Loading...
HomeMy WebLinkAbout20110782.tiff RESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 22 BETWEEN COUNTY ROAD 31 AND U.S. HIGHWAY 85 FOR TEN WORKING DAYS, FOR CULVERT REPLACEMENTS WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close to through traffic and to regulate, warn and guide vehicular traffic on said County roads by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 22, between County Roads 31 and U.S. Highway 85, be temporarily closed, with said closure being effective April 4, 2011, for approximately ten working days, in order to replace two (2) culverts, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. Ls e 2011-0782 EG0024 ROAD CLOSURE - CR 22 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 23rd day of March, A.D., 2011. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COL ADO ATTEST: 'fis , •≥ E 4 fr ` 7 rbara Kirkmeyer, hair Weld County Clerk to the :f ar. (1 t 0, • __777 I ean P Pro-Tem BY:3� �O[�!% �' ti Conway{/ Deputy Clerk to the Board % •� /// Wilkm F' arcia C APPRON/ TO:FORM: _David E. Long y Attorney Doug s Radema her Date of signature: ////// 2011-0782 EG0024 a 6 r MEMORANDUM '��• TO: Clerk to the Board DATE: March 21, 2011 COLORADO FROM: Janet Carter, Public Works Department SUBJECT: Agenda Item—Road Closure Road Closure: WCR 22 between U. S. Highway 85 and WCR 31 is scheduled to be closed from 4/4/2011 to 4/15/2011 to replace two culverts. A diagram of the closure barricades and detour plan is attached. M:'FrancieWgenda Road Closures-1 dots 2011-0782 Af z�- 000 j CO CC E al ® ` 112 r § 3 § § I { _{ ' k % % 3 )} (\\ �� 2 " k )j 221 Nen )\) \ 3 it .0 j !a §§cc ( |� o� /a ~E. 2 § 4/j -23 | � st In / . \ » | ! |*2 3D §_;! ! | $ • e • •■ w •■ ■. 0 ■ a N �. '' O B \ 0.2Z . �0 0 k ml / Ell iii Illi .■ I. a to co D ■ ill I. I Hello