Loading...
HomeMy WebLinkAbout20101854.tiff • DELICH ASSOCIATES Traffic& Transportation Engineering ��� Lows' 2272 Glen Haven Drive Loveland, Colorado 80538 • Phone: (970) 669-2061 Fax: (970) 669-5034 MEMORANDUM TO: Paul Sorenson, CGRS, Inc. Janet Carter, Weld County , Gloria Hice-Idler, CDOT— Region 4 ; J FROM: Matt Delich 3/a� • t DATE: March 11, 2010 SUBJECT: Conquest Oil Water Treatment Facility Traffic Impact Study (File: 1009ME01) This memorandum is an preliminary traffic impact study (PTIS) for the proposed Conquest Oil Water Treatment Facility, located near State Highway 392 (SH392) and Weld County Road 74 (WCR74), approximately 25 miles northeast of Windsor, in Weld County, Colorado. The site location is shown in Figure 1. The site plan is shown in • Figure 2. Janet Carter, Weld County Traffic Engineer, was contacted to determine the scope of this TIS. A preliminary traffic study (traffic impact study minimum requirements) was deemed appropriate. In addition, Gloria Hice-Idler, Access Manager, CDOT— Region 4, was contacted. There are no capital improvement projects on any of the roads in the vicinity of the Conquest Oil Water Treatment Facility. Weld County uses the 2002 State Highway Access Code to determine the need for auxiliary lanes at intersections on county roads. Since the project life will be at least 30 years, short range (2012) and long range (2030) analyses were performed. The access to the Conquest Oil Water Treatment Facility will be via a private driveway that has access to WCR74, approximately 300 feet west of SH392. Daily traffic data (2008) was obtained from Weld County for the west leg of WCR74, and for WCR69 both north and south of WCR74. Currently, there is no recent count data available for this section of SH392. However, CDOT had 1992 count data on SH392 at WCR74 (ADT 310). Since there is a recent CDOT daily count at WCR51 (ADT 1800), 1992 count data at WCR51 (ADT 600) was obtained. Using the same ratio between the two 1992 count locations, the daily traffic volume on SH392 at WCR74 was calculated to be 930. Figure 3 shows the recent daily traffic counts (actual and calculated) on the various road segments in the area. In order to estimate peak hour traffic, particularly at the SH392/WCR74 intersection, the daily traffic was factored by 0.08/0.10 for the AM/PM peaks, respectively. In addition to this, it was assumed that 60 percent of the AM peak hour traffic would go towards the west and that 60 percent of the PM peak hour traffic would be coming from the west. Peak hour intersection traffic volumes were • estimated and are shown in Figure 4. 2010-1854 • State Highway 392 is a paved road with a two-lane cross section and minimal shoulders with a posted speed of 65 mph. State Highway 392 is categorized as an RA highway. This road is considered to be in good condition. There are no known deficient structures in the area. Land uses in the area are agriculture or open. Weld County Road 74 is a rural road, 22 feet wide, with a paved surface west of SH392 and a gravel surface east of SH392. Weld County Road 69 is a gravel rural road, 20 feet wide on the north leg and 22 feet wide on the south leg. As shown in Figure 1, WCR69 is not continuous through the SH392/WCR74 intersection. The Conquest Oil Water Treatment Facility is proposed as a 7 days a week/365 days a year operation. The hours of operation will be 7:00am to 10:00pm. Trucks will enter the site, drop off waste water from gas and oil wells throughout Weld County, pick up treated water, and then leave the site delivering the treated water to gas and oil wells throughout Weld County. There will be one operator employee on site on each of two shifts. The number of trucks trips into the site per day is estimated at 50-70. The number of trucks trips out of the site per day is also estimated at 50-70. The trucks will arrive at the site randomly during the hours of operation. Details regarding the truck schedule are not known at this time. Table 1 shows the components of the trip generation for the Conquest Oil Water Treatment Facility. It was assumed that approximately 10 percent of the truck traffic would occur during the peak hours. • Truck trips will originate from all over Weld County. The trip distribution for Conquest Oil Water Treatment Facility was based upon the condition of the roads, road continuity, and engineering judgment. The trip distribution for the Conquest Oil Water Treatment Facility is shown in Figure 5. Figure 6 shows the assignment of the daily and peak hour site generated traffic. Since the vehicles accessing this site will be water trucks, Figure 6 also shows the passenger car equivalents (PCE) for the site generated traffic. The water trucks will be a 50/50 mix of single unit (<40 feet long) trucks and combination trucks. To be conservative, a PCE factor of 3 was used to calculate the passenger car equivalents for the site generated traffic. Background daily and peak hour traffic projections for SH392 were obtained by reviewing CDOT 20-year projection factors. The CDOT 20-year growth factor for SH392 is 1.44. This growth factor was also applied to the county roads. A short range future year of 2012 was used with a growth factor of 1.088 and a long range future year of 2030 was used with a growth factor of 1.484. Figures 7 and 8 show the short range (2012) and long range (2030) background daily and peak hour traffic, respectively, on the various road segment and at the key intersections. The key intersections will operate acceptably as indicated in Tables 2 and 3, respectively for the short range (2012) and long range (2030) background traffic conditions. Calculation forms are provided in Appendix A and B, respectively. The site generated traffic was combined with the background traffic projections to determine the total forecasted traffic. Figures 9 and 10 show the short range (2012) • and long range (2030) total daily and peak hour traffic, respectively, on the various road —��L—DELICH Conquest Oil Water Treatment Facility TIS, March 2010 -mss rASSOCIATES • segment and at the key intersections. The key intersections will operate acceptably as indicated in Tables 4 and 5, respectively for the short range (2012) and long range (2030) total traffic conditions. Calculation forms are provided in Appendix C and D, respectively. Figure 11 shows the short range (2012) and long range (2030) geometry at the key intersections. This is the same geometry that currently exists. State Highway 392 is categorized as an RA highway as defined in the State Highway Access Code. It was assumed that the Weld County roads would be in the same category. The criteria for requiring auxiliary lanes are: 1) left-turn deceleration lane — greater than 10 vehicles in one hour, 2) right-turn deceleration lane — greater than 25 vehicles in one hour; and 3) right-turn acceleration lane — greater than 50 vehicles in one hour. The only auxiliary lane that may be required is an eastbound left-turn deceleration lane on SH392 approaching WCR74. Since the Conquest Oil Water Treatment Facility will use primarily multi-unit trucks, passenger car equivalent (PCE) factors for the site generated traffic were used for determining the auxiliary lane requirements. For multi-unit trucks, a PCE factor of 3 is used. Using the afternoon short range (2012) total traffic shown in Figure 9, the eastbound left-turn volume would be equivalent to 12 passenger cars. Using the afternoon long range (2030) total traffic shown in Figure 10, the eastbound left-turn volume would be equivalent to 14 passenger cars. These left turns are beyond the threshold volume that requires a left-turn deceleration lane. However, according to Section 3.5.5 of the State Highway Access Code, the left-turn deceleration lane may be • dropped if the 20th year opposing traffic is predicted to be below 100 vehicles per hour. In consideration of the long range (2030) forecasted traffic shown in Figure 10, the left- turn deceleration lane requirement can be waived, since the opposing traffic is predicted to be less than 60 vehicles per hour. Auxiliary turn-lanes are not required at any of the other key intersections. Sight distance was field checked at the key intersections. At the posted speed of 65 mph and a passenger car design vehicle, the intersection sight distance should be 650 feet in both directions from the intersection. Since this site will be used by primarily multi-unit trucks, the sight distance for these vehicle types were calculated. At the 65 mph posted speed, the sight distance is 1105 feet for this vehicle type. The sight distance is greater than 1200 feet in both directions at all intersections. Therefore, it is concluded that the intersection sight distance is adequate. It is concluded that Conquest Oil Water Treatment Facility will have minimal impact on the area roads. The key intersections will operate acceptably. No additional auxiliary lanes are warranted at any of the key intersections. There is adequate intersection sight distance for all vehicles that may use the key intersections. • �---DELICH Conquest Oil Water Treatment Facility TIS, March 2010 7 t r-ASSOCIATES • co Conquest Oil \)(5 Water Treatment Facility WCR74 • SCALE: 1"=4000' • SITE LOCATION Figure 1 $--DELICH Conquest Oil Water Treatment Facility PTIS,March 2010 -7 , =ASSOCIATES NS • SCALE: 1"=200' O, W _m m d ce 3 o 10 C C, C -Q U anIEMMIAMT -C P - C 11 09 Mink t 15b b EooyuM • CIP L.) m • - - "" WCR 74(60'R.O.W.)-asphalt surface /l• SITE PLAN Figure 2 -�/!-DELICH Conquest Oil Water Treatment Facility TIS, March 2010 =70 r-ASSOCIATES S • N ry /v I M a 147 WCR74 • 0o m rn rn 0! U Daily H (2008) • RECENT DAILY TRAFFIC Figure 3 $-DELICH Conquest Oil Water Treatment Facility TIS,March 2010 (=ASSOCIATES S • N / f i 1/1 f / i r2/2/1 icNOM 0/1 2/2 WCR74 -�' 6/S y 1/1 -� / , 0/13/4 4/3 ry^ r O N Z • 0, 0 U -� - AM/PM (2008) • ESTIMATED PEAK HOUR TRAFFIC Figure 4 J/LDELICH Conquest Oil Water Treatment Facility TIS, March 2010 �� =ASSOCIATES • TABLE 1 Trip Generation AWDTE AM Peak Hour PM Peak Hour Use In out to Out in Out Water Trucks 70 70 7 7 7 7 Facility Operator(2 shifts) 4 4 0 0 0 0 Total 74 74 7 7 7 7 III III /1 1--DELICH Conquest Oil Water Treatment Facility TIS, March 2010 -, rASSOCIATES a • N /flØV SITE 20% 25% — - - WCR74 • ry E o W Z 0 cc U • TRIP DISTRIBUTION Figure 5 —i/L-DELICH Conquest Oil Water Treatment Facility TIS, March 2010 =7 J rASSOCIATES S � N �U N co Q m � m O ZO 54 �� 16 _ 6/6(1&18)) f 6/6(18/18) 1 f 2/2(6/6) f 22(6/6) (3/3)1/1 NOM (6/6)212 ; (6(6)22 "- WCR74 (18118)6/6 y (6/6)2/2-� NOM - (6/6)2/2 ry O • M O rn CD U AM/PM (PCE) Daily SITE GENERATED DAILY AND • PEAK HOUR TRAFFIC Figure 6 Jy LDELICH Conquest Oil Water Treatment Facility TIS, March 2010 / [=ASSOCIATES AS • N cb o 1U a /$1b' ---4/3 / (/ f i q/g/1 160 f / /cm NOM 0/1 J,/ `? iii r' WCR74 nil Oh m c p 5/3 Z • t� 0 N C) C 2' O AM/PM Daily SHORT RANGE (2012) BACKGROUND • DAILY AND PEAK HOUR TRAFFIC Figure 7 — n$—DELICH Conquest Oil Water Treatment Facility TIS, March 2010 1 =ASSOCIATES AS • N co cv �U 18/1 /217:1Z1/N1 -5/4 i \ -*-6/112 218 NOM 1/2 -' 4!7yWCR74 8/8 - 1/2c2 — O 2 0rN U + AM/PM Daily LONG RANGE (2030) BACKGROUND • DAILY AND PEAK HOUR TRAFFIC Figure 8 1/i—DELICH Conquest Oil Water Treatment Facility TIS, March 2010 f i=ASSOCIATES • TABLE 2 Short Range (2012) Background Peak Hour Operation Intersection Movement Level of Service AM PM NB LT/T/RT A A SH392NVCR74 SB LT/T/RT A A (stop sign) EB LT/T/RT A A WB LT/T/RT A A WCR74ANCR69 (north) SB LT/RT A A (stop sign) EB LT/T A A WCR74/WCR69 (south) NB LT/RT A A (stop sign) WB LT/T A A • TABLE 3 Long Range (2030) Background Peak Hour Operation intersection Movement Level of service NB LT/T/RT A A SH3921WCR74 SB LT/T/RT A A (stop sign) EB LT/T/RT A A WB LT/T/RT A A WCR74/VVCR69 (north) SB LT/RT A A (stop sign) EB LT/T A A WCR74/WCR69 (south) NB LT/RT A A (stop sign) WB LT/T A A • X71—DELICH Conquest Oil Water Treatment Facility TIS. March 2010 =7 1 r--ASSOCIATES • AiIL I Z h U) V Q m N 6 1 mN 214 in 211 616(18!18�)/•\^ \ ! � 1 .�-3f3(717) f-6/5(10/9) 5/10 f C `t.�-10115(2227) . / ( r 2 NOM (3/3)1/1 0/1 -if (818)4/4 / f if(9n 1)5/7 -..- r WCR74 7/5 -+•- (25/23)13/11 y (7!n 3/3--4.-- ct) CV 4Z3(1119)7/55 a 1 ^ O �� z • O 0 N C) Co cc U + AM/PM (PCE) Daily ► SHORT RANGE (2012) TOTAL • DAILY AND PEAK HOUR TRAFFIC Figure 9 —a►—DEUCH Conquest Oil Water Treatment Facility TIS,March 2010 / (=ASSOCIATES S • N iv A? 1 0 /c° _ m m O <0 272 m is \IC 2/1 1` 616(18178) S a � �� v 4) f_ un) 7/6(11/10) f �/ --7/12 J -0-12/17(24/'29) i / C `r 313 / r NOM (3/3)1/1 J" 12 (9/10)5/4 I /" `1x12)ed9 —+- re' WCR74 9/10 —� (2626)14/14 y (7/7) —�" o a 40 12 (12/12)8/8 m n n) ' O .N °) z 0 • V t-- a) f0 CC U AM/PM (PCE) Daily --0---...— LONG RANGE (2030) TOTAL • DAILY AND PEAK HOUR TRAFFIC Figure 10 --a L--DELICH Conquest Oil Water Treatment Facility TIS, March 2010 7! rASSOCIATES • TABLE 4 Short Range(2012) Total Peak Hour Operation Level of Service Intersection Movement AM PM NB LT/T/RT A A SH392NVCR74 SB LT/T/RT A A (stop sign) EB LT/T/RT A A WB LT/T/RT A A WCR74NVCR69 (north) SB LT/RT A A (stop sign) EB LTIT A A WCR74/WCR69 (south) NB LT/RT A A (stop sign) WB LT/T A A WCR74/Site Access SB LT/RT A A (stop sign) EB LT/I A A • TABLE 5 Long Range (2030)Total Peak Hour Operation Level of Service Intersection Movement AM PM NB LT/T/RT A A SH392NVCR74 SB LT/T/RT A A (stop sign) EB LT/T/RT A A WB LT/T/RT A B WCR74/WCR69 (north) SB LT/RT A A (stop sign) EB LTIT A A WCR74/WCR69 (south) NB LT/RT A A (stop sign) WB LT/T A A WCR74/Site Access SB LT/RT A A (stop sign) EB LT/T A A • —�I I—DELICH Conquest Oil Water Treatment Facility TN, March 2010 ar A r--ASSOCIATES • N 1 9 yUN m ( \CAr Ncre WCR74 • rn m cc U f— - Denotes Lane SHORT RANGE (2012) AND • LONG RANGE (2030) GEOMETRY Figure 11 Jf 4-DELICH Conquest Oil Water Treatment Facility TIS, March 2010 -7/ r-ASSOCIATES • • APPENDIX A • l 3: WCR74 & SH392 HCM Unsignalized Intersection Capacity Analysis Short Bkgrd AM 3/10/2010 r" 4 Z 'J ,fif /0 I ./ Movement EBL EBT EBR WBL WBT WBR NEL NET NER SWL SWT SWR • Lane Configurations 4. 4. 4. 4. Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 2 1 5 2 1 2 2 29 1 1 42 2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 2 1 5 2 1 2 2 32 1 1 46 2 Pedestrians Lane Width (ft) Walking Speed (f ls) Percent Blockage Right tum flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 88 86 47 91 86 32 48 33 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 88 86 47 91 86 32 48 33 tC, single (s) 7.3 6.7 6.4 7.3 6.7 6.4 4.3 4.3 tC, 2 stage (s) tF (s) 3.6 4.1 3.4 3.6 4.1 3.4 2.3 2.3 p0 queue free % 100 100 99 100 100 100 100 100 cM capacity (veh/h) 860 777 984 853 776 1003 1474 1493 • Direction, Lane# EB 1 WB 1 NE 1 SW 1 Volume Total 9 5 35 49 Volume Left 2 2 2 1 Volume Right 5 2 1 2 cSH 920 889 1474 1493 Volume to Capacity 0.01 0.01 0.00 0.00 Queue Length 95th (ft) 1 0 0 0 Control Delay(s) 8.9 9.1 0.5 0.2 Lane LOS A A A A Approach Delay(s) 8.9 9.1 0.5 0.2 Approach LOS A A Intersection Summary Average Delay 1.6 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Light Report • Matthew J. Delich , P. E. Page 1 Z 3: WCR74 & SH392 HCM Unsignalized Intersection Capacity Analysis Short Bkgrd PM 3/10/2010 • Movement EBL EBT EBR WBL WBT WBR NEL NET NER SWL SWT SWR Lane Configurations 4. 4. 4. 4. Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 2 1 3 2 1 1 6 52 3 2 35 3 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 2 1 3 2 1 1 7 57 3 2 38 3 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 117 117 40 119 117 58 41 60 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 117 117 40 119 117 58 41 60 tC, single (s) 7.3 6.7 6.4 7.3 6.7 6.4 4.3 4.3 tC, 2 stage (s) tF (s) 3.6 4.1 3.4 3.6 4.1 3.4 2.3 2.3 p0 queue free % 100 100 100 100 100 100 100 100 • cM capacity (veh/h) 822 744 993 818 744 970 1482 1459 Direction, Lane# EB 1 WB 1 NE 1 SW 1 Volume Total 7 4 66 43 Volume Left 2 2 7 2 Volume Right 3 1 3 3 cSH 883 829 1482 1459 Volume to Capacity 0.01 0.01 0.00 0.00 Queue Length 95th (ft) 1 0 0 0 Control Delays) 9.1 9.4 0.8 0.4 Lane LOS A A A A Approach Delay(s) 9.1 9.4 0.8 0.4 Approach LOS A A Intersection Summary Average Delay 1.4 Intersection Capacity Utilization 15.1% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 1 3 8: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Short Bkgrd AM 3/10/2010 Movement EBL EBT WBT WBR SBL SBR • Lane Configurations 4 1 tj► Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 0 7 4 1 1 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 8 4 1 1 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 5 12 5 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 5 12 5 tC, single (s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free% 100 100 100 cM capacity (veh/h) 1529 972 1039 • Direction, Lane# EB 1 WB 1 SB 1 Volume Total 8 5 2 Volume Left 0 0 1 Volume Right 0 1 1 cSH 1529 1700 1004 Volume to Capacity 0.00 0.00 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.0 0.0 8.6 Lane LOS A Approach Delay(s) 0.0 0.0 8.6 Approach LOS A Intersection Summary Average Delay 1.2 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period(min) 15 Synchro 6 Light Report • Matthew J. Delich , P. E. Page 3 4 8: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Short Bkgrd PM 3/10/2010 • Movement EBL EBT WBT WBR SBL SBR Lane Configurations V Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 1 5 9 1 1 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 1 5 10 1 1 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right tum flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 11 18 10 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 11 18 10 tC, single (s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free% 100 100 100 cM capacity(veh/h) 1522 964 1031 • Direction, Lane# EB 1 WB 1 SB 1 Volume Total 7 11 2 Volume Left 1 0 1 Volume Right 0 1 1 cSH 1522 1700 997 Volume to Capacity 0.00 0.01 0.00 Queue Length 95th (ft) 0 0 0 Control Delay (s) 1.2 0.0 8.6 Lane LOS A A Approach Delay(s) 1.2 0.0 8.6 Approach LOS A Intersection Summary Average Delay 1.4 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 3 5 6: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Short Bkgrd AM 3/10/2010 -• � C4\ Movement EBT EBR WBL WBT NBL NBR • Lane Configurations is 4 V Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 3 0 0 4 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 3 0 0 4 1 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 3 8 3 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 3 8 3 tC, single (s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free % 100 100 100 cM capacity (veh/h) 1532 978 1041 • Direction, Lane# EB 1 WB 1 NB 1 Volume Total 3 4 1 Volume Left 0 0 1 Volume Right 0 0 0 cSH 1700 1532 978 Volume to Capacity 0.00 0.00 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.0 0.0 8.7 Lane LOS A Approach Delay(s) 0.0 0.0 8.7 Approach LOS A Intersection Summary Average Delay 1.1 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Light Report • Matthew J. Delich , P. E. Page 2 • 6: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Short Bkgrd PM 3/10/2010 tte ~ 4\ /4. • Movement EBT EBR WBL WBT NBL NBR Lane Configurations to 4 V Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 5 1 0 3 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 5 1 0 3 1 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 7 9 6 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 7 9 6 tC, single (s) 4.3 6.6 6.4 tC, 2 stage(s) tF (s) 2.3 3.6 3.4 p0 queue free % 100 100 100 • GM capacity(veh/h) 1527 976 1037 Direction, Lane# EB 1 WB 1 NB 1 Volume Total 7 3 1 Volume Left 0 0 1 Volume Right 1 0 0 cSH 1700 1527 976 Volume to Capacity 0.00 0.00 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.0 0.0 8.7 Lane LOS A Approach Delay(s) 0.0 0.0 8.7 Approach LOS A Intersection Summary Average Delay 0.9 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 2 7 • APPENDIX B • • 3 • 3: WCR74 & SH392 HCM Unsignalized Intersection Capacity Analysis Long Bkgrd AM 3/10/2010 • Movement EBL EBT EBR WBL WBT WBR NEL NET NER SWL SWT SWR Lane Configurations 4, 4+ 4+ 4+ Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 3 1 6 3 1 2 4 37 3 1 57 2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 3 1 7 3 1 2 4 40 3 1 62 2 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 118 117 63 123 117 42 64 43 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 118 117 63 123 117 42 64 43 tC, single (s) 7.3 6.7 6.4 7.3 6.7 6.4 4.3 4.3 tC, 2 stage (s) tF (s) 3.6 4.1 3.4 3.6 4.1 3.4 2.3 2.3 p0 queue free % 100 100 99 100 100 100 100 100 • cM capacity (veh/h) 820 745 964 811 745 990 1454 1480 Direction, Lane# EB 1 WB 1 NE 1 SW 1 Volume Total 11 7 48 65 Volume Left 3 3 4 1 Volume Right 7 2 3 2 cSH 891 850 1454 1480 Volume to Capacity 0.01 0.01 0.00 0.00 Queue Length 95th (ft) 1 1 0 0 Control Delay(s) 9.1 9.3 0.7 0.1 Lane LOS A A A A Approach Delay (s) 9.1 9.3 0.7 0.1 Approach LOS A A Intersection Summary Average Delay 1.5 Intersection Capacity Utilization 14.4% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 1 1 3: WCR74 & SH392 HCM Unsignalized Intersection Capacity Analysis Long Bkgrd PM 3/10/2010 Movement EBL EBT EBR WBL WBT WBR NEL NET NER SWL SWT SWR Lane Configurations 4 .j, 4. 4. Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 2 1 6 3 1 1 8 69 6 2 46 4 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 2 1 7 3 1 1 9 75 7 2 50 4 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 154 155 52 159 154 78 54 82 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 154 155 52 159 154 78 54 82 tC, single (s) 7.3 6.7 6.4 7.3 6.7 6.4 4.3 4.3 tC, 2 stage (s) tF (s) 3.6 4.1 3.4 3.6 4A 3.4 2.3 2.3 p0 queue free % 100 100 99 100 100 100 99 100 cM capacity (veh/h) 776 706 977 765 707 945 1466 1432 • Direction, Lane# EB 1 WB 1 NE 1 SW 1 Volume Total 10 5 90 57 Volume Left 2 3 9 2 Volume Right 7 1 7 4 cSH 888 782 1466 1432 Volume to Capacity 0.01 0.01 0.01 0.00 Queue Length 95th (ft) 1 1 0 0 Control Delay(s) 9.1 9.6 0.8 0.3 Lane LOS A A A A Approach Delay (s) 9.1 9.6 0.8 0.3 Approach LOS A A Intersection Summary Average Delay 1.4 Intersection Capacity Utilization 17.3% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 1 /D 8: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Long Bkgrd AM 3/10/2010 0 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 14 Y Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 1 8 6 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 1 9 7 1 2 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right tum flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 8 18 7 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 8 18 7 tC, single (s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free % 100 100 100 0 cM capacity (veh/h) 1526 964 1036 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 10 8 3 Volume Left 1 0 2 Volume Right 0 1 1 cSH 1526 1700 987 Volume to Capacity 0.00 0.00 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.8 0.0 8.7 Lane LOS A A Approach Delay(s) 0.8 0.0 8.7 Approach LOS A Intersection Summary Average Delay 1.8 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 3 11 8: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Long Bkgrd PM 3/10/2010 Movement EBL EBT WBT WBR SBL SBR • Lane Configurations 4 T V Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 2 8 11 2 1 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 2 9 12 2 1 1 Pedestrians Lane Width (ft) Walking Speed (f 15) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 14 26 13 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 14 26 13 tC, single (s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free % 100 100 100 cM capacity(veh/h) 1517 953 1028 Direction, Lane# EB 1 WB 1 SB 1 • Volume Total 11 14 2 Volume Left 2 0 1 Volume Right 0 2 1 cSH 1517 1700 989 Volume to Capacity 0.00 0.01 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 1.5 0.0 8.6 Lane LOS A A Approach Delay (s) 1.5 0.0 8.6 Approach LOS A Intersection Summary Average Delay 1.3 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Light Report • Matthew J. Delich , P. E. Page 3 /Z • • 6: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Long Bkgrd AM 3/10/2010 � NIT 4- 4\ r • Movement EBT EBR WBL WBT NBL NBR Lane Configurations '. 4 V Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 4 1 0 5 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 4 1 0 5 1 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 5 10 5 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 5 10 5 tC, single(s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free % 100 100 100 • cM capacity (veh/h) 1529 975 1039 Direction, Lane# EB 1 WB 1 NB 1 Volume Total 5 5 1 Volume Left 0 0 1 Volume Right 1 0 0 cSH 1700 1529 975 Volume to Capacity 0.00 0.00 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.0 0.0 8.7 Lane LOS A Approach Delay(s) 0.0 0.0 8.7 Approach LOS A Intersection Summary Average Delay 0.8 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 2 13 6: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Long Bkgrd PM 3/10/2010 C ~ 4\ p � Movement EBT EBR WBL WBT NBL NBR Lane Configurations j, 4 V Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 7 2 0 4 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 8 2 0 4 1 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 10 13 9 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 10 13 9 tC, single (s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free % 100 100 100 cM capacity (veh/h) 1523 971 1034 • Direction, Lane# EB 1 WB 1 NB 1 Volume Total 10 4 1 Volume Left 0 0 1 Volume Right 2 0 0 cSH 1700 1523 971 Volume to Capacity 0.01 0.00 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.0 0.0 8.7 Lane LOS A Approach Delay(s) 0.0 0.0 8.7 Approach LOS A Intersection Summary Average Delay 0.6 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 2 i4 • • APPENDIX C • l5 3: WCR74 & SH392 HCM Unsignalized Intersection Capacity Analysis Short Total AM 3/10/2010 Movement EBL EBT EBR WBL WBT WBR NEL NET NER SWL SWT SWR Lane Configurations 4. 4. 4. 4. Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 4 3 7 2 3 2 4 29 1 1 42 4 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 4 3 8 2 3 2 4 32 1 1 46 4 Pedestrians Lane Width (ft) Walking Speed (f/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 95 91 48 100 93 32 50 33 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 95 91 48 100 93 32 50 33 tC, single (s) 7.6 7.0 6.8 7.3 7.0 6.4 4.6 4.3 tC, 2 stage (s) tF (s) 4.0 4.5 3.8 3.6 4.5 3.4 2.7 2.3 p0 queue free % 99 100 99 100 100 100 100 100 cM capacity (veh/h) 770 706 889 836 704 1003 1276 1493 • Direction, Lane# EB 1 WB 1 NE 1 SW 1 Volume Total 15 8 37 51 Volume Left 4 2 4 1 Volume Right 8 2 1 4 cSH 808 810 1276 1493 Volume to Capacity 0.02 0.01 0.00 0.00 Queue Length 95th (ft) 1 1 0 0 Control Delay(s) 9.5 9.5 0.9 0.2 Lane LOS A A A A Approach Delay (s) 9.5 9.5 0.9 0.2 Approach LOS A A Intersection Summary Average Delay 2.4 Intersection Capacity Utilization 13.7% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 1 //O 3: WCR74 & SH392 HCM Unsignalized Intersection Capacity Analysis Short Total PM 3/10/2010 • Movement EBL EBT EBR WBL WBT WBR NEL NET NER SWL SWT SWR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 4 3 5 2 3 1 8 52 3 2 35 5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 4 3 5 2 3 1 9 57 3 2 38 5 Pedestrians Lane Width (ft) Walking Speed (fUs) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 123 122 41 128 123 58 43 60 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 123 122 41 128 123 58 43 60 tC, single (s) 7.6 7.0 6.8 7.3 7.0 6.4 4.6 4.3 tC, 2 stage (s) tF (s) 4.0 4.5 3.8 3.6 4.5 3.4 2.7 2.3 p0 queue free % 99 100 99 100 100 100 99 100 cM capacity (veh/h) 734 674 898 801 673 970 1284 1459 • Direction, Lane# EB 1 WB 1 NE 1 SW 1 Volume Total 13 7 68 46 Volume Left 4 2 9 2 Volume Right 5 1 3 5 cSH 776 751 1284 1459 Volume to Capacity 0.02 0.01 0.01 0.00 Queue Length 95th (ft) 1 1 1 0 Control Delay(s) 9.7 9.8 1.0 0.4 Lane LOS A A A A Approach Delay(s) 9.7 9.8 1.0 0.4 Approach LOS A A Intersection Summary Average Delay 2.1 Intersection Capacity Utilization 15.9% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 1 l7 8: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Short Total AM 3/10/2010 ti Movement EBL EBT WBT WBR SBL SBR • Lane Configurations 4 I. M Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 0 13 10 1 1 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 14 11 1 1 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 12 26 11 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 12 26 11 tC, single (s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free % 100 100 100 cM capacity (veh/h) 1520 955 1030 • Direction, Lane# EB 1 WB 1 SB 1 Volume Total 14 12 2 Volume Left 0 0 1 Volume Right 0 1 1 cSH 1520 1700 991 Volume to Capacity 0.00 0.01 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.0 0.0 8.6 Lane LOS A Approach Delay(s) 0.0 0.0 8.6 Approach LOS A Intersection Summary Average Delay 0.7 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Light Report • Matthew J. Delich , P. E. Page 3 1$ 8: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Short Total PM 3/10/2010 • 44— t Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 1 V Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 1 11 15 1 1 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 1 12 16 1 1 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 17 31 17 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 17 31 17 tC, single (s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free % 100 100 100 • cm capacity(veh/h) 1513 948 1023 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 13 17 2 Volume Left 1 0 1 Volume Right 0 1 1 cSH 1513 1700 984 Volume to Capacity 0.00 0.01 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.6 0.0 8.7 Lane LOS A A Approach Delay (s) 0.6 0.0 8.7 Approach LOS A Intersection Summary Average Delay 0.8 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 3 19 6: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Short Total AM 3/10/2010 C 4— 4\ t Movement EST EBR WBL WBT NBL NBR Lane Configurations 4 �* Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 5 0 0 6 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 5 0 0 7 1 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 5 12 5 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 5 12 5 tC, single (s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free % 100 100 100 cM capacity (veh/h) 1529 972 1038 • Direction, Lane# EB 1 WB 1 NB 1 Volume Total 5 7 1 Volume Left 0 0 1 Volume Right 0 0 0 cSH 1700 1529 972 Volume to Capacity 0.00 0.00 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.0 0.0 8.7 Lane LOS A Approach Delay(s) 0.0 0.0 8.7 Approach LOS A Intersection Summary Average Delay 0.7 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Light Report • Matthew J. Delich , P. E. Page 2 ZD 6: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Short Total PM 3/10/2010 { ~ 4\ P • Movement EBT EBR WBL WBT NBL NBR Lane Configurations 4 M Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 7 1 0 5 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 8 1 0 5 1 0 Pedestrians Lane Width (ft) Walking Speed (fUs) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 9 14 8 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 9 14 8 tC, single (s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free % 100 100 100 • cM capacity (veh/h) 1524 970 1034 Direction, Lane# EB 1 WB 1 NB 1 Volume Total 9 5 1 Volume Left 0 0 1 Volume Right 1 0 0 cSH 1700 1524 970 Volume to Capacity 0.01 0.00 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.0 0.0 8.7 Lane LOS A Approach Delay(s) 0.0 0.0 8.7 Approach LOS A Intersection Summary Average Delay 0.6 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 2 ZI 10: WCR74 & Site Access HCM Unsignalized Intersection Capacity Analysis Short Total AM 3/10/2010 ~ 44.- Movement EBL EBT WBT WBR SBL SBR • Lane Configurations 4 14 V Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 1 7 5 6 6 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 1 8 5 7 7 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 12 18 9 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 12 18 9 tC, single (s) 5.1 7.4 7.2 tC, 2 stage (s) tF (s) 3.1 4.4 4.2 p0 queue free% 100 99 100 cM capacity(veh/h) 1148 796 847 • Direction, Lane# EB 1 WB 1 SB 1 Volume Total 9 12 8 Volume Left 1 0 7 Volume Right 0 7 1 cSH 1148 1700 803 Volume to Capacity 0.00 0.01 0,01 Queue Length 95th (ft) 0 0 1 Control Delay (s) 1.0 0.0 9.5 Lane LOS A A Approach Delay(s) 1.0 0.0 9.5 Approach LOS A Intersection Summary Average Delay 2.9 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 • Matthew J. Deitch , P. E. Synchro 6 Light Report • Page 4 2z • 10: WCR74 & Site Access HCM Unsignalized Intersection Capacity Analysis Short Total PM 3/10/2010 • Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 ti V Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 1 5 10 6 6 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 1 5 11 7 7 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 17 22 14 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 17 22 14 tC, single (s) 5.1 7.4 7.2 tC, 2 stage (s) tF (s) 3.1 4.4 4.2 p0 queue free% 100 99 100 • cM capacity(veh/h) 1142 792 840 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 7 17 8 Volume Left 1 0 7 Volume Right 0 7 1 cSH 1142 1700 799 Volume to Capacity 0.00 0.01 0.01 Queue Length 95th (ft) 0 0 1 Control Delay(s) 1.4 0.0 9.6 Lane LOS A A Approach Delay(s) 1.4 0.0 9.6 Approach LOS A Intersection Summary Average Delay 2.6 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 4 Z3 • APPENDIX D • • 24 • 3: WCR74 & SH392 HCM Unsignalized Intersection Capacity Analysis Long Total AM 3/10/2010 t / f 4/ • Movement EBL EBT EBR WBL WBT WBR NEL NET NER SWL SWT SWR Lane Configurations 4. 4. 4. 4. Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 5 3 8 3 3 2 6 37 3 1 57 4 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 5 3 9 3 3 2 7 40 3 1 62 4 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 125 123 64 132 123 42 66 43 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 125 123 64 132 123 42 66 43 tC, single (s) 7.6 7.0 6.8 7.3 7.0 6.4 4.6 4.3 tC, 2 stage (s) tF (s) 4.0 4.5 3.8 3.6 4.5 3.4 2.7 2.3 p0 queue free % 99 100 99 100 100 100 99 100 • cM capacity (veh/h) 732 675 870 795 675 990 1257 1480 Direction, Lane# EB 1 WB 1 NE 1 SW 1 Volume Total 17 9 50 67 Volume Left 5 3 7 1 Volume Right 9 2 3 4 cSH 782 781 1257 1480 Volume to Capacity 0.02 0.01 0.01 0.00 Queue Length 95th (ft) 2 1 0 0 Control Delay(s) 9.7 9.7 1.1 0.1 Lane LOS A A A A Approach Delay(s) 9.7 9.7 1.1 0.1 Approach LOS A A Intersection Summary Average Delay 2.2 Intersection Capacity Utilization 15.7% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 1 ZS" 3: WCR74 & SH392 HCM Unsignalized Intersection Capacity Analysis Long Total PM 3/10/2010 •Movement EBL EBT EBR WBL WBT WBR NEL NET NER SWL SWT SWR Lane Configurations .j. 4. 4. 44 Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 4 3 8 3 3 1 10 69 6 2 46 6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 4 3 9 3 3 1 11 75 7 2 50 7 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 160 161 53 168 161 78 57 82 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 160 161 53 168 161 78 57 82 tC, single (s) 7.6 7.0 6.8 7.3 7.0 6.4 4.6 4.3 tC, 2 stage (s) tF (s) 4.0 4.5 3.8 3.6 4.5 3.4 2.7 2.3 p0 queue free % 99 99 99 100 99 100 99 100 cM capacity (veh/h) 691 639 883 749 639 945 1268 1432 • Direction, Lane# EB 1 WB 1 NE 1 SW 1 Volume Total 16 8 92 59 Volume Left 4 3 11 2 Volume Right 9 1 7 7 cSH 767 717 1268 1432 Volume to Capacity 0.02 0.01 0.01 0.00 Queue Length 95th (ft) 2 1 1 0 Control Delay(s) 9.8 10.1 1.0 0.3 Lane LOS A B A A Approach Delay (s) 9.8 10.1 1.0 0.3 Approach LOS A B Intersection Summary Average Delay 2.0 Intersection Capacity Utilization 18.3% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Light Report • Matthew J. Delich , P. E. Page 1 uP • 8: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Long Total AM 3/10/2010 • Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 1+ "iv Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 1 14 12 1 2 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 1 15 13 1 2 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 14 31 14 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 14 31 14 tC, single (s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free % 100 100 100 • cM capacity (veh/h) 1517 948 1027 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 16 14 3 Volume Left 1 0 2 Volume Right 0 1 1 cSH 1517 1700 973 Volume to Capacity 0.00 0.01 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.5 0.0 8.7 Lane LOS A A Approach Delay(s) 0.5 0.0 8.7 Approach LOS A Intersection Summary Average Delay 1.1 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 3 Z7 8: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Long Total PM 3/10/2010 -0 k- ti r Movement EBL EBT WBT WBR SBL SBR • Lane Configurations 4 1 Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 2 14 17 2 1 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 2 15 18 2 1 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 21 39 20 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 21 39 20 tC, single (s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free % 100 100 100 cM capacity (veh/h) 1509 937 1019 • Direction, Lane# EB 1 WB 1 SB 1 Volume Total 17 21 2 Volume Left 2 0 1 Volume Right 0 2 1 cSH 1509 1700 976 Volume to Capacity 0.00 0.01 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.9 0.0 8.7 Lane LOS A A Approach Delay (s) 0.9 0.0 8.7 Approach LOS A Intersection Summary Average Delay 0.9 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Light Report • Matthew J. Delich , P. E. Page 3 2� • 6: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Long Total AM 3/10/2010 -► 7 f 4- t1 /r • Movement EBT EBR WBL WBT NBL NBR Lane Configurations 1 4 V Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 6 1 0 7 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 7 1 0 8 1 0 Pedestrians Lane Width (ft) Walking Speed (f/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 8 15 7 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 8 15 7 tC, single (s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free% 100 100 100 • cM capacity (veh/h) 1526 969 1036 Direction, Lane# EB 1 WB 1 NB 1 Volume Total 8 8 1 Volume Left 0 0 1 Volume Right 1 0 0 cSH 1700 1526 969 Volume to Capacity 0.00 0.00 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.0 0.0 8.7 Lane LOS A Approach Delay (s) 0.0 0.0 8.7 Approach LOS A Intersection Summary Average Delay 0.6 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Deficit , P. E. Page 2 z1 6: WCR74 & WCR69 HCM Unsignalized Intersection Capacity Analysis Long Total PM 3/10/2010 —► 7 f 4- 4\ /, • Movement EBT EBR WBL WBT NBL NBR Lane Configurations 4 Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 9 2 0 6 1 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 10 2 0 7 1 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 12 17 11 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 12 17 11 tC, single (s) 4.3 6.6 6.4 tC, 2 stage (s) tF (s) 2.3 3.6 3.4 p0 queue free % 100 100 100 cM capacity (veh/h) 1520 966 1031 • Direction, Lane# EB 1 WB 1 NB 1 Volume Total 12 7 1 Volume Left 0 0 1 Volume Right 2 0 0 cSH 1700 1520 966 Volume to Capacity 0.01 0.00 0.00 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.0 0.0 81 Lane LOS A Approach Delay(s) 0.0 0.0 8.7 Approach LOS A Intersection Summary Average Delay 0.5 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 Synchro 6 Light Report • Matthew J. Delich , P. E. Page 2 3v 4 10: WCR74 & Site Access HCM Unsignalized Intersection Capacity Analysis Long Total AM 3/10/2010 r • Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 I V Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 1 9 7 6 6 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 1 10 8 7 7 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 14 23 11 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 14 23 11 tC, single (s) 5.1 7.4 7.2 tC, 2 stage (s) tF (s) 3.1 4.4 4.2 p0 queue free% 100 99 100 cM capacity (veh/h) 1145 791 844 le Direction, Lane# EB 1 WB 1 SB 1 Volume Total 11 14 8 Volume Left 1 0 7 Volume Right 0 7 1 cSH 1145 1700 798 Volume to Capacity 0.00 0.01 0.01 Queue Length 95th (ft) 0 0 1 Control Delay(s) 0.8 0.0 9.6 Lane LOS A A Approach Delay(s) 0.8 0.0 9.6 Approach LOS A Intersection Summary Average Delay 2.5 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period (min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 4 31 • 10: WCR74 & Site Access HCM Unsignalized Intersection Capacity Analysis Long Total PM 3/10/2010 Movement EBL EBT WBT WBR SBL SBR • Lane Configurations 4 j, V Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 1 10 12 6 6 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 1 11 13 7 7 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal(ft) pX, platoon unblocked vC, conflicting volume 20 29 16 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 20 29 16 tC, single (s) 5.1 7.4 7.2 tC, 2 stage (s) tF (s) 3.1 4.4 4.2 p0 queue free % 100 99 100 cM capacity(veh/h) 1139 783 838 •Direction, Lane# EB 1 WB 1 SB 1 Volume Total 12 20 8 Volume Left 1 0 7 Volume Right 0 7 1 cSH 1139 1700 791 Volume to Capacity 0.00 0.01 0.01 Queue Length 95th (ft) 0 0 1 Control Delay(s) 0.7 0.0 9.6 Lane LOS A A Approach Delay(s) 0.7 0.0 9.6 Approach LOS A Intersection Summary Average Delay 2.1 Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period(min) 15 • Synchro 6 Light Report Matthew J. Delich , P. E. Page 4 32 Hello