Loading...
HomeMy WebLinkAbout20111123 ac - II CORRESPONDENCE RESPONSE DEPARTMENT OFRe* U - CALLA Ya-Div/o '' *** PLEASE RESPOND WITHIN THREE DAYS ** * IF RESPONSE WILL BE DELAYED, PLEASE NOTIFY "CTB GROUP" BY E-MAIL r,_ ( E fi- VIE OF EXPECTED DATE FOR RESPONSE. Iii 1 RECOMMENDED ACTION: 'I L APR 2 7 1011 u Narrative: WELD Cali)FY ' 3LIC It'r ,{(S WEPT cc ALLI METHOD OF RESPONSE: Board Action • Work Session Letter (Attached) Telephone Call No Response (explain) Department Head Signature BOARD ACTION: (INITIAL BY SC WO BK DL DR APPROVAL) AGREE WITH RECOMMENDATION- P.AJ-', WORK SESSION- C c rnvh� vU C ‘o,As 5- 1 ,t1 2011-1123 PA - CTB � � �a p• a� t REFERRED TO T Ll(tLA jmrr\il FOR RECOMMENDATION CONWAY f GARCIA KIRKMEYER H LONG RADEMACHER 1 David Bauer To: Douglas Rademacher; Sean Conway; Barbara Kirkmeyer; William Garcia; Dave Long Cc: Pat Persichino; Esther Gesick; Jennifer VanEgdom; Clayton Kimmi Subject: St. Vrain Sanitation and Floodplain Commissioners, This morning Clay Kimmi and I met with Rob Fleck of the St.Vrain Sanitation district and his engineering consultant Bob Orsatti. The meeting topic was flood hazard permitting for the planned expansion of their wastewater treatment plant to be located a quarter mile west of WCR 15 in the St.Vrain floodplain. They left much happier than when they arrived. Their expansion construction Notice of Bid Award is next week with Notice to Proceed in early June. They have not pulled any building permits yet. For the County to have appropriate documents to meet FEMA requirements, we've asked for, and they have agreed to update an older flood model of the area and submit that to FEMA for a LOMR and so doing verify that their site is safe from flooding. We would use that same information to issue a conditional Weld County Flood Hazard Development permit. Worst case they might have to flood proof per FEMA requirement, best case they prove their site is out of the floodplain. Their contractor can pull a grading permit in June to start preliminary site work; their project moves ahead on schedule. David Bauer, P.E., CFM Weld County Engineer - Development Weld County Public Works P.O. Box 758 Greeley, Colorado 80632 (970) 304-6496 IBA I -20II WEL O NTY Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. 1 David Bauer From: David Bauer Sent: Monday,April 25, 2011 10:38 AM To: Douglas Rademacher; Sean Conway; Barbara Kirkmeyer; Dave Long; William Garcia Cc: Pat Persichino; Clayton D. Kimmi Subject: Draft Response to Comm. Rademacher- St Vrain Commissioner Rademacher, The existing St. Vrain Sanitation District facility was built on fill in 1987. They did not report that construction to FEMA so FEMA has written them a letter(3/22/11) asking that they provide data and modeling to document that floodplain fill and any impact on adjacent properties(submit a LOMR). Once FEMA approves the LOMR for the old fill and if the expansion of their facility is on that area of fill, it would be considered out and not subject to floodplain regulations. However, any activity outside the area released by FEMA would still need to be evaluated for compliance with both FEMA and Colorado Water Conservation Board rules. We are asking that they provide whatever they submit to FEMA to us so we stay compliant with FEMA. Their site is in the center of the floodplain, if they have any floors below flood elevation, they will probably have to flood proof. Clay has a meeting with St.Vrain's operations manager on Friday where we will discuss how to get through the Federal process. The County is not holding up their permits. David Bauer, P.E.. CFM Weld County Engineer- Development Weld County Public Works P.O. Box 758 Greeley. Colorado 80632 (970) 304-6496 i $4 20 ; 1 W E LEI-2C a U N V. U Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. 1 St. Vrain • . SANITATION DISTRICT April 21, 2011 Commissioner Douglas Rademacher Commissioner Sean Conway 915 Tenth Street P.O. Box 758 Greeley, Colorado 80632 Dear Commissioner Rademacher and Conway, St. Vrain Sanitation District(SVSD) appreciates the recent approval by the Board of Commissioners regarding our plant site in Weld County near the St. Vrain River. Your assistance will provide us the opportunity to soon begin construction on this important sanitary sewer project in the southwest Weld County area. An issue arose following our discussion and approval from the County that I would appreciate your assistance and thoughtful direction regarding. We have been told by Clay Kimmi of the Planning Division, of the possible need to submit a floodplain change including a LOMAR. This seems unnecessary since we are not altering in any manner the placement of facilities, buildings or processes with the design and build of the new plant. Bottom line, nothing on the 45 acre site that SVSD owns is neither changing from our previous plant design last built in 2002, nor floodplain specifics that were included in the 2006 CLOMR approved by Weld County for the CARMA subdivision St. Vrain Lakes. The 2006 approved CLOMR reflect the past work performed by the Corp using the NAVD 1988 Datum. We are anticipating a meeting with staff of the County this coming week. We have performed cross section surveys of the area specific to the plant site to demonstrate no significant change to the plant site. Our concern is the cost and delay that potentially is involved with the necessary steps that may be sought from the County to meet standards that do not seem applicable to our project or situation. We have been approved for the site plan design by the State Public Health and Environment staff and our site plan (as previously mentioned) does not take up any additional footprint or encroach upon the floodplain areas of our property. We are at the point of award of bid to a contractor and 11307 Business Park Circle Firestone,Colorado 80504 303.776.9570 Main 303.485.1968 Fax www.stsan.com anticipated that they would be on site in late May to begin this $28 million and 21 month project. Your assistance and direction would be most helpful as we move forward. Please contact me 303-682-4685 or Rob Fleck, 303-682-4681 if you have questions or thoughts related to this concern. Sincerel Eric E. Doering District Manager Cc: Rob Fleck, SVSD District Engineer Richard Lyons, SVSD Attorney SVSD Board of Directors Bob Frachetti, Frachetti Engineering Bob Orsatti, Frachetti Engineering 11307 Business Park Circle Firestone,Colorado 80504 303.776.9570 303.485.1968 Fax www.stsan.com Hello