JAR Holdings
Conditions for Approval
USR-1652
Dust Abatement Plan:
Garden hose will be used to control any dust on or around driveway when needed
Weed Abatement Plan:
Any noxious weeds over 12"will be cut down as needed
Waste Removal System:
Western Disposal Services is the Garbage/Waste removal company
5880 Butte Mill Rd., PO Box 9100
Boulder, CO 80301 (303-444-2037)
Truck Maintenance:
All company vehicles are washed &serviced at the local Grease Monkey/Monkey Shine establishment
located at the corner of Colorado Blvd. & Hwy 119 in Firestone in the High Plains King Soopers Plaza
Handicap ADA Standards:
ADA standards are not applicable since the office is not on site&there currently are no non-ambulatory
employees. Should any future employees be non-ambulatory, we will make the appropriate ADA
standard arrangements.
Dan Rodarmel
Owner of JAR Holdings
7-1
2010-2879
� oph mom/ rlJ`7 s/1 S
i2/6,/ic7 � � iq7 �
Quality
Engineering LLC
WW W.QUALITY-ENGINEERING.BIZ
November 10, 2010
Mr. Dan Rodarmel
J.A.R. Concrete LLC
11621 Weld County Road 13
Longmont, CO 80504
Re: 11621 Weld County Road 13,Longmont(Weld County), Colorado
Pole Building Structural Observation (Project No: 1013-001)
Dear Mr. Rodarmel:
At your request, a representative of Quality Engineering, LLC was onsite on November 2, 2010
to observe and document the pole building at the above referenced address. The purpose of the
review was to determine the structural adequacy of the pole building for Weld County code
enforcement purposes. It is our understanding that the pole building will be utilized for storage.
OBSERVATIONS.INFORMATION,AND UNDERSTANDINGS:
• The pole building is approximately 32' wide by 56' long and 12' high from floor to ceiling.
The pole building was built in 1995 according to Weld County Records.
o Measured dimensions of the pole building are shown on pages 3 and 4 of the Pole Barn
Construction Building Guide available from Weld County(attached).
o There was one 8' wide roll-up door opening at each end of the pole building with double
2x10 headers.
o There was one 18' wide roll-up door opening at the east end of the pole building with a
double 1 3/4"x 11 3/4"Microllam header.
o One of the sidepost footers was dug out to the top of footer elevation at the time of our
observation and measured approximately 38" from grade to top of footer. Footer
dimensions were not visible at the time of our observation.
• Current adopted building code for Larimer County is the 2006 International Building Code.
Building Code requirements and assumptions are as follows:
o Snow Load: 20 PSF
o Wind Speed: 90 MPH(3-sec), Exposure C
o Seismic Category: B
o Min. Frost Depth: 30"
QUALITY ENGINEERING,LLC (970)416-7891 724 BRAMBLEBUSH STREET FORT COLLINS,COLORADO
Page 2
Re: 11621 Weld County Road 13,Longmont(Weld County), Colorado
Pole Building Structural Observation (Project No: 1013-001)
OPINIONS AND RECOMMENDATIONS:
• The Pole Building construction generally meets the current Pole Barn Construction Building
Guide available from Weld County(attached).
• The Pole Building has stood the test of time for 15 years without any noticeable defects or
damage to the structure.
• The Pole Building appears to be structurally adequate and can be used for its intended
purpose.
Quality Engineering, LLC has only visually investigated the items noted above. An in-depth
analysis of the entire structure was not performed. It is possible that structural defects exist as a
result of items that were not inspected or that are not visible. Quality Engineering, LLC makes
no guarantee on such items. If you have any questions or if you require further investigation
concerning this structure,please call at(970)416-7891.
Sincerely,
QUALITY ENGINEERING, LLC --- 0 LICE N‘11
QP ..-....-.. Ns, iP
���j0/ ,GEISEN' Fa II
1 % U(>� OT /%
r; 0 4\o a�3zs -/cc: r
Cody isen�orfer, P" tt o J f�W��
Attachments \ ,th�SS/ONM. 's
8/23/09
Pole Barn Construction
12
2'x4'purlin 24"O.C.installed on edge B'span max
612 Maximum or
2'x4'purlin 24"O.C.installed flat 4'span max
MGr - roof
mkr 29 Ga.Steel
•
' •
r I 7 L L 8 1l 0.C.
y. .
Engineered Truss
r
2x4 Lateral bracing / Truss notched into a
as required by post-see detail A,B, 2x_kgirts@
engineered truss &C,page5 oxn:2x 60240.0.with(4)200 nails
MFra-c""- wall
ma Ga.Steel(example)
r x t„,.treated post @ U t o.c.
min:6'x 6'or(3)2'x 6"0 8G.G
treated below ground
t.
Z x lo treated splash board
I ms:T '
Grade
tsvf=
Compacted earth -
Proper surface drainage required
Slope top of concrete for drainage 48"Mit :_'� i 38�min. ✓
Concrete or compacted earth__',*.o- `j.
Treated hold down cleats nailed with(4)3"nails
min.or(2)#4 18"Reber through bottom of post .A e t
^,',,a' ./i� Min.10"
Concrete pad
Min.24"
Footing size x
nit 10'x24'
A-&eAr5 To MEET
This handout was developed by the Colorado Chapter of the C7 Gjq'f L
International Code Council as a basic plan submittal under
the 2006 International Residential Code.It is not intended to
cover all circumstances. Check with your Department of
Building Safety for additional requirements.
8/23/09
Pole Barn Construction
Tr-
Trusshirec' 8'mac typical ✓
re •I �l
Show all doors and window locations
:I I •I
Length
MEW 40'
Building length to width ratio:5:3
• _�••I 40'may.x32'max.,24'min.
Please see page 3 for footing size
•I
Must have 8'wall between corners
and doors for bracing ,
See bracing detail,page 5 •I
1 _ _ Door
• _HLength 16• •
—8'min. (example:10') -8'min.—
Width p!r
32'max.afw lengm.
This handout was developed by the Colorado Chapter of the
International Code Council as a basic plan submittal under
the 2006 International Residential Code.It is not intended to
cover all circumstances. Check with your Department of
Building Safety for additional requirements.
4
Hello