HomeMy WebLinkAbout790951.tiff u 79
RESOLUTION
RE: AMENDMENT TO WELD COUNTY ADMINISTRATIVE CODE CONCERNING
50-25 PLAN.
WHEREAS, the Board of County Commissioners of Weld County,
Colorado, pursuant to Colorado statute and the Weld County Home
Rule Charter, is vested with the authority of administering the
affairs of Weld County, Colorado, and
WHEREAS , on March 7 , 1979 , the Board of County Commissioners
of Weld County, Colorado adopted a resolution concerning the
modification of normal working hours to increase productive time
in the Road and Bridge Department, and
WHEREAS, the Board of County Commissioners desires to amend
the Weld County Administrative Code to reflect said modification
of normal working hours in the Road and Bridge Department by
adding the following to the Board Procedures Section -- C. Working
Hours :
"4) Not withstanding any other provision to the
contrary within this Administrative Code ,
the following provisions in regard to work
hours shall apply within the Road and Bridge
Department:
a) The Divisions of Construction, Bridge,
and Paving and Aggregate shall, during
the months of May through October, have
a normal work day of ten (10) hours per
day and a normal work week of fifty (50)
hours per week; and the Weld County
Engineer may, at his discretion, reduce
the number of hours worked per week so
as to maximize productive hours.
b) All Divisions other than Construction,
Bridge, and Paving and Aggregate within
the Road and Bridge Department shall have
a normal work day of eight (8) hours per
day and a normal work week of forty (40)
hours per week, except that the Weld County
Engineer shall have the discretion to in-
crease the hours normally worked per day
and normally worked per week so as to
increase the operating efficiency of such
Division.
c) Such hours of employment of the Road and
Bridge Department employees may, at the
discretion of the Weld County Engineer,
begin prior to 8 : 00 o 'clock a.m. and
end later than 5 :00 o 'clock p.m. so as
to reach a maximum scheduling capability.
d) Compensation time. Within the operational
requirement of the Road and Bridge Depart-
790951
ment, overtime accumulated during the
months of November through April , during
which time the employees of the Road and
Bridge Department shall work only twenty-
five (25) hours per week until such time as
all overtime accumulated during the summer
months has expired.
e) Employees in the Construction, Bridge and
Paving and Aggregate Divisions shall ,
during the week that contains the holiday
July 4 , not work during the such week but
accumulated overtime shall be used in its
place.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commis-
sioners of Weld County, Colorado that the amendments to the Weld
County Administrative Code as hereinabove stated be, and hereby
are, adopted.
The above and foregoing Resolution was , on motion duly made
and seconded, adopted by the following vote on the 25th day of
April, A.D. , 1979 .
BOARD OF COUNTY COMMISSIONERS
ELD COUNTY, COLORADO
C4 A0-.--
*in, t ji/..-v7424/
*-2 lip- 21-,,,c
ATTEST: ' Iathi CIA/ .9la
r
Weld County Clerk and Recorder
an le k to the Boar
B r ,
e uty County Clerk
K APPR D AS TO FORM:
6
County Attorney
DATE PRESENTED: APRIL 30 , 1979
'1
BOARD PROCEDURES SECTION -- Pg. 8
9. B. 4) g) i . Three Maintenance Districts , each with a District
Supervisor responsible to the Maintenance Division
Supervisor.
ii . Road Maintenance Methods. Motor grader operators will
be trained in at least two methods of grading. The
Engineering Department will set standards for maintenance.
After the operator has been trained, he may be allowed
to determine which method is to be used.
C. Working Hours.
1 ) County Road and Bridge crews will come to work on their own
time and be on the job site by 8:00 A.M. ; they will leave on
County time.
2) Motor Grader Operators. The eight hours per day worked by the
motor grader operators may be other than the regular 8:00 A.M.
to 5:00 P.M. shift. Said hours worked will be under the direct
supervision of the district overseer. The overseer must
guarantee the eight hours per day worked by each employee to
the Board of County Commissioners.
3) Compensation Time. Comp time will be one hour worked to equal
one hour comp time. The comp time may be scheduled and taken
over a three-month period.
4) Not withstanding any other provision to the contrary within
this Administrative Code , the following provisions in regard
to work hours shall apply within the Road and Bridge Department:
a) The Division of Construction, Bridge, and Paving and Aggre-
gate shall , during the months of May through October, have
a normal work day of ten (10) hours per day and a normal
work week of fifty (50) hours per week ; and the Weld County
Engineer may, at his discretion, reduce the number of hours
worked per week so as to maximize productive hours.
b) All Divisions other than Construction , Bridge, and Paving
and Aggregate within the Road and Bridge Department shall
have a normal work day of eight (8) hours per day and a
normal work week of forty (40) hours per week, except
that the Weld County Engineer shall have the discretion
to increase the hours normally worked per day and normally
worked per week so as to increase the operating efficiency
of such Division.
c) Such hours of employment of the Road and Bridge Department
employees may, at the discretion of the Weld County Engineer,
begin prior to 8:00 o'clock A.M. and end later than 5:00
o' clock P.M. so as to reach a maximum scheduling capability.
BOARD PROCEDURES SECTION -- Page 8a.
9. C. 4) d) Compensation time. Within the operational requirement of
the Road and Bridge Department, overtime accumulated during
the summer hours shall normally be taken during the months
of November through April , during which time the employees
of the Road and Bridge Department shall work only twenty-
five (25) hours per week until such time as all overtime
accumulated during the summer months has expired.
e) Employees in the Construction , Bridge, and Paving and
Aggregate Divisions shall , during the week that contains
the holiday July 4, not work during the such week but
accumulated overtime shall be used in its place.
D. Monthly Meetings Scheduled. Each District Shop will meet on the
second Tuesday of the month at 4:00 P.M. The County Engineer and the
Supervisors will meet with the Commissioners on the second Wednesday
of the month at 8:00 A.M.
E. Commissioners in Field. Four out of five County Commissioners each
month will be responsible for spending one day in the field. The
responsibility will rotate among the Five County Commissioners so
that the individual Commissioners will not have the responsibility
each fifth month.
Hello