Loading...
HomeMy WebLinkAbout20100158.tiff • MEMORANDUM Mot44 TO: Chris Gathman, Planning Services DATE: 12/9/2009 W FROM: Donald Carroll, Engineering Administrator Clay Kimmi, Engineer III COLORADO Janet Carter, Traffic Engineer SUBJECT: USR-1695, A&W Water Service, Inc. The Weld County Public Works Department has reviewed this proposal. This project falls under the Use by Special Review Standard, Weld County Code, Chapter 23, Article II, Division 4, Section 23. Staff comments made during this phase of the Use by Special Review process may be all-inclusive, as other issues may arise during the remaining application process. Comments made during this stage of the review process will not be all inclusive, as revised materials are submitted other concerns or issues may arise. All issues of concern and critical issues during further review must be resolved with the Public Works Department. • CDOT: The Colorado Department of Transportation (CDOT) has jurisdiction over all accesses to the state highways. Please contact Gloria Hice-Idler at the Greeley office (970-350-2148 or 970-350-2163) to verify the access permit or for any additional requirements that may be needed to obtain or upgrade the permit. (State Highway 60) The State Highway Department is requiring that a northbound to westbound left turn lane be constructed at the entrance of the site. Permits and planning should be coordinated with CDOT for this phase of the construction. Approach Road: In evaluating the traffic flow pattern for the proposed use, the Public Works Department recommends extending the asphalt paving to the west 300-feet to accommodate the internal traffic flow pattern to keep the dust down and to use as a track pad. This needs to be shown on the plat. The remaining portion of the approach road west to the commercial well operation shall be an all-weather surface capable of handling heavy truck traffic and adequate dust control at all times. The new asphalt approach road shall match improvements at your entrance with adequate turning radiuses in both directions. Circulation and On-Site Parking: The applicant is identifying traffic flow of large vehicles through the gate utilizing the facility and the proposed parking adjacent to the office area for customers and employees. The applicant is identifying parking adjacent to the office with one ADA spot identified for handicapped accessibility. This shall meet the standards. Wheel guards or curb stop shall be required for the parking area adjacent to the office. Planning Services will determine the amount of parking spaces required. • Page 1 of 3 C:\Documents and Settings\kranslem\Local Settings\Temporary Internet Files\Content.Outlook\SYBLART8\USR-1695 p EXHIBIT referral.doc 2010-0158 • If truck parking or equipment storage is being proposed on site, identify the location on the plat drawing. Move the future pipe and equipment storage area on the plat to the same location as on the drainage plat. Agreements: The applicant shall enter into an Improvements Agreement According to Policy Regarding Collateral for Improvements. Please refer to Rich Hastings to finalize this item. Storm Water Drainage: A final drainage report that was stamped, signed, and dated by Kurt Rollin, P.E. # 24802, was submitted for review on November 20, 2009. Prior to recording of the plat, the applicant must provide a final drainage report and final construction drawings that have addressed all redline comments, been stamped, signed, and dated by a licensed professional engineer, and have been accepted by Public Works. Please provide calculations and detail drawings for the 1 foot wide channel shown on the site plan, the rundown into the pond for the channel, the 18" CMP culvert in the channel, the spillway, and riprap protecting the spillway on the downstream side. Please show the topography for 200 feet outside of the USR boundary in all directions. Please address in the drainage report how offsite runoff from the south will be addressed if it flows onto the site. The calculations for the proposed condition are not consistent with the proposed conditions shown on the site plan, Sheet 2 of 2. Please review and revise the drainage report to be consistent with the site plan. • The calculations for the retention pond will likely change once the drainage report is revised to be consistent with the site plan. Please review and revise the calculations. Please note that revision of the retention pond size will require the calculations showing the pond draining in 72 hours will have to be redone. Please ensure that the final drainage report addresses all items on the preliminary and final drainage report checklists. Copies of the checklists used to review the drainage report have been attached for your use. Please include a copy of the variance request, geotechnical report, and all pertinent reference information in the appendices of the drainage report. Please bind the copies of the drainage report. Traffic Study: Weld County Public Works has reviewed the traffic study prepared by Eugene Coppola, PE for the A&W Water site and finds it acceptable. A northbound left deceleration lane is warranted based on the projects trip generation. A westbound left turn lane at the site entrance is also required by Weld County and CDOT. Trucks from the project site accessing US-85 must use SH 60 south or WCR 40 to access US-85. Trucks should not use WCR 38.5 and 38 to travel east to access US-85. The applicant shall enter an improvements agreement for the use of WCR 40 and all other onsite and offsite improvements. Please contact Janet Carter for any questions regarding the traffic study. Plat Drawing: The applicant needs to place on the plat drawing the improvements at the intersection, the left turn slot including lane widening, tapers, adequate turning radiuses, the extension of the pavement to the west gate, all right-of-ways, easements, and haul route sign • Page 2 of 3 C:\Documents and Settings\kranslem\Local Settings\Temporary Internet Files\Content.0utlook\SYBLARTB\USR-1695 pw referral.doc • located in the appropriate location prior entering on to State Highway 60, and any other red line items associated with either drainage or traffic. Permits: Weld County requires you to obtain any overweight or over width permits as needed. Please contact Amy Burry, Weld County Public Works Department at 970-304-6496, extension 3764. The State also requires these types of permits. Stay on paved surfaces as much as possible. Comments made during this stage of the review process will not be all inclusive, as revised materials are submitted other concerns or issues may arise. All issues of concern and critical issues during further review must be resolved with the Public Works Department. < r `of nr. = inlinsft t n i O 305 3=, • • Page 3 of 3 C:\Documents and Settings\kranslem\Local Settings\Temporary Internet Files\Content.Outlook\SYBLART8\USR-1695 pw referral doc • Allit Weld County Referral Weld County Planning Depadrdh 3, 2009 Illik GREELEY OFFICE MAR 18 7nn0 i COLORADO RECEIVED MAR - 5 2009 . The Weld County Department of Planning Services has received the following item for review: Applicant A&W Water Service, Inc Case Number USR-1695 Please Reply By April 3, 2009 Planner Chris Gathman Project A Site Specific Development Plan and Use by Special Review Permit for Oil and Gas Support and Service Facility(water supply&storage; potash mixing and storage; washout facility; reverse osmosis facility and production pipe and equipment storage area) in the A(Agricultural)Zone District. Legal Part of the E2 of Section 31, T4N, R66W of the 6th P.M., Weld County, Colorado. Location West of and adjacent to Highway 60 and 1/2 mile north of CR 38. Parcel Number 1057 31 000015 • The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined. U We have reviewed the request and find that it does/does not comply with our Comprehensive Plan because ❑ We have reviewed the request and find no conflicts with our interests. J See attached letter. Comments: Signature LA" Date 3„ a_ 07 Agency 17 �, / i • :•Weld County Planning Dept. 4918 10t Street,Greeley,CO.80631 4(970)353-6100 ext.3540 4(970)304-6498 fax • ,sotaivigH MEMORANDUM TO: Chris Gathman, Planning Services DATE: March 16, 2009 WIiDcFROM: Donald Carroll, Engineering Administrator ligt COLORADO SUBJECT: USR-1695, A &W Water Service, Inc. The Weld County Public Works Department has reviewed this proposal. This project falls under the Use by Special Review Standard, Weld County Code, Chapter 23, Article II, Division 4, Section 23. Staff comments made during this phase of the Use by Special Review process may be all-inclusive, as other issues may arise during the remaining application process. CDOT: The Colorado Department of Transportation (CDOT) has jurisdiction over all accesses to the state highways. Please contact Gloria Nice-Idler at the Greeley office (970-350-2148 or 970-350-2163) to verify the access permit or for any additional requirements that may be needed to obtain or upgrade the permit. (State Highway 60) The State Highway Department is requiring that a northbound to westbound left turn lane be constructed at the entrance of the site. Permits and planning should be coordinated with CDOT • for this phase of the construction. Approach Road: In evaluating the traffic flow pattern for the proposed use, the Public Works Department recommends extending the asphalt paving to the west gate to accommodate the internal traffic flow pattern to keep the dust down and to use as a track pad. The remaining portion of the approach road west to the commercial well operation shall be an all-weather surface capable of handling heavy truck traffic and adequate dust control at all times. The new asphalt approach road shall match improvements at your entrance with adequate turning radiuses in both directions. Circulation and On-Site Parking: The applicant is identifying traffic flow of large vehicles through the west gate utilizing the facility and exiting out of the east gate. The east gate is also being utilized for proposed parking adjacent to the office area for customers and employees. The applicant is identifying parking adjacent to the office with one ADA spot identified for handicapped accessibility. This shall meet the standards. Wheel guards or curb stop shall be required for the parking area adjacent to the office. Planning Services will determine the amount of parking spaces required. If truck parking or equipment storage is being proposed on site, identify the location on the plat drawing. Agreements: The applicant shall enter into an Improvements Agreement According to Policy Regarding Collateral for Improvements. Please refer to Rich Hastings to finalize this item. . Storm Water Drainage: Please refer to Clay Kimmi's memo dated March 13, 2009, and the red line copy of your final drainage report. Contact our office to finalize this report. Traffic Study: Weld County Public Works has reviewed the traffic study prepared by Eugene • Coppola, PE for the A&W Water site and finds it acceptable. A northbound left deceleration lane is warranted based on the projects trip generation. A westbound left turn lane at the site entrance is also required by Weld County and CDOT. Trucks from the project site accessing US-85 must use SH 60 south or WCR 40 to access US-85. Trucks should not use WCR 38.5 and 38 to travel east to access US-85. The applicant shall enter an improvements agreement for the use of WCR 40 and all other onsite and offsite improvements. Please contact Janet Carter for any questions regarding the traffic study. Plat Drawing: The applicant needs to place on the plat drawing the improvements at the intersection, the left turn slot including lane widening, tapers, adequate turning radiuses, the extension of the pavement to the west gate, all right-of-ways, easements, a stop sign, and haul route sign located in the appropriate location prior entering on to State Highway 60, and any other red line items associated with either drainage or traffic. Permits: Weld County requires you to obtain any overweight or over width permits as needed. Please contact Amy Burry, Weld County Pubic Works Department. The State also requires these types of permits. Stay on paved surfaces as much as possible. Weld County Public Works Office number# 970-356-4000. pc: USR-1695 M:\PLANNING-DEVELOPMENT REVIEW\USR-use by Special Review\USR-1695 A&W Water Services\USR-1695.doc • • Weld County Planning Department GREELEY OFFICE • flOh' li6 MEMORANDUM RECEIVED ITO: Don Carroll, Public Works DATE: March 13, 2009 FROM: Clay Kimmi, P.E., C.F.M., Public Works Cat • COLORADO SUBJECT: A&W Water Highway 60 Site Drainage Comments Final Drainage Report: A Final Drainage Report was provided. The Report was stamped, dated, and signed by Kurt R. Rollin, P.E. number 24802. A discussion needs to be added to the narrative describing how and when the retention pond will be maintained. A discussion needs to be added to the narrative describing the changes that occur in the basin boundaries between the existing and proposed conditions. Sub-basin A requires a detention or retention pond to contain the 100-year event. The sub- basin cannot release at a rate greater than the 5-year historic rate of 0.28 cfs. A spillway and water quality control feature will be required for a detention pond. Preliminary calculations show that a detention pond would likely be less than 1/3 of an acre-foot. A spillway needs to be shown on the drawings for the retention pond. Calculations for the spillway need to be provided in the drainage report. A note needs to be added to the grading plan stating "Weld County will not be responsible for the maintenance of drainage related facilities." The final drainage report shall address the redline comments in report and on the exhibits. The applicant shall address the comments listed above during this review process. Comments made during this stage of the review process are not all-inclusive, as revised materials will have to be submitted and approved by Public Works prior to the recording of the Final Plat. The review process will continue only when the all application materials have been submitted. Original: A&W Water Service,1892 Denver Ave,Ft Lupton,CO 80621 CC to File: FHDP-551 PC by Post: Michelle Martin,Planning Services CES Consultants,LLC,118 W Charlotte St,Johnstown,CO 80534 • Page 1 of I March 13,2009 M:\PLANNING - DEVELOPMENT REVIEW\USR-Use by Special Revicw\USR-1695 A&W Water Services\A&W Highway Drainage Comments 3-13-09 doc , Kik• MEMORANDUM iiiIlDTO: CHRIS GATHMAN, DEPT OF PLANNING SERVICES FC• SUB ECT: USR-1695, A&W WATER SERVICE, INC. -OIL COLORADO FIELD SERVICE SUPPORT FACILITY DATE: DECEMBER 16,2009 Environmental Health Services has reviewed this proposal for Use by Special Review Permit 1695 for Oil Field Service Support Facility, consisting of water supply&storage,pot ash mixing &storage, and a production pipe&storage area. We recommend that the following conditions be part of any approval: We recommend that the following requirements be met prior to recording the plat: I. A fugitive particulate emissions control plan(dust control plan) shall be submitted and approved by the Weld County Dept. of Public Health&Environment. • 2. The applicant shall submit a waste handling plan, for approval,to the Weld County Department of Public Health&Environment. a) A list of wastes which are expected to be generated on site(this should include expected volumes and types of waste generated). b) A list of the type and volume of chemicals expected to be stored on site. c) The waste handler and facility where the waste will be disposed(including the facility name,address,and phone number). 3. If applicable, the applicant shall obtain stormwater discharge permit coverage from the Colorado Department of Public Health&Environment,Water Quality Control Division for construction activities. 4. A secondary containment structure surrounding each tank or battery of tanks used for slurry storage or mixing shall be constructed. The volume retained by the structure shall be 110%greater than the volume of the largest tank inside this structure. The structure shall prevent any release from the tank system from reaching land or waters outside of the containment area prior to cleanup. For tanks stored in contact with the ground, a concrete secondary containment structure(floors and walls) shall be constructed. The structure shall be designed by a Colorado Registered Professional Engineer. The Department will consider structures other than those constructed of concrete so long as a • • registered professional engineer provides a certification indicating that the proposed structure meets or exceeds the expected functionality of a concrete structure in regard to containment, spills, unintended releases, etc. 5. A secondary containment structure surrounding the slurry unloading/truck slurry loading area shall be constructed unless all connections are made within the structure required in 4 above. The volume retained by the structure shall be sufficient to capture spilled slurry and prevent spills from reaching land or waters outside of the containment area prior to cleanup. 6. An individual sewage disposal system(I.S.D.S.)is required to dispose of sewage from the facility and must be designed by a Colorado Registered Professional Engineer and in accordance with the I.S.D.S. portion of the Weld County Code. 7. The septic system serving the existing residence,which the applicant intends to use for office space shall be reviewed by a Colorado Registered Professional Engineer. The review shall consist of observation of the system and a technical review describing the systems ability to handle the proposed hydraulic load. The review shall be submitted to the Environmental Health Services Division of the Weld County Department of Public • Health and Environment. In the event the system is found to be inadequately sized or constructed, the system shall be brought into compliance with current Regulations. Development Standards: I. The facility shall be constructed and operated to ensure that contamination of soil and groundwater does not occur. 2. Slurry unloading/truck loading operations shall be conducted within the secondary containment areas. Spill prevention measures shall be employed when making connections and during loading/unloading operations. Portable containment such as drip pans shall be available for use. 3. The fresh water storage and loading system shall be operated in a manner to minimize spills. Fresh water spills should be captured in above ground containment areas and allowed to infiltrate. There shall be no discharge from this process to surface waters or to the facility stormwater management system in accordance with the Rules and Regulations of the Colorado Water Quality Control Commission,and the Environmental Protection Agency. 4. No permanent disposal of wastes shall be permitted at this site. Any liquid or solid wastes shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 5. Fugitive dust shall be controlled on this site. The facility shall comply with their 2 • approved fugitive dust control plan. 6. This facility shall adhere to the maximum permissible noise levels allowed in the Commercial Zone as delineated in Section 14-9-30 of the Weld County Code. 7. Sewage disposal shall be by septic system. Any I.S.D.S. on the property shall be permitted, installed,maintained and operated in compliance with Weld County Code, pertaining to I.S.D.S. 8. A permanent adequate water supply shall be provided for drinking and sanitary purposes. 9. Adequate drinking water,hand washing, and toilet facilities shall be provided for employees and patrons of the facility at all times. 10. Waste materials shall be handled,stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. The applicant shall operate in accordance with the approved Waste Handling Plan. • 11. All chemicals must be stored secure,on an impervious surface, and in accordance with manufacturer's recommendations. 12. This facility shall comply with the laws,standards, rules and regulations of the Water Quality Control Commission, Air Quality Control Commission, Hazardous Materials and Solid Waste Division, and any other applicable agency. • 3 DEPARTMENT OF PLANNING SERVICES iaff • Weld County Administrative Offices 918 10`6 St Greeley CO 80631 Phone (970) 353- 6100 Ext 3575 WEBSITE: www.co.weld.co.us C. COLORADO Applicant: A & W Water Services, Inc. March 25, 2009 Case Number: USR-1695 Project: A Site Specific Development Plan and a Special Review Permit for Oil and Gas Support and Service Facility (water supply& storage; potash mixing and storage; washout facility; reverse osmosis facility and production pipe and equipment storage area) in the A (Agricultural) Zone District Legal: Part of the E2 of Section 31, T4N, R66W of the 6th P.M., Weld County, Colorado. Location: West of and adjacent to Highway 60, and 1/2 mile north of CR 38. • Parcel Numbers: 1057 31 000015 There are two building permits on record for this parcel, both are finaled. Prior to the start of any construction, alterations, or change of occupancy; 1 A building permit application must be completed and two complete sets of plans including engineered foundation plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A geotechnical engineering report preformed by a registered State of Colorado engineer shall be required. 2 A plan review shall be approved and a permit must be issued prior to the start of construction. 3 Setback and offset distances shall be determined by the 2006 International Building Code (Offset and setback distances are measured from the farthest projection from the structure). 4 Buildings located within a 100 year flood plain require a Flood Hazard Development Plan. 5 A letter from the Fire District to ascertain if a FPD permit is required. Sincerely ova)/ Robert Powell • Plans Examiner II Service,Teamwork,Integrity,Quality R rectellis• Weld County Referral ' March 3, 2009 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant A&W Water Service, Inc Case Number USR-1695 Please Reply By April 3, 2009 Planner Chris Gathman Project A Site Specific Development Plan and Use by Special Review Permit for Oil and Gas Support and Service Facility(water supply&storage; potash mixing and storage; washout facility; reverse osmosis facility and production pipe and equipment storage area) in the A(Agricultural)Zone District. Lega/ Part of the E2 of Section 31,T4N, R66W of the 6th P.M., Weld County, Colorado. Location West of and adjacent to Highway 60 and 'IA mile north of CR 38. Parcel Number 1057 31 000015 • The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan because ❑ We have reviewed the request and find no conflicts with our interests. XSee attached letter. Comments: 2..11 4-el u i/a ll'` *ttnio Signature , Date 3- e/d9 Agency 7f/y7e)i�f?eo • +Weld County Planning Dept. '''918 10"Street,Greeley,CO.80631 +(970)353-6100 ext.3540 +(970)304-6498 fax likrh,6„ MEMORANDUM • COLORADO To: Chris Gathman, Planner March 4, 2009 From: Ann Siron, Zoning Compliance Officer Subject: USR-1695 Referral Upon review of my case files and computer,an active Violation(ZCV0B-00225)was noted. This violation was issued due to commercial activity in relation to an Oil and Gas Support and Service Facility(water supply&storage; potash mixing and storage;washout facility;reverse osmosis facility and production pipe and equipment storage area)taking place in the A(Agricultural)Zone District without having submitted a Use by Special Review permit. This case has was initially scheduled to be heard in front of the Board of County Commissioners through a violation hearing on March 10, 2009 but has been removed from the docket as a USR application has been completed and submitted to the Department of Planning Services. This application, if approved, will correct the violation. If for any reason, this application is denied, the Violation Case will proceed accordingly through a violation hearing and possibly district court. • cc: ZCV08-00225 • SERVICE.TEAMWORK.INTEGRI rY.QUALITY Weld County Referral 0 ilit ‘Ser 4111, W®14 Coua' '6 1!7g DBparknetl ORL4-. OFFICE March 3, 2009 IllipC. RECEIVED COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant A&W Water Service, Inc Case Number USR-1695 Please Reply By April 3, 2009 Planner Chris Gathman Project A Site Specific Development Plan and Use by Special Review Permit for Oil and Gas Support and Service Facility(water supply&storage; potash mixing and storage; washout facility; reverse osmosis facility and production pipe and equipment storage area) in the A(Agricultural)Zone District. Legal Part of the E2 of Section 31,T4N, R66W of the 6th P.M.;Weld County, Colorado. Location West of and adjacent to Highway 60 and I/2 mile north of CR 38. Parcel Number 1057 31 000015 • The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan because We have reviewed the request and find no conflicts with our interests. See attached letter. • Comments: Signature eeDate Z Agency i , tntiLh l • +Weld County Planning Dept. +918 10t Street,Greeley,CO.80631 ❖(970)353-6100 ext.3540 +(970)304-6498 fax 4 } • Town Hall, 1101 Broad St., Drawer 290 Milliken, CO 80543 _____ (970) 587-4331 Fax: (970) 587-2678 Milli fen_ April 2,2009 Chris Gatham,Planner Weld County Planning Department 918 10th Street Greeley,CO 80631 RE: Referral USR-1695 Mr.Gatham, On behalf of the Town of Milliken, I have reviewed this request for a Site Specific Development Plan and Use by Special review Permit for a Oil and Gas Support and Service Facility,Case#RE-4797.and offer the following comments; New development within the growth areas of towns and cities should be served by municipal/district water and • sewer systems whenever possible. Any new development within the County should be inside the municipal boundaries of a Town or City. For those developments that cannot meet this requirement because of distance from service lines or inability to annex,a requirement for connection to water and sewer at some appropriate time or when proximate to service lines should be a condition of approval of the application. Thank you for the opportunity to comment on this project. Should you have any questions,please call me at 970/660-5042. Sincerely, 'teve House Community Development Director • • _ E121.2 $ ° g �' a▪ eril,; t 2 L.A, 8W4. yg c oQ. c8 E EEI5u �• `om aw8 807J m , ato t $ w `w m g` S' 6 - moo a Em lzle m a . $ I 0 C § I am ! .b 'girl v I a +J t El. L E ¢2o & 8 1 _ V G C 40 gm C R .s m ' C "N5 PVC O00'0 JS ° O2 k O g C -6 /1 gZ,m¢ a E i• .'� mii w '� 1 8 W 4= @m H S 8 � 'n 'E `a I � aala °8 8 b € 2 n.t b y p 9 _ m tat.f! 'a m c❑ o f $ $io 2 ❑51 e a m v t E t.2 'J m a 'b `o g 43; t- N •�O m ro gS cm m `6 25 gr" e53 8s $ b a T m - _ m' di im«owp 3 k m ,$ Q ;o$,a� m @ o E � o ul � mc � � c � N Leo = � > s $$ a C2}� ° C :18:: o 'WW1 3 m $ d ` off - C � s - 8o'Sm_ 9 > ❑ ❑g, 8 l 'd 8 Ll '°N aaH [ 9 / aLIiA }}eld Wd60 :1 6001 'E ', dd ID ID 8 0 o alt 4 . i - � s �a s b' ? v7 IS - p w �` s 00 0 1 to qa el or E lb I t B iS sy Qv = og L 'q 'C le v; ^tea O OF [�1J GI p O YL p T •C F d o g ttl i4 P m6 $ b E _S. y p d 3 e 1RMw V� S ebb it . 1 .� Tu R 8 U p� 3re� � 59 -7 Ai � - '$ode age s ,tee & ; iql� ye q 3G - v.4I.S emI ? wC Sa 0 V b° v G q • A i ' a'9 . 3 i 00 7 w ., q rn ES yy ` '' N 0 'n.o $ ES o g 5 o d ,�"� O 9 O' a� &y o 'S ea 1 _pp c A � y A1 ,1 - g .8= .q b 1 t+' "�$ �, c� q°, b �a mug _, * �> N '3 q d 8 0 � ¢� L' X 3 v g..6 1� O 6 w ~°o n " t c, "' w ix iZ 'd Oa acid }saaal 'I9 / 9L [ A ; ;pld Wd60 6 6002 '0 'ady Chris Gathman om: Matthew Machado[MMachado@Igkhlaw.com] nt: Wednesday, July 15, 2009 11:02 AM o: Chris Gathman Cc: ditchoffice@gwestoffice.net; Steven P. Jeffers; chrys@Ilolaw.com Subject: RE: A&W Water Service, Inc. - USR-1695 Attachments: 20090715-MDM-Gathman.pdf man.pdf te� 20090715-MDM-Gat hman.pdf(89 K... Chris, On April 23, 2009, we sent you a letter regarding A & W 's USR request. The attached letter is intended to replace the April 23 letter. The attached is the same as the April 23 letter, except to clarify a sentence in the proposed condition (the following sentence was changed: "Discharges to the ditch include stormwater runoff from the land within the USR boundary from entering that enters the FIDCo Ditch via any of aforementioned routes.") . Thank you. Matt Matthew Machado LYONS GADDIS KAHN & HALL, PC O. Box 978 Longmont, CO 80502-0978 303-776-9900; Facsimile 303-776-9100 mmachado@lgkhlaw.com <file: ///C: \Documents%20and%2oSettings\mdm\Application%20Data \Microsoft\Signatures\mmachado@lgkhlaw.com> www.lgkhlaw.com <http: //console.mxlogic.com/redir/? b0Vxx4QsK6zASOOC ssUCr017AiFc j7bUrLRXFLELf6zB5MTsSGHJyuEllhV4GjfQNOVJ5x5xZcSyCMes73CrCzAS 0Yr1oQAg811E1jh00KP-9Ew6fypBrM3d40r2T6y0Kg80Cc01KyUgenPs3VU3zg9J4S00C_ssyyrt3axwcNp> CONFIDENTIALITY STATEMENT: THIS E-MAIL MESSAGE AND ANY ACCOMPANYING DOCUMENTS CONTAIN INFORMATION WHICH IS ATTORNEY CLIENT PRIVILEGED, CONFIDENTIAL AND INTENDED ONLY FOR THE USE OF THE ABOVE-NAMED RECIPIENT. IF THE READER OF THIS MESSAGE IS NOT THE INTENDED RECIPIENT, YOU ARE HEREBY NOTIFIED THAT ANY DISSEMINATION, DISTRIBUTION, PRINTING OR COPYING OF THIS MESSAGE IS STRICTLY PROHIBITED. IF YOU HAVE RECEIVED THIS MESSAGE IN ERROR, PLEASE IMMEDIATELY NOTIFY US BY TELEPHONE OR RETURN THE E-MAIL MESSAGE TO US. THANK YOU. Please note our new name, e-mail, website and fax number. illkom: Brenda K. Hartshorn Sent: Thursday, April 23, 2009 3:30 PM To: Chris Gathman (cgathman@co.weld.co.us) 1 Cc: Frank Eckhardt (fsdefi@msn.com) ; Donna Coble (ditchoffice@qwestoffice.net) ; Matthew Machado; Steven P. Jeffers Subject: A&W Water Service, Inc. - USR-1695 • Per Mr. Machado' s request, please see the attached letter. Thank you. Brenda Hartshorn Brenda K. Hartshorn, Legal Assistant BERNARD LYONS CADDIS & KAHN, PC P.O. Box 978 Longmont, CO 80502-0978 303-776-9900; Facsimile 303-413-1003 bhartshorn@blglaw.com www.blglaw.com CONFIDENTIALITY STATEMENT: THIS E-MAIL MESSAGE AND ANY ACCOMPANYING DOCUMENTS CONTAIN INFORMATION WHICH IS ATTORNEY PRIVILEGED, CONFIDENTIAL AND INTENDED ONLY FOR THE USE OF THE ABOVE-NAMED RECIPIENT. IF THE READER OF THIS MESSAGE IS NOT THE INTENDED RECIPIENT, illiU ARE HEREBY NOTIFIED THAT ANY DISSEMINATION, DISTRIBUTION, PRINTING OR COPYING OF THIS SSAGE IS STRICTLY PROHIBITED. IF YOU HAVE RECEIVED THIS MESSAGE IN ERROR, PLEASE IMMEDIATELY NOTIFY US BY TELEPHONE OR RETURN THE E-MAIL MESSAGE TO US. THANK YOU. • 2 Richard N. Lyons, II Bernard Lyons Gaddis & Kahn Eve I.Canfield Jeffrey J.Kahn Scott E.Holwick • John W.Gaddis A Professional Corporation ' Attorneys and Counselors Matthew Machado Bradley A. Hall Madoline Wallace-Gross Steven P.Jeffers Chad A.Kupper Anton V. Dworak Adele L.Reester Catherine A.Tallerico Daniel F.Bernard Special Counsel Senior Counsel REVISED July 15, 2009 Chris Gathman Weld County Planning Department 918 10th Street Greeley, Colorado 80631 • Re: Additional Comments on Site Specific Development Plan by A&W Water Service, Inc., USR-1695 Dear Chris: After submitting comments on behalf of Farmers Independent Ditch Company("FIDCo")on April 2, 2009,A&W Water Service contacted the Company and clarified that the use by special review was limited to the southwest portion of its property away from the Farmers Independent Ditch ("FIDCo Ditch"). Based on that clarification, it is now our understanding that none of the proposed new uses or facilities will have a direct impact on the right of way for the FIDCo Ditch. FIDCo remains concerned with potential discharge of pollutants to the FIDCo Ditch from runoff into the • borrow pit along State Highway 60. In addition,since the previous letter,the Ditch Company learned that a ditch that runs north-south along the western edge of the proposed USR boundary carries irrigation tailwater directly into the FIDCo Ditch. Such contamination could occur from the potash slurry storage on the west side of the property,as well as from storage of used production pipe,the washout area and the storage and mixing of potash and salt,all along the eastern portion of the property near Weld County Road 60. These uses should be conditioned upon construction of adequate berms to prevent runoff leaving the areas where these activities occur from entering into the roadside ditch or into the tailwater ditch. Based on this new information from A&W Water Service,we request that the County include the following revised term and condition in A&W Water Service's permit: Applicant shall not cause discharges and shall take measures to prevent any discharges into the ditch owned by the Farmer's Independent Ditch Company ("FIDCo Ditch"), including discharges caused by direct discharges into the ditch, discharges to the borrow ditch on the east side of Highway 60 and then into the FIDCo Ditch, or discharges into the tailwater ditch that parallels the western USR boundary and continues north into the FIDCo Ditch ("tailwater ditch") unless Applicant and FIDCo enter into a written agreement allowing the same. Discharges to the ditch include stormwater runoff from the land within the USR boundary that enters the FIDCo Ditch via any of aforementioned routes. In order to prevent stormwater runoff or other discharge from entering the tailwater ditch, Applicant shall construct and maintain a berm along the western USR boundary sufficient to prevent runoff into the tailwater ditch. • 515 Kimbark Street • Second Floor • P.O. Box 978 • Longmont, CO 80502-0978 Phone: 303-776-9900 • Fax: 303-413-1003 • www.blglaw.com Bernard Lyons Gaddis & Kahn • A Professional Corporation Attorneys and Counselors Chris Gathman July 15, 2009 Page 2 Please send all future correspondence regarding this matter to my attention at the Law Offices of Bernard. Lyons. Gaddis& Kahn PC. 515 Kimbark St.. 2nd Floor. Longmont.CO 80502. If you would like to further discuss this matter,feel free to contact me. Sincerely, BERNARD LYONS GADDIS&KAHN, PC By St en P.Jeffe $Ieffers@bigiaw.com Matthew Machado mmachado@bfa7aw.com cc: Frank Eckhardt, Presdient Donna Coble, Secretary f:\oilents\1\6dco\e a w\corr\2009041.0-9Ngethman.doc IP FACLIENTs\F\FIDCO1A 8 W\CORR{20090T16-MDM-OATHMAN.DOC 07/15/09 10:64 AM • x y, t,'�` _ °*,w,gw.. F _ r. . d _E} x, i - tix ry -;w A.3• i +",' y,1-.. {- '�- x rs^� k i 4'zt ? m�. xSri -'. <.. sib " v F • {, ,,,,- ,.a° a: ' "C t r�s fi aFt.. 1,; 4 w 15 ,_.z#� F�7 , a,� I;'.y 'Z- `Ite x S` ``5 4';✓ k•t4A'�is `f,�� A'a kf d r i:"'k' S�";'P i" Y; & • i T3cty. � + �� #. 9 w. .�, .:< ':.•1/4••• q +- 'P p�l :1s1 'µ1' g' ._ pia :. - . , �-kk #( t� PF Ki,- t . qC a`stj �., ,_. ti >r' S^'�'' +ta s i N �� a,. is p xCi ty ' ,t, `�'a ^. t•.-. ' ^>.� _ �', :::ki v Ql:w, ; `a,:_,€ }.i i k.. : . r C.m 'Y Ci a P,r -y:_, -,:v�� .�4,d ,,,'a e�,: x a'' c ren t 1 fir: ! 'Lv - t i b Fi N N �+y4 "`r. £ -.' .8 yµ,� 44144 R :44N. mo t—74± b 1 {{3sF" ! :14- U @ 'IN�tp i� + it,:L i :t,:%•:‘„471/4140.. 't > �{ L , 14111 411 574. 44.1 robs x 1 L #% a'4,Pi✓- 111 44iY�' 4 lt:5 - O '.6 57 y- +'I i ..d '4„" 1,-31 N (0 4%4414Z4441144F "a+..y ya' S x, 1 cs, ' v G . C ,n 7`I 4 st '5 ms'} ,. - +L+ "" it,SA„ � L"°` `4 a t ..aE ;u m c '3:'x 't i t� ,•" • t ..h 4'C a .23 ' ,t". 8 t ams`` it +.'4 LL A- c gamg,�: -i s a' .y t! 'e O > ~ .p.44-4.,:.-.. 4' ' -.. -O ci a itt ,�444%4 4.p V_y -4 t y O. r.: t r_ za c N 44444 ' '}� - • 7:-..t u ,°s t$ t s h, - i i'5 - O r .3 O (n 414 0 o6 4.44 r 't i �'a i' s t r F �, "d i h�sF d d (n mss., �,;. U } 4 {�a ,4 ; 4% .4tt: coy , _' ° , fi as r',-.?..0'),77,z,214 +:��-`` A ,.-.' �i4;t:1:4;7::6, c m. . a " 4.442 r�+z .� 1z. rz .a, 15 2 °do- s-,• . `• N O e �;-m der. i�"w • '''‘;..4,1-..2'...:17.$2.1::,;. s�v �,� _•-:•:7:;:11:§;:',.14%9:2114414.u.�, � c m a s - ,�° P = U x A\ �q, ,..„,::„.,:t. � �` • try""'P �c"t "� U O uw� 4:� � �` ¢• Q ; J`.•.'iii'' ..p.„.4,-.4.:1,-:%., 4 .; .a[ a i4 � •'s/. q L. s ;= ,, 411.44444144144 ". '' i. ys" ,6 vt µ 4 1 O ,-,:m,: ,,&:::,.-11-? -9,14:.- - -- ` 'NX .. N a (n*st `'�' ' tip n ?:'c ^.:z rtQ y O to - �` N a y � 1 " r�: ry477. r sip rp� > °:** O C ti�. i• C 4 441 4 WO s § T t' 4 `'� `^ , a..... ,:- z_ "v'' a ' a� �: r � *a,,,,a,„w'4j2, ..]`+r ' -p 3 ' .'4s�x1 X (6 a '�"�, ' r " S W ,: Mt `z Eha. ;:i E rat` t'4.ss O } ..-s. •W LL Q • u,.;,4:::::1;,,,:: tiTt s 'Sd7,th ' •- .4= t . 7.4 li. aifr3 :.441 '74441114;201t, t'}.:Yi' '6'' -4 w '� x�4F" �� � ' gyp__ : "� s 'k - Sm'y� �a >F. x 4 v. ': ....,R.. ..° ..._°. $�{`� iLc �. a•,p x.9'*,.�' . . .Aa W?, r 3� k 'Po•t°,�::•_• k'+ .P:,°'. ..xi•;..... `' ... " `4„�..�. !+k'fi.,. . `! Y�'t � farft-ri" Weld County Referral March 3, 2009 hive COLORADO The Weld County Department of Planning Services has received the following Item for review: Applicant A&W Water Service, Inc Case Number USR-1695 Please Reply By April 3, 2009 Planner Chris Gathman Project . A Site Specific Development Plan and Use by Special Review Permit for Oil and Gas Support and Service Facility(water supply&storage; potash mixing and storage;washout facility; reverse osmosis facility and production pipe and equipment storage area)in the A(Agricultural)Zone District. Legal Part of the E2 of Section 31,T4N, R66W of the 6th P.M.,Weld County, Colorado. Location West of and adjacent to Highway 60 and 1/2 mile north of CR 38. Parcel Number 1057 31 000015 • The application is submitted to you for review and recommendation. Any corn ments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be _ _deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request-Please-note-that-new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified In writing of the Planning Commission date once the date is determined. U We have reviewed the request and find that it does/does not comply with our Comprehensive Plan because ❑ We have reviewed the request and find no conflicts with our interests. See attached letter. /' Comments: 64-1.itjY F /� �f�&✓ _sec, /-4,/17c+(/ `tf z/D`l ✓c til t`4/17A7 �J\ Signature rl/ `l� /e c .f / Date /1t Q / G Agency ` � p+&vs �h .. AL-4 e.,..• +Weld County Planning Dept. +918 10th Street,Greeley.CO.80631 4(970)353-6100 ext.3540 4(970)304-6498 fax • Richard N. Lyons, II Bernard Lyons Gaddis & Kahn Eve I. Canfield Jeffrey J. Kahn Scott E. Holwick John W. Gaddis A Professional Corporation ( Attorneys and Counselors Matthew Machado ',Bradley A. Hall Weld County Planning Department Madoline Wallace-Gross Steven P.Jeffers GREELEY OFFICE Chad A. Kupper Anton V. Dworak Adele L. Reester , t�-- - „ 27?ring Catherine A.Tallerico Daniel F. Bernard Special Counsel Senior Counsel 'Z °r I VED April 23, 200b Chris Gathman Weld County Planning Department 918 10th Street Greeley, Colorado 80631 Re: Additional Comments on Site Specific Development Plan by A&W Water Service, Inc., USR-1695 Dear Chris: After submitting comments on behalf of Farmers Independent Ditch Company("FIDCo") on April 2, 2009, A&W Water Service contacted the Company and clarified that the use by special review was limited to the southwest portion of its property away from the Farmers Independent Ditch ("FIDCo Ditch"). Based on that clarification, it is now our understanding that none of the proposed new uses or facilities will have a direct impact on the right of way for the FIDCo Ditch. FIDCo remains concerned with potential discharge of pollutants to the FIDCo Ditch from runoff into the • borrow pit along State Highway 60. In addition, since the previous letter, the Ditch Company learned that a ditch that runs north-south along the western edge of the proposed USR boundary carries irrigation tailwater directly into the FIDCo Ditch. Such contamination could occur from the potash slurry storage on the west side of the property, as well as from storage of used production pipe,the washout area and the storage and mixing of potash and salt, all along the eastern portion of the property near Weld County Road 60. These uses should be conditioned upon construction of adequate berms to prevent runoff leaving the areas where these activities occur from entering into the roadside ditch or into the tailwater ditch. Based on this new information from A&W Water Service, we request that the County include the following revised term and condition in A&W Water Service's permit: Applicant shall not cause discharges and shall take measures to prevent any discharges into the ditch owned by the Farmer's Independent Ditch Company ("FIDCo Ditch"), including discharges caused by direct discharges into the ditch, discharges to the borrow ditch on the east side of Highway 60 and then into the Ditch, or discharges into the tailwater ditch that parallels the western USR boundary and continues north into the FIDCo Ditch ("tailwater ditch") unless Applicant and FIDCo enter into a written agreement allowing the same. Discharges to the ditch include stormwater runoff from the land within the USR boundary from entering the FIDCo ditch via any of aforementioned routes. In order to prevent stormwater runoff or other discharge from entering the tailwater ditch, Applicant shall construct and maintain a berm along the western USR boundary sufficient to prevent runoff into the tailwater ditch. 515 Kimbark Street • Second Floor • P.O. Box 978 • Longmont, CO 80502-0978 Phone: 303-776-9900 • Fax: 303-413-1003 • www.blglaw.com Bernard Lyons Gaddis & Kahn A Professional Corporation Attorneys and Counselors • Mr. Gathman April 23, 2009 Page 2 Please send all future correspondence regarding this matter to my attention at the Law Offices of Bernard. Lyons. Gaddis& Kahn PC. 515 Kimbark St.. 2nd Floor. Longmont. CO 80502. If you would like to further discuss this matter,feel free to contact me. Sincerely, BERNARD LYONS GADDIS&KAHN, PC 574 By ,✓- Steven P.Jeffers sjeffers@blglaw.com Matthew Machado mmachado@blglaw.com cc: Frank Eckhardt, Presdient Donna Coble, Secretary f:\clients\t\f dco\a&w\corr\20090410-spj-gatnman.doc • • F:hCLIENTSIFIFIDCOIA&WICORRl20090417-SPJ-GATHMAN.DOC7.DOC 04/23/09 2:56 PM Weld County Referral Weld County Planning Department VII9c March 3, 2OO9 GREELEY OFFICE APR O. 3?PIA COLORADO RECEIVED The Weld County Department of Planning Services has received the following item for review: Applicant A&W Water Service, Inc Case Number USR-1695 Please Reply By April 3, 2009 Planner Chris Gathman Project A Site Specific Development Plan and Use by Special Review Permit for Oil and Gas Support and Service Facility(water supply&storage; potash mixing and storage;washout facility; reverse osmosis facility and production pipe and equipment storage area)in the A(Agricultural)Zone District. Legal Part of the E2 of Section 31,T4N, R66W of the 6th P.M.,Weld County, Colorado. Location West of and adjacent to Highway 60 and% mile north of CR 38, Parcel Number 1057 31 000015 • The application is submitted to you for review and recommendation. Any corn ments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be _deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated wdh the requ€st-Please-note-that-new Information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan because O We have reviewed the request and find no conflicts with our interests. ()La See attached letter. Comments: Signature ) G �/l C / Date 4 /2"-)o? Agency A's tvs /n4oe / lit"7aL Co. _ . • *Weld County Planning Dept. +918 10'"Street, Greeley.CO.80631 •(970)353-6100 ext.3540 +070)304-649a fax Richard N. Lyons, II Bernard Lyons Gaddis & Kahn Eve I. Canfield Jeffrey J. Kahn - -- Scott E. Holwick John W. Gaddis A Professional Corporation Attorneys and Counselors Matthew Machado • Bradley A. Hall Madoline Wallace-Gross Steven P.Jeffers Chad A. Kupper Anton V. Dworak Adele L. Reester Catherine A.Tallerico Daniel F. Bernard Special Counsel Senior Counsel April 2, 2OO9 Chris Gathman Weld County Planning Department 918 10th Street Greeley, Colorado 80631 Re: Site Specific Development Plan and Use by Special Review Application by A & W Water Service, Inc., USR-1695 Our firm represents the Farmers Independent Ditch Company ("Ditch Company"), which owns the Farmers Independent Ditch ("Ditch") and associated right of way. The Ditch Company recently received a referral for the application of A&W Water Service, Inc. ("A&W")for approval of a Site Specific Development Plan and Use by Special Review Permit for property owned by A&W in the Northeast 1/4 of Section 31, T 4 N, R 66W ("A&W Property"). The Ditch Company's Ditch and right of way are located on the northwest side of the A&W Property. • The Ditch Company's right of way allows the Ditch Company to operate, maintain, repair and replace the Ditch. When cleaning and maintenance of the Ditch and right of way, the Ditch Company may pile muck and debris from the Ditch in the Ditch's right of way and burn vegetation within the Ditch and right of way. This practice is a normal maintenance activity and is included as part of the Ditch Company's right of way. According to Bill Schneider, the ditch rider, the company sprays with herbicide and burns vegetation in the Ditch Company's right of way that includes the area extending 20 feet out from the southeast edge of the road on the southeast side of the ditch (see attached aerial photo). The Ditch Company's use of its right of way and Ditch for these purposes takes precedence over A&W's use of its land, as the Ditch Company's right of way is the dominant estate in the A&W Property. The Ditch Company is concerned about the impact A&W's proposed activities on the A&W Property may have on the Ditch and the Ditch Company right of way. A&W provides support services for local oil and gas production operations, including cleaning and filling water frac tanks, mixing and selling potash, and treating contaminated "produced" water, a wash out area for cleaning oil production equipment, and a production pipe and equipment storage area. Given the nature of A&W's operations, the Ditch Company is concerned that A&W may store or place flammable materials within the right of way or cause discharge of pollutants to the ditch directly or by runoff into the borrow that runs along State Highway 60. Accordingly, any approval by the County on the A&W Property should include the following term and condition: • 515 Kimbark Street • Second Floor • P.O. Box 978 • Longmont, CO 80502-0978 Phone: 303-776-9900 • Fax: 303-413-1003 • www.blglaw.com Bernard Lyons Gaddis & Kahn A Professional Corporation Attorneys and Counselors • Chris Gathman April 2, 2009 Page 2 Any alterations of the Farmers Independent Ditch (relocating, sloping or piping), ditch crossings (over, under, or through this Ditch), encroachments on the right of way (trees, structures, fences, placement of flammable materials etc.) and discharges of storm water into this Ditch either directly or by discharging to the borrow ditch on the east side of Highway 60 and then into the Ditch are prohibited unless A&W Water Service, Inc. and the Ditch Company enter into a written agreement allowing the same. For purposes of this approval, the right of way is assumed to extend approximately 20 feet to the southeast from the southeast edge of the road that runs along the Ditch's southeast side. Please send all future correspondence regarding this matter to my attention at the Law Offices of Bernard. Lyons. Gaddis & Kahn PC. 515 Kimbark St.. 2nd Floor, Longmont. CO 80502. If you would like to further discuss this matter,feel free to contact me. Very truly yours, BERNARD LYONS GADDIS&KAHN, PC • E%-/-2/1- 4-7/6-4.-,1:(1Z Matthew Machado mmachado@blglaw.com • F:ICLIENTSIFIFIDCOIA 8 W\20090318-MDM-WELD CTY.DOC 04/02/09 4:36 PM Chris Gathman From: Hice-Idler, Gloria [Gloria.Hice-Idler@DOT.STATE.CO.US] •t: Thursday, March 12, 2009 12:09 PM Chris Gathman Cc: 'Verlene Leeburg' Subject: USR-1695/A&W Water Service Chris, Linn Leeberg provided me with a copy of the traffic impact study. Based upon the information in the study, CDOT is requesting that a northbound to westbound left turn lane be constructed to this site. If you have any questions, please do not hesitate to contact me. Gloria Hice-Idler Permit Supervisor CDOT Region 4 1420 2nd Street Greeley CO 80631 (970) 350-2148 • • 1 I do. It doesn't have to be a "complete" study. I'll accept a memorandum. They need to provide me with the volume. It should be an easy task for Gene Coppola. And they still need a permit, since one has never been pulled for this intersection. I need to establish a baseline" for the future. I doubt that any improvements will be necessary, but I need to •erify. Gloria Hice-Idler Permit Supervisor CDOT Region 4 1420 2nd Street Greeley CO 80631 (970) 350-2148 Original Message From: Chris Gathman [mailto:cgathman@co.weld.co.us] Sent: Wednesday, December 02, 2009 2:11 PM To: Hice-Idler, Gloria Subject: RE: A&W USR -Amendment to Application Gloria, I just wanted clarification on responses #1 and #2. The applicant provided a traffic impact study for this site in March 2009. At that time you indicated (upon reviewing the traffic study) that CDOT was requesting a northbound to westbound left turn lane to be constructed for the site. Under this proposal the number of trips to the site will be reduced (by approximately 80 trips per day due to removing the Reverse Osmosis Facility, Equipment Washout Facility and downsizing the office). •o you still want an updated traffic study to review for this site? Sincerely, Chris Gathman Planner III Weld County Department of Planning Services 918 10th Street, Greeley, CO. 80634 Ph: (970)353-6100 ext. 3537 Fax: (970)304-6498 Original Message From: Hice-Idler, Gloria [mailto:Gloria.Nice-Idler@DOT.STATE.CO.US] Sent: Wednesday, December 02, 2009 1:34 PM To: Chris Gathman; Kristine Ranslem; Donald Carroll; Clayton D. Kimmi; Janet Carter; Troy Swain; Lauren Light Subject: RE: A&W USR -Amendment to Application Chris, I've reviewed the amendment and offer the following: 1. A traffic impact study should be completed for the site. 2. The WCR 38.5 access will require a new permit because of the increased traffic. If the AmsTI5 indicates highway improvements are necessary, the applicant would be responsible for heir construction. 3. The plan sheet indicates an oil/gas and emergency access. This access has not been permitted. Based on the category of highway, this access should not be allowed. CDOT would 2 consider an emergency access, but such access will have to gated at ALL times and only used for emergency services. Any violations will result in the access being removed by CDOT forces and the applicant billed for our costs. liThere appears to be another oil/gas access road. I cannot find any evidence of a permit or this access. This access should be removed. 5. CDOT Hydraulics will review the drainage plan. If you have any questions, please do not hesitate to contact me. Gloria Hice-Idler Permit Supervisor CDOT Region 4 1420 2nd Street Greeley CO 80631 (970) 350-2148 Original Message From: Chris Gathman [mailto:cgathman@co.weld.co.us] Sent: Wednesday, December 02, 2009 12:06 PM To: Kristine Ranslem; Donald Carroll; Clayton D. Kimmi; Janet Carter; Hice-Idler, Gloria; Troy Swain; Lauren Light Subject: FW: A&W USR -Amendment to Application Here is revised information for USR-1695 (A&W Water). The applicant has removed the equipment washout facility and reverse osmosis component. This case is scheduled to be heard by the Weld County Planning Commission on January 5th 2009. Let me know if you have any questions or need anything else. Ilso, Kris - could you please forward this to the other outside referral agencies on the list or USR-1695. Thanks, Chris Gathman Planner III Weld County Department of Planning Services 918 10th Street, Greeley, CO. 80634 Ph: (970)353-6100 ext. 3537 Fax: (970)304-6498 Original Message From: Chrys Hinze [mailto:chrys@llolaw.com] Sent: Wednesday, December 02, 2009 8:28 AM To: Chris Gathman Subject: A&W USR -Amendment to Application Chris, attached are the revised site plan, drainage plan, questionnaire and application form as requested. CES provided the drainage report to Clay Kimi last week. Hard copies of these items, with updated drainage report, will be submitted to you on Friday. Thanks, Chrys • Chrysten Hinze 3 Chris Gathman rom: Hice-Idler, Gloria [Gloria.Hice-Idler@DOT.STATE.CO.US] ent: Wednesday, December 09, 2009 9:16 AM o: Chris Gathman Cc: Chrys Hinze Subject: RE: A&W USR -Amendment to Application Based upon a discussion regarding this site, CDOT is willing to allow the oil/gas and emergency access to remain. The applicant will need to get a new permit for the access to allow the emergency use. The permit will state the following: 1. The access is to be locked and gated at all times. However, should this be a violation of any agreement the property owner has with the oil company, CDOT will consider the removal of the lock. We would still want the access gated, if at all possible. 2. Any violations of the emergency access by A&W Water will result in the removal of the emergency use portion of the permit. The access will then function as an oil/gas well access only. 3. At such time as the oil/gas well use ceases, the access will be required to be locked and gated. Of course, this would only apply if the lock has been removed as part of the oil agreement. I hope this clarifies things a little better. Call if you have any questions. •loria Hice-Idler ermit Supervisor CDOT Region 4 1420 2nd Street Greeley CO 80631 (970) 350-2148 Original Message From: Chris Gathman [mailto:cgathman@co.weld.co.us] Sent: Wednesday, December 02, 2009 2:21 PM To: Hice-Idler, Gloria Subject: RE: A&W USR -Amendment to Application O.K. Just wanted to be sure. Thanks Gloria. Chris Gathman Planner III Weld County Department of Planning Services 918 10th Street, Greeley, CO. 80634 Ph: (970)353-6100 ext. 3537 Fax: (970)304-6498 Original Message From: Hice-Idler, Gloria [mailto:Gloria.Hice-Idler@DOT.STATE.CO.US] Sent: Wednesday, December 02, 2009 2:17 PM Ao: Chris Gathman object: RE: A&W USR -Amendment to Application 1 Chris Gathman From: Hice-Idler, Gloria [Gloria.Nice-Idler@DOT.STATE.CO.US] ent: Monday, December 28, 2009 11:11 AM To: Chris Gathman; Janet Carter Subject: A&W Water Chris and Janet, Gene Coppola provided me with the figure I requested. Based upon it, it would appear that in the short term the left turn lane is still warranted. It would appear that their proposed change in scope did not remove this requirement. Gloria Hice-Idler Permit Supervisor CD0T Region 4 1420 2nd Street Greeley CO 80631 (970) 350-2148 • • 1 Hello