Loading...
HomeMy WebLinkAbout20100999.tiff AGENDA WELD COUNTY PLANNING COMMISSION MEETING Tuesday, May 18, 2010 12:11* p.m. ** *# * y y* Weld County Planning Commission Luncheon* 1:30 p.m. - Public Meeting of the Weld County Planning Commission,Weld County Department of Planning, Hearing Room,918 10th Street, Greeley, Colorado. 1. PLEGE OF ALLEGIANCE 2. ROLL CALL Tom Holton—Chair Mark Lawley—Vice Chair Erich Ehrlich Roy Spitzer Bill Hall Robert Grand Nick Berryman Alexander Zauder Jason Maxey 3. APPROVAL OF MINUTES from the May 4, 2010 regular meeting. 4. HEARING ITEMS-Specific time for public input has been set aside for discussion on the following items: A. CASE NUMBER: USR-1723 APPLICANT: Cedar Creek II, LLC PLANNER: Chris Gathman REQUEST: A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a Public Utility(a wind energy facility with a generating capacity up to 250.8 megawatts(MW)along with a 230-kilovolt(kV)electric transmission line, an interconnection facility to tie into an existing 72-mile transmission line, existing collector transmission lines, up to five(5) permanent 80-meter meteorological towers, one(1)substation, an operations and maintenance building/facility, along with one(1) temporary batch plant and construction facility) in the A(Agricultural)Zone District. LEGAL DESCRIPTION: Wind Energy Facility T10N R57W Section 6 T10N R58W Sections 1, 2, 3, 4, 5 T11N R56W, Sections 5, 6, 8, 17 T11N R57W Sections 1, 2, 3, 5, 6, 7, 8, 9, 10, 11, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 26, 27, 28, 29, 30, 31, 32, 33 T11N R58W Sections 3, 4, 10, 11, 12, 13, 14, 15, 16, 24, 25, 27, 34, 36 T12N R56W Sections 28, 32, 33 T12N R57W Sections 34, 36 Transmission Line T10N R58W Sections 1, 2, 3, 4, 5, 7, 8, 9 T10N R59W Sections 4, 9, 10, 11, 12 T10N R59W Sections 5, 6 T1ON R60W Section 2 T11N R57W Section 7 T11N R58W Sections 12, 13, 24, 25, 36 T11N R59W Sections 31, 32 T11N R60W Sections 35, 36 of the 6th P.M., Weld County, Colorado. LOCATION: Wind Generator facility is generally located in an irregularly shaped area south of and adjacent to CR 138.5; North of and adjacent to CR 120 and west of CR 153. The section of transmission line lying outside of the boundaries of the Wind Generator Facility is located north of CR 118 and east of and adjacent to CR 382. is 2010-0999 a o/0 2:00 p.m. - Joint Hearing with the Greeley Planning Commission A. CASE NUMBER: Ordinance 2010-4 PLANNER: Chris Gathman REQUEST: Proposal to adopt the North Greeley Railroad Subarea Plan for Greeley&Weld County. 5. PUBLIC COMMENT 6. NEW BUSINESS NOTE: In accordance with the Americans with Disability Act, if special accommodations are required in order for you to participate in this hearing, please contact the Department of Planning Services at(970) 353-6100, Extension 3540, prior to the day of the hearing. Hello