Loading...
HomeMy WebLinkAbout20112297.tiff WATER SUPPLY INFORMATION SUMMARY Section 30.28•1334dL C.R.S.west that 1M Merit whit to S. Casaty,'Adqueto widow that a wow apply that • is alffodwt is tarn of tplontIty, poky ad dgwda *y will he ara±abh to inns an adequate supply of watn. 1. NAME OF DEVELOPMENT AS PROPOSED Dietzler Water Resources Groundwater Load Out Facility 2. LAND USE ACTION USR 3. NAME OF EXISTING PARCEL AS RECORDED SUBDIVISION N/A FILM N/A BLOCK N/A LOT N/A 4.TOTAL ACREAGE 80 Acres 5.NUMBER OF LOTS PROPOSED 0 PLAT MAP ENCLOSED D YES (USR Map) B. PARCEL HISTORY-Phew attach who of Wok,plats ar Mbar widen Joann elidan. A.Wes parcel neadad with army Our to Jew 1, 1972? ❑ YES 0 NO B. Ha the parcel war haw pat of a&lion of hod action Ala Jaw t, 1872? O YES H NO If yes, Swig the praaioa Min 7. LOCATION OF PARCEL-Mode a mop daidsdq the prejwt a ss and tie to o eaet n arrow. W 1/2 1µ OF NW 1µ SECTION 13 TOWNSHIP 10 ON OS RANGE 61 OE 1 I W PRINCIPAL MERIOLUt t 5TH O h.M. O UTE 0 COS tLLA •5. PLAT-Location of aU welt so property nowt he plotted and pflt i tars provided. Sinaloa'M O 'S Yw O No N rat,ached hand drown*eta LI Too ❑ No (USR Map) S.ESTIMATED WATER REOUIREMENTS-tiro ow spy w A Tot wise 10. WATER SUPPLY SOURCE __ ... .__ Ain @7 EXISTING ❑ DEVELOPED I ❑ NEW WELLS WELLS SPRING Iroe awer•nee ace HOUSEHOLD USE/ of wits GPO AF WELL PERMIT NUMBERS o rr oe r A a unr into Industrial / I assasala Dlolrl MUSE I O Will Mans ®WAIN FU rut (COMMERCIAL USE iI of S.F. GPO AF 74876F 1 owlrwUpper OaarTe 74877F - O Laramie IRRIGATIONS of owe GPD AF 74874 F, 74878F STOCK WATERMG / of had GPO AF 0 MUMCN'AI, O ASSOCIATION ; WATER COURT DECREE CASE NO.'S OTHER Fish Rearing GPO AF 0 COMPANY Recreation, Pond Filling O DISTRICT I TOTAL 1,737,872GNI 2,000 AF NAME LETTER OF COMMITMENT FOR I SERVICE ❑ YES ❑ NO It (PIONEER'S WATER SUPPLY REPORT 0 YES 0 NO IF YES, PLEASE FORWARD WITH THIS FORM. MN My IN nerd Mon ow rnwa a wwww) 12.TYPE OF SEWAGE DISPOSAL SYSTEM O SEPTIC TANKILEACH FIELD 0 CENTRAL SYSTEM •DISTRICT NAME Sr LAGOON O VAULT• LOCATION SEWAGE HAULED TO O ENGINEERED SYSTEM(Ans I espy Al eyilaria NNW ® OTHER Portable Toilets 2011-2297 Form No. OFFICE OF THE STATE ENGINEER GWS-25 COLORADO DIVISION OF WATER RESOURCES 818 Centennial Bldg.,1313 Sherman St.,Denver,Colorado 80203 • (303)886-3581 916 WELL PERMIT NUMBER 74874 -F APPLICANT DIV. 8 WD64 DES. BASIN 8 MD APPROVED WELL LOCATION • WELD COUNTY NW 1/4 NW 1/4 Section 13 DANIEL P DIETZLER Township 10 N Range 61 W Sixth P.M. DIETZLER FARMS INC DISTANCES FROM SECTION LINES 52583 CR 107 300 Ft. from North Section Line GROVER, CO 80729- 300 Ft. from West Section Line (970)656-3766 UTM COORDINATES(Meters,Zone:13,NAD83) PERMIT TO CONSTRUCT A WELL Easting: 57061 fly Northing: 'fS21393s CONDITIONS OF APPROVAL 1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit does not ensure that no injury will occur to another vested water right or preclude another owner of a vested water right from seeking relief in a civil court action. • 2) The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402-2,unless approval of a variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation Contractors In accordance with Rule 18. • 3) Approved pursuant to CRS 37-90-107(1)and the Findings of the Groundwater Commission dated March 15,2011. 4) The pumping rate of this well shall not exceed 250 GPM. • 5) The annual withdrawal of ground water from this well shall not exceed 400 acre-feet. The total combined volume of withdrawals by this well and all other wells withdrawing from the Laramie-Fox Hills aquifer beneath the 3840 acres of overlying land,as described in the Findings referenced above,shall not exceed 112,000 acre-feet. 6) The use of water under this permit is limited to irrigation,industrial and commercial,livestock,fish rearing,recreation, and pond filling on the 3840 acres of overlying land,as described in the Findings referenced above;and additionally in all of Weld County for industrial and commercial use via truck hauling. 7) This well must be constructed to withdraw water from only the Laramie-Fox Hills aquifer. The top of the Laramie-Fox Hills aquifer is located approximately 425 feet below the ground surface. The bottom of the Laramie-Fox Hills aquifer is located approximately 800 feet below the ground surface. Plain casing must be Installed and grouted to prevent the diversion of water from other aquifers and the movement of water between aquifers. 8) The owner shall mark the well in a conspicuous place with well permit number(s), name of the aquifer,and court case number(s)as appropriate. The owner shall take necessary means and precautions to preserve these markings. 9) A totalizing flow meter or Commission approved measuring device must be installed on this well and maintained in good working order. Permanent records of all diversions must be maintained by the well owner(collected at least annually)and submitted to the Ground Water Commission upon request. 10) This well shall be constructed within 200 feet of the location specified on this permit. 11) The use of water from the well under this permit must have occurred,and a completed Statement of Beneficial Use (including the pumping rate and annual appropriation)must be filed by the well owner,within three years of the dale of issuance of this permit. • JI2Ii. Q� • ,APPROVED JPM State Engineer By Receipt No.3647841 DATE ISSUED 03-15-2011 EXPIRATION DATE 03-15-2012 Form No. OFFICE OF THE STATE ENGINEER GWS-25 COLORADO DIVISION OF WATER RESOURCES 818 Centennial Bldg.,1313 Sherman St.,Denver,Colorado 80203 (303)0663581 • ' 916 WELL PERMIT NUMBER 74876 -F APPLICANT DN. 8 WD64 DES. BASING MD APPROVED WELL LOCATION WELD COUNTY SW 1/4 NW 1/4 Section 29 DANIEL P DIETZLER Township 10 N Range 60 W Sixth P.M. DIETZLER FARMS INC DISTANCES FROM SECTION LINES 52583 CR 107 2085 Ft.from North Section Line GROVER, CO 80729- 200 Ft. from West Section Line (970) 656-3766 UTM COORDINATES (Meters,Zone:13,NAD83), PERMIT TO USE AN EXISTING WELL Easting: 573806 Northing: 4517767 CONDITIONS OF APPROVAL 1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit does not ensure that no Injury will occur to another vested water right or preclude another owner of a vested water right from seeking relief in a civil court action. 2) The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402-2,unless approval of a variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation Contractors in accordance with Rule 18. 3) Approved for use of an existing well(cancelled permit no.284580)pursuant to CRS 37-90-107 and the Findings of the Groundwater Commission dated March 15,2011. • 4) The pumping rate of this well shall not exceed 250 GPM. 5) The annual withdrawal of ground water from this well shall not exceed 400 acre-feet. The total combined volume of withdrawals by this well and all other wells withdrawing from the Laramie-Fox Hills aquifer beneath the 3840 acres of overlying land,as described in the Findings referenced above,shall not exceed 112,000 acre-feet. 6) The use of water under this permit is limited to irrigation,industrial and commercial,livestock,fish rearing, recreation, and pond filling on the 3840 acres of overlying land,as described in the Findings referenced above;and additionally in all of Weld County for industrial and commercial use via truck hauling. 7) This well must be constructed to withdraw water from only the Laramie-Fox Hills aquifer. The top of the Laramie-Fox Hills aquifer is located approximately 420 feet below the ground surface. The bottom of the Laramie-Fox Hills aquifer is located approximately 800 feet below the ground surface. Plain casing must be Installed and grouted to prevent the diversion of water from other aquifers and the movement of water between aquifers. 8) The owner shall mark the well in a conspicuous place with well permit number(s),name of the aquifer,and court case number(s)as appropriate. The owner shall take necessary means and precautions to preserve these markings. 9) A totalizing flow meter or Commission approved measuring device must be installed on this well and maintained in good working order. Permanent records of all diversions must be maintained by the well owner(collected at least annually) and submitted to the Ground Water Commission upon request. 10) This well shall be constructed within 200 feet of the location specified on this permit. 11) The use of water from the well under this permit must have occurred,and a completed Statement of Beneficial Use (including the pumping rate and annual appropriation)must be filed by the well owner,within three years of the date of issuance of this permit. • APPROVED JP State Engineer By /4 Receipt No.3647839 DATE ISSUED 03-15-2011 EXPIRATION DATE -0345-2642' Form No. OFFICE OF THE STATE ENGINEER GWS-25 COLORADO DIVISION OF WATER RESOURCES 818 Centennial Bldg., 1313 Sherman St., Denver,Colorado 80203 • (303)866-3581 916 WELL PERMIT NUMBER 74877 -F APPLICANT DIV. 8 WD64 DES. BASIN 8 MD APPROVED WELL LOCATION WELD COUNTY NW 1/4 NW 1/4 Section 13 DANIEL P DIETZLER Township 10 N Range 61 W Sixth P.M. DIETZLER FARMS INC DISTANCES FROM SECTION LINES 52583 CR 107 300 Ft. from North Section Line GROVER, CO 80729- 300 Ft. from West Section Line (970) 656-3766 UTM COORDINATES(Meters,Zone:13,NAD83) PERMIT TO CONSTRUCT A WELL Easting: 5'70575.3 Northing: VS2-1393•S CONDITIONS OF APPROVAL 1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit does not ensure that no injury will occur to another vested water right or preclude another owner of a vested water right from seeking relief in a civil court action. 2) The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402-2,unless approval of a variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation Contractors in accordance with Rule 18. 3) Approved for use of an existing well (cancelled permit no.284660)if a well has already been constructed under permit no. 284660,or for construction of a well if a well has not already been constructed, pursuant to CRS 37-90-107(1)and the Findings of the Groundwater Commission dated March 15,2011. 4) The pumping rate of this well shall not exceed 200 GPM. 5) The annual withdrawal of ground water from this well shall not exceed 320 acre-feet. The total combined volume of withdrawals by this well and all other wells withdrawing from the Upper Laramie aquifer beneat the 3840 acres of overlying land,as described in the Findings referenced above,shall not exceed 57,600 acre-feet. 6) The use of water under this permit is limited to irrigation, industrial and commercial, livestock,fish rearing, recreation,and pond filling on the 3840 acres of overlying land,as described in the Findings referenced above;and additionally in all of Weld County for industrial and commercial use via truck hauling. 7) This well must be constructed to withdraw water from only the Upper Laramie aquifer. The top of the Upper Laramie aquifer is located approximately 240 feet below the ground surface. The bottom of the Upper Laramie aquifer is located approximately 420 feet below the ground surface. Plain casing must be installed and grouted to prevent the diversion of water from other aquifers and the movement of water between aquifers. 8) The owner shall mark the well in a conspicuous place with well permit number(s),name of the aquifer,and court case number(s) as appropriate. The owner shall take necessary means and precautions to preserve these markings. 9) A totalizing flow meter or Commission approved measuring device must be installed on this well and maintained in good working order. Permanent records of all diversions must be maintained by the well owner(collected at least annually) and submitted to the Ground Water Commission upon request. 10) This well shall be constructed within 200 feet of the location specified on this permit. 11) The use of water from the well under this permit must have occurred,and a completed Statement of Beneficial Use (including the pumping rate and annual appropriation)must be filed by the well owner,within three years of the date of issuance of this permit. 4PROVED 9.40:41 �[/ 77 M �� State Engineer By Receipt No. 3647840 DATE ISSUED 03-15-2011 EXPIRATION DATE 03-15-2012 Form No, OFFICE OF THE STATE ENGINEER GWS-25 COLORADO DIVISION OF WATER RESOURCES' 818 Centennial Bldg.,1313 Sherman St.,Denver,Colorado 80203 (303)8663581 • 916 WELL PERMIT NUMBER 74878 -F APPLICANT DIV. 8 WD64 DES. BASIN 8 MD • APPROVED WELL LOCATION WELD COUNTY SW 1/4 NW 1/4 Section 29 DANIEL P DIETZLER Township 10 N Range 60 W Sixth P.M. DIETZLER FARMS INC DISTANCES FROM SECTION LINES 52583 CR 107 2085 Ft from North Section Line GROVER, CO 80729- 200 Ft from West Section Line (970)656-3766 UTM COORDINATES(Meters,Zone:13,NAD83) PERMIT TO CONSTRUCT A WELL Easting: 573dog.(p Northing: 05,77(07 CONDITIONS OF APPROVAL 1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit does not ensure that no injury will occur to another vested water right or preclude another owner of a vested water right from seeking relief in a civil court action. 2) The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402-2,unless approval of a variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation Contractors in accordance with Rule 18. 3) Approved pursuant to CRS 37-90-107 and the Findings of the Groundwater Commission dated March 15,2011. 4) The pumping rate of this well shall not exceed 200 GPM. • 5) The annual withdrawal of ground water from this well shall not exceed 320 acre-feet. The total combined volume of withdrawals by this well and all other wells withdrawing from the Upper Laramie aquifer beneath the 3840 acres of overlying land,as described in the Findings referenced above,shall not exceed 57,600 acre-feet. 6) The use of water under this permit is limited to irrigation,industrial and commercial,livestock,fish rearing,recreation,and pond filling on the 3840 acres of overlying land, as described in the Findings referenced above;and additionally in all of Weld County for industrial and commercial use via truck hauling. 7) This well must be constructed to withdraw water from only the Upper Laramie aquifer. The top of the Upper Laramie aquifer is located approximately 150 feet below the ground surface. The bottom of the Upper Laramie aquifer is located approximately 425 feet below the ground surface. Plain casing must be installed and grouted to prevent the diversion of water from other aquifers and the movement of water between aquifers. 8) The owner shall mark the well In a conspicuous place with well permit number(s),name of the aquifer,and court case number(s)as appropriate. The owner shall take necessary means and precautions to preserve these markings. 9) A totalizing flaw meter or Commission approved measuring device must be installed on this well and maintained in good working order. Permanent records of all diversions must be maintained by the well owner(collected at least annually)and submitted to the Ground Water Commission upon request. 10) This well shall be constructed within 200 feet of the location specified on this permit. 11) The use of water from the well under this permit must have occurred,and a completed Statement of Beneficial Use (including the pumping rate and annual appropriation)must be filed by the well owner,within three years of the date of issuance of this permit. • APPROVED IWJ�i gad— i/ r,YY State Engineer By (��'L,�///y�}�Lw ,Receipt No.3647842 DATE ISSUED 03-15-2011 EXPIRATION DATE 03-15-2012 • PATRICK ENGINEERING GROUNDWATER LOAD OUT FACILITY USE BY SPECIAL REVIEW PERMIT STATEMENT OF SEWAGE DISPOSAL Prepared By: Patrick Engineering On Behalf of: Dietzler Water Resources, Corp. Date Prepared: May 2011 The purpose of this Use by Special Review Permit Application is to enable Dietzler Water Resources Corp. to supply groundwater for municipal, industrial, and agricultural uses. In addition, groundwater will be supplied to oil and gas companies for support of their drilling operations within a 50-mile radius of the load out facility. The site is currently vacant agricultural land and no buildings are associated with the property. The proposed load out facility will require no on-site employees and truckers will only be on-site for loading • groundwater, which should not typically take over forty-five minutes. As a result,there is no need for permanent water supply nor a sewage disposal system. Portable toilets will be located on-site during groundwater load out operations.Toilet holding tanks will be pumped bi-weekly or as needed, and their contents will be fully disposed of at proper municipal treatment facility(s). • 7905 West 120th,Broomfield,Colorado 80020 1800.799.7050 I patrickengineering.com Hello