00 2.95 2.91 2.87 2.83 14.496 2.80 2.77 2.74 2.71 2.68 2.66 2.63 14.748 2.61 2.58 2.56 2.54 2.52 2.50 2.48 14.999 2.46 2.44 2.42 2.40 2.38 2.36 2.35 15.251 2.33 2.31 2.29 2.27 2.25 2.24 2.22 15.502 2.20 2.18 2.16 2.15 2.13 2.11 2.09 15.754 2.07 2.06 2.04 - 2.02 2.00 1.98 1.97 16.006 1.95 1.93 1.91 1.89 1.88 1.86 1.84 16.257 1.83 1.81 1.80 1.78 1.77 1.75 1.74 16.509 1.73 1.72 1.71 1.70 1.69 1.68 1.67 16.760 1.67 1.66 1.65 1.64 1.64 1.63 1.62 17.012 1.61 1.61 1.60 1.59 1.59 1.58 1.57 17.263 1.57 1.56 1.55 1.55 1.54 1.53 1.53 17.515 1.52 1.51 1.51 1.50 1.50 1.49 1.48 • 17.766 1.48 1.47 1.46 1.46 1.45 1.44 1.44 18.018 1.43 1.42 1.42 1.41 1.40 1.40 1.39 18.270 1.39 1.38 1.37 1.37 1.36 1.35 1.35 18.521 1.34 1.33 1.33 1.32 1.31 1.31 1.30 18.773 1.29 1.29 1.28 1.28 1.27 1.26 1.26 19.024 1.25 1.24 1.24 1.23 1.22 1.22 1.21 19.276 1.20 1.20 1.19 1.18 1.18 1.17 1.16 19.527 1.16 1.15 1.14 1.14 1.13 1.12 1.12 19.779 1.11 1.10 1.10 1.09 1.08 1.08 1.07 20.030 1.06 1.06 1.05 1.04 1.04 1.03 1.03 20.282 1.02 1.02 1.01 1.01 1.00 1.00 0.99 20.534 0.99 0.99 0.98 0.98 0.98 0.98 0.97 20.785 0.97 0.97 0.97 0.97 0.97 0.96 0.96 21.037 0.96 0.96 0.96 0.96 0.95 0.95 0.95 21.288 0.95 0.95 0.95 0.95 0.95 0.94 0.94 21.540 0.94 0.94 0.94 0.94 0.94 0.94 0.93 21.791 0.93 0.93 0.93 0.93 0.93 0.93 0.92 22.043 0.92 0.92 0.92 0.92 0.92 0.92 0.92 22.294 0.91 0.91 0.91 0.91 0.91 0.91 0.91 22.546 0.91 0.90 0.90 0.90 0.90 0.90 0.90 22.798 0.90 0.90 0.89 0.89 0.89 0.89 0.89 23.049 0.89 0.89 0.89 0.88 0.88 0.88 0.88 23.301 0.88 0.88 0.88 0.88 0.87 0.87 0.87 23.552 0.87 0.87 0.87 0.87 0.86 0.86 0.86 23.804 0.86 0.86 0.86 0.86 0.86 0.85 0.85 24.055 0.85 0.84 0.82 0.80 0.77 0.74 0.69 24.307 0.64 0.58 0.53 0.47 0.42 0.37 0.32 24.558 0.28 0.20 0.14 0.08 0.07 0.06 0.05 WinTR-55, Version 1.00.08 Page 7 5/11/2010 10:48:41 AM • • Cedar Creek II Wind Project Developed - CCII with Offsite Runoff for Channels & Spillway Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (c£s) (csm) WinTR-20 Version 1.0 Page 7 05/11/2010 10:45 Cedar Creek II Wind Project Developed - CCII with Offsite Runoff for Channels & Spillway Area or Drainage Peak Flow by Storm Reach Area Alternate 100-Yr Identifier (sq mi) (cfs) (cfs) (cfs) (cfs) (cfs) DA P1 0.816E-02 10.5 DA P2 0.500E-02 5.5 DA Ti 0.01 13.4 DA T2 0.956E-02 9.1 OUTLET 0.03 37.7 411 • WinTR-55, Version 1.00.08 Page 8 5/11/2010 10:48:41 AM Cedar Creek II Wind Project • Developed - CCII with Offsite Runoff for Channels & Spillway Name of printed page file: TR20.Out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) WinTR-20 Version 1.0 Page 8 05/11/2010 10:45 S WinTR-55, Version 1.00.08 Page 9 5/11/2010 10:48:41 AM • Cedar Creek II Wind Project Site Developed Condition 100-YR Storm Runoff Calculations for Drainage Area South of CR 132 • WinTR-55 Current Data Description --- Identification Data --- User: Tetra Tech Date: 5/11/2010 Project: Cedar Creek II Wind Project Units: English SubTitle: CCII - 100-Year Runoff for DA South of CR 132 Areal Units: Acres State: Colorado County: Weld Filename: P:\BPAE_Wind\Colorado\Cedar Creek II\Engineering\Hydrology Modeling\CCII Drainage Area South --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc CR132 S DA South of CR 132 Basin 132 151.94 69 1.930 Total area: 151.94 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr -Yr (in) (in) (in) (in) (in) (in) (in) • 1.8 2.35 2.7 3.2 3.6 4.0 .0 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> • WinTR-55, Version 1.00.08 Page 1 5/11/2010 11:03:14 AM Tetra Tech Cedar Creek II Wind Project • CCII - 100-Year Runoff for DA South of CR 132 Weld County, Colorado Storm Data Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr -Yr (in) (in) (in) (in) (in) (in) (in) 1.8 2.35 2.7 3.2 3.6 4.0 .0 Storm Data Source: User-provided custom storm data Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> • WinTR-55, Version 1.00.08 Page 1 5/11/2010 11:03:14 AM • • Tetra Tech Cedar Creek II Wind Project CCII - 100-Year Runoff for DA South of CR 132 Weld County, Colorado Watershed Peak Table Sub-Area Peak Flow by Rainfall Return Period or Reach 100-Yr Identifier (cfs) SUBAREAS CR132 S 59.46 REACHES Basin 132 59.46 Down 58.90 OUTLET 58.90 • • WinTR-55, Version 1.00.08 Page 1 5/11/2010 11:03:14 AM Tetra Tech Cedar Creek II Wind Project CCII - 100-Year Runoff for DA South of CR 132 Weld County, Colorado Hydrograph Peak/Peak Time Table Sub-Area Peak Flow and Peak Time (hr) by Rainfall Return Period or Reach 100-Yr Identifier (cfs) (hr) SUBAREAS CR132 S 59.46 13.17 REACHES Basin 132 59.46 13.17 Down 58.90 13.29 OUTLET 58.90 • WinTR-55, Version 1.00.08 Page 1 5/11/2010 11:03:14 AM • • Tetra Tech Cedar Creek II Wind Project CCII - 100-Year Runoff for DA South of CR 132 Weld County, Colorado Structure Output Table Reach Peak Flow (PF) , Storage Volume (SV) , Stage (STG) Identifier by Rainfall Return Period Structure Identifier 100-Yr Reach: Basin 132 Weir : Basin 132 72.5 (ft) PF (cfs) 58.90 SV (ac ft) .44 SIC (ft) .41 • • WinTR-55, Version 1.00.06 Page 1 5/11/2010 11:03:14 AM Tetra Tech Cedar Creek II Wind Project • CCII - 100-Year Runoff for DA South of CR 132 Weld County, Colorado Sub-Area Summary Table Sub-Area Drainage Time of Curve Receiving Sub-Area Identifier Area Concentration Number Reach Description (ac) (hr) CR132 S 151.94 1.930 69 Basin 132 DA South of CR 132 Total Area: 151.94 (ac) • WinTR-55, Version 1.00.08 Page 1 5/11/2010 11:03:14 AM • • Tetra Tech Cedar Creek II Wind Project CCII - 100-Year Runoff for DA South of CR 132 Weld County, Colorado Reach Summary Table Receiving Reach Routing Reach Reach Length Method Identifier Identifier (ft) Basin 132 Outlet STRUCTURE(Basin 132) • • WinTR-55, Version 1.00.08 Page 1 5/11/2010 11:03:14 AM Tetra Tech Cedar Creek II Wind Project • CCII - 100-Year Runoff for DA South of CR 132 Weld County, Colorado Sub-Area Time of Concentration Details Sub-Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) CR132 S User-provided 1.930 Time of Concentration 1.930 • WinTR-55, Version 1.00.08 Page 1 5/11/2010 11:03:14 AM • • Tetra Tech Cedar Creek II Wind Project CCII - 100-Year Runoff for DA South of CR 132 Weld County, Colorado Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) CR132 S Pasture, grassland or range (fair) S 151.942 69 Total Area / Weighted Curve Number 151.94 69 • • WinTR-55, Version 1.00.08 Page 1 5/11/2010 11:03:14 AM Tetra Tech Cedar Creek II Wind Project • CCII - 100-Year Runoff for DA South of CR 132 Weld County, Colorado Reach Channel Rating Details Reach Reach Reach Friction Bottom Side Identifier Length Manning's Slope Width Slope (ft) n (ft/ft) (ft) Basin 132 (This reach is a structure: Basin 132) Reach End Top Friction Identifier Stage Flow Area Width Slope (ft) (cfs) (sq ft) (ft) (ft/ft) Basin 132 (This reach is a structure: Basin 132) • WinTR-55, Version 1.00.08 Page 1 5/11/2010 11:03:15 AM • • Tetra Tech Cedar Creek II Wind Project CCII - 100-Year Runoff for DA South of CR 132 Weld County, Colorado Structure Description - User Entered Surface Height Surface Reach Area @ Above Area @ Pipe Head on Weir Identifier Crest Crest Ht Above Diameter Pipe Length (ac) (ft) (ac) (in) (ft) (ft) Basin 132 0.72 .67 1.67 72.5 • • WinTR-55, Version 1.00.08 Page 1 5/11/2010 11:03:15 AM Tetra Tech Cedar Creek II Wind Project • CCII - 100-Year Runoff for DA South of CR 132 Weld County, Colorado Structure Rating Details - Computed Reach Pool Flows (cfs) @ Weir Length Idendifier Stage Storage Length #1 Length #2 Length #3 (ft) (ac ft) 72.5ft ft ft Basin 132 0 0.00 0.000 0.5 0.54 71.771 1 1.43 203.000 2 4.28 574.171 5 21.32 2269.609 10 78.10 6419.424 20 297.98 18156.872 • WinTR-55, Version 1.00.08 Page 1 5/11/2010 11:03:15 AM • • Cedar Creek II Wind Project CCII - 100-Year Runoff for DA South of CR 132 Name of printed page file: TR20.out STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) CR132 S 0.237 1.266 13.17 59.46 250.47 Line Start Time Flow Values @ time increment of 0.122 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 11.459 0.10 0.22 0.50 1.27 3.22 6.72 11.66 12.312 16.19 26.34 35.39 43.63 50.62 55.44 58.29 13.165 59.46 56.92 57.16 54.44 50.71 46.31 42.13 14.018 38.58 35.48 32.72 30.31 28.12 26.08 24.26 14.872 22.65 21.21 19.92 18.76 17.73 16.80 15.97 15.725 15.24 14.57 13.97 13.41 12.89 12.41 11.96 16.578 11.54 11.15 10.78 10.45 10.15 9.87 9.60 17.431 9.35 9.11 8.89 8.68 8.49 8.32 8.18 16.285 6.04 7.91 7.78 7.66 7.54 7.42 7.30 19.136 7.19 7.07 6.96 6.85 6.74 6.63 6.52 19.991 6.41 6.30 6.19 6.08 5.98 5.87 5.77 20.844 5.67 5.56 5.50 5.42 5.35 5.29 5.23 21.698 5.18 5.13 5.09 5.05 5.02 4.99 4.95 22.551 4.92 4.90 4.87 4.84 4.82 4.79 4.77 23.404 4.75 4.73 4.70 4.68 4.66 4.64 4.60 24.257 4.55 4.46 4.33 4.15 3.91 3.62 3.30 25.111 2.96 2.61 2.28 1.97 1.68 1.42 1.20 • 25.964 1.01 0.86 0.73 0.62 0.53 0.45 0.36 26.617 0.32 0.27 0.23 0.19 0.16 0.14 0.12 27.671 0.10 0.06 0.07 0.06 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Basin 132 0.237 Upstream 1.266 13.17 59.46 250.47 Line Start Time Flow Values @ time increment of 0.122 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 11.459 0.10 0.22 0.50 1.27 3.22 6.72 11.66 12.312 18.19 26.34 35.39 43.83 50.62 55.44 58.29 13.165 59.46 58.92 57.16 54.44 50.71 46.31 42.13 14.018 38.58 35.48 32.72 30.31 28.12 26.08 24.26 14.672 22.65 21.21 19.92 18.76 17.73 16.80 15.97 15.725 15.24 14.57 13.97 13.41 12.89 12.41 11.96 16.578 11.54 11.15 10.76 10.45 10.15 9.67 9.60 17.431 9.35 9.11 8.89 8.68 8.49 8.32 8.18 18.285 8.04 7.91 7.78 7.66 7.54 7.42 7.30 WinTR-20 Version 1.0 Page 1 05/11/2010 11:02 Cedar Creek II Wind Project CCII - 100-Year Runoff for DA South of CR 132 Line Start Time Flow Values @ time increment of 0.122 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 19.138 7.19 7.07 6.96 6.85 6.74 6.63 6.52 19.991 6.41 6.30 6.19 6.08 5.98 5.87 5.77 • WinTR-55, Version 1.00.08 Page 1 5/11/2010 11:03:49 AM Cedar Creek II Wind Project CCII - 100-Year Runoff for DA South of CR 132 • Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 20.844 5.67 5.58 5.50 5.42 5.35 5.29 5.23 21.698 5.18 5.13 5.09 5.05 5.02 4.99 4.95 22.551 4.92 4.90 4.87 4.84 4.82 4.79 4.77 23.404 4.75 4.73 4.70 4.68 4.66 4.64 4.60 24.257 4.55 4.46 4.33 4.15 3.91 3.62 3.30 25.111 2.96 2.61 2.28 1.97 1.68 1.42 1.20 25.964 1.01 0.86 0.73 0.62 0.53 0.45 0.38 26.817 0.32 0.27 0.23 0.19 0.16 0.14 0.12 27.671 0.10 0.08 0.07 0.06 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Basin 132 0.237 Downstream 1.266 0.41 13.29 58.90 248.10 Line Start Time Flow Values @ time increment of 0.122 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 11.580 0.14 0.32 0.79 2.01 4.45 8.33 13.70 12.434 20.65 28.90 37.48 45.23 51.40 55.69 58.16 13.287 58.90 58.15 56.21 53.24 49.41 45.25 41.35 14.140 37.91 34.67 32.20 29.82 27.65 25.67 23.91 • 14.993 22.33 20.92 19.66 18.54 17.52 16.62 15.81 15.847 15.09 14.43 13.84 13.29 12.78 12.30 11.86 16.700 11.45 11.06 10.71 10.38 10.08 9.80 9.54 17.553 9.29 9.06 8.84 8.63 8.45 8.29 8.14 18.407 8.01 7.88 7.75 7.63 7.51 7.39 7.27 19.260 7.16 7.05 6.93 6.82 6.71 6.60 6.49 20.113 6.38 6.27 6.16 6.06 5.95 5.85 5.75 20.966 5.65 5.56 5.48 5.41 5.34 5.28 5.22 21.820 5.17 5.13 5.08 5.05 5.01 4.98 4.95 22.673 4.92 4.69 4.86 4.84 4.81 4.79 4.77 23.526 4.74 4.72 4.70 4.68 4.65 4.63 4.58 24.379 4.52 4.42 4.27 4.08 3.82 3.53 3.20 25.233 2.67 2.53 2.21 1.90 1.62 1.37 1.16 26.086 0.98 0.83 0.71 0.60 0.51 0.43 0.37 26.939 0.31 0.26 0.22 0.19 0.16 0.13 0.11 27.792 0.10 0.08 0.07 0.06 Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) OUTLET 0.237 1.266 13.29 58.90 248.10 WinTR-20 Version 1.0 Page 2 05/11/2010 11:02 Cedar Creek II Wind Project CCII - 100-Year Runoff for DA South of CR 132 Line Start Time Flow Values @ time increment of 0.122 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) WinTR-55, Version 1.00.08 Page 2 5/11/2010 11:03:49 AM • • Cedar Creek II Wind Project CCII - 100-Year Runoff for DA South of CR 132 Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 11.580 0.14 0.32 0.79 2.01 4.45 8.33 13.70 12.434 20.65 28.90 37.48 45.23 51.40 55.69 58.16 13.287 58.90 58.15 56.21 53.24 49.41 45.25 41.35 14.140 37.91 34.87 32.20 29.82 27.65 25.67 23.91 14.993 22.33 20.92 19.66 18.54 17.52 16.62 15.81 15.847 15.09 14.43 13.84 13.29 12.78 12.30 11.86 16.700 11.45 11.06 10.71 10.38 10.08 9.80 9.54 17.553 9.29 9.06 8.84 8.63 8.45 8.29 8.14 18.407 8.01 7.88 7.75 7.63 7.51 7.39 7.27 19.260 7.16 7.05 6.93 6.82 6.71 6.60 6.49 20.113 6.38 6.27 6.16 6.06 5.95 5.85 5.75 20.966 5.65 5.56 5.48 5.41 5.34 5.28 5.22 21.820 5.17 5.13 5.08 5.05 5.01 4.98 4.95 22.673 4.92 4.89 4.86 4.84 4.81 4.79 4.77 23.526 4.74 4.72 4.70 4.68 4.65 4.63 4.58 24.379 4.52 4.42 4.27 4.08 3.82 3.53 3.20 25.233 2.87 2.53 2.21 1.90 1.62 1.37 1.16 26.086 0.98 0.83 0.71 0.60 0.51 0.43 0.37 26.939 0.31 0.26 0.22 0.19 0.16 0.13 0.11 27.792 0.10 0.08 0.07 0.06 • WinTR-20 Version 1.0 Page 3 05/11/2010 11:02 Cedar Creek II Wind Project CCII - 100-Year Runoff for DA South of CR 132 Area or Drainage Peak Flow by Storm Reach Area Alternate 100-Yr • WinTR-55, Version 1.00.08 Page 3 5/11/2010 11:03:49 AM Cedar Creek II Wind Project CCII - 100-Year Runoff for DA South of CR 132 • Name of printed page file: TR20.out (continued) STORM 100-Yr Area or Drainage Rain Gage Runoff Peak Flow Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Identifier (sq mi) (cfs) (cfs) (cfs) (cfs) (cfs) CR132 S 0.24 59.5 Basin 132 0.24 59.5 DOWNSTREAM 58.9 OUTLET 0.24 58.9 • WinTR-20 Version 1.0 Page 4 05/11/2010 11:02 WinTR-55, Version 1.00.08 Page 4 5/11/2010 11:03:49 AM • Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Appendix B: Hydraulic Computations • • Cedar Creek II Wind Farm Project • Drainage Channel P2: 100 Year Peak Flow - Retardance C Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.163 Channel Slope 0.00290 ft/ft Left Side Slope 4.00 ft/ft(H:V) Right Side Slope 4.00 ft/ft(H:V) Discharge 5.47 ft3/s Results Normal Depth 1.76 ft Flow Area 12.38 ft2 Wetted Perimeter 14.51 ft Top Width 14.08 ft Critical Depth 0.65 ft Critical Slope 0.58631 ft/ft Velocity 0.44 fUs Velocity Head 0.00 ft • Specific Energy 1.76 ft Froude Number 0.08 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity fUs Upstream Velocity Infinity fUs Normal Depth 1.76 ft Critical Depth 0.65 ft Channel Slope 0.00290 ft/ft Critical Slope 0.58631 ft/ft Bentley Systems,Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.068.00] • 5/10/2010 5:33:20 PM 27 Siemons Company Drive Suite 200 W Watertown,CT 06795 USA ♦1.203.755.1666 Page 1 of 1 • Drainage Channel P2: 100-Year Peak Flow - Retardance D Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.082 Channel Slope 0.00290 ftlft Left Side Slope 4.00 ft/ft(H:V) Right Side Slope 4.00 ft/ft(H:V) Discharge 5.47 ft/s Results Normal Depth 1.36 ft Flow Area 7.40 ft2 Wetted Perimeter 11.21 ft Top Width 10.88 ft Critical Depth 0.65 ft Critical Slope 0.14837 ft/ft Velocity 0.74 ft/s Velocity Head 0.01 ft • Specific Energy 1.37 ft Froude Number 0.16 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 1.36 ft Critical Depth 0.65 ft Channel Slope 0.00290 ft/ft Critical Slope 0.14837 ft/ft • Bentley Systems,Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.068.00] 5/10/2010 5:34:23 PM 27 Siemons Company Drive Suite 200 W Watertown,CT 06795 USA +1-203-755-1666 Page 1 of 1 • Drainage Channel TI: 100-Year Peak Flow - Retardance C Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.099 Channel Slope 0.00320 ft/ft Left Side Slope 4.00 ft/ft(H:V) Right Side Slope 4.00 ft/ft(H:V) Discharge 13.39 ft2/s Results Normal Depth 2.00 ft Flow Area 16.07 ft2 Wetted Perimeter 16.53 ft Top Width 16.03 ft Critical Depth 0.93 ft Critical Slope 0.19194 ft/ft Velocity 0.83 ft/s Velocity Head 0.01 ft • Specific Energy 2.02 ft Froude Number 0.15 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 2.00 ft Critical Depth 0.93 ft Channel Slope 0.00320 ft/ft Critical Slope 0.19194 ft/ft • Bentley Systems,Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.068.00] 5/10/2010 5:32:06 PM 27 Siemons Company Drive Suite 200 W Watertown,CT 06795 USA +1-203-755-1666 Page 1 of 1 • Drainage Channel T1: 100-Year Peak Flow - Retardance D Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.059 Channel Slope 0.00320 ft/ft Left Side Slope 4.00 ft/ft(H:V) Right Side Slope 4.00 ft/ft(H:V) Discharge 13.39 fN/s Results Normal Depth 1.65 ft Flow Area 10.90 ft2 Wetted Perimeter 13.61 ft Top Width 13.21 ft Critical Depth 0.93 ft Critical Slope 0.06817 ft/ft Velocity 1.23 ft/s Velocity Head 0.02 ft • Specific Energy 1.67 ft Froude Number 0.24 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 1.65 ft Critical Depth 0.93 ft Channel Slope 0.00320 ftft Critical Slope 0.06817 fUft Bentley Systems,Inc. Haestad Methods Solution Center Bentley FlowMaster (08.01.068.00] • 5110/2010 5:29:49 PM 27 Siemons Company Drive Suite 200 W Watertown,CT 06795 USA +1-203-755-1666 Page 1 of 1 • Emergency Spillway - Detention Basin P Project Description Solve For Headwater Elevation Input Data Discharge 37.66 ft3/s Crest Elevation 5132.25 ft Weir Coefficient 3.00 US Crest Length 40.00 ft Results Headwater Elevation 5132.71 ft Headwater Height Above Crest 0.46 ft Flow Area 18.47 ft2 Velocity 2.04 ft/s Wetted Perimeter 40.92 ft Top Width 40.00 ft • Bentley Systems,Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.068.00] • 5/10/2010 5:36:13 PM 27 Siemons Company Drive Suite 200 W Watertown,CT 06795 USA t1-203.755-1666 Page 1 of 1 • Effective Spillway Weir- Drainage Basin Area South of CR 132 Project Description Solve For Discharge Input Data Headwater Elevation 5140.41 ft Crest Elevation 5140.00 ft Weir Coefficient 3.09 US Crest Length 72.50 ft Results Discharge 58.90 ft3/s Headwater Height Above Crest 0.41 ft Flow Area 29.72 ft2 Velocity 1.98 TVs Wetted Perimeter 73.32 ft Top Width 72.50 ft • Bentley Systems,Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.068.00] • 5/10/2010 5:38:00 PM 27 Siemons Company Drive Suite 200 W Watertown,CT 06795 USA +1-203-755-1666 Page 1 of 1 Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 Appendix C: Design Drawings • Cedar Creek II Wind Farm Project 3dA1/NOLLdIei0530 33N3M33321 •ON ONIMVH0 3dA1/N0LLdIa0S30 30N3N3d3?1 '0N ONIMVe30 ddV HH0 AG •oN 0/M N0ISU32i 31V0 'ON ddV )1H3 AG •°N 0/M NOISIA32J 31V0 '°N Q CO U o I DM CI0 Lti:S0 0A32J 1f10AV i O 0 w0 Z Z cx Lii I 4- O J 1.4.1.I W U I VI X w -. _ r w 0 w J m 1 w z J z Z — — t1 - - U z >- Y w � W � w w = o W f 1 . • • t I 1 w Z w H NO — -f , t N = Q U r WQ • \ .� I - Cr to -- i }- _--«L ------ --, = - ( ocsi W Q S I NI :, . cc YQ U w we o Z , • N N Y J cc O Q W ¢ U O O o U cn z • � ' D.: W. c O re U 3 La- _ J d T YUOU18 2 I / . ' Q'L.: tz • U z ton M N • O W tiOr......may, it • ' ww c� V 1r't' •• I, •1 cite- - • • W O 'y C • ,AW Z I G U 1 n a U ZZ Z tai- t- < _ U eta u� �i •il-O, Y. .I. 0( W W W H S7 O - 2 M O?U y 2 t I 'r \ \\ : rt• S � 0 ao z Z it ' `f • •1 U 0 w Q un_ Li cc UJ t W Oar /Q �2 FU0U ^ CD ¢ O tJ o0 , • V � oo � a in 1 a a0 0 G •aou \`\, CC L-1 CL III a � pvoi Z Z Ig • W Q VI i , IIIU m Z W JJK rZ � [n - ¢ ZZV- v �/ \ __ coo Z Q ' O Z ¢ ZO J C.•2 U ICI a W.,a N S I J 9 O oaoa � Wcn Q Z xo� 4 � oK � 8SL ; �` mop ono= I WOWZ N W O J J ¢ W ! ZH # f # LL t O O W 0 � \ :, 0 z f b Cr oho I 11 _ 1 W te Z \ \\ S d re 0 U i 'i�� • # 1 , co �' µ Q b 0< ,. 0 X O Z w N 7 W IX 2 U ° = ttttttt� I- W N 1-• W a W2 CC W0000000000000 O O O O O O 0 O O O O O 0 0 0 0 0 0 0 0 0 0 o a o U W N N N N N N N N N N N N N Q ♦ •f Y Y Y ♦ ♦ Y Y O • Y Y [n N. N. \ N. \ \ \ N. \ N. N. Na \ N in N N N if) in in in in in in N M Z O O O O O O 0 O O O O O O n O O < — X- vi W Q I"MW OW T CC i d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0CL i Z Q 0 rZ O W N N Lum G/\ Q p W 1W� W C Li 6 5 O O W W m = O i_ ra- 2 o % g ��',, o ¢ O cWi W 4i z W Z Z a U J L_ W �` 2 o a cc CO W w �. > O o Itt W n. K K W O pW y O _ W 0 Q IN N > Cr (Cr m m 4 ? V2 E. 7 re 'z?I W ZaU V W W U a I •• ern; 3 L_ W w < r< U U U O W La-IL4 40 2 O O 2 N f0/1 2 t Q U Q 8 N a U N LL ig < 4 Iii V U �a = — K LJ 4 �' U m W O Z E. Z 0.1 P co CC < u o o N " 5 ZZQ o o ¢ ZO N Z a Z Z W I- W r 0 D W g z ₹ � z N z a at Q w N O U L WQ d a a o o ocui o o 0 a z ; 0 _ z N = O u o re on z l 0 0 0' 0 o PO Op �/� W J Z < ¢ I--• W N f 7 a N a W %O p p z ; -i m ¢ li n. iii U Q LO N a 7 V < {Z/� p Z 0 <Y r I. 23 z O j Z 0 a Z Z Q J Z <20' qq, tJ 4 Cj 7 O U U 6 0 a ZO 3 N O y'ij p Q W IT p Z L K U 1 LWj 1 J U Q Y p0 o `0 U O Z l._ Z t"� a O Q ClioQ. G. K Q 6s, (D Z k" m m K W W m ? Q O J Sa yJj G, 2 U O O r- I-- 0CC U 1._ K Ci CL o p 3 a O O U Z t Z O W w U O 1 re Z >-. CC C O Z J Cr to M W = W t te U W O O a s i 8 Ea 3 LU is_ ? 0 15". ~ tiNi omQ �3Q 1 0 o 3 a l34 of ! 1 a x ix z I.a `� m J Ci -' . 2 t - � wYVI �.� V) Z Z - N f z a p eta tJ W O 0 J CO O �Qj O O Y Y Z O m U N 2- Jg U' U' R<' 99 .O U F O Q• p p o o Uri w w 0 U g a d a_ 0o S g 3 0 3 U rtJ�� 3 ¢ ZJwQ W K CC p' K a O N W K - W W O I U () a Q U 1- p a a 0 w w U U U N 0 = U < a a z,W, 0., d� r p m z N w a La- 0 0 CC COr < 00 -: J J J 2 .. < 2 Z ; CC OO O J o ¢ mreO at °n d - a ���[[ W ` or oo s 00 0} p;p py - 0a. ao $ W 1 vlNOa0 O U a W a W a d 2• N O W 2 2 a 6 K T W a N U Vl N W COW } NIDIui I-- CA l- 52 I I I I WWL` XD I II I OO � ¢ Z Z U p O I � ' p0o p = ¢ Z N v n o n m o x i \ X I I ¢ W ¢ CL Q ~ z o 0 0 0 0 0 0 8 Z I - I ONO � O r 3 U U U 0 U U U U 0 U 0 U U !LI I I I I I J J O N w roes a. d' I I I N ' WI W I00 O Lai J • . i 'I I i I I I o� or - I Z .- NM7 atlas ¢ m U 0 W Lt- I 3dA1/N0LLd180S3G 30N3213.i3?! '0N 0NIMVu0 3dA1/N0LLdId3S30 30N3N3J32! '0N 0NIMV80 ddV )4H0 AG '°N 0/M N0ISU3d 31VG '0N ddV )1H0 AS '°N 0/M N0ISIA321 31V0 '0N < m U 0 DMO'OLVLSO OA3a if10AVl V Uto zN cc a Z A— O O Q O. U ZLs_ 00wM << 0 — Q i c..) zW->w CY cn U i eioi.a� ao r Y 0_ 0 °° w `2 QW�1c Wo W J J I °' w D 1 2sic w , yj °op wN 9 J a Z W W?�?y�d WLC il�O l..L Q Z z u_ 5 50W ` g IEz W I- Z WI z ern3�0 et< <MU W Y W W Zc W cc a Q U L > m J LL 00411:-°. W ~(Y O Cr 1 W Q wzQZ Zr mZ AWS>S %W N (� (.-) F� W W 0 <O �oP-Fac <� C L.[_ Z QQQ < W J o w,n ,_ U Q i- La_ mQ NU N-1 ,< jrCY Wm /�e� _� Cr Q W W bJ 3 WKp,a WQ .20 V Q W D W U z� 5LIz Nlnc�$?r=- � o� W z o IN % 0 0004 z.<g <g t(N o \l F U.S Z Z a< �AN Irrzzox taixU �;Wa I % rC y< { 0 11 Ce H -Jo IV a5zt CI- I- z O z 3 sr3 Z= cop J o w I Q U( 6o wjw zcnx- 0.4 aim o I <L1 Q 3<05 8?3 �Zw55 O ni La ii OmmQ U W -i0 l6 V) N- OD Z W ZFQF T_ < O Z k'mN N > n I— • re rU m O W O ? L^ . < W o 6&CICI��' 0 O Z Ndud < O• o <- co I to acy) < 7d ix Ct 4 t3f Fl6 CD O 0 0 0 < < w CC VI U -� www3 7[ •m a a <�< IwilcavilVSO 0 O i- 0 a . —. — - - -- - Lai 2 KU ce % < Z cr — _ ,N,,; a 3 0 w O 0 J--- V o • .i 30 _ o z z .77. ___...H.,, kJ il ul 1 D i �' • � •' 1-2gI �� 1, I, W O o e 0 fy N. �:w i i C4:5 a U i J �11n (AWW.U+I.!`N �� 1� tai Of ci 4Jo I6„:�11 h . co t Li O I., \ �� PP . n §rWo8 ` �.. LD IA Jr Z :'' r0?U COCA 4. I ZVD ��'� rte— �� \ Z ,, _ d = o .. U I4 CC UThl {{�� W 6 3 NQ• G Z I � t � aO Z aiv `�_ = O�14 S. • W La X3Pi _ moQo Le _ <�z v �' �' ��^, O �wa f (� I,l 0 CwJ W _ �; a s x 00 r A OIainnt amw Q a wCe Cr Wdm CA O A Willi i� wt?7 0 "� n (��+ CC I-''w , �nS II" timiaj oWCI w _ IA � N N4 Z� 1 Na z Fz � _ V W • O Iy �' lco 2 a J- 0 1 Co UZ ? O ,- Q I U J N EE J J z in • w g� 8o ' '�i Z a � F Ci U O OZ 4 � '' ��� x ' ce < wcn ? m I �W �� w m0 7 � O � O 3 O n > _ Fu. i a _ _ 1 z � ^ �� a4a S tt way' L._ r.) I/ 1 UUpY O -- ZZ } < Ce O N �'— .! OF w .,'l W 0 W C9 (O 0 ( 0 J Z , o � \ i I "! f �� prO X , wA zwOw N./ / / g Ig n w " _ • I, ` z v mOcwilcz—.�IILL �_ J y� X? W �Y Z / ` > Y W IL n- w • / a aUri In U O< N 7. 0 < O 0 m W / z W In < a I w F- W N I // y0 I tea ^ z^W < o� W nW oho m / to g N�� 1 I^I/'7 ^ o � o �og _ ≤ v[v n cam` a A n t( lil a n � w\\1/44 / CiCi I ' {� v N ^ 'Am J I W � �aW .� w r N a O l lul `.' N V 42 m Z cr 2 ~ z st iN ON CS I ( O W , (n <= O O �1 I I .1 (O ) r ^� Kt M Z U Z .- O AS 373' — i _ Q F �y,' r. -- '-5132 - /, \ ^ UOUOX < ) W) a z � w .rNf W ^ �' ` �4 H W � H Nut nh ISrh UzZ ) �aila �'^ w_ t ) to NUc,�1 /• 15°Z �y C J y VK m< *Ila- 1� � �� I U a� p Let W� att 3, o �A y" Qg vy,j o YQ to r4�' S /la w3W W 1 rNo.LI •- Ea 00 z. ,,, o WCW . Q I Z-I 00 F- wi a W- xLS J a 23 1 0- W V Z • Z PO =Cs in 3 / '.� n oz .,� 3 {I o5 �� cr,J.ee co l•2 I I�. w Q / r J w Y ys. z N ,1,. V W ._ o I o ^ II ' _ f `J -- 7ii __c a di _ t� cm L.,i— en I Q= Q N V ;� WmU 3 N. H In a. u. 44 j <Z J< F� Z >-ie! A 1 c. U V JO IN I /-- I 8 JI Li v ( z eT [ 8 I Op' 0 < ' 00 0 0 I W I t1 3dA1/NOLLdIa0S30 3ON32i3d321 '0N ONIMVNO 3dA1/NOLLdIeJOS3O 33N3213d3b '0N ONIMVNO ddV MO AG '0N 0/M NOISIA3eI 31V0 'ON ddV NHO A8 '0N 0/M NOISIA32i 31V0 •0N < m c...) o 0M0'0141S0 0A3a if10AVi Q Z Wo Z U et I— en 0 U o ( = _ U u'I Y V) m W _I m W O _Id i_ U cr _ z U o Y w Z w O Q 0 Q CC w Q V) O ►- U -a. CC Q I- O o ~ Lai 1"O Ct N CL U le I Z li Ls., U c.)< > cn n n rn > U Lo O O m O N N V) Y < W U- < o o a 0 U 0 U) JV- rilO N a o < I e o o o < < 0CK D a re x K = d Z CC N . o a o w o aw.__, -cr. Nlu J O w „o re U Z N Z J O J rg W W 52 W CV j Lq •'?ter P <�)'1 r L W o 0 0 0 0 0 U e`�'l��$ ti O O 0 O O O wD0 O y jy �D t Z o 0 0 0 0 0 cao k' e" :o < i Z ka � v r) Cu 8 z2o= � o � o :Jits a . co • z ••LII Lii LSI V mU + ri 0 Cio =r� W Y fI )„,.. r"(e., " C + •• 4 O o aml w:- OWOw rri J m va� z .-I 00 I U0- • ---]u. " a b a o< u z I a x � o I I: _ � o, ON Z p G W / I O U O Q W a + - 0 _o ix I� J o r d O — Z o + I wONr ya o o.n ) 000 7 ^ Io ±n > zw CL I W m „ U m < a D ..-.I 4c .< „Lc.) I ..i., _+ >> WQ, Y O Z� a, a aKKw z O4 a I I W ,f lV Z W a '03 J 33 -, 0-x n a3 � 0- `zzO._ 2 }} _ WON JU „ U <NO zO O F C-5 (DOW W w J O I z Z i°4 T z0 K off ° �� W O 900 OW - Li.N ' 10 = >> Is. U U O Z< nzo3 Co U Z ? O I w ? Od N z Q ~ z �OOr-w tl' J .J I Z 80 �O OW ^jay M ZO - ' - `p l- a W W`,` of tO iOP-VZ < )- (] U IN m Z 00 ON p� Z� Orb Z?LI= O CC D p - Lf^ - + - ' b , I b v < r WZ iZ-cii .W„W �W tc,8pim " E �;;;;" ..,, ni 0 0 0 0 0 o N M U /z� yz n �� z a a ix P I J o? X w cn �. �•• 0 0 O O O O W `< <m I a3 <� rn We ₹„ Z Z .0 to v Cl N_ w a_ _ _ w za09I o zo ' O' I I r O I J F� U?f/1 �JA } O � U i ill id If1 N to Q W WF< oO wm O� w� OFOp I H r',iv) KW t- OF- CILLJ ZmZW ZWrNr W E U- Z L.� a Jaw Z0 � K K= Z� it Z Z < CC s a??F ZZ..j x21 go 021708 w o w C9 (n • CI -J-� iZ � w VI 0 O zWOw r a o NW Os v w oi� a aW; v. z5z aZ � z J w C.)I- ' 0 s 3 21 a�iii oD IL m ptwi) C9 p CO O_ . {w- �YW ��00 oz - zaZ ?U� O Dww Z I° r 00 „3 <iN w<< O<zt='= Oa �O< } menu' '-'-' < - 2 N W Talc, N r W~ 3 w Q cc Q J a U41N< JZm -no rLU2 O a W st. O< a W Z Z�Zc=izovr � r 66 �� iSYa30 � m outo'zd{• ULI a0 x O , o 0 0 0 0 < w < zz°°<O taUo 0 <zN� <z irr3a d I- liJ NHS \ n o 0 0 0 o ww n� no a w < •• Lan_.._... ..il In_ - f•) Nka ore C _ t(� I� t� t-�• U Q a�mtn a;xx{0# wo �3}z gC aZUa cYiU� ~ Zp � a o { I , 1 . AI t . . I C) 3<00 xa¢o �5S a UcZ�! �fovi oo?e < � O _ in Z Z U O in Co w < F In Z 0 UvOV in V) o o NO a Q >�> O Z O w IZ341 NPe) z _12 0 U z O 3 N U O W / 3„r a )o n I 5 m wa ar II of S-2 w a s o - 1 0tf4 � zi 2 m o _ I a � -W Lai D o o W z13, -46j wSoo J p' 3 0 ¢ LI Z I m w o s 0 • I / M N 2 L N W t-w in I E o y ,a„ ZZ3 •� I 5 o i w 0 z `U„ 0 d , t — IP o _A- + A_C fit M rn r o I— p = o U _ •- J - w _ 6"r 3 ; Z I , o< vi a Z - I U _ O W W O ss W CC I O oo N m 7 I 0 w O U• U w w LL I_ p ? f o O o + _� a w Lo 0 O m M H I W J N LIJ - yl < pp W Z J _ z •- O N Z J If1 N LL I 6 o rr � O N N U a L w W - 2 fr wo u a. o I I = w o 00 O a.0 > > e IL Z'CC I j W O Y a 0 o co 0 N Z —o w re L - I ocu 'as"; rn fZ o Ws- U N I Z q' N �viQZ ? 1 :(4` Yg?WKUZ 0 0< o tz NC 0molww D j - 3 J 3 3 W Z I O mj I-'K W W � OTj 1 4. .. —' I O U=ON2 CI n 1 . .+. L-�wi Jj Jw „o w�0Q h J W ww0 ..- �a Ow -i CC zOOO �N _ oI I j _ 033?.- In'2 O a 1 I I waU� H W J l rr< 8 • c.),_) w<I at'? N or n I to to „ aN �UVI to ua .- O Q , . I b ! 1 , I r I b r 1 . b I I r gU 0 0 0 0 0 Zu„ 0 0 0 Oa- en 0 in to in N In z --" C--Z -Q < m 0 0 w L.L. I 3dA1/NOLLdl2!OS3a 30N3N333a '°N ONIMVaa 3aAI/NOLLdI80S30 30N3213332! '0N ONIMVaa ddv NHO Aa '°N 0/M NOISIA32J 31V0 '°N ddY NH0 AB '°N 0/M NOISIA38 31V0 '0N Q CD U 0 oM0.0141S0 0A3N 1(lOAVI 0 W W Q //1 >: 0 z Jcr oz Q _ w w 5 W .- pm w.r. -J w U Z .�j U 2 2 _ UU 9 W ( < I N w CO 2 1 1A 2 0"j o c3 Y (21 CO • o0 tUa � J zoo o Z U � a 7( a O w J m \ Uo - rC0 00 4 Qe Si4 � Z J Z � a a. 3700 i� T as II %r � a °Z a- - �\� 0 o Y W � cc z a0a �O t2 o' 2 W ~ ' U�mZ �' ga U w i no W r^ 0 _ O is N Z Y I2 Ill t 8 g Q /�/ Z c) F- 0 a _ a a pa W o .• Eoao ›- yyT s� U Q < C d r a om, 5 I u. i is CO w T bo l o U o n o -`a N Z U • z 0 S r---- O 1 3 1 r 0-8 �, > 7( WI UU Z Y 1• g .-:' O F- W_ U w 0a CO w w o O a. N. Vj�Y� JYK U Q Y Lay., 0 N. N K Ql a W w2!0�2 U W Y N mm S n FCC U gar A WW owoa-U Q_ O W W O UOII N n .r O J a N N w CC N2 Y ~ a.a� �n� 0 00 a ° U >O co .Z a$l w,...4-a caw I.Wj a O X 0 3 W r N c° M U1 J 0_ CC a O ? O o U < 0 z 0 a o o a cc W 0 0 I-'' 0 Ce � Q Z O_ z 0_ 3w O - p 25 Z o 3j n_ la U J iJ 3 Y3 C U q y, n La a K W ri �if Z 40 r.! 2 w ........ „....,‘N‘ in ay.m `^0 3 2 Oin �c0, . a.�13\�,1 '^1 a . ZNp w w L =2' P. ..ti'0.y�J ,1 0wm Y I 1 8 � W U 8 i G� . 4. ;quell V W V) wZc7S O ' •r m f, o> zp n I.11tsJ .i\O �� .� I �: / lii x e in n C Y w°.,J w o \\\\\\\�� CO h IC ~ 0? VfN B 3 CO 1° O II Pa Ici N :li- t 1 1 _;� Oio O 40 0 ? d Il t % H U 0 I-;0 IOLA U ›- Z W N• } npp0 Z 0 Za mLo 0 UQQ' r w e7 nN J N<W� O 7(<W w 0_ _! .n Z w^ inOWO�S a Z SN O 0_' 02 0_8 yy JJ ' _,ce < = Q � aU it in N cc Li Wp w.-,re k- , Z p w a � O � u Z~ JW� ° ^ XL' m ra. } U N PI WUyj a Xam i �r K?lY� O Yv p wY .N 3 W (w7_i0 UV w - WOIn In _ a Z U a 2 2 Q O m W < Z S U m 0 W rlr Y < ww ,- zr ed UmN O 3 (���rmw0 D jO.0 OD OV ifi ? � ~ < go ; 0 Z 520 o �� Q ZZ0+- in 2 —� '� to to x 0 1- z O ly�y+��U r=- In Cl)C 0 J O yW t.7 r. ce N W ZI.i 3 ��J++ QH 3� F W Q00 in I >-, 5 La raj a a.aCO 0U z Q w0 C.: �} O 2.] In (0 7 F O = O O u 1 0o �.�r 9 za0; •= < ZW z - < CC < Dill az >" OY W 2N0 Z.[ ;z V Z 2Z ca iI- ii ia my �� oz sZ VIZ t,#Z9?a o �oo "� �' o� 0 W S�.1 y 0 yJ Y m W Z W w (.�cr F O O H a0 O W^JW-J W In° WN� W OwZ let).- 0-�z u W 2ac=.� a taiD8 Z� n re 1? Z JQ 3y < Z J U b O y• 00 OZ�N^w Q ?�W OZOS '< I. 0UJZ — wm � SQ W An K0 O Smite' mQ�0a �j Z Z WOE O � a to U0 mamp .J U� ]g 8 la O NW n V1W9 r w �ar U d � � ? 4 4.j 0=0jJ CjamL OoZ IML m0(!lU $ 0 -Aw CO I- w OlU2`7F LagOW L.L. aOW Li O a zNlno < i- OOw in La to n d &c:1 'e�= la w li !j!2! , a o � o 2 W 0-CC I-w ; Z--j=Z0Mi leh j 0 w a o S 2, cc �0CCL 0&1-n a a_ >: I— Li LLJ a 0 0 }yy < P W UZSVIUW WWO7�Ww0 a W NQS v G 1.^i t NUO W0 W��W{wil=7(V vai � O ° CC h r Pi 1� IG n N Q 0 K � O 302 !- rd'p_i < Z Y Z= W �I < CO W 1-- Q F F z ' g U ,_ w a. < 4_4�.. 7 U X 3 2 ; i<0� z W 1g 0 • '1g N UJWr.I OZ. 0 � CZDW 0 la r1a0wow I w < ( W 0a a J0 am rta 2 U � 2.^ a 5 ?i Ua� �0. �� La wco a'a oN 2;n re wr a — owr-' W 0 _ a-a ...1 Z ONa 0z !AN 0en .- UU> ONO E a U N0 pwc K10 x020 vi I- > MI a, N "'� -` r U W —-gpp O N I F W . >W W p W S W 1 W I w M - • 05m 7(N 0 zN .Or . wN WOO 'J r J $ QQ \ N 111 to r�1 \ O 0 m w ! W Z a a / _,/ I 6"- 'f_ r r r r r %c .? c r '1 � CY / r �,r o r.. N z rz J r ` 5 4 0 0 ZaZ _ �" 8 a.W �N1 n< �•--- W / CO /' / 0 N Z ~ U V1 Q Z %°W2 O !rgil!TA c0 O U W W W p7( wr, w 0 � zN 2ZN + i/ �G K QaUj aQ �O{.rjmW W � —=W gN1 0 // �, U �� in�7 7( la z OW<>Na 2 0 W la er all NZ0F7Zm NZ oz o 01n / � OWO >- O OF <�8 �2 io WN06w �Vi w ��<Ow V00 C J / L � 2p U D 0 0O 4o ZW ouiw;O aZ Z CC MMKI`U 1_ w I. rO�� _`� h FeWW 0 yid z.- ya i cc a �� • �U Z L < sal wI LOOU Z wZ w 0�N�0yj0< / ' Z0 .... P- Q CC I I ZZ Z ZOZ<ZZF Z- ZZ 1 zS •Nln te Zaw 1 w7( . 2 Z lr_ W WN �jf 1-NO F W w5w Y.j N �/ p^r ii EC�no aN 5 5� 2d 220 ZO • pZ pa Soz5mg�'W N 8 8 }N FU /�1 ccQ All a:0 KZo 2z� Z Z Ca OW ?aO-O ZK Z? C�O46.SOMM � , N 8 II p' W < L 7(U # W yJ Jr WW Z0 2N ZrCd La W •f la I aN Z Cn ~ 0'�W5 04 OZ{Z7�WN r 5� < N jZ 1``—<cZ1<-3Z / 0Ci U Q W 0,T. - Z7(0 u5(7 wYZW wOr'Er'a.? �a 3 r wVIWYO I 7 ay 0 QFz m coo .0� 2Uyzj .NO OWa ,9a_y2 S,=„ zk mZzWo }ia j' Nw U Z 0 OI'- O�Iw/1J % U4 � � OaC O :MI." pm z� gin 0 O!. p N Z W�j U <<` '-p 3 W of taj W ��/A1 K Z_ O Z��..jj ( N R Z .- ha Z 0 Q O fl< OZQ mm1 =D 2 0V” 55ja a06 )J ,-- y—!0 rw l h WW aIZ�U W Lu Q Z 2207 W` � a�rig W 30� ?7(U ` �WO�Vazo 1 In p �< z<w Z Q Zm<K �te0A O �7K z&r=-rz000� UU�oN� y<z�o l`J0 tc5ca g#4 I N Zp<<-, O_cv 43° V3 rr2O O SLa V a Qm ht "O <1A m(Ui°. y5a 0�f yU-w0 _t') 1 N n Oa 5UW I Q ZORi-Z��j a� za2r a 3KU- UW �a0 "w aZ3yj3JN< h 2V -� �(y.//j,, WO Oyj aWa� ��/-j WO aW 1- J� 0 h h- 0— 31- 4 WWWO O> Z WKwad WS32a- WZ< Za Z0 Z 5 wl20 F-W ^Z 37(00 Y<¢G] 7(O K<crNK Let' aw0 OVI ONE7(r It: I N 0 le w-1 an CCU W CO - - - -aW 5 Q > w w In ""' 0 I / Oa ENLa O ± Zw / Ua So0 o a 0 3 .- ‘. ii‘ i Z 0 cs At Yow wv1 i "' cc ofUZ D cc La .- 1 N a / 47) W 0 Cr a I aLiz0-a / , iag y Z I(1 Uwl<- �� I raa7(a oow La o a 0 0 La W I 5 Z � twli7(a (� Z O U a N Z / O w w ¢ 4 .- N r7 N U f- z ii �j In 3 g a m & O a SQ ca �� La "". Z 5 o Z W U G 0 Q m 0 0 w IL 3dU/N0LLdIN3S30 30N3N333N '0N 0NIMVN0 3dA1/N0LLdR!0S30 33N3N3332i '°N ONIMVN° ddV MH3 AS '0N 0/M N0ISV,3N 31V0 ON ddV )IH3 AB '0N 0/M N0ISIA3d 31V0 '0N Q m 0 0 °MO'Olb1SO 0A32! If10Avi _ 0 > 0 \ \ Z w cc '- Q '- 0 \ ` - II — I w U Q I Y W co I WCCJ m I W Q U CY F— W Z = U _ (5 < Y w -D 1_1_1 W v < 0 < Cr w p 0 ►- Liio g (3 _iQ U W i I (\ O O (2 = o . U) J tn v N j. -- N I U W O O 0 O J K W 2 < W p O - 0 U 0 U I . d 0 < O O O Q O < W qk cc I �__-. I O O o ♦ cc Q Z cc a >. 0 w o i o 5130 ___J------______ i W i wgo o `°\ v2 m : . �i rc----.----er--------"cTh\)r \ y�Uw\N 0 L 1�., i h'I- it c!„. dp gyp h . me \ c SI Z- t - _____ Z A O J O -Or' i, Q w i � � + Sao W �tJ O Uwd G Oa I__ U a_ tr cc tAj - N � °wam CS CID 0 Li li Z Z F o • • ZzL._ La zO < or_ CD U 0FwVI Z i- Z O _ > Z U U < w a W Z COIX Z Z } < QN r.'_ } Q LA-4 Q W U CV . O J Z Laj• J \ �^ O O '- ij II O W Q_ Z �I a. I 4 mZNU LJ 3 `� o ace H N u_ a0 W O �- < D ` r 0mw 0 I- w Cpp 0 ath s o Q � 0 � � o = ,_ w H '-' N a a LLI 0in ci La a � . < Wad. N II "� '^ 4Q. aF- W l w cc O3 mq 11 < 0 h wN cc< W r � 00 (n w ! D Oad: _ I ,L( Z J I d Q _ z = W 6.J. tlS OQ 1- a N Q0K < N w zocn �� � I 25 _______X • Qtn\ CO Ce -± a_ 0 <7_ La- CC II 0 i— 0 wgo � � 0 Ln O N 7 %I. 0 0 0. W S o r W N h- \ W O II III II ♦ II wO \ fJw¢ O — ♦ ♦ 1Fc� aU_ II zo ,- F- w0a: 77 CO N. .( OW \ar• ` U w o) Ls_ 0 II p \ LH \ 0 Ln Q a N \ N M Oa I Q , OC II Z II O � , r = N �ILLI V)0 w N < O I< a J D N - -C---------.\--H - C _ __ , —_ _ a \) - -- - SC L-80 __ / I-- N o f N mid NE L_ , Ln CC LL tit X id I cc O I U IN \ CO U UCNi f %' v) / --.Iiiii— Z 8 _ _,___z/_ ' X--- o Jr, < 0 U 0 w i., 3SA1/N0LLdta3S30 33N32l3J3M '0N 0NIMV2i0 3dA1/N0LLdlil3S30 33N3i13d321 '0N 0NIMV2l0 ddV NH3 AS 'oN 0/M NOISIA3b 31VO '0N ddV )!HO AS •0N 0/M N0ISIA321 31V0 '0N Q m 0 0 OMO.Ol4 LSO 0A32f 1f10AV1 0 w 0 z 1 < 11 J r o I - Q J Li U — 2 N m Y Q U W W >- J m W (Y O J ci QZ z r, F W w U00O Y U W Qw w t Q C) Z CC w 0 Q Qw CD I- 0 Q U Hun - z� CC IX Q 0 < 0 isi I- re) � J � El CD w Li Z QID I2 CI 1 CD V) n I n to > U W __ o O • O N DN N Y Q 00 - O U K VI U / _ -- \,. to 0 Ln Ja ore- - o 0 oa Q o 1qtCC 00x0 vN) a 3 o w o ,— w -_ ,----------- T` ? o W ti K 513 i� W � =o , ell t� 7 • w-8 .! ® W i +I r' ZUp W at :id � ..� . J �. : '.. IN 1 N - (0 Q o t 0 3Ckj yo II % ip.0'-� 8 ca • lvC / \ o ~ Ls- 7 II 0 � F p F- 1- O 0°CD 2 O r o? Ln cn r � J •_y.W.� O S 11 O II O Q W J T V! II w M Q> Z cc ^ -� ULym2 �� JFx- LJQ ° O NOn 2 O ZN OO I _QO Q. LA- 11 II MOO U � Li• 1\I. _C1.-O U ~w -' a U N (N/) 0 O Y 'a. ^ ZJV1 VlUr dQ11 < OJ 30 Ilvnp /Z ' � 0"I0 • i. a0 10 1- Jo01` II II \ �. < -c< O Cn 4WOOO Q N Q Z OK <W 0 VI T-1- C)QU # a CA NV) UH QON 101 } Zwi Li 'J I— ;1 io o Va.1 O ti J a'wet m Q o �t1 O z Q 5 o Uwe (n `` Q � i ¢ wW¢ Vri 11 WQNoa U t � aaOaz = Qoa � 11 U _ � O � C9 a. 0 w W o CZ LA • V g l ._. _ , � �h / Ini • X •ir :47) \19-Z i / n j 1 ea u) f 7:\\\\,, cn cn o w z i- 8 cc l =o ono / 5 � FOp / La ZZ >La a - Z N I Q I a W O --1 Q •• //--��_ I Y) to Z LaJ O a' --� \ II O oO 3 HNWawQoU' QI-14 i r UmETc yo 0VI (7W ,CO I- Q WaOZ a6 w W• N0Z Jflu ! : 3 \wJ a rO =mwQOp� W Oa y0 WOJt`O71 )- O OCR 2 a O }� O i p ¢ 41O wirLrJj1 : Tis > II y = IIU �o W �aW �> 2 a r L`') Q II p v ` z O p � Q �N - QIIN ` F (� n � II D zp \ zC z ^ L� Cjc Z .jv)voiop_ r .�� Z isi ------- o zLc�� • 2 2 , z II OWr u \ CI) F._ QF r - --- —5132 -- II Q\��\ \ N. o v0 w 3 owe ozoW O \ o a w \ \ 8 J WI O V) \ I V) O Lai I N. N. 0ç :< ! f \ \ \ \ Z -ifl \ N. r l- < WU L Q \ N. WSJ T © Q J ;6 no \ \ \ \ \ w .4 < Q I� L? Q Li z h M \ \ U Oi O K CC U 2 Q FII \ \ \ \ OU � O U '') c�N U L /1 ist O \ 3 11 II w� � N � U00 Ln N. O 2 U _ O I- Q U Q\ u.i •Q I/! u m t � �el Z 0CC0 ` \ \ � . 233 � � > U � Qc�OM Li -H_ Q Q Q \ 5- ` W J N V)U r Q V1 Y ^ (./) 01LO �N It CwjO ICI WN M l1 ta O ` 2 K II 0 0l 1: raQ ¢ Q I— rJLA a' \ _ .� Kn' RQZ S Co N / Ot� �t ) ' x � '` 0 - U' a. L.) L�l QLnM w0 r Q> II "r `�.. co co I u wao \* w (0" o • ��Q -N------2 ♦ ♦ Q N O J a m / Q LO q.�-��� �7 \ - awa ¢ z• 71 doc �}�Q U \ ♦ ♦ \ a 1- ooIoa0owx • W gzao w00 v) ` 42% 8 U ♦ u) - r.:. O \ 1n J \ \ gg T /2 v+ a a Thl\- is) - - - - -- - --�� Ncc � HWf/1OK raa " i--- f ° o ��z � J 3 > _ p� N a OL Q r n II CO°�° o i at �� wll � � o o L� omO � IY N `"a \ Ww x</' ., . . • o � sa � a )- 00M2 2 I° 8 f� �4 OJw 1 wOOllr �' xx to W • • J Q . III N11 IIw � MLn � / F � agn: 1 � izwaJoo z b ? O . O Qc90_ L� �Pzoce < II II o l• \ T II 0 IC wQ QJ IN CCCC co N CS a o N ( i .,• V) v/ Z -1 8 = ot•1s C I Q 1 0 1 (J I 0 I La W 3dA1/N0LLd12i0S3G 33N3N3J32i '0N 0NIMVNG 3dA1/N0LLdIS10S30 30N3tl3l3ti 'ON 0NIMVMG ddV )IH3 AS '0N 0/M N0ISIA3M 31V0 '0N ddV )II-0 AS -0N 0/M N0ISIA32i 3IVG '°N - ¢ m U 0 0MG'0LtLS0 0/O8 1f10AVl II 0 > 0 Z W I cc r` a_ o - Q w U _ I Y Q a_ U co W W J co CC Q - J Z U OM Y GS W Z Z LL U CC U I: W Q F- 0 Q O H ro N a U O i w I 2' p 0 J III U I cn cn > U Ls.; O O cc • _ O O J w \\\------)- N N (/) Y Q w 0 p V O a Q co P p at U ce O '° 0 „ N J d CC - O O o o ¢ < O Z � Q 3 o w 0 V1 W4•• I' 3( .... • N �I zca o rz b3 �, s ? ;�2ye2 ».. ...4.1vitI. ..------;-----c-Th al°et)_TH- ._.,- �1 � a youWc: io y . o' LO roc.41: 'lam' 3 w O \ 11�`0J••....**flew*. 44 + CCI W Z- \ rciU utN -- '` O OO W ¢ f\ ee _ Z CC -�--�� ,..„-------s-_— -� l� J �`-�! i O II O V O l` 4 N,II II WM6 O u. � O � 1F� U O -_ �- ON 000.'1 S '�� �C7 qW. � 0 11 < uJ -JWi U o II t �� _ ZO \X LrW. o_ O — In = N 3 II II Who -2\..I4.1Vl V)UIU- ' ~NOV) - 2 02 U ? O >- Zb U 6Q. J Qoau- p II m � QK 3 z Iw -JD s0 II wowa O Q LO 0 I- ¢ 0aU Wii; o � � O 0 — -- I' - WpN r a z n / Q Umwpw 3 a ¢ N i / II �M I ? � Z � Co } Q � � Wes: Q � N �� Z M zo \• , U o < Uncnr. v z i� QroU Z aQ O O Ni\'' K c°a o a Kaz w z 0 OCVOU � Qo0 °- )- 0Ocro - - ce 1= 00 wo La- z IX- zzrQ - - P w O J U, Z OZ U_ Z CA J q= ~ w w �� a pz i d O3 u_ < motwnU t° wQ W IL L._ Dw C Z ` II � 1- iA QU = < >- pmW a in- n L00 QH f .. z cc aU = ` ` 6 LI UJI O QOd rrJinQ' QCW <O ¢ yJ >b W 4' 3 Q w > = f D 0 N wp NHQ 0 t`W O } � Ww � _ � U c0 z pa � p p = w Orl C7 �j0• II N p Z - III 0 dE II \ CO � O zff / \ I w Q O II o_ UQ \ z0 Z a // II o0 U w % < ♦A �z'' �' Q � — zz W � ¢ Qoj � �/� o �oW 4 \ JON Q N o 5 m \ p z p W 1 ! �� \ � o 3 Gw11 w � Il o rwNr=- VI D - • � N � \ h 0 tea. `na � z v � VI ¢ /7........{-.....":11 Q 03 I N ¢ Z J NO Q \, . Ow L �'� y I, 4U N - ` \ I- Q ¢ U /J Q \ / Q0EwQ - p I OW LC OO I cn W V I U � 0 \ ¢ rn � S co o W ¢ W> ¢ ,� � � � ` Zzp� II W �`..\ 1 � I Ica ri � n in 0u_ - 1(NI ` �� oova � cz) � w �J "' �r, �1 $ Ii „to O �to - < uv zOw �'' i H u M wp: a wP a In I 7 WQ p� MUO9 r Z� OCR') 2 J 1 w w< UU rn O N. '� • o 'to) M '� '�/ z ,I QUaain w� 6U II \ \ 3II � � m U � 0CLre)) 0 A wr II ~ ✓ \ �� wQ� o ¢ V) SJco UU. wo_ \ JOdw u II w o p$ o• \ \ az0ce z cr ii OZ �. -. . Sw J > > U z zeaoa< z �"JN \ \ T _, cn (no I-•— Q oo ,n � OU 3 \—.. I 0 I- l- o . H I- VI O(X 0 l• U. M P- 0 N 0w L. VIM = J J �wp w � i � O of N ---- 1 a wow0 m 1— tr.; — II I \ I— N O II P W P NJ \\\1 �W wIII .t .- 00 OW' II o�0 I cf) go (� � It OW J = a xx lf) a ~ II Fc~aw� 3>E / W FU - Wa- A = ' i l( �p7s ? W ICI — J o0 ' 0 - J VI = N� Z �� i• -/"P''''' c> <' \? J '.• CC UJ 1 I\ a IX a Cr U II II CO ci II W LI CC CC X. / 0{,/S o `U Q Oft V p cu u_ 1 3d.U/N0l1dIa3S30 33N3a343a 0N ONIMvaa 3dAl/N0U.dIa3S30 30N3S3d3a '0N 0NIMVS0 ddV NH3 AS '0N 0/M NOISIA3a 31V0 0N ddV )1I-0 AS oN 0/M NOISIA3a 31V0 oN ¢ m 0 0 OM0"O141S0 0A3a i lOAVl 0 w > o cr 47, / tE co Ii w U la t s y. co Z U co „ 51 /7/- W � rN I U m y`y �= �Yl - Q Z I- CO C)QI7-Nk____jQCY ° Ct Li W Z (r 5160 U Q D Q NJ ci le r---• w f c u I Z o .p , (V 0 0 co /! \ VI > I i N a Y < Q' Q W "�� O O * O U t4 1 > V) z o/ N.` ai in p a c_.) Q ♦. h 000cNi � a o y`6o `� o o ¢ w _ 111 �� 0 (—...., tN '' f \ O Orw- C9 a %••••• ••:t w o r-- 1 y`v �z/ \ yw9 •`O 1\ `\ v _ in g7 c ---____________, —NI <5, j , 0 •t' z<I \."'..‘-) C^ 1 Z N.. .r ILL ) % „e.A .4 11). lb-81(.118 I�. P` CO 79 � W 0 VI Ed ce e X U o p l 1/4.-N,o % 1 O / '..\ -N m > z , 7 al Li O l J h j / � Ii a P CL v• O"a V ui .- J T l` H imm ` / f N SON * J / / Z L_ Z i n ))3 N= N cri � pl - ' W QZ I O / O \ l' 1 a iz no c3LDiv'iCi� / < i-c.5v \ m O J U< - K O• ?ii) �Od r �. La 0 Lti V) aI ��\ 1 / cc I er L= O p z ` - W Q 11 Z \ cc / - - - - - Ce W O JQ. ` w _ ' ` ` ��/ O U J Z � � � _ _ _ \ O ZWOd:w ` ` ' _ _ ' ` "ry N W %, - / o / \ / / / OV0D1,Zj/ � • La, O m �; 1U/ /I( / Q cr o J ] / T : P `I w co cc 5 yp,... 1 Q in o / (1 I ZUwZ I 2 ¢ F ~ laJ h r� / J./ \- 7 / �� 2 O / 4 V) LrJ -0--"'"--/ / s / C / -----/ (j / - -3 •,,, ,ev ,c 1$. tyo o \f1+.. . ./.... . ... 73 .... .. _ ____.// 'i ( ( ) ( i 7 f en I K-----"-H-- ---- ---\ 1 /'-\'''N-N-\\\ NN........___._HN.._::_ > zs_� Os c clt gl 8 I 77 . ( I J W 8 /V fl e4 tore u \ I O" j -; as LS C O \ / _ tj1'10 Jl \ C. _ J S \ .- / I - . . I.CiiiiEZ - 8 N ff (`� ¢ I 02 I 0 0 1 W I U. 3dAl/N0ILdlei0S3a 33N32J3432J 'ON ONIMVila 3d/.1,/N0LLdIa0S30 30N36343N '0N 0NIMV?J0 ddV )IH3 A8 'oN 0/M N0ISIA3?J 3IV0 'ON ddV )IH3 A8 '°N 0/M N0ISVON 31V0 'ON a co 0 a 0M0 0IALS0 0A32J 1fl0AVi Q > 0 w z it .- 0 o (n td U J I U) Y Q U 0o W Li ,J co W 0 --J . ' lo 2 I U w W J W Y < 0 U L.] U i 1 I \..• U Q is hh1 J p w I \ , \\ z 1.4) w w ~ \ \ > U \\ \ \ 0 z N Qle \ ' \� r---- cc 1 \• \\ W C \ \\\ I 0 I W S \\• 1 re C/1 ui N. a J N.\ ~ N 1 D Q z 0 �N / z Q 0 (/) / N n / \\ / 204 0 > / ^ LO \\ / ce OI- 0 CC 0 \ \ / O O J Ce 7,4 N. U� Ul Y _ a (D 0 O {/J J d CC L.- u� 3 O O O O Q < CkJ C CO of ° yN 0 U K C Zce 8 W >§ C d3OwO - U h U0 S 0 0 O K U o 7Z 43 111 L^w o 4,2 ...,.......•••44, 1 W p iL /y : y �j 00 o ice : m t J t ZZ w ; ;U ; t ultaw1.;\H II�• iy f y i i U K O Y 1I1 c).1., .,o •. Qt.Z 11Q •• w• co k F o 1n O 11y v1;_- co S o W�o� W I I o0 �o?Uinvs _, o z boo z r U W Q O IIIII w J Ill z za � r10 m W oNFJ Et z maQO 2 o 0Na o W Cr 0 0 v 0 2 Iref ° . CL w ul �a CCI D re CL re . Lai Z N Iiii O / � - ti \ \ QZ Zw / �' to 7//7>.'--------- _� N U O ♦ N\ \ W F 0 Z 4 HU U Er 0 O ce \ \ Q s 1- \ \ O wcn / \ z Z O ZO } OxO / I cr E0O I 1 t I W O Z T Zzy < I wOJO 1 1 `o O V Z / z WOE / / � w / / "� a O z CD § /// C.1� F OOww / / I- LLI 8bi� Omw O� CI WoJ � // / -0 0_ Sp O 1 // ULI ccar3 / \ a 1._ 1.0 / \ w <cri cc "j /M x a. Cr .t I H Z 0 a / / \ / z � Id a F / 0 r w ♦ w N 0 z w O W 1 / / // ♦ W °N � ....... / n W N 9n 3 s o z 5 rl O 0 CO I • I \ \ iL \ \ I ' \ cc \ \ N � \ •\ \ \ W N \ \ I I 0 \ \ \ 1A I I W 0 W \\ N -ft Z WO \ N I 1 K IN; \` \ 1 i I- H CO . \�\ \ / / OLd 0 a W C N. \ ZZ / \\ \ / J / \\ \ / / I+ / ♦ \\ \ \ / / ce N ga / I- 2N \ / \\ \ - - / // n o (1 N. \ / 0 ce ig — Id tl a a < W(J � C r rIfi O Jr N WJ U U a U ti 0 0 0 O a 8 X W z a 0] 0 0 w LL_ I I 3dA1/NOLLdR10S30 33N3 3M '0N SWAMI 3d/.1/NOLLd1B3S30 3ON3H3i3d '0N ONIMVS0 ddd NH3 A9 '°N DIM N01SIA3d 31V0 'oN ddV NH3 AG '°N 0/M NOISlA3d 31VO 'ON < m v I 0 OM0'0L4LSO 0A3b i.f10AV1 Q WO Z ( Ir J Q ro I--' W U — W 0 Y co Li 0 LW Z J U m - Z a U VLI)W I- W W Cr —) O w v p0 Z ct U ,__,z Q g N) U �w E' N D U le I- Z O U D z U y N N y > U w O p 2 0 N p N W = < W go a 0U cr tn U X NI u\7 CA J d < • S O a i < 0 2 0' \ Q Z a 2 & 0w0 --I - QI d i4 A e, 4,34, ,,, e. 3 , A 'e "i54,31/2 X 0 , g . 0 lc I,L, to qui a . to z 2 OX20 pOJ < W W -- WW O W F UOU U p U W a M w 'VIM CC S 0 v W d j w IXCO WOL CO CC F O. W p N CO 5 cn ii0 0 rH ILa cWc La-O �W (n Z �J W zIIMI ? mZ� dui OW • 0W d <p W U im O O I- Zt Uo� W W W W O a� a�Lew a O JO FQ J yZ O Clo < ZZ h < i� �jtZ iw cn x W �O �a w �jW�� z5 Vq}� m ym SL) O = Q Q O `$�` �if g p�O Z W U W 5 6-oz �y t W OF nqi� � �W _ZUUW �0��"' Z �1 0 aW O� Oy3 a �OzZ EO CL Q15:2 0OW =03 W � <z �n Q o rz 0OF (9 WO 3 Za Wr CCD0 QJOa Op,W4 �q1 O• � 0m 00 L` N Z p Z 0 ryW mWa.� Wxyy � 3ZO O tr �" I- NW PR W W U0 L► azln ?win a �/)r CC r0 � Sz U3 WJ 21r Oz )-W x Ozm �� ZZU ZaW mWW yyOZ QF-(JV U QWz zW F WO U 20 dm O WW - UYZZ Mule -< 3 yO �W _J z - Mu., UOWpp az0 {{a,.1lm § ZWil3 cc 2a 0 2rO0 cc < 9 � i -IY w row al- 09 4' � WO w- ZrWW3 �0 OF # UUL''"IZ 0yU0 pNUC 0 za i_ <± O_ O O < KK ya aq } 3- �o� �nz `�` u� z yr xtnw o rr a Q OW NW y2 IC �- �"' � Z dWJ 20 UZIPO y O }ZXy G W20 nZ O0 U Z� <<W �Z U K j? 9xw zW � o oO mm Q W z _� .9 %("E _. � m z Qo'a�z3 zWN `69 WZ izl �Z9- v�] .r,U r cp.) .. o w r tY o z p UO y5 Wr ox 3w ZZ rJ ado W �z� �;W1i Or>K WOE<W w2 �/10 <LW <2 V2� < V QZ �iwo 00z OF�p J CO L►} I... Wy ° WF J W y W_ CC a maJ eel- O Zr 0 mD I- O O }W W l►y [Ilia a' Z oo W2 m 98 UO r 1x- 5 3 zU — O ZW O Ce N20 U � }OWm W 00 z 2U Z22x0 aJZU O ZxWx ZZ } < a O W C 0 a WL► 30 U Z oz� 3 U' 0 }} U W� cc ") p2 Wpl►Z r ZO W S1= U U W O WU F2� x W Z J - aOJ prFx- l► L++ W UWO r W 2 1-R• W In J 22 LL-o < - g yW pw � p JU z a W rZa >r00 �- QU �r0 Up aOCAy � Q -In r 0p 0 - �- p L► w 82 W ? �1 2 aQW o y < C Z O Qr Dz _�� ` 3 z �� 0z i wok- - 1-t, rW w►w- g hr5 m O z 2L Z3 g2 ?O 0Z1 _ IL 0w � 5 023Em Q0 Oz 2 _. W C }ZZ Na ZU Qr 0 NZ 0n- WW rW W U O9 WZ 4, 5 p p0 z o - p0 2 Uz 2 W of } a > - Z 0 yW La o LaiptY CW JO 0LaJ K_ o Ow ? 3 y ►- Zw t 2 WU- P0 O$°zq • W< x n' 2Ua0 Zy rU OyWYYy t- -W O < OOLi �pC W WQ OZ S ZU y r Z� �/} O WS x TWO OjU zrUO m 1- Jwf.9Q < � aW Jp0 UUp �p 020 zlal2 2Z0Z aZ a 2w 29 r p z wA QS) L►1- y 2 7d } d =sw W2 is 00 a2 r y 5 , r ZO mpN�9 or WW QQ • V) m0 a 2 WOC ErU2 S0U2y coca Q3 xw Ur U IY�z a — jZp �zpa 0UaO WJ <— 0z t`r p� 9 Li Q Y yy U' ZW y a Wz WPJ y �rOQ(,� �wZ W V70 x �ym Qa �O? 00 Z� O m0 < 00 W W YO L` Q XO2 Zp K W ? � 3 W 2O � pZN WZ aaD - ZZ I-W 0 WZ W�j W W U_J2 IA Lal a a-Ci mW 9 j 4aal Q Sip Z Jr O LA h-KO OY O p �_ UW o a W,W= �yF- � QOJ 3r �(Fj ~ 3 Xoo r map J OJQJcOWW W y Z yy3zy r 2 UO 0 r p 1- p �- r z y z� 8m _ zz 0 < �aL y W L�gw �rmo p - xJ )- I Cl- W Wm _I � L► L► 0 3r w� z y z zdQ 1 < ysW rz - O _il WO O2 w rz2 a N� 2 O W <` f- Wa2Z W � J 0 - 02 _O J - z1ayz y W a. O i Z W O -I .C) Z -1 J O ow Z WO C9 y r � f=Q Xr erg ay O WU2 W a 2 W K 00 LiQ2N OW NQZ U-' < Um w WQ � zpZOz QW32zW ! - li arW pZ � r0 ZO W��w MJOWmQ ZyzJ2 02� �dy W02 CL W llaa]] Z -} ZZ LLyyL1 La p W � U 2L► W QQU' x ^� Q r w r1� g <w O0 t- WoOp OF- F �j y UW -JVl m � 0 � on'wo �O J OU 3 Z d dO 2 J- 2pL�. OW nj • ~ } WO 2 ? W 2w0 Ora oW WWy �t Ln6piz 0 o Q 0 Y041 � O N 2 - Z O _z% O_ < F 0 F 020 y Y 020 DU 0 iZ 2_ r Z Q� 1 g ."- p a N La t,0 ao IX O0 000 a Zp �r CL 0Wm �zY <aV 0s >: FyWJU am p0 < SNWO UWZNO trig_ x W W Z ZUxZ O 7 } � W 0 0 z z < x 00 UO% 228Oa _v)y02 a r2Sr y � r 2Wpp~Q X002 z0 w �O u., m>-- wa'� a0 W < w 2 w r� U' L�. I- WrayQ O eo_2 Zia 2y a 0W2 U w0wWz ~W z 0p a .1 i - < F- 01 J x0 3 cOj�y C9 Fy 3 Z_O y Qy cocoa 6awpyr W0 mW CC m O�zpO WWr NQ QC CI)ZW2lal� � QF W W.< W p W Z r• O O ^ rb) o1 03 L2,, Z5.W 5.Z! -Q2 20ZN W 020- 00ZUZ xi-a, 2� __low lal aw0 ,oWIn UW0WmJ 2000 7d' >yW 0...pw a U J p Z GGG wow JQ J Vf ¢ Or} W1- li ~z lull- a. c(�a� 0002 Sx � < F-2Z 000 -sox S E zd2p 02v zm [Fla a = W w o "Z uS5 Q UL� N � ZX < (i' Z 'f' M ya y _ W i w aLJ-` O 2OW Y2 OW rZ W UWQ U a wU2 0 —O < J ON OO W 0x 0 ZUW ?Lulu {/Q� 296Z la 2 v1 Lp W zl] y2 O� 1:3iv) 2p 2aQ Zz�20 � OL► 0ZW O y J y- mpZ wr Zar �i10 6Z 0,„ ry J m I 4. WN = L''1 S � Qp in < Mre) wia p �L � O 00 a.0 Q� � p0 'OYz WmzUzz 2z0 sO Fs_ < a ZtOi) J_ OC� N - pUZO � !C:ICLL613-4°. `� WNO a' � r 0tJ 0 W W Z fY22Q W Z ZW 0 p Z 20 2 �W3OW tal d U SW O 2 \ 2 ZU000fYFZ � WOQ — 0 g 3O� f1I � L� O Q0 2p 2� ZZ� J a a'� L�L O� UT, Fx- Na dp p sna Z33 NrL-� �f� U' Wqa t4,_ z - 2a3 �_ FjW222 aQW F- xZW - ON - y 4� S a ZZ z2 Z : J O {� t�1 r0 z Zg0 mOQZJg5 y <p0 O yin 2 O4v 2� UaxO � -. >i11 yJJ GJ Z y � 20 p � DO WW OU2_ UFOWC JU3F Fw Wr 2 Ua' G7Z Za'O <�y Up _22 WO 41/4 - y2J — 2 Q W ...1-4 -I y QQQ O Q y 00 W yUZ z Q< K SxW wWN Sao J � U' 2 OQ J: O W WL� w W W Z W st W W 0 1- w W Z y - O 0 WvW ZCi mW :E 2 y�W CL Be W Ww a 2a FQ' y JZD - Oz XZ I- LOS } WZ y UOy pW (.1:7; F'" lii 2W y 00 23 0C9a =a JUax �aLW -� � OS�r y~ 0 0 m 0SW0 000 y or WF�W OWma 2 �,,�+ w^_ z z g _ r < V7 W 2 < y W o-r 2 - ay 2 • 'Ana ,-ow o J G� t{�.1 J U W W OQ a O Cap 1_-� F a0 �y0 2x W 2 J 2 y 00- } yUyOa ;0� F0 O� 00W 2 r 0Z Z yLv Q0 < W W w a' I-I- tn y2 WO U Z oZZ - U a2W x Oy r rbo2 U) Ot O O W2x 6WUL�7 OZ ?L- z 2 J2 Zm W1WS yN W W 2 2 W yW ZW OCIlbW x 2 Q WIT OV. Qa y W y OP- U wr r2 p } J 2 p O an wu. J wW W r.a. ,, r-o 1- CO vQ W(��1 < 0L= O g 3 p L► Ulm �Up Ls. ' ptY m W� z°�U2 p r r � xz vi y0 z �qz o T y2 - a_ r6. OW_ y 22 - mm� Q <W a w p a r <> m o OWJ > _cl- p 90 W WWO z z Z O 2 e y y z < ZOW 2ceFU ``L fir L► Q W F� • ZptxyN 2Wara p J . zO�rW ��p w^-Ir < H3O yU� z�p 2yW OF a � WWUM Li.rQ p0 �L� ZQQ m La W O W N Ota U- O � 00 UJ yQU 0 W M < y 0 CJm 2p2 °2 y2J W U O Z ayy y zgWcree U K S or UW WOr 5 K _� yaa c.> zf..' '- aozar oa 00r Lo2W W QOppr OOWOJ WW aw 1._ wail W2 a< )- Uym 0y ? U W W W y WpZU el La Zt WO= aW a Z Jla zI.- no". CO a ga y lWi2JZ mW Wx2 JrZ000 ce�WpR'W wa & Op rWWil J xp^ o Lim . z o 2 UN /ail z3 Sao �cxi � i�a �U3Q � w3�da3 L�► aa z � 3 V) I- t2- aN �3�ao� �i15y ?da3 L-�oaU3 ?� �ro �iy c� 0 • n 'i v a s tril F L.i ri 4 rri Id r; co ai c C I ssi 'r to N ce z z 2 a O O VfF 00 pw0 2 o 0 F a: z 9 m ZO z 4a ? a J2 Z MOO cO200m Q W W W �Q = W m (Do g y j20 < M W I 0 U�C� WOW �jaom .]N OO� y2 Ls; a a Cr_C5 r0 J CI Zrr n> to 0 0LL1 r3 z0 41 o � a J�O a. ,O zH J 2� o ' )- 23 zz oa W Q m IE 2 3 a G Y0 w W 3 1 w00 0 � W<0 � COJ CC O W OW< O a 02L► Liu_wD iii o u_ JJ ? UU W y W W m y IT O2K a Lamw 2W z °° y tai a ro� > ao < zW y Wz a' U IY W QQ W �' a' ? < p Z K x 2 Q>Q2 l5 H O W IX Q � O Q QO w 2 y W j 9zOL��U W < yzMON O OH .: 3 9 i- 2 y Uy cc J r W 0 2 CL r Z O W X y JWOJm MW 0OZpN..° ayr2QxW W W613 5 x U p O Wce 2t- ZZ '�'a 1'. 2 O > W l`L < y qQ� 3 "' � `n Q o 2L= 9 cc ri o w o =9rz3 Q�Q !hP Qz t p � aW 0 cr w2 Z (—i 2 L- W U r W_ WOU O2r lY r 2 cc ya y Y W a O2 NW``a OW Ew ,cUzz 4 2W mW Z O aZ LiO `->J x O x a m aW et Wl- U' W ! mei,: 0000a2 UQyd s%(9)atwit y La U � ' wr < § 2yjrU WOW2rW agS01 20L'' 0o. � o^o• vim' ZO O < WN 2WW rJinO < Mm 0 JO L. LaWoa m 2 O OOUx w wNOm - 0 hy� L0 C9UW OK 2? _ W w y I- r 2 0z2 f- 3: tT N �a°d O W a s g LLI o aF O a Ct � � O WO 02 0 0 d � gal_ zm c�oz � rrOM � + 0Up �Z oz; g � m OO wQJ < � z 2aW Z ? Q W W L+-p '4'1 zo Li I- W < 0 0 U2 0 } W% O Z WCE g � mO �S oOW < WQ � OD2 r a # 0 WU WMt I- Z = r 0 x yJ V. < 2 oy z I W r a 2 W J z Z O xa wy x 0 W10- � ?o ra O U Wy tli J O z Z0 w z O 0 a y9n LiNU, ZU „fin a I pl!L }t O0 Z 0 0 0 0 U(Y7 p0 y W 2 Z 0 O Vi U W 2 0U F C.. 2W L<► ^ . g J L§ Z tY 2 a2SF la1W F ? 000 QpvJ: � t� U l] a w a 48 2U y 2 >> tY W ce < w 2 cc .y.. < a W 0 W 0y )- U r Zy x 2 DO ar ? y w O M W 1w- 0 0 2 a W W j 20- OW 02 z a Y 2 < OW �� SXU a � N ZO� 40 = r W w 2 Z 2 y w 2 2 J 00 tL - y0 < W r x � Z < - KU a mwU z < w F- x 0 J O x o I- W 2 m O y y �L W O a y y Q W W Z U O ail~ 2 2 J r y O W FJ U 3 Z 9 N 3 ydW�� �j a Wm �-0p x z - r L- zZr O tL o F l 0 Z z 0 p <y J< D O CaA O r ? w Z W Fg r »�-1-p L► � z OO �_ zy 3 2 0 < } U�0 QO y y Z 1- Jo U U 0 CO O > O w VI ~ O y W r` I_io f► Z wWaaU OQ ?OU r yU � be p (O-/! z Q o pZ �m _ We tio � "' ,? 2 �Q r a Td > viX� Tm Wc> > JAW E. zo � , � �� � o� Et La " zozN i <w o U Z W 0 N W a W W U 0 r y,1 Y Y W a' 2 2 `'a p a� l0 W W Z < Y J �j Q r Z 8 8 > U Z {y W W 22 O }WOOZ Lai')UO zC� 0a 0 O O Eta' y ` 0- z 0 Q W _ 0 Z a o y < U J 0 00 yLa z z d W yU Wt► wj F W UO W } yW a m UUW 2UF 2p Q I-14 W J r O 3 3 ZF U Z yW U 2 W o % 7d' Kp x w a < m rp r m WZ > r paQ _o _ U) 5 -W{{�� 0 U 0 Q J W W W m - J )'a m X 2 1- y W J OZ0 _ p OOm • Z ZU 22kU' p WO Dt x a0 OQ z2 a� 6Q < y W w l.1 W W z 2 C.7 w ? W a L► Z pr Z � O < 9 w y W W v zo O1;5U < 0M a>: + < /x- gyp* 3y 472 W 01 Q� C7 Or WO °� Z U' mm ow F U 3 V r iL<-- y W J O p 2 V O O J z 0 Z O m r F > x z F- U re Zt/1 M Q Z 2 x W 4 p 1�1 ?co z r r Q O 1- UW W 2 O z �v W O < y - z x O X < 22 w o O > U 2 0 a yaZ Q } 002 OQ ` Z _J -I WLUa,12p mW Z J Z Zp y r W O Op W y x 3 Q cc 0 r my 2 2 a WHO^vUj4. � r - OF WO I- J wit J 1-C�E 02 O 2 3 Y 2 3 X Oz J J W m N x 00 l y < a a Z p ply 0 000 m W Za1r- U UUy >U y CA: W W U' W Q O Z W a O _RD 1"' W W y U +- Z >: °� ax y J Wiry % < MIn2x a002 - p t- Z Xl W<LJ on U r 2 z Z w- Uy a O r pZ O a wO O y W 0 U W WI-In 2<- I LoOU � 220a L�. w y� y2 UW W < d ` y O < O OX Jm CO d W z og z 0 W W_Y Wp W _ Q ow Oz a0 Loot-► a O Ug OaZ� JJ Fx- J Oz O 8 2Wr o r2 y W < W 0 < W y OU - p a a W J v20 y Oa Q J (9 W JQ 2 J a g_ m J lY �► Z O U D r O La1• J 2 Q q L� J a_ 11.� o U O a < ys a z c Y 3 y O O p y W O w 0 O W rL 2 X Qq� L] V x z W {- O w i W� L7W O J O (Y m a ,` j J Iy- W < W O U W Fi. '' � O 41 L� Z < I- a: W )- v W y€ ~W ���Qjjjay $ LsJ o o 1- x z P. 2 a7 J w U I-- W N {y pL�J1 g yS (� 2 J y a y J a O W O F- z U Lys < ? p W J 2 W2D u- 2L�3 O Z v pL► W Z Z p 2 Z_Q Y 3 y r O L j -U' O U VI W (� p Lit < 0 5 J > y t-- W P WpWW <0 -I WW ~ y L` L` L► L` WOy0O zLjL,LJU X OOOO > axW (1} U. WWOW y - ZW O o z 0 U 6a Lza' oz JOW Z 1/12 � 0Zal OOWWWW5 r 4 U V U > r7 W O Qtr 0 2 1-- X Q Z J a W J 0 m r y F h- 41 < Cc a Q V y LY W w O J O � U � W r O J U Ca) w C7 Lys a y r, y _ F O U J W U Q I O J 1► �j {� y W W s.Z OzW Q cW� a w a' W W a' J 0 U U' Wx M<- Y L► 6 Z O U Q>U~ y < aW]w W [► m ~ 0.. Y 2 W Ul Ny 5 C 20 W 4Q Li a? r� L8►UO Ww- OL] N2Y �(Q-► i � 0G0,1Lsj a >2 W WW Q 3 mK t7 �FF 0W 0C9 a • W W • U FW-p W� W W Op O 2 a w � WU U t.� z0 O y x3 p 00 O L� 0 W Uay <QW a. m .( 2aW upFtx- OmU � rnGCy L 2L cr0 = <O Ow N<0 m y2 y< N Z sW al.?. M 2 — U3 Z a J (Y 1-- x Lr/1 t► U LIsi► 02u, O 43-N y •- N CE ^ C _• M j a a N M d' N M • N M 4 IA td N < r N 17 LA y .- N M 4 L!) t0 N fA ca .- NMI N .- N a rU • a N Q N CZ N yz a r) M ri Poi M ni M < CO U 0 W Lr. i, 3dAl/NOLLdI83S30 33N3213338 '0N ONIMV80 3dA1/NoadILIOS30 30N32l333M 'ON ONIMV2l0 ddV )4H3 AG 'ON 0/M NOISth38 INC '0N ddV NHO AS 'oN 0/M N0ISLA321 31V0 'oN a m 0 0 OMa'Ol4IS0 OA32I 1110AVi C21 J w0 Z 0 cc CC Z LI 0 O w U tn = Y i— a co ; W Z .J w W w J 1 _ z — — C .) U 0W Z Y w Cc W (A < w s C z ° 0 1- WQ_ < CCg 0 IZO w ,_ _ • N U O J ct < <— W r W o I J flO 0 / / N > n 5ypa� O O C \ O O OO N N Y ¢ 0o 00 •0' ° (-) 0 U vv • U.:: o p-,-- too ,� (n -J ce In 00ooa o a ce d00/I La 0 Q �—`' O .,04 a %.% o w 0 ,— x,130 rf � b,ci �‘4 iC_- TJ_- 7\ :----.::\ N Ls z 1n r I ti w 52 0 / i I J �1 �0= . go �S�o�ti�0 ?' y' N �� I Urvi z i LLp\ I%�1` xO_� CO Lej C. \L in "....r.-----r-H w QZUfnN _ _mod__ �.�� \\T-...-:• J I ._ --.-- d �' x o _ z \i l U K W _ a -_ 1 HOr It J Y N ~~��(�,..-- ‘--# Q O W it vi NO ul '2 / �' � � 0 v/ 3w0 w`-� K U U 4�tal Q OW wONa J o W J W W — k d o cc crock W - oK W W ��T�.""�- - �// W a 0 7 �"W" UK o a ♦ w� swam J J p Z W K J , O W a J• C eDe ms Ei 1 n � 3 worn .�� ow W OF✓� "y1 1-<(W� Z le m z W jg WUll)Q 11 1.; U J`11 in U N lifl r v 8 =<N I I r - I O i 7 Z ' -,- J 0 �i 1 } O ce - � L-- - d O ccFOO (/5/ .. 2 `9n Sa S , C, wau- Z ri /1 3Y o zz } ¢ in O J O W h p W Ce W • O in 1 Z�if U O V J Z ^, r O J F J� X \ . Z W O Q: 1 gUl i,• I� iXi . W go < a z y 5 La ♦♦ ♦ ♦ nom •♦♦♦i''i♦♦�i♦♦i♦if �= J 0 WSJ k- �.,•/•.,' ��♦♦ ♦♦'iii ♦ 0g 06 o 3 Cu- (HI ,_ } rz v, flu i �� ,+ � r• ♦ IS . CC Z Wo �� N Yo , W I-61 2 CL cr I-j�,W,, i ♦♦��'♦♦®.♦�♦�♦` t-+► ♦' O «JJ U z z d Co 5132. _L ._S cc I \ W I = — _ .- - - = - oz ow U -j77-------N\c/ - o E Li j N Nw W r IS OZ W- W `I ) co Z yE? ' 1 / W C l[ 'U ? O W K / J t� U �'t' ~'K �< W Li. i� <v 3o win 1 IC 0 y 33 Ka� u et o ts. 0, S ] g00 a ca .�] Uo mm r- 81 S m S 03 r0 �I� zP u KC 30ov I ' _ 9C � S wa z < o 7' ca-', I al{ aw tit Li z %rwz n i1� c� 'I� M zo \ a I I'C7 ` ! \ W O r LaiZ -ti' m —mil - -, 4 O J - O , M� g y` " ; l-_ I •4Ce n : _ . .009 4£1, aJ — I 6., oz cc z N \/ ` a � W W h5 p]Lai O in N / WC) K 8N. VIVI Z_� VOZ �K{ SS // CN a o 00o 5 w zer K / <z ^ J . Z YI,q N. co LS Li 0 U / v N LIM- Z 8 W , / , ii . • - I V b.i ., o ej HMO Q It 0 0 W 4. 3dA1/NOU.c f2$OS3G 30N32133321 '0N ONIMYNO 3dA1/NOLLdlb0S30 30N3213d321 '0N ONIMV2l0 ddV >H0 AG •0N DIM NOISIA32i 31V0 '0N ddV MO AG •°N 0/M NOISIA32i 3140 '0N < m U o OMO'OLflSO OA3N If10AV3 Q —J O Wo ct Z V — O N W I Y I— O U a LI_1 Z t- _i m E W W J d zsoa� s 0 ( o W _ z ct Sr 12W c/) O w = a 0 _ 5 c1 . U - a ans (3 O ❑ P.$ p x i3: Z �C� Z d h 2a pp�X''a p t a 2' $ ^ ;: U SK HOz 5� arimo �' v 2 a x F a J U ci K J gg 1 w L47 3 E1 + d O Q 1s w oT RKcC $ p d7 7z 1 OK ? I6 2e - W d'O (n� J a ww J ��'' T' `— W loc m OW JO2 ZZK <n }�j! .l v O N ,-,1 d 29, O N W Z '8 V I W w ?...5, Z �. �'2 a ris fin� mm 1 4 D J Kj OF '35A - o E c g G o < Z qq U N. 9 JY '�w 3ya n P b N IIO w d 3K ?w F3 ►- o .gX ` uU. tZ y2j Z pw p 0 Cr 5, •off Y ro Ku re g o o $„ Ff LL $ 1 y Kw w o wiz O I_WW 8 Ec& Ow J� I I I I • tr O O il_x _Ga ` <❑ Wf/} O wr UY O W }S� NI 0 N Y J lZ' z K U. lJ W ❑ JI Pf S L (pG< 2< o Wj < O a 1+.1 > + 78W W�WF- 1.1 W U W 2 r.._ On h n .- 4 D p _ �3 cc 4 30 �� S o O V- O U O 0 W m0.p0.['>>I W <�wile w NUJ 3" 4 - }K 'O >W KO XaJZw O ZUSGJKO UW K _ £ ; a £ •�i C Om 30 OS z mVl d�� p (/1 J Cl_ O Q' 27 •Ti I" 4 J= Or OW O wee Om W� - W a'4 El: S r J F- i- W QI O F- .. C S 0 � z< 7tn< OW O ON W(•jJ Kee 2' < Z ix g~ a s E z `Q '05 ^< }< = ro± Wy a 3 o w a 5 $ Z 1. 0 8 S . 7W Uww �o s Z & ri ms o it! 0 c t y"y 4 x2 i3 Km �W z�p s_W z❑ gW aa�c��Jcc 6 C a,v t € g 6 an n. A r we W1 ZO < <r pU�SW w o J �gQ G 5 88 gm 3< X_ r 2 W ',.\\\\ 0< -0 T 2l r vs w8 z N <w a,w z W oU W o z ❑ ...••••..033111 n W _ Q K W W m v n O 2 s 15�T' '•.1i 11 Jri y44�++ .If - IL s -, ? �- O VNi�� n <O2In J 1 �' Z p J ccW 3^ iB k �' O p_ ma -J �v Y m rn W�$ , G:cy m i y . g _ z N W Orn N Z s U Z N a : 6 t o wee K J j ,L, 3 W o 2 K W r Z N Z N J tor 0 �cyO / O •J • 2 QO � � ,Z+ z� < K�� Wu 1 r OKw7wJ wcc 41WUIJ\O it O r W '� <Z N o_p Z o o Q o i- (V Q.�Z `- AMR ¢ E r & 7 LA ZZ Z ?1Wn C NC a� ea Z I Z ��Y !l Ojj%�� ti0 @.�'� jj�� W ft ' d r�N O IO W Wm0 “. O LL O8 - 1 O /IC.^''` 6• tW ZOE. < JW O N r �IIWW-- Nh �\t0 �� \ OW_ yy n G y� w w O ~ 2 &w 00J J <3 \ y • P��� ' / 4,\ W1❑ Incaz Il t ; N-NCtn w 0on s ., w mmoo WJ ��$$$WWJJ;;;�6y�nwzt�� Si . Q`W2�QO \\\\\��`� O 22 \ > 3W2 Ea €G = a g Wp KN lbj ma... 0j �p � )-Col _ aO KO a0a0 x��( ZZ pt N n N N NCa�~ U1 CU ��'4-4010\s / 00.0 . ", b {i ^_ NLLZ� a _ Jr N 1/120NIA S �� Y oG rn 7Z _ ¢� (� V p 2 y1 ^7W- 3� �a �%\ 2 V W W i ,6 4 T t 11 V)>—O� W WJ�yIHW `� N> LLW Z 4: 5 d II Crs \�\ ,,,99U II a T alga. od.t mtzRzm %yK Om m c�wmw O K �� ,, r d5 � a dilit IJm�w ! F� alloa Z S' tn❑su o om$� W ?o �z v � � Q 1'Jj • � 2 a >6 fI - . i I� t' WU 1ns �U-t/+�3 a \�_ . _ _'� .x - a 5 y o U zuuor }wpWwo� Wr o a N O WOr �p /I `'} �/\ E a s v WWW ZZ W lo JU W W �WWO O > G J Ct \ 7 k a s 1-r z m r fV ✓1 T N >OK I 1;�- / ffAA 9 flues i4 \5zZ LL �Z ? 3❑ �t�U jO J71ZLL NA O1-0 J < 1Y A 3 fi CCC777���JJJ s Z Z E.3 r K LL 3 7 z OC 1 I \e/ 645-at OJJ bfn1V1? WWmW yUaaW dw W .\- I t iv, 2 W W _W 2__OW 0 .aa�n W 22 K c�W¢2 W O L.. q “j91 2 .�. .-. v .n w .- .0 1-00000000-0aw«Krrw70N<war t- 0 OU CD z 1 m Uo I.i o ± O mp ¢ O L.6.1 O U p Uwe W Watna. �m U am0 z ❑ CC W = m z N Cl. � OV1 W a W W O Z IIIII ? m Z x o 0 W U -I ? O zmJJZ � 3Z0 it- < t o o r < o � �� I o I w cn Z Z z r oWU � POp o Iri a w E:-.0.“ Z La p Z Z } 0< O O I > W O J r K - n a K ,--o--o--a—a - a O U Li).- Z Sim 11f O z Wow FF Z w W a (NA !i0'L) a.m Z W 6 i w o (dill) St m O cn N 0 de] g W a = W 3 o in ,n t0 610 O O w W < 03...i Cl Q O _ ~ W 5 W 0 X ii $ i III2 K K K K o F cc Oory Z C! a W $ _z r2i 2 2 W In a < Z W W a W �* I K ce .n V. tW.. < z * z p Cif)8W ft N W z 01- Z o o Y LS m < M < F N 2 UvUw w E U X IJ O W J O Z W I ay- W t o N Dui X 0 ig a O I W - W a = U (n = s f _ I— Z A trR . I > 6x ❑ to � W d ...--0---0--0-- ---.--s W < O m 0 Z z 3 S �fyI ._�„i_ aUw ZO Z W a # 4.... (�..ti m m )2 3 h —� U K U < W < i > /77....) \` > I- o • 9 . s e 431".. . W I/1 En r r) * g z m 0 3 2 3 2 i w < W tWn O ; U K N C� U Z 1 N4 8 Q y 0 K U O J W W W 0 , w W < z o U zo W J p K Z W �J z 3 m to m mu- z r W N `-� W J M r J Q N W Si < C aO COO W Z U• LW Z K 0 Wz W <r y Kn2-'- i W oC p� IS-' r Gw2 z W m < 1� I O 111 w mQ wo 22 rKXN �J+ W WW J W NF-k,i2 Z O W^ r J2 m rr a � $z7�] GI zo J ��n i ma rr "' Og om Z..J ,X, oxyy"['� �n v3 rz rWr WWI Ls,' K 1 OO 0q Zola J U Z < 3Z N„Li NJs WrU<nJ < y �N S W N? WK N1 Wt Z C V� WWd V1r m OWO a O 2 W 2 KO N W7O W W In K WO O ❑r WK Qv IJ '� Lc:), ki U zJ tow Z 7 tLLZZZ��� w Z O W r z O R O M U , v7 Q z V J 7 U17 a < w mo (Ow U O`er ora: WOpK Otn• r ' �1 N Fw rQ �a J3�0 FZ aU O =I'll l &wog , y ❑ oJ O �K p F}7\ Jtn05 r5 Z Ow U' o off+ W Uz N�n K p 70 acz UJW w❑ pN WOK UQU3 W 2 tn2 WJ NWS 2 `�I.i2 ZH Zd Y w 22 3 QS'-a YOW w< _] 3�K ng �S a2 o�K \v U O ❑ m �3 O N Z wp O QU N K z .- 8 at gA ca OX Q <a 0g '.' I+i r' 3Ui 51 WC )• -- K Z ^ w 3 1 3�<4 W� r`` < O O�q Om Z_ r U NDUa —1a10 < z �C2F 0 E0 ,/�a pJ U pUW zOZaa` rI}9 U� 7 3 •"V1 Ow W wr Z`- OW Wrw K1 I-= 0 -0N zg azi <Kitv/1` � g § Lt .ariF OY =U & tW..OrrZ WJQmr 7o{rwy7 oz L4?, U2 WU '_ 20 , �U �m�J 3r 7r WC/10d_ �¢ �`•!"j' N aLL <; rZ 3& '] 3 � 0 ❑ zq 2W r ?U UJW < - WO <� � t Ocl.z d0 • WW "'mlmn W �W?ZN 3< W-QN N w yN�U OU nC3 _m 2 O U Jm Ow U ZZJO= yUm < V' UUr< tLLJ ❑ �' K OU Z N NK 3zO W �3 ❑aUU m J I- < OwK U 7 oJ 3I- V OSN OtipWW !n K (7 O WK O J r zR0 atj au_ wKO� W NO Oa Z O frJ y mt, i�OJ « 27 W pOtJ0. �gao� $ < Qm mzZ O a, N t�1LL mW m rW w I._ WKWa rig < Ww w a ❑# > r_O �il :::;n8mxzn; wzwo*j lJS OWr t 00 a0- ZN �2 K�.I ` w 2EopOUr Z Z UVf 3 O Uw U a qz �U � WJO t Z 3 J �m �Bw QZ j y�jWtv? YrN 7W O 2 U O < O 7 2 O W ZZU 7_ J yj JX Wad 3W- rZZZ C'NZ N WUnw n r = X U a0 y 8_ 03QtW,, Npw KO mO ZO Wm w S• W � UO Wzw 1 7U mr�.lOY yyte _JJ1O W nz InZ W � KO wW < (tUt W W 7 5 rq O ONU W w � < �y 3 O 3 Z m� QF z O LL W <6Z Iw L r O N >wo �2r W� Wa.V1 ZOa. U Zy UOX 7j �Z No „z- zp7W<Z 7n 3sK <W KKUO W IJUW� � 7 � 3 XW-z000<< - �n < a � W "m Z r i O(annKa0 } 3o ZW w Um wZ JN<r � 001' I- nW w X -0 N Z 01 w wz 2 (-7 IV be ,.,K ow-633 oll go wow = W a o 00 ZO W � S U jw ..- C4 O W CI W LJV JW O xec mZ H3I ��}� OrW V 2 3 a K �V ow is O �7jln UN le0g < VO 3wV2 `N U < KJ U O ₹ U N r OU X Y a w O ? tnoWO y WW Ci r < K U- wm o U= ZK z w u.0,204- m K J < aF ?O� K 2� SWZ O_ Z Vl In Op� 416Kd ON Z_w0 Zy =ONmm < Umal.i w w m W J Z W Z G < y.1 a o s -0< m � n w z rn w m a< K Q WJ z y22Z of o J Z WZvs K N OZJ UUKO Qz O mQ r 0 2 Jr S K1zJ1' KO 3<<(9N W U J O (Sow J�C�iI F� 00Z S ww O< ZJ 1 W JZ U r3 U w7r U ❑1 r Ww0 K K Z Wm tnr O�N < WG WW W WWKOJ on < m O>�pp (>. Upp woo 0 Z3 W Z OWI^,3 O O JZ W Us < JKWZr tP ZZ M {JW WO3r I ZQ 30 S`'<y << �tl ZZNW7 K N �5 QW w t� 3� < VJVm �� rt d m W3 Z poQJ� O WW � W�W i- 3Z UW I.-- 0 Ow KZ Wee < to r O J Z 3Cm U 3 N U W O U _ WO-zi- J K W OK Z O O" Inn Z U Ur O� Z- JN O s < N } 15 Z_ p0ZZ 6Z Sm 00 K NOIJw 2 O N U W Z <p CI O �UU wwo OWV V,� "La WK W ZWKUKOIaI Kz❑ Zti ZOw 3 w1 UN}rW< Z <O gNtY UXoW a LT, Wm U-- &ZJW N�j O Ov/ >1".2 wz 6.i om O O W3 "1 U 0 Rrr Wz2 w�WU0 r0 . �mJV1W 2 ❑U z_W Z N U O W� Y m <K m W W U N O r yI N 1 Z K s W N J U t/� 7 J7 W< O❑Z r <_ S K W7 5m0 W 5 W Nr �,, Ti..... W a. - O J _ tnwW O 0 (� W K �Z (� U X m�.I K IK <J Si 6 a • m NZ .JK K &< 3_ <1 pppm m 2 • ZO n� KW3 12 O I-15 5 _203 W MK 871 « xr w mrNw Z2N N O< KO�N OKW K t.7- K UJO N O o <3K J Z_ K U • r W<Z.T � ZW W _ K N ❑pOK IJ �[•'-� {fl O yWj con (j0W a O 2> O O z g- o N QO 2Z5.W pdC W WO a L„ y1 nZ r < ow1W I ' UZ10- X r aw W 2 w WW r Z Ywr GWJ }2K J❑ 2� w KN Km 70zW12 ss cWi 2Vs N O Opp mOO0- S <( �tnnW 7 O Z Y N 1 ^ m - W pp 3r O < SS U mWU V 7 S < KO < WU WO SF 0J O mm N�IJ Z SK r U-120_0 U WaWp{20� <m ,80. arc a �p U w WZ ?ZWW O WW z ��`-❑ Z— W W-J OW K 'tilt._ J� K 7 oyr) WOZW 10 {�/n�m N Q� a 7 w0. w mw KNO �a: m Kr K t� O Ur r 2 m n r J f U <o < o _p; OOJ gm W1 Ja m W 0W>OWtA Kh _� pw �On .(f0 <W aU�Z2 &� r Oa 0n0 pQv K 00.2 p s0 ❑ O O U 0 wt.. Ur7KK ZZU2U ZZ < K IOw0-Zz O N1 z _jam w a3 O il 3o WO}K F_ VQ3 p Cig .. Nag oK ❑X<�d OW . 70W ultn0� p4jWW< � �v"Aw ZVa7 �wZ O j�V m1 aZWN6F 0wocco5�CW3 C 2W OW61- m0r. K (-> ja12 7u, a tOa U2012 ❑ r2- SU 7j Cywj -_m z N1i UVWW Jr:Oa" L Ns� a�c 0Z? 7K tU <<2rZ•�ZWy��j W� QW ZO zyKj V ��7 00_ .- 7 ZIJ� V1< 3Op} W YW m Q I 01? OWN❑�CL W(/� Wm WZwr 20-2067 mm° ❑O❑ j w-i <U�7WjW 3X }LA -i Om> z3SU~W• �a ao UK� zln w(A. 2 < O 3 -' K J_w` 4 Or �. Z �j O W H O ^ •'O Z O z 3m OV Uk3 30 LV1WNU... `-'OJ W( �r�� Nww r J JJ pKwW O�n ZQ UZK v� rl� tJJK NW pW4l={V�1 W 1:5°0. g. 2.7.. OU C{2_ N -K � li JJ 66,-oz tZZ�e Z7 w O & w 4w W W op!e9 OOIJ vmm o ZWS OKz<LL pp[yI<� ,�,� rj3O a'S� W OV7` a= (�� r W O V wop tti a ce 0 NFU O� WRO �Z TA N� OO�wK Vl< �1UV1z-I a0 wL'at amog OwwiT-❑LL < NO<mK 002 KCZwo w _O a 3�N<WW FmOI���� WO gels° �p << Z=o N3 IK- UWU�- NpU p- O O U F K r JS=SJ 1❑ - K0- ₹ (40°°m (-) 0- I OIn Vf W❑ 002 05o .5 W-(n _ [-UUzP Z fZ W Z Z ZtAZ 9 WW3 �� zW 6E, 68 ;3 < SO - S7- s Z�w�IKJ 20 „_ W O O U❑WW NJ JZw❑W<I�N JJZ J�pm V ❑OWJW < O rr3" S, O Z W O W N K K IvZ r W Z O Q Z Z O W r U Z U S 1' ❑a Ir r z 7 W Z O O J 7 qqSS W W W J-7 W w t Z W K 0 W Z O 0 O U Imo ?3 O7- 0 2 6Uo° C, , ?UKt�OU< mi "-a=0- ti ,e,28 gCogC - O7Z 2y 3 � W <K2VI�C NOC <3LL �NfnO K= O��K ( 01 �❑ aJU pU WO O = KV7K 7K W N N W Ww3 U Zg..- 8.7,12:6 7 7 g '0.2-;' n tnJ U`OZ rV171� I 1 W 102 I W =1W WW2 p}�<WO: 1K W WO .NnY ,ntO Zs rr IDIo-m w 1otn1Q4 tawJU7 J • 0N n .r ,n OW21 wk J� 1 2 2 ,= N1W twi173 23< K? El &O ? CO� UN V)I�WO <ma rY (=n U717/IN1 W �O 7e<� Ow 0-U ooawa04 as _K onmom00 <1 UNCZ1 =Z < m 0 0 w W 3dAI/NOLLdELPJS30 30N3 i3J3d oN ONlMV2iO 3dA1/NOLLdIa0530 30N32i3i32J oN ONIMVMO ddV )IHO AS 'oN 0/M NOSIA32! 31VO •oN ohm HH0 AB oN 0/M NOSIA32! 31V0 oN < m v 1 O OMO'Ol4LSO OA3M 1f10AVi o J Wo z o iz cr _ e) Z ^ p- •- o N wo O ti i 11 . - • Y f a II �R. sco g Q g W wCN1 _J m .....-.H.--• I 1 es etjat se; i •8 14:1 • • gs • • •Lit• • • • EE ti' It _ • _ • • • w • • • �w. .• • • :r. •�•w..�•-taj rs z • • • • Q O 0 CI to w- ¢ W Q Z 14 $ vi U Z Q W r2 e- .••••:. V I W z U Q r3 _' 8 $ Q' cc r— W W .i tit yy�War 70 J ® • • a ® f • �'••y • • • :, 4„-- . 1Q O U Z e. `•$ 44 tS • n Wcc co • o z CC p 1—y CC-I.! w › w 7 $ Uj O W J zW U§ O N N VI Y Q UST .cO •OS p •t O O O U U1W�w\n I O O WO7 '~ p 0 O U Q p W0�7\ O p ¢ w §r0<r J\pO x fL N� CZ3 d' < Zee O?6NV=i a 30 W O �'I o - 4.V•.. •••ti3ti ii 4.s' 0:02 co �yi• ii IS 9 16 ill b• 4 cj i It TIPPa • • S N h s • le 8 g � In m N " O _ e ^ O o °� ? 0aw 9 2ir t_ I t5 . . * E ti, J`I' I • • • • • awrCx rW) Go WY L h- • • ' •• • • ' • • • • • • •. • f • • • • • • . • • • • • < < Wz � 2 i 4 W 6 ¢' < Cp > O Lao I _b • •• • • • • a. i c-a � r < Go oZ Li 41.1 U \\���`v ; ./. I O < ww8n � S Lo o � < G60 N y. WCw� = & w �'a 4 e = d ��CCOOU �.. .�\\ , � 'II % / / � •I % � WCC GI^f3 r e o D OW goat m s c awdm ' /G �/ /' /`%' /' o /' as W 2Ce•, \\ \ \ m� a Arno H a aD • •I\\ �. ^y \ ,•\ O V Gl• �.•� /i.////./'' % ! b ! at \i�3���j��' �� !' J < a �� G ` �o � _l t i i i o;:;:;Q• - �; g x Z` \z to o a z w et t ' • : �/ (q 5 COO wNi •.t r 6E a l i 0 G J ad 3 vi O W > e y= G K p U Z a !- �T W a Z 0 U O LO di • 1 t 7. ., W WW x� pp J o,- a ZZ Z W VI 7- fA_Z p 00 7 J {(� . •• `JJ/111(1 ` liii? ?i ii7. is ... OV ( hUO O < OW z G J\ pp<,,U �Li � J ° .� �. 1 ..•::. . lit iii Z W O U N D_ C ILL W &I C Nc:. N z . ti` O f1�' iiiiEiiiiieiifiEilia! •iiii i:i < fV O W J W P o 1cc. w 0 0 o r `' ✓ o g ¢ F • //\\// f rC( ( i •i Eiiiiiiiiiiii j' ti*.:. . ? IJ = i o G G < � � (nu� � acxi " n�; °1� s tree O a o � • I// I \ J "� 'KS: i7:' : to WZx � O VO CD .S 11A < W LNJJ N i� Q Wln \ ` \ I. '..;t;:i ;•.: ;:; ;: a 1. O W W p d t- la vi .g111: U // / \ ( 0003 m � w� . ni ISM � aS z v z� o ¢ Z fx � � o•• �, x W a • / re,_ ••• f zdo�pJ Z'aaz `' ..1Mz ' � ; _ ' �Cjo� UW r z U : l\ / / \ ( ( (•• m00 O � �. 0 CL.1-tliOL- CC ou zx vi PH • • . , • W HJilt! 1J9 O a• a J •< . • • • • ',\. m W <$ 0g0 = 0g y r V 1 W La< ... 7 J N m 'Z N U' • • '; / ••.\ C J • iW' K F J G O w rer 00.002m a Z w 3 Y ' 3 •t w a W Li •r�':r'' ,:•.'��/\,/ Z Z z } S U r C 006 -4 , w E Z O z < < W<F W U N p _ "� • ��� •' /\/\�1• OOJOsW S O Z O Uc� 'C -/ 0 Ws e• aigCr,.). rUowm - °D � B no cc? , •i>j9 • / / / ! : : wWO � Wc� Om a �IiW < 4GWJ4 � v /,g. ; 1 III W ad � 3 -�1 w . \\\\/\\� i.•; :: r6moS� °2 � � � sg =zmo �zor a a aw G, •//// // :E. .,I := .i.:. .wa w zyoawUN �z# rn0p E a - 9 ijiw �_ ¢ 5 v • \'\\ ..:li:iiiiiii'i:ii'iilli W N O W > x W G < N. -Snow- Z p q n _ w . mgr ^ a = r � ✓ NW CL W ; zn dce • • •:�ii r N W O (A N W W U• W } O a = 'in .G o f}.3 h p a Y •'f.'.'. • • • � t :. J a. W yy< IA y y� 1(/) W -J U Z Q p ar .'. • • • \ \ .:: : ; s ;: to V H U r p O U F_ < m VI P 0 ; 10 W 6 .d �_ ° • • n/�/\/\ ,::? ���� ® mn � , acWg� oozy - � � x ��j� gilt ,,E. 1 1- y.:•, . . . / / / :•a . : [':.;t[1`f W IJ K V a a R W _ z ••e.•'\-') N N U C W • Crise- \� ,•�, ,•, • • • • • .: I�/�/ 2O �o ar J � � �WWO J � wV � }�y yi •an a- �i w � ¢ F \_..\ ).••••- • '• /• \// ; i` iE?ii ? / aom `rl��n coi °rs °1GGaaG22 ? gCG7o $� ' �5 � � v `�rOW 1 • \�\� . lii :"iiii . Y'�r o i r ri ids am ?m I �_ 4' O6, x uj Mr �! z w w i0 i u�i.�i FMU W N H F 4a wl f 111 L ii g ti i $ i - ii 'full! 1 _ = ?• ets. 11111 . _ - 1111;611 1 yo"e q 3H 1 fig rn _ � "' x W (/i )- r 11115H1111111P - - ry n4mziwii rn W S r $ Ilk! �, w 7 O X 1- O Z C C r .. © i1}M� 8_ 3ujrn W z Cy F `// ' h ,/ H z G G r N d E � ' I% x � oa � og a / • "n 11 U W U U (4._(.-o , 6 w -14 I •� \ .. •. U ZCGC < r� �/ ? F Z 2 �' _C 2 J j m . ,/�\I/ t a r ON Da O U dl U p fi - S • ' • .\\ i. • U N UGC• 10 m Y n N O r G N• W i 1 • N O 2 Y gw n z r O day{ C W J S N V x G O U C I W y� U W W O y� 8/ G C i- E . ♦ • Idz ± .(1' < a w1 �{ 3 Go N • . / ya} Uo J 3 v W U W t 2 a / z of - rc 3 . z c� ax G } fie{ h N H i W w U $ Z a g • y p, ffi k a � t VW~] IJ G r ` . $ . of♦ • ♦\ rr ���\�': Z N 3' N l ��� O b r O W J W r Z a W e •/ I/ x G W C • 1 l < ,-, ' W a • < 4 • N N W _ • //( ' it Zr � 3 Wwrn '5= 0 w N K. i ri �o N ' • • ( i •' �. • aZ � OUNw� U<Z< cLc •N-' Ip� Ill 111 0 l 0712 V, < 1.� J J N a . . \ f ri K O0 G a KgU w = yiC = mr z — • ' • \� ( O OZri UW < mYry 023 r iN • , • � r \ ' l ~awJSr > % x20° 0 3 " �A IIEot� •`n S' I{i Y ii" • ( l O < �(I r wG x I 95G_ NUN 3 •. • . Q \ f owo � `� 30¢ 0 `]6' 0 •n °t Ea • ( `0cilZw _.. ga nW0 ill-Oh w E�� D is € w O - O v a [[ Z W O O Y i- W O . ., Lit r f/i < W 1S,� Y • • � \• jN J 1J� G � UaU' USO= U Ri �i{ 2 u { i W e r y} y!j tl o • �� W QS0 W GO �WC R > 6 3 = S li • • IIV 2Wi ,x- W x >. y Na W< J ( S2 0Wozco __, l0gYj10 41 w in A -' g i $ �t ' �— o >< < NzGg U ' Q w 3 De) 6J O Li,a Yj � r w s r Yj W ° W U v g B 06 '� :ii iiiiii•• •i:i• i : _, �.-..,, . . . . . . . . . Vl0 •" WPI- a,1IIilkh d S JC > � O > O ll�•,. W _ it El J a 1C JZO J W 15 A N N •' 6 �`ti O Jf I SW N �C 0W J a. -yS Ep{ � 2 r U i ' O W S - QQ Z Z- •� ci ri .i vi z w a < If �i N W u u a n _ a �n ti Tl {g, In d 9 d 3 Q M U O 1.41 L. I Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Appendix D: USDCM Volume 1 , Chapter 5—Time of Concentration Details • • Cedar Creek II Wind Farm Project DRAINAGE CRITERIA MANUAL(V. 1) RUNOFF • 2.4 Time of Concentration One of the basic assumptions underlying the Rational Method is that runoff is a function of the average rainfall rate during the time required for water to flow from the most remote part of the drainage area under consideration to the design point. However, in practice, the time of concentration can be an empirical value that results in reasonable and acceptable peak flow calculations. The time of concentration relationships recommended in this Manual are based in part on the rainfall-runoff data collected in the Denver metropolitan area and are designed to work with the runoff coefficients also recommended in this Manual. As a result, these recommendations need to be used with a great deal of caution whenever working in areas that may differ significantly from the climate or topography found in the Denver region. For urban areas, the time of concentration, tc, consists of an initial time or overland flow time, t;, plus the travel time, t„ in the storm sewer, paved gutter, roadside drainage ditch, or drainage channel. For non- urban areas, the time of concentration consists of an overland flow time, t;, plus the time of travel in a defined form, such as a swale, channel, or drainageway. The travel portion, t„ of the time of concentration can be estimated from the hydraulic properties of the storm sewer, gutter, swale, ditch, or drainageway. Initial time, on the other hand, will vary with surface slope, depression storage, surface cover, antecedent rainfall, and infiltration capacity of the soil, as well as distance of surface flow. The • time of concentration is represented by Equation RO-2 for both urban and non-urban areas: tc, =t. + t (RO-2) in which: t,=time of concentration (minutes) t;= initial or overland flow time (minutes) t,= travel time in the ditch, channel, gutter, storm sewer, etc. (minutes) 2.4.1 Initial Flow Time The initial or overland flow time, t;, may be calculated using equation RO-3: 0.3951.1—Cs� t (RO-3) ) in which: t;= initial or overland flow time(minutes) C5 = runoff coefficient for 5-year frequency(from Table RO-5) • 2007-01 RO-5 Urban Drainage and Flood Control District RUNOFF DRAINAGE CRITERIA MANUAL (V. 1) • L = length of overland flow(500 ft maximum for non-urban land uses, 300 ft maximum for urban land uses) S= average basin slope (fUft) Equation RO-3 is adequate for distances up to 500 feet. Note that, in some urban watersheds, the overland flow time may be very small because flows quickly channelize. 2.4.2 Overland Travel Time For catchments with overland and channelized flow, the time of concentration needs to be considered in combination with the overland travel time, r„ which is calculated using the hydraulic properties of the swale, ditch, or channel. For preliminary work, the overland travel time, t„ can be estimated with the help of Figure RO-1 or the following equation (Guo 1999): V=C,.S„as (RO-4) in which: v=velocity(ft/sec) C,=conveyance coefficient(from Table RO-2) =watercourse slope(ft/ft) Table RO-2—Conveyance Coefficient, • C, Type of Land Surface Conveyance Coefficient, C,, Heavy meadow 2.5 Tillage/field 5 Short pasture and lawns 7 Nearly bare ground 10 Grassed waterway 15 Paved areas and shallow paved swales 20 The time of concentration, t,, is then the sum of the initial flow time, t;, and the travel time, t„ as per Equation RO-2. 2.4.3 First Design Point Time of Concentration in Urban Catchments Using this procedure, the time of concentration at the first design point(i.e., initial flow time, t,) in an urbanized catchment should not exceed the time of concentration calculated using Equation RO-5. t = 180 + 10 (RO-5) in which: tc.= maximum time of concentration at the first design point in an urban watershed (minutes) • RO-6 2007-01 Urban Drainage and Flood Control District DRAINAGE CRITERIA MANUAL(V. 1) RUNOFF • Table RO-3—Recommended Percentage Imperviousness Values Land Use or Percentage Surface Characteristics Imperviousness Business: Commercial areas 95 Neighborhood areas 85 Residential: Single-family * Multi-unit(detached) 60 Multi-unit(attached) 75 Half-acre lot or larger * Apartments 80 Industrial: Light areas 80 Heavy areas 90 Parks, cemeteries 5 Playgrounds 10 Schools 50 Railroad yard areas 15 • Undeveloped Areas: Historic flow analysis 2 Greenbelts, agricultural 2 Off-site flow analysis 45 (when land use not defined) Streets: Paved 100 Gravel (packed) 40 Drive and walks 90 Roofs 90 Lawns, sandy soil 0 Lawns, clayey soil 0 * See Figures RO-3 through RO-5 for percentage imperviousness. CA = KA + (1.31i' -1.44i2 + 1.135i-0.12)for CA ≥0, otherwise CA = 0 (RO-6) Cco = KCD + (0.858i' -0.786i2 + 0.774i+ 0.04) (RO-7) Ca =(CA + Ccfl 2 • 2007-01 RO-9 Urban Drainage and Flood Control District DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF • Table RO-5—Runoff Coefficients, C Percentage Imperviousness Type C and D NRCS Hydrologic Soil Groups 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 0% 0.04 0.15 0.25 0.37 0.44 0.50 5% 0.08 0.18 0.28 0.39 0.46 0.52 10% 0.11 0.21 0.30 0.41 0.47 0.53 15% 0.14 0.24 0.32 0.43 0.49 0.54 20% 0.17 0.26 0.34 0.44 0.50 0.55 25% 0.20 0.28 0.36 0.46 0.51 0.56 30% 0.22 0.30 0.38 0.47 0.52 0.57 35% 0.25 0.33 0.40 0.48 0.53 0.57 40% 0.28 0.35 0.42 0.50 0.54 0.58 45% 0.31 0.37 0.44 0.51 0.55 0.59 50% 0.34 0.40 0.46 0.53 0.57 0.60 55% 0.37 0.43 0.48 0.55 0.58 0.62 60% 0.41 0.46 0.51 0.57 0.60 0.63 65% 0.45 0.49 0.54 0.59 0.62 0.65 70% 0.49 0.53 0.57 0.62 0.65 0.68 75% 0.54 0.58 0.62 0.66 0.68 0.71 80% 0.60 0.63 0.66 0.70 0.72 0.74 85% 0.66 0.68 0.71 0.75 0.77 0.79 90% 0.73 0.75 0.77 0.80 0.82 0.83 95% 0.80 0.82 0.84 0.87 0.88 0.89 • 100% 0.89 0.90 0.92 0.94 0.95 0.96 TYPE B NRCS HYDROLOGIC SOILS GROUP 0% 0.02 0.08 0.15 0.25 0.30 0.35 5% 0.04 0.10 0.19 0.28 0.33 0.38 10% 0.06 0.14 0.22 0.31 0.36 0.40 15% 0.08 0.17 0.25 0.33 0.38 0.42 20% 0.12 0.20 0.27 0.35 0.40 0.44 25% 0.15 0.22 0.30 0.37 0.41 0.46 30% 0.18 0.25 0.32 0.39 0.43 0.47 35% 0.20 0.27 0.34 0.41 0.44 0.48 40% 0.23 0.30 0.36 0.42 0.46 0.50 45% 0.26 0.32 0.38 0.44 0.48 0.51 50% 0.29 0.35 0.40 0.46 0.49 0.52 55% 0.33 0.38 0.43 0.48 0.51 0.54 60% 0.37 0.41 0.46 0.51 0.54 0.56 65% 0.41 0.45 0.49 0.54 0.57 0.59 70% 0.45 0.49 0.53 0.58 0.60 0.62 75% 0.51 0.54 0.58 0.62 0.64 0.66 80% 0.57 0.59 0.63 0.66 0.68 0.70 85% 0.63 0.66 0.69 0.72 0.73 0.75 90% 0.71 0.73 0.75 0.78 0.80 0.81 95% 0.79 0.81 0.83 0.85 0.87 0.88 100% 0.89 0.90 0.92 0.94 0.95 0.96 • 2007-01 RO-11 Urban Drainage and Flood Control District Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Appendix E: USDCM Volume 1 , Chapter 7—Drainage Channel Design Criteria • • Cedar Creek II Wind Farm Project DRAINAGE CRITERIA MANUAL (V. 1) MAJOR DRAINAGE 0.5 0.4 0.3 Channel capacity / design curve o.z c fn z(7 01 - oa (c ) — RetardanCe Q os D) 041x— Limiting velocity — .03 design curve .02 0.1 0.2 0.3 0.4 0.5 0.6 0.8 1.0 2 3 4 5 6 8 10 20 30 VR, PRODUCTOF VELOCITYAND HYDRAULIC RADIUS From "Handbook of Channel Design For Soil and Water Conservation,: U.S. Department of Agriculture, Soils Conservation Service, No. SCS-TP-61 March, 1947, Rev. June, 1954 Figure MD-9b—Manning's n vs. VR for Two Retardances in Grass-Lined Channels. I Rev. 04/2008 MD-85 Urban Drainage and Flood Control District Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Appendix F: USDCM Volume 1 , Chapter 7—Riprap Design Criteria and Gradation • • Cedar Creek II Wind Farm Project DRAINAGE CRITERIA MANUAL (V. 1) MAJOR DRAINAGE • Table MD-7—Classification and Gradation of Ordinary Riprap %Smaller Than Given Intermediate Rock Riprap Designation Size by Weight Dimensions(inches) dm(inches)* Type VL 70-100 12 50-70 9 35-50 6 6** 2-10 2 Type L 70-100 15 50-70 12 35-50 9 9** 2-10 3 Type M 70-100 21 50-70 18 35-50 12 12** 2-10 4 Type H 70-100 30 50-70 24 35-50 18 18 2-10 6 Type VH 70-100 42 50-70 33 35-50 24 24 • 2-10 9 * d50= mean particle size (intermediate dimension) by weight. ** Mix VL, L and M riprap with 35% topsoil (by volume) and bury it with 4 to 6 inches of topsoil, all vibration compacted, and revegetate. Basic requirements for riprap stone are as follows: • Rock shall be hard, durable, angular in shape, and free from cracks, overburden, shale, and organic matter. • Neither breadth nor thickness of a single stone should be less than one-third its length, and rounded stone should be avoided. • The rock should sustain a loss of not more than 40% after 500 revolutions in an abrasion test(Los Angeles machine—ASTM C-535-69)and should sustain a loss of not more than 10% after 12 cycles of freezing and thawing (AASHTO test 103 for ledge rock procedure A). • Rock having a minimum specific gravity of 2.65 is preferred; however, in no case should rock have a specific gravity less than 2.50. 4.4.1.2 Grouted Boulders Table MD-8 provides the classification and size requirements for boulders. When grouted boulders are used, they provide a relatively impervious channel lining which is less subject to vandalism than ordinary riprap. Grouted boulders require less routine maintenance by reducing silt and trash accumulation and • Rev. 04/2008 MD-61 Urban Drainage and Flood Control District MAJOR DRAINAGE DRAINAGE CRITERIA MANUAL (V. 1) 60 ■ 2 Ate, o `Q IQ k 3 JyC�44 �yQ 1 2� ,�' ty 20 SYpE oJ� O .2 .4 .6 .8 1.0 Yf/H • Use Ho instead of H whenever culvert has supercritical flow in the barrel. **Use Type L for a distance of 3H downstream. Figure MD-22—Riprap Erosion Protection at Rectangular Conduit Outlet Valid for Q/WH1 5≤8.0 • MD-108 04/2008 Urban Drainage and Flood Control District Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Appendix G: NOAH Atlas 2, Volume III—Precipitation Depths • • Cedar Creek II Wind Farm Project N a, co cn C i CD .1 1 N d d ..C 4•F • o CO PI Ca GI I 4 FN Q 4 U W a' V W in o Q) :al U a m W N L' 2 O u ` LL m c ~ dP rL W ` I ¢ 0 4 j a 3 C a 0 LL K m c m Z a Nom c O (p O 4 N t, a O Z U W o c n g Z.CI) Ca J • W LL I F__ W¢ vi v Et'O8 3�g QCD i ii AD a m Q 3 a" _ Q •� `m J �� v Z�U �aZ Li J N` 40 4w ' . CD Cr, u q m ,a 0.e u u w mn ° gwF ° o ° � o� a � ° � �va ;vo �cc� � � � aar� W r� 9A50 p d b c N•0 u•o N z 2 T Q a Vtl u . a'eo'L9 n u X a. p 2 m �° 3 b-' 3 ° U-g m n >,t 9 3 z 11.190 § 81.°4' " 2 c.g. E :- Cs o.S u o o•5.°s c Y � o>'�+1' 3 q° c v 7! P. k sf 2 " e v .4 ,1'66' t• 4 c-E E m c = a,E V U a u oo a u u a ° e v e b X g inn 0,1cc� E.°' ° u'c-salt ad N p- - s-0.30E2� r o o 2 ° %^'5 8 ° 5 TA R °. E ° X g .•r to a e c u p m.�..°.° p> �a > "Q ° E o O T O'a 1 e a y,V N m2 ,, , u 2 a .D 0)9' .E 2 oo m -F. r•' U U 'A V ?2 N i C Ci D ^ j ',39, O Y 7 d 3 e t J = O 4- ' 'b S `°',� "7 v > g = g -J5 ^ ° a'4. • o c c r. 2 o u 6- .. a•y ; > s a• .m . ei u ... C u)2 c cLu._ :'E-- c •Q rY,"rs2s .A f? 3 a c . -m 3 m` 3 - - c goer - = a a c %).4. ^ c cQv7 c u m`d E ° cp u u 2•7uU a m ° t' ?>, ' .^�4 °-' o o m N g $ c..§ E g. •o u u:°o c u c ;4-. QV e6 v e a Cg u r a . ti 0 c .G a 2 3: 'E ,. Em 1 a ° a o ° a m 02 a >13 'a'3 2'8'5 -al E 8.4 '' E 0. 'P.'t. Ts E c c I, $ 2 -5•E.5. u oFf °.0 0 o w wii , ea E op c t c E. .rd i- 3. Y,''.R.o� e'f3r I....TS u c c� . w- . 0 -- ._ . . - N . R °` e a c 3 .s c Q 'o >,t'$ ° .40E.E'c ri E H c c t'0 F _ a� == c°' O'Q t o m u ac E. 6 40 00 , co ,_ 1..g 71M3a4 Eo� ugt.EE3 u°i 3cua0 .- ...CDEc f_= e �o14O.6 ara ma a. MO E a c ac.$ 039 a m .a u c S.?`.c2$V a r; auri E Er•- cc -•'c • Q `ro 0 3 4f~ -03E 2-22g' ''ct °'pbEuUArp'ao•N •1, waoTo ;.0u3`F' .�• >-, = •o0•5 a u w u a 4-• 3 2.›,F., .. 2 - u 0, m A •E e x c _ y iN £v ' •4tS .03-0 o.agYE,•S - E611u v_ o_�.A.ca2�"`' y 4$' , �Q_ �°`a' ears L >'Nr V O - 7 O O .. VVVu111 OS (,.. V J Ta�g7 !_ D7 . [q'. d - E [J. .O' a ZS (/�0 7 L U d m L a 2 r €O 3 (j 3 1 O A 2 V'O w_,A C a J O; - to a E O a �O'17 P"' e 5 . v N a c o °� o m e a • c 7 t c m p u > 1. u oo c N G Et 7c o £tn•5oEeu ` •e1 $"- G—Fuo▪ .'oo ° o a ToSpGR7" p E y. a : ..3. .+ - 8i n 3 °' g F E i'�`o r > > ii ..8 °,,,•5 ' ; 'm 3 o r, a s ". oQ 0- Z, v soGo 'mRuic � E II lb � ° ±.4._ oVrme0. mUa2rn m ° , v ro F-W " $ a•a a°, �' a F ?'u r c ° a pi$4. C g'e u c s o o °r y u q a am 0rn 2 '3 cuy.ea ^' . -- -AcRig- oo" u ca ° noo e o .. = F- ac '+ an aaEl- 8 °v'? Q o�Euum a .. eocE0 ...M Vi VC��� u �`0 ... o^- u _ 8 : m 7' ▪L .9 m' m.� n , W 001 r') N l° Id a•''• 6 N C '- C d 0 - 7 m G g i ., -- - 1; 0 % 2 e E c o m o N o -. o c K L 'v °� eu`, E u c'7 _ .• a y u m e h v._ o g .yu ,E 3 a r ,.-2 2 i,•`a p >. . � E,0 m = N L °' E•�• EA° `r A E,4. --...,,e' _ -.3 02°r=-'F EA 6-u'5.—Q4 ,. 5 >,K �r C ;. 0 ,1 7 O .2&.g O n .7 C 8 r E > " c o p 0 ~ o u `v c m u g ,may b 2 § . ca C.' it e 21 , u 9 m 7 v. 2E =::..-. y G r� �' C . E O h° v m a y _• 2 a Cam-. A a 4•- G .+a u 7 • :; a r u m t1 a u - > O . eY v.• . ./. V Y V 2'.y- . ^ °.t =. .' _. — 6 C •j-8`Tx 4 � c to bm co CO o c. E � $ � ouEEEe° _ g � u �" n Nnr4 � S '� v `( o r. P. e•. OD CO Co r. Co ac ° c•5:7 c c. ''5 ,. 3 c . . r> aA e g c-� c '4 5 r.' c a ,a E — c u o v"p ° e ' L m 0 R . e±a c o 3 0 u . c 7 s� o E E v _ c y s x e` m E 3 c�` N• y a›*5 8 ° od A l .. m rn rn x 'r o Y —° °� ° uE— !-.1.'-`- go '50.' 0-5.8` C • :' n y--0 e u . w�`p u ...-5O e E .. u . i 3 .p �' 'g•a '? c '_v'3 w -° c'n °.�, .a e o a c.S u u w E u Q r m 2, Y 3 .� g c b u m u .cs 2 ° O • u• n° C o E r ° °c S E �, >✓ 3 ; c` w , • 4 0.� E u E'uu E c▪ p. u c c `a -�>F >- z =a >Z �>i m n g.�i°Q u .2'c in o u .° g .eu E � c 0. 6. aaUH.Y ✓~3 'a c .E • . ,:g ) N... )7-'A N "0... wro. cwo nr a °. a to a n uLi W pp -�-_.i� Q '•� s a Ol^ ...a Nic^°N O In N N Q n �. r_ 0 w d Ci m a o ep a I r 3 a fit] ~ + { O +O 68 8 o +C m 1O aE,� 0°o - o0, rn .�* i- cow i t E 0 = 4, = m c [ N..i Oo C O DO a C j try • 1 f $ I O a w0.4.2 .. _ - a li 00 II I8 II I� II I8 pe m e c o o €_.. I >-">- >=.3.7 › > >L2>= o ...- 8,=. $ �.... Roy w. 3 ae a' m zx vm ° ! g 'a 2 Lifl 43 ,_ 2. CC n. m Igo C7OC WS 'ia A EYnm? Psn y ry c ' n ov ?' m a m? '° . a a E20.2 c V, oy c in > Lm R" p. o f °' a D:V n$lo ro °U C M y I d ?�L'�t V L°N m i s a W c =" � � oc3w ,.., CUs, ••••• u E � � i�Nbi.� f I. I a > r u d. .� ro U /I C7 K ro O N N N a i e • £ m.0 ad a r o II II Il ii II I1 II I ' • ; : - s s acti cad'mE E > E L:-.: . • • �Y I . 3 ro D:DADDX.14CDO:4- Oa t- r°nam tnn� ra >! r ro>- z :as>"x"x>ZaZN •.n.oea,.a"u..r E c,,c p o 0 2 " ° E o E o $ ° E c a sy > o c_ ' u o A a ch 2 `as P. 9 p u 3 v°0 4' 4115 £,�"_ O.., ia •s .. .0oyugh.a -'BomldLYI g°—P.- .9..- - -— . uau. - 2 a ,, ,,, T u . . HUil a m > gi '4 ,.i3u y;r5.� u°' ea ao 6.5it'- 2 �E_ Sb py 0z ° > ,., 2 = cgcC 08c2-E0 Cu, �0$0 = egg4=. ou w .o n A 0't7 O C .s a O C O a u C �'i g a l'''' .- 0 a e 3 p''o ' -E is `N $m'w a ° ,o.7≤ m m G m,c ? . m �'.x'^�• w•G u •£ a.a•� O c m m a "S xq o p Ts wo - 7c $E aQZ Z. E�•� _� 2 m E 0Tu A E.74„ o a•-g ° O. .4 1:4 .4..g t C C ,- g... . e...-: ° a 4 O u v.'4' 'a 1.- E . C E'Y'. 4 O u e.> 7.0. �..m. a u «� V...-0-c `" ,�a m u u t fa c o o -• c A u .a o 3 ' . a tmo u• •a m s P.fL.s82601-1 N('...: v e N u 0'c..Q C ."N si•E'. C ° 3 0 uC e m U a. V N .V. T. ca..,Wi t„ O p g a o,S 8 ■ u 0'� 3 X 2 F c E e R.:a T', c ,4 x 50 °d m 7, E e. a °o: °r u 8 2', .r •E ° -. u 3 3 aoo� a•.� m•iy e3o .�� p $'ya �i'o �, u�8v '' � > :° �� m �ov3 °ouo7Q �• p 'e� r,3,o u gm `p p, C y t,=.Y o c e•� -.8 . s - . pt ..- 7 E.ric k"''3 .c 'e3.`"t o m e .a o c�t„L°'` E u o. _E 1,...42-90. . . j F 0 0. ..- p o q e u p _ 41,,,,7, 22.s . E SS U a h a s ry p.O O y C r b I-1 m y N °' t� ≤ >,9 C' '... . T U R p E g �i O . a U 1. 'a p h .C'� O a V •U ° V. ° 0 0 u '5� "D N a K p .. > ° ` u� g.s u.oF �o.223 > oa - EW•o � 3• 8I t62 . -RV sn �Gu aa:sg.., E ,`,,. 0-41-41.8: -A >. •Ir •' 'o e ° °•5 `P >. u Q•e g o e'g•.° `g.c e E p e N 4'a -..°. : — u. ea,� —c•ii �O a ail C . .u. C o m le a >t O a° C m u�' vN p a o a ' 'va a ° Ro. a ° V'E " NQA ' o ' eof C 4 v �f o �uC B ,ni n," c o o. d ,I E 3 g W�' F q:o o V u x $ "u, u C ¢ F' yy .6p '� d - g O q pp C p ¢ N if 13 C E m t i O C al T..e L G -N N...•A V,= P O C 0 a u Q G - Q .e tJ.a j R .V..'C m 3 T a r0 °O .' - 3 L , 6,6 ,. N g fA x m do 11 a ° 1 a.y° Z A a e O c:U u o m.4 `o r " c E I m 0 0i Ti O.° �N c—E-R« > vaf u,_ CU O w.°.F .° O •J Z C C X{ J•� 2 _�L g�= .`1 O V t ° > o c E.C d+ R 1 0 -A O L. C N..-..M 2 0 0,R u g 1 N ° 3 > o •E 'a u 3 .3 [0 W y o g 11 f3 „ E c T 0 S o `5 3 a a 3 ° m c.c O �° 3e c g 8 3M 20,1 „ ' r.§,. a o ,>�o 6.,4 .2 .2 § - 20u0-0 c c•n g "C c z g.4 m E c o _o ..g -. .--).8'P e R p O m a u Q 3 ar,v m? oo u E m m g v •s �■. 7 3S �o rod' eu °oa �`... ., ^!°° . yr 6 £ memg .. m .. . Eo . ..c u > a,• m O eS a T V -. s 4.8,2 s-,—..g 4 s',90S6 c c.E'r, v g'34 o z-C a 2.2 af 2:° ad?,„,•. g o. C fi g�� › 5.c ° a•[zz p a °'b ti o fi4 u u a u r. R Oc- ' y . •2.. m'o _0 a u_l o i c s m �«a a 2 2< 6= `s.550• N-5 5 E $.5'o°E. a s $ > g's'a °0 i a si E 5'S 2� a S of i aRi u I I I I -P-1"T - i 1 I ` I I I 1 ill .Z a ry O 1 : % o std I =-•H- f III lFI III Il 1 If I = 1 I s i I I I I I I I i i I I I I I i I I I I I I , •• •• r • •• ry (...na)VI4,0 ueuItu4.J.l4 iZ I I I I I I I I I , 'III I III r 1 1 • r I r-r-r'i•-r• , 1 ( iii I r c� I I i 1 I i 1 ) �..I I 1 r T� i I I I r i r I i I "o '° — 1 ,o - c ! III �U a �"-',G i It ' ° LI C o o ti • i ' E h c $ a e r I i 1 a C '�tj a . •-• °,4 v 6I III ! l ' lIlI Ill III IIiI« i ({ I ! ' a a w C.� 1 1 1 1 • l 1 l ! I I 44I ill i t f-1- • ((' ( a •� C I I I I I I I ! I -1 ; a $• I I ; O I I I I 4141 , f i I ' I l ! I j 1 •^ C® ••vo v E Q i I f l I I I e"axxS °0. III Ill iii . E.4-11I } III ! 11 IIIYIII III ' If 11f '« ! I 3dhgac1 i i 1 I j 1 1-- -H--�•....i..l.i III I l i Q s a 6i � C7 o 8 1 4 ti •c c IH Unlink• 11..: ' i ' < <.l.t I I i Ll__i_ I I _a �La..,.a III III �L3. _. I . ..o.i.:......y. a • _ w T E2 E E Egga.g`-7'o a u ='offs E.0 n.3 cQ C 6 3.$ E e• .0.5 38 VT, ›sgsdo•�N u1 > uuk� c E3 c .v.^r. N u 2 u u N p 6 2ra u iT �C >� ur °c'3'c-5 L ,Cn C •a ep,:, 10 e 3 �,E i S ' N •• A O C £t ° 3 4 ffi 8`.3„ c W .c. n !l 'O 1L.' 1 •O L _ 'tic To E 5 c 2 k_ Y. F- w•vN..`o.� v w,fl a e�('+N.£ il++ . u o c E p.�u m ° t m20 0 c a Gm E. cEES cmo.o Eo •, Eit� V o vv4L p a.W t 'm $ ::' 'y a•o•$ V , '�' a •�a 'c7S.p i. ,G pAp M y Y G N O c o ca-°48'c- 0 ° w wv a mi•e - n o G C o $ g Eb Ql • m O 0-0-8E.,,7, 0,23 +m 0 b.s u Q c E A ^ s o h a.— 5 g ' u w o c . „ VI ? cu".$ V C.. A - G 2T•4a a" ,JX, O CD'.. 1 s a c a6 0^ 3 o .0 3 u 4 9 n- '4°—�" 2 ;-g 2 d c Ku c v: p m ..M N Kg 5 A m mZA W y E S 0 a. L O u 8.500 }.Q ?C - E 8 A :o• C > 6 7•n N ..2...—,„ Y E > p N y E^ f• O.M.. m ea M t O . . n u n '2= d e w,C u •N a I"' .7. w . V 7apg-s O v. • u A.N A 7 mm " a E N Iv Y N a S vl N G o u ty .Ee '3 C a > .1 O 9i J.2 E�> w .n. •M+N c'=F, a>t .a O N N O & C A0'D.9 C c °A v A'° S g o o g E 3 3 l , , ,--...,-,A44 sa4 .vL q • ° ; a 'sc8 % A > b Ivs $ E > m y e... mmr n.n In n o c �Vl 51 ° o n ;", N > E °� u > �' u ry E a v t In m N .um M C L 02— c u u •i''SY N $LQ C V .°. 4 rj N � NNNM 4 Y ` v -- o Y .7 .C-7 R A T� — N E a s eA iu E1 1° c Son^ E a. > " F mMa-2M a ; S AN. o d ° 'g. 9 a ego§a c ° o N .a c e w ea�.nh.n s g ' mmamm 2 QEn ^ 4� Y8p 'cE. — r 5 WE 80000 `—' a o_ nm M p' ^' c E c j 4 t0 _ OO p OL L'A .-• ^ ^NN C I J . n p 2 00 E 9 '� ° n N d d 'O m „p. 4 2 v ti rs u° g. $ c Y c s E'; k c a L' i + i Ir W c o-� g c •a U A Q > v •'3 O L .. L C m.C. ` O A 0 V c 6 .c v a v.'3 =.ap• i AA =F 6.0 IN. A '«•a ° omw,'R . Edo c � �`3n A z �..� £ .dbbloZ "L° oy « � y.c •op . a.{ 0 u 1.4 . Fpp O m. , u g� Es N, a on ti m °a . t 0 - N .. o G S C 3 g . .0. > e .o•o 1 a a v 40.n.o °'Mix V F' > — A O �j 3 c a. u.d L A u 4, O N. ≤ ; .o O r�.A M.n N< C u ,•d G•�A p 4 N p 3 O p y� ≤� c S °°° O .g . N' 9 �Q q ..!° ' o • 0 0 viiu .5 c „o a o 0 ao II iI II II I1 II d— w C E~ T5 �r G .. _a N o m'9^ . A 0 v E 0 r e c'a v .£d >'✓ti 3 N m N A N A v .V O_ .ca O N O E O ig80 u .d a ra8, -- 10- 2-2 2Mc8oy ..� ass , v A .. 015...2 20.p• 4a1 1 ,,•.`�.v N 1.° v; E £o S•`-'"0•' �, O- c a ti .. S j Am e ,owle . u .va ° �° S-' cS `b°t - E g c gE W � 3a2 •� w %Q . ° • proof wEc'R v g30 a : . E vu g 0 . AE— ..-E % t a? g ' 8•o A u p c E m n u 4 0 -4- 0 .A^ a > •m a.'a°`.E.,t �+ u Y. — p ..•l 0. o:•0 A u 0 = 'o c a s A Y ni'a n G 3 EA u w 26- m.s9 s 9 t g'° B o H O 4 .a £ c • E `0 A.. n --5 eu'0 g . 2 . I'I c v o..p fi pE Xn cc oo i.p >n c a�O W ;,l E W 2 0 a O••'p o I•+ `�> H.=w w w la !?fi� 8•Np'u . 0..Lo. G Lep 3 $ 0g a Y 's m a =v e 2 e E.0a'.x x n 3 L— o— m � '>'�3 t._a.a .e. F.b e•v o cv ndNda w r —I N M _ I i r N i 1 Neil!' :�-- �—�'—t�. ^, — �� ter' — r— 1 1 1 `� Y j 1 �1 I o .1- �j- I Z t I I I I I �' ( C._: ‘,._, I�> �� I 10 c II �• \. I mI Ii g. I E • 1 ~ O I I 1 a •0 + - - S �- - ri - I I - �� - - 1 w "-l` J I b �'-- - - - - - --- H 1 1 1 I a - I M M I I a NO fl. \\L 7" I C LTh i ex r_l _ _1/4' . _ _ - , n 144 z oz � / -2-- 1- - - - n .- I Cit a I I I I ,-11 I_ ; I !�"�1 wl o I 1 1 l 1 I 4t I I 1 l t I , I� 4 I t I_ ' 1 i�t I t 1_ - - - - `� I o I I _ r I 1 �. I MI I _ R / f N '7 n 1 - a I in L _- - 1 ''' t _ E 1 g mill la �. 1 0 -� r !�� r"cS. �acw c O K._ (-... Taos.- :44.7 ,-\_, ,ii'irle=, , =.,r) -`,,-_;< r V,/----‘\ . ca to el .-- a♦ _ � " r O • g • ..._ 93 w y , , 41.0-1-- I'rr v y4" '' I - rr'ri` • ! .n /* f �� . # iii 0..-- ' - 1:4M 4::#4.-riW..----vitoverar ty.:‘,..r�` 4 I pil t till liff a. c7.'/ 14 , R a- u •. - . '---- ire ., , A I ^ z� a`z z a i ilte .,0.7-.. . - . - ,agarreffe . :Al 'e • hodi ,01\i /_r?,} -rdi if.,4 . err . I' tri t r ' .irr, s • - -; ** 4 ,-: L . eir---,--rd : ~� .:-DILr� -. ' �� .- \7 X4= 1 • .l 4 '1 t J �$^ {�� �'° �• . ' fit• � • *is, _„: - 'T WilialiPISValt. .1. --' rpri Afrall"1116- 4t2 , dris• __ , :„.. a..". ise,L., p • ;‘, COar -4 juirtrisyrri .,--isT-_14 -Tr- . Iwi ‘:): .. ...' w ) - I c7. `4- Kt. ) / ( P lit,,! r r r- ,. i , i=_ '- $ . K `/ if( te- ` :a� • - egii. I.. # OW 1 be al 14 C° L-\\t Api, l'et,"%fie- ; _ 1--Sib . I Illidef .',..* el.,,,/- I ir.,...:. _a__ .... 1 Jo . i O ...,, J.-a a.... ami St , t _...,,,e2 sr:Th . ,,,-, , • !PIT -;_, --, t....„ i tY) 4 K 44." r 7 jr:: IS. - Sitit(1111;11\Vikk . i I Aram-gigg--4' ,,:,.\\ses__ hil ) \ t. 4 . r._ , Ali (p rin I ., iis ' v If . 'NS, vs" ,.. _ icc c, - O (:;;;" .: )1 Vedr: c: , ,.•if . Itri •-• ,r2-- I 111,, , '-• .c. 4j 1 a F_ f cg. 1 ci' I :- ... ..........: .. , . : . : 47,........ . ,. _ , t.. ..., ,_ ,. i ... jg. 1 „, _.< r___ .. . c....,/1 O lri l)", `q Lv ► �� ` iii r - 11: . 1 n / \ 1 ` 1 t ., ic ,Nie.Theiro., c: i jr: Or(_ I Ita.-- v e .' moo — �. iYt7�y �_' are IMI - �� er . C - �(i7+•�• Z es •s `•`1J .J rY a sass.` S ( Vrij4'" O• O - r- CI M p M Q. co N. Q d co) N1 N1 N O • V _OI ' - ...aaa a p - Tom' - -• C ♦S / � �\ � i t /.1 ___...---1/41"11....4 z el I Itr+ .1. ct I ` • 1 5• r C I �' ;( 11, m I 1 I cc O I Icc I °C I — i —e I I - - T a ci r.. „Lys_ _ _ . _ _ _ _ __, bk. I . cn o — } 1 ' I 1I I S "J 0z E .— — S — -.,. I i - cS 1 �- — z I I oa a. N C ? " 1 , H P.--...\-N I \ o - J I 1 1 _,,. . _ 14. 7: 9 • - - t 1-./. c_LE. co "lee% --/-----111-•'-` I EL 111\E %' 1 `? �` ~ ` n ( �, •, •�- 1 '7 .3.� . • -� e1` a- - Au.- . mi_i to _ ��� mss. vuraccezymr• .� , Y c O in ���j �Jf �. "7 - sue +'O I O' �� �� — �. .� �-..I1/4 _:o. ��a /w % .� u ol M Z. • I 4e , , *leas ft:, E '" L' 40 .,-4r„,, ,,.. ..-,..---._-.4,,,.......,- -rictetlir•--- , _I- / 4,...........4 _ ,,_- 0 . risks . 00 •C t 42/ 51 _ 'arra..\/_#9,7:0.--W, ---- .,,,szL - c Ito ow eador, 'I"7. < 0 9,1 9 te ;IA « 1 `� :� c d! ~� r�•_ 1 --- pi (AZ a of g y _air ,r ‘,_,I,..-........... „: wise_ etikyla-. . .. - i tia_. "j-i/41 e°A eV 1 i - 7-r-rt-Trt . Rs- '8; ;,9- 31 - plif70% • liStek ikarny:Thjoyi %,._:..2 N, 1, Nii...w.--, -- ...• ti:.-iir",. - -cilia a. dolitiebt: e 14,-!------- .=--'---`7---tar\ IN:tit-7y 4, 1 44,-.4., Qii 4 •'.,, sjsr:,,-.04011-t-er I:vit.., fr.\ Cr,' ,cie c 4.4-e..1.. - AIL. tleillib- Ile 45000%a tit .ral....Ilellig "la M ' a.S41 II•••••• • - ser 11;:tt.- % ?:: i r PI - <oily —xf `�y�''►�' G�''' ' , -- '+V l/,ataVirdidpialtiite ; �-t ,��, — '- mow;.. kilt .4. cv.tv---ir we etas + ' , n P. 4 R ��_. - ` yt_st • ,.'-iti-1 -. 1.1V IL file\ lie ' _iiio p • 1. W L `�J ���It * , „��,,firyyrr - ,r �' - + ~ O /" a l ^ 'icb 14_x`.. H " --l<`'i •. m�lis. 4i ...I v. by , kAtrirskt , -sair ..clitipi tx `c., tVi iv , -; fffrit \'''' N-Iffir. "`, _IRS e'srse.--..ztri:tr-84 •'My Ira Jr--sik �1 RlY I1`�f Erik 1/4�•,'�� , !•,r, O C dyerit k4$W rf ."� iF►� • , A + I' it lare- Eck- 4.0_1 ,.� .� . �� /► Its t a` Or1,11‘ Vc. T al N , � , ` , L� 4 Ill ^ (�.� ccJ - I... a.a.i t -erns . , O r 1 M M c0'' C h in N �! _lir__ __,14 _i ; I i 4 + O- I I I r 1 I I — -I --, 4 5 ._-, r- -7 I I i 1 ' - • t g..r-Thrimi z I I I � I !" i 1 0 I - -(6 �, O a I I 1 If I $ _a r, t -- - - - - - - -{ y a ...1 I I 1 \ i-- x - O r — N O I 'CT) j z. o i- -�a 1 L ., • i \ ' I ix > xI • I - I i I I t Nz LL1 toIto - - - - -I + 1 I I , i U 1 m a I- • Ii 1 I I . 1 Q --PX3----ealI b Li 11 h. p r - , A - I 4 ILI • J - -- ct .._ - - i - t 9e in d- t� _r� 7 r rA ���V�'a�11 1:4".. ,/- w {'tee_ J - �-r "�•l•���'/� �_�J�� r �v t eG' `5_ /ter��� �, lie----,till -.� V � P AperV . e; --aimme7.3 4 ,,bi is cl- mivrg."1:40.,W,.<DO ; J:illl if in �( Tnt ay ,Y V f/I p .! .[�� i1`�f%ry � y�.ptl •'` — irJ.�Y / ♦ Q O is s a C •)OT Zi t3 _ ,,, s,„2.,. , ao- sitic,-..trry 1 2 * IF- rf-• -4„a-;:t.1 + y , fl II. Aik - - •), sr aP‘ I ....• "Ifliatc.WaidtAltgs-.4t-ilta2. FISCrm.";tar-' 4 SP" t N1 1 re • i't ,1/4t-2 , 04- a clititt ...,... „„,......., ‘. a At.. .740,77-4 ii, q$1 4011\47 '1:,/ ‘,„"frA! -Pekl tiallthailri .14E -4,rsapyStSec.47kFtir, SL:r air;I I t i ti. 1 01 e 0 ,-,,r,,,,5,,,, iilt-: - ....t, •fr iii.,. .14,,.0. ...,,, I ado._--Thh.L,...*_ Let - 0,-1 • — 7;....ir .L., t.ca=k rtik. „..s.. ir.,., ii) ,:,,,,. ----r- ,410E-10114 .:, • sit -lb --li:.q -""Ie hsz •.• O., ) peli .- a!!'ll - led , 7 -' rs- 47 W.; yri c'-i712:1,.... ..-tar±3/4 knakister....,----a ‘ Pil V a I "Fffi fj nip:-... ; tk at lci i_s, iirl. 4-514.0 . _ AL 111). 4 /fit - qb... ,.ht, .p. n �� '! i, \• S�l ` :. Ate.-=1� ♦` -` !/ ' O 0 1 • i • ‘fly( E'-1?,k •t �,'�`• rk:*'�`�_2��ii�. 0 `" CO O . 1/4, ' /_,.;25,,,, , I • '1/4%\-•=--'4-- i -ii -111: 1 ) r."4,0 1 " ii‘ ‘ 3: it CSC : IT 4f •-` - f,/--;'.:It 1 -Lit ."... . 1.6... I '‘\ _.", '. ) 1,1 )(I I ,. ,1_ fit .41 ar. , zgerr , b_‘ .„ 1Plf i , *-'''.4. , ....1 - VIllc\;: VrIt•VilA '<r?" • '--' 941r: lidfr . '.%...- l' Itte C., c I st_-"ASICI .4.4-/ it, AtAre-- 'kit* t7 „oe, $ A) _ .) id Fe.;:4 /Att .< , • -- —Tit if 11 ti ir.... g it erg122-1. 'Lira!' V 41); I.,. Iris /it, A.,/^0, it * . ue► v.7 . 0O vs CO • co ra I M p. co h '? Q M f•1 M N IIIIIIIIINIIIIMIIIOIMIII O •met----- 7 _ -- _ mamma a IPA I 1 1 I r ' I 1 *.• it 1 0 c I I y. ,• � r 1 1 �/, * I N . 0 1 • I G a o r F= - - - - - - -1 I a M cc cm 65 o I x 1 1 r\ .. lir .`!: U 1 t. I ( I I `0 1 `t' Z I o O 1tg LL. — o I I I a w ` ' / �� I — �� t I OZ CC O • CL I I L flTTaT I —"unilliallilllir x o I I / ill I I - _T a 4 I , I 5 I i I IlL II? /1 I I I • / _ 111 I cV W m ,, m I 1-- - \ SF- -, a ,'., NIA C 1 r., Ls- "Nib :\1; L,-, ,r. .::...adie. ......phi.- -, 1 --it _ASP' sixfor:r.s.a. Am ul a WO e (- �a ~ I rte.+ .f1'_��fIC _- ! ill, s t `�; � o �pw / - � �Y, LjrSasj/ l Ate' �,�,+' E r y m ....c`.., --44i►• , o , - " -,_:)%-%-‘-;- ..z. .- :. a •- c 2 in v4 a ,t. FP — -,73.1°4* ®!.,. '555 T"� + �/j On 7.7 f "H' • t4-164. -aril tlsrll, .}vs* ere t"%racrit---I-2' ----;_ew r Of _ 41/41.‘ . Qi a ifr —m Y4. m z a`zz 13. -- I %if. le „ /.44. iitingts... iti '1_,airat_yr- . : s, -1.'1 liftifi4J r Cod "-. •Yi 4c; : hee 9' ' ''''5";:: *7 Viarertilii\p4:, 6 401, '• 1 (AI 0 A *' sir.re. e-orI n\.�' - `1 �-IN!, titan: '� I ft: `�' / ,''A01 i -14 s ' I� • (i' '�._ -.." 411kip,.. Ill. sik.,.I. icLiti te, I 0.4 _ I-47 - AersriOsTA. A tfig:AA -..410940 ZIP 7211 4 taw riskia -tY22 "rat 't' i =.- C. .14 47t,_ 4i• +') �4 �i� :__ _cztir- ; a. ,' i T�T• '_�,.!}t} y 0. am.-1 I�'�1-� -J -- ' - i "11.• A ^fr• • -i ..17,..- ,,, ic_ipt.,SA .„.... ::‘Iskrt-V4 ••••,- . ..:71 ricsiip,q -li it I IA ., --: 1,41 A _ - ..4 . :J..* A.: :,„..,.. fitir-„Atilt, , .. -tra-,.: ), il luder 4 elfr 4.‘ , iriv.--. .............,....:( , ... 4, „Li.W, L. . _sisir 4,11 6,.. ‘,.. 4 ,, • -,,-.--- • ts...6,4,... np.,„ses _-,_ CO cc\ Ture.„1, :3-i tz:NNIAtivispop . _.... acc c1ei • --N WO . lir -- .....41n0406;tk,\L- ) 1 . . .I.- Name' de,iik.----' A a • Ik3A-R1, iv i g r is I ,_ . * Ail it Ci put ir-±-,; it: . , f, .1i C3 4 ire- *, t. ; 4 ,kriNi. .......S41 ter---• - ' • 1111- t I I i fr lite.fe ,,Or • ellereff i , .. f tt , , 4C. •••• 1 F"V.--. /1.4 4; I I i y, . - ...c o at _ t• 4> "�: ►. "C ► 41"- .. _ r. s -ate! , ' O - e Col CO h Col M n M CI: en en en v O T I + — — ��. 1 _ — oN _r — —T — — ._ �- — I I t 4, .. , I f+1A O I I I _ I I 5. „-k,I+ _ ., .4.1 c I Y ...Thin1 ^ I I I 1 E- C 1 ,� Iira I I I 0 1 �,� T I • I �4- - - - p- - - - t co -,.- - - -1 I I N1 1 :11_ L ...,-..Ti• t , i u. z ._, Nti_ -2" I + I 1 I 1 .= I fa v)lo- - st JN OD 5t a 1 - _• r I Cr i t --- 'T' — I I.a.% 1 VI m 2z DbAh�� I •� ` I �1,� aik 1I ri, 4 e : ciI I \� O OBI • I 1 I , •- 0 - ` at - I I I /,ow - I eily Zt o /4. r `� W W _IL 1 ' • Ilt ` I �'•� I ` ? I 4 8 I "I1 1 1E v, is - - -- �r�(/ .ice �S. .�1 AschaThei ,fit !t o 7 7en 3 )2 fA-ie;) kisLimorgi c 4, rialsa -',.%. r; Ott 4IVIISA*IllfWal-rItiCaZOn.111 a, likt • "41- 7.,- • ••Lr-1;04-iy. r 5,441 J \4i.... .ct".§ (4. tt 1,-,.„--:---,:_r—\\;51Laerier- It.' - irriolsic - ),, .. - cm o ' ♦64)9,0---4 ,-,L.;,,,,,, ,,,,alreltritfraWc7 a 1 ill ir , ft' 1.0 1 ID .,-,_ --• c go. a--r E c to ki\` y . • •_'Itak-iii hi. . Ifs '_ ���' I w > 11111 {�� o Ike. \ `-,w�''-R� - �� / "'�+" ..� a� '`• 1l' cf Ji�r co_z.0 p�l'�� � ..c VJ d"..-- -arf' �1 �� �wie, . I a° c g G O s zazza�i a : c4-3 7 % ilia! •Pe rj'‘ IV t,`NIVAPer 4 ‘. . . tiK telt( - ; ‘-- 0 .4 .nor c ,.li i 114 l .,�� 1- i b n - ; 1 • it'..,rte•_.„fr, ..". •.�•, g��2 , / o• _ . J 3/4) - Ai.. re. • i N. I _e 14 rc47.114 :"\ frdet.--- i)MI ii,P45p ?.\_71t,,,_-` ��,t r� a7 _ -+ Ve-,T,Arr i1/4 • at,,,,?,,,, -4tis -,,,„ %,„, ,,,,,, ,,,, -ig , feitZie pi • t• - ���/� M 1 ./. � ,r����.�',�a �Clis 417. are; • `•�s. ���Jam•,• � . vi I k1c - ",t03� 1Y ' - t+ • 7v. "� w1 taiij- i S... ._...„,.. ... ..,.. 4r-&--1- -2_; 4 o I , >> % A % _ T O — `yam >4 4 4r, 4t, t. vit,„ \ �,� _ .,nlij O ir.: ‘,... ,1 cia:iHez : i \j t 1, .,I l _, / t _ . j ' Ilk .%4 Z l (=0 ..)/1 PI 9 . 4 1 a-• - % • et „dor . t• • . t .•••• J. fe . _ss'S Altiel -4 sa.t.fr 4 , 0„4 4 a' # -. 044-0- 4 lartArg der r _ � `�-'COS .... "— vi :- .7 _ i -visor IR - J-1+/_7%"'sue : ` I I a Z -_. P. am I %Ira o, r tw L.l n Ir 0% C, N I . C'7 F9 l7 Os M M M M N O . - _ Tom - 1 \� t ..... it I ^(i^cil\arr%J o I I ca 7 it tfl. I I `� 1 I mo. -a o I I ? I - I • I � • �I I I Icr Q I gri PI I 1` I I I .N 'J I a -- N --' p Cn 01 m_.,:,/7'n i I CC r lir? >-o p + < H n I I , < 1 1 O \\\\L ra.1 ——— — — — - - - + 1 — t.. w I 1 , _ 1 � � �� 3 aw sciI / I 1 "I • -12),.....2 is r I I & 1.. I/ePti.s. .... - I • C,•in tH ' e� • w�`� J • ,.. i w to ——— — — — • - ♦l r� — ?a��a�. .- . - ''+ r �� — o .;2 `-Ja - I C r� �^ o-- a . . ! Ma of C P 1 r F= - ^ ft - - -lie.*". '7t W :9 i .... o n . ��•ci ► i, / .1/ is . Vw y iq- D; 0 `v �� ` %Y�` ' ^ '`ed' � �.ti - - a o —kl..5 au o • - s t � o e ' -.'� ..� r �_ y` 1 i✓ N Z �22 d irt-No Cis LIY IC '�1.' �� a ice f •yl l •.c‘P‘\A I 174 CZ1 e . , ... , ,..._.„ ger 1 LiLt_y' r' L --, . erg C . • �, T 6:1/4 ( ,..., "LI . - I \Ns f 1^ � � ?L. sir• c' • �rI I c) o ammEll .— I.. ,.. i: .<_./ : . . a...,...„, .In w le co t. dm M RI I -ft O. o _ nt it o• t70 K. ci) q CO M M M N _ T - ....A.Sintrn - ,-z i 1 5- i . - .t. i- a-. I 1 I 6 F � s J \ 1< I C I rti, ! 1 (-2,,---, I t N . cu., e O I '/ �• , �'r•l m I c4t a. U I c ti, a J I I •J `�' _r'' o Si O - I li Q I a —-3,. II L ' - a-,-,..01- , OZ \ _ I z o e i < - w o �� Iz - �- - - JO LZ I W I u `� _✓ 1 r ¢ cn 1-.71-- .17 I i t S I I L �z • I I p0 I Ooer r .I I I i �1 v - -'..v, o O -----, . _ Li-j: — — — —--r I_-- - - --J I I �, ) /-.,,,, Li I r' „J l .. il I ,- w C. w I -- I : LyS' I ) ft "..‘‘..% '4\ ;\Ns, O 1 f' �°� — �l'�� T©� t cam. -� - • i7`I 4.0 JIHI rakmpa.Rks- ..4 • t air 40 F.,7 . -1 , (.... oE ° 6 0 led ..\p _ �- `I•r� Ong.... ( f-i •,.� . / -- �'� , _ �� > p c In p 03 a w 1 o s n 0-0�• � 0 - :: r � �� /i I r• •'� _ 1 I to Vic; Dr. �.�� ittfit......r.a. _ - __ I . d and3 Q • f i g a c_ --a.. ...,,,a 1'i Ptinail a 'j o o 113 O " *yr i' - aspriglisg; `„ Z .. .at 1 2 d�i CO ..„, if e % __ *` _ / / ry ?• 1r �!reiNit ' ,4414-1 mi °a IPS. . Ati, 1. 1PILIVI At --W.'-..-if--, - ho ii: 9, i . ,01 e ,) r. I ItNe,,.• 4) ; di/ A; c_ i speft • 014. Atter" 7444kaa-e. ••••1/4\eitivreq, ..44 Sr 0 raitaltit r: e--; ) (111 Witcrt -"art '•— .4 , ti A -i ..)1/4 *011 1,r _ , rd *V- - a ..._ ,-a t al c--10! ' ef lib 4 I • 1 t 15 �' s it,— sir _ ., ; aix, ./fir ; Arka \v..w !. + � mac-' c�. 4 rtt L. -"ti r ,y��� • -. Thai 1 ( i - 'il - 400 tie 1- co J,( �\;j4.�/+ � /! IA ��� ` joi 1/ ___,r rata'. 4.4.:,,,.. 111/4...„1 0Z1I41,c __Thim, ‘ • ill— v; 1,4 \ ie ,,,,,4 , _ H. , Irge ‘ sp .,,r. r 4 0. T-v Farr iblisr- .,co a v ti : tiA. • 14.r. Ltio4H-- it, rt. \kJ: .. 0 _RD ' at -4"-r-t- It'A. - __,,de et g eil en I r ° AlQle ,--14144111- „rAw_ . „.... „.. , . _ 0 . irlgal44004 et 4 , A•,.. 7 . I CC T, ,v00,14? i r . , 4,-- i , t., tt .a...1.-„s-, i . • • ig ....., - fi, t s - L:1 ....Ji' -;s3 i gee is ... 1 e... ..t,..--, _ if ,... • r I 4 _..31211 ..t. .... i C3 Illbt amsVjellitts .... se N 1 O cir ‘ kiv. 1 , ti, if 00,+.4 I `i� i2ii if ... it itileilir: :Aid):rtil&ISH.et: 'CH-ttCl°4 I * kY = IC ccyf Pb. M Tr cl co VA O _ • o I >- . T-1,,----JA Jr- I I i I z v I I & LI tr. i '? g i . tC„ cc 1 0 >. i m i y--1 i c) t m isi 0 z to O I a a- 1 L I I - — oZ.... .... ,..._\_ ,\ I I \ >c , I i < Ii c .n NO Wi- t- II I oOA o I- - - -CdJ- eir- i t/ 4 cz I • �I II%br n� �"'1 O I , I I�t i Still �1"* _ -- -1 -si v ier �` I- - - - - - ,��--' I L/ I :41 a /piker S1 �. . J f1 . Iaissiam , __ __ _ 3_1 • rti il_ . j in -- - - — - fi ` I Iw =�. slo /_ ''��1 _ 1:�� l { ° la / s o O 1 ,...... ., i 1 1 -1`.. ....kuer,..0,frdi,, - � ,-►: /! fit• `''� *ref 0 s • c u ,.w• M c, Ce g _ le ace tO 4P--. 1C-4-41eja,N : - r b 4"7:17 :CC•N'Ilifiirr 1Wrill .:61 I -% vilabaShisie 0 ? 41 'i N .,;,, -6 ...r3. t, -6 c . ) , ,, ,, , , - f"- Itc... _ , , ••.\ �� 1<. f `•^i��+..:� - . .I`�kb/ - r _ :ti _ I��( i ` • ° 1'C mit.{Clic "lig t '' Levitit \t,‘T�v ��^+! ire! SS I e : AI I ' a ny > at -...,-,...... ,..,-0-1 fi brozaiihrrill-,,,, _..-19,vilikr-irer • ,.. -.41-01s, ‘L — - ` c -8 — o s's ' 1-1 - ....t.es -; ,,or - -.,-a-< - 'iwirreitp4-fti --- .11 my ewe if.' a•- Ar----- - '-'' ,- is im ,,...."0.4/: a, 2 z et 4g N ' i " jam- , "'. . a: ...... .. , lik' lit I red r•tti0 —A.,7-' rkc%-r----nidttgjfkic' aacstrti4i � v. s VI)1 # ��_ tir citDI i ' i 4t ti 41 Olere , ip....mori> ;-•;;;-, ,' a lc.atrel A / _a.e .. a - Nr-tw 714-priti fil) SC.--:i- nre` 44 - 1 it .-• I -2 4 .441:*&:".aC " t" * fitit# L *15 a \ i. ft: tit a. , ilk .. se ) ,k - . -,S; It arrartZtry`,-741.1swiner-Th..../Int _ _ . .. h ct .....„ x , iii. -� �� ./ L_ /+_ _.. .rte' . r..� �^ `•Y _ - ,-,,.-it., � ,.�_ � �-' 1�. A: . , .:,,:.$7.gis...c.Q. ii _ ..31 ,,,, * v pp orrs Iti2, LI? 1 1 ikt i $ - 4.- th. c - 4) eferef4.1t -e -41 4 L . 1 fj# ' 0,.,,,t, //fit ! A i 7r^`C �_ .t� -r�-• . V go ill VD, ,,‘„,...‘fr - • i - mi It lirod, iiiir a ..iliArAilksr,eftw i an 441 ,, s 6010( Ci,„_____. . " „.."-At it Ist y- 4,4 ,z-- [ „0„ I 4. i 0.. . ir - V I- . + . �. 4,3 - it �f ♦ / „ �, coC ir.,o. Ak.. ,....,, --jah...4? .... at, .41a i I h ir. 41 ak:deg\f C:C .071 Ar Z.. at e".- C23 a 0 v._,am iha •v. - It' - ' 4 b t• ei, (4, • ,ras ,„, ICle Mild► en - +u�: . ea I v �-FR cr. O 7 e•f co C, Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Appendix H: USDCM Volume 1 , Chapter 4—Conversion Factor (1 -Hour to 2-Hour Storm) • • Cedar Creek II Wind Farm Project RAINFALL DRAINAGE CRITERIA MANUAL (V. 1) • Figures RA-1 through RA-12 and the 3-hour point precipitation is distributed evenly over the period of 185 minutes to 360 minutes. Table RA-2—Design Storm Distributions of 1-Hour NOAA Atlas Depths Time Percent of 1-Hour NOAA Rainfall Atlas Depth Minutes 2-Year 5-Year 10-Year 25-and 50-Year 100-and 500-Year 5 2.0 2.0 2.0 1.3 1.0 10 4.0 3.7 3.7 3.5 3.0 15 8.4 8.7 8.2 5.0 4.6 . 20 16.0 15.3 15.0 8.0 8.0 25 25.0 25.0 25.0 15.0 14.0 30 14.0 13.0 12.0 25.0 25.0 35 6.3 5.8 5.6 12.0 14.0 40 5.0 4.4 4.3 8.0 8.0 45 3.0 3.6 3.8 5.0 6.2 50 3.0 3.6 3.2 5.0 5.0 55 3.0 3.0 3.2 3.2 4.0 60 3.0 3.0 3.2 3.2 4.0 65 3.0 3.0 3.2 3.2 4.0 70 2.0 3.0 3.2 2.4 2.0 75 2.0 2.5 3.2 2.4 2.0 • 80 2.0 2.2 2.5 1.8 1.2 85 2.0 2.2 1.9 1.8 1.2 90 2.0 2.2 1.9 1.4 1.2 95 2.0 2.2 1.9 1.4 1.2 100 2.0 1.5 1.9 1.4 1.2 105 2.0 1.5 1.9 1.4 1.2 110 2.0 1.5 1.9 1.4 1.2 115 1.0 1.5 1.7 1.4 1.2 120 1.0 1.3 1.3 1.4 1.2 Totals 115.7 115.7 115.7 115.6 115.6 3.2 Adjustment to Rainfall Distribution for Watershed Size The NOAA Atlas provides guidelines for adjusting the rainfall depths with increasing catchment area. Area-depth adjustments are given in the Atlas for durations of 1-, 3-, 6-and 24-hours. Figure RA-14 was based on a similar figure in the NOAA Atlas. The 15-minute curve was extrapolated by the District from the information shown for other storm durations on Figure RA-14. The fast response times of urbanized watersheds and sharp rainstorm distribution gradients in the Denver area require adjustments of rainfall depths for storm durations that are less than %-hour. • RA-4 01/2004 Urban Drainage and Flood Control District Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Appendix I: NRCS Soil Reports • • Cedar Creek II Wind Farm Project en 0 in O izt O V cp• 096££57 006££57 058££94 008££57 0SL£ES7 00L££54 059££57 w ..£4 .97 £0L r „£7 .9t7 !COL o O re. r.4144:411 - • ar In OC0 Ni I lb 5 . a i iii.titiii• iiti , % .4000 •% -1. '- T. ' • Ilk - _ S t �s a N J CD c o (ill. gyp N SR co tD o t ^(Q LL IlltiA, J LCD • Z aw O c0 ~ a) O = u) U : : , ' S > CI:ill 'o O § l (n o a� cn 0 O aiiN a ' 1 l)I' I o `rr O o 8in U N .JLS) u_ O fd pp O C O (O co to o ro o Z w 6. U O , C O N , ,t pp I I m N L 'p . ii pp x v co O yin O O I I I ' ' O m O co N ' C O r— o CU. O rJ — -1r _.--... S l Q O M } ici► • en O cy on in to o G I , . to n 8 � c°n o en QN • � taw a) = C r al Z Z U ., V* r! 1 I ,£Ol ..9 .L4 _£0L S .L7 • 096££57 006££54 0S9££S7 008££54 0SLE£57 00L££S4 0S9£ES4 p�� b) f•-• ip in ,n v c 0 / 0 / 1 E C 2 / / f ° > ° m = c a $ 0 % J \ a E 0 G % / _ 0 _ Cl) = \ $ $ f Cl_ c .C & / _ mi m = t G C = e z \ / 0 § a) f / / / 0 ct 0 ® 0 E $ / / / ® 2 - / = I- / 6 M 7 k / / . . / E a) 4 a c = <co A . e 2 ± $ < / a z I 5 k a c E co / Cie 0 7 © / / D O © 5 0 t < f Q c / a) \ c / - # \ a k % ° ° _LL od° $ j 6 N E o ' .c _ s co R Z 7 '\ 2 crt 2 / .R / \ 22 > _ o a E o - D \ \ f m \ Cl) & / \ < ._ ° 5 2 0 __ o e E . 2 / / \ z / / a) % / / / / @ o cc) cn / / a ° \ ./ � '- 0 \ � t0 o c Ct \ m - 00 ± O t an r D E ® ± \ c / B 2 a m .(!) = t o ? _ _ - < m ° _ § co / 0 0 j § / / j / k / \ C E m ma) _ b § > — a a) m E 7 E ° k H f E / / O H / / $ 0 H o = c o a z 2 0 0 / � U / j 5. c 5 \ iii = m 0 0 2lill / [ / 2 0 2 0 5 C/) g 2 co 0 CIP \ _ \ in » co \ % { I ) f } 0 _ III . ca $ \ / \ \ \ O o ± W a % ; y) @ / \ \ i o » § In § - 0 g a e / / R / _ \ § c \ ` % CL e < / en < k m = 0 0 0 / 2 6 a J 2 e o 05 o / E = 2 \ 42 / F # — E 7 • ❑❑ I El Cu. § a \ ❑ ❑ k \] § i }/ U) 0 & U < 0 6 0 o = § 2 ■ m CO t 7 # o 2U \\ I Hydrologic Soil Group—Weld County, Colorado, Northern Part • Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Weld County, Colorado, Northern Part Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 23 Dacono clay loam, 0 to 6 B 7.4 31 .6% percent slopes 24 Eckley sandy clay loam, 0 to B 16.0 68.4% 6 percent slopes Totals for Area of Interest 23.4 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet. and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B. C, and D) and three dual classes (A/D. B/D. and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly • wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table. soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D. or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition • USDA Natural Resources Web Soil Survey 5/3/2010 als Conservation Service National Cooperative Soil Survey Page 3 of 4 En v � iD n Q a • 0S6CCSV 006'£S4 0S8'£5b 008£ES4 0SL££S4 00L££54 059££54 O SilyR . t CU . 1.O Cr. I r _ • ► - ;T. Cu 'itI rin n h ♦ I- , .7. lii.-1. ‘: - i f Art0 II I I 41-= r 1 \ 1 - t Cu . . CL . i .4i E S ; L c O ( CO z a 1 r:) O > 'O { O N o o fA c in S S ` . °'to ' ad 2O o � N u) a ,p O y O 8 4 ; N N CU U) o O O + CO Z O Sst vIII N1_± 1 a Y till , di o 0 m h :, x ti 00 in N N in 4 - el cp I O Ma O C T _ n �i o c3, `p I o • N U7 dab~ el O `n r') O lit 1 It 19 N �, ► a 8 � . of Cu is C 0 0 o c =— QN'40.''•t • % sir ;w s •�A. _ • f4 to a V C Z z L S L4 .£0L „9 .Lb .£01. Q • 056££54 006££54 058££54 008££56 0SL££54 00[££54 0S9 £5b D v a • e o a O C o �, o E m ° M a t)• as N In c w r cm 0 t 3 E �O a ca (6 d c_ co U a) O .C N 0sa) N U) )«= C CD •C 07 a O C ui a) L NO O ct E Z co 0 U 0 'C co n o 0 % E Tau aa) ca CM in U) Z N r � Y _ N T Q� Y I— in a) N a) a) 0 O O -c E CO t a) a 0 aQ z ao c' p a) 41( _ ca ° [`0 N C L N Q O 0o Z o co a CL_ to C (0 0cn co U a O Q O < o a) a) Q o ao �; > C T O = �? C L Y Y ca a a) !1. 0 a) C 0 O Y c 06 ,a E —>' c4 a) Z N ° 0 aN o o O C a ° E C a � r 5 4- .a 0 a) ca p a) ca < a) > Y N U ca CYV —) 3 N > O L C .O 2 o RI 0 Z a) — O N O C TN a) - o ona � N Yo N > C Q a) Cr)Cn 4) p p r O O C f� ra) 2 u) a Q t0 0 a_c c a .fl ca f 3 CO a) p — frf a .0 a Q co t a m O Ca c j o a) = a) co C 0 L 7 T N t r " a d co a a) ca ms j � O a > - a N O .a m a c la a) am co a 2 I- � E WSU IHy cncn 0 I- ° .Eo t Z o U. -o _ m T C O aU. U = > mow. T a il c `a 0 0 3,1 T.) U,Tii >. c I c m o m U -c Z (1) O) t/) to a) m I a) a' @ o to m m o O iu c0 O Dec x f° u) o (7a a) O U) O Q' S 3 2 J U •co l° 0 t o O A- LLI NZ k a tki J a) a a m Q o 03 `° N N o a C t c a) 3 O C O Q `�- (SS a) - C O I) V F- Qto ``° H cn rn y O N p y (N 0 Co to O V CO N f-- M O V O , .� (n C (n y a) i ` < co 0, O O r 7 7 N N N M '2 V' V to t0 z w U a et a ` O c c a) c to O 0 E �. a) r U) . C LL t0 w ca u, o f El El ❑ ❑ ❑ ❑ ❑ w a a) 2 d a) Q V) a o c ca O zC Itr II K Factor, Whole Soil—Weld County, Colorado, Northern Part i K Factor, Whole Soil K Factor, Whole Soil— Summary by Map Unit — Weld County, Colorado, Northern Part Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 23 Dacono clay loam, 0 to 6 .17 7.4 31 .6% percent slopes 24 Eckley sandy clay loam, 0 to .15 16.0 68.4% 6 percent slopes Totals for Area of Interest 23.4 100.0% Description Erosion factor K indicates the susceptibility of a soil to sheet and rill erosion by water. Factor K is one of six factors used in the Universal Soil Loss Equation (USLE) and the Revised Universal Soil Loss Equation (RUSLE) to predict the average annual rate of soil loss by sheet and rill erosion in tons per acre per year. The estimates are based primarily on percentage of silt. sand , and organic matter and on soil structure and saturated hydraulic conductivity (Ksat). Values of K range from 0.02 to 0.69. Other factors being equal, the higher the value, the more susceptible the soil is to sheet and rill erosion by water. • "Erosion factor Kw (whole soil)" indicates the erodibility of the whole soil. The estimates are modified by the presence of rock fragments. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.' None Specified Tie-break Rule: Higher Layer Options: Surface Layer USDA• Natural Resources Web Soil Survey 5/3/2010 Conservation Service National Cooperative Soil Survey Page 3 of 3 Hydrologic Soil Group—Weld County, Colorado, Northern Part (CCII Wind Project - Hydrologic Soil Groups for DA South of CR 132) o sr ic- sr 0 0 602000 602100 602200 602300 602400 602500 602600 602700 602800 40' 56' 55" - I 40' 56' 55" i 1- ,� _, O g el 11) ia it a -- v 1 St^ S _ sr • 'f 8 1 - U) . • O dip O (n Q (n cn v a 8 4 J` i s (j(Lin NTsr U UUUV o5 • • oh. p Il 8 • 8 V in 0 0 pO 0 0 M U) M sr V O O O cr O Cr) In V U) a- y co N i 4 l (n in V a a o r- o N n fn N I I v S - • 8 ( co N _ I�� 111 N Ln sr Ln 40' 56' 15' a 40° 56' 15" 602000 602100 602200 fri C..;:,r, r :: '- ;, ,,D.1: C ;); >'' ,: t_ , 602800 in - I-- MapScale 1 .5,830 if punted on A size (8.5"x 11") sheet v Meters v. IIII o N 0 50 100 200 300 r) A Feet 0 200 400 800 1,200 U� Natural Resources Web Soil Survey 5/10/2010 >• Conservation Service National Cooperative Soil Survey Page 1 of 4 0 a. o O) c) co as CO a) • O1 a) Co o t.._ a a N Y) > N 3 -o ` CL O U a) 'O C E co a (n a) c j O - a) _ Cin — U �— a ►O O U U - O N .n O Z E is c O o o a) a) Z > `� U Z rn s L = - °° a) Q 3 cod .—`� Z 4:( o o 3 f _ 5 o o � � Z a cn Q ° w, (") U M o Q d O U U � `- a Q a) cu to > LL c a) c ° 3 O c -c 3 C ao 4.L E 2 co a) a cn ° o a tV E o o c a a) m E Z a) a a) CCs 2 2 .O o .o a) can a) c E U t ) -O -o ` a`) � oa) E as Q a O 7 7 > Q) 'O N `- U ft c0 .J > v) L a) c � 2 p 03 Z O C •O •- O CO . Q) N Q) O Cn Q) C co N -c >' -) rn a) N ca E O to >, 7 a N m o f6 a) C .. z � }c.� o Tom _ o N �- a OO 2 = u) .. V Q O as L C a .O co a) 7 >' E (n a) C 2 N a (D g2 '" T C 6 N N O O - N 73 0 2 Q RS L -O 7 ctl it U O a) 7 o 0 C O` ` 7 >, y t __ a CU a a) cci D p );2 a > (n > O a) aCnE O O ca .c Q) a) o O o Ea) O 7 CO .c 0 E E L .c 2 H EE w > o H ... u) u) o i- U ._ o > O o a) Z U) > 7 o Q u) cu >, o O 0 TD 0 7 (1) o a c/) m c2 5 m 7 _0 U ) t U O c Q O cc 7 T Z o /� _ V , p U CO .O U O N O) Q- A co ° O m n 0 La o c 0 Q m co c TO m o a m 3 _• = Z y a c U 0 W " �' a) C o -, N cn U _ O C v C I `� coo coo C9 — a, O w co F co �' `� cis J IM CC LLJ Q g m m 0 cn 0V) c, cn m ro ,, C o N N 0 u) CJ 0 O 7 _ -J (p J 0 U cal d v) R O a L Q co CI) Q a CO m U 3 0 z v 6 n. o≤ n. 2 O Co- o w S D 2 Qd cC r• m .. it ❑ ❑ ❑ ❑ ❑ w ° a Q CO a n n75 �! cot 1 tai Lk N .z i (/; R c C) C O rt R cu a V C co C Z .i Hydrologic Soil Group—Weld County, Colorado, Northern Part CCII Wind Project - Hydrologic Soil Groups for DA South of CR 132 Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Weld County, Colorado, Northern Part Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 1 Altvan fine sandy loam, 0 to 6 B 0.6 0.3% percent slopes 4 Ascalon fine sandy loam, 0 to 6 B 10.8 6.1% percent slopes 5 Ascalon fine sandy loam, 6 to 9 B 19.5 10.9% percent slopes 16 Bresser sandy loam, 3 to 9 B 0.3 0.1% percent slopes 19 Bushman-Curabith-Canyon B 79.1 44.3% complex, 0 to 20 percent slopes 23 Dacono clay loam, 0 to 6 B 60.0 33.6% percent slopes 24 Eckley sandy clay loam, 0 to 6 B 8.3 4.7% percent slopes Totals for Area of Interest 178.6 100.0% • USDA • Natural Resources Web Soil Survey 5/10/2010 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Weld County,Colorado,Northern Part CCII Wnd Project-Hydrologic Soil Groups for DA South of CR 132 • Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (ND, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture.These soils have a slow rate of water transmission. • Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (ND, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie-break Rule: Lower • • USDA Natural Resources Web Soil Survey 5/10/2010 Conservation Service National Cooperative Soil Survey Page 4 of 4 Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Appendix J: WINTR-55 Curve Numbers • • Cedar Creek II Wind Farm Project Chapter 2 Estimating Runoff Technical Release 55 • Urban Hydrology for Small Watersheds Table 2-2a Runoff curve numbers for urban areas V ilmil Curve numbers for Cover description hydrologic soil group Average percent Cover type and hydrologic condition impervious area ti A B C D Fully developed urban areas (vegetation established) Open space(lawns,parks,golf courses,cemeteries,etc.)y: Poor condition(grass cover<50%) 68 79 86 89 Fair condition(grass cover 50%to 75%) 49 69 79 84 Good condition(grass cover>75%) 39 61 74 80 Impervious areas: Paved parking lots,roofs,driveways,etc. (excluding right-of-way) 98 98 98 98 Streets and roads: Paved;curbs and storm sewers(excluding right-of-way) 98 98 98 98 Paved;open ditches(including right-of-way) 83 89 92 93 Gravel(including right-of-way) 76 85 89 91 Dirt(including right-of-way) 72 82 87 89 Western desert urban areas: • Natural desert landscaping(pervious areas only)S 63 77 85 88 Artificial desert landscaping(impervious weed barrier, desert shrub with 1-to 2-inch sand or gravel mulch and basin borders) 96 96 96 96 Urban districts: Commercial and business 85 89 92 94 95 Industrial 72 81 88 91 93 Residential districts by average lot size: 1/8 acre or less(town houses) 65 77 85 90 92 1/4 acre 38 61 75 83 87 1/3 acre 30 57 72 81 86 1/2 acre 25 54 70 80 85 1 acre 20 51 68 79 84 2 acres 12 46 65 77 82 Developing urban areas Newly graded areas (pervious areas only,no vegetation)) 77 86 91 94 Idle lands(CN's are determined using cover types similar to those in table 2-2c). I Average runoff condition,and la=0.25. 2 The average percent impervious area shown was used to develop the composite CN's.Other assumptions are as follows:impervious areas are directly connected to the drainage system,impervious areas have a CN of 98,and pervious areas are considered equivalent to open space in good hydrologic condition.CN's for other combinations of conditions may be computed using figure 2-3 or 24. 3 CN's shown are equivalent to those of pasture.Composite CN's may be computed for other combinations of open space cover type. 4 Composite CH's for natural desert landscaping should be computed using figures 2-3 or 2-4 based on the impervious area percentage (CN=98)and the pervious area CN.The pervious area CN's are assumed equivalent to desert shrub in poor hydrologic condition. 5 Composite CN's to use for the design of temporary measures during grading and construction should be computed using figure 2-3 or 2-4 • based on the degree of development(impervious area percentage)and the CN's for the newly graded pervious areas. (210-VI-TR-55,Second Ed.,June 1986) 2-5 Chapter 2 Estimating Runoff Technical Release 55 Urban Hydrology for Small Watersheds • Table 2-2b Runoff curve numbers for cultivated agricultural lands 1/ siii Curve numbers for Cover description hydrologic soil group Hydrologic Cover type Treatment?) condition 1/ A B C D Fallow Bare soil — 77 86 91 94 Crop residue cover(CR) Poor 76 85 90 93 Good 74 83 88 90 Row crops Straight row(SR) Poor 72 81 88 91 Good 67 78 85 89 SR+CR Poor 71 80 87 90 Good 64 75 82 85 Contoured(C) Poor 70 79 84 88 Good 65 75 82 86 C+CR Poor 69 78 83 87 Good 64 74 81 85 Contoured&terraced(C&T) Poor 66 74 80 82 Good 62 71 78 81 C&T+CR Poor 65 73 79 81 Good 61 70 77 80 Small grain SR Poor 65 76 84 88 • Good 63 75 83 87 SR+CR Poor 64 75 83 86 Good 60 72 80 84 C Poor 63 74 82 85 Good 61 73 81 84 C+CR Poor 62 73 81 84 Good 60 72 80 83 C&T Poor 61 72 79 82 Good 59 70 78 81 C&T+CR Poor 60 71 78 81 Good 58 69 77 80 Close-seeded SR Poor 66 77 85 89 or broadcast Good 58 72 81 85 legumes or C Poor 64 75 83 85 rotation Good 55 69 78 83 meadow C&T Poor 63 73 80 83 Good 51 67 76 80 1 Average runoff condition,and la 0.2S 2 Crop residue cover applies only if residue is on at least 5%of the surface throughout the year. II Hydraulic condition is based on combination factors that affect infiltration and runoff,including(a)density and canopy of vegetative areas, (b)amount of year-round cover,(c)amount of grass or close-seeded legumes,(d)percent of residue cover on the land surface(good≥20°/b), and(e)degree of surface roughness. Poor:Factors impair infiltration and tend to increase runoff. Good:Factors encourage average and better than average infiltration and tend to decrease runoff. I 2-6 (210-VI-TR-55,Second Ed.,June 1986) Chapter 2 Estimating Runoff Technical Release 55 • Urban Hydrology for Small Watersheds Table 2-2c Runoff curve numbers for other agricultural lands 1/ Curve numbers for Cover description hydrologic soil group Hydrologic Cover type condition A B C D Pasture,grassland,or range—continuous Poor 68 79 86 89 forage for grazing.V Fair 49 69 79 84 Good 39 61 74 80 Meadow—continuous grass,protected from — 30 58 71 78 grazing and generally mowed for hay. Brush—brush-weed-grass mixture with brush Poor 48 67 77 83 the major element.3' Fair 35 56 70 77 Good 30 ii 48 65 73 Woods—grass combination(orchard Poor 57 73 82 86 or tree farm).57 Fair 43 65 76 82 Good 32 58 72 79 Woods.El Poor 45 66 77 83 Fair 36 60 73 79 • Good 30 N 55 70 77 Farmsteads—buildings,lanes,driveways, — 59 74 82 86 and surrounding lots. I Average runoff condition,and I.=0.25. 2 Poor <50%)ground cover or heavily grazed with no mulch. Fair 50 to 75%ground cover and not heavily grazed. Good: >75%ground cover and lightly or only occasionally grazed. t Poor. <50%ground cover. Fair: 50 to 75%ground cover. Good: >75%ground cover. f Actual curve number is less than 30;use CN=30 for runoff computations. 5 CN's shown were computed for areas with 50%woods and 50%grass(pasture)cover.Other combinations of conditions may be computed from the CN's for woods and pasture. 6 Poor: Forest litter,small trees,and brush are destroyed by heavy grazing or regular burning. Fair: Woods are grazed but not burned,and some forest litter covers the soil. Good: Woods are protected from grazing,and litter and brush adequately cover the soil. • (210-VI-TR-55,Second Ed.,June 1986) 2-7 Chapter 2 Estimating Runoff Technical Release 55 Urban Hydrology for Small Watersheds • Table 2-2d Runoff curve numbers for arid and semiarid rangelands V Curve numbers for Cover description hydrologic soil group Hydrologic Cover type condition 2/ A 1/ B C D Herbaceous—mixture of grass,weeds,and Poor 80 87 93 low-growing brush,with brush the Fair 71 81 89 minor element. Good 62 74 85 Oak-aspen—mountain brush mixture of oak brush, Poor 66 74 79 aspen,mountain mahogany,bitter brush,maple, Fair 48 57 63 and other brush. Good 30 41 48 Pinyon juniper—pinyon,juniper,or both; Poor 75 85 89 grass understory. Fair 58 73 80 Good 41 61 71 Sagebrush with grass understory. Poor 67 80 85 Fair 51 63 70 Good 35 47 55 • Desert shrub—major plants include saltbush, Poor 63 77 85 88 greasewood,creosotebush,blackbrush,bursage, Fair 55 72 81 86 palo verde,mesquite,and cactus. Good 49 68 79 84 Average runoff condition,and I„,=0.2S.For range in humid regions,use table 2-2c. 2 Poor: <30%ground cover(litter,grass,and brush overstory). Fair: 30 to 70%ground cover. Good: >70%ground cover. 3 Curve numbers for group A have been developed only for desert shrub. • 2-8 (210-VI-TR-55,Second Ed.,June 1986) Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Appendix K: Site Photos • • Cedar Creek II Wind Farm Project f S 0 H . \ 1.i \ ".. A , t. _ sir . - I - _I I •s J r \ • Photo 3: Inlet end of 4-foot diameter corrugated metal pits looking west across CR 135. 4111 RD 132 14 ,{yy f • ' ' r Y.Ir•' U . ..• if a , 1 P, 1 . . Photo 4: CR 132 and CR 135 looking northeast across site. • It -t II '� �� 1 . . ... .7.....;,.kir( I: „_.;11.Wish- : . . - ' ..-4:: �iglif • ' f • . a , yf f _ �yy[� � • • „ yr?. , . • -' • �� - - * _ het. j..:• I �y art 1. I •at' } .• ' �t N. �'• _- y1 - .. . ' c f ..•if y - • s • Photo 1 : Outlet end of 4-foot-diameter corrugated metal pipes looking east across CR 135. M , _._ • ...• '~ - �: roc. .. - yn�„/�•'_ _ - _ _ - ., - ... - • V• • . , _._, , ... . . --,....... _. j:- .._�. __-.yam.. '�'�". _ . ..• . . . . .. .. .., .•c .. .. ., . .. . . • •,. . , . . 07,4 y�y - j 1'3 • , . . . .• . . •• ...,. • : ' Iftlerr . . - ; \y',:• ♦ • • 1.1'440, , \�, cl 1. • •. . . - � , . Photo 2: Drainage area north of Batch Plant Area along CR 135 looking east. I Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Appendix L: FEMA Flood Maps for Weld County • • Cedar Creek II Wind Farm Project N 4••I O .--e I.) b4 CZ a ::::..a: - .:is i a e 77 ix men 8 .C`S _ s Y Qs a:.. t ,. � m ii Y 3 3 3 . I. i u u u 1 u i i i a o r X. o • I ♦ f•,I Y w u o t _ r 7 i i s x • r r e « / / 4+ S a!W u ( C T. O r w, - r s !^ ., E. „ F.! �i c 2 i• o .-.' r XW a .: s u » i c it i.7. $ s .a ( . n or .. o 2 0) ai C ......... .. 0 2 ,,,,:, ,. C`,1 \ CD 00 O < 0 ;11 . 0 Io o .I. C; -^i 2 dI : . ,:., d . H / s L • m� x“ d ' T\ .mpv co �. _ 'Sic N ti e9 D. C N W 4 a^ > •a' h< Eu of L cc N N N s m a 8 We a w "v° ;g v > W �� f m S �v z F E. Q o„ ILa f FzN `o Q Z a am w a. t$ Na c ca O o a = o ta�� 1-e a. , y n� y q y ePmm z w Soz U 4 y. z'^e�r e H 2Eg°o C0 r:4 E ae ' m w rtmo `� ..1 - � 9a"^„.._ a S€ FELL 7. ai g c0i o <e„Smm /TTM..,\ �vB`w - / 1 1 ;.8!w - Y q o n0 3s %2 Era l`t t`u 8 @itk re r E .gv213 uE c E mN m am LP 36Va / I / o C.3 CJ /1 0 O O / O N In / co O9 co O 0 r. ` 5°' to co co co co - I N N CV O 0 O CO CO CO O 0 0 O IL * ,❑ * s] C,0 II I' a 4101 I kr CJ ❑ w et ;D a e- 1z a ❑ l Di y 0 W V %Z _ 0 b w CJ C.9 'J CJ 0 CC a Ili 0 _Z Y9 I..-- 0 N C� 07 �F O O 0 0 =0 .� w ;z ❑ ❑ Co CO o a CJ - W CD c-I w CO 6 'Jj .,0 N W N P =❑ O O a O 90 � O O O I 9`9° -z O O O �O �a -0 I_ _ w ,Z H....s.NN: =a w a k0 '-111--- cc �,W o 06i '`: o CJ `0 J,9 J90 I Ja96' V O 9 .;y.. o d -z O 0 0 9 �9 Its Oc' i_ y2 y, J� y °90 1 0 0 090 °00 0y �0�0 co I Z o , O o�w O 20 a CO `- = J1�I —'-� CO IL CC CO CO 8,J z \ W —+--- a p�9i9rp y9 �Zys ! X00 CV s OCO y _ C-J �._f 00 9 \_9 �9 —y O 9c' 3 Z.- \O J H (....,,,,,y__7 c' �9c' 02—k—� y2 I cpoO c ItsO p O O J c._o N• a J�� c'y Jay ' C O -3 ^o t J co CJ 8p AO -❑w '7' C� 0 I' �❑ =U 0 ID t9 `3",4.-o0 cZa zo 0 CD %Z 119 c'y ac9 C'' _` wJ co CJs 7 `cV CO��' y 30� y -"0 ,o CO CO O �z oz 0 p:�`. O 'a? ;z O 0 a '- a m ��----yy�� co I co V `oo rw coCV J J °�� ` co CO a a 0 !98 e9�1 O I CV 0 w w rw CO O CO CO --- T 0 9y� 99c' O O 0 0 0 N N 00 °80 Z Z 1 as ww {''� SR l;JD CJ ❑ (� ❑ �. 0 p as 4' r C O c ❑ O “F0 O Co N r1 \ 'GD co - ❑ 2 _Owl ww C� `\VU CO ^`iU -' 2- On 'a _Wa CT Z O 7 0 .= z .-O� O . U aOl O 2 2V a- ¢¢ 1 Cif I ea O Ha O � 4 �w. ta CO H T ¢ kitLV ____ 0 _— a __ 0 a ro2-1 1 11 � ,� da Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Appendix M: NAG Erosion Controls • • Cedar Creek II Wind Farm Project 0 NOh Arm gine1Nn-EPOS Venom*3 _ AMIN0 BA 501A1'DOMPUTED W:1nan Teel ELIlc DRDIECT NAME:Cods We ENNA II Wind%Oct DIECT NO IFR0YSTATII:WREN:ft RD STATION/MACK DRAINAGE AREA Diu,*11 IbE91GN FREQUENCY 1(01wSdn JlYWAULIC RESULTS 5751rQ035) DarJMge Pea.Flow Velocity�Nw Pall Nyh 6a Noun( sthI Paiad hW Raf4(19 Dash Rl 13a 20 1.03 744 ' 0.66 136 / \s-0.0032 • 1 L ' 0n0a J !.0 WA °ft d1 l MIER RESULTS NA b Sub mon;trim Vepltlm:.hsecleahcs Ruch _paisley AnYia Pannnebit CMaarne Sdely Ftla RnnneA, Stale Pawn Ruse Class Tve 00.141 She.5he" ShesSasN Illy TAI Shndl 975 Ume9dded 1 155 (127 569 STABLE StaeD C III 0d b Nose kw • n***************************************************************************** NORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4 . 3 NORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S. I . QUICK-PICK CHANNEL LINING BACK-UP COMPUTATIONS ***************************************************************************** PROJECT NAME : Cedar Creek II Wind Project PROJECT NO. : COMPUTED BY: Tetra Tech EC, Inc. DATE : 5/1/2010 FROM STATION/REACH: TO STATION/REACH: DRAINAGE AREA: Channel Ti DESIGN FREQUENCY: 100-yr Storm Flow ***************************************************************************** INPUT PARAMETERS ***************************************************************************** Channel Discharge : 13 . 4 cfs ( . 38 mA3/s) Peak Flow Period : 2 hours Channel Slope : 0 . 003 ft/ft (0 . 003 m/m) Channel Bottom Width : . 0 ft ( . 00 m) LSide Slope : 4 : 1 R. Side Slope : 4 : 1 Required Lining Longevity : 12 months Blanket Selected From All Materials Degradeable Material Options ***************************************************************************** CALCULATIONS ***************************************************************************** Initial Depth Estimate = 0 . 16 * (13 .4 / (0 . 003A0 . 5) ) A0 . 375 = 1 . 24 ft ( . 38 m) Final Channel Depth (after 8 iterations) = 1 . 36 ft (0 . 42 m) Flow Area = (0 . 0 * 1 .4) + (0 . 5 *1 . 36A2 * (4 . 0+4 . 0) ) = 7 . 4 sq. ft (0 . 7 mA2) Wet Per. =0 . 0 + (1 .4* ( ( (4 . 0A2) +1) A . 5 + ( (4 . 0A2) +1) A . 5) ) = 11 . 2 ft (3 .4 m) Hydraulic Radius = (7 . 4 / 11 . 2) = 0 . 7 ft (0 .2 m) Channel Velocity = (1 .486/0 . 035) * (0 . 7 0 . 667) * (0 . 003 . 5) = 1 . 8 fps (0 . 5 m/s) Channel Effective Manning' s Roughness = 0 . 035 Calculated Shear (Td) = 62 .4 * 1 . 36 * 0 . 003 = 0 . 27 psf (13 . 0 Pa) Safety Factor = (Tp/Td) = (1 . 55 /0 . 27) = 5 . 69 • I 54oah Menem,Green WADS Veleon 4.3 amino Di PMIC0MUIED BY ham Tech EC.lnc. PROJECT NAME.Caen Creek II Wid Project FFI0JECI N0 MOM 5TA1 N/PEACK R0 statiIDN/REA H QRAIJAGE AREA Wa,IR2 IDESI5N FREQUENCY:100m Slam r{YTRALMJC RFSU1 TO 975Imo 0121 Deawpe Pack Flom Veber*Awl Arm IwM N98wic Wang 7 Idel Peed M] ROAM Math 110 5.5 20 127 4..52 012 1A6 5•00009 I INFR RFS1M TS Nato 50111 MMene ripe Vegetates Oserrecataams Reach GNhigAnabaie Permeable CaInIIM Sal*Fade Remarks ilapleTeltwn rwe Dewb Shea Sbas Stew Slams WI lam 51.71 575 Lanaegetelard 1.55 019 805 51ABLE Stage D • e Iron Soge • • II***************************************************************************** NORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4 . 3 NORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S . I . QUICK-PICK CHANNEL LINING BACK-UP COMPUTATIONS ***************************************************************************** PROJECT NAME: Cedar Creek II Wind Project PROJECT NO. : COMPUTED BY: Tetra Tech EC, Inc. DATE: 5/1/2010 FROM STATION/REACH: TO STATION/REACH: DRAINAGE AREA: Channel P2 DESIGN FREQUENCY: 100-yr Storm Flow ***************************************************************************** INPUT PARAMETERS ***************************************************************************** Channel Discharge : 5 . 5 cfs ( . 16 mA3/s) Peak Flow Period : 2 hours Channel Slope : 0 . 003 ft/ft (0 . 003 m/m) Channel Bottom Width : . 0 ft ( . 00 m) Left Side Slope : 4 : 1 Rill Side Slope : 4 : 1 Required Lining Longevity : 12 months Blanket Selected From All Materials Degradeable Material Options ***************************************************************************** CALCULATIONS ***************************************************************************** Initial Depth Estimate = 0 . 16 * (5 . 5 / (0 . 003A0 . 5) ) A0 . 375 = 0 . 91 ft ( . 28 m) Final Channel Depth (after 7 iterations) = 1 . 06 ft (0 . 32 m) Flow Area = (0 . 0 * 1 . 1) + (0 . 5 *1 . 062 * (4 . 0+4 . 0) ) = 4 . 5 sq. ft (0 . 4 mA2) Wet Per. =0 . 0 + (l . l* ( ( (4 . 0A2) +1) A . 5 + ( (4 . 0A2) +1) x . 5) ) = 8 . 8 ft (2 . 7 m) Hydraulic Radius = (4 . 5 / 8 . 8) = 0 . 5 ft (0 . 2 m) Channel Velocity = (1 .486/0 . 042) * (0 . 50 . 667) * (0 . 003 . 5) = 1 . 2 fps (0 . 4 m/s) Channel Effective Manning' s Roughness = 0 . 042 Calculated Shear (Td) = 62 .4 * 1 . 06 * 0 . 003 = 0 . 19 psf (9 .2 Pa) Safety Factor = (Tp/Td) = (1 . 55 /0 . 19) = 8 . 06 • Mlpwhwicai Gem•ECMTOS WHEN 41 /1/ 110 $6 Ml0MPU IE0 By Tel:a Tech EC.hp. (PROJECT NA11E•Cd.Gook IIWMPsaeet FROIECT NO (SLOPE DESCRIPTION Dnerdm Ban P.Al Selo Ikon C..,Hp [Used SM. JI Slal./Regan ICalsad0 SKOIEr44001.11 Cep Io.d., Annual R Facto, o row Slope Lwgsh P.decem Tape AIMe11 P.aaeben Puma'moIMM) 12 Begi.rr.BMan1N Jdy J 515IC.0.0561 denuded fl Value EB 25 Slope G.ednn.CH 1I 4 Sal l,pe Eby Lora K Facts 021 Not to Scale Sall I e..iolnmcn In] 025 Reach C.N.Del NI et r...l=r.n Inf..' 1%:..,:r 454'451 MSL 1151 SCY SE..-Rea.a.E. Staple Bern End R.eml:1l,Si bee ad boo eat 1111 1111 Mal i.1 1.41 CHI Fl 1 L h :S 0.570 ow'(1130 0007 025 31.]54 STABLE A 3 0 25 Co poste :0.576 O0o1 Vegetaon0ensdfe.ee000ea.ol...ageprowled by regnaten Ctow naiad peyseaee lade Elation oi.o0 loss 01 uepdu401 ASLbee.Ares pe Sa1Lo.0poterAN upatesned.d IpMb.iu'Msl ASU.eleAvpaoe Sal Lon perv1ld.Poeadlvdem.ael..l MSLbero.M.a..n Sell Lou pob.A.l onw.deaee sel1Naw inches) MSLeda1aa.pa Sal Lon,,O.Oel esneetneeNtrionsnches) SLT.Sal Lo..Invade 10 sbpe eaprr l� l l Ml 5F.501*r W C msnoweArvq.d I.I..o.tad elope • • ************************************************************************ NORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4 . 3 NORTH AMERICAN GREEN SLOPE PROTECTION - ENGLISH/S . I . QUICK PICK - TEMPORARY BACK-UP COMPUTATIONS ************************************************************************ PROJECT NAME: Cedar Creek II Wind Project PROJECT NO. : COMPUTED BY: Tetra Tech EC, Inc . DATE: 5/1/2010 SLOPE DESCRIPTION: Detention Basin P - 4 : 1 Side Slopes ***** INPUT PARAMETERS ***** Slope Gradient : 4 : 1 Slope Degrees = tan" (-1) (1/4) = 00 . 00 degrees Slope Length: 25 feet (7 . 6 meters) Soil Type: Clay Loam K Factor: K= 0 . 21 t*ac*h/100*ac*ft*tonf*in (K= 0 . 03 t*ha*h/ha*MJ*mm) Ael R Factor: 40 100ft*t*in/ac*hr*yr (681 MJ*mm/ha*h*y) for United States, Colorado, Greeley Protection Period: 12 months from July to July, over 1 whole year (s) Cumulative Annual R Factor For The Beginning Month: 38 . 3 % Cumulative Annual R Factor For The End Month: 38 . 3 % PRECIPDIST = 38 . 3 - 38 . 3 + (100 * 1) = 100 . 0 REACH CUMULATIVE DISTANCE MATERIAL C NO. TO END OF REACH FACTOR 1 25 feet/7 . 6 meters S75 0 . 056 SLT = 0 .25 inches (0 . 64 centimeters) ADJR = 40 * 100 . 0 / 100 =40 . l0oft*tonf*in/ac*hr*yr (680 . 8MJ*mm/ha*h*yr) Soil Loss Factor (SLF) = 1 . 71 inches (4 . 34 cm) ***** CALCULATIONS ***** REACH NUMBER: ***1*** CUMHORZL1 =25 * cos (0 . 0) = 24 . 3 feet (7 .4 meters) LS 1 Factor = 0 . 00 Cumulative LS 1 Factor = 1 . 52 ASLBARE 1 = . 00595 * 40 * 0 . 21 * 0 . 00 =0 . 076 in (0 . 193 cm) MSLBARE 1 = . 00595 * 40 * 0 .21 * 1 . 71 *1 . 52 =0 . 130 in (0 . 330 cm) ASLMAT 1 = 0 . 056 * 0 . 076 =0 . 004 in (0 . 011 cm) MSLMAT 1 = 0 . 056 * 0 . 130 =0 . 007 in (0 . 018 cm) SF. = 0 . 250 / 0 . 007 = 34 . 354 COMPASLBARE 1 =0 . 076 * [ ( 25 - 0) / 25] = 0 . 076 in (0 . 193 cm) TOTCOMPASLBARE = 0 . 076 in (0 . 193 cm) COMPASLMAT 1 =0 . 004 * [ ( 25 - 0) / 25] = 0 . 004 in (0 . 011 cm) TOTCOMPASLMAT = 0 . 004 in (0 . 011 cm) For additional computation details, see the North American Green Users Manual and the Natural Resource Conservation Service RUSLE Documentation. • • S P4 MI Amman Gem.ED/05 Vegan 4.3 32010 1.S3 AM LED BY:1wa iCh .Ion: PR11JEL7 NW+E'.Cad.Gee.11V/61%0U IRWJECI NO RDN SI4TION/wan+: R0$TA1pNREAUI bRANAOE AREA Basil.Le.el DE sic).FR I IJ,LY.Darn P Dui* KfURAUUC RESULTS DPeak S75 t�y� Die rageeggs Pae dua.Velocity hwlwM 8450100 Nigh bdsl Pelpd hsl RedeuBO DapB�R] p0 20 046 ]92 035 070 5 eDm10 11-r0 Am. Mgt toScale LINER RESULTS _Matby type Vegetation Grs{w10Ci Reach 14f5.Anateve P,+nnalie Cekulbd Sally Peeve Remark, Slagle Pattern Ph.a Gen 110„ Dam." Shan Sties Shur Sags IPA 10a0 Straight 515 Unwq.Nad 155 , 004 R 45 SIABLE Stays D S lack toa,.15a. • „***************************************************************************** NORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4 . 3 NORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S . I . QUICK-PICK CHANNEL LINING BACK-UP COMPUTATIONS ***************************************************************************** PROJECT NAME: Cedar Creek II Wind Project PROJECT NO. : COMPUTED BY: Tetra Tech EC, Inc . DATE: 5/3/2010 FROM STATION/REACH: TO STATION/REACH: DRAINAGE AREA: Basin P - Level Spreader DESIGN FREQUENCY: Basin P Outlet Flow ***************************************************************************** INPUT PARAMETERS ***************************************************************************** Channel Discharge : 1 . 8 cfs ( . 05 mA3/s) Peak Flow Period : 2 hours Channel Slope : 0 . 001 ft/ft (0 . 001 m/m) Channel Bottom Width : . 0 ft ( . 00 m) Leff Side Slope : 4 : 1 R. Side Slope : 12 : 1 Required Lining Longevity : 12 months Blanket Selected From All Materials Degradeable Material Options ***************************************************************************** CALCULATIONS ***************************************************************************** Initial Depth Estimate = 0 . 16 * (1 . 8 / (0 . 001_0 . 5) ) A0 . 375 = 0 . 73 ft ( .22 m) Final Channel Depth (after 7 iterations) = . 7 ft (0 . 21 m) Flow Area = (0 . 0 * 0 . 7) + (0 . 5 *0 . 70-2 * (4 . 0+12 . 0) ) = 3 . 9 sq. ft (0 .4 mA2) Wet Per. =0 . 0 + (0 . 7* ( ( (4 . 0A2) +l) * . 5 + ( (12 . 0A2) +1) " . 5) ) = 11 . 3 ft (3 . 4 m) Hydraulic Radius = (3 . 9 / 11 . 3) = 0 . 3 ft (0 . 1 m) Channel Velocity = (1 .486/0 . 050) * (0 . 3 0 . 667) * (0 . 001 . 5) = 0 . 5 fps (0 . 1 m/s) Channel Effective Manning' s Roughness = 0 . 050 Calculated Shear (Td) = 62 . 4 * 0 . 70 * 0 . 001 = 0 . 04 psf (2 . 1 Pa) Safety Factor = (Tp/Td) = (1 . 55 /0 . 04) = 35 .49 • g a a< o a ^_in a LL W VI w igw ¢ �S a a 2 WW0 G o in J Liu-, OW0 U w _„N_ •o '^z 4 zou d aa .. a _wm �Wo 0 og w i a u 8_ a Nu Q O o?0o <09 a •m y x >: 1 a m<F W aF a0 W D v n w? CI. Jad o o x a x a woz m a�' WO a : '6i li OFW Li. < o O Fi opJ GO as a !con a Z 1 I IT �aa�U> a' FO a' o W a'J j �Ny KaQ UWYI W WU < ♦O O K• a P,/� •:y co •G O Oaf^• 4� W ? O w p KO F Qa� a O N W p Nu ���. •. L vl mow IonFg a p w x wz3 v !ill �'^9 z o> a a 0 R 1 �,/ ••v •�•• _ r ��G r.• �O I r'r•r•r W NOvi Jd0- U 9 CO U p 48i ZQLL UW, dOwO a 6L0 < nY1j g $gU Iv I I Y�/.. • • �'A�rrr r , . • • • N >vN O W O a O WUU W OWJ JU Z LJI J a2' '� p 2 w. !o maa a v o .. u COW m� (xipw m>i J biz W0F a >ZQ• �� 'Si b mF Q�M1 Iw/IQW �g <Jzu,a g�o J JK ≤ 00 Z y r•r r'r•r'r'. •.0 RJ ._wE Wa L,,,-Li o o w oao a zo 45 i W r I,i oW ao mx o 0 K 4wp rn Ew m E Wo wod !La ox za >z 0 •. r .•. r • r r r•.•.•r r r r vl O� KFw ZFO N 0 Z W K< a' aKa' O <� SO U a'W ] a IYII a F a WJLL LLu U'w W^ .O ow U U O Z QI. I � K azo 3o J j ¢ mw� o�ni g 0-C.) f<ag o• 50 ?J '3 Q '�✓/•-'///� 'U'�v... �oz o 09'" z? rc a °d a 041 w:� ' vl w 0-)0.• ja in aw i.i W o Z 1i �\\JV i u w k a 9 '^ ol^� z aow o o < w . I\� �tI ��'//�t/'A✓�Q���' o z -nww -02 9 a m I o DOL.. J4orc "w 9�W p rc r % t �7 /j`\/��I o Sao 0vxin Oa x o i ~ Ii I- w c2i ow �70M Soo � � z 0 a ao 0 S �■■1 • �O�Q t t[ � x zd In o o o in w z "' o In 7o J w c� F 91n < Q [ [ [�Q�.....�.//✓i iw g�j� o rc oJo prc WU ww0 rc< � 3 0 h ♦\\ \ ...: Jw J a' p a a O a yj JFo oow aFm OA o W U^ w m m \'\ f a w n za > o f W oomo qq w w-- a /I✓/:i l[ l a � o�y amo as a w zKJ rza w K a< Z ],'^ O. o Z O •Q .. •.• [[ < mm zo N o �i K zK o p a < e WO o c� �.i l a po vwi m — w OWE' OW vi via zwJ Qy' a o 0 on en G ' 1 [ oN0< dF<F J W n Z V13U OWa rya O QO W WW" g¢ p q a CO) OM . E m .••VJJ [ 39�� <pOp a m 9J0o oon o�� ooa pU>p z rca w .....— CC "a/4' Jw -t4]i '. �,:I O tt O h�LL o G U )- -J Q U xa< Iy IL, VI rig tat 1?": o WO 2 p 2 H `o . •\�� f t[[ w iQriim 3ww ce co La m r > aao� J of J'5i ai5 4i> 11=! oJWcma � t t< f [ Li iI ov� oovZ3am /% [[ °dxo ] W zWo ,w_, \' oi wKg< Om20myc // / ! ap zee m KoFo w Sum/� wmm r• .t [ I U, 1pKW_ JaLL NN-inWJa UaZ WKF p<Ua' "'ZrVC0E r �: / N. (! z aW3 JaO ... a'UU J N 3C1mO Od• i< maFyE � � / / (!( ! m a m J J< oti OOzrc Kw w "' w ppmg J w �ap ww aQQ ! J_ 3zz w 10 x m mz� 00 .�n �i ( w o ¢� x : om : oa �\ / 0 La`SaN nm2 2 a F wi v�Fp p0 ,at. O5. VI a• • a� z J am4 �\ ! I. / _:ra W W<15O xrn o Qo a u, ��es3� oo paa oo o ciEN o ;cc Qo Gm , • • • 1 I l� b. awz ix .7-• `' 3W a Wp J a w cc w� UOgOJ OZ a' gO^ <�. --- �d OM p Q y Cr .•. 11 fib. ¢^.wao wH0 w i w3 G rc wwz w S w�o (zi .2_:6: 3J�w In, woua, �� e %/'� erc' a 'dam `v xi u �K ou, zwm apzy, o FWh oaS oW ino v5W�''.':i � . � ,�V rc>w x o OF �K\ aJ <J2.� o a w {V !w! zz• :i:i :.'i..::::::::i.:.:......-�,� ii Jai p UUw < iW vI wW 3i mwlO. nec�� 2a< Sw3 ✓Uim mg• •'t 1 /��/��/ i rc w'd w ou5 mew in prc on z i3ow o raao a ik'rc�v Jwopwo W W Jp U OU w �Wi aom� p W < wW.�W J�^oa^m� J� 3 • • mww �> >wing F� z xo 'gg"FJ�' rc woos S<ooz pFa�o 1J w zo• a ]wiw w °g O o$dW w00 wo< UU.: ,��%I�✓/�✓/ i wW`a mw9 c a iJ a a N V`�p oza^ �'oarc"fCW g w'd... 11\ x wJ J vip utz > r wa'do yQQ�1 z z a WJ< 3... /\I I pU fF2U 2(�p a WO J UV JKxJ �20W W gKWOr a atFW F . 0 La •.y. •• •/'//\//` � 'OO zrUm Om z3 ;no 3 cUi0 UZ w cai dmci0 'a FFFF4 and (-1z°J 0 oono gQg Li9<coo' a Yla W� W I /�/ in moW fimw iw LA o �^ rd °JdS5a og d Nt3S °d oo �o z .'• / �� //�\/ rc cxioovoi pm- �� vo-i� a *C.) in',^ �wJ uJ oaw W> o vwi �a mr' in .'f:.'. 2 p w c7 LilFF a':::::.:::: .J✓ • ,• /I\`��/.. m 0 :::::::::::::: Lt�/ WaOpm 3OV\W� OV < �O m� ONO< JwW KU Fa g w ���/�� 77� o 8oaa "I- -IW0 om a vi`a is '" 5v�J pi� zmoz mo SZJ 3 �9 oa w... K -0-.0_ owaa >K a Z a m o woo�n-yy!!z m ao 0 �(�'�,���ry�yy',� z°' zz ow o0 5 00o J K<"F^ wo a w y� -rvvv. ....... .� zw IJ rn S '^s w cS oza w •- o F J U 9ariOa OF F Fx K FZ a0 x zs ow F • z o Z J ? Oxoo F r. oz <i w �< oo F m 5 J �Ua oviaa 5'wp z m jo a T 2 n" r, pNg OK witeOLL19.J WU nw 0 7 Ko yj wo 0- 3a3 WOZ`O w. Liz WJI m_ O O C win Lad_ <W 0J~ mz El- w a< wi O a Oa'«U• dg�za ti-" p Z<QJ So ,- 0 W 6°. Q ON ? �J2�� no VO K� m FJJ F Uw~Uw Ow wUa V:Si VI UZ W� N znOE WLLII Lou- JF Kj LL; N W� LL4 2 WWI <O aW 99ViW aJ OK E _aa0 KOFw00 U UO JZU OQYQ O OmQ OW I-pU as U6a a' Jwa g.Z C aZ0C ...is UN� �� (wJU n2� 20 J OUgJOaW2 aZR y�� mJ Qw a W F >— N mOOW>O �WWJ O aUvW w W�< < 2 > 1/1 Zp W c�W z 1; 31.iNrn JwZiry3 K�� w� WO 01 es. w 3c �t 'on uJi ipwg 5• 1012v'.opW wa iQ �— o Z�(7 z O C N F000F zZm 02 Zb p OW 3W 0 w WUW0 JUO <O<m Q ca co Ace Lui w LP NU oin 2 -I SyI O 'T W <W mW JUa Z KKK O W00 UO U 022E m < 01 0^0 0 Q OSi Z m><m3 a ?WoaO Ua2 W wJX W 00 of!isiW <W vg oz ore Oa az 9 J X m 2 3 me U mW aw OWU OWSg �W (<J awo o— W3• ZW NOF09UwaK yaj �2J VIm �W a OU N tn.()) OFM1DUw W.<Ova WPO9O z• a a m mKa KK3 as i'o pa ?fin 3 z. O 7 W ce ¢ ^ Sri n d N e ri m ^N Ili v v e ri m a Ct Fcc C1 x C E et claF N V CO N C y Q N N lEn •f• N M m N ItQmUOw oII1' . 4 Sul �U C!� oC; CC 2 cc W } CC >-2} as 00 • • • • as 0C Wy O © • • • • 0W as Ow • • • • � n as �a aQ • • • • -1w Qa Q¢ as CI aQ COm N rn o 0 0 W-1 0 C' r/ O /4 o r o N- o °� [°m CC am Q N o 0 O--� 0 ri 0 0 ¢¢ o 0 W N } >> Z -- � W � � o cow C W C'3 J tyre }� wW 00 a W © • T • WW as 1 u) nw Q ^ J ¢ a W 'It WC/3 C70 N o v N �O CO N- - `. CO O •- Q c„ b COo" 00 c0 io 0^ • o �� �Q at o 0 O� aQ it fr ix wW w rc cc w cece it a s 00 as 00 O m • • • c4 as @ • • • • • • • • row as W W W(n W CO aQ aqs as H LN �LC to �lL to . i ei?O ZZ Jo 0 zaao OP o K J U I;! I ` C Q Z Z ; O < N ! b W 0 K Q ^ • CO a — a x o E N▪ 9 0 y CD 0 Z 0 CO O M M 6 a, E _m N f f �_• • fi N CO o O si actg .—.- v CO o �, v Co CO co y Q a O 1::oi 0 0 0 C le en • z O O cij v H a O O 0 0 0 E ONO F Q o] o O w In N 7 l() O N O O 0 O r m Ir^ r. I„; >- D ¢ > � DQ CC U d� U U U co O O • • • • cow p as cep • • T• • ad 00 W _ _ © • • • • w � as Qw • • • • co co as y J J (n • • • • w w co co CO N O N • • • • • • • • • • • • H a a C� O QZ0 a o Co� o c� � � �, � c� b y 0 o Hr` v r` o co l7 CO Q p N 7 Q r N co Co V Z c,:7? L._ W Qy,1 i2 ja m CC i:i cc W. • • I (id UU oco co 0 J • -F • w } 0 0 ww o0 cd ai a WCC © • • — L to as CL C /� • • a s a s N cr co cNy G u,12 i- i- gg . CO W • • rulQ `/ Qom/ L ••• N Oo 0o N N v O 0 ? N a Y Cl -- • it D ' w � d U o o d U V y � CO•� o • • • cccc En >- 2 • • • • • • • • co } 2 a Ce 0 a III It ce @ • • • COrn aaa @ mrn daa w � u) u) w incn (0ln do cor dc T I M v et ez m oN U N r .- `- o C7 `-' t7 0 z -; E zap o N O) a FZ v a=N c ... . . ` 3--1 N c o 0 ZW0 oe m iJro M Z��7 u . j�Y?jjl I 40 Z a xv>)o ; < ° m< N a IP ou a te QW f e- O m , c v 5 8 � �EIIIcow U N - 1- ¢OW Q / •1� E LL-- p 2 o LAC V) O < OF -Iz ONZ =o p ¢ < F in O F Z 2 ¢O J X E �1 o U O YN w r 'oagf Oa0 LI ¢ ¢ �E \` gyp- a U0 - NI-\z w o 3 z^ Wg¢ a4a¢ z a -o irk •• CV 3 w W N QN Q a ZS CD F\JW p aw Vl oJpW� 0 aV�O I w 0 ' ' ¢ �z z¢ a`"a� 5 ¢Z 0 N aOjJ a`.' J pp I • r FQ2 JN¢ mz OWO iV a w ZZ Oa a w z r �¢,��� ¢owz �a w z N O=,QH a(Fn -_ > ¢N CO W ZJmroF¢- opal O Z QQU O ' U 3 ZFu-Wa,3 COma 0 -o CO ZZ lOi¢O O Wa 520" 2 JK z �= O S?�(Fn 3U r "' �tiOMQOM JKQo D oa 0 E0 • ' ( 2FFO HUqa U ¢ 2 J Z"F WOO I- ¢ W in NtV • ( >- z OWWONN 3lIj--Lc N JF K WON¢Wg za�)� x �N,1 TN ( ( ( O vli�2OUi OmOa ^ N¢ N W r0WO�al p OOQN CC OND -co- in ( Z O ¢� OR I W J M FUmO OO O I ` p0 ¢a ZW Jr v < U Z OS OInaJ ¢ Z W CO ■II�M� •` Tr :uj...L zo�sw o Li owa s Os v gwoNV JJa L., 5O 0 [ CT ( ? 0_I= -SOW .N.. No O v cal ¢V LAD Iza JOWO O o ¢ Q D III ( Wo=OjO 3NZS a z ° s o a 4a4 Z ( \\ ( ( ( h OWZUoH aJ6O N ZN F 0 WQ0W�O En p�O� N � J Q ( v �a aho wMzF I w� w pnawI gjQQQ >w�o �¢ N ( �� ( NLLI oac�oOw ��3? >CC w a ZmNJ�� �voo¢ z o�z a 4 scEY (\ ( N �� tic Z L.,- o N0UJw¢ GOw D Ogg IFn L� CC • ' , ( ¢ ( U cOJ�OKVI OOZ41d H ZX in ¢ptiw<¢ WJ-p Zo Wa W a • ( \\ O ( ( d ?pvW Wa S¢Oa X OWa z ?0 ZWo�QO MNJK K pwo a H co) • ( �\ ( ( zMrN Fwz� O¢ ¢� w�Fg �azF ¢ v ao W Z • ` CC ( �( \ �I................... ....... S ( • [ z wmraNa 0pa¢o = ma ? ��owo¢ ocn2 z a?a w w O_ • I^�'IA`\\ � :.. O O.-. Hw I� 2wp HrzmZ00 ¢NCO 3 DW K ¢ Sgp¢oo =z�c¢i ao w New w CO S Vrw-zaaV JW¢w LU �a ow oo p'gzp� mw�oQ o � oVp z �/� o amv~i 5 J z--zwN m v w.no CI) V r NZInwO H a N ¢ J J Og0O^ VwlO ,aON � rwN o IFn pOwO' wx "z 0 '0ow 'ww ol,Q �.1. i J ¢ w W. O rWWZOW ::.'t::j : K mOWa3Oa' o ZUWN Z ¢ F OaF W. • V W^ ZN �w (v~i =¢z a NW aJNWH OF W W = OoWQ ¢ aUO OUa O¢Nd J " O ww¢)WO N, Jwa = pNz ¢¢ W V)00 > ¢ U Oa O N ¢ ¢ 0 -a. " FN v¢Woaz Ow w¢ i ¢ <mf N)p oli`:>::::;:;3, o QaC ❑ N W FS ¢ 3UNO Z OF Za F KO�GGOx OWN¢ FZ KO WO y iii ca zo,d E ? z z.FNNFOO OI¢iom w aN OW ¢ U_mW JNK QFa as Qa 7a� NO B ¢� W ¢ wF¢w aF= J N �= WXO ¢a Ho ¢J W N 4▪ 0 CO Cc LO IN OK Jam .¢iNOO ¢ Na zF zm�OFN ¢ ¢ OOO',Hid a0~°w OW "d�LLIc' al.i ww �D 4V4¢oa i NN0g� gc°.) �aQ4� w, ao � C+j Q. J F�¢UWW 20Fg wa a> JU W JZwM�F 0: JZ W ON wJW QZN at O < wU JH cn O QW F Cj U In NN wUUW NZ U Ni FOHce ¢l E- a=aW �O WWZ ¢Jo UJw� r0 J En wNdCC O UFQ Za i>O ; ca ¢ 2_ctw ¢¢ NIiOJ FNa0_ wzo � 1-1 Ww wNH Oa ¢ WZQWZ¢ Z Laj aUN¢ m3 in 0O Q o pam3 w -' O�UU�a J¢zO IZ 0:W02d K OW Q�GW Wa' UDWgO oN ¢ Oa OwV) �� tOW ao m3cemoa t~n as-1=n FO UN)aZit a UOJaaO 0NW V J � mo< zw ¢ O Q a W N tM 4 di r N M a C• x '—^ a m E a E u co n901a 2 Lc 0> m NM N ° in Ni N en 3 0 , C 0) N N N I L h I U N o. Esm a o o a\¢ E r o E 0 :° f9 eC c O r- om In in C i°° .N.. E "en' E C U°o co O E •CD 0- V O pN E E m as N 0 d m__ ,O vN � UON Op` p in E O NNE N E0 ate° 9 N T } a ° o+U in o ... U m a N j N `� 0 m ° m E e V Is Emu Em N In, In in Cy-0 r °m 0 In in COD r o¢ M °Y O 0- 2 Ca Q W 00 ¢?� NON vi D ° m Opo� �.��� o oEN CD r w I a m c) O W n n .c oo m y o e com i ww oinm mpo Y� EN°u ° o _ - p� ENS ° mo coo as ZN NUc ci0¢° yo -t • 1nN ¢?�3 you cc ww N °°L C ° • NVIrow (0 a • ^ In • 0' LOO y N as 'L"'a 0 N a • W W rN mK N >,n h • aW O%_J m P N a al D I I- ...C E 0 m- o © • a a Z U C7 7,T)o O • O N FL'v) Z u> N U O I Ni n0 m >`0 oo-° 0 aa'L"2r U �•a o • aQ r 2 V Na ?! O� N N N m O ¢¢L?! ow • • H‹ r i f! E U YrL E0 > 14 • ,)--cy ° pU' � • d ° OHO W to _o °+3 ° EO N 0 N U EC N N 3 u)-C cc 0 CO O L L t ° E —��NN Eao M NNN EuU O N ° v O r le CO' ° N> N __ d C O L ° N N f 0 Q N In n a z e n° o ¢¢� „ 3ry a o ¢¢ o Om `o - r ° .0.° u `o r r ° E Z c L.L. o W CC = oo W Z u v>c o Z I—• cu CD a Ni E0a Z00.c c E u Inv° N in in c o yaJ © • _ _ I— W rn n = Nc m N r O '- O- 0 C O° Q J Q in E E aci .u°. N • N E .o0 0 6 y°u CL �. E `� 000 o --. o> E c� ate° a s N ` 0 ~° V�cc N J ¢ m mm v) my m v1 * CO-0 ro Cl) a m in wi rei CC O 0 p y Ml U O N oo a m 0 N O °Y N to N ° aE> m u b I ON ¢n U p a • •6 • • • N O y O F 0 N a E E • •w W - OId in N 0 W W 0= m > 6 as omC m-o '" aaz03 vuo N O E Env) w Z U L -67.)-a' Oto • • w w N_t c I pl i0 JJ L °� c •ca O as »L- a" o y° d aa ,., a oN i FN ! 0 ° Nm • • • I~I~/I .•L"ZE 0 m(70 n • v) v) y a_ m - 0 N 3wL ° T i _ — In ID IDa 3-4-. u o r 00 c C N O C Ca Qa mN o 00-0 . 0 = Kill mNN ° ° n`-' y N E a Z Q O N E �` " L E.20 a> E �r L N y o; J L- o aa0I) u m OOo °` EE u a n� o ¢¢` G8 = J U Z N . N l ¢¢ N v r a 0 ® Q N E.' N b i. y L ° N < o r ° W(9 u < 0 °J N. ° E li z u I a z LG _ 20Op ; U .�.. Q O E m.c m 3 ilw Zit In 1r) C o U ^ • iN W ¢ N O y > CC g a > L MITI I-N caaC dc. r o 0000 N = C n z - CO M cm° n 7 IW CO G Cl E S n e O 9 a Q C '. CI z • • • • Ee eO • a m • • • • • p^ _ eto , ¢ meow • • • • • p� O ONO a - }a �¢ • • •N • }� D¢ v CM s • • N• • • Cl O, O • • • N• • (C O O N O p • • •.=. •co u)p • 5-- • • 2 >2 • • • a• • 2'Ct > o as �p 5 • �� • as oo O UO • •� 4• • • wW CI- O • • �� • • co° a,a W Cn a Ui Q • •o o•� • W 0 mil • a• • • aQ Qaa • • o•o • • a° as O O N ~I- g g • •a 0• • r~ G • • I •7 1 • • • • O (�(� • • °•N • • N m (�(� 2 W a W • • >� D< •� • • • • • • • • C7 U ri- 1.1.1 • • ° a oo -1 I �I a LI— attrt 0 F © • y • tD (0(n b a CL s W • N a m� O O N • O • 0_ d lqa� "' M W • N • N !nom 00 • • • • � 00 N-O 0 W � a � o� o� mg " cze a0 • • • .2 ff. N rn� p C‘! �cn p r , • • • W W Et W • • • •n• • • • • 2'W a. y r r N o as oo g o as o0 a Om • •( v • • to u") as Op • • •o•a• • • • • NCO as o p W w 0(0 *or W J (� o° _• a •— • as as; gg • • ♦ _I-J as •to • • • �0 •v •N• • • • • • cow,5 H 0o T al'c nv awl �� x a • 1 •1 • .a o.i v -7.N co K N O L = a04:1 z,nNac •N • , • •i C u �{Ia 3wml NCD �Nlitertei Gh 22 Z m —sm-k [..._ W� O e (Q s_J n o �O u v 'yV?j�l c�_' I C O C z S Z pco ; O O ti> 0 • MATERIAL SPECIFICATION 4 " A S75 x GREEN' The short-term single net erosion control blanket shall be a machine-produced mat of 100% agricultural straw with a functional longevity of up to 12 months. (NOTE: functional longevity may vary depending upon climatic conditions, soil, geographic location, and elevation). The blanket shall be of consistent thickness with the straw evenly distributed over the entire area of the mat. The blanket shall be covered on the top side with a lightweight photodegradable polypropylene netting having an approximate 0.50 x 0.50 inch (1.27 x 1.27 cm) mesh and be sewn together on 1.50 inch (3.81 cm) centers with degradable thread. The S75 shall meet requirements established by the Erosion Control Technology Council (ECTC) Specification and the U.S. Department of Transportation, Federal Highway Administration's (FHWA) Standard Specifications For Construction of Roads and Bridges on Federal Highway Projects, FP-03 2003 Section 713.17 as a Type 2.C Short- term Single Net Erosion Control Blanket. The blanket shall be manufactured with a colored line or thread stitched along both outer edges (approximately 2-5 inches [5-12.5 cm] from the edge)to ensure proper material overlapping. The short-term single net erosion straw erosion control blanket shall be S75 as manufactured by North American Green, or equivalent. The S75 erosion control blanket shall have the following properties: Material Content Matrix 100%Straw Fiber (0.50 lbs/yd2)(0.27 kg/m2) Netting Top side only, lightweight photodegradable Minimum netting weight(1.50 lbs/1,000 ft' [0.73 kg/100 m2] approx. weight) Thread Degradable S75 is Available with the Following Physical Specifications Per Roll [English Units(Metric Units)] Width 4.0 ft(1.20 m) 6.67 ft(2.03 m) 16.0 ft(4.87 m) Length 135.0 ft(41.14 m) 108.0 ft(32.92 in) 108.0 ft(32.92 m) Weight± 10% 30.0 lbs(13.60 kg) 40.0 lbs(18.14 kg) 96.0 lbs(43.54 kg) Area 60.0 yd=(50.16 m2) 80.0 yd2(66.89 m2) 192.0 yd2(165.53 m2) Roll Widths Also Available Upon Special Request Width 8.0 ft(2.43 m) 13.3 ft(4.05 m) Length 108.0 ft(32.92 in) 108.0 ft(32.92 m) Weight± 10% 48.0 lbs (21.77 kg) 80.0 lbs (32.28 kg) Area 96.0 yd2 (80.26 m2) 160.0 yd2(133.78 m2) Stitch Spacing for All Rolls= 1.50 inches (3.81 cm) Updated 1/2004 too • SUPPLEMENTAL SPECIFICATION = " - 4 r „,,aySit •AMER NORTH S75 GREEN' The North American Green S75 short-term single net straw erosion control blanket is constructed with a 100% agricultural straw fiber matrix and has a functional longevity of up to 12 months. (NOTE: functional longevity may vary depending upon climatic conditions, soil, geographic location, and elevation). The straw fiber shall be evenly distributed over the entire area of the blanket. The blanket shall be covered on the top with a lightweight photodegradable polypropylene net having an approximate 0.50 x 0.50 inch (1.27 x 1.27 cm) mesh size. The blanket shall be sewn together on 1.50 inch (3.81 cm) centers with degradable thread. The following list contains further physical properties of the S75 erosion control blanket. Property Test Method Typical Thickness ASTM D5199/ECTC 0.33 in(8.38 mm) Resiliency ECTC Guidelines 78.80% Mass per Unit Area ASTM D6475 6.42 oz/yd2(218 g/m2) Water Absorption ASTM D1117/ECTC 424% Swell ECTC Guidelines 15% Stiffness/Flexibility ASTM D1388/ECTC 6.31 oz-in(70,523 mg-cm) Light Penetration ECTC Guidelines 11% Smolder Resistance ECTC Guidelines Yes** • MD Tensile Strength ASTM D5035 115.20 lbs/ft(1.68 kN/m) MD Elongation ASTM D5035 11.90% TD Tensile Strength ASTM D5035 93.60 lbs/ft(1.37 kN/m) TD Elongation ASTM D5035 9.60% **Material is smolder resistant according to specified test MD—Machine direction TD—Transverse direction Bench Scale Testingt Test Method-Description Parameters Results ECTC Method 2—Determination of 50 mm (2 in)/hr for 30 min Soil loss ratio* =8.80 unvegetated RECP's ability to protect soil 100 mm (4 in)/hr for 30 min Soil loss ratio*=8.16 from rain splash and associated runoff 150 mm (6 in)/hr for 30 min Soil loss ratio* =7.81 ECTC Method 3 —Determination of Shear: 1.26 lbs/ft2 for 30 min Soil loss: 142g unvegetated RECP's ability to protect soil Shear: 1.82 lbs/ft2 for 30 min Soil loss: 453g from hydraulically-induced shear stress. Shear: 2.39 lbs/ft2 for 30 min Soil loss: 980g Failure criteria=0.50 inch soil loss Shear at 0.50 inch soil loss(450g) 1.80 lbs/ft2 ECTC Draft Method 4—Determination of Top soil; Fescue (Kentucky 31); Percent improvement temporary RECP performance in 21 day incubation 27° C±2° & =228% encouraging seed germination and plant approximately 50% RH (increased biomass) growth *Soil Loss Ratio=Soil Loss with Bare Soil/Soil Loss with RECP(NOTE:Soil loss based on regression analysis) tBench Scale Performance Testing • Bench scale tests are index property tests. These tests are not indicative of field performance and therefore should not be used in design to establish performance levels for rolled erosion control products. Bench scale tests are performed according to methods developed by the Erosion Control Technology Council(ECTC). Updated 1/2004 MATERIAL SPECIFICATION HydraCM Steep Slope Matrix The North American Green HydraCM Steep Slope Matrix shall be a hydraulically-applied matrix composed of a patent-pending blend of mechanically processed straw fibers, reclaimed cotton plant material, and proprietary performance-enhancing tackifiers. The HydraCM mulch is design for soil erosion protection, and establishes an intimate bond upon application with the soil's surface to create a continuous, porous, absorbent and flexible erosion control matrix that allows for rapid germination and accelerated plant growth. Composition: All components of the HydraCM mulch shall be pre-packaged by the Manufacturer to assure material performance and in compliance with the following values. Under no circumstances will field mixing of additives or components be accepted. Mechanically processed Straw—75% ±3% Mechanically processed Reclaimed Cotton Plant Material— 15% ±3% Proprietary Hydro-Colloid Tackifiers — 10%± 1% Specifications: Content: Straw/Reclaimed Cotton Plant Material Packaging: 50 lbs(23 kg) +/-3% Total Organic Matter: 90.0 Moisture Content: 12% ±3% Color: Natural Green • Packaging: Bags are filled with 50 lbs (23 kg) of material and packaged in a UV and weather-resistant bag. Each pallet contains 40 bags or one ton with a plastic pallet cover for enhanced protection from rain and UV rays. Manufacturing: HydraCM is manufactured exclusively for North American Green by Mulch &Seed Innovations, LLC, Centre, Alabama. HydraCM is manufactured within a set of quality guidelines established after years of product development and rigorous testing in varying conditions. Application Instructions*: 1. Fill tank of a mechanically agitated hydroseeding machine with sufficient water to suspend seed and fertilizers.Add soil amendments. 2. Continue to add water slowly while adding HydraCM at a steady rate. Mix at a rate of 50 lbs of HydraCM per 100 gallons of water. 3. Agitate for a minimum of fifteen minutes after adding the last amount of water and HydraCM. 4. Apply in a uniform layer from two opposing directions to ensure complete soil coverage. Use loading chart to determine the proper application rates. Irregular surfaces may need slightly higher application rates to obtain adequate coverage. 5. Clean equipment properly to ensure HydraCM is removed from the pump, tank, and hoses. Not for use in channels, swales, or other areas where concentrated flows are anticipated, unless installed in conjunction with a temporary erosion control blanket or permanent reinforcement mat. HydraCM may be applied on saturated surfaces. Do not allow foot traffic or grazing on treated areas until vegetated. Be cautious of slippery surfaces while applying. Warning: Do not store near an open flame or heat source. Use caution when stacking units. * See Installation guide for more detailed information regarding application of the HydraCM • Updated 10/2008 GREEN" , Installation and Application Guide f .5d SUBSTRATE AND SEEDBED PREPARATIONS 1. Examine substrates and conditions where materials will be applied. Apply product to geotechnically stable slopes. INSTALLATION Strictly comply with manufacturer's installation instructions and recommendations. For optimum pumping and application performance use approved mechanically agitated, hydraulic seeding/mulching machines. Apply HydraCM from opposing directions to achieve maximum soil coverage. MIXING 1. Fill tank of a mechanically agitated hydroseeding machine with sufficient water to suspend seed and fertilizers 2. Add all soil amendments (seed, fertilizer, etc) 3. Continue adding water slowly while adding the HydraCM at a steady rate. 4. Consult application and loading charts to determine the proper application rates. Mix at a rate of 50 lbs of HydraCM per 100 gallons of water. Confirm loading rates with equipment manufacturer. 5. All mulch should be loaded when the tank is approximately%full. 6. Agitate for a minimum of fifteen minutes after adding the last amount of mulch. • 7. For machines with variable speed agitation bring agitator to a slow roll while maintaining high RPMs. APPLICATION 1. Apply the HydraCM in a uniform layerfrom two opposing directions to ensure complete soil coverage. Irregular surfaces may need slightly higher application rates to obtain adequate coverage. Apply materials at the following minimum application rate*: Minimum Application Rates SLOPE APPLICATION RATE 2H:1V 4,000 Ibs./ac (4,500 kg/ha) ≥ 3H:1V and < 2H:1V 3,500 lbs./ac (3,900 kg/ha) ≥ 4H:1V and < 3H:1V 3,000 Ibs./ac (3,400 kg/ha) < 4H:1V 2,500 Ibs./ac (2,800 kg/ha) `HydraCM is for moderate applications only 2. Material should not be applied in channels, swales, or other areas where concentrated flows are anticipated, unless installed in conjunction with a temporary erosion control blanket or permanent turf reinforcement mat. HydraCM may be applied on saturated soils. CLEANING AND PROTECTION Clean equipment properly after use of this product to ensure that the HydraCM is removed from the pump, tank, and hoses.Clean spills promptly. Do not allow foot traffic or grazing on treated areas until vegetated. Be cautious of slippery surfaces while applying. • Warning: Do not store near an open flame or heat source. Use caution when stacking units. 14649 Hwy 41 North• Evansville, IN 47725 . 800-772-2040. 812-867-6632 • Fax: 812-867-0247• www.nagreen.com Updated 10/2008 NORTH • , GFEEN- ff Oil Helpful Tips for Use of High Performance Hydromulches • HydraCM is most easily introduced to the slurry by cutting the lower portion of the bag on 3 of the 4 sides, thus leaving the bottom portion of the bag attached. Next, make a slit in the upper portion of the bag to create an air hole, allowing the HydraCM to drop into the tank for instant agitation. • Avoid dropping the bag, a piece of the bag, or any foreign objects into the slurry. If this should happen, is imperative to stop the machine before the object reaches the pump. • Agitate HydraCM for a minimum of ten minutes then reduce the paddle speed to a slow roll to prevent cavitations. • Maintain paddle speed during the application process. • Avoid blasting the soil's surface during application by utilizing the appropriate nozzle. For short distance applications use a fan-tip nozzle. Using a long distance nozzle at close • range could significantly alter the soil's surface. • All hydroseeders have a bypass valve that increases/decreases the amount of pressure within the lines. Most erosion control professionals choose not to use the bypass valve due to its sensitivity. Instead, the pressure is adjusted by fluctuating RPMs of the motor accordingly. • After applying the mulch in opposing directions, it is beneficial to spray the mulch upward in a lofting manner to produce a cap for the mulch's surface. • The green dye in HydraCM is UV sensitive, which will allow the green color to fade in approximately in seven days. However, avoid spraying houses, mailboxes, cars and other objects directly with HydraCM. • Lubricate the hose at the beginning of filling process (water filling stage before adding mulch or additives) by opening the nozzle valve and pumping only water through the hose. Turn the nozzle valve off trapping water in the hose. This lubricates the hose and assists in preventing hose clogs. • 14649 Hwy 41 North•Evansville,IN 47725 . 800-772-2040. 812-867-6632 • Fax: 812-867-0247•www.nagreen.com Final Drainage Report Wind Energy Facility and 230-kV Transmission Line USR 1723 • Appendix N: CDPHE Permit Application • • Cedar Creek II Wind Farm Project STATE OF COLORADO For Agency Use Only N•.. Permit Number Assigned toted to protecting end improving the health and environment of the people of Colorado °_ et 4300 Cherry Creek Dr.S. ' 1� Denver,Colorado 80246.1630 , .'" - COR03- Phone 1393)692-2000 •/nt• TOD Line(3031 691-7700 Colorado Department Located in Glendale.Colorado of Public Health Date Received / / nllp'/Mavw.odpheslate.co.us and Fnviromnent Month Day Year STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES APPLICATION PHOTO COPIES, FAXED COPIES, PDF COPIES OR EMAILS WILL NOT BE ACCEPTED. Please print or type. Original signatures are required.This application must be considered complete by the Division before it will initiate permit processing. The Division will notify the applicant if additional information is needed to complete the application. If more space is required to answer any question,please attach additional sheets to the application form.Applications must be mailed or delivered to: Colorado Department of Public Health and Environment Water Quality Control Division 4300 Cherry Creek Drive South WQCD-P-B2 Denver, Colorado 80246-1530 PERMIT INFORMATION Applicant is: ❑ Property Owner 0 Contractor/Operator 1. CONTACT INFORMATION Permit Applicant Company Name: Blattner Energy, Inc Legally Responsible Person: First Name:David Last Name:Blattner Title: VP-General Counsel Mailing Address: 392 County Road 50 City,State and Zip Code: Avon, MN 56310 Phone: i Email Address: bethanyb@blattnerenergy.com Local Facility Contact ❑ Same as Applicant Local Contact Person: First Name: Marvin Last Name:Stinson Title: Project Manager Phone: (320)248-5629 Email Address: marvins@blattnerenergy.com Billing Contact O Same as Applicant Company NameBlattner Energy, Inc. Billing Contact Person: First Name:Bethany Last Name: Braegelman Title: Legal Assistant Mailing Address: 392 County Road 50 City,State and Zip Code: Avon, MN 56310 Phone: (320) 356-2094 Email Address: bethanyb@blattnerenergy.com Authorized Agent Agent may sign reports, DMRs,etc.,as required by the permit Agent Name: Andrew Snyder Title Site Manager Email address andrews@blattnerenergy.com Phone#(320)248-0127 • Authorized Position Position Title Site Manager Phone# (320)248-0127 Currently held by:Andrew Snyder Email:andrews@blattnerenergy.com Page 1 of 3 Revised 2/2010 2. PERMITTED FACILITY INFORMATION Name of Plan,Project or Development: Cedar Creek II Wind Farm • Location of construction site: Street Address(or cross streets): County Road 132,County Road 135 City(if unincorporated, so indicate):Grover County: Weld State and Zip Code: Colorado 80742 Latitude and Longitude(approximate center of site to nearest 15 seconds using one of following formats): Latitude: N 40 56' 54.1" Longitude: W103 46' 45.7" (e.g., 39°42'11", 104°55'57") degrees/minutes/seconds degrees/minutes/seconds OR Latitude: Longitude: (e.g., 39.703°, 104.933') degrees(to 3 decimal places) degrees(to 3 decimal places) 3. MAP(Attachment) Map:Attach a map that indicates the site location and that CLEARLY shows the boundaries of the area that will be disturbed, Maps must be no larger than 11x17 inches. 4. LEGAL DESCRIPTION Legal description: If subdivided, provide the legal description below,or indicate that it is not applicable(do not supply Township/Range/Section or metes and bounds description of site) Subdivision(s): Lot(s): Block(s): OR m Not applicable (site has not been subdivided) 5. AREA OF CONSTRUCTION SITE Total area of project site(acres): 25,367 Area of project site to undergo disturbance(acres): 78 Total disturbed area of Larger Common Plan of Development or Sale, if applicable: (i.e.,total, including all phases,filings,lots,and infrastructure not covered by this application) 6. NATURE OF CONSTRUCTION ACTIVITY Check the appropriate box(s)or provide a brief description that indicates the general nature of the construction activities. (The full '.. description of activities must be included in the Stormwater Management Plan.) ❑ Single Family Residential Development ❑ Multi-Family Residential Development ❑ Commercial Development ❑ Oil and Gas Production and/or Exploration(including pad sites and associated infrastructure) ❑ Highway/Road Development(no including roadways associated with commercial or residential development) D Other, Describe: wind energy facility consisting of wind turbines, associated electrical transmission line&access rot 7. ANTICIPATED CONSTRUCTION SCHEDULE Construction Start Date: 6/1/2010 Final Stabilization Date: 7/1/2011 •'L Page 1 of 3 Revised 2/2010 8. RECEIVING WATERS(If discharge is to a ditch or storm sewer, include the name of the ultimate receiving waters) • Immediate Receiving Water(s): N/A Ultimate Receiving Water(s): N/A 9. REQUIRED SIGNATURES(Both parts I.and II.must be signed)Signature of Applicant: The applicant must be either the owner and/or operator of the construction site. Refer to Part B of the instructions for additional information. The application must be signed by the applicant to be considered complete. In all cases, it shall be signed as follows: a) In the case of corporations, by a principal executive officer of at least the level of vice-president or his or her duly authorized representative, if such representative is responsible for the overall operation of the facility from which the discharge described in the application originates. b) In the case of a partnership, by a general partner. c) In the case of a sole proprietorship, by the proprietor. d) In the case of a municipal,state,or other public facility, by either a principal executive officer, ranking elected official, or other duly authorized employee if such representative is responsible for the overall operation of the facility from which the discharge described in the form originates. STOP!: A Stormwater Management Plan must be completed prior to signing the following certifications! I. Stormwater Management Plan Certification "I certify under penalty of law that a complete Stormwater Management Plan,as described in Appendix A of this application, has been prepared for my activity. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the Stormwater Management Plan is,to the best of my knowledge and belief,true,accurate, and complete. I am aware that there are significant penalties for falsely certifying the completion of said SWMP,including the possibility of fine and imprisonment for knowing violations." ---� 711 —771010 2oto gnature of Legally Responsible Person or Auth rued Agent(submission must include ori•final si•nature Date Si•ned • I -bcuow ,'f lawecr SC era Name(printed) Title il. Signature of Permit Legal Contact "I certify under penalty of law that I have personally examined and am familiar with the information submitted in this application and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine or imprisonment. "I understand that submittal of this application is for coverage under the State of Colorado General Permit for Stormwater Discharges Associated with Construction Activity for the entirety of the construction site/project described and applied for,until such time as the application Is amended or the certification is transferred,Inactivated,or expired.° c I 5/5t/yoto Si nature of Le all Res onsible Perso mission must include ori inal si•nature Date Si ned paid' H. - G eVICY a\ • t e Name(printed Title DO NOT INCLUDE A COPY OF THE STORMWATER MANAGEMENT PLAN DO NOT INCLUDE PAYMENT-AN INVOICE WILL BE SENT AFTER THE CERTIFICATION IS ISSUED. • Page 2 of 3 Revised 2/2010 TETRA TECH Y,. • Transmittal Cover Sheet To: Chris Gathman,Weld County Planning Department Phone: (970) 353-6100 ext. 3540 From: Sarah McCall Jensen Date: May 3, 2010 Project: Cedar Creek II Wind Farm Project Tetra Tech Project# 106-4002 Subject: Traffic Impact Study Enclosed please find four(4) hard copies and one (1) CD of the Cedar Creek II Wind Farm revised Traffic • Impact Study. • V 416) Tel Fax SGS r 1 Traffic Impact Study CEDAR CREEK II WIND FARM Weld County, Colorado Ill Eugene G. Coppola PE, PTOE P.O. Box 630027 Littleton, CO 80163 303-792-2450 1/ Traffic Impact Study CEDAR CREEK II WIND FARM Weld County, Colorado Prepared For: TetraTech EC, Inc. 143 Union Blvd, Suite 1010 . Lakewood, CO 80228 '' -9E0RcE 0 'nt GISTE'•074 Prepared By: Eugene G. Coppola PE, PTOE _ ;D P. O. Box 630027 cn " Littleton, CO 80163 . oNA� t s,: 303-792-2450 R C'""'o ova, April 29, 2010 • Table of Contents I. INTRODUCTION 1 II. AGENCY DISCUSSIONS 3 III. CURRENT CONDITIONS 4 A). Current Road Network 4 B). Current Traffic Conditions 6 C). Surrounding Land Uses 6 IV. SITE ASSUMPTIONS 6 A). Haul Routes 10 B). Site Access and Circulation 10 V. SITE TRAFFIC 15 A). Construction Traffic 15 B). Operations & Maintenance Traffic 19 VI. FUTURE CONDITIONS 26 • A). Background Traffic 26 B). Total Traffic 26 C). Roadway System 26 VII. TRAFFIC IMPACTS 33 A). Construction 33 B). Operations & Maintenance 34 VIII.OTHER ISSUES 35 A). School Buses 35 B). Dust Mitigation 36 C). Department of Defense 37 IX. CONCLUSIONS 38 X. APPENDICES 41 • • List of Figures Figure 1. Vicinity Map 2 Figure 2. Current Roadway Geometry 5 Figure 3. Current Peak Hour Traffic 7 Figure 4. Current Daily Traffic 8 Figure 5. Concept Plan 9 Figure 6. Potential Haul Routes 11 Figure 7. Access and Circulation Routes 14 Figure 8. Peak Month Daily Construction Site Traffic 20 Figure 9. Average Month Daily Construction Site Traffic 21 Figure 10. Peak Month Peak Hour Construction Site Traffic 22 Figure 11. Average Month Peak Hour Construction Site Traffic 23 Figure 12. Operations and Maintenance Daily Site Traffic 24 • Figure 13. Operations and Maintenance Peak Hour Site Traffic 25 Figure 14. Construction Background Peak Hour Traffic 27 Figure 15. Operations and Maintenance Background Peak Hour Traffic 28 Figure 16. Construction Peak Hour Total Traffic 29 Figure 17. Construction Daily Total Traffic 30 Figure 18. Operations and Maintenance Peak Hour Total Traffic 31 Figure 19. Operations and Maintenance Total Daily Traffic 32 • List of Tables Table 1. Round Trip Construction Traffic 17 Table 2. High Construction Month Site Traffic 18 Table 3. Average Construction Month Site Traffic 18 Table 4. Low Construction Month Site Traffic 18 Table 5. O&M Site Traffic 19 Table 6. Construction Levels Of Service 34 Table 7. O&M Levels Of Service 35 Table 8. Average Daily Traffic 36 Table 9. Dust Mitigation Measures 37 • • • I. INTRODUCTION This study updates the January 20, 2010 Traffic Impact Study for Cedar Creek II Wind Farm in Weld County, Colorado. It incorporates recent project updates and refinements, and County comments on the earlier study. Recent decisions on material sources, haul routes and operating strategies are expected to reduce site traffic; however traffic used in this study is consistent with the earlier study, thereby presenting a conservative analysis. This approach was discussed with the County and approved. The study assesses current area roadway operations, operations during construction of Cedar Creek II, and long-term operations and maintenance with Cedar Creek II fully functional. Cedar Creek II is located between the existing Cedar Creek I Wind Farm and State Highway 71 (SH 71), some 17 miles north of New Raymer. It covers almost 27,000 acres; about 3% of the site will be disturbed during construction and less than 0.5% will be disturbed after construction. The wind farm will have turbines capable of generating • up to 300 megawatts (MW) of electricity that will be transmitted into the existing trans- mission line segment that runs from the Cedar Creek I substation. Primary site access will be provided by SH 71 connecting to County Roads (CR) 120 and 132 and the network of county roadways serving this area. A vicinity map is presented on Figure 1. Key work tasks undertaken as part of this effort are described below. • Obtain current traffic and roadway data in the immediate area of the site. • Determine and evaluate traffic conditions during construction. • Develop and assess conditions after construction with Cedar Creek II fully built and operational. • Evaluate traffic operations and other critical issues during construction and the long term. • Identify areas of potential deficiencies. • Recommend measures to mitigate the impact of site-generated traffic as ap- • propriate. 1 - �h�/ -- ESE dO �� I eR_, '�. •1 N N e 0 r e r C N cc sftan o cco at- -v,E_ in w en c\1/4.1'..Th 1 6:7 I- In CV Q7 3 II L `.- 8 of, —, V4 r a r v Ln C.) 0 k' / 1 - 54 �► 1 lye ek } a I co --r— CC U TI - '_t HO g I i i a - i. 9 ££1 83 A ££l a3 (- U i _ .. who 4,0 U 6t t HO Ri CI- I N 0 - < a I Lz1 a3 �- U C 0 0 St 1 80 i F 0 CC 9z1 a3 m - Ll._ o U co N e cc m - U CC CC 0 U A cc \ 611a� stt 83 0 c L1183 co �% N Rstl 80 cc p? — u U £l l 83 I 111 83c , C0 ,- a 1 111 83 JO a M U - z C) - N 5 •. Yr CO a C 3N C �M Lo1 83 o o 90183 CO — S 90183 1 co _ S+ ) W WI 83 U r`--Z 0 a) ? O Lr £0I83 U L U ` \ Uit s 0 CO 73 r cc N ^` 0 66 83 0 ev B UJ El W re O L6 83 [6 en 2 II. AGENCY DISCUSSIONS At the onset of this study, Weld County and the Colorado Department of Transportation (CDOT) were contacted. Several discussions with County staff and Gloria Hice-Idler, representing CDOT, resulted in the following agreed-upon items: • The County asked for information and analyses focusing on construction which is expected to be the timeframe associated with peak traffic. This in- formation, while preliminary, and based upon a number of construction as- sumptions, will help form the framework of the roadway maintenance agreement. • It was requested that all items identified in the County's Traffic Study scope of work (Appendix A) be addressed even if specific items are simply identi- • fled as not being applicable. • The County suggested that daily traffic counts be conducted for roadways for which the County did not have counts available. • The need for acceleration and deceleration lanes at the SH 71 intersections with CR 120 and CR 132 should be fully investigated using State Highway Access Code criteria. Per the Access Code, conditions after construction will need to be fully assessed in the long term. • Weld County specifically asked for sight distance evaluations at critical inter- sections along the haul route and a list of improvements needed to serve large vehicles. These items are included or discussed in the various sections of this study. • 3 III. CURRENT CONDITIONS A). Current Road Network SH 71 is the major roadway serving this area and is supported by a network of County roads. It is a north-south paved roadway extending north from SH 14 into Nebraska, the town of Kimball, and beyond. SH 71 has one lane in each direction and a posted speed limit of 65 miles per hour (MPH). Some 580 vehicles per day currently use SH 71 in the area of Cedar Creek II. SH 71 is a rural regional highway designated as an RA roadway by the State Highway Access Code. CR 120 and CR 132 intersect SH 71 at full-movement, stop-sign-controlled intersec- tions. They extend west of SH 71 and connect to a number of other County roadways. To the east of SH 71, both CR 120 and CR 132 are considered field approaches. All applicable County roads are gravel roadways and are designated local roadways. They • have one lane in each direction and there are no posted speed limits. The County roadway network is somewhat discontinuous in the area of the project. Current roadway geometry at the SH 71 access intersections is shown on Figure 2. Sight distances are acceptable at the SH 71 intersections. Sight distances at key inter- sections along the proposed haul route were field reviewed. It was determined that all intersections have sufficient sight distance for site traffic travelling at 40 MPH, the BP imposed speed limit for all site vehicles. Vehicles travelling at 55 MPH, the County's legal speed limit, will have sufficient sight distance at all intersections except the CR 120—CR 135 and CR 126—CR 129 intersections. Sight distance analyses at intersections such as turbine access roads, haul routes, and County roads will be completed as part of the final project layout and design based on CDOT standards. 4 • 2 4ed. 44 cc DS itt CR132 / re 742,9 n re K • CR120 S CR116 W m re U • r Figure 2 CURRENT ROADWAY GEOMETRY 5 • B). Current Traffic Conditions Peak hour and daily traffic counts were undertaken in conjunction with this study. Traffic was counted on SH 71 at the CR 120 and CR 132 intersections between the hours of 7:00 AM and 9:00 AM and 4:00 PM and 6:00 PM to frame the typical highway morning and afternoon peak hours. The high continuous peak hour within the two-hour count times represents the morning and afternoon peak hour. Peak hour traffic is shown on Figure 3 and daily traffic on Figure 4. Count sheets are provided in Appendix B. Since current peak hour traffic demands are minor on SH 71 and insignificant on CR 120 and CR 132, it can be stated that operating levels of service are at level of service (LOS) "A" during both peak hours. C). Surrounding Land Uses Most land uses surrounding the site are rural and agricultural in nature; however, the • Department of Defense (DOD) also has a number of missile sites in the immediate area. The DOD has a maintenance agreement with Weld County to ensure that critical road- ways are readily available for use. Missile routes that overlap the roadways that Cedar Creek II will use include CR 132 and CR 116 and segments of CR 127, CR 133, and CR 135. IV. SITE ASSUMPTIONS Cedar Creek II will be built in one construction phase starting in mid-2010 with comple- tion approximately 10 months later. When completed, it will be a network of turbines and transmission facilities. It will be served by the existing County roadways and a network of string roads providing access to each turbine. A concept plan is presented on Figure 5. • 6 • 2 M N p Q u ` 1/1 Cl 1 0/1 rn N CR 132 1 a re a Cip 4 in re 7.2e in m v re a • CR 120 "`_"`_` o N ti) 1 1/0--l' 1) 1 n 0/1 —). N� S CO CR 116 ON N N V re U • LEGEND: AM/PM Peak Hour l Figure 3 CURRENT PEAK HOUR TRAFFIC 7 i • £91 83/1 611183 661 83 e ^ry K 0 co 1.0 099 1c HS 0 N U LL LL J V 1H9� j 111 Q O C ry LL z z W Ure C K U O U ZL SfIHD • EEL 213 EEL 83 LE1 83 6Z 83 c e U N U LZ l HS co LL Rl83 o c N Y CO U C U� c C V N N `N t O U >. OD o4 m m •611 80 U '.45 ui 0 O L1180 o 8 C • 1 .0 ._ " f T to Fr" .... Z qj P a IE - T t I dJ 425 N a f J ' cre---1-Nr" I_. ' 1 srta0 o " t, 1 y LI 4- CD .__ i all. ,..._-mi 5 ci, 1 2 2 I t►{ to - - . Q V in a P F- rn a ii Z C re ri V • a cc v* CRi. S'` ..._ . __i I� Et do Cu 83 g A - lf l 80 66 110 v X LL. re r_ni. i _ , 40 a.„ „:, .� 1D 5 szt a� O co .... Y I _C a) 0 c N a) - O N L. co 0 U U u v cc3 a ID Cti \ U.) C.) • Q) 61183 V r 9 Traffic activity associated with the development of Cedar Creek II will consist of three . distinct elements. They are (1) importing materials and equipment, (2) construction, and (3) operations after construction. Each element is described in the following sections. A). Haul Routes Haul routes have been identified based on the location of water and gravel sources. Given the location of these sources, some traffic will originate onsite but most trucks will use SH 71 to access Cedar Creek II. Turbine haul routes are expected to use either Interstate 80 (1-80) or 1-76 leading to SH 71. Anticipated haul routes are shown on Figure 6. B). Site Access and Circulation Two access and circulation schemes are proposed for Cedar Creek II. The first is designed to accommodate large loads during construction based on the B&K Trucking survey. The second will serve other construction traffic and operations and maintenance (O&M) traffic after construction is completed. Each scheme is outlined below. Construction Traffic A construction access and circulation plan has been prepared as shown on Figure 7. This plan was developed to provide all large loads, such as the turbine components, a safe and efficient network of one-way roads to access and circulate through the site. Large vehicles will travel west on CR 132 from SH 71 to CR 135 and south on CR 135. As vehicles approach CR 130, they can either proceed south on CR 135 or turn west on CR 130. Vehicles proceeding south on CR 135 will turn east on CR 120 to SH 71. Vehicles going west on CR 130 will turn south on CR 131, west on CR 126, south on CR 127, east on CR 116, north on CR 133, and east on CR 120 to SH 71. These routes form a one-way circulation scheme entering on CR 132 and exiting on CR 120. 10 I 1 • N W \ ESL a0 C to -I y'646 HO T� ✓�— 69l a� m p 691 HO u Q H 2 u W Q49 cc U d te c u IL HS re U 141 aO N en z u u • F£l HO C£L HO ICI MO 0 Ct CU 6ZL HO N 2 en te0 a) U U U d re 0- al.a0 w co CO SZl 110 U _ a) (7 rc > U 1p N • \ c M143 \7 a° • LII HO o i • ♦ 11 \ • / ESL NO g64L SO 641 HO s4L as to 4, 1 m U 4� V ♦ LL HS 0 O 7 �. 5 A co N l4LHO N C= 1r _ LL Q� n r N W re tJ U U Q ♦ • • N � V EEL HO ,££L ISO , • LEL HO V 6Z1 aO u '' C U U ♦ al HO m rc u SZL HO N cu LT `o c g t o ° rem U .o 3 = V N V T O . w 6LL HO p 2 o Z W W m o O J Z UL NO • 12 • Improvements such as increasing turning radii, structural strengthening, and obstacle removal will be made along these routes and other routes leading to the site, as identi- fied in the B&K Trucking survey of the internal and external haul routes. Potential improvements were recently refined based on a site survey conducted by BP, GE, and B&K Trucking. This survey resulted in identification of improvements needed to serve large vehicles. The list of identified spot improvements is provided in Appendix C. All large loads will be escorted by pilot vehicles and meet all legal requirements. The indicated routes provide service to the primary substation located in the northeast corner of the CR 132—CR 135 intersection. Three substations were assessed in the earlier study; therefore, a traffic reduction is anticipated. The routes also provide con- nections to the planned network of string roads serving the individual turbines. Planned access and circulation routes and the substation location are shown on Figure 7. Since the County has taken the position that speed limit reductions will not be allowed, BP will • direct all site traffic to travel at speeds of 40 MPH or less when onsite or using County roads. Although not legally enforceable, this action will promote safety and minimize dust. Sight distances at critical intersections were also reviewed along the access and circula- tion routes. This effort determined that all intersections have adequate sight distance for the BP imposed site traffic speed limit of 40 MPH. Given the County's legal speed limit of 55 MPH, sight distances remain adequate since good lines of site are available over most vegetation. Deficiencies were found at two locations. One location is the CR 120— CR 135 intersection where sight distances are limited by vertical curves on CR 120 on both the east and west sides of CR 135. Because this intersection will serve both haul routes, further review was undertaken. The northwest corner will be modified to allow easier turns for large trucks. This will likely improve sight distance from CR 135 to the west along CR 120 but not to the level to accommodate 55 MPH traffic. In the interest of safety it is suggested that temporary all-way stop sign control be implemented during construction and conditions returned to normal after construction. Alternately, temporary • 13 stop sign control for southbound CR 135 traffic and a 40 MPH speed limit on CR 120 • approaching CR 135 could be implemented in both directions. The second deficiency is sight distance on CR 129 to the east of CR 126. This could be remedied by reducing the westbound speed limit on CR 129 as it approaches CR 126 to 45 MPH and installing a temporary stop sign on CR 126. In the interest of enhancing safety, the County should reconsider its' previous decision to maintain 55 MPH speed limits, and allow 40 MPH construction speed limits on all area roads. This temporary reduction will improve conditions at the two intersections, discussed above, and improve safety throughout the work zone. Normal sized trucks and smaller vehicles are expected to use the haul routes since these roadways form the framework of the area roadway network. While use of other public roadways cannot legally be restricted, BP will promote using the haul road net- work. • The area near the substation is expected to serve as the project headquarters. As such, most material and component drivers will need to check in prior to being dispatched to another location. It is also expected that all workers will report to this area when arriving at work and will depart from this area at the end of the shift. Two driveways to CR 132 and one driveway to CR 135 are planned for this area during construction. Operations and Maintenance Once construction has been completed, roadways will be restored to a condition agreed to by Cedar Creek II and Weld County and function normally. At that time, O&M per- sonnel will be based in the area of the substation. The design of this area will be evolv- ing through the preliminary design phase. A single driveway to CR 132 will provide access to the O&M area. 14 • V. SITE TRAFFIC Cedar Creek II site traffic will generate construction traffic and normal operations and maintenance traffic after construction is complete. Site traffic in each phase is described in more detail below. A). Construction Traffic Construction traffic will occur over an approximate 10-month construction period. During this time, up to a 300 MW wind farm will be constructed. Activities are expected to generally commence in the following order with some overlap: 1. Grade site for construction staging (includes creating parking area and setting up construction trailers). 2. Begin constructing access roads. 3. Begin installing the energy collection system. 4. Begin constructing foundations. • 5. Begin receiving deliveries of equipment. 6. Begin building substation/O&M building. 7. Erect wind turbines. 8. Restore the site. The above-described work is planned to commence in mid-2010. Work will normally occur during daylight hours up to six days per week. This will result in a 10- to 12-hour shift each day. This schedule may be extended if circumstances re- quire working seven days per week, there are weather delays or schedule slippages, or emergency repairs are needed. Additionally, large loads may travel at night, thereby reducing conflicts with other vehicles. Up to 250 workers will be working on this project. Construction will start with the building of new roadways and making spot improvements to the current roadway system as needed to facilitate large loads. Anticipated spot improvements, as known at this time, are provided in Appendix C. Tracking pads of • sufficient length to permit a full tire rotation will also be provided where appropriate. 15 Construction activity will increase up to month four, which is expected to represent the • peak time. After month four, it is expected to drop significantly and drop to the lowest level over the last three months. Assuming a mid-2010 start, peak construction activity is expected to occur during the months of July, August, and September. Monthly site traffic was calculated for each month of construction based on owner-provided informa- tion and the following assumptions: • Up to 250 workers will be needed for this project in the peak month. During other months, the number of workers will be proportionate with site traffic activity. It was also assumed that no fewer than 100 workers will be onsite at any time. • Given the lack of populated areas near the site, workers may decide to carpool. Three workers per vehicle were assumed. • Once onsite, workers will remain onsite for their entire shift. • Roadway repair material will be stockpiled onsite at one or more locations de- pending on strategic needs, construction activities, and legal limitations. Each stockpile will have 1,000 cubic yards of material. Since the earlier study assumed • each stockpile would have 3,500 cubic yards of material, site traffic will be re- duced. • Site traffic will be equally distributed on the north-south directions on SH 71. Resultant monthly construction-related round trips are shown on Table 1. • 16 • Ti0 O O N OO) 7 OO) 0O 0)0 (O O N a O M O O CO N F (D O O r us y r O (O O O CO OO OO (O CO co on 0) O 0) ro 0 OO) m O O O O O Ow Ow OO) OO) m CO O O 0o O O) o 0 O O) n co co m O v a v r N r r M, O o (o o O ,.. o v a v 'O = r N r r M s- c H O 2 N o O O m O O O )O C coM O C V V (0 O O r r N r r (+j U 0 bO O O O O 0 0 O 0 0 ct M (0 (0 r(O (OO 0 C o CO ui N C r N ' r N co .E • 0 O O U O O 0 (0 a o o M N O �- (' o o n v o v o v 'o .o r N V r N (O `a C "O L co O N N M 0 O xl-a MO OO O 7 1E CO (D M N V O N O) CO C O rCN OO O co r O O O Lo r M N O O(O M O) O) V o t r O O a) 0 E nSZI c R3 H To > 0 C co o v _c N a r a m 3 s a o N N -J J Q N Q N co Y D 0 Q o OC U t. sa a >no E d C 2 x F S 0 coC 3 F 0 O O H T ~ Za O O O v 0 o `y t O d o O K U t > m a m C C L 0 O O m m M ( 2i F . 0 0 J 3 s to O a o d O r lO r C • O a 0 0 tU (0 0 0 (0 t0 N 0 O C F C C C C C C K n a) d o d o o `m Cl.) d Ls! H w w w w w w 17 • Based on the provided information, the following peak hour and daily traffic is ex- pected for the high, average, and low construction months (Tables 2 through 4). Peak-hour traffic assumes all workers arrive and depart the site at the same time. Other traffic is assumed to occur uniformly over a 10-hour workday. These assump- tions present the worst-case peak-hour traffic conditions and have been rounded to the nearest five vehicles. One-way trips are presented, instead of round trips as shown earlier, to facilitate operational analyses at key locations. Table 2. High Construction Month Site Traffic Peak-Hour and Daily One-Way Site Trips AM Peak Hour PM Peak Hour Daily In Out In Out In Out 100 15 15 100 255 255 Table 3. Average Construction Month Site Traffic •Peak-Hour and Daily One-Way Site Trips AM Peak Hour PM Peak Hour Daily In Out In Out In Out 65 10 10 65 150 150 Table 4. Low Construction Month Site Traffic Peak-Hour and Daily One-Way Site Trips AM Peak Hour PM Peak Hour Daily In Out In Out In Out 40 5 5 40 70 70 As indicated above, from 45 to 115 morning and afternoon peak hour trips and 140 to 510 daily trips can be expected during construction of Cedar Creek II. On average, 75 morning and afternoon peak-hour trips and 300 daily trips will occur. • 18 • Daily traffic assignments for the high and average construction months are shown on Figures 8 and 9, respectively. Peak-hour site traffic assignments were also developed for the high and average construction months. This information is shown on Figures 10 and 11 for the high and average construction months, respectively. B). Operations & Maintenance Traffic Site traffic will be significantly less after construction is completed and normal O&M operations commence. An estimated 12-14 employees will work at Cedar Creek II from about 8:00 AM to 5:00 PM, Monday through Friday. They will be responsible for routine operations and maintenance. Emergency operations may occur outside normal working hours. Anticipated peak hour and daily traffic is shown in Table 5. The indicated traffic assumes that employees do not carpool and arrive independently. Table 5. O&M Site Traffic • Peak-Hour and Daily One-Way Site Trips AM Peak Hour PM Peak Hour Daily In Out In Out In Out 14 0 0 14 14 14 As indicated, ongoing operations at Cedar Creek II will generate 14 morning peak- hour trips, 14 afternoon peak-hour trips, and 28 trips per day. This level of activity is expected for the foreseeable future. Equal distribution is assumed on SH 71 between the north and south. Daily site traffic for O&M activities is shown on Figure 12, with site peak-hour traffic for the same timeframe shown on Figure 13. • 19 • ! CS L as/I / On S3 614 213641 219 m e "ry te 4Q- U O N OSZ OOZ O OSZ IL HS en C,, ❑ U LL N J F L a W re• 141219 N m SN N > Z l re LL �U Y U co ay Z O U • SCI 210 04 OLZ 0SL 0 0 0 CCL 83 EEL 83 r OOl // LEL 219 I 6Z 219 0 \ 0 re re O OCR U LZL 219 m 0 d yce 1E 51180 a II m U L U 0 r N 01 CU rn > o 0 a er 0 „ L U090 1°oU V N pi'0 c a a N a > 3 cm tea) 0 0 0 U 'a7 NL 0 U en .65 r C 3 > C r U o cc m 0 m M Et 92 m w0 ON yr0 ar m = s e w n woo r g y m y u n o 0 • ai i a u>, 611219 0010 ,-« O ii c 0 c TN Cr) N 0 3Uvr = ¢rry CC m r Li Li di LLL 219 0 O Z O Z Z I 20 • 0 £5I NO� s64tao 614.HO 641 aO 0 1O �~ K O OLl . . , 0Zl OO . . IL HS`. N O W U LL J LL NL o� V trot.HO ]:W Of Z N , co 0a n K m f O O U LL LLI 17- U N g N O U W H Q 2 • U SCI.HO OZ I 09l 06 O co ££t NO E£I 50 ri 09 1.£1.113 sit NO N _ Ce U 09 U LZI NO el y CC I '- w K ZS U U SZISO U u m >. co o .CU ). Or N m >''oc a2^ m d LI K ONaa 10 oU t m a C a .n N C CO m m m CO O'.1. en N in O0 Q a5 r cN cp" ea.c m0' w K —c' n > C� m U -oce coo 2 cox m mueN m'U m T co CC C m a"-) p_U NA- ' m U ,.x m 614 50 \72x2 9mo 2 CC C0M 3 U v L- N `N 2 co n� N W W W - F- F- LIIaO rc 0 0 0 U z z z ` 21 • z z N/N tn. z N/N K A) 1 Cas N/N 5/50-51 N/N 1):9 5/50The 13-2— �" z CR 132 /J/ e_ C) U CR ss n_ m ce • Z CR 120 E \ � 1 5/5 n 5/5 z H CR116 Z CI) re U LEGEND: AM/PM Peak Hour . N= Nominal Figure 10 NOTE: Rounded to nearest 5 vehicles. PEAK MONTH PEAK HOUR 22 CONSTRUCTION SITE TRAFFIC • 2 �, N z z IC N/N a c? z z I—N/N _,...., : IY 1 N/N U 5/35 N/N—110 to tn z '%' 5/35 n "' Z CR 132 /J/ e re U CA le PI ss in ce u m O re u • Z LO CR 120 A) TIT 1 5/5 1 t 5/5--4 zN A N = CR 116 Z N CI) a C u • LEGEND: AM/PM Peak Hour N= Nominal Figure 11 NOTE: Rounded to nearest 5 vehicles. AVERAGE MONTH PEAK HOUR 23 CONSTRUCTION SITE TRAFFIC 1 • / ESL. 691.a3 saL as to re e 11 O 44 Z O 09S LL HS N (C I / W O Z '` ZIt O L4La0 N <g f R L.a w J Z I- C,CO U OI a y LL y C J Z U OQ gO a1111 • 0L SCLa. 0 0 EEL NO EEL aJ LEL ao o\ 6Z I.ao 0 O N U Ei re 11,___ 11_./-r\,__<---.. LZI a0 0 z U SZL as y 0 w C K N U c fl] 2 o U N U j• -L C 0 T ( o o a m N C J 61 HO Z °O cog a cc w • di ui N W O O LLId0 re J Z Z U ` / " 24 • 2 (;:z N/N c zz l-N/N ce N/N u N/5 lP N/N CR 132 N/N/5-4 '^ z z f e C U C R7z6s n te A O • CR 120 Z '° \ Z z � 1 N/N 1 N/N zz / CO CR 116 Z m rc U • LEGEND: AM/PM Peak Hour N= Nominal Figure 13 NOTE: Rounded to nearest 5 vehicles. OPERATIONS&MAINTENANCE 25 PEAK HOUR SITE TRAFFIC • VI. FUTURE CONDITIONS A). Background Traffic Background traffic was developed using straight-line growth based on CDOT pub- lished growth factors for this section of SH 71. Traffic growth on County roads is expected to be insignificant. Background peak hour traffic is shown on Figures 14 and 15 for the construction and O&M timeframes, respectively. B). Total Traffic Total traffic was developed for each future evaluation year. Total traffic is the combi- nation of site and background traffic. Total traffic is shown on Figure 16 for peak hours during construction; total daily traffic during construction is shown on Figure 17. It • should be noted that Figures 16 and 17 reflect conditions during the peak construction month. Total traffic for representative O&M operations is shown on Figure 18 for peak hours and on Figure 19 on a daily basis. C). Roadway System Short-term and long-term roadway features were estimated using known or planned improvements along SH 71. Since no planned improvements are anticipated, the existing roadway geometry and striping was retained through the long term. • 26 • 2 lC al es CC u CR132 // a re a C4) N rc a m e re U • M CR 120 Z iii N - Al N/N 1) 1 N/N Z o y CR 116 Zin N Of e re U • LEGEND: AM/PM Peak Hour N= Nominal Figure 14 NOTE: Rounded to nearest 5 vehicles. CONSTRUCTION BACKGROUND 27 PEAK HOUR TRAFFIC J o u N/N� N/N Z e, ' Z M N .7 CR 132 e_ re 'Ye rti ce CO e ce • t�fl CR 120 JI N/N-s N/N Z � y CR 116 Zn m U LEGEND: AM/PM Peak Hour • N= Nominal Figure 15 NOTE: Rounded to nearest 5 vehicles. OPERATIONS&MAINTENANCE 28 BACKGROUND PEAK HOUR TRAFFIC • 2 o 0 .n, in o N/N �n cu Z {—N/N K A.) 1 c s N/N 5/50 ry N/N ire z r N Z 5/50� N N CR 132 re C4,114 re te m • °c o' Z N A1 5/51 1 5/5 z co CR116 Zm w re U • LEGEND: AM/PM Peak Hour N= Nominal Figure 16 NOTE: Rounded to nearest 5 vehicles. CONSTRUCTION PEAK 29 HOUR TOTAL TRAFFIC Ic S . ESL 80 5'646.83 644 83 641 83 0 e nnt 6 Q K U O N 098 08L oor, 0£8 LL HS v 0 0) L Z u. O 0r v re u Lb483 N 0 cc co io o L Z Y mco CC U V U • M V • SE L do OS 06Z 091. 0 o EEL BO EEL 83 r LEL 8o \ f EZ183 O o 01. to N e re a o 01.l U a i.80 m 0 d r)) a u cc 0 c tU SZL 83 t) U L 0 >M O en U T O'-N_ • N O m J ry d. m >C C D 0IL� U UNt` a COOU 0 a 0 0)0 N 0 y C > Cm N M O N 0 , 6 ,- =m mt NU' m ≤, 3 j C N e ms CC NO EMIX 10 o dUoN IO'U m c t C ;En No° 2 w tm 03 t Y o X v • m 61483 3tl)▪N ',co �9 0 CO U o w Uv•- = ate K co W W W U13 re 0 O 8 U Z Z Z ` J 30 • 2 (z/(:-T-1 N/N m z 4--N/N C.A, N/N N/5 R N/N z1 z o z CR 132 a K U cRflstn ce m ce • Z CR 120 Z a N/N fi 17) 1 N/N z M N CR 116 Z o m e U • LEGEND: AM/PM Peak Hour N= Nominal Figure 18 NOTE: Rounded to nearest 5 vehicles. I OPERATIONS&MAINTENANCE 31 I` PEAK HOUR TOTAL TRAFFIC • ESL HO g'sal ao 6PL HO saL as '` �ti C CJ OL6 IL HS U QU =LL f e g LPL NO N• a U ?J- o e Q M it 20 O U Q C� a. a O •Ol OZ se L ao O N O EEL aO EEL ao LEL NO 0 6Z NO co N _ C C O 0 U N Ol LZL NO co SZL a7 U d U U v 0 N N co 0 C O o O • C su as re ui n F-- 0 LLL aO K Z ` 32 • VII.TRAFFIC IMPACTS In order to assess operating conditions with the Cedar Creek II facility fully opera- tional, highway capacity analyses were conducted at the critical site access intersec- tions with SH 71. Construction and long-term O&M conditions were evaluated. At the onset of these undertakings, peak-hour traffic was reviewed at each location to identify the need for new auxiliary lanes or an upgrade in traffic controls. Findings for each timeframe are documented in the following sections. A). Construction A review of peak traffic was conducted to determine the need for auxiliary lanes at the SH 71-CR 120 and SH 71-CR 132 site access intersections. CDOT's State Highway • Access Code auxiliary lane criteria for RA roadways and the existing 65 MPH speed limit were used in this assessment. It was determined that no improvements would be warranted on SH 71 at the CR 120 and CR 132 intersections because virtually all side street traffic will be construction related and therefore considered a temporary use. A review of traffic using the CR 120 and CR 132 intersections with SH 71 determined that stop-sign control is appropriate at these intersections since traffic signals will not be warranted. Operating conditions during the peak construction month were assessed using highway capacity analysis procedures. Resultant levels of service at the key access intersections during construction of Cedar Creek II are shown in Table 6. • 33 • Table 6. Construction Levels Of Service Movement/ Level of Service Intersection Control Direction AM PM SH 71-CR 120 Stop NB LT A A EB LR A B SH 71-CR 132 Stop NB LTR A A SB LTR A A EB LTR B A As shown, all traffic movements will operate at LOS "B" or better; therefore, very acceptable operations are expected during construction of Cedar Creek II. Capacity worksheets are presented in Appendix D. All internal intersections with County roads are expected to operate acceptably given the small amount of traffic at those loca- tions. •B). Operations & Maintenance A review of long-term peak hour traffic determined that no auxiliary lane improve- ments will be warranted at the site access intersections with SH 71 during normal operations at Cedar Creek II. Consequently, the current roadway geometry was retained through the long term. Total peak-hour traffic was loaded onto the current roadway geometry to reflect 2030 conditions. Resultant operating levels of service are shown in Table 7. • 34 Table 7. O&M Levels Of Service Movement/ Level of Service Intersection Control Direction AM PM SH 71-CR 120 Stop NB LT A A EB LR A A SH 71-CR 132 Stop NB LTR A A SB LTR A A EB LTR A A As indicated above, the site access intersection will operate acceptably in the long term. Capacity worksheets are available in Appendix E. • VIII. OTHER ISSUES A). School Buses Prairie RE-11 School District was contacted regarding its school bus routes and schedules in the area of Cedar Creek II. These issues were discussed with Joe Kimmel, the District Superintendent. Generally, school is open four days per week (Monday through Thursday); school is open on Fridays when needed to meet atten- dance requirements. The school is located in New Raymer and serves students from preschool through grade 12. School hours are 7:50 AM to 3:35 PM from late August through late May. No summer classes are held. Currently, the school district serves only one family in the area of the proposed pro- ject. This family lives just north of CR 134 on CR 125. Per Mr. Kimmel, the school bus driver uses CR 127 to access CR 125 and proceeds north to the residence and returns to New Raymer using the reverse route. Pick-up time is roughly 7:15 AM, with • drop-off around 4:15 PM. Part of the time, the student resides in New Raymer. 35 Given the frequency and duration of school buses in this area, no significant conflict • with site traffic is expected. This is reinforced by the fact that school will not be in session during approximately one-half of the peak construction time. B). Dust Mitigation Cedar Creek II will use a number of unpaved County roads during construction of the wind farm. County policy indicates that roadway segments with annual average daily traffic (AADT) exceeding 200 vehicles per day should be treated to inhibit fugitive dust. In this instance, only the following roadway sections are expected to exceed 200 vehicles per day during the peak construction month: • CR 132 from SH 71 to CR 135 • CR 135 from CR 132 to CR 130 A more detailed analysis was conducted on these two roadway segments both during and after construction. Average daily traffic was calculated for the different levels of activity as shown in Table 8. • Table 8. Average Daily Traffic Total Daily Traffic Peak Average Post Construction Construction Construction Roadway Section Month Month Month AADT CR 132 SH 71-CR 135 430 290 90 255 CR 135 CR 132-CR 130 290 170 20 145 As shown, only CR 132 will average more than 200 vehicles per day during 2010. When construction has been completed, no roadway segment is expected to exceed 90 vehicles per day. This number is well below the 200 vehicles per day threshold when dust mitigation should be considered. • 36 • County dust control mitigation treatments include: 1. Surface treatment using dust control agents 2. Six-inch-thick stabilized aggregate base using dust control agents 3. Paving 4. Speed limit reductions 5. Periodic watering Because dust mitigation will only be needed during construction and all site traffic will be restricted to 40 MPH, the dust mitigation measures shown in Table 9 are reason- able during construction. Table 9. Dust Mitigation Measures Roadway Section Dust Mitigation CR 132 SH 71-CR 135 Surface treatment CR 135 CR 132-CR 130 Surface treatment or watering Others Varies Watering as needed • After construction is completed or significantly reduced, no further dust control mitiga- tion will be needed. C). Department of Defense The DOD has a number of missile silos in this area that are accessed using a portion of the proposed circulation route for Cedar Creek II. Some 30% of the Cedar Creek II circulation route will overlap the existing missile routes. Consequently, activities and logistics should be coordinated with the DOD as appropriate. • 37 • IX. CONCLUSIONS Based upon the above documented investigations and analyses, the following can be concluded. • Area traffic conditions are very acceptable given the modest amount of traf- fic using SH 71 and the negligible traffic on County roads. • LOS "A" is currently being experienced at the CR 120 and CR 132 inter- sections with SH 71. • Offsite and onsite improvements will be made to accommodate large loads based on the findings of the BP, GE and B&K Trucking site survey. • Construction site traffic will be meaningful but manageable. It will range from 45 to 15 morning peak hour trips, 45 to 115 afternoon peak hour trips, and 140 to 510 daily trips during the approximate 10-month construction • period. • Site traffic after construction will be negligible, with up to 14 morning and afternoon peak-hour trips and 28 daily trips. • No auxiliary lane improvements are needed to serve Cedar Creek II traffic either during or after construction. Consequently, the existing roadway ge- ometry will serve future traffic demands through the long term. • All major intersections, namely the CR 120 and CR 132 intersections with SH 71, will operate very acceptably under all timeframes. This is docu- mented by the fact that all traffic movements at these intersections will op- erate at LOS "B" or better during all peak hours. • Temporary all-way stop sign control should be implemented at the CR 120—CR 135 intersection during construction. Alternately, a 40 MPH speed limit should be posted in both directions on CR 120 approaching CR 135 and a stop sign should be posted for southbound CR 135 traffic. Addi- • 38 tionally, a temporary stop sign and a westbound 45 MPH speed limit on CR 126 approaching CR 129 should be implemented. In lieu of the above spot speed restrictions, the County should reconsider its' earlier decision and al- low 40 MPH construction speed limits on all impacted roadways. This will enhance safety throughout the work area. Conditions could be returned to normal after construction. • Coordination with DOD may be appropriate when large loads arrive at the site. • Conflicts with school bus traffic will be minimal since the school bus only serves one house in this area. Furthermore, approximately one-half of the peak construction activity will occur when school is not in session. • Surface treating CR 132 from SH 71 to CR 135 and CR 135 from CR 132 to CR 130 with dust control agents should be considered during construc- tion to mitigate dust. Watering all other roadways as needed to mitigate dust should be sufficient. No dust treatment will be necessary after con- struction. • Cedar Creek II is viable from a traffic engineering perspective. In summary, with the indicated improvements, Cedar Creek II traffic will be fully mitigated. Acceptable operating conditions can be expected in this area for the fore- seeable future. • 39 X. APPENDICES • • 41 • APPENDIX A Traffic Study Scope of Work • TRAFFIC IMPACT STUDY Scope of Work All new commercial/residential developments with expected ADT >200 will be required to submit a traffic study as a part of the review process. Current Site Conditions a. Discussion of current road network (roadway classifications and use) b. Current traffic conditions Types of roadways to be used by development (paved, gravel, etc.) ii. Current traffic counts iii. Current peak hour traffic counts on adjacent roadways c. Current operations i. LOS calculations for existing intersections in study area d. Surrounding Land Use and Discussion of proposed development impacts on existing land use. II. Site Assumptions a. Hours of operation, expected volume of truck and vehicular traffic, life of mine, potentially include truck distribution over time during the day and a discussion of the proposed haul route(s). III. Future Conditions a. Peak hour site generated traffic b. Short Term background traffic (5-years) c. Long Term background traffic (2020) d. Short Term Peak Hour e. Long Term Peak Hour IV. Traffic impacts from development a. Intersection operations/LOS calculations (both short term and long term) b. Roadway geometry recommendations (both short term and long term) V. Other design considerations a. Signing & striping b. Sight distance c. Pavement maintenance d. Intersection Radii for truck turn movements e. Acceleration/deceleration lanes and lengths VI Conclusions/Recommendations VII Supporting analysis (counts, LOS calcs, accident history, traffic projections) • M:PLANNING-DEVELOPMENT REVIEVATRAFFIC IMPACT STUDY-info sheet doc • APPENDIX B Traffic Counts • • • Navjoy Consulting Services, Inc. Page 1 1385 S Colorado Blvd Suite A-707 Denver,CO 80222 Site Code: 6 303-502-7343 Station ID:6 CR 120 WO CR 135 Starlit -Jan-10 Time Mon EB WB Total 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 1 0 1 06:00 0 2 2 07:00 1 0 1 08:00 0 0 0 09:00 0 0 0 10:00 1 1 2 11:00 0 0 0 12:00 PM 0 1 1 01:00 0 0 0 02:00 0 0 0 03:00 0 1 1 04:00 0 0 " 0 05:00 1 0 1 06:00 0 0 0 07:00 0 0 0 08:00 0 -0 0 09:00 0 0 0 • 10:00 0 0 0 11:00 0 0 0 Total 4 5 9 Percent 44.4% 55.6% AM Peak 05:00 06:00 06:00 Vol. 1 2 2 PM Peak 17:00 12:00 12:00 Vol. 1 1 1 • Navjoy Consulting Services, Inc. Page 2 • 1385 S Colorado Blvd Suite A-707 Denver, CO 80222 Site Code: 6 303-502-7343 Station ID: 6 CR 120 WO CR 135 Start12 -Jan-10 Time Tue EB WB _ Total 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 2 2 06:00 0 0 0 07:00 0 0 0 08:00 1 0 1 09:00 0 0 0 10:00 1 0 1 11:00 0 1 1 12:00 PM 0 0 0 01:00 0 0 0 02:00 0 1 1 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 0, 0 09:00 0 0 0 10:00 0 0 0 11:00 0 0 0 • Total 2 4 6 Percent 33.3% 66.7% AM Peak 08:00 05:00 05:00 Vol. 1 2 2 PM Peak 14:00 14:00 Vol. 1 1 S • Navjoy Consulting Services, Inc. Page 3 1385 S Colorado Blvd Suite A-707 Denver, CO 80222 Site Code:6 303-502-7343 Station ID:6 CR 120 WO CR 135 Stadia -Jan-10 Time Wed EB WB _ _ Total 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 1 1 09:00 0 0 0 10:00 1 1 2 11:00 0 1 1 12:00 PM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 - 0 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 1 0 1 09:00 0 0 0 • 10:00 0 0 0 11:00 1 0 1 Total 3 3 6 Percent 50.0% 50.0% AM Peak 10:00 08:00 10:00 Vol. 1 1 2 PM Peak 20:00 20:00 Vol. 1 1 Grand 9 12 21 Total Percent 42.9% 57.1% ADT Not Calculated • Navjoy Consulting Services, Inc. Page 1 • 1385 S Colorado Blvd Suite A-707 Denver, CO 80222 Site Code: 5 303-502-7343 Station ID: 5 CR 126 WO CR 129 Starlit -Jan-10 Time Mon EB WB Total 12:00 AM 0 0 - 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 2 0 2 07:00 0 0 0 08:00 1 0 1 09:00 1 0 1 10:00 0 0 0 11:00 0 2 2 12:00 PM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 1 1 04:00 0 0 0 05:00 0 1 1 06:00 1 0 1 07:00 0 0 0 08:00 0 0 0 09:00 2 0 2 10:00 0 0 0 • 11:00 0 0 0 Total 7 4 11 Percent 63.6% 36.4% AM Peak 06:00 11:00 06:00 Vol. 2 2 2 PM Peak 21:00 15:00 21:00 Vol. 2 1 2 • Navjoy Consulting Services, Inc. Page 2 1385 S Colorado Blvd Suite A-707 Denver, CO 80222 Site Code: 5 303-502-7343 Station ID: 5 CR 126 WO CR 129 Start12 -Jan-10 Time Tue EB WB Total_._ 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 2 0 2 04:00 0 0 0 05:00 0 4 4 06:00 0 0 0 07:00 1 1 2 08:00 0 0 0 09:00 0 0 0 10:00 2 0 2 11:00 0 0 0 12:00 PM 2 0 2 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 1 0 1 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 2 2 09:00 0 0 0 • 10:00 0 0 0 11:00 0 0 _ 0 Total 8 7 15 Percent 53.3% 46.7% AM Peak 03:00 05:00 05:00 Vol. 2 4 4 PM Peak 12:00 20:00 12:00 Vol. 2 2 2 • Navjoy Consulting Services, Inc. Page 3 • 1385 S Colorado Blvd Suite A-707 Denver, CO 80222 Site Code: 5 303-502-7343 Station ID: 5 CR 126 WO CR 129 Start13 -Jan-10 Time Wed EB WB_.. _ Total___ 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 1 0 1 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 1 0 1 08:00 0 1 1 09:00 0 1 1 10:00 0 0 0 11:00 0 1 1 12:00 PM 2 0 2 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 1 0 1 05:00 0 0 0 06:00 0 0 0 07:00 0 1 1 08:00 0 0 0 09:00 0 0 0 10:00 0 0 0 • 11:00 0 0 __ _ __ 0 Total 5 4 9 Percent 55.6% 44.4% AM Peak 03:00 08:00 03:00 Vol. 1 1 1 PM Peak 12:00 19:00 12:00 Vol. ------. 2 1 —. -_. 2 Grand 20 15 35 Total Percent 57.1% 42.9% ADT Not Calculated • Navjoy Consulting Services, Inc. Page 1 1385 S Colorado Blvd Suite A-707 Denver,CO 80222 Site Code:2 303-502-7343 Station ID: 2 CR 129 SO CR 134 Start11 -Jan-10 _ -- -----_- - Time Mon NB SB _ Total 12:00 AM 0 0 - 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 0 0 09:00 0 0 0 10:00 0 0 0 11:00 2 0 2 12:00 PM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 0 0 09:00 0 0 0 • 10:00 0 1 - 1 11:00 0 0 0 Total 2 1 3 Percent 66.7% 33.3% AM Peak 11:00 11:00 Vol. 2 2 PM Peak 22:00 22:00 Vol. 1 1 • Navjoy Consulting Services, Inc. Page 2 • 1385 S Colorado Blvd Suite A-707 Denver, CO 80222 Site Code: 2 303-502-7343 Station ID: 2 CR 129 SO CR 134 Start12 -Jan-10 - - - - �Time Tue NB SB ________ Total 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 0 0 09:00 0 0 0 10:00 2 1 3 11:00 0 0 0 12:00 PM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 1 1 06:00 0 0 0 07:00 0 0 0 08:00 0 0 0 09:00 0 0 0 10:00 0 0 0 11:00 0 0 -- - 0 • Total 2 2 4 Percent 50.0% 50.0% AM Peak 10:00 10:00 10:00 Vol. 2 1 3 PM Peak 17:00 17:00 Vol. 1 1 • Navjoy Consulting Services, Inc. Page 3 1385 S Colorado Blvd Suite A-707 Denver,CO 80222 Site Code: 2 303-502-7343 Station ID: 2 CR 129 SO CR 134 Start13 -Jan-10 Time Wed NB SB Total 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 0 0 09:00 0 0 0 10:00 0 0 0 11:00 0 0 0 12:00 PM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 1 1 • 2 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 0 0 09:00 0 0 0 10:00 0 0 0 • 11:00 0 0 0 Total 1 1 2 Percent 50.0% 50.0% AM Peak Vol. PM Peak 16:00 16:00 16:00 Vol. 1 1 2 Grand 5 4 9 Total Percent 55.6% 44.4% ADT Not Calculated • Navjoy Consulting Services, Inc. Page 1 • 1385 S Colorado Blvd Suite A-707 Denver,CO 80222 Site Code: 1 303-502-7343 Station ID: 1 CR 130 WO CR 135 Start11 -Jan-10 Time Mon EB WB _ _ _ Total 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 0 0 09:00 0 0 0 10:00 1 0 1 11:00 0 1 1 12:00 PM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 1 1 2 05:00 1 2 3 06:00 1 0 1 07:00 0 0 0 08:00 0 1 1 09:00 0 0 0 10:00 0 0 0 • 11:00 0 0 - _ - 0 Total 4 5 9 Percent 44.4% 55.6% AM Peak 10:00 11:00 10:00 Vol. 1 1 1 PM Peak 16:00 17:00 17:00 Vol. 1 2 3 • Navjoy Consulting Services, Inc. Page 2 1385 S Colorado Blvd Suite A-707 Denver, CO 80222 Site Code: 1 303-502-7343 Station ID: 1 CR 130 WO CR 135 Start12 -Jan-10 Time Tue EB WB Total 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 1 1 09:00 0 0 0 10:00 0 0 0 11:00 1 0 1 12:00 PM 2 1 3 01:00 0 2 2 02:00 1 2 3 03:00 2 0 2 04:00 1 0 1 05:00 0 0 0 06:00 1 0 1 07:00 0 0 0 08:00 0 0 0 09:00 0 0 0 • 10:00 0 0 0 11:00 0 0 0 Total 8 6 14 Percent 57.1% 42.9% AM Peak 11:00 08:00 08:00 Vol. 1 1 1 PM Peak 12:00 13:00 12:00 Vol. 2 2 3 • Navjoy Consulting Services, Inc. Page 3 • 1385 S Colorado Blvd Suite A-707 Denver, CO 80222 Site Code: 1 303-502-7343 Station ID: 1 CR 130 WO CR 135 Start13 -Jan-10 Time Wed EB WB _ __ _ Total _ 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 1 1 08:00 0 0 0 09:00 0 1 1 10:00 0 0 0 11:00 0 0 0 12:00 PM 1 0 1 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 1 1 05:00 0 0 0 06:00 0 0 0 07:00 1 0 1 08:00 0 0 0 09:00 0 0 0 10:00 0 0 0 • 11:00 1 0 1 1 Total 2 4 6 Percent 33.3% 66.7% AM Peak 07:00 07:00 Vol. 1 1 PM Peak 12:00 16:00 12:00 Vol. 1 1 . __- 1 Grand 14 15 29 Total Percent 48.3% 51.7% ADT Not Calculated • Navjoy Consulting Services, Inc. Page 1 1385 S Colorado Blvd Suite A-707 Denver, CO 80222 Site Code: 3 303-502-7343 Station ID: 3 CR 134 BETWEEN CR 119 8 CR 125 Start11 -Jan-10 Time Mon EB WB Total 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 1 _ 1 08:00 1 0 1 09:00 1 0 1 10:00 0 0 0 11:00 0 0 0 12:00 PM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 1 1 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 0 0 09:00 0 0 0 • 10:00 0 0 0 11:00 0 0 0 Total 2 2 4 Percent 50.0% 50.0% AM Peak 08:00 07:00 07:00 Vol. 1 1 1 PM Peak 16:00 16:00 Vol. 1 1 • Navjoy Consulting Services, Inc. Page 2 • 1385 S Colorado Blvd Suite A-707 Denver, CO 80222 Site Code: 3 303-502-7343 Station ID: 3 CR 134 BETWEEN CR 119&CR 125 Start12 -Jan-10 Time Tue EB WB _ _ Total 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 1 1 08:00 0 1 1 09:00 2 1 3 10:00 1 0 1 11:00 0 0 0 12:00 PM 2 1 3 01:00 2 1 3 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 0 0 09:00 0 0 0 10:00 0 0 0 • --- 11:00 0 0 0---_ — -- 0 0 0 Total 7 5 12 Percent 58.3% 41.7% AM Peak 09:00 07:00 09:00 Vol. 2 1 3 PM Peak 12:00 12:00 12:00 Vol. 2 1 3 • Navjoy Consulting Services, Inc. Page 3 1385 S Colorado Blvd Suite A-707 Denver, CO 80222 Site Code: 3 303-502-7343 Station ID: 3 CR 134 BETWEEN CR 119&CR 125 Start13 -Jan-10 Time Wed EB WB _ Total 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 1 1 2 08:00 0 1 1 09:00 0 0 0 10:00 0 0 0 11:00 0 0 0 12:00 PM 1 0 1 01:00 0 0 0 02:00 0 1 1 03:00 0 0 0 04:00 0 0 ' 0 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 1 0 1 09:00 0 0 0 • 10:00 0 0 ------------ ---0 11:00 0 0 0 Total 3 3 0 Percent 50.0% 50.0% AM Peak 07:00 07:00 07:00 Vol. 1 1 2 PM Peak 12:00 14:00 12:00 Vol. 1 1 1 Grand 12 10 22 Total Percent 54.5% 45.5% ADT Not Calculated • Navjoy Consulting Services, Inc. Page 1 • 1385 S Colorado Blvd Suite A-707 Denver, CO 80222 Site Code:4 303-502-7343 Station ID: 4 CR 135 SO CR 132 Start11 -Jan-10 Time Mon NB SB __ __ __ Total 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 0 0 09:00 1 1 2 10:00 0 0 0 11:00 0 0 0 12:00 PM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 3 2 5 04:00 1 1 - 2 05:00 0 0 0 06:00 0 1 1 07:00 0 0 0 08:00 0 0 0 09:00 0 0 0 10:00 0 0 0 11:00 0 0 Total 5 5 100 • Percent 50.0% 50.0% AM Peak 09:00 09:00 09:00 Vol. 1 1 2 PM Peak 15:00 15:00 15:00 Vol. 3 2 5 • Navjoy Consulting Services, Inc. Page 2 1385 S Colorado Blvd Suite A-707 Denver, CO 80222 Site Code: 4 303-502-7343 Station ID: 4 CR 135 SO CR 132 Start12 -Jan-10 Time Tue NB SB Total 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 1 1 08:00 0 0 0 09:00 1 0 1 10:00 1 1 2 11:00 1 0 1 12:00 PM 0 1 1 01:00 3 1 4 02:00 0 0 0 03:00 1 1 2 04:00 1 0 1 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 0 0 09:00 0 0 0 • 10:00 0 0 0 11:00 0 0 0 Total 8 5 13 Percent 61.5% 38.5% ----— -- - — AM Peak 09:00 07:00 10:00 Vol. 1 1 2 PM Peak 13:00 12:00 13:00 Vol. 3 1 4 • Navjoy Consulting Services, Inc. Page 3 • 1385 S Colorado Blvd Suite A-707 Denver, CO 80222 Site Code:4 303-502-7343 Station ID:4 CR 135 SO CR 132 Start13 -Jan-10 Time Wed NB SB Total 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 2 1 3 09:00 1 0 1 10:00 0 0 0 11:00 0 0 0 12:00 PM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 1 1 2 04:00 0 0 0 05:00 0 0 0 06:00 0 0 0 07:00 0 0 0 08:00 0 0 0 09:00 0 0 0 10:00 0 0 0 11:00 0 0 0 • Total 4 2 6 Percent 66.7% 33.3% AM Peak 08:00 08:00 08:00 Vol. 2 1 3 PM Peak 15:00 15:00 15:00 Vol. 1 1 2 Grand 17 12 29 Total Percent 58.6% 41.4% ADT Not Calculated • Gene Coppola •From: Janet Carter Ucarter@co.weld.co.us] Sent: Tuesday, January 05, 2010 10:20 AM To: Gene Coppola; David Bauer Subject: RE: Traffic counts Hi Gene, My counts in this area are pretty minimal. I have a count at WCR 132 near SH 71 and a count at WCR 120 near SH 71, I also have counts on WCR 390; if you want them I would be more than happy to pass them onto you. WCR 132 near SH 71 7/6/2009,4 day count ADT 68 85th percentile 36 mph Trucks 33% WCR 120 near SH 71 7/6/2009,4 day count ADT 24 85th percentile 50 mph Trucks 21% •Thanks, Janet L Carter Traffic Engineer Weld County Public Works Dept. P.O. Box 758,Greeley,CO 80632 Tele-970.356.4000 ext 3726 Fax-970.304.6497 From: Gene Coppola [mailto:trafficpe@comcast.net] Sent: Tuesday, January 05, 2010 9:36 AM To: Janet Carter Subject: Traffc counts Hi Janet. Can you send me the traffic counts on the roads near Cedar Creek II as soon as you can. I found the missile road information so I no longer need that. Thanks and Happy New Year. Gene Gene Coppola 303-792-2450 (Office) 303-792-5990 (Fax) • 1 -- 2 — o Q m r V O m eq .m N m m '- " ,.... 00 S C y • o N O O O O O O r 0 0 r 0000 , 000 r F— 0 ( Z C m U m o m E O O O e e e e 0 0 0 0 0 0 0 0 0 0 0 N O I• W U Cl) off$ 0 v K 0 0 N C — Z = N m Sa fq 0 O CO N N — — 0 N 3 8 m J 0 e () O I- C W c _ J �+ v, .n C.) 1 g e 0 0 0 o r 0 0 r o 0 . 00 - 000 r " C d C/ T ~ II W > t R' 0 0 0 0 0 0 0 0 0 0000 .- 000 .-- e - O V N 0 0 )11 W - W W ...J0000000 r 0 0 0 0 0 0 0 0 O Q a — — 5 a a0 • m r < O < N O am m ' A m N S N 0 II W C oe 4 A N 5 15 . m .v� m a m ua .v N ua a A m m m �n m M m G 0 0 QI— c K O O O O O O O O 0 00000000 0 C S V1 (O M m tD C aO u'i cp c.4 m V r- O> O> [O to co M E J — m N • J O O II J t▪ m M m m m m f M N m O N O m m m N N 1- 00 I- 0 0 0 'O K 0 0 O C M 1 g — — O Ne G eV CO V co co co co co I� M N n V N tO In O N N N CL o W co 1r d N 0 • O x0 U Z J O O O O O O O O a 00000000 O V m G_ c C7 za .V c m cO ' emp Ino11nn oUnOUnOinol�nn in M W a = ? tin V O r M Q C• W O r r) 0 0 r M V 44 4` C7 d y. IA IA W W m OD N m O < R O 4i in iii in O a m 0 0 0 0 0 0 0 0 O 00000000 M W n 4 O IS C A co co IA N N N CI 0I M .0 M O I.- O V• r O c.c w O a O r O O r O r O O O r O O r O N L ~ N UOJ 01 t C N a V 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O n 0 F o m CO ,a 8 .6 x 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 O O - _ Z = N 11 N O O O O O O O O O 0 0 0 0 0 0 0 0 O co N d Q 8 d 3 J O o O O O O O O O 0 0 0 0 0 0 0 0 O C o O I- - W 0 Ua p O O O r O O r O O O O r O O r O N • C '- N it OJ n ce W C O O ,o WOOOOOOOO O O O O O O O O OOOOOO r O r U. c c O6 10 OOOOOOOO O OOOOOOOO O 0 r I W _ A/ J O O O - O O '- O 0 0 0 - 0 0 0 0 Q _; L Z O C W N N M O ' ` 0 M O M M M O 10 O N N C r0 L r r of r H O N W C JG en I- v {0 10 M 0 N m A (0 00 OI m 10 m e M O CO Q9re0 0 0 0 0 0 0 O O O r O O O r C J y N e v r V e e m e N r O 0O m O O m e m mot.. t y J OOOOOOOO O OOOOOOOO 0 0 0 0 0 0 O J IO N n 010 MIO 117 07 10 00 f0 N t0M m v loa 1� e r O O W V K O O O o O O O O O 0 0 0 0 0 0 0 0 O O � C M e ' alp o 0 r L N (� m In In rn co ao cGJ N cn m v v u) (o v r 0 00 m o.a CV O o — — o >< O C Z J O O r O O O O O O o O r O O O r O ID 0 OO c O ° Q st d Y'� O In Z a J E O r M Q o r I�+f in T = 81,222 o :222, IA = C7 n. H 0. . . . . . . . . o a �u 0 0 0 0 0 0 0 e a w m 4 4 • APPENDIX C Spot Improvements • Cedar Creek II Observations from site survey conducted 03-23-2010 Participants: Bill Koller(BP), Mihir Patel and Ryan Cameron (GE) and Bruce Lang (B & K Trucking) STATE HIGHWAY CONSIDERATIONS Highway 71 Junction with CR 132—Main delivery road for both vendors Need radii on north and south sides heading west due to incoming traffic from both direc- tions. B&K will need to use the double radii as a swing wide to go east. The other option would be to install a cut-through prior to the hill. Both sides need temporary removable STOP signs for ease of entry. Junction with CR 120—Main return road for GE trucks (All in agreement) Need radii on north and south sides. Line of sight is very poor to the south. Most trucks will go north, however, some blade and nacelle trucks will have to go south. Also need temporary removable STOP sign. DELIVERY ROUTE CONSIDERATIONS • Intersection of CR 132 and CR 135 (by Construction & Laydown Yard) If land on southeast corner is a non-participant,there will need to be a radius to the north and a swing wide to head south. This will be a very busy intersection throughout the project. Temporary removable STOP sign. Intersection of CR 135 and CR 134 Not enough room to put in radius. Will either need to put in a cut-through farther north or continue string road to GE48 over to include GE49 and GE50. (All in agreement) CR 130 Road on map toward GE31 to GE35 does not exist. Can see the trail all covered in grass. String road will be new road. 90° turn-CR 130 and CR 131 Will need to shave down hill for radius. Dirt can be used to fill in on CR 131 side. CR 126—Crest rebuild First crest west of CR 131 will need to be built up about 1/16`h mile and about 2 feet to allow for clearance. Will possibly need to add a pole on the south side to ensure clearance of electri- cal lines to house. CR 128—Stabilization Road has many soft spots that will not hold up to heavy traffic. May want to stabilize to the last string road entrance. 4111 CR 126 west of CR 129 High water zone. Has signs posted and ground is much darker in the area. Need to watch very closely after heavy rains. May need additional consideration. Intersection of CR 127 and CR 124—Offset Check with landowner to see if it is possible to run a cut-through from CR 124 east straight to CR 124 west. With the contour of the land in the area it would be very difficult installing two separate radii. (All in agreement) THIS CONCLUDES THE DELIVERY ROUTE CONSIDERATIONS RETURN ROUTE CONSIDERATIONS 90° at CR 116 and CR 133 Add inside radius to ensure stacked trucks and double Schnabel trucks can maneuver around the turn. 90° at CR 133 and CR 120 Add outside swing wide (approx. 3 feet)to ensure stacked trucks and double Schnabel trucks can maneuver around the turn. CR 120 Just after the turn above there is a flash flood waterway. Will need to keep a close eye on this area after any rain in the area. Junction of CR 120 and CR 135 Add swing wide on west side of CR 135 to ensure stacked trucks and double Schnabel trucks can maneuver around the turn and get straight to get through cattle guard. CR 135 There is one major waterway and three minor waterways along this road that will need to be monitored after any rain in the area. THIS CONCLUDES THE RETURN ROUTE CONSIDERATIONS Bill Koller Logistics Coordinator BP Wind Energy • APPENDIX D Construction Capacity Analyses Work Sheets • Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY Sneral Information Site Information lyst GC Intersection 120- 71 Agency/Co. Jurisdiction Date Performed J,4411142010 Analysis Year 2010 Analysis Time Period PM PK HR Project Description CONSTR TION East/West Street: CR 120 North/South Street: SH 71 Intersection Orientation: North-South Study Period(hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 5 90 0 0 25 5 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 90 0 0 25 5 Percent Heavy Vehicles 100 -- - 100 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1I , 0 Configuration LT TR Upstream Si:pal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R ume 0 5 0 5 ak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 5 0 5 Percent Heavy Vehicles 100 100 100 100 100 100 Percent Grade(%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay,Queue Length,and Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 5 10 C (m) (vph) 1127 743 /c 0.00 0.01 95%queue length 0.01 0.04 ontrol Delay 8.2 9.9 LOS A A pproach Delay -- -- 9.9 pproach LOS — -- A hts Reserved HCs2000TM Copyright O 2003 University of Florida,All Rights Reserved Version 4.I f Version 4.I f 1/14/2010 Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information • Analyst GC Intersection 120- 71 Agency/Co. Jurisdiction Date Performed 1/ 10 Analysis Year 2010 Analysis Time Period A PK HR Project Description CONSTRUC N EasNWest Street: CR 120 North/South Street: SH 71 Intersection Orientation: North-South tudy Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 5 35 0 0 80 5 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 35 0 0 80 5 Percent Heavy Vehicles 100 -- -- 100 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTL 1.1 t_._ TR stream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R 'Volume 0 5 0 5 • Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 5 0 5 Percent Heavy Vehicles 100 100 100 100 100 100 Percent Grade(%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length,and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR v(vph) 5 10 C (m) (vph) 1068 717 v/c 0.00 0.01 95%queue length 0.01 0.04 Control Delay 8.4 10.1 LOS A B Approach Delay — -- 10.1 Approach LOS — -- B Rights Reserved 41HCS2000TM Copyright C 2003 University of Florida,All Rights Reserved Version 4.1f Version 4.1f 1/14/2010 Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY pi t neral Information Site Information lyst GC Intersection 132- 71 gency/Co. Jurisdiction Date Performed 4/2010 Analysis Year 2010 nalysis Time Period PM PK HR Project Description PEAK CO STRUCTION MONTH East/West Street: CR 132 North/South Street: SH 71 Intersection Orientation: North-South tudy Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 55 35 0 0 20 55 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 55 35 0 0 20 55 Percent Heavy Vehicles 15 -- -- 100 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal _ 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R me 0 0 0 5 0 5 k-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 5 0 5 Percent Heavy Vehicles 100 100 100 100 100 100 Percent Grade (%) 0 0 Flared Approach N N torage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration LTR LTR Delay,Queue Length,and Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR (vph) 55 0 0 10 C(m) (vph) 1446 1122 671 /c 0.04 0.00 0.01 95%queue length 0.12 0.00 0.05 ontrol Delay 7.6 8.2 10.4 LOS A A B pproach Delay -- -- 10.4 pproach LOS -- -- B is Reserved s20002M Copyright O 2003 University of Florida,All Rights Reserved Version 4.I f Version 4.11 1/14/2010 Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information • Analyst GC Intersection 132- 71 Agency/Co. Jurisdiction Date Performed 111�Q 10 Analysis Year 2010 Analysis Time Period AM(PIVI)PK HR Project Description PEAK CONS CTION MONTH East/West Street: CR 132 North/South Street: SH 71 Intersection Orientation: North-South Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 10 25 0 0 30 10 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 10 25 0 0 30 10 Percent Heavy Vehicles 100 -- -- 100 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR =team Signal _ 0 0 _ Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 0 0 0 50 0 50 • Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 50 0 50 Percent Heavy Vehicles 100 100 100 10 10 10 Percent Grade(%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length,and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR v(vph) 10 0 0 100 C (m) (vph) 1116 1133 944 v/c 0.01 0.00 all 95%queue length 0.03 0.00 0.35 Control Delay 8.3 8.2 9.3 LOS A A A Approach Delay -- -- 9.3 Approach LOS -- -- A Rights Reserved • HCS2000TM Copyright C 2003 University of Florida,All Rights Reserved Version 4 If Version 4.1 f 1/14/2010 • APPENDIX E O&M Capacity Analyses Work Sheets Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY neral Information Site Information alyst GC Intersection 120- 71 gency/Co. Jurisdiction Date Performed /2010 Analysis Year 2030 nalysis Time Period M PK HR Project Description CONSTR TION East/West Street: CR 120 North/South Street: SH 71 Intersection Orientation: North-South IStudy Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 5 50 0 0 40 5 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 50 0 0 40 5 Percent Heavy Vehicles 100 -- -- 100 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 I 1 0 Configuration LT 1 TR . Upstream Signal 0 0 _ Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R sume 0 5 0 5 k-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 5 0 5 Percent Heavy Vehicles 100 100 100 100 100 100 Percent Grade(%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR v(vph) 5 10 C (m) (vph) 1111 752 /c 0.00 i0.01 95% queue length 0.01 0.04 Control Delay 8.3 9.9 LOS A A pproach Delay -- -- 9.9 pproach LOS — -- A hts Reserved S2000rhf Copyright®2003 University of Florida,All Rights Reserved Version 4.I f Version 4.If 1/14/2010 Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information • Analyst GC Intersection 120- 71 Agency/Co. Jurisdiction Date Performed 1/14 10 Analysis Year 2030 Analysis Time Period AM PK HR Project Description CONSTRUC N East/West Street: CR 120 North/South Street: SH 71 Intersection Orientation: North-South Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 5 35 0 0 55 5 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 35 0 0 55 5 Percent Heavy Vehicles 100 -- -- 100 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 __ __ 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 0 5 0 5 • Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 5 0 5 Percent Heavy Vehicles 100 100 100 100 100 100 Percent Grade(%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR v (vph) 5 10 C (m) (vph) 1094 743 v/c 0.00 0.01 95% queue length 0.01 0.04 Control Delay 8.3 9.9 LOS A A Approach Delay — -- 9.9 Approach LOS — -- A Rights Reserved • HCS2000TM Copyright®2003 University of Florida,All Rights Reserved Version 4.If Version 4.I f 1/14/2010 Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY aneral Information Site Information lyst GC Intersection 132- 71 Agency/Co. urisdiction Date Performed 4/2010 nalysis Year 2030 Analysis Time Period PM PK HR Project Description LONG TE M East/West Street: CR 132 North/South Street: SH 71 Intersection Orientation: North-South Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 5 50 0 0 35 5 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 50 0 0 35 5 Percent Heavy Vehicles 15 -- -- 100 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 i 1 0 Configuration LTR LTR . Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R game 0 0 0 5 0 5 k-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 5 0 5 Percent Heavy Vehicles 100 100 100 100 100 100 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR v (vph) 5 0 0 10 C (m) (vph) 1490 1105 748 v/c 0.00 0.00 0.01 95%queue length 0.01 0.00 0.04 Control Delay 7.4 8.3 9.9 LOS A A A Approach Delay — — 9.9 Approach LOS — -- A lilts Reserved HCS2000TM Copyright O 2003 University of Florida,All Rights Reserved Version 4.1f Version 4.If 1/14/2010 Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst GC Intersection 132- 71 • Agency/Co. Jurisdiction Date Performed 1/1 V�;0Analysis Year 2030 Analysis Time Period A 3;PK HR Project Description LONG TER East/West Street: CR 132 North/South Street: SH 71 Intersection Orientation: North-South 'Study Period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R Volume 5 30 0 0 50 5 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 30 0 0 50 5 Percent Heavy Vehicles 15 -- — 100 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 0 0 0 5 0 5 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 • Hourly Flow Rate, HFR 0 0 0 5 0 5 Percent Heavy Vehicles 100 100 100 100 100 100 Percent Grade(%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length,and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR v(vph) 5 0 0 10 C (m) (vph) 1471 1127 745 v/c 0.00 0.00 0.01 95% queue length 0.01 0.00 0.04 Control Delay 7.5 8.2 8.9 LOS A A A Approach Delay — -- 9.9 Approach LOS — -- A Rights Reserved HCS2000TM Copyright®2003 University of Florida,All Rights Reserved Version 4 I f II Version 4.I f 1/14/2010 TETRA TECH EC ' C • et d County Pia GRf etEY F Oniog�E rtment Mar �a20jo Transmittal Cover Sheet "CCEI F To: Chris Gathman,Weld County Planning Department D Phone: (970) 353-6100 ext. 3540 From: Sarah McCall Jensen Date: May 17, 2010 Project: Cedar Creek II Wind Farm Project Tetra Tech Project# 106-4002 Subject: Construction and Additional Studies Documents Enclosed please find attached hard copies of the following documents: • Name of Document No.of copies Utility Crossing Map 2 Summary Listing of Utility and ROW Encroachments 2 Turbine ID Information 1 FAA Determinations, March 1,2010 1 FAA Determinations, May 14,2010 1 Legal Description Maps(five maps) 2 CC-II Proposed Transmission Line Map 2 Summary of Meeting with Pawnee Fire Department 2 Attendance Roster for Meeting with Pawnee Fire Department 2 Fip Right-of-Way Permit Attachments 1 Road Access Information Sheet Attachments 1 The Right-of-Way Permit attachments were forwarded to you previously on May 14, but they have been included in this package with the required check for$2,250.00. The Road Access Information Sheet attachments include the required check for$3,644.80. ZOO: • I 7t re) Tel • Fax • SGS A 4- 0 XI 8 r 4 • t • i r^ a a) co co 1_ I8% I ii 4 J II o J jiitibil ..11, .1 t. r WCO r • L Oa r I i �� D z w u 4 44 i J Z m r IX i O �, z Z �` ^ •5 . >, I • i-L .� v W •r • 0 CD t. c cr o Q ..r' die 1•r li Cin CDI I i Iai Z �— J .0 -- lieSs .• 1 4i ill I Cl) �•,r. a) L — r iir • t5 U o- ■ Z U a NA , U CO y all l liCD .... a LL r 0 I 101.- 0 O \II tr) rLO N i rr •r iip .1- , 1 r i • ISIS • r rnalliallinntin . , . r I I r a ♦ • gib es Ir r ,•r _ i • •a ` a • a - • r • •asie V'- I • r • • ala w ea 4IS _ _ r I — — _ _ ��. I ��� r Pei IS Iarrint 1 I lar---,1• a k ••- rwr �.•... ' r- III ■ II R`r .111 li r a af - IM -r _ • • I - - -. - a dill --. w. aS -■ O. • -=a-.-v. •-... • Meeting with Pawnee Fire Department 10 May 10, 2010 Subject: Cedar Creek II Wind Project On 6 May at 1:00 pm a meeting was held in Grover, CO to discuss the Emergency Response and Fire Protection and Prevention Plans for the Cedar Creek Wind Project with the Pawnee Volunteer Fired Department. Copies of the proposed emergency response plans were presented to Daniel Harms for his review and we will provide copies of the final plans when they are complete. The action items from the meeting are: - Provide a project map with grid coordinates to Pawnee Fire. We will provide enough copies of the plan to place a copy in each of the Pawnee Fire vehicle as well as 2 large maps to post in the Fire Department. The maps will have contact information for the points of contact for the project. - Provide a hand held radio to Pawnee Fire for coordination with Wind Farm Project personnel. - Invite Pawnee Fire to construction kick-off meeting. - Pawnee Fire personnel are First Responder trained but have no EMT or paramedics on staff. • - Pawnee Fire will be a backup to New Raymer for any issues on the project with the exception of the work within their coverage area. - Response time will be approximately 30 minutes. - We will need to get the direct dial phone number to emergency dispatch because we are not certain where calls to 911 will be routed. We also discussed the location of the closest Life Flight for the project and were informed that the nearest locations were Greely, CO and Scott's Bluff, NE. Greely is also a Trauma 1 hospital. Attendance Roster attached. • Nat& C / /Q I 7 6 P J as4.4,, y et e p, cant 4 e. v ar '5 QEr /rya-,14O4 ,/,. .-.74:jy. ai,7 fk-i-5��1'^^�ace k�et- crercer ioWberener9j -cm- -.) /A 2 r' 4E tl°soak. kWc®t'c in e,,e,• /4141,,ea' 239, Kim Rc?.nck I ph P kA m ht-r`l y . rerx I ph4 bp.con 6 /� /��,S,4re �/c' /4,,7/. A3h,re 40. 0on,. n,� �Jc"vQv G��1 VR-%, �V �UV :�, ����ia���� b�, CAM c3t1-57 `it �CQ�1�11g� �C,ifli, lS ?otwu F7vL.p gift,ocOC ✓ Qi /;cow ti‘\cs.,r ;�, :2 t..)..., ,_ `�E 1 11�.-;1,S cr. 61O.\i,.,:f.....,,,,,c1 ,7_‘•,,.. /fin • 0 • > 0 0) CO N N 0 0 N 0 a a M CO N N 0 0) 0 CO N m 0 0 N r a CD CO (0 N a0 M y a CO CO a CO CO 0 OD CO OD CO CO M CO CO CO CO M N CO N N r N N N N N r N N N N N N N r Y 0 (00000 (0 ODOODM CO0 mm 000000OD0 mm (00000000 COOOD C00 W (ofo '9 (o (0 (o (0 (0 (0 (o (0 (o '9 (0 (0W(0 (9 (9 '9 (0 (0 (0 '9re '9 '9a? '9 '99zzz'9 (9 '9u? (9 W 73333333333333333333333333333333333333 3 Z O O o o o o o o o 0 o o o o o o o o o 0 o o o o o o o o 0 o o o o o o o o d o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N r0m ra CO 0m NOOr r 0 CD CO 00ra CO 00 Nr a 0M Nm O0r0) (O0 Q yr rr r (D CO 0 O (0 (D O 00 CO 00 CD Q3 000 O N 00 (0 (Om (O O) LL amaomma$$DT °F m9c95“91:9T, m (OmmmazzDmezzD zzmmmmm (o 0omazzDmwrcon ° , 3333333333333333333333333333333333333 5 13 6666666666666666666666666666666666666 a 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N (9 N N N O Q L j m C O V y0,J J J W J J W W J W J W J W J LU J J J W J J W J W J LU J W J LU J J W J W W r Y G X a: EJLLLLLLOLLI¢LOOLLO � OLLOLLOLL ¢ (LLOLI- LI- OLLOLLOLLOLLOLL (LOLLOO N r £ ZZ Z 0 c)COCOMZCOMZ ZCOZCOZ (OZCOZCOCOWZMCOZ (OZ (OZ (OZ (0Z000OZCOZZ a- o w C Q V W 0 2 ¢ '� a . A ? C L J CM 0) 0) 0) 0) 0) 0) CD 0) 0) 0) CD CD m rn m 0) O) O) 0) 0) O m m m m m m m m ar mm Ca V O Z = Q 007007 m Mm Co 007 MMM M COCO MMM 007 (0 00o007 CoMM 007 (0000o Mm Co CO MMMMM MMm c C J N (D (0 N 0 0 O) N N N N N 0 CO 0 N M CO m 0 CO CO CO M m 0 N M 0 CO 0 a 0 CO CO r 0 7 jp M0 NO) 03 (0 C0000 (0 r co Na (ON (0a co (OM * Co aN CO N OO O) N o00 I > Q (MD (N N (NO (N N N N (NO N N (O N N N CM N N (NO N N (N0 N LU N (N N N (0 (CV N N 0 N N N (N0 N W " C0ONON as NO) amr (O a coa M co NM CO CO 11) c0NM0 mr mr (0M r0001� N a0 cu a 0a 0M CON r a a N (0 r) 0 m mr (0 N Mr Z (NOaCNCV 00aCCo C O 7 M '- r a N (MO 7N N r a CC N (0O d N (N N , a CO CO 6 15 0 0 0 r 0 0 0 0 0 m 0) 0) m m m O0 C0 m co w m 0 r N N r N N N N (n tf) (n (D (O N (D (D to co (O (D (D (n (n u) a a a a a a a a a a a a a a a a a a a a a 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J co CO r a 0 (O N N a 0) N 0) CO 0 (0 CO N N a o (D N o M 0 0) CO CO r 0 0 N CO (O N 0 0) CO NCO m 0 0 vl V m M r 0 CO 0 N N No! N N 0) N N (D N O 0 n m a m (D CO N CO Q O O (O 0 0 N M N a 0) o N 7 0 (0 r 0 (.j h M N a M M N N 6 (O r 0 N M 6 66 Z r N r NCO r r r r CO N 0 0 N N M a r (0 N M a r r a a N M CO a CO a N r N U) N N N LO N N (LOU) CO0 LO Ln N (O N N (00 N U) N (0 N (0O N N N N (O N (0O N CO co0 N N N N (0O N r c O O O o O O O O o O O O O O O o o O O O O o O O O O O O O o o O O O O o 0 J a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a N M a 0 r 0 m O r N M a (O 0 r �o m lc; N M a (0 0 r m O Lucy' N a (O 0 r 0 0 0 0 0 0 0 0 N N N N N N 1E' N N M M M M M M M • 3 0000WWWWWWW000000WWWWWWWWWWWWWWWWWWWW f C7 C7 C7 C7 C7 C7 C7 C7 C7 U' (7 (7 (7 (7 (7 (7 C7 C7C7C7C7C7 (7 C7 C7 C7 C7 (7 C7 C7 C7 C7 C7 C7 C7 C7 C7 r N M a 0 0 r 0 m O r N M a 0 (O r 0 m o N gin 0 r 0 N M a N 0 r N N N N N N N N N N M M M M M M M M 2 Q 0 O 0 N r I() O r Co O N (o (n o) 4r CO Co N Co r Ln O O d' co Co N (` (o r c ) ZJ 72 12 1 a d'' O CO r N r N r r r CD r r (.o r Co (o r CD r 0 (D 0 Co (D 0 0 CO 0 w CD 0 0 Q) w O O O W CO CO CO CO co W Co Co Co co co Co Co co Co CO Co CO CO Co Co CO CO Co CO C C C C C C C C CO CO CO u) '9 CO (D CD (D CO (D (D (D O Co (D (9 (o (o O Co CD Co 0 Cp (D CD Co CD O -J-8 -8 .C .C -8 .0 .D (D CD CO cc E !- I- f- f- �- f- f- I- F- H f- f- f- I— f- n a .fl .O .o n .0 Zo000000000000000000000000065 [1565656656'5 l in not ni innsn% in 000 61.J W T r T 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Z N N N N N N N N N N N N N N N N N N N N N N N N N N �. F- f- f- 12 ♦- 1:21— N N N >r Ln d' CO CO In N CO N r r- O 0) O O CO CO r CO Co (n co 4- d Co co N N r O r CO) CO 0 N- C (n a) is) a) (n a) a) Ln a) C ) (n a) a) W in Ct Co d d Co (o d Co d d• Co "t co d' co CO co d• t` r d r C W fl N- CO W N N- CO N W W W W W(� r- N- N oo N- r r� CO CO N- N CO W H H N N N ZHHHHIHIHIHHI— I— }— HHHHI- IH HP- HF- H , HP- F- H 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 & 00000000000000000000000000 0 0000000000 0 0 0 0 NNNNNNNN0 • G) ^ C O O 'D = N V 3 E -' iZQZi LiJ ainCCZCEZZCCZmiZCCZZ al cciZCC CCZCC * Y N z E rnu- OLI- OLL LOLL- LL- OI-I- OOLL QU L 0LI- 00W Li- OrL I.LQW C 0 CWZ W Z W W W Z W W Z W Z Z Cn Z W W Z W Z Z W W Z W Cn Z C/) • Q L. w O X C) J Oa) .t mJ a) a) a) a) 0) a) a) C) a) a) a) rn a) a) a) coma)rn a) C) a) a) a) a) a) a) a) a) a) a) a) a) o) 0) 0) 00 0 Z W W W CO CO CO W CO W CO Co CO W Co CO W W W CO W W W Co CO W Co W CO 00 W W W W W r 1 - r 0 Q CO CO 01 0) CO 0) c7 CO C) C'7 0) CO CO CO CO CO CO CO CO CO CO CO CO CO Co CO Cr) CO CO CO CO Cr) CO CO d 4t 4- C C o r0r` NNrrr r-- r-- d d Cr (nr-- rd' Cod' 4r (oWd' In oa) WNrnN 0 > W r o r� CD inN Co N. co N N r- N Co Co In 4- co N Ln co co 4- it C) (n 'd d• co co C\IN co co N N N o L a) Q (n Ln in In CO (n lf) Ln Ln In Ln In V) (n (f) (n If) In (n (f) (n Ln I ) (n In In (n (n lf) (t) (n In (n (n (n tOIn O 0) 't CO r 0 Co CO CO a) (n N- C N a N) O O ) r 0 CD t N W CO In 1.0 (D a) O 0 CO a) N L.0N v N N O r Q) h (n r 0 N O CIS CO a) Co CO r- r CO r 11) co a) N (fl N W (D O r < N CO r Co O d- N aj N (D a) 0 O M a) N N N CD N 0) O N Ln (D N (n (n tp N W et- CV O N N Z to d' CO d• CO r r Ln d CO N N r In d' N CO CO CO N N r CO N r C) 0 N r (n (n CO In CO r z d 't d d d d' it d d d d d d' d d d• d' d' d d' d' d' d d In (A ( ) C Co co Co CO CO CO C) CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO ('') CO CO CO CO CO CO CO CO CO CD CO D 0000000 000000000000000000000000000000 J cpNN CT) (n 't0N r (oa) 000L0000 N '- N- ) N- cy) CO (O CO CO lf) CD ) CDCGIn O r-- O Co Q) r a) a1 a) CO r d CO (C) a) In r Co d d In d d (T a, CO N O W 00 CD d' CO 0 r to (n < O CD N d cc) r (D a) r- r In N N W a) a) O C) N (NI (0 r C„) a) CD N C.j aj 0 CO Co a) W Z r r- N N CO CO Lf) r 't CO CO d' 't d' CO r N CO CO d r It) r N d d N r r 13 CO CD CO r` N Co Co Co CD CD CD Co Co N- N r N- N N co (o co N co Co co 4t 'I' It d N N N Ln Ln CO (n In Ln (n L ) L ) In In to (n (f) (n Ln Ln L ) Ln in IS) In In I ) In L() (n (n to (n co (n IC) In (C) (p Lc) 4.4 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d d d' d d 't d d d' d' 't 't V 'C V d d d' d d d `S d d N (o C W a) O r N CO 't LC) CD r co a) o r N CO "t If) O Co a) O r N CO d Cn CD r� CO CI) O T O O C) C) d' d' d' d' d' d' d' d' In to 11') to Ln to In to cD CD (D CD O (D W W IT CD t` iris tD Q) e O W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W s V -aD z 0000000000000000000000000000000000 000` Z 2. Z Co a) o r• N CO d' Ln CD N Co a) o r N CO d' In CD N CO 0) 0 r- N CO t Ln (D CO CO d' 't d d d d d d d d (n to (n Lc) (n In (n (n In In CO O W W (D C0 C0 I >, (A CO N r 0 O CO N (O I� CO Ln Ln 't CO 't N 0 O CO CO t\ CO N Ln 't CO T O N C3) r 0 O O CO Ln Ln O O O O CI) Ln Ln CA (3) O Ln O CT) Ln O O O O Ln CO CO CO Ln CO CO CO Ln Ln co d' co co d O CO CO O CO N (` O CO N t` t\ CO N CO I"- (` t` CO N co N t\ N co co t\ co N t` CO N (\ i CD CO CD O CO CO O CD (O Cfl O CO CO CD CD (D O a) Cfl a) O CO CD O (O CO CD O CO O (O CO CO O O CO O < E F- H F- H. H. H. F- F- H H F- H F- F- F- F- F- F- I-- I- I- I-- I- F- I- Zit 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a) o o o o o o o o o o 0 0 0 o o o o o o o o o o o o o o o 0 o o o o o o o o Z N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N rr 0) CO CO Ln N it CO CD N Ln T O C D id- COV) CO t� C L CO N N r O CO r O N O (3) Ln d' CO C7 N Qco coC7 N N co N t` co N CO N N CD CD O CO CO CD CO 0 O co CO CD co Ln O C) Co Ln Ln N to to N to Lo Q -0 O CO r` O r` r` O r` O r` r` r` r CO r` O r` h r` O t` r` h CO O r` c9 h r O F- F- F- F- F- F- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 112 a 0 0 0 0 0 0 0 0 0 0 0 o N 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 N N to, 13 C m O 0 O o L 0 ‘es. c.) c W W J J J J J W W J J J W J J W J J J J W J J J W J J J in in J W J J W J J N �( i ai E ZZCCCLCECCtZZZCECCCCZCCCCZCCCCCCCCZCCCCCCZCCCC11ZZCCZCCCCZQCC att.= p y z g °1zzwu ccoccowzzcnncc/) zzcoccnzu) wcwwz cocci z(f)nccnnzzwzw! cwnzcOc(J) Li- N D c Z Z U CD O CC � 2 (13 L ,0. 43 it.00 cu a, ' C _^ =rn a0 0 O O 0 O O O O 0 O O O O O O O O O O O 0 0 O O O O O O O 0 CD 0 0 0 0 0 OrT T r T r T- T T in U Z " Q "cr v' 71- icr71- t 'cr � "t 'trt" '71- 'tzt 't ":t 't d" C C J O N LO CD CO LC) if) Ln Ln O Ln LO r CO N O O CO N 't CD CO CO O N ' CY O N N N LC) If) 5 VI (T N r r r o r 0 Ln O CD t`- Ln CD CO N CD Ln Ln CD CO 0 0 0 CO 0 0 0 0 0 0 1 Q in in U7 to E ) to i CV CI n in In t 00 CO Of) l Ln O LL ) in in LN CV to in in tr) to to IN Ln Ln Ln to Ln Ln to LO LO LC) CI W `f i D CA OM Ln N r CO r N CO L O 0 r Ln CO Ln N r N O CO d- CO O 0 In O tf) r DN N Ln -d- CC? C ) N co O C) C) N C) In O CO CD d CD (:)(1) r O) Ln N r LO CO O NU) Ln CO r r t` N C9 ai co O N C) C') N Ln (� N� 6 (D T O (v) OT t co CON O Ncri N: N r Lf) t Z In co O it) N T- T- to Ln Ln In CO r rr LO r O O O 0) O r r r 0 0 0 0 co O 0) 0) co co co co r` (3) CT CO CO r` CO CD (O CD O CO CO CO N 3 In Ln Ln In an In Ln in in Ln In V 71- 't d it get -t C CO CO C) C ) CO CO CO C) CO CO CO C) CO C ) CO CO CO CO CO CO C') C) CO CO CO C-) CO CO CO CO CO CO CO CO CO CO CO 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 000 J V r co N I"- CO CO r C ) it r O) Ln co r O Lf) .z co N r O CO CO LC) N CO LO V' O ,ct. r., O O N (O) CO N N O CO O Ln r CO t-- O CO O Cr N N d N t` Lf) (T O C3) N Ln N d- CO CO CO O to CO Q N a (D r r•-: (O 4 CO Ncid aiLn O Ln O T C) N (i N h in 6 n O) Z N N N r N Lf) r r r N 't CO CO to N N r r NN "Ch V' Ln 'CrCO CO r r CO Ln Op• NNNNNN CO C) CO C) CO cr N N N C) CO CO CO icr V `c vcr Ln Ln Ln Ln Ln CO CO CO 3 Ln Ln Ln In LS) LO Ln L ) Ln Ln Lf) Ln tf) Ln LO Ln Ln If) Ln Ln Ln LO Ln Ln Ln LO Ln L.0 In Ln LC) LC) Ln L7 to LO Ln rsed 0000000000000000000000000000000000000 't '7 Nt .7 d -7r ,t ‘t i -ct .zr 't in co N co 0) O r N CO 'cr Ln O N CO 0) 0 ((r N CO 't U) CO N O 0) 0 r N CO 't LI) O N co O) 0 co 000000 x X X X X X X X X X X x X X X X X X X X CO X CO CO CO CO CO CO X x(711 X n 0 N o w 0 CD N 0 a CD CD 0 CD CV a) CU 0 CD 0 0 0 O O 0 O N 0 0 0 CD CD 0 0 0 0 0 CD CU • i — -2 -2 -2 -2 t t -2 -2 a -2 -2 "D -2 D a a 'a a 'D 'D '6 - D 'D "D a 'a T2 '2 "2 'a 'D 'a t Z7 '� L L ►.. L L L L L L L L. L L L L L L L L ►... L ` L L L L ►. L L L L L L L L L. L 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 z0 0 0 0 z0/ O •(0 zzzzzzzzzzzzzzz 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 zzzzzzzzzzzzzzz CO CA O r N CO 'r O (D co O r N CO dr Ln CO co (O) O r N C7 't LC) CO O 0) O r o C) (D CO CO N N N N N N N N N N co co co co co co co co co co O a) Q) (n () CA (7) 0 0 0 or O T"- r r r 0 0 0 0 T T T T 0 T Cr re) T as as M , T T 0 0 0 0 0 T T T T T 0 0 0 0 0 0 0 0 0 0 OOOOOOOOO E E E EE E CL ^^ ^^� ?, rrcoCo Li) d' Lcco4- rcoo Na) rCDrL1) aaaaa1:3 -13 0OoorON •;1 r d' r r v r 'a r r d r o r r co co co co co v' co 0 0 0 a) 0 0 0 0 c cO co co co r co a r corrl)orrooroorroorrcDrrrcor c c c c c c c crn0rnrnrnrnrnrnrn L O O Co O O O CO CD CD Co CD Co Co co CD O cD Co O CD 0 0 0 0 0 0 0 0 In L-9 In In In Lc) In co O o O o 0 0 0 o O O O O o O o O O O O O m m m m m m m m o o O o O o o O O 0 O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Z N N N N N N N N N N N N N N N N N N N N H f.- H i- i- f- F- F- N N N N N N N N N r r 0 0 0 co LC) r d (D CO !.f) N et CO r N r O O O N CO CO CO CO In et Q N If) LO N et N N N N et N et d N V' co r co r r M CO CO Q A M r CO r r aD r Co r CO oo r r c)? N.- r co r r CO r M c"? r r z HH HHHH ►- - H )— >, m u o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 N O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N 000000 N N C:(1 _ a C m Or 0 'o r te. o o U C W J J W J J W J W J J W J J W J J J W •— — N X I ai E -iin 222222222 C N F- E Z c c zz cf) w z c ? cn z co z cf) ct z c) cn z cn cn cn z c� 000000000 L i qt, Q L w O m a mu. Z CO a C d o 0 0 0 0 0 0 0 0 0 o O 0 0 o O 0 0 0 0 0 0 0 0 0 0 O 0 N N N N N N N N N U c r Z ? Q ct 4- d' 4- d' 4- 4' .' d' d' .4 d' 't rt ct ct ‘t d' �t d' d' '4 d' N N N N N N N N N J r O N in LO LO noon oCOO) CO O 0 CO O O r N CO r (D M d' CO r N 1.0M O) Lf) LO Co C w r r O O O O O CO CO (3) r o0 CO N N O 0 r r CO CO N O r N r r%. O r O CO O r N NN cp QO *- o O r r O r 0 0 0 0 0 0 0 0 0) 0 0 0 0 0 0 0 0 0 0 O O r O N M N M M N to Ln In Ln Ln Ln Ln Ln LC) LO Ln LO LO LO LO LC) it Ln Ln Ln Ln in in d Ln to to En in to Ln in in in IA up Ln 0 W is? CO N 0 O O Co O CO LO r Co d' CO LO O CO Co CO CO N- O) O N O O) In Co CD CO CO LO CO r CO CO Ln O r CO c0 CO r CO O N r r CO CO O N �t LC) d' O C7) co O O r d' r .— c0 co O co 74- r Ln Lo Q N �j [� M O r CD r M O) d' O N N Ln r r c3 r C3) Co If) N r M O r Ln N 0 r 0 Lf) Z co N r r r LO V CO N r r Cr Co CO N r r Lf) CO CO CO N r LO r Ln Lf) Ln 't CO CO LO -0 N N N r r N N N LO LC) et et e' et er LO d et et d et d' 0 N N CO 'et mt 't vt Cr " qt .ct Nt LO LO LO LO LO CO Co Co CO CO Co Co Co Co CO M Co CO CO M CO CO CO Co CO C ) CO CO CO CO CO CO CO CO CO CO CO Co CO Co CO CO CO D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Co 0 0 0 0 0 0 0 0 0 0 0 0 0 J CO N O Co CO COr �3 O r N CO et N Ln N r N CO if) CO LO co CO d d; C 'C N N OD r 01) CO et to in O CO r O O Q N co o0 Oi O Ct r cci o O) V O O O O O M co Ln O c 4 O CV r to CD r r M Ln CD z N CO LO LO L1) r NNN Ln LO N N CO LOr N N N "1- Lf) r N (-0 N N r r N N r d CO Co CO CD r r CO CO CO CO r r co 4- 4- d- co 4t d 4- 4t Ct 4 co d d d r Co co 0o Ln Ln to co co Co Lf) LO LO LO LO LC) L!) LC) LO LO if) LO LO LO LO LO LO LO LO LC) Cr) Lf) LO LO Lf) Ln L() LO if) LULU Lf) Ln Ln Ln LL)efl Ln 0 0 0 o 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 o o o 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 J it d .4 .4 .' it er et d' �t d' et d d d .' d' d' .4 �t it �t d r N CO icrLn CD r Co O) O r N M LO CD r CO O) 0 r N M d LO CD r co �t .4er d' d' d Ln L ) LO Ln LO LO LO LO Ln LO CO CO CD CO CO CO O Co CD N CO 't Ln CO r CO CA C X X X X X X X X X X X X X X X X X X X X X X X X X X X X 0 0 0 0 0 0 0 0 0 CU CU CL) 0 a) 0 0 0 0 CV 0 0 CU CV CL) CD CD CL) Cll (U a) 0 0 0 0 0 CD U U U U U U U U) U a -0 -a 'vaaaaaaaaaaa -0aaa '0aaaaaaa a as asas as cts as as as 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 22222222 zzzzzzzzzzzzzzzzzzzzzzzzzzzz co r co O) O r N C ) er LI) co N co O) O r N CO 0 0 0 0 0 0 N N N N r N CO 't LO Co r CO O) 0 0 0 0 T T T T C7 f7 M C7 • as as I T T T I 1 I I I O O 00 T T T T T T T T V 8 8 O 3 33 H H H.° H H li 76 IT i 15 15 EE € EE H H a H H >' CO N r 0 a) 'Q CO CD CO CD Ln O O 0) CJ) 0) 0) — " Ln 19 L9 Ln Ln QE H I- I-- H- 2 00000 o 00000 Z N N N N N < tij Q .Q LL E 0 7 = Z o• >' 5v a " ) a) O v c °t co O p O c a, N 3 °) 10-Ct N ~ F Z E c 0 0 0 O O o QU Tr.O Ct � C L a) O CC a cai% z aDes ^. m a) th O sc J N N N N N co co co co co O cc r Z � Cu a NN N N N 6 O C a CO 7 Iji Cn C O O CamO CO CO "_ O 0 Q LNn Lin LO LO in O aW •� cn .5 Y A\ M N co coCD in cm Q. • N v Mgt 0 JE Z LO v NN r 0 .« Z O) 0 • co co v v v :cc >, 0) zvvvvv � :c -- a) C 45).r cn v> > (13 ta2 C c � ccococococo al EL: a , 000000 N >, c o J 2 a) C .7 = o O D 0 > co I - Cl. CO 0 CO U (U Ct O CD LO O r I` ? C O < O CD co O CD n( 2 cn Z v v T T r — 4^, '....0" m E c m a) M C ._ _C CO W CO CO W D V 1 O 1 O vv m LO LO LO Lc) LC) '1 I -j_J 2 O a.( 0 0 0 0 0 J v v v v v Q u O z Q C O r N M v ..15• O_ cn cn cn cn O r N CO v W O et H Z Fz ao U W H .4 � 0 O 0 W a m z O a Y W F e X F :4 z w a a U 00 H F a F C.1) C C F o O ro ro ro ro v a °J a A m .��2 o 2 2 2 2 0 O O 0 s.O O 2 UH Lin ce,h U ,,, ,, U ,e, ce, y a d 0 ;,� 0 a, 0 0 0 O Ca m U A 0 U � ��, Ca ca v C4 O O 0 0 v a O v a O O O C.) c c c c c v r"j c c v c c c a a a ;n 0 v ?' a a 0 v a a a w Fes- F F F E- U = U F F U .� F Fes- F O l- 2 ¢ O W j cc Ili O cc cc uj Z• Q F Z tu= W R Q• W J O aO cc a Z W z z z L L z L L L L L 00 09 W 00 00 00 00 b0 00 09 09 c4 a a z z z z g- a a U_ U_ V_ V_ V V U_ .Q U•_ U_ V z D L a a P L L z L ' ' = a a a a a a a a a a 0 C e > > U O O J > > > . 7 U 0 0 0 0 0 0 0 0 O O O x x x x x x x x x x x x U M M M M M M M o w o z A 0 0 0 0 0 0 0 0 0 0 0 ul U cell cell U U U O U U U U U U U U U U U U U U U U U Z Z z z Z z z z z z z U o d d >-• d 6 o n o o o ca 44 Cm) z z z z z z z z z z z „ 3 0 3 3 3 3 „ 3 „ 3 3 _ 3 _ 3 „ 3 [% O [% O w0 u. 0 v. O --- LE (5 4: o LE "c5 iz. 0 ii0 i% O 0 E z ? z a s m z z z z _ z z z z ti W Z z z z z z z z z z i COoF �i za � � 73 .7 3 33 63 d3 � 3 � 3 3 ° 3 a3 W v-, ryUj vri v^i W vni W v^i v^i W v^i W vii W In W In kn 44 U w w v) w ti W W vl a LC L7 W L7 W y W y W a w � C7 co � U � U � U � U � U � U � O IO ,., 0 Z — Z -. Z — Z -- Z — Z Z — Z — Z — z ^ Z Z i> wa wa Wa 3a 3a 3a 3a 3a Wa wa¢ 3a zx ice cnw cna vnc Z04 cna cnc4 Z z zs - a o F M T T T T T T T T T T T ICI W F ,a ro m m m w w C C a '" a 3 3 3 3 3 3 3 3 3 3 3 ►w+ OM a � 3 0 0 0 0 0 0 0 0 0 0 0 W // {L it. L L L L L t t L t L L w 00 00 00 00 00 00 00 00 W 09 09 C iY s zipz s 'ce w-- -0 ce z H . O 9 9tl 0 A A F ro .:4--- -O p a O 0 0 O O O O O O O O U >, N rx a 04 04 K X X a 04 C a .r a A Hin w a o . o o 0 0 r- 0 0 U .4- RS 4 di o o o? co -003 0 0 CO 0 0 0 0 O y o N G C En G w tt,m m O G Lc C y m m m w ^4 U -1 U •-� O U U U — — U — — U U U Cl 'c ❑ V ❑ U i G .m U U L ❑ G U r' G ❑ U t G U L U t U F o o R O N O A A o O N N 0 O A oo N N CO N ro. 0 C U O o f G C C a 0U O C a U U C a U G 0. ❑ � C 0 0 0 0 0 > > ❑ 0 0 0 .. 0 0 0 0 0 0 0 U U F U F U O F F F F U U U F UUU F U U F U F U F a a a a a a a a a a a - a a a a a a en be b0 W 09 O9 W b9 09 CO 09 W DO 00 DO W 09 CO a a ce a a a a z a z a a •iz z a a a a .. s = s s = = = = = = a a a a a a a a a a a a a a a a a C rE ea 4 4 a. 4 a 4 4 4 e $ a 4 0 0 0 O b b b b b b b b • O b b b b b T S O a a a S S a a S U S a - U S O O O O O O O O O O O O O Y O O a O O O O S x S S S T T S T S S T — S S S S x .0 —6 6 6 6 —6 —6 thr r r A — — C C' .o co — On Q` T P o\ro, N Cl Al O P O\ O O 0 O - O O 0 O O S O O O 0 S O O 1 'I � et 1- 1- 1- � et V 1- 1- � et et V) N y N h y y h en h h of h h N H y N Z Z. Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z 0 0 0 > C C > 0 0 c 0 0 0 C 0 0 r 0 c 0 G 0 > 0 Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z _ 3 „ 3 _ 3 _ 3 „ 3 3 3 3 � 3 _ 3 3 „ 3 v3 6, 3 _ 3 „ 3 3 „ 3 w w w w w w C- w w to* •"- ti O 0. O iL a [� a 'v: O LEO k O i% O i% O iL O 'u. O u. O i% O '¢. O tE LEO LEO w O z z z z z z ? z z z ? z z z z z _ _ _ - ? z _ _ _ _ z z • rc o O o N n cr. in V7 in in W 00 - N N N CL U3 U3 w3 w3 - 3 - 3 U w3 w ai vi w 6 6 c N ti ti y3 3 n3 N3 N3 n3 � 3 � 3 w3 a [i] W [i1 U] U] W W r [i7 y U] r r r r r r r ti o0 ,., V V -o V V V _ V V h U V u, v1 v1 vi in in in Z -. Z — Z -' Z Z Z — Z — CU — Z '-' Z — W _ W W — wk..: i7 — ❑] — ❑] — W — th a w W aa 3a 3a 3a 3a wo 3a 3a w 30 3v 30 30 wC 3c: wv a h za in Ana Za DO ("IX Za cnX Ana Za Z 0 ZOO Z 0 coca Za tia coCC COco ro CO CO co CO C CO co o CO CO CO CO CO ro co 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 w in w in w w w w w w 0 0 0 `o `o 0 0 0 0 0 ` w 0 0 o 0 0 0 0 0 a a a a a a a a a a a a a a a a a a 00 09 M 60 09 W DO 09 00 09 00 00 DO W W W 00 00 'a 'a z a a ix 4 'a 'a z a - z - 'a -o 'O -o -o 9 9 -o 'O 'O -o -o -o -o 9 'O -o 'O '0 CO CO CO CO CO CO CO CO CO CO CO CO co CO CO CO a a a a O a a a O O a a a0 a0 a a a a N en in OO 00 _ O - N M Ea in Lot r co O1 '"' - - - - _ - eN Cl N EN N. N N Cl G 9u 9 9 9 ng 9 9 9 -o -a 9 9 aN N N C a N a C O o 2 2 2 O O 2 O 2 O O O se.w d U m m m d m m m w N m m O m y a) m ac m ai d d 0 d m d dC c vl o_ u = O 0 0 = O O O 0 = 0 O = 0 ._ - O t t m `� m G a C C a ° ° c A o I n o o O 0 0 E c � 0 c c N V I) V N V V V y V ) CV C C C C) C C o = p i) = F F U U U F E F U F F a a U H F U C U a H a a a a a a a a a a a a a a a a a a V C 09 09 00 00 0)) 00 09 00 r 00 00 00 00 00 00 00 09 00 i--� a a a 'z K. & z 'a a ce "X a 62 'z 'ce X 'a 'a a N y U O U_ o_ o U_ U o_ o_ o V_ U_ o_ o_ o_ O O o 70:l L a L a a a l) a a a a a- a a a a a a ..-5.- C C a.. a.. 4 0. 4 re a.. a a e d & - S e e 4 4 vi En O O b O O O O O O O O b O b O b b b ' b b b .o .o .o .0 .O .o .0 .o .0 .o .o .0 .0 .O .o .o — .. — — 5 — — .. f. — —, — .-. — O a a a a a a O O O a a O O O a a a O O O O O O O O O O O O O O O O O O O O S S S S S x S S S S S S S S x S S S S S a a .n a• c a a M M M M o. M M oo M ,n M o. vi P P O P U P 0 O O 0 O U P C O O O O P O an O en O en en O O 8 O O en en 8 O O O O o O 0 0 0 0 or or 0 0 S or 0 co 0 O S O O 1 a a a e a a a a a a a a v q a a a 1- a U, 07 G7 (A 07 V) 07 U (A N U, V) h U, N h U, 07 U, N z z z z z z z z z z z z z z z z z z z z .. O r` O r,,-. 0 T a T 0 T 0 T O T 0 T a T O T O T G T 0 T a T O T O O T O T 0 a O N N N F R N N N .O N N N F F ,>d• N N Z5. z z z z. Z z �. z z z Z Z ''' Z z z z z z z E a3 ^ 3 v3 V � 3 � 3 � 3 v3 � 3 � 3 � 3 � 3 ^ � 3 � 3 � 3 v3 � C) w w w w w w w w w 4- w0 tEo L: a ito .4OO v: o LEO Ea u. o LEO � o : O u. `O u. o U. o ito � O 'wO 'ww LEw z z z ? z z z z z z z z z z z z z z z Z z Z z z >r Z ZZ Z z Z, z Z Z O O - Z Z F �^ `r F-� E F F of m re; .+i a vc vi vi vi a N N N N N a a 7I: M M cA � 3 � 3 � 3 h ti w v) [LI N 3 � 3 ti w w w 3 U 6 U c:.) U U w � � � � � � 00 co 00 � 00 N3 o0 ti00 00 3 00 � N NN g0 In 't � in aN kn aN ‘Tr In vin aN Cvl � in aan -et In a � gh � m vin cm — w cw7 3 3— v 3 v 3 v 3 p ^ vi - w - v� ^ w - cu u - v - ail - w ^ w - vi - vS w zx zz Na zs c, a za coX za zz coz c (X coa za zz � z zs WO zz ha za Ca C L O P O co.) O y P 0 Cv 0 N C m N N N N C .a N cc> C C .a C C C .C N Cg d g 3 3 - 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 0 0 `0 `0 0 0 `0 `0 `0 w0 `0 0 0 0 0 0 0 0 C) c d a a a a a a a a a a a a a a a a a a a C a N 00 00 00 .09 00 00 00 00 09 09 00 00 00 00 au 09 09 00 U U X a z 0 a s a z a z a a 'a ce z a 'z s a) 9 9 9 9 9 9 'O 9 9 9 9 9 9 9 9 9 9 9 Q y y m el t0 n m m .C .C n m ro C C C C C tC N en co va z I0 K0 C0 C4COQ a0 a0 c0 COQ K0 X L00 c0 00 X0 ROB. OO U, O — N t a .O In 0n 0. O N en a tr. .O ZN ^ I N eno - en en_ en en' en en00 an a ^ a a a a a ^ N N ^ ^ N N I n ro - A 2 2 2 0 0 c C Y U .e 0 0 d C U e y C C Z s s 0 8 = .c c c 0 0 0 C 0 0 o a a u CO .o a o o d o C o C o o c c o o e c o c o a .t E ?' 0 c a a °' q O O a °' a °' •air. °' C o ❑ c o o o 0 o 0 o e o i° U U U F F U U U U F U F U F U F v C) N N m C) C) N m N N u Y C) N C 0 C C C = = C C C C 0 0 0 C O d N N m m N N N N N N m m C) a a a a a a a a a a a a a a a m m ci n .E F ci t0 n N ci m co ci ci U U U U U U U U U U U U U U U in Vl in.6 in.6 in in in in incc inco in.6 in.6 .6 co in v6 ci 'a a a a a a a a a a a a a a a a O O O O O O O O O O O O O O O S S 2 2 2 2 2 2 2 S 2 S 2 2 S o_ o_ o_ o_ e .n CA M A Arn .n a` a` a o a 0' 0 0 0 0 0 o 0 0 T 0 0 0 0 0 0 0 0 0 0 � a v a M v a a a e a v a a -1- z 00 c 00 J rii C J, 00 h h 00 00 c), U U U U U U U U U U U U U U U z z z z Z z z z z z z z Z z z c c c c 7 c c c c c c c c 7 c o d 60 o d o d 6 d 6 d 6 d o d 60 o 0 60 o 0 o d o d 6 d zE z E z E Z E zE z E z E z E zE zE zE zE z E z E zE m0 h y h y °' °' h m ,o el r r_' m °? a a� c a� e e m e � m e = c °r a m e iiw ii: ELI iiw 'u. w u; w ww LE c4 G: w LE t�. w n. w il: w tr: w t. w CZ ill z z z z ? z z z z z z ? Z z z Vl V1 N vi vi N N 45 � 3 ", 3 N3 N3 y3 w3 W3 W3 y3 � 3 "' 3 c3 � 3 N3 W3 N N a N K N 00 00 cn co W 00 't 00 00 m. 00 00 oo N 00 .0- in .5- in In Fv, � ? � � g � ain � � ZU In a � QV2 � � w- al m cw7 3 V] 3 v 11.10 ' w — a$ -. ry al — Gil ry w ^ w - w ZC4 Za Za Zs Zx wt., cz Zs Za ZC4 Za Za w) c4 r3nz ca UX a a a a a a a a a no a I a a a m m o es n n n ro m m e m n m .G L e t .C a L g L 9 t S. t L e L .C' s t o L e P P P P P P P P P P P P P P P O V1 O L7 O y O y Oct O rn O y O h Oct O y Oct O rn O (n Oct Oct P T P T D\ co P P T 4\ D\ co co Q` Y N N N N N N U 4l N N N N N 4J • 0 • 0 0 0 0 0 0 ' Cl O 0 U V u 0 0 O 0 ' o 0• C E c0 E e C C6 05 2 C6 E C E a.J0 N G C C e C C6 OO E C6' C05 0 C tC C G �E G C C G ro C C C � G N C [tl G G C C ▪ G C C C G G C C C C C e C C C Q C IDE el“ 0 .0 O c a> c VC 00 O c 00- 00 00 O 0 QC 00 a _N a a .0 a a N a N a N a a N a 0 a a N a a N cs cl U '' U � U cl � U el •C U 'C U ' U ' 'cid et CZ UPC' U CO cI � U cl � U cl � U 'C U el el C' U '03 ' UPC' N m N N u N N N N N m N U •i :1) "4 :1) 271.)' ay ¢ y ¢ ¢ y ah ¢ y ¢ y ¢ y < . ¢ 7U ¢ ¢ 7 vi .•1, vi '1, Ct .2 00 ._ ( .= vi .,> vi .•4 ct .= ct .= vi C4 V) .= V) .: Vi .C4 C .= C; .= 7 a 7 2 j 2 5 5 5 7 5 a 5 5 5 5 ' j 5 5 5 5 5 5 5 en in .G N 00 0' 0_ —_ N en u1 bN O 0 0 O 0 O - - -N N N N N N N N N N N N N N N Federal Aviation Administration Aeronautical Study No. (.... Air Traffic Airspace Branch, ASW-520 2010-WTW-6840-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-817-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE01 0452.TX.001 Location: New Raymer, CO Latitude: 40-55-10.98N NAD 83 Longitude: 103-51-52.13W Heights: 389 feet above ground level (AGL) 5691 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. al Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6840-OE. Signature Control No: 701400-126001570 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 "" Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6839-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-816-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE02 Location: New Raymer, CO Latitude: 40-55-20.87N NAD 83 Longitude: 103-51-48.90W Heights: 389 feet above ground level (AGL) 5661 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6839-OE. Signature Control No: 701399-126001569 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. C.) , Air Traffic Airspace Branch, ASW-520 2010-WTW-6838-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-819-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE03 Location: New Raymer, CO Latitude: 40-55-16.24N NAD 83 Longitude: 103-51-30.12W Heights: 389 feet above ground level (AGL) 5684 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6838-OE. Signature Control No: 701398-126001563 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6842-OE ` 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-871-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE04 Location: New Raymer, CO Latitude: 40-55-26.36N NAD 83 Longitude: 103-51-26.50W Heights: 389 feet above ground level (AGL) 5671 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6842-OE. Signature Control No: 701402-126001829 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6837-OE ' 2601 Meacham Blvd. Prior Study No. Fort Worth, TX 76137-0520 2010-WTW-815-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE05 Location: New Raymer, CO Latitude: 40-55-38.95N NAD 83 Longitude: 103-51-26.32W Heights: 389 feet above ground level (AGL) 5654 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6837-OE. Signature Control No: 701397-126001560 (DNE -WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6836-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-814-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE06 Location: New Raymer, CO Latitude: 40-55-12.02N NAD 83 Longitude: 103-51-06.61W Heights: 389 feet above ground level (AGL) 5684 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6836-OE. Signature Control No: 701396-126001558 (DNE-WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. OAir Traffic Airspace Branch, ASW-520 2010-WTW-6886-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-813-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE07 Location: New Raymer, CO Latitude: 40-55-12.02N NAD 83 Longitude: 103-51-53.64W Heights: 389 feet above ground level (AGL) 5678 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6886-OE. Signature Control No: 701446-126001832 ( DNE -WT ) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6885-OE • 2601 Meacham Blvd. Prior Study No. Fort Worth, TX 76137-0520 2010-WTW-870-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE08 Location: New Raymer, CO Latitude: 40-55-14.44N NAD 83 Longitude: 103-50-43.04W Heights: 389 feet above ground level (AGL) 5681 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a . hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However,this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6885-OE. Signature Control No: 701445-126001845 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6835-OE �`� 2601 Meacham Blvd. Prior Study No. • _ ' Fort Worth, TX 76137-0520 2010-WTW-869-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE09 Location: New Raymer, CO Latitude: 40-55-19.49N NAD 83 Longitude: 103-50-35.05W Heights: 389 feet above ground level (AGL) 5674 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national , airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6835-OE. Signature Control No: 701395-126001555 (DNE -WT ) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6884-OE 2601 Meacham Blvd. Prior Study No. Fort Worth, TX 76137-0520 2010-WTW-812-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GEI0 Location: New Raymer, CO Latitude: 40-55-33.92N NAD 83 Longitude: 103-50-34.79W Heights: 389 feet above ground level (AGL) 5671 feet above mean sea level (AMSL) iiiiThis aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6884-OE. Signature Control No: 701444-126001835 ( DNE -WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6834-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-868-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GEl 1 Location: New Raymer, CO Latitude: 40-55-50.39N NAD 83 Longitude: 103-51-00.26W Heights: 389 feet above ground level (AGL) 5654 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6834-OE. Signature Control No: 701394-126001553 ( DNE -WT ) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6883-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-811-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE12 Location: New Raymer, CO Latitude: 40-55-52.18N NAD 83 Longitude: 103-50-48.41W Heights: 389 feet above ground level (AGL) 5664 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However,this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6883-OE. Signature Control No: 701443-126001830 ( DNE -WT ) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6833-OE �` 2601 Meacham Blvd. Prior Study No. • ' Fort Worth, TX 76137-0520 2010-WTW-867-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE13 Location: New Raymer, CO Latitude: 40-55-54.OON NAD 83 Longitude: 103-50-35.64W Heights: 389 feet above ground level (AGL) 5645 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6833-OE. Signature Control No: 701393-126001552 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. OAir Traffic Airspace Branch, ASW-520 2010-WTW-6882-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-810-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE14 Location: New Raymer, CO Latitude: 40-56-20.85N NAD 83 Longitude: 103-50-14.99W Heights: 389 feet above ground level (AGL) 5642 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6882-OE. Signature Control No: 701442-126001828 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6832-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-809-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE15 Location: New Raymer, CO Latitude: 40-56-28.08N NAD 83 Longitude: 103-50-11.37W Heights: 389 feet above ground level (AGL) 5635 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6832-OE. Signature Control No: 701392-126001551 ( DNE -WT ) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6881-OE �`� 2601 Meacham Blvd. Prior Study No. 0 Fort Worth, TX 76137-0520 2010-WTW-866-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE16 Location: New Raymer, CO Latitude: 40-56-37.27N NAD 83 Longitude: 103-50-04.43W Heights: 389 feet above ground level (AGL) 5641 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6881-OE. Signature Control No: 701441-126001846 ( DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6831-OE 2601 Meacham Blvd. Prior Study No. 0 ___. ' Fort Worth, TX 76137-0520 2010-WTW-865-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE17 Location: New Raymer, CO Latitude: 40-56-40.27N NAD 83 Longitude: 103-49-53.05W Heights: 389 feet above ground level (AGL) 5612 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6831-OE. Signature Control No: 701391-126001550 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. �� Air Traffic Airspace Branch, ASW-520 2010-WTW-6830-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-808-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE18 Location: New Raymer, CO Latitude: 40-56-03.24N NAD 83 Longitude: 103-49-53.44W Heights: 389 feet above ground level (AGL) 5645 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6830-OE. Signature Control No: 701390-126001534 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6829-OE ` 2601 Meacham Blvd. Prior Study No. • _ _ Fort Worth, TX 76137-0520 2010-WTW-807-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE19 Location: New Raymer, CO Latitude: 40-56-17.20N NAD 83 Longitude: 103-49-48.88W Heights: 389 feet above ground level (AGL) 5638 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6829-OE. Signature Control No: 701389-126001531 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 -- Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6880-OE �` 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-864-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE20 Location: New Raymer, CO Latitude: 40-55-53.96N NAD 83 Longitude: 103-49-27.34W Heights: 389 feet above ground level (AGL) 5645 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6880-OE. Signature Control No: 701440-126001838 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6828-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-863-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE21 Location: New Raymer, CO Latitude: 40-56-02.25N NAD 83 Longitude: 103-49-23.61W Heights: 389 feet above ground level (AGL) 5642 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6828-OE. Signature Control No: 701388-126001529 (DNE -WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6827-OE 2601 Meacham Blvd. Prior Study No. • _._ Fort Worth, TX 76137-0520 2010-WTW-806-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE22 Location: New Raymer, CO Latitude: 40-55-24.20N NAD 83 Longitude: 103-49-11.21W Heights: 389 feet above ground level (AGL) 5634 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6827-OE. Signature Control No: 701387-126001516 ( DNE -WT ) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. jAir Traffic Airspace Branch, ASW-520 2010-WTW-6879-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-805-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE23 Location: New Raymer, CO Latitude: 40-55-33.93N NAD 83 Longitude: 103-48-47.73W Heights: 389 feet above ground level (AGL) 5635 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended,revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6879-OE. Signature Control No: 701439-126001836 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6826-OE �` j 2601 Meacham Blvd. Prior Study No. • __ Fort Worth, TX 76137-0520 2010-WTW-862-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE24 Location: New Raymer, CO Latitude: 40-55-43.21N NAD 83 Longitude: 103-48-43.41W Heights: 389 feet above ground level (AGL) 5622 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&I3(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2,Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6826-OE. Signature Control No: 701386-126001496 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6878-OE �` 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-861-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE25 Location: New Raymer, CO Latitude: 40-55-12.20N NAD 83 Longitude: 103-48-50.48W Heights: 389 feet above ground level (AGL) 5638 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a * hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6878-OE. Signature Control No: 701438-126001834 (DNE -WT) Earl Newalu Specialist M Page 2 of 2 Federal Aviation Administration Aeronautical Study No. �� Air Traffic Airspace Branch, ASW-520 2010-WTW-6825-OE " 2601 Meacham Blvd. Prior Study No. • _ _ ' Fort Worth, TX 76137-0520 2010-WTW-804-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE26 Location: New Raymer, CO Latitude: 40-55-12.69N NAD 83 Longitude: 103-48-29.22W Heights: 389 feet above ground level (AGL) 5626 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6825-OE. Signature Control No: 701385-126001487 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. :( Air Traffic Airspace Branch, ASW-520 2010-WTW-6877-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-860-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE27 Location: New Raymer, CO Latitude: 40-56-40.53N NAD 83 Longitude: 103-48-56.63W Heights: 389 feet above ground level (AGL) 5621 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6877-OE. Signature Control No: 701437-126001844 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6824-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-803-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE28 Location: New Raymer, CO Latitude: 40-56-46.08N NAD 83 Longitude: 103-48-47.38W Heights: 389 feet above ground level (AGL) 5602 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6824-OE. Signature Control No: 701384-126001493 (DNE -WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6876-OE ` . 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-802-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE29 Location: New Raymer, CO Latitude: 40-56-27.87N NAD 83 Longitude: 103-48-02.03W Heights: 389 feet above ground level (AGL) 5609 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6876-OE. Signature Control No: 701436-126001731 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. ii- ,( Air Traffic Airspace Branch, ASW-520 2010-WTW-6823-OE 2601 Meacham Blvd. Prior Study No. 0 Fort Worth, TX 76137-0520 2010-WTW-859-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE30 Location: New Raymer, CO Latitude: 40-56-30.71N NAD 83 Longitude: 103-47-53.98W Heights: 389 feet above ground level (AGL) 5592 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE i EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6823-OE. Signature Control No: 701383-126001387 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6875-OE I. (,; 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-801-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE31 Location: New Raymer, CO Latitude: 40-56-31.96N NAD 83 Longitude: 103-47-22.95W Heights: 389 feet above ground level (AGL) 5595 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6875-OE. Signature Control No: 701435-126001730 (DNE -WT ) Earl Newalu Specialist i • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6822-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-800-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE32 Location: New Raymer, CO Latitude: 40-56-41.40N NAD 83 Longitude: 103-47-13.17W Heights: 389 feet above ground level (AGL) 5583 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page I of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6822-OE. Signature Control No: 701382-126001386 (DNE -WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. , '( Air Traffic Airspace Branch, ASW-520 2010-WTW-6821-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-858-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE33 Location: New Raymer, CO Latitude: 40-55-35.95N NAD 83 Longitude: 103-47-46.24W Heights: 389 feet above ground level (AGL) 5609 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc.,which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6821-OE. Signature Control No: 701381-126001384 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. (.ib. Air Traffic Airspace Branch, ASW-520 2010-WTW-6874-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-857-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE34 Location: New Raymer, CO Latitude: 40-55-43.68N NAD 83 Longitude: 103-47-37.38W Heights: 389 feet above ground level (AGL) 5602 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6874-OE. Signature Control No: 701434-126001728 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6820-OE ' �`� 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-799-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE35 Location: New Raymer, CO Latitude: 40-55-53.65N NAD 83 Longitude: 103-47-31.65W Heights: 389 feet above ground level (AGL) 5592 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. . This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6820-OE. Signature Control No: 701380-126001378 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 - Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6873-OE ` 2601 Meacham Blvd. Prior Study No. • _ _ Fort Worth, TX 76137-0520 2010-WTW-856-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE36 Location: New Raymer, CO Latitude: 40-56-03.51N NAD 83 Longitude: 103-47-19.33W Heights: 389 feet above ground level (AGL) 5596 feet above mean sea level(AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6873-OE. Signature Control No: 701433-126001726 ( DNE-WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6872-OE ' 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-798-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE37 Location: New Raymer, CO Latitude: 40-56-10.87N NAD 83 Longitude: 103-47-14.78W Heights: 389 feet above ground level (AGL) 5589 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be • used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6872-OE. Signature Control No: 701432-126001724 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6819-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-855-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE38 Location: New Raymer, CO Latitude: 40-56-10.77N NAD 83 Longitude: 103-46-57.39W Heights: 389 feet above ground level (AGL) 5560 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6819-OE. Signature Control No: 701379-126001373 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. , :'( Air Traffic Airspace Branch, ASW-520 2010-WTW-6871-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-797-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE39 Location: New Raymer, CO Latitude: 40-56-16.07N NAD 83 Longitude: 103-46-46.94W Heights: 389 feet above ground level (AGL) 5589 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6871-OE. Signature Control No: 701431-126001723 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. .;( Air Traffic Airspace Branch, ASW-520 2010-WTW-6818-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-854-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE40 Location: New Raymer, CO Latitude: 40-56-22.69N NAD 83 Longitude: 103-46-37.78W Heights: 389 feet above ground level (AGL) 5566 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6818-OE. Signature Control No: 701378-126001372 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6870-OE �` 2601 Meacham Blvd. Prior Study No. • ___ Fort Worth, TX 76137-0520 2010-WTW-796-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE41 Location: New Raymer, CO Latitude: 40-57-24.95N NAD 83 Longitude: 103-46-46.51W Heights: 389 feet above ground level (AGL) 5584 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6870-OE. Signature Control No: 701430-126001722 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6817-OE 2601 Meacham Blvd. Prior Study No. • • Fort Worth, TX 76137-0520 2010-WTW-853-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE42 Location: New Raymer, CO Latitude: 40-57-35.14N NAD 83 Longitude: 103-46-36.20W Heights: 389 feet above ground level (AGL) 5546 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6817-OE. Signature Control No: 701377-126001370 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6816-OE ' �`.-- 2601 Meacham Blvd. Prior Study No. • _ _ Fort Worth, TX 76137-0520 2010-WTW-795-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE43 Location: New Raymer, CO Latitude: 40-57-37.90N NAD 83 Longitude: 103-46-14.48W Heights: 389 feet above ground level (AGL) 5560 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6816-OE. Signature Control No: 701376-126001368 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6815-OE ' 2601 Meacham Blvd. Prior Study No. • __ Fort Worth, TX 76137-0520 2010-WTW-794-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE44 Location: New Raymer, CO Latitude: 40-56-56.92N NAD 83 Longitude: 103-46-12.28W Heights: 389 feet above ground level (AGL) 5576 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be • used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6815-OE. Signature Control No: 701375-126001367 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. (ft. Air Traffic Airspace Branch,ASW-520 2010-WTW-6869-OE 2601 Meacham Blvd. Prior Study No. • v Fort Worth, TX 76137-0520 2010-WTW-852-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE45 Location: New Raymer, CO Latitude: 40-57-07.98N NAD 83 Longitude: 103-46-09.21 W Heights: 389 feet above ground level (AGL) 5560 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6869-OE. Signature Control No: 701429-126001678 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6814-OE 2601 Meacham Blvd. Prior Study No. • __v Fort Worth, TX 76137-0520 2010-WTW-793-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE46 Location: New Raymer, CO Latitude: 40-57-19.87N NAD 83 Longitude: 103-45-57.63W Heights: 389 feet above ground level (AGL) 5563 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6814-OE. Signature Control No: 701374-126001366 (DNE -WT) Earl Newalu Specialist Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6813-OE �` ' 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-792-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE47 Location: New Raymer, CO Latitude: 40-56-47.16N NAD 83 Longitude: 103-45-46.19W Heights: 389 feet above ground level (AGL) 5576 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6813-OE. Signature Control No: 701373-126001364 (DNE -WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. , z"( Air Traffic Airspace Branch, ASW-520 2010-WTW-6868-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-851-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE48 Location: New Raymer, CO Latitude: 40-56-31.49N NAD 83 Longitude: 103-45-39.95W Heights: 389 feet above ground level (AGL) 5566 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a 41, hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. . This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6868-OE. Signature Control No: 701428-126001668 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6812-OE �`� 2601 Meacham Blvd. Prior Study No. • ___ " Fort Worth, TX 76137-0520 2010-WTW-791-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE49 Location: New Raymer, CO Latitude: 40-56-35.86N NAD 83 Longitude: 103-45-26.77W Heights: 389 feet above ground level (AGL) 5563 feet above mean sea level (AMSL) . This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6812-OE. Signature Control No: 701372-126001358 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6867-OE 1 �` 2601 Meacham Blvd. Prior Study No. • _._ Fort Worth, TX 76137-0520 2010-WTW-790-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy-TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE50 Location: New Raymer, CO Latitude: 40-56-42.50N NAD 83 Longitude: 103-45-20.53W Heights: 389 feet above ground level (AGL) 5566 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6867-OE. Signature Control No: 701427-126001672 (DNE -WT) Earl Newalu Specialist • i Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6866-OE 2601 Meacham Blvd. Prior Study No. • . Fort Worth, TX 76137-0520 2010-WTW-789-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy-TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE51 Location: New Raymer, CO Latitude: 40-56-47.95N NAD 83 Longitude: 103-45-13.16W Heights: 389 feet above ground level (AGL) 5563 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6866-OE. Signature Control No: 701426-126001666 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6811-OE ( ' 2601 Meacham Blvd. Prior Study No. Fort Worth, TX 76137-0520 2010-WTW-850-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE52 Location: New Raymer, CO Latitude: 40-56-46.59N NAD 83 Longitude: 103-44-59.07W Heights: 389 feet above ground level (AGL) 5550 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting,white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2,Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6811-OE. Signature Control No: 701371-126001357 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 - Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6865-OE ` 2601 Meacham Blvd. Prior Study No. • ___ Fort Worth, TX 76137-0520 2010-WTW-849-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE53 Location: New Raymer, CO Latitude: 40-56-49.19N NAD 83 Longitude: 103-44-47.77W Heights: 389 feet above ground level (AGL) 5553 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. . This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6865-OE. Signature Control No: 701425-126001674 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6810-OE 2601 Meacham Blvd. Prior Study No. • ___ Fort Worth, TX 76137-0520 2010-WTW-788-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE54 Location: New Raymer, CO Latitude: 40-56-39.69N NAD 83 Longitude: 103-44-27.00W Heights: 389 feet above ground level (AGL) 5543 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6810-OE. Signature Control No: 701370-126001348 (DNE -WT) Earl Newalu Specialist • Page 2 of 2 --' Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6809-OE ` .' 2601 Meacham Blvd. Prior Study No. • _ ' Fort Worth, TX 76137-0520 2010-WTW-848-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GESS Location: New Raymer, CO Latitude: 40-57-00.94N NAD 83 Longitude: 103-44-37.50W Heights: 389 feet above ground level (AGL) 5533 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6809-OE. Signature Control No: 701369-126001344 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6864-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-847-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE56 Location: New Raymer, CO Latitude: 40-57-13.42N NAD 83 Longitude: 103-44-36.32W Heights: 389 feet above ground level (AGL) 5543 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6864-OE. Signature Control No: 701424-126001663 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6808-OE `wy . 2601 Meacham Blvd. Prior Study No. • __ Fort Worth, TX 76137-0520 2010-WTW-787-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE57 Location: New Raymer, CO Latitude: 40-57-27.41N NAD 83 Longitude: 103-44-37.99W Heights: 389 feet above ground level (AGL) 5534 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404)305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6808-OE. Signature Control No: 701368-126001343 (DNE -WT ) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6863-OE ' 2601 Meacham Blvd. Prior Study No. • _ _ Fort Worth, TX 76137-0520 2010-WTW-786-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE58 Location: New Raymer, CO Latitude: 40-57-32.57N NAD 83 Longitude: 103-44-29.61W Heights: 389 feet above ground level (AGL) 5546 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6863-OE. Signature Control No: 701423-126001671 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. �`� Air Traffic Airspace Branch, ASW-520 2010-WTW-6862-OE 2601 Meacham Blvd. Prior Study No. • _ Fort Worth, TX 76137-0520 2010-WTW-846-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy-TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE59 Location: New Raymer, CO Latitude: 40-57-36.49N NAD 83 Longitude: 103-44-20.32W Heights: 389 feet above ground level (AGL) 5540 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6862-OE. Signature Control No: 701422-126001673 (DNE -WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6807-OE `_ 2601 Meacham Blvd. Prior Study No. • __ Fort Worth, TX 76137-0520 2010-WTW-785-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE60 Location: New Raymer, CO Latitude: 40-57-41.47N NAD 83 Longitude: 103-44-12.70W Heights: 389 feet above ground level (AGL) 5523 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6807-OE. Signature Control No: 701367-126001342 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6806-OE 2601 Meacham Blvd. Prior Study No. • • Fort Worth, TX 76137-0520 2010-WTW-845-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE61 Location: New Raymer, CO Latitude: 40-58-03.99N NAD 83 Longitude: 103-44-35.16W Heights: 389 feet above ground level (AGL) 5537 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6806-OE. Signature Control No: 701366-126001341 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 "` Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6861-OE 2601 Meacham Blvd. Prior Study No. • __. ' Fort Worth, TX 76137-0520 2010-WTW-844-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE62 Location: New Raymer, CO Latitude: 40-58-09.92N NAD 83 Longitude: 103-44-26.84W Heights: 389 feet above ground level (AGL) 5533 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6861-OE. Signature Control No: 701421-126001677 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6805-OE 2601 Meacham Blvd. Prior Study No. • _ _ ' Fort Worth, TX 76137-0520 2010-WTW-784-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE63 Location: New Raymer, CO Latitude: 40-58-16.38N NAD 83 Longitude: 103-44-17.72W Heights: 389 feet above ground level (AGL) 5523 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a ophazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6805-OE. Signature Control No: 701365-126001336 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. (� Air Traffic Airspace Branch, ASW-520 2010-WTW-6804-OE 2601 Meacham Blvd. Prior Study No. • __ ' Fort Worth, TX 76137-0520 2010-WTW-778-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex0l Location: New Raymer, CO Latitude: 40-52-22.16N NAD 83 Longitude: 103-51-52.99W Heights: 410 feet above ground level (AGL) 5682 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6804-OE. Signature Control No: 701364-126001320 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6860-OE �` 2601 Meacham Blvd. Prior Study No. 0 __._-' Fort Worth, TX 76137-0520 2010-WTW-840-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex02 Location: New Raymer, CO Latitude: 40-52-18.56N NAD 83 Longitude: 103-51-33.44W Heights: 410 feet above ground level (AGL) 5689 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a . hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2,Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6860-OE. Signature Control No: 701420-126001662 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6803-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-777-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex03 Location: New Raymer, CO Latitude: 40-52-12.55N NAD 83 Longitude: 103-51-12.10W Heights: 410 feet above ground level (AGL) 5740 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6803-OE. Signature Control No: 701363-126001490 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. �� Air Traffic Airspace Branch, ASW-520 2010-WTW-6859-OE ' 2601 Meacham Blvd. Prior Study No. • `- Fort Worth, TX 76137-0520 2010-WTW-839-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex04 Location: New Raymer, CO Latitude: 40-52-22.27N NAD 83 Longitude: 103-51-04.74W Heights: 410 feet above ground level (AGL) 5686 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6859-OE. Signature Control No: 701419-126001833 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 —' Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6858-OE 2601 Meacham Blvd. Prior Study No. • ___ Fort Worth, TX 76137-0520 2010-WTW-838-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex05 Location: New Raymer, CO Latitude: 40-52-24.92N NAD 83 Longitude: 103-50-51.26W Heights: 410 feet above ground level (AGL) 5682 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6858-OE. Signature Control No: 701418-126001839 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6802-OE •' 2601 Meacham Blvd. Prior Study No. • ___ Fort Worth, TX 76137-0520 2010-WTW-776-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex06 Location: New Raymer, CO Latitude: 40-52-26.37N NAD 83 Longitude: 103-50-37.59W Heights: 410 feet above ground level (AGL) 5720 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6802-OE. Signature Control No: 701362-126001318 ( DNE -WT ) Earl Newalu Specialist Page 2 of 2 — Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6801—OE ew 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-775-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex07 Location: New Raymer, CO Latitude: 40-52-17.23N NAD 83 Longitude: 103-50-05.28W Heights: 410 feet above ground level (AGL) 5656 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a . hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6801-OE. Signature Control No: 701361-126001494 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6800-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-837-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex08 Location: New Raymer, CO Latitude: 40-52-21.23N NAD 83 Longitude: 103-49-52.40W Heights: 410 feet above ground level (AGL) 5636 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6800-OE. Signature Control No: 701360-126001489 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6799-OE 2601 Meacham Blvd. Prior Study No. • • Fort Worth, TX 76137-0520 2010-WTW-774-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex09 Location: New Raymer, CO Latitude: 40-52-54.81N NAD 83 Longitude: 103-50-43.89W Heights: 410 feet above ground level (AGL) 5725 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6799-OE. Signature Control No: 701359-126001317 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6798-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-773-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordexl0 Location: New Raymer, CO Latitude: 40-53-15.73N NAD 83 Longitude: 103-51-29.85W Heights: 410 feet above ground level(AGL) 5725 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6798-OE. Signature Control No: 701358-126001492 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6857-OE 2601 Meacham Blvd. Prior Study No. • _ _ Fort Worth, TX 76137-0520 2010-WTW-836-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordexl l Location: New Raymer, CO Latitude: 40-53-14.64N NAD 83 Longitude: 103-51-14.27W Heights: 410 feet above ground level (AGL) 5725 feet above mean sea level(AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6857-OE. Signature Control No: 701417-126001840 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6856-OE 1 " 2601 Meacham Blvd. Prior Study No. illFort Worth, TX 76137-0520 2010-WTW-772-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex12 Location: New Raymer, CO Latitude: 40-53-17.91N NAD 83 Longitude: 103-51-01.31W Heights: 410 feet above ground level (AGL) 5725 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6856-OE. Signature Control No: 701416-126001842 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. �� Air Traffic Airspace Branch, ASW-520 2010-WTW-6797-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-835-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordexl3 Location: New Raymer, CO Latitude: 40-53-26.59N NAD 83 Longitude: 103-50-53.73W Heights: 410 feet above ground level (AGL) 5715 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6797-OE. Signature Control No: 701357-126001485 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. �� Air Traffic Airspace Branch, ASW-520 2010-WTW-6796-OE 2601 Meacham Blvd. Prior Study No. • __ Fort Worth, TX 76137-0520 2010-WTW-771-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordexl4 Location: New Raymer, CO Latitude: 40-53-44.17N NAD 83 Longitude: 103-50-59.91W Heights: 410 feet above ground level (AGL) 5725 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6796-OE. Signature Control No: 701356-126001491 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6795-OE 2601 Meacham Blvd. Prior Study No. • ___ Fort Worth, TX 76137-0520 2010-WTW-770-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordexl5 Location: New Raymer, CO Latitude: 40-54-05.67N NAD 83 Longitude: 103-50-57.32W Heights: 410 feet above ground level (AGL) 5715 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_ Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6795-OE. Signature Control No: 701355-126001482 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. r Air Traffic Airspace Branch, ASW-520 2010-WTW-6855-OE ` 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-769-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex16 Location: New Raymer, CO Latitude: 40-52-34.75N NAD 83 Longitude: 103-48-53.33W Heights: 410 feet above ground level (AGL) 5607 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6855-OE. Signature Control No: 701415-126001837 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6794-OE 9 • ii 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-768-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordexl7 Location: New Raymer, CO Latitude: 40-52-36.06N NAD 83 Longitude: 103-48-39.25W Heights: 410 feet above ground level (AGL) 5561 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2,Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6794-OE. Signature Control No: 701354-126001486 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. �� Air Traffic Airspace Branch, ASW-520 2010-WTW-6793-OE 2601 Meacham Blvd. Prior Study No. • • Fort Worth, TX 76137-0520 2010-WTW-767-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordexl8 Location: New Raymer, CO Latitude: 40-52-52.81N NAD 83 Longitude: 103-49-12.30W Heights: 410 feet above ground level (AGL) 5613 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national . airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However,this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6793-OE. Signature Control No: 701353-126001480 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. :( Air Traffic Airspace Branch, ASW-520 2010-WTW-6854-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-766-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordexl9 Location: New Raymer, CO Latitude: 40-53-08.80N NAD 83 Longitude: 103-49-15.54W Heights: 410 feet above ground level (AGL) 5689 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6854-OE. Signature Control No: 701414-126001843 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Q� Air Traffic Airspace Branch, ASW-520 2010-WTW-6792-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-834-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex20 Location: New Raymer, CO Latitude: 40-53-29.45N NAD 83 Longitude: 103-49-06.96W Heights: 410 feet above ground level (AGL) 5686 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6792-OE. Signature Control No: 701352-126001484 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6791-OE 2601 Meacham Blvd. Prior Study No. - Fort Worth, TX 76137-0520 2010-WTW-765-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex21 Location: New Raymer, CO Latitude: 40-53-25.24N NAD 83 Longitude: 103-48-43.31W Heights: 410 feet above ground level (AGL) 5669 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a * hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6791-OE. Signature Control No: 701351-126001479 (DNE -WT ) Earl Newalu Specialist S Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6790-OE �` 2601 Meacham Blvd. Prior Study No. I _ _ Fort Worth, TX 76137-0520 2010-WTW-833-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex22 Location: New Raymer, CO Latitude: 40-53-48.76N NAD 83 Longitude: 103-48-42.65W Heights: 410 feet above ground level (AGL) 5676 feet above mean sea level (AMSL) alThis aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6790-OE. Signature Control No: 701350-126001483 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6789-OE 2601 Meacham Blvd. Prior Study No. • ___ ' Fort Worth, TX 76137-0520 2010-WTW-764-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex23 Location: New Raymer, CO Latitude: 40-54-10.42N NAD 83 Longitude: 103-48-19.48W Heights: 410 feet above ground level (AGL) 5597 feet above mean sea level (AMSL)This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6789-OE. Signature Control No: 701349-126001478 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. ___ Air Traffic Airspace Branch, ASW-520 2010-WTW-6853-OE • * 2601 Meacham Blvd. Prior Study No. • __ Fort Worth, TX 76137-0520 2010-WTW-763-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex24 Location: New Raymer, CO Latitude: 40-54-17.21N NAD 83 Longitude: 103-48-06.05W Heights: 410 feet above ground level (AGL) 5584 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6853-OE. Signature Control No: 701413-126001831 (DNE -WT) Earl Newalu Specialist • Page 2 of 2 , Federal Aviation Administration Aeronautical Study No. l� Air Traffic Airspace Branch, ASW-520 2010-WTW-6788-OE . 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-762-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex25 Location: New Raymer, CO Latitude: 40-54-21.74N NAD 83 Longitude: 103-47-52.65W Heights: 410 feet above ground level (AGL) 5574 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2,Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6788-OE. Signature Control No: 701348-126001481 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 - Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6787-OE I. �' " 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-832-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy -TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex26 Location: New Raymer, CO Latitude: 40-54-21.59N NAD 83 Longitude: 103-49-01.06W Heights: 410 feet above ground level (AGL) 5666 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6787-OE. Signature Control No: 701347-126001495 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6786-OE • ' �� 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-761-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex27 Location: New Raymer, CO Latitude: 40-54-45.93N NAD 83 Longitude: 103-49-09.79W Heights: 410 feet above ground level (AGL) 5666 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6786-OE. Signature Control No: 701346-126001477 (DNE-WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. (� Air Traffic Airspace Branch, ASW-520 2010-WTW-6852-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-760-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex28 Location: New Raymer, CO Latitude: 40-54-48.93N NAD 83 Longitude: 103-48-52.12W Heights: 410 feet above ground level (AGL) 5676 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However,this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6852-OE. Signature Control No: 701412-126001841 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. �� Air Traffic Airspace Branch, ASW-520 2010-WTW-6785-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-759-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex29 Location: New Raymer, CO Latitude: 40-54-51.95N NAD 83 Longitude: 103-48-33.91W Heights: 410 feet above ground level (AGL) 5660 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6785-OE. Signature Control No: 701345-126001488 (DNE -WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6784-OE 2601 Meacham Blvd. Prior Study No. • _ _ Fort Worth, TX 76137-0520 2010-WTW-758-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex30 Location: New Raymer, CO Latitude: 40-54-43.77N NAD 83 Longitude: 103-47-18.52W Heights: 410 feet above ground level (AGL) 5607 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. . This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However,this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6784-OE. Signature Control No: 701344-126001273 ( DNE -WT ) Earl Newalu Specialist • S Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6783-OE 2601 Meacham Blvd. Prior Study No. • _ _ ' Fort Worth, TX 76137-0520 2010-WTW-831-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex31 Location: New Raymer, CO Latitude: 40-54-32.52N NAD 83 Longitude: I03-46-45.76W Heights: 410 feet above ground level (AGL) 5597 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6783-OE. Signature Control No: 701343-126001278 ( DNE-WT ) Earl Newalu Specialist • S Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6851-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-830-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex32 Location: New Raymer, CO Latitude: 40-54-39.23N NAD 83 Longitude: 103-46-37.18W Heights: 410 feet above ground level (AGL) 5604 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6851-OE. Signature Control No: 701411-126001665 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6850-OE • �` ` 2601 Meacham Blvd. Prior Study No. 0 ___ Fort Worth, TX 76137-0520 2010-WTW-757-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex33 Location: New Raymer, CO Latitude: 40-55-12.95N NAD 83 Longitude: 103-46-37.54W Heights: 410 feet above ground level (AGL) 5617 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a 4. hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6850-OE. Signature Control No: 701410-126001669 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. (lb Air Traffic Airspace Branch, ASW-520 2010-WTW-6782-OE . 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-756-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex34 Location: New Raymer, CO Latitude: 40-55-17.47N NAD 83 Longitude: 103-46-24.83W Heights: 410 feet above ground level (AGL) 5593 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6782-OE. Signature Control No: 701342-126001272 ( DNE -WT ) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. �� Air Traffic Airspace Branch, ASW-520 2010-WTW-6849-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-829-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex35 Location: New Raymer, CO Latitude: 40-55-37.61N NAD 83 Longitude: 103-46-08.89W Heights: 410 feet above ground level (AGL) 5590 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE . EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6849-OE. Signature Control No: 701409-126001676 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6781-OE �` 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-755-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex36 Location: New Raymer, CO Latitude: 40-55-45.34N NAD 83 Longitude: 103-46-02.10W Heights: 410 feet above ground level (AGL) 5577 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6781-OE. Signature Control No: 701341-126001271 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6780-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-754-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex37 Location: New Raymer, CO Latitude: 40-55-59.30N NAD 83 Longitude: I03-43-23.75W Heights: 410 feet above ground level (AGL) 5512 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6780-OE. Signature Control No: 701340-126001277 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. �`� Air Traffic Airspace Branch, ASW-520 2010-WTW-6848-OE 2601 Meacham Blvd. Prior Study No. 0 _ Fort Worth, TX 76137-0520 2010-WTW-828-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex38 Location: New Raymer, CO Latitude: 40-56-06.94N NAD 83 Longitude: 103-43-14.58W Heights: 410 feet above ground level (AGL) 5502 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a ahazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6848-OE. Signature Control No: 701408-126001664 ( DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6779-OE 1 ' 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-753-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex39 Location: New Raymer, CO Latitude: 40-56-07.57N NAD 83 Longitude: 103-42-57.85W Heights: 410 feet above ground level (AGL) 5510 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6779-OE. Signature Control No: 701339-126001281 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 ` Federal Aviation Administration Aeronautical Study No. c �x Air Traffic Airspace Branch, ASW-520 2010-WTW-6778-OE . 2601 Meacham Blvd. Prior Study No. • _ _ Fort Worth, TX 76137-0520 2010-WTW-752-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex40 Location: New Raymer, CO Latitude: 40-56-19.60N NAD 83 Longitude: 103-42-49.11W Heights: 410 feet above ground level (AGL) 5505 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6778-OE. Signature Control No: 701338-126001276 ( DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6847-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-827-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex41 Location: New Raymer, CO Latitude: 40-56-27.69N NAD 83 Longitude: 103-42-42.78W Heights: 410 feet above ground level (AGL) 5502 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However,this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6847-OE. Signature Control No: 701407-126001679 ( DNE -WT ) Earl Newalu Specialist • Page 2 of 2 • Federal Aviation Administration Aeronautical Study No. OAir Traffic Airspace Branch, ASW-520 2010-WTW-6777-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-751-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex42 Location: New Raymer, CO Latitude: 40-56-36.37N NAD 83 Longitude: 103-42-30.82W Heights: 410 feet above ground level (AGL) 5521 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. . This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6777-OE. Signature Control No: 701337-126001280 ( DNE -WT ) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6776-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-750-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex43 Location: New Raymer, CO Latitude: 40-56-58.87N NAD 83 Longitude: 103-42-05.40W Heights: 410 feet above ground level (AGL) 5489 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6776-OE. Signature Control No: 701336-126001275 ( DNE -WT ) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6846-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-826-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex44 Location: New Raymer, CO Latitude: 40-56-59.15N NAD 83 Longitude: 103-41-44.39W Heights: 410 feet above ground level (AGL) 5512 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6846-OE. Signature Control No: 701406-126001661 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6775-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-749-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex45 Location: New Raymer, CO Latitude: 40-57-00.48N NAD 83 Longitude: 103-41-28.89W Heights: 410 feet above ground level (AGL) 5515 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6775-OE. Signature Control No: 701335-126001282 (DNE -WT) Earl Newalu Specialist 41 Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6774-OE (mi. 2601 Meacham Blvd. Prior Study No. 0 Fort Worth, TX 76137-0520 2010-WTW-748-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex46 Location: New Raymer, CO Latitude: 40-57-54.43N NAD 83 Longitude: 103-42-16.86W Heights: 410 feet above ground level (AGL) 5515 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a 4. hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE aEXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6774-OE. Signature Control No: 701334-126001266 (DNE-WT ) Earl Newalu Specialist S Page 2 of 2 Federal Aviation Administration Aeronautical Study No. " � Air Traffic Airspace Branch, ASW-520 2010-WTW-6845-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-825-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex47 Location: New Raymer, CO Latitude: 40-58-11.48N NAD 83 Longitude: 103-42-17.19W Heights: 410 feet above ground level (AGL) 5505 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6845-OE. Signature Control No: 701405-126001667 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6773-OE ` 2601 Meacham Blvd. Prior Study No. • _ _ Fort Worth, TX 76137-0520 2010-WTW-747-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex48 Location: New Raymer, CO Latitude: 40-58-27.01N NAD 83 Longitude: 103-42-16.93W Heights: 410 feet above ground level (AGL) 5515 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6773-OE. Signature Control No: 701333-126001283 (DNE -WT) Earl Newalu Specialist • Page 2 of 2 "' Federal Aviation Administration Aeronautical Study No. tr Air Traffic Airspace Branch, ASW-520 2010-WTW-6844-OE ` 2601 Meacham Blvd. Prior Study No. • _:_ Fort Worth, TX 76137-0520 2010-WTW-824-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex49 Location: New Raymer, CO Latitude: 40-58-24.71N NAD 83 Longitude: 103-41-57.05W Heights: 410 feet above ground level (AGL) 5499 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6844-OE. Signature Control No: 701404-126001675 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. �� Air Traffic Airspace Branch, ASW-520 2010-WTW-6772-OE 2601 Meacham Blvd. Prior Study No. • ___ Fort Worth, TX 76137-0520 2010-WTW-746-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex50 Location: New Raymer, CO Latitude: 40-58-26.29N NAD 83 Longitude: 103-41-43.27W Heights: 410 feet above ground level (AGL) 5495 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6772-OE. Signature Control No: 701332-126001264 (DNE -WT) Earl Newalu Specialist Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6771-OE �' ' 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-823-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy-TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex5I Location: New Raymer, CO Latitude: 40-57-50.37N NAD 83 Longitude: 103-41-49.73W Heights: 410 feet above ground level (AGL) 5502 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6771-OE. Signature Control No: 701331-126001268 ( DNE -WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. C� Air Traffic Airspace Branch, ASW-520 2010-WTW-6843-OE 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-745-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex52 Location: New Raymer, CO Latitude: 40-57-59.42N NAD 83 Longitude: 103-41-34.14W Heights: 410 feet above ground level (AGL) 5485 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a ihazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6843-OE. Signature Control No: 701403-126001660 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6770-OE ` 2601 Meacham Blvd. Prior Study No. • _ _ Fort Worth, TX 76137-0520 2010-WTW-822-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex53 Location: New Raymer, CO Latitude: 40-58-08.28N NAD 83 Longitude: 103-41-20.83W Heights: 410 feet above ground level (AGL) 5498 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. . This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6770-OE. Signature Control No: 701330-126001270 (DNE-WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6769-OE 2601 Meacham Blvd. Prior Study No. Fort Worth, TX 76137-0520 2010-WTW-744-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex54 Location: New Raymer, CO Latitude: 40-54-24.53N NAD 83 Longitude: 103-45-12.65W Heights: 410 feet above ground level (AGL) 5495 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE iEXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6769-OE. Signature Control No: 701329-126001269 (DNE-WT ) Earl Newalu Specialist • Page 2 of 2 '-``., Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6887-OE 2601 Meacham Blvd. Prior Study No. • u Fort Worth, TX 76137-0520 2010-WTW-743-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex55 Location: New Raymer, CO Latitude: 40-54-29.25N NAD 83 Longitude: 103-45-01.99W Heights: 410 feet above ground level (AGL) 5489 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6887-OE. Signature Control No: 701447-126001732 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 "" Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6768-OE '' 2601 Meacham Blvd. Prior Study No. • __ Fort Worth, TX 76137-0520 2010-WTW-821-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex56 Location: New Raymer, CO Latitude: 40-54-39.73N NAD 83 Longitude: 103-44-42.23W Heights: 410 feet above ground level (AGL) 5433 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any,is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-6768-OE. Signature Control No: 701328-126001265 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6767-OE l �• ` •'. 2601 Meacham Blvd. Prior Study No. • ___ Fort Worth, TX 76137-0520 2010-WTW-742-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex57 Location: New Raymer, CO Latitude: 40-53-50.25N NAD 83 Longitude: 103-44-35.46W Heights: 410 feet above ground level (AGL) 5400 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6767-OE. Signature Control No: 701327-126001263 ( DNE-WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6766-OE �' 2601 Meacham Blvd. Prior Study No. 0 ' __ Fort Worth, TX 76137-0520 2010-WTW-741-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex58 Location: New Raymer, CO Latitude: 40-54-00.82N NAD 83 Longitude: 103-44-31.56W Heights: 410 feet above ground level (AGL) 5410 feet above mean sea level (AMSL) aik This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a sip hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6766-OE. Signature Control No: 701326-126001267 (DNE -WT ) Earl Newalu Specialist • S Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6841-OE P ' 2601 Meacham Blvd. Prior Study No. • Fort Worth, TX 76137-0520 2010-WTW-820-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex59 Location: New Raymer, CO Latitude: 40-54-14.28N NAD 83 Longitude: 103-44-27.46W Heights: 410 feet above ground level (AGL) 5426 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6841-OE. Signature Control No: 701401-126001670 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-6765-OE 2601 Meacham Blvd. Prior Study No. . Fort Worth, TX 76137-0520 2010-WTW-740-OE Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex60 Location: New Raymer, CO Latitude: 40-54-20.42N NAD 83 Longitude: 103-44-10.97W Heights: 410 feet above ground level (AGL) 5420 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-6765-OE. Signature Control No: 701325-126001279 ( DNE -WT ) Earl Newalu Specialist . • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-5965-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Met Tower Mast01 Location: New Raymer, CO Latitude: 40-58-32.11N NAD 83 Longitude: 103-42-08.86W Heights: 262 feet above ground level (AGL) 5360 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system- Chapters 4,8(M-Dual),&12. It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-5965-OE. Signature Control No: 697960-126000299 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-5971-OE �� 2601 Meacham Blvd. . Fort Worth, TX 76137-0520 Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 **DETERMINATION OF NO HAZARD TO AIR NAVIGATION FOR TEMPORARY STRUCTURE** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Met Tower Mast02 Location: New Raymer, CO Latitude: 40-58-27.50N NAD 83 Longitude: 103-42-16.88W Heights: 262 feet above ground level (AGL) 5373 feet above mean sea level (AMSL) This aeronautical study revealed that the temporary structure does not exceed obstruction standards and would . not be a hazard to air navigation provided the following condition(s), if any, is (are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system- Chapters 4,8(M-Dual),&12. Construction of a permanent structure at this location requires separate notice to the FAA. This determination expires on 05/14/2012 unless extended, revised or terminated by the issuing office. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. Any changes in coordinates and/or heights will void this determination. Any future construction or alteration, including increase to heights, requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of a structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. • Page 1 of 2 This determination did not include an evaluation of the permanent structure associated with the use of this temporary structure. If the permanent structure will exceed Title 14 of the Code of Federal Regulations, part 77.13, a separate aeronautical study and FAA determination is required. This determination concerns the effect of this temporary structure on the safe and efficient use of navigable • airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. A copy of this determination will be forwarded to the Federal Aviation Administration Flight Procedures Office if the structure is subject to the issuance of a Notice To Airman(NOTAM). If you have any questions, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-5971-OE Signature Control No: 697966-125999011 ( TMP -WT ) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. , ( Air Traffic Airspace Branch, ASW-520 2010-WTW-5970-OE S� ' 2601 Meacham Blvd. 0 _ _ Fort Worth, TX 76137-0520 Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 **DETERMINATION OF NO HAZARD TO AIR NAVIGATION FOR TEMPORARY STRUCTURE** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Met Tower Mast03 Location: New Raymer, CO Latitude: 40-58-25.07N NAD 83 Longitude: 103-41-57.38W Heights: 262 feet above ground level (AGL) 5354 feet above mean sea level (AMSL) This aeronautical study revealed that the temporary structure does not exceed obstruction standards and would • not be a hazard to air navigation provided the following condition(s), if any, is (are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system - Chapters 4,8(M-Dual),&12. Construction of a permanent structure at this location requires separate notice to the FAA. This determination expires on 05/14/2012 unless extended, revised or terminated by the issuing office. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. Any changes in coordinates and/or heights will void this determination. Any future construction or alteration, including increase to heights, requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of a structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. • Page 1 of 2 This determination did not include an evaluation of the permanent structure associated with the use of this temporary structure.If the permanent structure will exceed Title 14 of the Code of Federal Regulations,part 77.13, a separate aeronautical study and FAA determination is required. This determination concerns the effect of this temporary structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. A copy of this determination will be forwarded to the Federal Aviation Administration Flight Procedures Office if the structure is subject to the issuance of a Notice To Airman (NOTAM). If you have any questions, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-5970-OE Signature Control No: 697965-125999006 ( TMP -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. , :'( ' Air Traffic Airspace Branch, ASW-520 2010-WTW-5969-OE 2601 Meacham Blvd. 0 ___ Fort Worth, TX 76137-0520 Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Met Tower Mast04 Location: New Raymer, CO Latitude: 40-55-16.82N NAD 83 Longitude: 103-51-55.05W Heights: 262 feet above ground level (AGL) 5547 feet above mean sea level (AMSL) . This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system- Chapters 4,8(M-Dual),&12. It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page I of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-5969-OE. Signature Control No: 697964-126000498 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-5968-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 **DETERMINATION OF NO HAZARD TO AIR NAVIGATION FOR TEMPORARY STRUCTURE** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Met Tower Mast05 Location: New Raymer, CO Latitude: 40-55-11.12N NAD 83 Longitude: 103-51-52.83W Heights: 262 feet above ground level (AGL) 5570 feet above mean sea level (AMSL) This aeronautical study revealed that the temporary structure does not exceed obstruction standards and would • not be a hazard to air navigation provided the following condition(s), if any, is (are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system - Chapters 4,8(M-Dual),&12. Construction of a permanent structure at this location requires separate notice to the FAA. This determination expires on 05/14/2012 unless extended, revised or terminated by the issuing office. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. Any changes in coordinates and/or heights will void this determination. Any future construction or alteration, including increase to heights, requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of a structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. • Page 1 of 2 This determination did not include an evaluation of the permanent structure associated with the use of this temporary structure. If the permanent structure will exceed Title 14 of the Code of Federal Regulations, part 77.13, a separate aeronautical study and FAA determination is required. This determination concerns the effect of this temporary structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. A copy of this determination will be forwarded to the Federal Aviation Administration Flight Procedures Office if the structure is subject to the issuance of a Notice To Airman (NOTAM). If you have any questions,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-5968-OE Signature Control No: 697963-125999010 ( TMP -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. , _:-.-( Air Traffic Airspace Branch, ASW-520 2010-WTW-5967-OE 2601 Meacham Blvd. • ___ Fort Worth, TX 76137-0520 Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 **DETERMINATION OF NO HAZARD TO AIR NAVIGATION FOR TEMPORARY STRUCTURE** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Met Tower Mast06 Location: New Raymer, CO Latitude: 40-55-21.10N NAD 83 Longitude: 103-51-49.41W Heights: 262 feet above ground level (AGL) 5541 feet above mean sea level (AMSL) This aeronautical study revealed that the temporary structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is (are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system - Chapters 4,8(M-Dual),&12. Construction of a permanent structure at this location requires separate notice to the FAA. This determination expires on 05/14/2012 unless extended, revised or terminated by the issuing office. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. Any changes in coordinates and/or heights will void this determination. Any future construction or alteration, including increase to heights, requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of a structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. • Page 1 of 2 This determination did not include an evaluation of the permanent structure associated with the use of this temporary structure. If the permanent structure will exceed Title 14 of the Code of Federal Regulations,part 77.13, a separate aeronautical study and FAA determination is required. This determination concerns the effect of this temporary structure on the safe and efficient use of navigable • airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. A copy of this determination will be forwarded to the Federal Aviation Administration Flight Procedures Office if the structure is subject to the issuance of a Notice To Airman (NOTAM). If you have any questions, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-5967-OE Signature Control No: 697962-125999009 ( TMP -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. � Air Traffic Airspace Branch, ASW-520 2010-WTW-5966-OE i 2601 Meacham Blvd. 0 _ _ Fort Worth, TX 76137-0520 Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Met Tower Mast07 Location: New Raymer, CO Latitude: 40-53-23.47N NAD 83 Longitude: 103-51-31.78W Heights: 262 feet above ground level (AGL) 5587 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system - Chapters 4,8(M-Dual),&12. It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-5966-OE. Signature Control No: 697961-126000301 (DNE -WT ) Earl Newalu Specialist • Page 2 of 2 — Federal Aviation Administration Aeronautical Study No. , :r-( Air Traffic Airspace Branch, ASW-520 2010-WTW-5972-OE ` .i 2601 Meacham Blvd. • ___ ' Fort Worth, TX 76137-0520 Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 **DETERMINATION OF NO HAZARD TO AIR NAVIGATION FOR TEMPORARY STRUCTURE** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Met Tower Mast08 Location: New Raymer, CO Latitude: 40-53-15.93N NAD 83 Longitude: 103-51-30.53W Heights: 262 feet above ground level (AGL) 5587 feet above mean sea level (AMSL) Ank This aeronautical study revealed that the temporary structure does not exceed obstruction standards and would • not be a hazard to air navigation provided the following condition(s), if any, is (are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system - Chapters 4,8(M-Dual),&12. Construction of a permanent structure at this location requires separate notice to the FAA. This determination expires on 05/14/2012 unless extended, revised or terminated by the issuing office. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. Any changes in coordinates and/or heights will void this determination. Any future construction or alteration, including increase to heights, requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of a structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. • Page 1 of 2 This determination did not include an evaluation of the permanent structure associated with the use of this temporary structure. If the permanent structure will exceed Title 14 of the Code of Federal Regulations, part 77.13, a separate aeronautical study and FAA determination is required. This determination concerns the effect of this temporary structure on the safe and efficient use of navigable • airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. A copy of this determination will be forwarded to the Federal Aviation Administration Flight Procedures Office if the structure is subject to the issuance of a Notice To Airman(NOTAM). If you have any questions, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-5972-OE Signature Control No: 697967-125999008 ( TMP -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-5964-OE (` 2601 Meacham Blvd. 0 Fort Worth, TX 76137-0520 Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Met Tower Mast09 Location: New Raymer, CO Latitude: 40-56-46.72N NAD 83 Longitude: I03-48-55.55W Heights: 262 feet above ground level (AGL) 5488 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a . hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system - Chapters 4,8(M-Dual),&12. It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2,Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-5964-OE. Signature Control No: 697959-126000497 (DNE-WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. � Air Traffic Airspace Branch, ASW-520 2010-WTW-5963-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 **DETERMINATION OF NO HAZARD TO AIR NAVIGATION FOR TEMPORARY STRUCTURE** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Met Tower Mast 10 Location: New Raymer, CO Latitude: 40-56-40.67N NAD 83 Longitude: 103-48-57.27W Heights: 262 feet above ground level (AGL) 5498 feet above mean sea level (AMSL) This aeronautical study revealed that the temporary structure does not exceed obstruction standards and would • not be a hazard to air navigation provided the following condition(s), if any, is (are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system - Chapters 4,8(M-Dual),&12. While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. Construction of a permanent structure at this location requires separate notice to the FAA. This determination expires on 05/14/2012 unless extended, revised or terminated by the issuing office. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. Any changes in coordinates and/or heights will void this determination. Any future construction or alteration, including increase to heights, requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of a structure. However, this equipment shall not exceed the overall heights as • indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. Page 1 of 2 This determination did not include an evaluation of the permanent structure associated with the use of this temporary structure. If the permanent structure will exceed Title 14 of the Code of Federal Regulations,part 77.13, a separate aeronautical study and FAA determination is required. This determination concerns the effect of this temporary structure on the safe and efficient use of navigable • airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. A copy of this determination will be forwarded to the Federal Aviation Administration Flight Procedures Office if the structure is subject to the issuance of a Notice To Airman(NOTAM). If you have any questions, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-5963-OE Signature Control No: 697958-125999569 ( TMP -WT) Earl Newalu Specialist • Page 2 of 2 — Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-5962-OE I. �` 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 **DETERMINATION OF NO HAZARD TO AIR NAVIGATION FOR TEMPORARY STRUCTURE** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Met Tower Mast 11 Location: New Raymer, CO Latitude: 40-56-46.54N NAD 83 Longitude: 103-48-47.46W Heights: 262 feet above ground level (AGL) 5482 feet above mean sea level (AMSL) • This aeronautical study revealed that the temporary structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is (are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system- Chapters 4,8(M-Dual),&12. While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. Construction of a permanent structure at this location requires separate notice to the FAA. This determination expires on 05/14/2012 unless extended, revised or terminated by the issuing office. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. Any changes in coordinates and/or heights will void this determination. Any future construction or alteration, including increase to heights, requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of a structure. However,this equipment shall not exceed the overall heights as • indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. Page 1 of 2 This determination did not include an evaluation of the permanent structure associated with the use of this temporary structure. If the permanent structure will exceed Title 14 of the Code of Federal Regulations,part 77.13, a separate aeronautical study and FAA determination is required. This determination concerns the effect of this temporary structure on the safe and efficient use of navigable • airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. A copy of this determination will be forwarded to the Federal Aviation Administration Flight Procedures Office if the structure is subject to the issuance of a Notice To Airman (NOTAM). If you have any questions, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-5962-OE Signature Control No: 697957-125999568 ( TMP -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-5961-OE ��" 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Met Tower Mast12 Location: New Raymer, CO Latitude: 40-58-16.03N NAD 83 Longitude: 103-44-25.93W Heights: 262 feet above ground level (AGL) 5396 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system- Chapters 4,8(M-Dual),&12. It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 05/14/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-5961-OE. Signature Control No: 697956-126000300 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-5960-OE 2601 Meacham Blvd. 0 ___ Fort Worth, TX 76137-0520 Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 **DETERMINATION OF NO HAZARD TO AIR NAVIGATION FOR TEMPORARY STRUCTURE** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Met Tower Mast13 Location: New Raymer, CO Latitude: 40-58-10.10N NAD 83 Longitude: 103-44-27.46W Heights: 262 feet above ground level (AGL) 5410 feet above mean sea level (AMSL) This aeronautical study revealed that the temporary structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is (are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system - Chapters 4,8(M-Dual),&12. Construction of a permanent structure at this location requires separate notice to the FAA. This determination expires on 05/14/2012 unless extended, revised or terminated by the issuing office. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. Any changes in coordinates and/or heights will void this determination. Any future construction or alteration, including increase to heights, requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of a structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. • Page 1 of 2 This determination did not include an evaluation of the permanent structure associated with the use of this temporary structure. If the permanent structure will exceed Title 14 of the Code of Federal Regulations,part 77.13, a separate aeronautical study and FAA determination is required. This determination concerns the effect of this temporary structure on the safe and efficient use of navigable • airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. A copy of this determination will be forwarded to the Federal Aviation Administration Flight Procedures Office if the structure is subject to the issuance of a Notice To Airman(NOTAM). If you have any questions, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-5960-OE Signature Control No: 697955-125999005 ( TMP -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-5959-OE 1♦ i 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 05/14/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 **DETERMINATION OF NO HAZARD TO AIR NAVIGATION FOR TEMPORARY STRUCTURE** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Met Tower Mast14 Location: New Raymer, CO Latitude: 40-58-16.78N NAD 83 Longitude: 103-44-18.05W Heights: 262 feet above ground level (AGL) 5400 feet above mean sea level (AMSL) • This aeronautical study revealed that the temporary structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is (are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, a med-dual system- Chapters 4,8(M-Dual),&12. Construction of a permanent structure at this location requires separate notice to the FAA. This determination expires on 05/14/2012 unless extended, revised or terminated by the issuing office. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. This determination is based, in part, on the foregoing description which includes specific coordinates and heights. Any changes in coordinates and/or heights will void this determination. Any future construction or alteration, including increase to heights, requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of a structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. • Page 1 of 2 This determination did not include an evaluation of the permanent structure associated with the use of this temporary structure. If the permanent structure will exceed Title 14 of the Code of Federal Regulations,part 77.13, a separate aeronautical study and FAA determination is required. This determination concerns the effect of this temporary structure on the safe and efficient use of navigable • airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. A copy of this determination will be forwarded to the Federal Aviation Administration Flight Procedures Office if the structure is subject to the issuance of a Notice To Airman(NOTAM). If you have any questions, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-5959-OE Signature Control No: 697954-125999007 ( TMP -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-817-OE Li 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE01 0452.TX.010 Location: New Raymer, CO Latitude: 40-55-19.15N NAD 83 Longitude: 103-52-08.17W Heights: 389 feet above ground level (AGL) 5661 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-817-OE. Signature Control No: 678001-123214040 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. 1� Air Traffic Airspace Branch, ASW-520 2010-WTW-816-OE ' 2601 Meacham Blvd. • __ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE02 Location: New Raymer, CO Latitude: 40-55-10.98N NAD 83 Longitude: 103-51-52.15W Heights: 389 feet above ground level (AGL) 5692 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date • prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However,this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-816-OE. Signature Control No: 678000-123214044 (DNE-WT ) Earl Newalu Specialist • • Page 2 of 2 F) ederal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-819-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE03 Location: New Raymer, CO Latitude: 40-55-20.48N NAD 83 Longitude: 103-51-48.48W Heights: 389 feet above ground level (AGL) 5663 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date . prescribed by the FCC for completion of construction, or the date the FCC denies the application. Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-819-OE. Signature Control No: 678003-123214335 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. '4.( Air Traffic Airspace Branch, ASW-520 2010-WTW-871-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE04 Location: New Raymer, CO Latitude: 40-55-16.24N NAD 83 Longitude: 103-51-30.12W Heights: 389 feet above ground level (AGL) 5686 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-871-OE. Signature Control No: 678055-123214331 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-815-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine CE05 Location: New Raymer, CO Latitude: 40-55-26.39N NAD 83 Longitude: 103-51-26.49W Heights: 389 feet above ground level (AGL) 5676 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-815-OE. Signature Control No: 677999-123214039 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-814-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE06 Location: New Raymer, CO Latitude: 40-55-38.97N NAD 83 Longitude: 103-51-26.31W Heights: 389 feet above ground level (AGL) 5661 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. . Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-814-OE. Signature Control No: 677998-123214045 (DNE -WT) Earl Newalu Specialist Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-813-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE07 Location: New Raymer, CO Latitude: 40-55-12.02N NAD 83 Longitude: 103-51-06.60W Heights: 389 feet above ground level (AGL) 5681 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-813-OE. Signature Control No: 677997-123214041 ( DNE -WT ) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-870-OE 2601 Meacham Blvd. __ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE08 Location: New Raymer, CO Latitude: 40-55-12.02N NAD 83 Longitude: 103-50-53.64W Heights: 389 feet above ground level (AGL) 5682 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a . hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-870-OE. Signature Control No: 678054-123214333 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-869-OE �` 2601 Meacham Blvd. • ___ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE09 Location: New Raymer, CO Latitude: 40-55-14.44N NAD 83 Longitude: 103-50-43.04W Heights: 389 feet above ground level (AGL) 5682 feet above mean sea level (AMSL) . This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-869-OE. Signature Control No: 678053-123215612 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. cD ' Air Traffic Airspace Branch, ASW-520 2010-WTW-812-OE 2601 Meacham Blvd. • _ . Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE10 Location: New Raymer, CO Latitude: 40-55-19.49N NAD 83 Longitude: 103-50-35.04W Heights: 389 feet above ground level (AGL) 5673 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc.,which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-812-OE. Signature Control No: 677996-123214826 (DNE -WT ) Earl Newalu Specialist • I Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-868-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE11 Location: New Raymer, CO Latitude: 40-55-33.92N NAD 83 Longitude: 103-50-34.79W Heights: 389 feet above ground level (AGL) 5672 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE iEXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-868-OE. Signature Control No: 678052-123215613 ( DNE-WT) Earl Newalu Specialist Page 2 of 2 Federal Aviation Administration Aeronautical Study No. I. �� Air Traffic Airspace Branch, ASW-520 2010-WTW-811-OE . 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE12 Location: New Raymer, CO Latitude: 40-55-50.38N NAD 83 Longitude: I03-51-00.25W Heights: 389 feet above ground level(AGL) 5652 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a '• hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination,the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-811-OE. Signature Control No: 677995-123214824 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. ,'( Air Traffic Airspace Branch, ASW-520 2010-WTW-867-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE13 Location: New Raymer, CO Latitude: 40-55-52.18N NAD 83 Longitude: 103-50-48.41W Heights: 389 feet above ground level (AGL) 5664 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a uphazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part 1) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-867-OE. Signature Control No: 678051-123215611 ( DNE -WT) Earl Newalu Specialist M • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. '( Air Traffic Airspace Branch, ASW-520 2010-WTW-810-OE 2601 Meacham Blvd. • ___ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE14 Location: New Raymer, CO Latitude: 40-55-53.83N NAD 83 Longitude: 103-50-35.17W Heights: 389 feet above ground level (AGL) 5648 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-810-OE. Signature Control No: 677994-123214821 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 - Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-809-OE 2601 Meacham Blvd. • _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GEI S Location: New Raymer, CO Latitude: 40-56-20.87N NAD 83 Longitude: 103-50-14.99W Heights: 389 feet above ground level (AGL) 5642 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended,revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-809-OE. Signature Control No: 677993-123214820 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-866-OE l• roof 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE16 Location: New Raymer, CO Latitude: 40-56-28.10N NAD 83 Longitude: 103-50-11.35W Heights: 389 feet above ground level (AGL) 5644 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-866-OE. Signature Control No: 678050-123215608 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. r. Air Traffic Airspace Branch, ASW-520 2010-WTW-865-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE17 Location: New Raymer, CO Latitude: 40-56-36.95N NAD 83 Longitude: 103-50-05.17W Heights: 389 feet above ground level (AGL) 5632 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a 1p hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc.,which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-865-OE. Signature Control No: 678049-123215607 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-808-OE 2601 Meacham Blvd. 0 Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE18 Location: New Raymer, CO Latitude: 40-56-39.58N NAD 83 Longitude: 103-49-52.72W Heights: 389 feet above ground level (AGL) 5625 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a ihazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-808-OE. Signature Control No: 677992-123214805 (DNE-WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. �` Air Traffic Airspace Branch, ASW-520 2010-WTW-807-OE . 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE19 Location: New Raymer, CO Latitude: 40-56-03.65N NAD 83 Longitude: 103-49-52.37W Heights: 389 feet above ground level (AGL) 5644 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-807-OE. Signature Control No: 677991-123214803 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-864-OE 2601 Meacham Blvd. 0 __ . Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE20 Location: New Raymer, CO Latitude: 40-56-17.20N NAD 83 Longitude: 103-49-48.88W Heights: 389 feet above ground level (AGL) 5641 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a . hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-864-OE. Signature Control No: 678048-123215606 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-863-OE � 2601 Meacham Blvd. • __ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE21 Location: New Raymer, CO Latitude: 40-55-53.60N NAD 83 Longitude: 103-49-27.15W Heights: 389 feet above ground level (AGL) 5642 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-863-OE. Signature Control No: 678047-123215605 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 -- Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-806-OE " 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE22 Location: New Raymer, CO Latitude: 40-56-03.60N NAD 83 Longitude: 103-49-25.04W Heights: 389 feet above ground level (AGL) 5625 feet above mean sea level (AMSL) Ain This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a yr hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-806-OE. Signature Control No: 677990-123214800 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. ir:) Air Traffic Airspace Branch, ASW-520 2010-WTW-805-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE23 Location: New Raymer, CO Latitude: 40-55-24.21N NAD 83 Longitude: 103-49-11.21W Heights: 389 feet above ground level (AGL) 5637 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&I3(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-805-OE. Signature Control No: 677989-123214792 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-862-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE24 Location: New Raymer, CO Latitude: 40-55-28.83N NAD 83 Longitude: 103-48-56.03W Heights: 389 feet above ground level (AGL) 5633 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-862-OE. Signature Control No: 678046-123215590 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. .( Air Traffic Airspace Branch, ASW-520 2010-WTW-861-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE25 Location: New Raymer, CO Latitude: 40-55-33.93N NAD 83 Longitude: 103-48-47.73W Heights: 389 feet above ground level (AGL) 5634 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-861-OE. Signature Control No: 678045-123215568 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-804-OE �� 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE26 Location: New Raymer, CO Latitude: 40-55-43.OON NAD 83 Longitude: 103-48-43.29W Heights: 389 feet above ground level (AGL) 5627 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&I3(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-804-OE. Signature Control No: 677988-123214786 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-860-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE27 Location: New Raymer, CO Latitude: 40-55-13.54N NAD 83 Longitude: 103-48-48.74W Heights: 389 feet above ground level (AGL) 5639 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a . hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-860-OE. Signature Control No: 678044-123215565 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 - Federal Aviation Administration Aeronautical Study No. (N. Air Traffic Airspace Branch, ASW-520 2010-WTW-803-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy-TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE28 Location: New Raymer, CO Latitude: 40-55-12.28N NAD 83 Longitude: 103-48-33.50W Heights: 389 feet above ground level (AGL) 5635 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-803-OE. Signature Control No: 677987-123214784 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-802-OE 2601 Meacham Blvd. • _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy-TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE29 Location: New Raymer, CO Latitude: 40-56-45.99N NAD 83 Longitude: 103-49-13.26W Heights: 389 feet above ground level (AGL) 5610 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a 1phazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-802-OE. Signature Control No: 677986-123214783 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-859-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE30 Location: New Raymer, CO Latitude: 40-56-40.53N NAD 83 Longitude: 103-48-56.63W Heights: 389 feet above ground level (AGL) 5623 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a . hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&I3(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-859-OE. Signature Control No: 678043-123215564 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-801-OE I. 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE31 Location: New Raymer, CO Latitude: 40-56-46.08N NAD 83 Longitude: 103-48-47.38W Heights: 389 feet above ground level (AGL) 5606 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-801-OE. Signature Control No: 677985-123214782 (DNE -WT) Earl Newalu Specialist • Page 2 of 2 - Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-800-OE 2601 Meacham Blvd. 0 Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy-TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE32 Location: New Raymer, CO Latitude: 40-56-27.26N NAD 83 Longitude: 103-48-02.04W Heights: 389 feet above ground level (AGL) 5602 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE aEXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-800-OE. Signature Control No: 677984-123214781 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. (N. Air Traffic Airspace Branch, ASW-520 2010-WTW-858-OE 2601 Meacham Blvd. • _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE33 Location: New Raymer, CO Latitude: 40-56-30.83N NAD 83 Longitude: 103-47-52.96W Heights: 389 feet above ground level (AGL) 5592 feet above mean sea level(AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a * hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE iEXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-858-OE. Signature Control No: 678042-123215563 (DNE -WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air 2601 TrafficMeac AirspacehamBlvd. Branch, ASW-520 2010-WTW-857-OE • _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE34 Location: New Raymer, CO Latitude: 40-56-31.97N NAD 83 Longitude: 103-47-22.96W Heights: 389 feet above ground level (AGL) 5595 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination,the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be • used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-857-OE. Signature Control No: 678041-123215562 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-799-OE �I 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE35 Location: New Raymer, CO Latitude: 40-56-41.47N NAD 83 Longitude: 103-47-13.33W Heights: 389 feet above ground level (AGL) 5586 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be • used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-799-OE. Signature Control No: 677983-123214763 ( DNE-WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. '( Air Traffic Airspace Branch, ASW-520 2010-WTW-856-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE36 Location: New Raymer, CO Latitude: 40-55-37.59N NAD 83 Longitude: 103-47-44.56W Heights: 389 feet above ground level (AGL) 5602 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be • used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-856-OE. Signature Control No: 678040-123215561 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-798-OE .' 2601 Meacham Blvd. • ' Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE37 Location: New Raymer, CO Latitude: 40-55-43.68N NAD 83 Longitude: 103-47-37.86W Heights: 389 feet above ground level (AGL) 5609 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2,Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be • used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-798-OE. Signature Control No: 677982-123214762 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-855-OE 2601 Meacham Blvd. • _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE38 Location: New Raymer, CO Latitude: 40-55-53.67N NAD 83 Longitude: 103-47-31.65W Heights: 389 feet above ground level (AGL) 5593 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a alhazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be • used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-855-OE. Signature Control No: 678039-123215560 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-797-OE 2601 Meacham Blvd. • ,_ . Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE39 Location: New Raymer, CO Latitude: 40-56-03.66N NAD 83 Longitude: 103-47-20.01W Heights: 389 feet above ground level (AGL) 5594 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be • used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-797-OE. Signature Control No: 677981-123214761 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-854-OE 2601 Meacham Blvd. Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE40 Location: New Raymer, CO Latitude: 40-56-10.87N NAD 83 Longitude: 103-47-14.79W Heights: 389 feet above ground level (AGL) 5594 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. •This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-854-OE. Signature Control No: 678038-123215559 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-796-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE4l Location: New Raymer, CO Latitude: 40-56-10.25N NAD 83 Longitude: 103-46-55.39W Heights: 389 feet above ground level (AGL) 5561 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE fb EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-796-OE. Signature Control No: 677980-123214759 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-853-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE42 Location: New Raymer, CO Latitude: 40-56-15.64N NAD 83 Longitude: 103-46-46.90W Heights: 389 feet above ground level (AGL) 5585 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-853-OE. Signature Control No: 678037-123215558 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-795-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE43 Location: New Raymer, CO Latitude: 40-56-21.36N NAD 83 Longitude: 103-46-39.36W Heights: 389 feet above ground level (AGL) 5575 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a 1p hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-795-OE. Signature Control No: 677979-123214757 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-794-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE44 Location: New Raymer, CO Latitude: 40-57-24.97N NAD 83 Longitude: 103-46-46.52W Heights: 389 feet above ground level (AGL) 5564 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-794-OE. Signature Control No: 677978-123214758 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 0 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-852-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE45 Location: New Raymer, CO Latitude: 40-57-35.14N NAD 83 Longitude: 103-46-36.20W Heights: 389 feet above ground level (AGL) 5550 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-852-OE. Signature Control No: 678036-123215557 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-793-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE46 Location: New Raymer, CO Latitude: 40-57-37.89N NAD 83 Longitude: 103-46-14.59W Heights: 389 feet above ground level (AGL) 5564 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-793-OE. Signature Control No: 677977-123214756 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-792-OE 2601 Meacham Blvd. Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE47 Location: New Raymer, CO Latitude: 40-56-56.94N NAD 83 Longitude: 103-46-12.27W Heights: 389 feet above ground level (AGL) 5575 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-792-OE. Signature Control No: 677976-123214755 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-851-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE48 Location: New Raymer, CO Latitude: 40-57-08.13N NAD 83 Longitude: 103-46-09.20W Heights: 389 feet above ground level (AGL) 5569 feet above mean sea level (AMSL) an This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be • used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-851-OE. Signature Control No: 678035-123215556 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-791-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE49 Location: New Raymer, CO Latitude: 40-57-19.91N NAD 83 Longitude: 103-45-57.68W Heights: 389 feet above ground level (AGL) 5563 feet above mean sea level (AMSL) aik This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-791-OE. Signature Control No: 677975-123214751 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-790-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE50 Location: New Raymer, CO Latitude: 40-56-47.22N NAD 83 Longitude: 103-45-46.36W Heights: 389 feet above ground level (AGL) 5575 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-790-OE. Signature Control No: 677974-123214752 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-789-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE51 Location: New Raymer, CO Latitude: 40-56-31.53N NAD 83 Longitude: 103-45-39.98W Heights: 389 feet above ground level (AGL) 5571 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-789-OE. Signature Control No: 677973-123214749 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-850-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE52 Location: New Raymer, CO Latitude: 40-56-35.86N NAD 83 Longitude: 103-45-26.77W Heights: 389 feet above ground level (AGL) 5565 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-850-OE. Signature Control No: 678034-123215555 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-849-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE53 Location: New Raymer, CO Latitude: 40-56-42.50N NAD 83 Longitude: 103-45-20.53W Heights: 389 feet above ground level (AGL) 5566 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-849-OE. Signature Control No: 678033-123215554 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 -- Federal Aviation Administration Aeronautical Study No. .( Air Traffic Airspace Branch, ASW-520 2010-WTW-788-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy-TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE54 Location: New Raymer, CO Latitude: 40-56-47.94N NAD 83 Longitude: 103-45-13.16W Heights: 389 feet above ground level (AGL) 5564 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-788-OE. Signature Control No: 677972-123214747 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-848-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE55 Location: New Raymer, CO Latitude: 40-56-46.58N NAD 83 Longitude: 103-44-59.07W Heights: 389 feet above ground level (AGL) 5550 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be • used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-848-OE. Signature Control No: 678032-123215552 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-847-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE56 Location: New Raymer, CO Latitude: 40-56-49.41N NAD 83 Longitude: 103-44-47.77W Heights: 389 feet above ground level (AGL) 5554 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-847-OE. Signature Control No: 678031-123215551 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-787-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE57 Location: New Raymer, CO Latitude: 40-56-39.68N NAD 83 Longitude: 103-44-27.00W Heights: 389 feet above ground level (AGL) 5544 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&I3(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-787-OE. Signature Control No: 677971-123214748 ( DNE -WT ) Earl Newalu Specialist w • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-786-OE 2601 Meacham Blvd. �`• Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE58 Location: New Raymer, CO Latitude: 40-57-00.94N NAD 83 Longitude: 103-44-37.50W Heights: 389 feet above ground level (AGL) 5542 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-786-OE. Signature Control No: 677970-123214746 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch,ASW-520 2010-WTW-846-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE59 Location: New Raymer, CO Latitude: 40-57-13.41N NAD 83 Longitude: 103-44-35.89W Heights: 389 feet above ground level (AGL) 5541 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2,Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-846-OE. Signature Control No: 678030-123215550 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-785-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE60 Location: New Raymer, CO Latitude: 40-57-27.28N NAD 83 Longitude: 103-44-37.85W Heights: 389 feet above ground level (AGL) 5536 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-785-OE. Signature Control No: 677969-123214743 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-845-OE 2601 Meacham Blvd. . Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE61 Location: New Raymer, CO Latitude: 40-57-32.57N NAD 83 Longitude: 103-44-29.58W Heights: 389 feet above ground level (AGL) 5546 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-845-OE. Signature Control No: 678029-123215549 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-844-OE �� 2601 Meacham Blvd. • __. Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE62 Location: New Raymer, CO Latitude: 40-57-36.56N NAD 83 Longitude: 103-44-20.48W Heights: 389 feet above ground level (AGL) 5542 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. . This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-844-OE. Signature Control No: 678028-123215548 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. (Nii. Air Traffic Airspace Branch, ASW-520 2010-WTW-784-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE63 Location: New Raymer, CO Latitude: 40-57-41.60N NAD 83 Longitude: 103-44-12.68W Heights: 389 feet above ground level (AGL) 5533 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-784-OE. Signature Control No: 677968-123214734 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-843-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE64 Location: New Raymer, CO Latitude: 40-57-52.26N NAD 83 Longitude: 103-44-35.58W Heights: 389 feet above ground level (AGL) 5545 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a 1' hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-843-OE. Signature Control No: 678027-123215546 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-783-OE � " 2601 Meacham Blvd. • _ __ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine GE65 Location: New Raymer, CO Latitude: 40-58-03.93N NAD 83 Longitude: 103-44-35.36W Heights: 389 feet above ground level (AGL) 5537 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a gip hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2,Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-783-OE. Signature Control No: 677967-123214733 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. OAir Traffic Airspace Branch, ASW-520 2010-WTW-842-OE 2601 Meacham Blvd. • _ _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE66 Location: New Raymer, CO Latitude: 40-58-09.87N NAD 83 Longitude: 103-44-26.95W Heights: 389 feet above ground level (AGL) 5533 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-842-OE. Signature Control No: 678026-123215544 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-782-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE67 Location: New Raymer, CO Latitude: 40-58-16.38N NAD 83 Longitude: 103-44-17.71W Heights: 389 feet above ground level (AGL) 5524 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be • used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-782-OE. Signature Control No: 677966-123214724 ( DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. (N. Air Traffic Airspace Branch, ASW-520 2010-WTW-781-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE68 Location: New Raymer, CO Latitude: 40-54-28.63N NAD 83 Longitude: 103-48-58.65W Heights: 389 feet above ground level (AGL) 5644 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-781-OE. Signature Control No: 677965-123214723 (DNE -WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-780-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE69 Location: New Raymer, CO Latitude: 40-54-46.45N NAD 83 Longitude: 103-49-09.23W Heights: 389 feet above ground level (AGL) 5649 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-780-OE. Signature Control No: 677964-123214721 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-841-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE70 Location: New Raymer, CO Latitude: 40-54-49.39N NAD 83 Longitude: 103-48-52.68W Heights: 389 feet above ground level (AGL) 5648 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-841-OE. Signature Control No: 678025-123215543 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 - Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-779-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine GE71 Location: New Raymer, CO Latitude: 40-54-47.09N NAD 83 Longitude: 103-48-30.66W Heights: 389 feet above ground level (AGL) 5637 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination,the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&I3(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended,revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-779-OE. Signature Control No: 677963-123214695 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. ::( Air Traffic Airspace Branch, ASW-520 2010-WTW-762-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy-TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex25 Location: New Raymer, CO Latitude: 40-54-10.42N NAD 83 Longitude: 103-48-19.48W Heights: 410 feet above ground level (AGL) 5605 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2,Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE . EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be • used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-762-OE. Signature Control No: 677946-123214676 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-778-OE 2601 Meacham Blvd. Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex0l Location: New Raymer, CO Latitude: 40-52-22.16N NAD 83 Longitude: 103-51-52.99W Heights: 410 feet above ground level (AGL) 5683 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a Mr hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-778-OE. Signature Control No: 677962-123214694 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. �4 Air Traffic Airspace Branch, ASW-520 2010-WTW-840-OE I. �" 2601 Meacham Blvd. • _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex02 Location: New Raymer, CO Latitude: 40-52-18.56N NAD 83 Longitude: 103-51-33.44W Heights: 410 feet above ground level (AGL) 5688 feet above mean sea level (AMSL) An This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-840-OE. Signature Control No: 678024-123215511 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-777-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex03 Location: New Raymer, CO Latitude: 40-52-12.54N NAD 83 Longitude: 103-51-12.10W Heights: 410 feet above ground level (AGL) 5736 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-777-OE. Signature Control No: 677961-123214688 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 -- Federal Aviation Administration Aeronautical Study No. � Air Traffic Airspace Branch, ASW-520 2010-WTW-839-OE ' 2601 Meacham Blvd. • _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex04 Location: New Raymer, CO Latitude: 40-52-21.80N NAD 83 Longitude: 103-51-03.82W Heights: 410 feet above ground level (AGL) 5682 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-839-OE. Signature Control No: 678023-123215502 (DNE -WT) Earl Newalu Specialist . • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-838-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex05 Location: New Raymer, CO Latitude: 40-52-24.96N NAD 83 Longitude: I03-50-51.76W Heights: 410 feet above ground level (AGL) 5682 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-838-OE. Signature Control No: 678022-123215507 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. LAir Traffic Airspace Branch, ASW-520 2010-WTW-776-OE ' 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex06 Location: New Raymer, CO Latitude: 40-52-26.37N NAD 83 Longitude: 103-50-37.59W Heights: 410 feet above ground level (AGL) 5721 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-776-OE. Signature Control No: 677960-123214687 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-775-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex07 Location: New Raymer, CO Latitude: 40-52-16.84N NAD 83 Longitude: 103-50-05.55W Heights: 410 feet above ground level (AGL) 5660 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Pad I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-775-OE. Signature Control No: 677959-123214686 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-837-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex08 Location: New Raymer, CO Latitude: 40-52-21.42N NAD 83 Longitude: 103-49-53.16W Heights: 410 feet above ground level (AGL) 5644 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-837-OE. Signature Control No: 678021-123215505 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-774-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy-TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex09 Location: New Raymer, CO Latitude: 40-52-54.81N NAD 83 Longitude: 103-50-43.89W Heights: 410 feet above ground level (AGL) 5726 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-774-OE. Signature Control No: 677958-123214685 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. (N. Air Traffic Airspace Branch, ASW-520 2010-WTW-773-OE 2601 Meacham Blvd. i __ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordexl0 Location: New Raymer, CO Latitude: 40-53-15.47N NAD 83 Longitude: 103-51-30.02W Heights: 410 feet above ground level (AGL) 5731 feet above mean sea level (AMSL) . This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-773-OE. Signature Control No: 677957-123214042 ( DNE-WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. (Ni. Air Traffic Airspace Branch, ASW-520 2010-WTW-836-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordexl l Location: New Raymer, CO Latitude: 40-53-14.56N NAD 83 Longitude: 103-51-13.46W Heights: 410 feet above ground level (AGL) 5724 feet above mean sea level (AMSL) illThis aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-836-OE. Signature Control No: 678020-123214334 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. � Air Traffic Airspace Branch, ASW-520 2010-WTW-772-OE " 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordexl2 Location: New Raymer, CO Latitude: 40-53-17.91N NAD 83 Longitude: 103-51-01.31W Heights: 410 feet above ground level (AGL) 5726 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national . airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-772-OE. Signature Control No: 677956-123214038 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-835-OE 2601 Meacham Blvd. Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex13 Location: New Raymer, CO Latitude: 40-53-26.04N NAD 83 Longitude: 103-50-53.86W Heights: 410 feet above ground level (AGL) 5724 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-835-OE. Signature Control No: 678019-123214332 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 - Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-771-OE I. '' 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex14 Location: New Raymer, CO Latitude: 40-53-35.51N NAD 83 Longitude: 103-50-34.04W Heights: 410 feet above ground level (AGL) 5716 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be • used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-771-OE. Signature Control No: 677955-123214683 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-770-OE �` " 2601 Meacham Blvd. 0 _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex15 Location: New Raymer, CO Latitude: 40-53-44.17N NAD 83 Longitude: 103-50-59.91W Heights: 410 feet above ground level (AGL) 5725 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. • Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-770-OE. Signature Control No: 677954-123214046 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-769-OE 2601 Meacham Blvd. • _ _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex16 Location: New Raymer, CO Latitude: 40-54-05.67N NAD 83 Longitude: I03-50-57.32W Heights: 410 feet above ground level (AGL) 5717 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) While the structure does not constitute a hazard to air navigation, it would be located within or near a military training area and/or route. This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. I Page 1 of 2 NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national • airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-769-OE. Signature Control No: 677953-123214043 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. r) Air Traffic Airspace Branch, ASW-520 2010-WTW-768-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordexl7 Location: New Raymer, CO Latitude: 40-53-56.58N NAD 83 Longitude: 103-50-33.07W Heights: 410 feet above ground level (AGL) 5704 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. . This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-768-OE. Signature Control No: 677952-123214682 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-767-OE 2601 Meacham Blvd. • __. ' Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordexl8 Location: New Raymer, CO Latitude: 40-52-34.75N NAD 83 Longitude: 103-48-53.33W Heights: 410 feet above ground level (AGL) 5607 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be • used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-767-OE. Signature Control No: 677951-123214681 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. (.... Air Traffic Airspace Branch, ASW-520 2010-WTW-766-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex19 Location: New Raymer, CO Latitude: 40-52-36.06N NAD 83 Longitude: 103-48-39.25W Heights: 410 feet above ground level (AGL) 5569 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a 0 hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be a used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-766-OE. Signature Control No: 677950-123214680 ( DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-834-OE 2601 Meacham Blvd. 1 _ _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex20 Location: New Raymer, CO Latitude: 40-52-51.70N NAD 83 Longitude: 103-49-14.01W Heights: 410 feet above ground level (AGL) 5623 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a 4. hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE 0 EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. This determination does include temporary construction equipment such as cranes, derricks, etc., which may be ID used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-834-OE. Signature Control No: 678018-123215508 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-765-OE .1" 2601 Meacham Blvd. • ___ ' Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex21 Location: New Raymer, CO Latitude: 40-53-08.12N NAD 83 Longitude: 103-49-15.72W Heights: 410 feet above ground level (AGL) 5685 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height(7460-2,Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-765-OE. Signature Control No: 677949-123214679 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-833-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex22 Location: New Raymer, CO Latitude: 40-53-29.05N NAD 83 Longitude: 103-49-07.49W Heights: 410 feet above ground level (AGL) 5691 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-833-OE. Signature Control No: 678017-123215500 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 — Federal Aviation Administration Aeronautical Study No. ::( Air Traffic Airspace Branch, ASW-520 2010-WTW-764-OE I. ' 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy-TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex23 Location: New Raymer, CO Latitude: 40-53-25.18N NAD 83 Longitude: 103-48-43.88W Heights: 410 feet above ground level(AGL) 5687 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-764-OE. Signature Control No: 677948-123214678 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-763-OE 2601 Meacham Blvd. • _ _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex24 Location: New Raymer, CO Latitude: 40-53-48.77N NAD 83 Longitude: 103-48-42.65W Heights: 410 feet above ground level (AGL) 5681 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-763-OE. Signature Control No: 677947-123214677 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. (MS Air Traffic Airspace Branch, ASW-520 2010-WTW-832-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex26 Location: New Raymer, CO Latitude: 40-54-17.16N NAD 83 Longitude: 103-48-06.11W Heights: 410 feet above ground level (AGL) 5593 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-832-OE. Signature Control No: 678016-123215513 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. r) Air Traffic Airspace Branch, ASW-520 2010-WTW-761-OE " 2601 Meacham Blvd. • ___ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex27 Location: New Raymer, CO Latitude: 40-54-22.18N NAD 83 Longitude: 103-47-52.72W Heights: 410 feet above ground level (AGL) 5576 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X Within 5 days after the construction reaches its greatest height(7460-2,Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-761-OE. Signature Control No: 677945-123214674 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. , -:-( Air Traffic Airspace Branch, ASW-520 2010-WTW-760-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex28 Location: New Raymer, CO Latitude: 40-54-42.13N NAD 83 Longitude: 103-47-53.56W Heights: 410 feet above ground level (AGL) 5565 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-760-OE. Signature Control No: 677944-123214675 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 — Federal Aviation Administration Aeronautical Study No. , .-t( Air Traffic Airspace Branch, ASW-520 2010-WTW-759-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex29 Location: New Raymer, CO Latitude: 40-54-44.05N NAD 83 Longitude: 103-47-16.68W Heights: 410 feet above ground level (AGL) 5608 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2,Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. . This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-759-OE. Signature Control No: 677943-123214673 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 - Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-758-OE � ' 2601 Meacham Blvd. 0 Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex30 Location: New Raymer, CO Latitude: 40-54-32.90N NAD 83 Longitude: 103-46-46.96W Heights: 410 feet above ground level (AGL) 5595 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a gur hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-758-OE. Signature Control No: 677942-123214672 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 - Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-831-OE 1. 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex31 Location: New Raymer, CO Latitude: 40-54-38.50N NAD 83 Longitude: 103-46-37.20W Heights: 410 feet above ground level (AGL) 5600 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination,the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-831-OE. Signature Control No: 678015-123215504 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-830-OE 2601 Meacham Blvd. • _ _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy -TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex32 Location: New Raymer, CO Latitude: 40-55-12.95N NAD 83 Longitude: 103-46-37.54W Heights: 410 feet above ground level(AGL) 5618 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2,Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-830-OE. Signature Control No: 678014-123215501 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-757-OE ( '' 2601 Meacham Blvd. • _ _. Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex33 Location: New Raymer, CO Latitude: 40-55-16.18N NAD 83 Longitude: I03-46-24.57W Heights: 410 feet above ground level (AGL) 5599 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended,revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-757-OE. Signature Control No: 677941-123214671 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-756-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex34 Location: New Raymer, CO Latitude: 40-55-38.96N NAD 83 Longitude: 103-46-10.25W Heights: 410 feet above ground level (AGL) 5600 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. . This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-756-OE. Signature Control No: 677940-123214669 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 - Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-829-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex35 Location: New Raymer, CO Latitude: 40-55-45.80N NAD 83 Longitude: 103-46-01.36W Heights: 410 feet above ground level (AGL) 5576 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-829-OE. Signature Control No: 678013-123215498 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-755-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex36 Location: New Raymer, CO Latitude: 40-56-03.42N NAD 83 Longitude: 103-45-58.90W Heights: 410 feet above ground level (AGL) 5550 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC,within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-755-OE. Signature Control No: 677939-123214665 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-754-OE 2601 Meacham Blvd. • . Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy -TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex37 Location: New Raymer, CO Latitude: 40-56-00.62N NAD 83 Longitude: 103-43-23.55W Heights: 410 feet above ground level (AGL) 5512 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a lup hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However,this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-754-OE. Signature Control No: 677938-123214662 (DNE -WT) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. -• =� Air Traffic Airspace Branch, ASW-520 2010-WTW-828-OE ' • 2601 Meacham Blvd. • ___ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex38 Location: New Raymer, CO Latitude: 40-56-06.94N NAD 83 Longitude: 103-43-14.58W Heights: 410 feet above ground level (AGL) 5504 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended,revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-828-OE. Signature Control No: 678012-123215510 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-753-OE �� 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex39 Location: New Raymer, CO Latitude: 40-56-07.57N NAD 83 Longitude: I03-42-57.85W Heights: 410 feet above ground level (AGL) 5510 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a . hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-753-OE. Signature Control No: 677937-123214625 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-752-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex40 Location: New Raymer, CO Latitude: 40-56-19.90N NAD 83 Longitude: 103-42-49.95W Heights: 410 feet above ground level (AGL) 5501 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-752-OE. Signature Control No: 677936-123214624 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-827-OE �` 2601 Meacham Blvd. • _ _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex41 Location: New Raymer, CO Latitude: 40-56-27.70N NAD 83 Longitude: 103-42-42.79W Heights: 410 feet above ground level(AGL) 5512 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only- Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-827-OE. Signature Control No: 678011-123215506 ( DNE -WT) Earl Newalu Specialist S • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-751-OE 2601 Meacham Blvd. • _ ... Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex42 Location: New Raymer, CO Latitude: 40-56-36.40N NAD 83 Longitude: 103-42-31.59W Heights: 410 feet above ground level (AGL) 5519 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a . hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-751-OE. Signature Control No: 677935-123214613 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-750-OE F i 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex43 Location: New Raymer, CO Latitude: 40-56-59.22N NAD 83 Longitude: 103-42-04.92W Heights: 410 feet above ground level (AGL) 5495 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-750-OE. Signature Control No: 677934-123214618 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-826-OE (� 2601 Meacham Blvd. Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex44 Location: New Raymer, CO Latitude: 40-56-59.15N NAD 83 Longitude: 103-41-44.39W Heights: 410 feet above ground level (AGL) 5512 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting,white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-826-OE. Signature Control No: 678010-123215499 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-749-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex45 Location: New Raymer, CO Latitude: 40-57-00.50N NAD 83 Longitude: 103-41-28.88W Heights: 410 feet above ground level (AGL) 5516 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-749-OE. Signature Control No: 677933-123214609 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-748-OE (mi. � 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex46 Location: New Raymer, CO Latitude: 40-57-54.32N NAD 83 Longitude: 103-42-17.10W Heights: 410 feet above ground level (AGL) 5516 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-748-OE. Signature Control No: 677932-123214619 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-825-OE I. (` '" 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex47 Location: New Raymer, CO Latitude: 40-58-02.41N NAD 83 Longitude: 103-42-09.59W Heights: 410 feet above ground level (AGL) 5505 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-825-OE. Signature Control No: 678009-123215503 ( DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. `� Air Traffic Airspace Branch, ASW-520 2010-WTW-747-OE 2601 Meacham Blvd. • __v Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex48 Location: New Raymer, CO Latitude: 40-58-22.77N NAD 83 Longitude: 103-42-18.00W Heights: 410 feet above ground level (AGL) 5514 feet above mean sea level (AMSL) Ask This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. . This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-747-OE. Signature Control No: 677931-123214612 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 —- Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-824-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex49 Location: New Raymer, CO Latitude: 40-58-27.88N NAD 83 Longitude: 103-42-08.10W Heights: 410 feet above ground level (AGL) 5513 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE . EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-824-OE. Signature Control No: 678008-123215514 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-746-OE ' 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex50 Location: New Raymer, CO Latitude: 40-58-26.41N NAD 83 Longitude: 103-41-49.52W Heights: 410 feet above ground level (AGL) 5497 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-746-OE. Signature Control No: 677930-123214621 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. �E Air Traffic Airspace Branch, ASW-520 2010-WTW-823-OE I. �. 2601 Meacham Blvd. 0 Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex51 Location: New Raymer, CO Latitude: 40-57-53.28N NAD 83 Longitude: 103-41-44.69W Heights: 410 feet above ground level (AGL) 5503 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination,the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-823-OE. Signature Control No: 678007423215495 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 - Federal Aviation Administration Aeronautical Study No. �� Air Traffic Airspace Branch, ASW-520 2010-WTW-745-OE • 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy-TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex52 Location: New Raymer, CO Latitude: 40-57-58.78N NAD 83 Longitude: 103-41-32.52W Heights: 410 feet above ground level (AGL) 5484 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-745-OE. Signature Control No: 677929-123214616 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-822-OE 2601 Meacham Blvd. • ___ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex53 Location: New Raymer, CO Latitude: 40-58-08.68N NAD 83 Longitude: 103-41-27.79W Heights: 410 feet above ground level (AGL) 5471 feet above mean sea level(AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-822-OE. Signature Control No: 678006-123215497 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. :( Air Traffic Airspace Branch, ASW-520 2010-WTW-744-OE 2601 Meacham Blvd. • _ _ Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex54 Location: New Raymer, CO Latitude: 40-58-20.93N NAD 83 Longitude: 103-41-26.61W Heights: 410 feet above ground level (AGL) 5484 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination,the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-744-OE. Signature Control No: 677928-123214608 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-743-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex55 Location: New Raymer, CO Latitude: 40-57-53.74N NAD 83 Longitude: 103-40-03.12W Heights: 410 feet above ground level (AGL) 5433 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc.,which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-743-OE. Signature Control No: 677927-123214610 ( DNE -WT) Earl Newalu Specialist • Page 2 of 2 -` ' Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-821-OE 2601 Meacham Blvd. Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex56 Location: New Raymer, CO Latitude: 40-58-02.83N NAD 83 Longitude: 103-39-55.62W Heights: 410 feet above ground level (AGL) 5454 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-821-OE. Signature Control No: 678005-123215496 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. OAir Traffic Airspace Branch, ASW-520 2010-WTW-742-OE " 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy- TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex57 Location: New Raymer, CO Latitude: 40-58-08.05N NAD 83 Longitude: 103-39-44.35W Heights: 410 feet above ground level (AGL) 5443 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-742-OE. Signature Control No: 677926-123214620 (DNE-WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-741-OE ��` 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex58 Location: New Raymer, CO Latitude: 40-58-34.86N NAD 83 Longitude: I03-38-34.36W Heights: 410 feet above ground level (AGL) 5361 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc.,which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-741-OE. Signature Control No: 677925-123214615 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-820-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex59 Location: New Raymer, CO Latitude: 40-58-36.92N NAD 83 Longitude: 103-38-19.82W Heights: 410 feet above ground level (AGL) 5359 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration,be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-820-OE. Signature Control No: 678004-123215512 (DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-740-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex60 Location: New Raymer, CO Latitude: 40-58-47.47N NAD 83 Longitude: 103-38-09.12W Heights: 410 feet above ground level (AGL) 5400 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-740-OE. Signature Control No: 677924-123214607 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. i. -:_ .( Air Traffic Airspace Branch, ASW-520 2010-WTW-739-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex6l Location: New Raymer, CO Latitude: 40-54-23.42N NAD 83 Longitude: 103-45-11.99W Heights: 410 feet above ground level (AGL) 5490 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination,the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&l3(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-739-OE. Signature Control No: 677923-123214611 ( DNE -WT ) Earl Newalu Specialist • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. , r) Air Traffic Airspace Branch,ASW-520 2010-WTW-872-OE 2601 Meacham Blvd. • , ._ ' Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex62 Location: New Raymer, CO Latitude: 40-54-28.48N NAD 83 Longitude: 103-44-59.80W Heights: 410 feet above ground level (AGL) 5491 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-872-OE. Signature Control No: 678056-123215614 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 _ - Federal Aviation Administration Aeronautical Study No. (lir, Air Traffic Airspace Branch, ASW-520 2010-WTW-738-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex63 Location: New Raymer, CO Latitude: 40-54-45.34N NAD 83 Longitude: 103-44-38.92W Heights: 410 feet above ground level (AGL) 5432 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are)met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction(7460-2, Part I) _X Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-738-OE. Signature Control No: 677922-123214623 ( DNE -WT ) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-737-OE � 2601 Meacham Blvd. `� • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex64 Location: New Raymer, CO Latitude: 40-53-50.49N NAD 83 Longitude: 103-44-35.00W Heights: 410 feet above ground level (AGL) 5408 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2010-WTW-737-OE. Signature Control No: 677921-123214614 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-818-OE �� 2601 Meacham Blvd. • _ _. Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex65 Location: New Raymer, CO Latitude: 40-54-03.21N NAD 83 Longitude: 103-44-32.79W Heights: 410 feet above ground level (AGL) 5421 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a • hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint only - Chapters 12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-818-OE. Signature Control No: 678002-123215509 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-736-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex66 Location: New Raymer, CO Latitude: 40-54-14.28N NAD 83 Longitude: 103-44-27.45W Heights: 410 feet above ground level (AGL) 5436 feet above mean sea level (AMSL) • This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) _X_Within 5 days after the construction reaches its greatest height(7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance, please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-736-OE. Signature Control No: 677920-123214606 (DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-735-OE �` 2601 Meacham Blvd. Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy - TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations,part 77, concerning: Structure: Wind Turbine Nordex67 Location: New Raymer, CO Latitude: 40-54-20.84N NAD 83 Longitude: 103-44-13.73W Heights: 410 feet above ground level (AGL) 5423 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a iphazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2, Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at (404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-735-OE. Signature Control No: 677919-123214605 ( DNE -WT) Earl Newalu Specialist • • Page 2 of 2 Federal Aviation Administration Aeronautical Study No. Air Traffic Airspace Branch, ASW-520 2010-WTW-734-OE 2601 Meacham Blvd. • Fort Worth, TX 76137-0520 Issued Date: 03/01/2010 Mingyu Tang BP Alternative Energy -TX 700 Louisiana Street, 33rd Floor Houston, TX 77002 ** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** The Federal Aviation Administration has conducted an aeronautical study under the provisions of 49 U.S.C., Section 44718 and if applicable Title 14 of the Code of Federal Regulations, part 77, concerning: Structure: Wind Turbine Nordex68 Location: New Raymer, CO Latitude: 40-57-09.75N NAD 83 Longitude: 103-40-50.16W Heights: 410 feet above ground level (AGL) 5484 feet above mean sea level (AMSL) This aeronautical study revealed that the structure does not exceed obstruction standards and would not be a imp hazard to air navigation provided the following condition(s), if any, is(are) met: As a condition to this Determination, the structure is marked and/or lighted in accordance with FAA Advisory circular 70/7460-1 K Change 2, Obstruction Marking and Lighting, white paint/synchronized red lights - Chapters 4,12&13(Turbines). It is required that FAA Form 7460-2,Notice of Actual Construction or Alteration, be completed and returned to this office any time the project is abandoned or: At least 10 days prior to start of construction (7460-2, Part I) X Within 5 days after the construction reaches its greatest height (7460-2, Part II) This determination expires on 03/01/2012 unless: (a) extended, revised or terminated by the issuing office. (b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case,the determination expires on the date prescribed by the FCC for completion of construction, or the date the FCC denies the application. NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST BE POSTMARKED OR DELIVERED TO THIS OFFICE AT LEAST 15 DAYS PRIOR TO THE • EXPIRATION DATE. Page 1 of 2 Additional wind turbines or met towers proposed in the future may cause a cumulative effect on the national airspace system. This determination is based, in part, on the foregoing description which includes specific coordinates and heights . Any changes in coordinates will void this determination. Any future construction or alteration requires separate notice to the FAA. • This determination does include temporary construction equipment such as cranes, derricks, etc., which may be used during actual construction of the structure. However, this equipment shall not exceed the overall heights as indicated above. Equipment which has a height greater than the studied structure requires separate notice to the FAA. This determination concerns the effect of this structure on the safe and efficient use of navigable airspace by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or regulation of any Federal, State, or local government body. If we can be of further assistance,please contact our office at(404) 305-7082. On any future correspondence concerning this matter,please refer to Aeronautical Study Number 2010-WTW-734-OE. Signature Control No: 677918-123214622 (DNE -WT) Earl Newalu Specialist S • Page 2 of 2 • Exhibit K for USR- 1723 contains five oversized maps • Please see original file r • Jennifer VanEgdom From: Chris Gathman Sent: Monday, May 17, 2010 4:03 PM To: Bruce Barker; David Bauer; Donald Carroll; Lauren Light; Jennifer VanEgdom Subject: FW: Hearing for Case USR-1723 Attachments: EmailHHlogo2003.gif Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue, Greeley CO. 80631 Ph: (970)353-6100 ext. 3537 Fax: (970)304-6498 Original Message From: James Borgel [mailto:JBBorgel@hollandhart.com] Sent: Monday, May 17, 2010 3:23 PM To: Chris Gathman Subject: FW: Hearing for Case USR-1723 • James B. Borgel, Esq. Of Counsel Holland & Hart LLP 555 17th Street, Suite 3200 Denver, CO 80202 Phone (303) 295-8245 Cell: (720) 939-1454 Fax (303) 713-6314 E-mail: jbborgel@hollandhart.com <htto://console.mxlogic.com/redir/?LlceniijdIIFLT7e9CMOheFV- Mci9X6vbUrLObX3PP3b38UTsS8A2007PMkiGuvI42uNDOVJ5wOsIFCOkNP2bab5TzgoEVdvU2F6v0b Iog8Cv1SIjh09 rjPh04Nw5BOhOr9KvxYY1NJ4SvrooivKehhdNO3GEobw> IRS CIRCULAR 230 DISCLOSURE: This e-mail and any attached documents may contain provisions concerning a federal tax issue or issues. This e-mail and any attached documents are not intended or written to be used, and cannot be used, by any taxpayer for the purpose of avoiding penalties that may be imposed on any taxpayer by the Internal Revenue Service CONFIDENTIALITY NOTICE: This message is confidential and may be privileged. If you believe that this email has been sent to you in error, please reply to the sender that you received the message in error; then please delete this e-mail. Thank you. L 1 From: Gonzalez, David [mailto:David.Gonzalez2@bp.com] Sent: Monday, May 17, 2010 3:07 PM To: Cohen, Matthew; James Borgel; Elizabeth Mitchell Subject: Fw: Hearing for Case USR-1723 FYI Sent from my BlackBerry Wireless Device From: Kevin Oakes <jkoakes@yahoo.com> To: cgathman@co.weld.co.us <cgathman@co.weld.co.us> Cc: Gonzalez, David Sent: Mon May 17 21:49:54 2010 Subject: Hearing for Case USR-1723 Chris, • I do appreciate you getting back to me a couple weeks ago. I am interested in the proposal to be heard tomorrow - case number USR-1723. I am specifically concerned about the transmission line that will cross T1ON R58W Section 4. I have visited several times with David Gonzales regarding his plan to cross land I regard as my property. The county records show me as owning the rectangular north half of the SE corner of Section 4 of T10N, R58W and therefore not the owner of the land to be crossed. My property is, however, by history, usage, fence lines, and recognition by surrounding property owners as an irregular shape further to the southeast. Is tomorrow's (Tuesday, May 18) planning meeting the best forum to express my concerns? I believe it is to be heard at 1:30 in the Weld County Planning Department Hearing Room, 918 10th St. in Greeley. Can you confirm that time and location and that this would be the proper forum in which to say something? I also understand that the matter comes before the County Commissioners at 1:30 on Wednesday. It would be my hope that the County Commissioners table this matter until resolution of this conflict has been obtained. Thank you, Kevin Oakes • 2 • Jennifer VanEgdom From: Chris Gathman Sent: Tuesday, May 18, 2010 6:17 AM To: Kristine Ranslem; Jennifer VanEgdom Subject: FW: Landowner Response Cedar Creek Phase II Fe Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue, Greeley CO. 80631 Ph: (970)353-6100 ext. 3537 Fax: (970)304-6498 Original Message From: Millennium III Partnership, LLC [mailto:m3p@skybeam.com] Sent: Monday, May 17, 2010 8:44 PM To: Chris Gathman Subject: Landowner Response Cedar Creek Phase II We've received a request from British Petroleum to voice our support for the Cedar Creek wind farm project. We do support this project without reservation. We sent the following to be read into the record during the March • 16th hearing and are requesting that it be added to the minutes of the next meetings and hearings. With our thanks... To: The Weld County Department of Planning Services: Please read the following statement into the official record of comments given by landowners regarding The Cedar Creek Wind Farm Phase II: At its essence, our story is no different than those of our neighboring landowners. Each of us has our history of triumph and tragedy. All of us have endured flood and drought, high yields and low market prices; disasters both natural and man made. As you review the opinions put forth regarding construction of Phase II of The Cedar Creek Wind Farm, every producer and landowner can and likely will tell you that this renewable energy project will add stability to an uncertain agriculture economy. At full operational strength, land use and its value will inevitably increase in a reliable and measurable rate. It will establish a new sense of economic security that is, at the moment, diminishing on the family farm. During our 50 plus years as owners and producers, we have taken great pride with each harvest that our efforts, along the hard work and cooperation of so many others, have provided employment and a steady food source for this nation. Our cooperation with the United States Department of Defense illustrates an additional commitment we've made • by yielding a portion of our property for the purpose of national security. And of great importance, we must note that we've worked closely with British Petroleum since the early stages of the Phase II planning process and believe that they are operating in the best interest of the owners and 1 producers, the various environmental groups and the adjacent existing enterprises as they fulfill their obligations • to bring this vital energy resource online. With a clear sense history along with our unflagging dedication to uphold the legacy left by previous generations, we look to the future and stand behind this project and encourage all levels of Weld County government to do so, as well. Thank you. Peter K. Wehner Emily A.Brantley John E. Wehner III Owners Farm 9880 • • 2 MesKt MEMORANDUM • WilkTO: Board of County Commissioners 1 5/18/2010 FROM: Chris Gathman — Planner III (9. }. COLORADO SUBJECT: Recommended Revision to USR-1723 (Cedar Creek II) Resolution The Departments of Planning Services and Building Inspection recommend the following revision to the USR-1723 resolution: Revise Prior to Release of Building Permits Condition 6.F (page 16) to read: The structure will be classified as a U (Turbine) occupancy. The maintenance structures and offices will be B occupancy. Temporary structures will be classed accordingly. Fire resistance of walls and openings, construction requirements, maximum building height and allowable areas will be reviewed at the plan review. Setback and offset distances shall be determined by Chapter 23 Section 23-3-50 of the Weld County Code. • EXHIBIT - i7a BOARD OF COMMISSIONERS SIGN POSTING CERTIFICATE • THE LAST DAY TO POST THE SIGN IS April 4, 2010. THE SIGN SHALL BE POSTED ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW IS NOT ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE DEPARTMENT OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON THE PROPERTY AND POST A SECOND SIGN AT THE POINT AT WHICH THE DRIVEWAY (ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. I, CHRIS GATHMAN, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS POSTED ON THE PROPERTY AT LEAST TEN DAYS BEFORE THE BOARD OF COMMISSIONERS HEARING FOR USR-1723 IN THE AGRICULTURAL ZONE DISTRICT. Chris Gathman Name of Person Posting Sign 4A-4Q CG '(,tiftily� Signature of Person Posting Sign • STATE OF COLORADO ss. COUNTY OF WELD ) \ The foregoing instrument was subscribed and sworn to me this 1-`(�1 aay of PON , 2010. WITNESS my hand and official seal. ON. tary Public My Commission Expires: 10.-l'-l'I. • EXHIBIT - sae ) / ' ,P; • P : 7:t s.- . 4- ,, ,,,,_ .- , ,..4,..4... . / ..„,:-...,,, 4„,y,-.7 . - ...-, it 'I / ' t, l l i - . ,, \ 1-. 1 rt `st7 ,-ssii....:.•:. .i i ,. . „.. 0 , • i fry . _ , , • . , F- `�! �. 1 .:- ...4,, i1/4--!--,,; ' ,ate ~�• i � , / •' Y '1•. `t tL "Ikt C " /Ie +1 i 'r 'f ptti �, s K J, i +1�,s "r •Nis: •'el;; A.Z1 • — ' '•• • - .4'16- 1•,.. ' • 4 i - . ;lit :, ' ' Is?" t...,,i14.7...,1/4...‘*_:,470.— ....rat/ - .at."; 1 • \ .y�'< ;41? , � f - jr f_ w -d , ✓ 1• � y 4 /4,;VH. -1,_•,h- ": •., - i i f yl x .... �. /. . ..�/ 1 tom., •,,,, ,, , \ , ;.,. . , in , , ea, .., . . F!('ll "�. as ' ra:: •�a. l Q♦1 1 V l E C C(3 ' , 4 Oww't IV'(Li) 0 \I kt, r „ ,.. ii:3) I), 401•1 RI . iii... .444.44 IA' C O C 0 O A ...,1 0, it O cL. X • • cr- vit si ti i, -. .. ,Q) C) iv-. `� _(1.) (ND , ' . %.1 1 "--\ i -it f\A cr, u .4 , 4 ‘4,.. ' A, e• 0 a) a.) . --, , ,z, „,., 1 .k1 rt w u., ,. ,._Cr va0 C a 13) ir\H(44 el O :1 locl�\r _ . 1._. .r. ' +,fit ` 1I c,. ij� .j • • r - -;.game L.. C ICD di `� reek 0 NI Ulla CT3 C L. 0 ,‘,/) Irk ' ,- --..1 co\ ' QC9 o \ I J 0- - -- 5 reu a. 4) I O) it C vikmi lA itli_l \ 0 ° . 1 0 C >ml (D (IID wim, , dip �.. '- L. L. t -._ N — a3 ae. 0 Q , (ID -� -� ,,.\_ ce, .z s.• i - au w c > (/) D > . I a c . , . , , I cLI • as. •••••• 14 cit: . _ . Jilla ifk:) c j 17' Th., ....._ . i . 42 g., 0._ 0 z . . Ile ° 0 (1) r 14.1"ji (1.1. 1. CL1 IC ad% e ,f • •.. i .. . . . __ . si a . (i) o W .... \-,4 L ua fa: „.• .• „. . ... T. '', T.) ,- .0.....• re . ..... cji a) ....i % d ef:, i 4 14) ___... ! , _ • \ •,:. . 1 .... , 0, si t c, A • oi ,, 2 , ea rni0,1,0,„„CL • is. O (D O) .. ..;4. 11 cap.. / . Cl. Cr • O CD- .+� .I _ '- -_ f - —1~ A ' .1" • \I . . - r, _ � +' .•.". . ter-./ y .; " r , \ •ice 1 /y.• . r4 _"�:-• / \' •' _♦F\, •r. r- a. ' '/ ^'_ - ' a a • 0 • 1.t ,�� ....r` "� ter, r• I _• *• f ----- , T7.:_. i,•y ,j,lam ''• + sfi f - .In--...,-_ , . , �.a } %r' :� /. • i' . R..� ,,. v�Lf�' t. . I 1 \- 1 1 V , !. _-� • -_' J 1 F `` a7.r/r�"�v/.�� �y�i �C� \ n r • , /J//// , .`',.' Z Ilea + / • Y': A ₹•.; Y 5°`" yprosy„ k i 7.1- . .i 40; d soli A130, ♦ - - It . �' � : ti. Nal itt -1. 3.16. \ 417C04 \ 1;rs 1 t• i \IIiilt Irneftall. 0 i a ...isio 0 N‘IIIIIII1 la rlik tim) 0.1 - ina Ilk C 0 2 lieliglik as) ..,---- -----.1 liiiik itil,1 it ii ii0 clzri , La , , , zi._ >1/4amass ia,), itilialliNit Iiii. ,illt --..i. \\ie.\ c! ktla \i‘ 3 1W . NiPtit ila "Scilltionni, i t lila ...„.Q... 98 evisilips le:::i . -* . 0 10 c vehai 1 j14 ' 11/4\1 . C. h c_,A\ - ig-H.-i.:- - - 1... 1 >gi, It ....1:„. . .3,...1 c __...„... .41lit ]' '. . '= 140ia 7 - . 0 amij ei ihillii IfillIPI4 ^ate .r S --.. ' It NIN E . „ a) ir . . . a ,.., z , .. li • CD < ...... as ....• (1) o ...- " .(1). . . it (1, , . 0 Poi 0 c, ..e es i.7_. . _ ____ . . _.__ _ _. .... ._ _____ c ,. , Y --- a . . • --- ` �t-°'t,, ' i; t/ ' rI `_ + 113 i . r ' l wlr ,f,C, - ��•. ?.` : . . Y` �.. ` .31 • s _. .'•t•♦ �l�-4�Z 1 S „r ,�M .. ! ,' • �- a p -•.• �,y `* • 'l •rt �� •�_ r� '. � �. \`, Y. . / ti, •• •.. .Y" • e. '1/4 '14 it 7, .'• I ;. . 1 � .- • •� ' ' . rI 'l',• ( 1. - - -f.� Y'%R 1' .4-1+ l�~• YS;».� 4, `• •• T �'•� '• •�. -�•i-- 7_.. ... may' / re. , . ' 1- •t - r lit( C. 1...) .. . •-. „A. , / i , .... ..„,_ .............. ,,,,,„......._ ... , I, . ,..„. , . .. ,t .. „... , ___ ..._ „,... . .. __ . . . _ • , ._ . . _ ,.. ,, • • • .... . al. N .......... \ . S'Illitor se - •ll ' may. 1- S . • t . ;. ' . r , r• • - -- 1-N. • • w .4. . ir•lw, k .. ...... .... , _ , . , ti ._„, ii. '1.:,.. 44. Al; e ev . .. . , , 11:3 E la) • Q \..1 il \ \ ii'cri ki ''' i"re,,,,,L12;.:•••-.C NM-- °"....':' 2 .%%. > *114% %.1114% 0 1414 0 , • LAI lit (I) ‘...j O \ \lei\40i1/4 •.,,, i 1 1,,,t, 1'44, „,, ".... N 6k4 (1) Z T`� • •..\ A` . -11.4 -a�- ,. � `iJ ♦. �`441 +' '/�] 1`� i� .M :�1�' us .N. �• �. [ \\,5. l~' Jam, . <; :3 % .` . ` \V ' , , `/�dy om .: w . \ IIII illitiA I 6,;(/ ...;„..\\ II . et >1.4 C.VI N --;-ci,.\4,. . ' kill lea - '017 S ,( �l . t'I"• tl it ( \\ ( lei j d t . r,„.. \ it,4,E. }.ti.i . i „-- , ' .,1/4 '� i t ,, , '';.'",„:-----l-s-IP-Mik ...... 4.1:4• ...--.4-% o +4 ...... • . , ,...... \ ..., • \, N 1 .ik.° a 4 ( , .. . . .../. _, -...... 0 (in c C. (.. Vi\.) --Pct. d cir\ '%NI NC Itt \ 1 nrbr: : , i ...'% 1\ , cr. ,.., \ 2 0 E" a• \` 1 Et c S ••• . A.: .. . . k` l dill i MII ..-4 , � -- N. r �•• 1t • f.l ale /� "t��"'111 1� .�. i'( hV•' 1 _ , r END i`- t t -.- (0 1_ Lis • V (� ,- � �w • w • igier L .___ St//��'`J r- 3 t 1• � � iirke , a �-- f , ' - ., .<, ..� - -. - -I'`:`` we �• � • ` t • t t \ r. • 1.�� � /. A'.: . 1' C tji�•,\rlr,_ 1�>'t�. \�/ I,- � 3 ri '�l\ ' 1 �"� _.• \� _ j : I \- i• \ • \ ,` ' `�• . _tom t_ • - 1 •01/4. .‹ ,.. \r \�. t\ -.may - t ' / .. i N.S.1%-... - •••lt. \• - ♦te?. .�--C ' , 1 '4 +" '• % / t • • •`.� . ` •` ` `1• II t !)L •.t 1 I. • . ... \ . . • _. it.l�` ' `� Qy�-�.S , • PLANNING COMMISSIONERS' SIGN POSTING CERTIFICATE THE LAST DAY TO POST THE SIGN IS March 6, 2010. THE SIGN SHALL BE POSTED ADJACENT TO AND VISIBLE FROM A PUBLICLY MAINTAINED ROAD RIGHT-OF-WAY. IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW IS NOT ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE DEPARTMENT OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON THE PROPERTY AND POST A SECOND SIGN AT THE POINT AT WHICH THE DRIVEWAY (ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. I, CHRIS GATHMAN, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS POSTED ON THE PROPERTY AT LEAST TEN DAYS BEFORE THE PLANNING COMMISSIONERS HEARING FOR USR-1723 IN THE A (AGRICULTURAL) ZONE DISTRICT. CHRIS GATHMAN Name of Person Posting Sign 1,„ • L Signature of Person Posting Sign STATE OF COLORADO ss. COUNTY OF WELD The foregoing instrument was subscribed and sworn to me this t—I 'flay of \ \ Y'11 , 2010. WITNESS my hand and official seal. 4t Notary Public 1 My Commission Expires: 1CJ�\`\ • IEXHIBIT LE bC ) `I t3 .. c 1 t• I 4 •`/ I', ,1 . P /4 x ., i R 8 le l r � a r! s A • . i w 1. ( ^a$. ) .♦sad I . : . ►- �, • . lde s♦ .., ♦I/.t• «• 1 r ` p 1•'s - .r:-. Y4 "P,e"� • - • • . ` a .f , .r ,i- .- ".. , •.a1t•-� •X 1 ! . / .♦.7 /5._ r _ '�, 'T-'rj A" . ♦ " ,._ •f f:[: ." �� .r/be.rflr'-t 7 } _ ' •%�I .(tr q''• k — ! I' r-- 1 •1 Z r-,. - . 'f'. , t 1 _ ` 7 P f j q/J . ' • C' 2 • • 1 ' 1 • . ' ,:1 ,v- % ' ' - • . . . 1 . lit. Nev 5 Pr. i / '4 "(...j. x A 0 *tic :Is * "%. t. • o, , ....k... i I \ sic.; f T �' mot .. — 1 1 �l ji /, �� • . ....firz.\• / t 1 • "qr. ---.) ne, NCI - IL„,,,,,, % .) i i i .„0 le4‘,/,' r'ri.,:::11. ....(,.; IC:) ii.jU 119:1......_ '-it‘ irci N 0 / 1 �'Ott g ... , 4 . .,,•_ _.... ,„........ i itAr1/4- Q...., N o vi r �r . , . ..4, . , .. 4, A(1:7 „, Crs. C it Ct4 it immft, - --thzta 1 eilltun .„ 2 , .,.. ., at r Z r I f4,, ,a. ? Cis i 1 i (1,, ---.....„, Clk 1 ° (41 i - ..4,y I , 4ji-7, . _ __ / till> CO 12 ' . i. ,it, , r. r!/ ' ',,i it G 'S.• '. ..K ilica b a.... yy ,,30, -- (1) ,,...,,:iiL . . , R. c:,!. . , tiri vill•••• e„.. kis, 4zt „,‘,...., . j (R. St. tie b! IC J Oa 4 a :it :1" SF.iii... • / O AI I ., ,41." ill --..-.$ Si. CC \is) _..„4 ti, z c�, y. . ,. . ......, ... rry, -�� CIL � , Oil p • () Z 2 to ..),... h. ._— , ,� ar\C . N ICt�—, 4Z Ct ( ii- - ' , • : ''•`/ ._,Q iii, a �, , //:-.ih ii\--)- . v, (11.. al 0 , , i u. , , ... ,,,,..tier', . ... ..,, .. 4 1. a hik vest zz , P t rA Qiii:1Ce 1 Jkli • f all • J..t:: j "�• I i ICI r.5.11--.. V...... is:11:1) Wit. .( y� ;• °'°liii ‘iip.$4b%1 ----."' to • . , • • -iti It t.s...Th [ , it it .40 ell 4..j "$-•-~- iris �U ti r ....C.' \illikp a = ie., cr *-....., a) )'' _ ,,,.,,, .. ..„ -..., _ __ a w LL, .. , , \ . - . ,e, , i:t (..) _ .... .. , . . ..... .... -....1.... • r j ,` — •• • - yam •! _ � I l� ♦ � � .� f _ - �-- • I > 1 . -- -1- _ .may ;id' • • 1 �� :;, ti• t4 t •i , -"NowIgior4 > 'ifel( a /jyw i y 4. `• '• � f f ♦ a - ►.. 4.,t s,1 ,;?. 1 - il.r. it. ",..,....-ft4 -or_Jeg 7 1., .r4 ,Af • .00y., it r,. . ¢� J• 1'• $,1,. ,et ,t •44.405„ 4-4, 05„4-rets2 4, ;5' ^" r - • ',�, WI,?'.!-.4, •.. - :4,,`i. 4 :wit, „Ie. tf,,, itl.:Lliez.f. AD--, kg. of . -,* ssIg?e . 4, - ,,, �. .t f T �nl •\ •�}� � rt *ttej;4. .!Z`127, . , �'•�1' -irr7Cce .10--tiVrril:i5ce I 4a• . If Af • ii Ca) % f::: ,.x1I w-_If fir* ' I IRc \ at ..0.., k > tbar 4.* t t• gi) 0 t 1411, , ty. ' ctA 4 ,,, 1,,,,,..., 1 4.k . , - •* % . , -L „ , ;i) t"ft Vito �1 tlF' Y)4 a. fa-earr •.,,,,444. 411 ' t -_ 4., ,..... a 4 ,. .'4.- t t \,44 Ni.IC? 01 1 tr\1/44 \ it.;744tor . . iiry- ... „04; (1) (...z ..„„ . \ „anti... if.,°' D ,, , ... 4- t- Q) V \r\ %N Pk A ZCisw?1:(1\-\\ 1/47,. .4..:; et:sr:I ‘‘t i iii. (3) IQ \ • j _ma to s (.\\\ tii•• u x k .... _ . -,,, iiiito-.; ri::$1) to 4 ....,k tu 4, , ._ ,.:,. • CED I•viimak 'Nes \itilillS\ aa , , N.1 itli) ?) % L ZN ......„ ichr, (0 tu to rer +Day et L. ma 1 ... ft 0 t ois-.. v , _ . il ,,,,• (13 !clips, IIIIMMO o0 CI 2 z li, ,10%9,,,, . La „, t N1-• cli) R '• 1 in.< as iii4sk cibi\ iniC t Vt ea hit joill, i o +a cl ri ) ft.fsert4 3, c tr. LL �` st It kfill �' z = 1 ati) Q N ...,„.... ie..... .. ,, i r, Hi 15so. i 0 li w 4r ;sax Q., 2,\ ,... c tr)gral. Se)kS1 1 '(11): I C * ‘ s)d '. 0 \oft, FL apt 'CMS 4 in Ire .\.„ . - vo 6 :dr , Z 40.) tit ` 0 in Q K t' ," ----- .._-- - - , 0 _ a .4.. 4, . 3 . • � C !.' , ``� # A ` r 441 . ti" . • if", ' I if •er •r 1 1 _ I ' r � _ r s. r.....-re / ' i . ,' j .40.0,e> .%1L.N. .4 ° 1: • .. l r % 44,et. , :4, • C. i •,,„,,,i . % t (9. ...... tt • . ` re fi I h _ I .. . ‘ • "b - • •- • I 's ----4 "...; .0) e 1 C-3 4 a ... . „ . ._ 't, i .4 1. I a Zeirese...f.... . ar; tp --L . - ? - _ i. \ -, \ te. - . . -..... , „isz. - - . psi ic,„ in 0 riia; ...3, it 4.\ , \„,i, 4 j rf., \ >, u.1 - i ---c-_--- ... 1%cl r ' + ..- --.7 . m Q tidal1 11L/`L 3\a\l _si, k.,. 'p r 191 Y� Ni. \\\t• \1♦` •'.mot... '� . `� {A'- /J �� ` V • - �`♦ ` --a• .•� . s �.I� 1 i P 117 4 j\ \ �5Ao(`� s� ' �' • 1 '�•�. .--rvis:•,..,ge . to-a 0 0 (I) a G) _, \A_„\\:,-.3 ccia ' V II ©) (ti CO , t u .� �. ',. .. • , ilt C1 I • l� - ` .'. t +�i�" '�•r :iY , I`� 1 _ �'_}sue �' • ' N, 'it -1 , - -,... I fINIele,. si•Nlik...: / \C* •-•AC / e‘s‘.. 1 k / A.' s. I • ••••••••• \ I:\ . •s .in ,ill2. %muerte% �. i y1 r ' Ej lLlo••••••••• ...a ID •••••ilii r it.4.... ta U VI an 4/2 tkItI4 %C. tU N :41:14ts5i 0 . 2 z °I\ w • it,0 \\I4••• ia\ tig.... N , � �2 kri qiiit . 4l>illin O13 4 .• .. ... O\ (1) au0 ........ th et 0 (13�... .-•_ . l""---..il N\ Ili& u... o k cl., up) irD o < �,� 0 s es. Z. it, Yit a a) p is.. _ _ • '2 4 5 0 t Q.% ..... 4 . tt is''')•—b ‘.?.... N417 . 1 Ut. 0 1 . _. , r i ) ,..,C 4—• . U\ ...... eor "'too. li e‘giu the C • - tri ay - CA del C "•-••1y ill - Kevin Oakes — 970-371 -3059 Filio is Range 58W, Township 10N, the north half of the SE corner of Section 4 Pawnee National0 ' i. " • ••. Grassland r . ` ' „� ` Red Rectangle is `chat BP say is Filio ` •' Blue "Texas" is historic Filio t• *��: '1� Green line is proposed transmission line •' ' h 1 1-- r if 1 Hash?Lyric ; �� Granrug / Association �Q 1 • 7 M c..' VY // , A, f . illit:11 ..' A / r (II •-. A , i ‘;49-',N / t t- it f . Bar 1'Bu Ranch(Duane Brown; - - — - _ . i . �� — __ _ R 2 . • • ,...,Iry { �� ti If z 7IJ tit.: iM ti l CR 124 -j . - I -- CDM ti Jed �I I �10 , �• �/=` �� ' l.ar_-r�� ----r° ' a � k ... • seai' Proposed Wind Farm•Boundary «+K�' - is “.. . _. f,N' . , (An'• .` .1 I ,l{-. ....:. I tit's. it ... 1(t'.. . y.ti , .l .1, '^I - ♦i I=�I ` I \.� , . . . i j . ' 7J • • ,i . - - - _ � � — - --- — — — I ' II - . • EXHIBIT I a __jai__ Us ,- -
Hello