Loading...
HomeMy WebLinkAbout780892.tiff CHANGE Distribution to: ORDER OWNER ❑ ARCHITECT ❑ •A1A DOCUMENT G701 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Weld County Centennial Center Phase CHANGE ORDER NUMBER: - 5 - (name, address) Greeley, Colorado INITIATION DATE: November 2, 1978 TO (Contractor): ��-- • ARCHITECT'S PROJECT NO: 71-1—CCA—0162 IMr. Darwin L. Guinn Hensel Phelps Construction Co. CONTRACT FOR: Weld County Centennial Center P. 0. Box 0 Phase III, Greeley, Colorado IGreeley, Colorado 80632 + • CONTRACT DATE: February 11, 1974 You are directed to make the following changes in this Contract: 1) Mount T.V. Camera in Tunnel between Jail and Courthouse $98.39 2) Provide and install two (2) Prototype Stainless Steel Bunks in "B" Pod $ 945.12 Not valid until signed by both (he Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) gmgpitaliatachtheautxxxxterst) was $ 268,585.48 • Net change by previously authorized Change Orders $ 53,798.00 • The (Contract Sum)jxrxxmdxs Jcitexitiourxriam0 prior to this Change Order was $ 322,383.48 • The (Contract Sum) (bssanuxtexd > i will be (increased) alt (Kimtmxgtml4 by this Change Order $ 1,043.51 • The new (Contract Sum) (taxxxatsxfl lviccr taarx t) including this Change Order will be saY$ 323,427.00 • The Contract Time will be kam:ton Tl) (dam (unchanged) by ( ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is Authorized: Weld County Board C-E Maguire Hensel Phelps Construction Co. of Cnnnry Cnnnn;geinnnrg �ARCEI ru:T CONTRACTOR OWNER 4reeley, Colorado Gree • Co oraeo Greeley. Colorado Address Address . Address • • BY 2'CWA Va4v4re BY I =�1�;4 B 780892 DATE 11 . 't •'13 DATE //" 7- 7i E /2•9-f AIA DOCUMENT O01 • CHANGE ORDER • .AI'RIL 1978 EDITION • ALA" • G 1978 THE AMERICAN INSTITUTE Of' ARCHITECTS, 1733 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 G701-1978 Hello