HomeMy WebLinkAbout20110313.tiff MEMORANDUM TO: Clerk to the Board DATE: May 24, 2011 FROM:I Wayne Howard, County Engineer/CIP I�`P�. Public Works COLORADO SUBJECT: AGENDA ITEM PW awarded the Annual Bridge Rehabilitation contract in February 2011 for the amount of$209,077 to Jags Enterprises from Greeley. The amount budgeted in 2011 was$275,000,which in past years allowed for the rehabilitation of approximately 9-10 bridges. Jag's bid is significantly lower than the budget and PW would like to an additional bridge to the current contract. Bridge 380/63A is on the 2012 list of rehab projects and would allow PW to move the work up one year and take advantage of the lower than usual bid costs. This Change Order No. 1 adds Bridge 380/63A to the contract. The proposed lump sum cost of$27,500 is reasonable and comparable to the original bid prices. The new contract amount would be $236,577. Attached are two original, signed Change Order No. 1. Please return one signed original to Public Works. cc: Mike Bedell M:\FrancieW Benda W ayneHoward doe 6/i/A0/` Ce, P� 20II - O3Y . tk - a I I FG ooh CHANGE ORDER NO. 1 2011 Bridge Rehabilitations Date: May 20,2011 Project: Bridge Rehabilitations described in the Invitation for Bids, Bid No. BI 100025 Owner: Weld County,Colorado Contractor: JAG's Enterprises, Inc. 7951 W.28th Street,Greeley,CO 80634 The following change is hereby made to the Contract Documents: Add rehabilitation (reinforced concrete walls) for Bridge 380/63A. This bridge was originally part of the design scope for the project. It was deleted just prior to bidding because the Engineer's Estimate was too high. The low bid from Jag's Enterprises was significantly lower than the Engineer's Estimate. Therefore,this bridge can now be added back into the project scope and still stay within the allowable budget. The proposed lump sum cost for this additional bridge is reasonable,and comparable to the original bid costs. CHANGE TO CONTRACT PRICE: Original Contract Price: $209,077.00 Current Contract Price adjusted by previous Change Order: $209,077.00 .. The Contract Price due to this Change Order will be increased by: $27,500.00 The new Contract Price, including this Change Order,will be: $236,577.00 CHANGE TO CONTRACT TIME: The Contract Time will be increased by 15 calendar days. The date for completion of all Work will be: December,25,2011 . RECOMMENDED:Owner Representative: ` ' ? • JUN UN 0 1 2011 J /� �Sea1/n��P. Co—nw`aa�y�l/A�) (Chair,pro-Te Engineer: \r1, k.a)L�/ �-�CXK �4•E • Date: 5(le,' Michael Bedell, P.E. (Senior Engineer) s'•Pl.O V ALS: te" ,4-�uLiLt psirDate: .563 /i ' Owner: ---- --jit Date:` // C//— /-5 JA et!5 • • bid Date: May 18,2011 JAG's Enterprises,Inc. 7951 W 28 ST Greeley,CO 80634 970-339-9971 Office 970-506-0579 Fax jags7@qwest.net To: WELD COUNTY PUBLIC WORKS JOSH HOLBROOK Estimator Job Description/Location Job Number Estimate Valid For JAG's 2011 BRIDGE REHABILITATIONS Item Notes Quantity Unit Unit Price Line Total /CNN, r La 14,/SU.UU 4,24,/5U.U0 380/63A 1 LS 27,500.00 $27,500.00 BRIDGES HAVE WATER RUNNING IN THEM FROM MAY TO END OF OCTOBER.TALKED WITH LOCALS TO VERIFY THIS.CAN WE ADD 30 DAYS TO END OF CONTRACT. THESE MIGHT NEED TO BE DONE POST OCTOBER.IF THIS CAN BE ADDED WE CAN DO THESE BRIDGES,IF NOT THESE PRICES TO NOT APPLY BECAUSE OF WATER. Estimate Total Q°'>,9"8.^B Buyer: vr` .f Cam( Q.e.• Date; S (-tO (t JAG's Rep: BOB BEETS Date: 5/18/2011 Terms,and Conditions: Not included unless listed above: bonding,compacting,demolition of existing and/or hidden conditions(water,rock,frozen ground,and/or hidden utilities),dewatering,electrical,equipment to import and/or export,excavation,fill,grading,heating,import and/or export,interior finish,labor, liquidated damages,permits,plumbing,project insurance,site preparation,staking,surveying,temporary facilities,testing,utility excavations and/or moving of,winter conditions,and/or any other item not listed above. Additional work performed,not listed above,will be considered a change order and will be priced at the time of change. JAG'S ENTERPRISES,INC.is not responsible for damages due to the acts of God,theft,and/or vandalism. Any legal fees generated from the collection of moneys owed will be paid by the owner of this project. Terms:Net 30 days from billings, any late payments will be charged @ 2%per month monthly progress draws(based upon percentage complete)and final upon completion. The undersigned agrees he/she has carefully read the above contract and conditions,and agrees to honor all above terms to make this a binding contract. Page 1 of 1 LVVvII VVG , t.l ROAD NUMBER ,580 STRUCTURE No. 380/63A 19° 304 z4� za P/an View id6 rdvti 7"A-P%alf ¢'Corr. Meta/ Dec 9.515" k'' 8"%B"hip cap beam /9' 8"x3"NPp;le5 Cory. Mafia/ shed file Elevation w- bear+ rail bloC/cec w c"x 6"l b locks to 5744,612- P o s t5 }'o S% 362 " XB°rb /oaks toy uts;a 302 �/"Grave %7" arflh4/f 11 1 1 4• Carr flan/ 1 7cX • 36" 9-5-15"X . of 48' - C-C Cross Sec tier •DMG 3/3/BB a o D• c_ z.r U a a c — a • of a a o 6 O N U -js c Z - a a v o ? _.. - 8 Lie O D• _ Lm u E a 9 p In-- is w m V m a a m -: rn v CO NO co n a F . c '. ../\! z Z c2 3 w 3 E ' / U Q a g a ® u a o �/ � O rc 2 o v o a c a u ` .. C a W L W o } o > o F- c = 0 . n A8 ! 0 y algoj maid w ° n 1y6iaH IIaM a s D co ov 0 0 c c o a o o \ o° o c �' urn < is. ov / ca! O a m c t �< own ¢ a a 'O 'a a P N / o c ~ ! .. c c a c v u o a `a c (L /\< x aai o co c 7 of oo c p•� , woo ¢ > z' y a re o n m �y/y��' N > O O M > ; .Tf 0Q Y �` Ti a a O " cam-oaq VP cm D L— "t ° Oc O'c g O D O ° N U D `• > N N ao . U + c L ° •- a O .0 V .45m N N E a 0 E 0 0 to via a .-. E° D m0 — 0 u i'o y S o c n a .7; 2 N u F o m N ,3) Q = n a c V s D a O C c° ma u to co 'c5 O g�W No U ° ° ° •aO a a Jt r ' c c E ` u E 5 W 0 0- oo a ' — wi 3 � g Rdo z x a O2 a' u .715 a .. Io � 4ig�WV m ° ate ? U e a) m a u o a c E U • s c ✓1 Q a vim o '-C � g 0 in " - . a r g /7 5 Oi a o ..4� . . )V7 .J x w o tor'. >m :J L: CJL� .Q.�, . . . ... . . . • r+ • 9`. o .,. 3 00000 o W 5 _CO N ca t15 E(° 4ir • o o x.00 'p' as as a -•0 E '° V(`°q t°eye E . ,` DD `o a , o g y N 0 0 cae RY 15 1°i W J _ Y § jl m v .. F ni 0 81E ,y, algo} woJj y}6uaj Tuaw;ngy E a s t = s s g Page48 ss ` oa c$Cr\ t MEMORANDUM Wilp C COLORADO TO: Clerk to the Board DATE: February 14, 2011 FROM: Wayne Howard, Public Works SUBJECT: Agenda Item Agreement for the 2011 Bridge Rehabilitations with Jags Enterprises, Inc. in the amount of $209,077.00 Attached are two original signed Agreements. Please return one signed original to Pubic Works. M:\Francie\Agenda Item-I doc C0M02- 0 Lt, ,. RL�0 of-1c6), PR AGREEMENT 2011 Bridge Rehabilitations THIS AGREEMENT,made this 14th day of February ,2011,by and between Weld County,Colorado,hereinafter called "Owner" and Jags Enterprises Inc. doing business as (an individual, ) or (a partnership,) or (a corporation)hereinafter called "Contractor". WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned: 1. The Contractor will commence and complete the following:Bridge Rehabilitations described in the Invitation for Bids,Bid No. B1100025 2. The Contractor will furnish all of the material,supplies,tools,equipment,labor and other services necessary for the construction and completion of the Project described herein. 3. The Contractor will commence the work required by the Contract Documents within ten(10)calendar days after the Notice to Proceed and will complete the 2011 Bridge Rehabilitations within 300 calendar days unless the period for completion is extended otherwise by the Contract Documents. 4. The Contractor agrees to perform all of the Work described in the Contract Documents and comply with the terms therein for the sum of$209.077.00 ,or as shown in the Bid Schedule. 5. The term "Contract Documents" means and includes the following: (A) Invitation for Bids (B) Instructions to Bidders (C) Bid Proposal (D) Bid Bond (E) Statement of Qualifications and Subcontractors (F) Required Project Forms (G) Agreement (H) Labor and Materials Payment Bond (I) Performance Bond (J) Notice of Award (K) Notice to Proceed (L) Change Order (M) Certificate of Substantial Completion (N) Lien Waiver (O) Notice of Acceptance (P) Contract,Specifications,and Drawings issued by the Weld County Public Works Department. (Q) Colorado Department of Transportation "Standard Specifications for Road and Bridge Construction" (R) Colorado Department of Transportation Standard Plans"M&S Standards" (S) Addenda: No. 1 , dated January 21,2011. 6. The Owner will pay to the Contractor in the manner and at such times as set forth by the Contract Documents,or otherwise agreed upon in writing. einizumf aja nA , o2-lln-SDI) a7O/)-03i3 £G()Noy 7. This Agreement shall be binding upon all parties hereto and their respective heirs,executors,administrators, successors,and assigns. 8. Contract Appropriations: The Owner hereby states and affirms that the amount of money appropriated for this Contract is equal to or in excess of the Contract amount. No change order to this Contract requiring additional compensable work to be performed, which work causes the aggregate amount payable under the Contract to exceed the amount appropriated for the original Contract shall be issued by the Owner unless the Owner assures the Contractor,in writing,that lawful appropriations to cover the costs of the additional work has been made or unless such work is covered under a remedy-granting provision contained in the Contract. IN WITNESS WHEREOF,the parties hereto have executed,or caused to be executed by their duly authorized officials,this Agreement in two(2)copies each of which shall be deemed an original on the date first above written. ORDERED BY: ACCEPTED BY: THE BOARD OF WELD CO TY COMMISSIONERS CONTRACTOR By ).zj„�. tt D/_- BY /,1 K Gr IL Jftik /1,ci NA E Barbara Kirkmever NAME Ot ftd a (iot c vi t it (Please Type) TITLE Chair TITLE C , Date FEB 1 6 2011 ADDRESS -7616- ) ocu 1 e1/4,7 01 1-1 (SEAL) (SEAL) ATTEST: i � � fa ®1,` ATTEST: Weld Coun Clerk to the Boar, 361 •� �� !"�"�"`"` '�1-�'-'- BY_` ______ � TI � BY (G52A•a,4-A-- Depu Jerk to the Board � l (Please Type) TITLE �rL-51 p,E - QeO ,)01I-03)3 MEMORANDUM Kit (iise-H- Date: January 28, 2011 ' To: Monica Mika, Director of Administrative Services O C� From: Michael Bedell, P.E., Senior Engineer COLORADO RE: Bid Request No. B100025 BOCC Approval Date February 14,2011 Bids were received and opened on January 27, 2011 for contract services for the construction of 2011 Bridge Rehabilitations Project. Four bids were received for the project and amounts ranged from $209,077.00 to $570,000.00 with the lowest bid submitted by Jags Enterprises Inc. from Greeley, Colorado. My Engineer's Estimate for the construction was $256,300.00. The overall annual project budget in the amount of $275,000.00 is associated with an appropriation intended to be used for contract services to improve the condition of bridges. Nine bridges will receive structural improvements extending their useable life. Attached are the bid tabulation and a location map for your information. It is my recommendation to award the project to Jags Enterprises Inc. for a total amount of$209,077.00. This contractor has completed similar work for us in the past. Construction of the project is anticipated to begin in February, 2011 with completion of the project in December, 2011. oii_ 03'3 O 0 0 O o 0 o 0 0 0 C p 0 0 0 CD 0 0 0 0 0 0 o c p a O6 O O O O O O O O i- CD 0 CD 0 0 O O o 0 O 0 O U 0 O O O 0 O 0 O CD O 0 0 C M r N: N CO M O O Ln U) Cr O in co co co V V' 0) co 1 r 0 U N. I. LA N w S O t O W Z o Eft Eft Eft Eft Eft EA EA 69 Eft 69 ER 44 Z O O O 0 O o O O co O O C o O 0 O 0 O O co O co O O O L6 1C) (0 O r r M L6 N— co 0 ✓ CO 6) N O N C0 M0)CO co o r 7 00 s2 lf) r r h t0 r Q) (C) I— L. r N N N N r r C0 r N r a to C N 0 O w o O w 2 69 EA EA Eft 69 EA 49 EA Eft I)) Ef) Eft O Z O 0 0 0 0 0 0 0 0 0 O O Ul O 0 O O O O O O CD O O O 0• Er7 f� of O M N- c+') O O O O O N M co cc) ' CO 0) r O O 0 N CO V U) 0) CO CO V d- EC) E 0 'i- O co ao N: (-6- co of co O o r: L6 N z. r r r N r r LC) r N r Eh C N O O N W UO az O d w Ce • U) 69 69 69 IR 69 E» EA EA EA U) (A O LL z a 0 0 0 0 0 0 0 0 0 0 0 p U) CD o 0 O 0 0 O 00 CD 0 a y O O Ln N L6 to L6 L6 O O O N ti N co co co .4- O E, O N- Z c0 o Q) ' N— O ID CD r O h. O L6 CO N CO U) Co 0 N N p a r r r r r r r co r co F— dC N Q w 1"' 0 o to W J --- 7 O M N (4) U) ER to EA EA EA co to EA U) 40 Z Q O poop co O O co O O a 0 CD O a O O co O 00 O O a W E O O 0 0 0 0 O o O co 0 0 re O '4) O O 0 O O O O O 0 Z. N c9 co- N N: O o) co-O L N W y r r N N N r to O J d N O M C, LY_ CO C Q m Q EA 69 et) Eft Eft 69 Eft 69 EA 69 EA 4 4 Z T' ~ c N''" p o � o 4 4 a 4 4 4 a a c < Q v m N N m m m N w o re:":4 v v E. C.) J o C coN 1N to ) N- N N 7 N 0 4 Q 0 m N- el N 14) 0o C) V i i— Z v O 0 LL • S. i (, r� • ,. L ;...• • r. ' .;- ... ._-• O , • •' ♦, i. ; r 1 44. -:Q 4I : I N{ ••• , :, -I IN7 \ 7. .f. .-�.....d. } _W • Y•T .• . � • • �� 1 •••4;:•I• s . }• � •• 1 . .� • : 1. ---h• A }.1 1-� • • ' •1Ki7�1 ••. • ."1""?.1.�. ,,' .1 •• ' • • a • I �..... !!��•. .� + ••..,... L.�.� f�.2..2. �_w�` ..I .i• •i• • • I �a �- 7 • .� Irl� a1 !►� r • ; : r.. 1.1 • • .. •. pg • . • , • Y.1. . f.+.. r •`•• " 1 • I • ` •. • „' • :�•• • , ����✓�I •. •. . : • • ' ^vV• • _� i..:. .•a, .. p . .. ''fJ • at�'1 ,..i.l�' •J •.�.:.. -. • .}�. :_ rn O�rn� mco c0 /,{ • 7 7 ' j� / �1 -•n ��-+-.� "�' ••j . Zizm; c. . N / %/ (OV V ,7Vo0 NNNNN .• (0 t CV tf) F. z N...' N </ N CO LO N N M w J co / F — N O O U a s j7) co EE W U } QN Z O Q F- WNUZU Y r O Ce rC•I a z ° p O U 7 0 ¢ H 0 Uxp U >- O ° ° Jmw (zWJWUJ CO Z kt U w a_ JWZZW � JX D Q O v IEl ..., c aom O _j J V U LIJ O < 0 NNa a a a a N Nu (nCfl ((DDNN V Lo N J I - < Mv) NN (A 0) (000) 0 Wj NwN M�M H r NV .4- to co 0) V WELD COUNTY PURCHASING 18 6 I - 2 OH 915 10TH St Room #334, Greeley CO 80631 . E-Mail: mwaltersco.weld.co.us E-mail: reverettco.weld.co.us Phone: (970) 356-4000, Ext 4222 or 4223 W E L R_ -COUNTY Fax: (970) 336-7226 DATE OF BID: January 27`h, 2011 REQUEST FOR: 2011 Bridge Rehabilitations DEPARTMENT: Public Works Dept. BID NO: #B1100025 PRESENT DATE: January 31St, 2011 APPROVAL DATE: February 14th, 2011 TOTAL PRICE FOR VENDORS TEN (10) BRIDGES JAGS ENTERPRISES INC $209,077.00 7951 W 28TH STREET GREELEY CO 80634 WELD COUNTY CONSTRUCTION INC $223,212.00 44340 WCR#33 POBOX67 PIERCE CO 80650 GL HOFF CO dba HOFF CONSTRUCTION $264,110.00 1815 W 12TH STREET LOVELAND CO 80537 NORTHSTAR CONCRETE INC $570,000.00 1220 S GARFIELD AVENUE LOVELAND CO 80537 *Engineer's Estimate $256,300.00 The TEN bridges are as follows: 1/32B & Supply ditch 59/70A & Greeley Canal No. 2 13/52A & Hillsbourough Ditch 86/27A & Pierce Lateral Canal 25/52A & Loveland Greeley Canal 90/45 & Owl Creek 42/39A & Evans Ditch No. 2 49/24A & Box Elder Creek (Grouting) 45/6A & Denver Hudson Canal 49/24A & Box Elder Creek (Headwalls & Wingwalls) Plus minor contract revisions /ao/i 2011-0313 O O Co C) O 0 0 00 O 0 o • O O O O O O O O O a O 0 O O O O O C7 O O O O O I- O O 0 O O 0 O O O O O 0 c) 00000000C)a o 0 o a 0 C) 0 o p e cO ,-- r r--- ti co co- o o r(o 0 U LO CO (0 CO V' Tr a) CO Lo 0 L. N. b to L 2 o w z o ER 69 69 (R 69 69 69 64 63 69 to 6� z 0 0 0 0 0 0 0 0 0 0 0 0 • 0 0 0 0 0 0 0 00 0 0 0 O M cco N- CO t v CO C) CO O 0 ✓ co a) N O N CO.. Cr) a) 00 O r 7 co- to r r ti (6 r a) Lo r 4-, r N N N N r r (O r N ,- N to C N O N U '- ✓ 2 O Lti I CO 64 (9 69 (R 69 ER ER 64 to 64 U) O Z O O 0 0 0 0 0 O 0 O 0 0 U/ 000000000 O O Q C CO N. a) 6 CO r- M6 O O O O N (,) CO to [!' (0 a) ,,-) 0 O 0 N co v co a) (0 co v v co Lo o U co co ti co- cr a) co O O N. c N A- r N r r LC) r (V r M C N U o N W U co O w w Cev9 to 69 ER to 63 EA EA 64 to U) to O LL Z O. 000000000 O o o �'/^� 0 0 0 0 0 0 0 0 0 o O O V! d O 0 tf) N to to to U) O O O t` V N- N M M CO MN t- N- ,- O N. Z CO O Cn v N- O L v O r oN. o to (o N- co ui (D to (o (N N «i 0 �' r r r r r r r M A- co r Q1 c F"C 0 Q W to I— o) 0 L., J_ -. - O CO N 69 (» 64 69 69 69 69 69 6H 64 69 40 Z = r 000000000 O O 0 N Coo O O O O O O O O 0 Z a o 0 0 0 0 0 0 0 0 C) 0 W O o 0 0 0 0 0 0 0 0 0 o 0 F, r` to co 0 0 0 o a 0 o 0 u) ca CO. N N N a7 cc (O Lo- N t!7 t'7 W Q �) r to Q L N Cl J • CO C C0c Q W 69 69 69 (R 69 69 (R 69 (R 69 69 69 z _ _ C O 0 IMP/y� °' m N PM1 # mN N U) Q O ti SUC) 'Cc i (V.> w V iii el N N U) M ti N N 3 (N = 4:1 Q O i <NI 41 '' C" N V IV N 00 0)) d' " v 0 ` F- Z O 0 LI. Hello