Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
780888.tiff
CHANGE Distribution to: ORDER • OWNER ❑ ARCHITECT O AlA DOCUMENT G701 CONTRACTOR ❑ /� HELD O 1� • OTHER ❑ PROJECT: Weld County Centennial Center Phase 11TCHANGE ORDER NUMBER: - 1 - (name, address) Greeley, Colorado INITIATION DATE: July 27, 1978 TO (Contractor): ARCHITECT'S PROJECT NO: 71-1-CCA-0162 Cr. James Albertson I Hensel Phelps Construction Co. CONTRACT FOR: Weld County Centennial Cente P. 0. Box 0 Construction Manager Greeley, Colorado 80632 I CONTRACT DATEFebruary 11, 1974 You are directed to make the following changes in this Contract: 1. Clarification Request No. 1 - Revised elevation at Plaza planter $ 857.00 2. Clarification Request No. 2 - 4" Storm drain at tunnel 3. Clarification Request No. 3 - Delete membrane at tunnel • (1,569.00) 4. C. R. No. 4 - Alternate dampproofing at tunnel (1,164.00) 5. C. R. No. 5 - Divider wall at Plaza paver steps 180.00 6. C. R. No. 6 - Delete at Plaza and move to planter 7. C. R. No. 7 - Roof drain at courthouse 148.00 8. Architect's Field Order No. 1 - 4" Plaza drain 847.00 9. One inch copper' water line and box at Plaza ' 1,397.00 w 10. C. R. No. 8 - New sod at Courthouse Butane tank 160.00 f ' TOTAL - - $ 856.00 • Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (fixanaLtcxt(1tataccennattEecO was $ $ 268,585.48 Net change by previously authorized Change Orders $ — 0 - The (Contract Sum) (Gvaxmtnc cbo47tnimataxkRs4) prior to this Change Order was $ 268,585.48 The (Contract Sum) (CRxoracitRo&k oxtmsxxamit will be (increased) (decreased) (unchanged) 856.00 by this Change Order $ • The new (Contract Sum) (mesa tenckxlxximoxf Rs!) including this Change Order will be $ $269,441.48 The Contract Time will be tiDuca,Exeb k xaexscah (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is Authorized: Hensel Phelps Construction E 1ic Board of Weld County Commis- P. Guire ARCIIIII Cf CONTRACTOR OWNER Greeley. Colorado _ Co. , Grreley, Colorado _ stoners, Greeley, Colorado Address Address Address BY BY BY 4-a 'id DATE DATE - DATE 780888 AIA DOCUMENT G70I • CIIANCE ORDER • AI'RII. 1978 EDITION • AIA"° • © 1978 TI IE AMERICAN !Will f 111 OE ARCHITECTS, 17J5 NEW YORK AVI.., N.W.,WASHINGTON, O.C. 20006 _ 71/21/e_ 853 ala/7�
Hello