HomeMy WebLinkAbout20112482.tiff Esther Gesick
oam: Clayton D. Kimmi
nt: Tuesday, September 20, 2011 11:02 AM
: Kim Ogle; Tom Parko; Esther Gesick; Donald Carroll
Cc: Clayton D. Kimmi
Subject: Addition to resolution for AmUSR-1251
Attachments: Proposed Resolution Language for AmUSR-1251.docx
Kim,
Here is an amendment to the resolution for the Pat Weakland case tomorrow. Please forward the proposed language
onto the applicant. I have also sent the proposed language to the Clerk to the Board for inclusion in the commissioner
packets.
Clay Kimmi, P.E., CFM
Drainage& Floodplain Engineer
Weld County Public Works
1111 H St
PO Box 758
Greeley,CO 80632-0758
O: 970-304-6496 x 3741
F: 970-304-6497
• I 8 il0l I
-aireS-w E CO-,COU NTV
u
Confidentiality Notice:This electronic transmission and any attached documents or other writings are intended only for
the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise
protected from disclosure. If you have received this communication in error, please immediately notify sender by return
e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the
contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited.
L �
•
661 zo I , MEMORANDUM
�✓�1� TO: Kim Ogle, Planning Services DATE: September 20, 2011
FROM: Clay Kimmi, P.E., CFM, Public Works Department
WEL•►��O NTY
I ' SUBJECT: AmUSR-1251, Pat and Amanda Weakland
The applicant has indicated structures associated with this USR may be constructed in the floodplain. In order
to ensure the proposed structures do not adversely impact the public health and safety, do not increase the flood
risk on adjacent properties, and are constructed in compliance with the FEMA and Weld County floodplain
regulations; please add the following statement as item 1J to the resolution for AmUSR-1251
1J. If structures are to be constructed in the FEMA mapped Cache La Poudre River floodplain, the applicant
must obtain an approved flood hazard development permit showing that the structures can be constructed in
compliance with FEMA and Weld County floodplain regulations. Additionally, buildings constructed after
March 18, 1980 which are located in the FEMA mapped Cache La Poudre floodplain must be shown to be
compliant with the floodplain regulations.
•
•
C:\Documents and Settings\egesick\Local Settings\Temporary Internet Files\Content.Outlook\M4M2CSX8\Proposed Resolution Language for AmUSR-
1251.docx
Hello