Loading...
HomeMy WebLinkAbout20112698.tiff • Exhibit F Evidence of Adequate Water Supply Bottled water will be provided during construction by the contractor. After construction, because this is an unmanned site which DCP employees will visit periodically, DCP will provide bottled water. In the event of a fire, water or fire retardants would be transported to the site. • • 2011-2698 • Exhibit G Evidence of Adequate Sewage Disposal Temporary sewage disposal units will be provided by the contractor during construction. After construction, DCP will supply a porta-potty. • • Hello