Loading...
HomeMy WebLinkAbout20112672.tiff SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW (USR) APPLICATION • FOR PLANNING DEPARTMENT USE DATE RECEIVED: RECEIPT#/AMOUNT# /$ CASE#ASSIGNED: APPLICATION RECEIVED BY PLANNER ASSIGNED: Parcel Number 1 0 5 7 _ 1 0 . 1 _ 0 0 . 0 1 8 (12 digit number-found on Tax I.D.information,obtainable at the Weld County Assessor's Office,or www.co.weld.co.us) Legal Description NE 1/4 , Section 10 , Township 4 North, Range 66 West Zone District: Agriculture , Total Acreage: 150 , Flood Plain: No , Geological Hazard: No , Airport Overlay District: N° FEE OWNER(S) OF THE PROPERTY: Name: WETCO FARMS INC. Work Phone# Home Phone# Email Address: 2055 1 Ave. Address: City/State/Zip Code Greeley,CO 80631 Name: Work Phone# Home Phone# Email Address: Address: City/State/Zip Code Name: • Work Phone# Home Phone# Email Address: Address: City/State/Zip Code APPLICANT OR AUTHORIZED AGENT(See Below:Authorization must accompany applications signed by Authorized Agent) Name: DCP Midstream,LP Work Phone# (970)378-6372 Home Phone# Email Address: 3026 4th Avenue Address: City/State/Zip Code Greeley,CO 80631 PROPOSED USE: DCP Midstream proposes to build a compressor station as part of an expansion that entails a pas plant,four compressor stations and connective pipelines. I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my(our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicatin that the signatory has to legal authority to sign for the corporation. gs j t 7 l col! S Lure owner or uthorized Agent Date Signature: Owner or Authorized Agent Date • EXHIBIT Iz 2011-2672 1 nk11-COOS • art DEPARTMENT OF PLANNING SERVICES 1555N 17th AVE 11111k. G353 610 80631 PHONE: (970)353-6100, Ext. 3540 COLORADO FAX: (970) 304 AUTHORIZATION FORM I DCP Midstream, LP represent Wetco Farms, Inc. for the property (Agent/Applicant) (Owner) located at Lot B of RE No. 1O57-1O-1-RE19O5 • LEGAL DESCRIPTION: SEC 10 TWN 4N RNG 66W SUBDIVISION NAME: LOT BLK I can be contacted at the following phone#'s: Home Work 970-378-6372 • Fax# 970-352-3165 The property owner can be contacted at the following phone#'s Home Work Fax# Correspondence mailed to (only one): x❑ Agent/Applicant ❑ Property Owner DATE rJ/ Z // OWNER'S SIGNATURE (/Jll t(O Il/�5 �� ( fi7 lam` Wetco Farms, Inc. by Craig Sparrow, President • • Use by Special Review Application Packet DCP Midstream, LP Godfrey Bottoms • Compressor Station, Weld County, CO July 2011 ENERCON • • Introduction DCP Midstream, LP (DCP) is in the process of expanding operations in Weld County, CO. The expansion will include a new gas plant, three (3) to four(4) compressor stations and interconnecting pipelines. This Use by Special Review (USR) permit application addresses only the Godfrey Bottoms compressor station. Additional USR permit applications will be submitted for the remaining compressor stations, the gas plant, and pipelines. The Godfrey Bottoms compressor station site is located southwest of Greeley, CO, in central Weld County. DCP intends to construct the compressor station between early 2012 and 2013. The total site will be approximately 150 acres; however, only 10 acres are expected to be disturbed by construction or operation activities. After construction, a 3-strand barbed wire fence will be installed along the property boundary per CDPHE's requirements under the NOX regulations. The compressor site will be fully fenced with a 6-foot chain link fence with a security gate. The area inside the fence will be graveled. The area outside the fence will be re-vegetated with native grasses. After construction, the site will be un-manned. Because the site will not be regularly occupied, • permanent sewage and water utilities will not be provided. However, bottled water and a portable sewage unit will be provided by DCP. DCP met with representatives of the La Salle Fire Protection District on June 28, 2011 to discuss fire protection for the Godfrey Bottoms compressor station. In the event of a fire, it is anticipated that water or chemical retardants will be transported to the site. A lock box on the entry gate will provide access to the site. Weld County code stipulates noise levels for industrial or construction sites be below 80 dB(A) from 7:00 a.m. to 9:00 p.m. and below 75 dB(A) from 9:00 p.m. to 7:00 a.m. DCP does not foresee exceeding these limitations during the construction or operation of the compressor station. Weld County code stipulates light rays will not shine directly onto adjacent properties where such would cause a nuisance or interfere with the use on the adjacent property. Also stipulated in the code is: "Neither direct nor reflected light from any light source may create a traffic hazard to operators of motor vehicles on public or private streets and colored lights that may be confused with or construed as traffic control devices shall not be used." DCP does not intend to use excessive lighting and does not foresee exceeding limitations regarding lighting on the Godfrey Bottoms compressor station. • • Table of Contents Use by Special Review Application Exhibit A Plat Map 24x36 Exhibit B Plat Map 8.5x11 Exhibit C Plat Map Digital Copy no exhibit Use by Special Review Questionnaire Exhibit D Weld County Road Access Information Sheet Exhibit E Evidence of Adequate Water Supply Exhibit F Evidence of Adequate Sewage Disposal Exhibit G Deed and/or Ownership Information Exhibit H Certificate of Conveyance Exhibit I Soils Report Exhibit J • Affidavit and Certified List of Surface/Mineral Owners Exhibit K Emergency Information Sheet Exhibit L Notice of Inquiry/IGA Boundary Exhibit M Application Fee no exhibit Investigation Fee no exhibit Use by Special Review Plat Recording Fee no exhibit Drainage Report Exhibit N Traffic Statement Exhibit 0 Flood Hazards Exhibit P Geological Hazards Exhibit Q Dust Abatement Plan Exhibit R Waste Management Plan Exhibit S • • Exhibit A USR Application • • • Exhibit B Plat Map 24" x 36" See map, next page. • • Exhibit D USR Questionnaire 1. Explain, in detail,the proposed use of the property. DCP Midstream proposes to build a compressor station southwest of Greeley, CO. 2. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 22 of the comprehensive plan. The proposed use is consistent with the comprehensive plan, as it will foster development of the natural resources of Weld County. Given the size of the property, only a small amount of agricultural land would be removed from agricultural production. 3. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 23 (zoning) and the zone district in which it is located. • The proposed use is consistent with the intent of the agricultural zone district, as it will foster the development of oil and gas resources. Pursuant to 23-3-20 of the Weld County Code, oil and gas production facilities are allowed as a matter of right in the agricultural zone district. 4. What type of uses surround the site (explain how the proposed use is consistent and compatible with surround land uses). This site is located in an area of the county rich in agricultural production. Plowed fields and pivot irrigation systems are common in this portion of Weld County. Section 31.2 of the Weld County Ordinance provides that oil and gas production facilities are allowed as a matter of right in the agricultural zone district. By keeping the compressor station footprint small, it is intended that surrounding agricultural areas will not be affected by the compressor station's presence. • • 5. Describe, in detail,the following: a. Number of people who will use this site. The site will be un-manned, but will usually be visited once per day by two employees. b. Number of employees proposed to be employed at this site. The site will be un-manned. c. Hours of operation. 24 hours a day, seven days a week, 365 days a year. d. Type and number of structures to be erected (built) on this site. One building is planned. e. Type and number of animals, if any, to be on this site. None. f. Kind of vehicles (type, size, weight)that will access this site and how often. There will be a pickup truck once per day. A tractor-trailer rig will access the site once every other day to haul condensate or produced water from the site. g. Who will provide fire protection to the site? La Salle Fire District. Water or other fire retardants would be • transported to the site as necessary in the event of a fire. h. Water source on the property. During construction, the contractor will supply bottled water. Bottled water will be supplied by DCP after construction. i. Sewage disposal system on the property. During construction, the contractor will supply portable sewage disposal units. DCP will supply a porta-potty post construction. j. If storage or warehousing is proposed, what type of items will be stored? 100 bbl produced water tanks—2 30,000 gal pressurized condensate tanks—2 200 gal lube oil tank—1 1,000 gal methanol tank—1 80 bbl slop oil tank—1 6. Explain the proposed landscaping for the site. The site will be graveled inside the fence line and re-vegetated with native grass outside the fence. • • 7. Explain any proposed reclamation procedures when termination of the USR activity occurs. At completion of construction, the site outside of the fenced boundary will be re-vegetated with native grasses. The area inside the fenced boundary will be graveled. If operations at the site were to cease, DCP would adhere to any COGCC rules or regulations concerning site reclamation. 8. Explain how the storm water drainage will be handled on the site. The site will be graded such that storm water will flow into a detention pond prior to being released. 9. Explain how long it will take to construct this site and when construction and landscaping is scheduled to begin. Construction is expected to last one year. DCP plans to start construction in early 2012, and complete construction in 2013. 10.Explain where storage and/or stockpile of wastes will occur on this site. Wastes will not be stored or stockpiled on site. Any wastes produced • will be containerized and removed from the site in a timely manner. • • Exhibit E Weld County Road Access Information Sheet A road is needed for vehicles to access the Godfrey Bottoms compressor station site from WCR 33. DCP intends to use a contractor to construct a new access road. As part of DCP's contract, contractors will follow safety recommendations advised by the Weld County Public Works Department. Guidelines used by contractors for DCP in the past to ensure the safety of other drivers using the roadway include: • Construction on the access road will only occur during the day. • Appropriate signage will be placed 500 feet from the construction to warn drivers from both directions of upcoming construction. • As a general guideline,vehicles and equipment will not block county roads. If equipment is expected to temporarily obstruct traffic, cones will be used to direct traffic • around the obstruction. • The access road width will be a minimum of 20 feet, with turning radii of 45-60 degrees. • A truck pull-off area will be provided to get trucks off the county road prior to entering the site. Vehicles will be able remain fully off of the county road prior to or after opening/closing the site access gate. An access permit application and photos of the point where a new road would tie into WCR 33 follow. • I Weld County Public Works Dept. • 1111 H Street ACCESS PERMIT ,,. it co P.O. Box 758 Greeley,CO 80632 APPLICATION FORM :</C WD Phone: (970)304-6496 Fax: (970)304-6497 Applicant Property Owner(If different than Applicant) Name Paul Park Name WETCO FARMS INC Company DCP Midstream,LP Address 2055 1 Ave Address 3026 4th Avenue City Greeley State CO Zip 80631 City Greeley State CO Zip 80631 Phone Business Phone (970)378-6372 Fax Fax E-mail E-mail pdpark@dcpmidstream.com ♦=Existing Access a=Proposed Access Parcel Location&Sketch The access is on WCR 33 Nearest Intersection:WCR 33 &WCR 46 WCR Distance from Intersection 0.75 mile 1O lt Parcel Number 105710100018 I Is M • Section/Township/Range 10/T4N/R66W 'I• Is there an existing access to the property?OYES NO Q N 3 3 i Number of Existing Accesses 0 Road Surface Type&Construction Information Asphalt El Gravel © Treated 0 Other WCR `16 Culvert Size&Type 30"RCP Materials used to construct Access Road base and gravel Construction Start Date Sprg 2012 Finish Date Spring 2013 Proposed Use °Temporary(Tracking Pad Required)/$75 °single Residential/$75 0Industrial/$150 °Small Commercial or Oil&Gas/$75 °Large Commercial/$150 °Subdivision/$150 OField(Agriculture Only)/Exempt Is this access associated with a Planning Process? ONo OUSR ORE OPUD °Other Required Attached Documents -Traffic Control Plan -Certificate of Insurance -Access Pictures(From the Left, Right,&into the access) By accepting this permit,the undersigned Applicant,under penalty of perjury,verifies that they have received all pages of the permit application;they have read and understand all of the permit requirements and provisions set forth on all pages;that they have the authority to sign for and bind the Applicant,if the Applicant is a corporation or other entity;and that by virtue of their signature the Applicant is bound by and agrees to comply with all said permit requirements and provisions,all Weld County ordinances,and state laws al regarding facilities construction.Signature /�--�V"%� Printed Name PotJ 1f�1J pot r L 1�Date I Approval or Denial will be issued in minimum of 5 days. Approved by Revised Date 6/29/10 • r — '�.� , .♦- _ _ - �. tip• ..� T .{..s t'- 's .• .w •J•- • `� .,'.► ✓rotaartse.„ ♦ �4.2•_„� , itnr- •..� } Ifs..•;, J.s'�~.7�T!.1.0i-_ • . J•^-I♦•J '•. ♦1.ay, - . • ,�y.. •''•la «, yr . . - 1• 1:' ii VS! ••J • , -,`,t�. .f.►•s`--- �,�.. ,`•,s ' • , , r', ""�C I✓Y - :T: .gc; sI • _.- `•t: �f tR.• • r' t T.'., t • . .. ., � . •1 ,S •.' 'ice 4.• air •w .�S.a ,I' I I • or .\ t r v�.• 7._, r J I _ 1 • it .'t• i -c _• 4w: : 1 ` .•Western view into the Godfrey Bottoms compressor station site from WCR 33. • • Y a .:, ....10. • " • .T � 494... .r.' — .•P.•ft_-i• -• .' �• ,.•._ -..1 \ "may' -. - _ ..� w ' may L' �� � ` • 'tt'1'•.. Pte, • - j ...16,-• ,z Southern view of WCR 33 from the proposed access location . • S eAillrallrrmispgsilae- we, .r.H. _ P. f. Northern view from WCR 33 at the point of intersect for the proposed access into the Godfrey Bottoms compressor station location. • Exhibit L Emergency Information Sheet See the attached emergency information sheet. • • • FOR COMMERCIAL SITES, PLEASE COMPLETE THE FOLLOWING INFORMATION BUSINESS EMERGENCY INFORMATION: Business Name: Godfrey Bottoms Compressor Station Phone: (970)356-9700 Address: 0.75 mi north of intersection WCR 33 and WCR 46 City, ST, Zip: Weld County Business Owner: DCP Midstream Phone: (970)378-6340 Home Address: 3026 4th Ave City, ST, Zip: Greeley,CO 80631 List three persons in the order to be called in the event of an emergency: NAME TITLE ADDRESS PHONE Joe Kuchinski VP Northern Ops 3026 4th Ave Greeley,CO 80631 (970)378-6345 Greg Kardos Assistant Director 3026 4th Ave Greeley,CO 80631 (970)378-6370 Russ True Reliability Manager 3026 4th Ave Greeley,CO 80631 (970)378-6340 Business Hours: 24 Days: 7 Type of Alarm: ❑x None ❑Burglar ❑Holdup ❑Fire ❑Silent ❑Audible • Name and address of Alarm Company: NA Location of Safe: NA ***`********************************„_.__._.*****,*_******_***********`****_***********************************************_**** MISCELLANEOUS INFORMATION: Number of entry/exit doors in this building: 2 Location(s): North and south sides of the office building Is alcohol stored in building? No Location(s): Are drugs stored in building? No Location(s): Are weapons stored in building? No Location(s): The following programs are offered as a public service of the Weld County Sheriff's Office. Please indicate the programs of interest. 13 Physical Security Check ❑ Crime Prevention Presentation UTILITY SHUT OFF LOCATIONS: Main Electrical: Inside MCC Building Gas Shut Off: NA Exterior Water Shutoff: NA Interior Water Shutoff: NA • • Exhibit M IGA Boundary Statement The Godfrey Bottoms compressor station site is not within a defined IGA Boundary. According to IGA boundary maps located in Appendix 19-1 of the county code, the closest IGA boundary surrounds the city of La Salle and is about one (1) mile east of the compressor station location. • • • Exhibit 0 Traffic Statement At a pre-application meeting with Weld County held on January 28, 2011, participants concluded that a traffic study for the Godfrey Bottoms compressor station site is not warranted. • • • Exhibit P Flood Hazards The Godfrey Bottoms compressor station is not located within a FEMA mapped floodplain. See the attached figure. • • Legend —— Proposed Lease Road • INIII Property Boundary MEM Compressor Station Boundary I ' 4 nfla••• fromammitO•imigli 4111•••••••—•••••airsi, alia••••••—retprmwaa # I l3/4\ I I, I` �t �'_ I_iP % ``E;.t_ii ill • I 1 0 4614) .� ..� ....."--- . .W........._.. - .. Prepared for: CI E N E R C O N DCP Midstream N Flood Insurance Rate Map Subject Property: w-<::::>—E Source: Federal Emergency Management Agency • Godfrey Bottoms Compressor Station Map #0802660750C - September 28, 1982 Section 10, T4N R66W 5 Weld County, Colorado 1:6,000 Prepared by;F Woolndge;July 1,2011 Feet 0 375 750 1.500 • Exhibit Q Geological Hazards The Godfrey Bottoms compressor station site is not within a defined geological hazard area. According to the Geologic Hazard Area Map prepared by The Weld County Department of Planning Services, the nearest geologic hazard area is near the city of Firestone, which is over 15 miles southwest of the proposed compressor site. • • Exhibit R Dust Abatement Plan During construction, water trucks will be used to maintain dust suppression. Also, a storm water management plan will be followed to mitigate soil erosion and sediment transport during the construction phase. After construction is complete, the site will be stabilized using native vegetation outside the fenced area. Areas within the fenced boundary will be graveled, as will the access drive. If necessary, a water truck will be used to control dust after construction. A tracking pad consisting of double cattle guards will be installed across the site entrance. • • Exhibit S Waste Management Plan Waste generation at the Godfrey Bottoms compressor station will be negligible. Chemicals anticipated on site include: • 100 bbl produced water tanks—2 • 30,000 gal pressurized condensate tanks—2 • 200 gal lube oil tank-1 • 1,000 gal methanol tank-1 • 80 bbl slop oil tank— 1 DCP containerizes all wastes and contracts for its disposal with a government permitted facility(ies). A spill prevention, control, and counter measures (SPCC) plan will be developed to outline appropriate actions in the event of a spill. The plan will be specifically developed for the Godfrey Bottoms compressor station prior to initiation of start-up activities. It will cover secondary containment requirements, response actions, and waste disposition and disposal in the event of a spill or release. DCP has detailed policies and procedures in place that will be • applied to the specifics of any spill or release resulting from its operations. DCP's SPCC plan will be written in accordance with requirements set forth by the Environmental Protection Agency. Waste handler and disposal facility: Used oil, Safety-Kleen, 2801 South Tejon Englewood, CO 80110, 303-761-8614 Spent filters,Thermo Fluids Inc. 2800 North US HWY 62 Brownfield, TX 79316, 806-637-9336 Produced water, Northern Plains Trucking, 1352 Factory Dr. Fort Lupton, CO 80621, 970-351-8870 Produced water, High Plains Disposal, 17754 WCR32, Platteville, CO 80651, 970-785-8189 General refuse, Waste Management, 500 E. Vine Dr., Fort Collins, CO 80524, 970-482-6319 General refuse, Waste Management, 40,000 WCR 25, Ault, CO 80610, 970-686-2800 Hello