HomeMy WebLinkAbout20112477.tiff •
• 1861 - 2011
Weld County Rfr eferr
�� • June 24 1O l = S ��—V1E I
EL �.WT ,C IUNTY � 1
_ LI JUN 2 8 9011
The Weld County Department of Planning Services has received the following item for rtptay. aon fY Pu°LIC IVORKS 1)1
Applicant ! Pat&Amanda Weakland Case Number AmUSR-1251
Please Reply By July 23, 2011 Planner Kim Ogle
Project A Site Specific Development Plan and an Amended Use by Special Review Permit
for a Commercial Greenhouse/Garden Center dba The Windsor Gardener, and a
Brewery pursuant to the provisions of Article 47, Title 12 of the Colorado Revised
Statutes, in the A(Agricultural) Zone District.
Legal Lot B RE-1425; Part E2SE4 of Section 18, T6N, R67W of the 6th P.M., Weld
County, Colorado.
Location North of and adjacent to State Highway 392; West of and adjacent to 17th Street,
I Windsor.
Parcel Number 0807 18 300006
• The application is submitted to you for review and recommendation. Any comments or recommendation
you consider relevant to this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this
date may be deemed to be a positive response to the Department of Planning Services. If you have any
further questions regarding the application, please call the Planner associated with the request. Please
note that new information may be added to applications under review during the review process.
If you desire to examine or obtain this additional information, please call the Department of
Planning Services.
You will be notified in writing of the Planning Commission date once the date is determined.
❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
because
❑ We have reviewed the request and find no conflicts with our interests.
❑ See attached letter.
Comments: �� 4,(ci ✓ Z o i1
G-A-y ✓ ? -21— Zoq
TA-ocr / 1/ 2_4/1
EXHIBIT
Signature Date
• Agency
IZSI
+Weld County Planning Dept. +1555 N 17'h Ave, Greeley,CO. 80631 4(970)353-6100 ext.3540 +(97(
2011-2477
RECEIVED
1861 - 2011 MEMORANDUM JUL 272011
TO: Kim Ogle, Planning Services WtiVrertaLhic(tynBkpIrtment
CREEL_Y OFFICE
FROM: Donald Carroll, Engineering Administrator 0,4/
W E L B .-C O N T Y Public Works Department
SUBJECT: AmUSR-1251, Pat and Amanda Weakland
The Weld County Public Works Department reviewed the submitted application for critical items, including but
not limited to Site Plan, Traffic Study, Preliminary Drainage Report, Geotechnical Soils Report, and Flood
Hazard Development Permit. A detailed review of these items was not completed at this step in process.
Comments made during this stage of the review process will not be all inclusive; as revised materials are
submitted other concerns or issues may arise. All issues of concern and critical issues during further review
must be resolved with the Public Works Department.
ACCESS:
Access to the Amended proposed USR shall be from State Highway 392 North on 17th to Ash. All access is
either from the state highway or from the Town of Windsor's jurisdiction. Please contact the Town of Windsor
to verify access permit or for any additional requirements that may be necessary to obtain or upgrade the
permit.
PARKING AND CIRCULATION:
The applicant is utilizing the existing paved parking area with additional overflow parking gravel surface
Ovailable. Utilize these two parking lots for your proposed expansion and existing business.
STORMWATER DRAINAGE:
A drainage report was not required for this location as it is located within the 100-year floodplain of the Cache
La Poudre River. The applicant has indicated that the stormwater runoff will follow historic drainage paths.
Please add the following notes to the plat:
1. The historical flow patterns and run-off amounts will be maintained on site in such a manner that it will
reasonably preserve the natural character of the area and prevent property damage of the type
generally attributed to run-off rate and velocity increases, diversions, concentration and/or unplanned
ponding of storm run-off.
2. The applicant must take into consideration storm water capture/quantity and provide accordingly for
best management practices.
3. Weld County shall not be responsible for the maintenance of on-site drainage related improvements.
SPECIAL FLOOD HAZARD AREA:
An amended Flood Hazard Development Permit (FHDP) will be required for the new building that is to be
constructed. The applicant applied for an amended FHDP on July 15, 2011. The application is currently under
review.
The floodplain boundary depicted on the site specific development plan does not match the floodplain
boundary shown on FEMA's current effective flood insurance rate map (FIRM). Please show the floodplain
boundary as shown by FEMA on the current effective FIRM. If the applicant has obtained a Letter of Map
evision from FEMA, the floodplain boundary depicted on the LOMR may be used.
Please add the following notes to the plat:
M:\PLANNING—DEVELOPMENT REVIEW\USR-Use by Special Review\AmUSR-1251 Pat and Amanda Weakland\AmUSR-1251.docx
• 1. WARNING: PORTIONS OF THE PROPERTY MAY NOT BE BUILDABLE DUE TO FLOODPLAIN OR
FLOODWAY DESIGNATION. Please be advised that portions of the property may not be able to
• obtain building permits to construct structures. All construction or improvements occurring in the
floodplain as delineated on Federal Emergency Management Agency FIRM Community Panel Map
#080266-0605D dated September 27, 1991 and FBFM Panel Map#080266-0001 dated September 27,
1991, shall comply with the Flood Hazard Overlay District requirements of Chapter 23, Article V,
Division 3 of the Weld County Code and all applicable FEMA regulations and requirements as
described in 44 CFR parts 59, 60, and 65.
2. Flood hazard development permits will be required for development activities located within the FEMA
mapped Cache La Poudre Floodplain. The FEMA definition of development is any man-made change
to improved or unimproved real estate, including by not limited to buildings or other structures, mining,
dredging, filling, grading, paving, excavation, drilling operations, or storage of equipment and materials.
3. FEMA's floodplain boundaries may be updated at any time by FEMA. Prior to the start of any
development activities, the owner should contact Weld County to determine if the floodplain boundaries
have been modified.
4. The installation of any septic system within the 100-year floodplain shall comply with the Weld County
I.S.D.S. Floodplain Policy. In accordance with the State of Colorado I.S.D.S. Regulations, no septic
system shall be installed within the floodway.
•
•
M:\PLANNING—DEVELOPMENT REVIEW\USR-Use by Special Review\AmUSR-1251 Pat and Amanda Weakland\AmUSR-1251.docx
• 1 8 6 1 - 2 0 1 1 PUBLIC WORKS DEPARTMENT
1111 H STREET, P.O. BOX 758
GREELEY, 80632
WEBSITE: WWW.CO.WELD.CO.US
WEL 0 N T Y PHONE: (970) 356-4000, EXT. 3750
FAX: (970) 304-6497
August 3, 2011
Pat Weakland
6461 W Highway 392
Windsor, CO 80550
Re: Flood Hazard Development Permit application (FHDP-731)
Dear Mr. Weakland,
The Weld County Public Works Department has reviewed the requested Flood Hazard Development
Permit (FHDP) application for an additional storage building housing a brewery that is proposed to be
constructed on fill placed at 6461 W Highway 392 and located in the Cache La Poudre River floodplain
and floodway. The current FHDP application cannot be conditionally approved at this time based on
the comments below.
• COMMENTS
A FHDP application was submitted to and received by Weld County for review on July 15, 2011. The
application was prepared by the applicant's engineer, John Meyers, P.E. number 18596.
During review of the FHDP application, it was discovered that the applicant's engineer had used two
different vertical datums in order to determine the base flood elevation (BFE) and the building
elevations. The base flood elevation is shown as 4792.1 NGVD-29 while the proposed building
elevation is shown as 4793.75 ft NAVD-88. There is approximately 3 feet of difference between the
two vertical datums. By converting the elevations to the same vertical datum, it is apparent that the
proposed building and the existing buildings are approximately 2.35 feet below the regulatory flood
datum (BFE + 1 ft). The general conversion to NAVD-88 is NGVD-29 plus approximately 3 feet. To
resolve this discrepancy, the applicant is requested have a professional land surveyor determine the
actual conversion factor for the property as professional engineers are not allowed to certify elevations.
The error in datums also shows that the existing buildings on your property may not be compliant with
the floodplain regulations. Section 23-2-480 (J) of the floodplain code states "No encroachments
including fill, new construction, replacement of existing structures, substantial improvements, and other
development shall be permitted unless certification by a professional engineer or architect is provided
demonstrating that encroachments shall not result in any increase in flood levels during the occurrence
of an intermediate regional flood." (Note the intermediate regional flood is the 100-year flood) Those
regulations have been in effect since the early 1980's before the fill was placed on the lot. The purpose
of this code requirement is to ensure that development occurring on one piece of property does not
adversely affect another property owner by pushing flood water onto the other property owner.
There should have been a hydraulic study for the original fill and buildings permitted under FHDP-353
• showing what the impact of the fill placement was on the floodplain water surface elevations. If the
study was not completed when the original buildings were constructed, it will need to be done now to
Page I of 2
M'.\PLANNING-DEVELOPMENT REVIEVJtFHDP-Flood Hazard Development Pennittl31 Windsor Gardner Storage Shed 1FHDP-731 Request for Additional Information doc
• show compliance with the floodplain regulations. The fill does not appear to have elevated the
buildings 1 foot above the 100-year water surface elevation as required by the floodplain regulations.
The study has to include a hydraulic model showing that the placement of the fill and the buildings does
not result in an increase of the 100-year water surface elevations. It is not sufficient for your engineer
to state his opinion that the fill and buildings will not impact the 100-year water surface elevations. As
you will recall, I have previously talked to you and your engineer about the requirement to show no
impact to the water surface elevations.
Should the new information prove that the existing buildings were constructed below the regulatory
flood datum (BFE + 1 foot), steps to bring the existing buildings into compliance with the floodplain
regulations will also need to be taken. Non-residential buildings can either be wet floodproofed or dry
floodproofed. Wet floodproofing would entail placing flood vents that have a net open area of 1 inch
per 1 square foot of building footprint. If the buildings are wet floodproofed, all of the utilities would
have to be elevated 1 foot above the base flood elevation. Dry floodproofing would entail making the
buildings water tight to prevent flood water from entering the building.
In order to address the above issues and move the FHDP process along smoothly, it is suggested that
the applicant's engineer schedule a meeting with Public Works to discuss the modeling methodologies.
Sincerely,
aft fra:tanl
Clay Kimmi, P.E., C.F.M.
Weld County Public Works
Original: Pat Weaklanrl,Applicant
CC to File: FHDP-731
AmUSR-1251
Kim Ogle,Planning Services
•
Page 2 of 2
M\PLANNING-DEVELOPMENT REVIENAFHDP-Flood Hazard Development Perm,t\731 Windsor Gardner Storage ShedWHDP-731 Request for Additional Information.doc
MEMORANDUM
"l ige TO: KIM OGLE, PLANNING SERVICES
FROM: MARY EVETT,SUBJECT: MUSR 12 1 WEAKLANDENTAL HEALTH
COLORADO DATE: JULY 22, 2011
Environmental Health Services has reviewed this proposal to include a micro-brewery to
the existing commercial greenhouse/garden center. There is a 4800 square feet
warehouse proposed for the micro-brewery, tasting room and storage for the brewery
and greenhouse. According to the application, the greenhouse/garden center employs 6
full-time employees with 2-4 seasonal employees. There will be 2 full-time employees
added to the brewery with 2-4 part-time employees. The applicant plans to conduct pre-
arranged tours of the brewery for 5-10 people 2-3 times per day and the brewery will be
open to the public 4-6 days per week. There will be no food preparation on site. Any
food provided will be catered. Therefore, a Retail Food Establishment license will not be
• required.
Water for the business is provided by the Town of Windsor. Documentation from the
Town of Windsor has been submitted indicating that the business may purchase
additional water to serve the brewery and tasting room without having to increase the
existing water tap size or add another water tap.
Existing septic system SP-0000297 serves the greenhouse/garden center business and
is permitted for 4 employees and patrons. The existing septic system will require to be
reviewed by a Colorado Registered Professional Engineer to determine if it is adequate
for the proposed increase in hydraulic load. If the septic system is found to be
inadequate, the system will require to be upgraded. A separate septic system may be
installed for the micro-brewery/tasting room. The septic system will require to be
designed by an engineer.
There is an existing 3 bedroom home on the property that is served by an individual well
(Permit No. 24745-A). According to the applicant, the domestic well water is used
exclusively for the residence. Environmental Health Services was unable to locate a
septic permit for the existing residence. A Statement of Existing must be completed by
the property owner providing information on the size and location of the existing septic
system. An ISDS evaluation will be required to permit the existing septic system.
•
The applicant submitted a waste handling plan which included removal and disposal of
•
garbage and the micro-brewery process wastewater. Trash and garbage disposal will
be provided by Northern Colorado Disposal of Greeley. The applicant is proposing to
initially haul process wastewater from the micro-brewery to two offsite disposal facilities:
A-1 Organics in Eaton and City of Fort Collins wastewater treatment facility. Future
plans are to recycle the process wastewater to irrigate and fertilize the hop field on the
property. The applicant shall provide evidence from the Water Quality Control Division
of the Colorado Department of Health and Environment that this proposed discharge is
approved. Alternately, the applicant can provide evidence from the WQCD that they are
not subject to these requirements.
The applicant submitted a dust abatement plan and was found to be adequate. Dust will
be controlled by applying water. The parking lot is asphalt and the overflow parking area
is recycled asphalt. The access driveway is covered with gravel.
We have no objections to the proposal; however, we do recommend that the following
conditions be part of any approval:
We recommend that the following requirements be met prior to allowing the plat to be
recorded:
1. All septic systems located on the property shall have appropriate permits from
the Weld County Department of Public Health & Environment. The
• Environmental Health Division of the Weld County Department of Public Health &
Environment was unable to locate a septic permit for the existing residence on
the property. Any existing septic system which is not currently permitted through
the Weld County Department of Public Health & Environment will require an
I.S.D.S. Evaluation prior to the issuance of the required septic permit. In the
event the system is found to be inadequate, the system must be brought into
compliance with current I.S.D.S. regulations.
2. Any additional hydraulic load to any existing septic system will require to be
reviewed by a Colorado Registered Professional Engineer. The review shall
consist of observation of the system and a technical review describing the
system's ability to handle the proposed hydraulic load. The review shall be
submitted to the Environmental Health Services Division of the Weld County
Department of Public Health and Environment. In the event the system is found
to be inadequately sized or constructed the system shall be brought into
compliance with current Regulations.
3. The applicant may install a separate individual sewage disposal system for the
micro-brewery/tasting room. The septic system is required to be designed by a
Colorado Registered Professional Engineer according to the Weld County
Individual Sewage Disposal Regulations.
•
2
• 4. In the event the septic system requires a design capacity of over 2,000 gallons of
sewage per day the applicants shall provide evidence that all requirements of the
Water Quality Control Division (WQCD) of the Colorado Department of Public
Health and Environment (specifically Policies WQSA-6 and WQSA-8 ) have been
satisfied. Evidence of compliance shall be provided to the Weld County
Department of Public Health and Environment. Alternately, the applicant can
provide evidence from the WQCD that they are not subject to these
requirements.
5. The applicant shall submit evidence of an Underground Injection Control (UIC)
Class V Injection Well permit from the Environmental Protection Agency (EPA)
for any large-capacity septic system (a septic system with the capacity to serve
20 or more persons per day). Alternately, the applicant can provide evidence
from the EPA that they are not subject to the EPA Class V requirements.
6. The applicant shall submit evidence of a Colorado Discharge Permit System
(CDPS) from the Water Quality Control Division (WQCD) of the Colorado
Department of Health and Environment for any proposed discharge into State
Waterways. Alternately, the applicant can provide evidence from the WQCD that
they are not subject to these requirements.
We recommend that the following requirements be incorporated into the permit as
development standards:
•
1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and
Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for
final disposal in a manner that protects against surface and groundwater
contamination.
2. No permanent disposal of wastes shall be permitted at this site. This is not meant
to include those wastes specifically excluded from the definition of a solid waste in
the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as
amended.
3. Waste materials shall be handled, stored, and disposed in a manner that controls
fugitive dust, fugitive particulate emissions, blowing debris, and other potential
nuisance conditions.
4. The applicant shall operate in accordance with the approved "waste handling
plan", at all times.
5. The installation of the septic system shall comply with the Weld County I.S.D.S.
flood plain regulations. Please contact Weld County Public Works to verify flood
plain vs. floodway.
•
3
6. Any septic system located on the property must comply with all provisions of the
Weld County Code, pertaining to Individual Sewage Disposal Systems.
7. Fugitive dust and fugitive particulate emissions shall be controlled on this site.
The facility shall be operated in accordance with the approved "dust abatement
plan", at all times.
8. This facility shall adhere to the maximum permissible noise levels allowed in the
Commercial Zone as delineated in Section 14-9-30 of the Weld County Code.
9. Adequate drinking, hand washing and toilet facilities shall be provided for
employees and patrons of the facility, at all times.
10.The facility shall utilize the existing public water supply (Town of Windsor).
11.All pesticides, fertilizer, and other potentially hazardous chemicals must be
handled in a safe manner in accordance with product labeling and in a manner
that minimizes the release of hazardous air pollutants (HAP's) and volatile organic
compounds (VOC's). All chemicals must be stored secure, on an impervious
surface, and in accordance with manufacturer's recommendations.
12.If applicable, the applicant shall obtain a stormwater discharge permit from the
Colorado Department of Public Health & Environment, Water Quality Control
• Division.
13.The operation shall comply with all applicable rules and regulations of State and
Federal agencies and the Weld County Code.
•
4
1861 - 2011
_7 _._ Weld County Referral
D.� June 24, 2011
W E L C O U N T Y
u
The Weld County Department of Planning Services has received the following item for review:
Applicant ! Pat&Amanda Weakland Case Number AmUSR-1251
Please Reply By July 23, 2011 I Planner Kim Ogle
Project A Site Specific Development Plan and an Amended Use by Special Review Permit
for a Commercial Greenhouse/Garden Center dba The Windsor Gardener, and a
Brewery pursuant to the provisions of Article 47, Title 12 of the Colorado Revised
Statutes, in the A(Agricultural) Zone District.
Legal Lot B RE-1425; Part E2SE4 of Section 18, T6N, R67W of the 6th P.M., Weld
County, Colorado.
Location North of and adjacent to State Highway 392; West of and adjacent to 17`" Street,
Windsor.
Parcel Number 0807 18 300006
• The application is submitted to you for review and recommendation. Any comments or recommendation
you consider relevant to this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this
date may be deemed to be a positive response to the Department of Planning Services. If you have any
further questions regarding the application, please call the Planner associated with the request. Please
note that new information may be added to applications under review during the review process.
If you desire to examine or obtain this additional information, please call the Department of
Planning Services.
You will be notified in writing of the Planning Commission date once the date is determined.
❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
because
pee
have reviewed the request and find no conflicts with our interests.
,/
/ ee attached letter.
Comments:
•
Signature Date S/
Agency .�(
111
tWeld County Planning Dept. C-1555 N 17th Ave, Greeley,CO. 80631 +.(970)353-6100 ext.3540 C.(970)304-6498 fax
• 1 8 6 I - 2011 DEPARTMENT OF PLANNING SERVICES
BUILDING INSPECTION DIVISION
1555 N. 17TH AVENUE
GREELEY, CO 80631
WELD____-COUNTY
970-353-6100 EXT 3532
FAX 970-304-6498
jgesick(a,co.weld.co.us
Date: May 23, 2011
Applicant: Zach and Pat Weakland
Project: A Site Specific Development Plan and a Special Review Permit for Oil and gas
Support and Service Facility (water supply and storage) in the A (Agricultural) Zoned
District.
Case Number: Pending AMUSR-1251
Parcel Number: 0807 18 300006
After reviewing the application and documents submitted the Building Department has
the following comments:
• 1. A building permit is required for any future building. Any owner or authorized
agent who intends to construct, enlarge, alter, repair, move, demolish, or change
the occupancy of a building or structure, or to erect, install, enlarge, alter, repair,
remove, convert or replace any electrical, gas, mechanical or plumbing system,
the installation of which is regulated by the code, or to cause any such work to be
done, shall first make application to the building official and obtain the required
permit.
2. Buildings, structures and use shall conform to the requirements of the various
codes adopted at the time of acceptance of the permit application. Currently the
following codes have been adopted by Weld County: 2006 IBC; IMC; IPC; IECC;
2008 National Electrical Code; 2003 ANSI 117.1 Accessibility and Chapter 29 of
the Weld County Code.
3. It appears that the site may fall into a floodplain. Additional floodplain
requirements may be required if this is proven.
Sincerely,
Jonathan Gesick
Plans Examiner/Building Inspector
•
•
Sumbit by Email
III186 I = 20 i I
•_ Weld County Referral
June 24, 2011
WELD__-COUNTY
The Weld County Department of Planning Services has received the following item for review:
Applicant Pat&Amanda Weakland Case Number AmUSR-1251
Please Reply By July 23, 2011 • Planner !Kim Ogle
Project A Site Specific Development Plan and an Amended Use by Special Review Permit
'for a Commercial Greenhouse/Garden Center dba The Windsor Gardener, and a
Brewery pursuant to the provisions of Article 47,Title 12 of the Colorado Revised
Statutes, in the A(Agricultural)Zone District.
Legal 'Lot B RE-1425; Part E2SE4 of Section 18,T6N, R67W of the 6th P.M.,Weld
•County, Colorado.
Location North of and adjacent to State Highway 392:West of and adjacent to 171h Street,
Windsor.
Parcel Number ,0807 18 300006
The application is submitted to you for review and recommendation. Any comments or recommendation
III
you consider relevant to this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this
date may be deemed to be a positive response to the Department of Planning Services. If you have any
further questions regarding the application,please call the Planner associated with the request. Please
• note that new information may be added to applications under review during the review process.
If you desire to examine or obtain this additional information, please call the Department of
Planning Services.
You will be notified in writing of the Planning Commission date once the date is determined.
0 We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
because
We have reviewed the request and find no conflicts with our interests.
See attached letter.
Comments:
ff n Wat&MA Lc
Signature .�� !"ucrt •( - 1�' Date ' ; 7�r /
Agency G .R.AA f .c -`7 S t.1,-L'66I b?y"T.I
Ill .:Weld County Planning Dept. •:1555 N 171°Ave,Greeley,CO.80631 4•(970)353-6100 ext.3540 •:•(970)304.6498 lax
1020 Main Street
Windsor, CO 8O550
WELD RE-4 SCHOOL DISTRICT Phone: °
• FOUNDATION FOR SUCCESS• EDUCATION FOR LIFE • CITIZENS FOR THE FUTURE karen.trusler@weldre4.k12.co.us
Karen Trusler,Superintendent
Stephanie Watson,Asst. Superintendent
June 27,2011
Mr.Kim Ogle
Weld County Planning Department
1555 N. 17'Avenue
Greeley,CO 80631
RE: Site Specific Development Plan&Amended Use by Special Review Permit AmUSR 1251
Dear Mr. Ogle:
The above referenced project is for property located North of and adjacent to State Highway 392
• and west of and adjacent to 17il' Street in Windsor. The School District understands that this project
• proposes the addition of a brewery with associated tasting room and patio to the existing Windsor
Gardener. Per the Colorado Revised Statutes at cite 12-47-313, a liquor facility cannot be located within
500 feet of a public school. The proposed site of the brewery is approximately 2,500 feet from
Grandview Elementary School. Given the project meets the state's requirement, Weld Re-4 does not
• object to the approval of this Plan. If the land use should change, however, the School District
respectfully requests the opportunity to respond with comments regarding the impact of any re-zoning or
land use changes. •
Yotu-continuing cooperation is sincerely appreciated,as is the opportunity to comment upon issues
of interest to the County,the School District and our mutual constituents. Should you have questions or
desit r further i nfonmation,please contact me at your convenience.
Sincerely,
c 1 Cyr 4-
Stephanie R.Watson
Assistant Superintendent of Business Services
••
•
Sumbit by Email
• I861 - 20I 1
Weld County Referral
June 24, 2011
WELD,COUNTY
The Weld County Department of Planning Services has received the following item for review:
Applicant Pat&Amanda Weakland Case Number AmUSR-1251
Please Reply By July 23, 2011 Planner I Kim Ogle
•
Project A Site Specific Development Plan and art Amended Use by Special Review Permit
for a Commercial Greenhouse/Garden Center dba The Windsor Gardener, and a
Brewery pursuant to the provisions of Article 47,Title 12 of the Colorado Revised
Statutes, in the A(Agricultural)Zone District.
Lega/ Lot B RE-1425; Part E2SE4 of Section 18,T6N,R67W of the 6th P.M.,Weld
County, Colorado.
Location North of and adjacent to State Highway 392;West of and adjacent to 17'"Street,
Windsor.
Parcel Number 0807 18 300006
The application is submitted to you for review and recommendation. Any comments or recommendation
• you consider relevant to this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this
date may be deemed to be a positive response to the Department of Planning Services. If you have any
further questions regarding the application, please call the Planner associated with the request. Please
note that new information may be added to applications under review during the review process.
If you desire to examine or obtain this additional information, please call the Department of
Planning Services.
You will be notified in writing of the Planning Commission date once the date is determined.
0 We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
because
,' We have reviewed the request and find no conflicts with our interests.
See attached letter.
Comments: This project shall be OK as long as the applicant adheres to all Fire District comments and Conditions as they relate
to the 2006 IFC as enforced for the construction of the building.
Signature Date 07/18/2011
Agency Windsor-Severance Fire
• +Weld County Planning Dept. 01555 N 17"Ave,Greeley,CO.80631 4(970)353-6100 ext.3540 6(970)304-6498 fax
Aga OF WFNDIOB
• A
COLORADO
August 5, 2011
Mr. Kim Ogle, Planner Ill
Weld County Department of Planning Services
1555 N 17th Ave
Greeley, CO 80631
Subject: Weld County referral —Amended Use by Special Review (AmUSR-1251)
for a commercial greenhouse/garden center dba The Windsor Gardener
and a brewery
Dear Kim,
The Town of Windsor Planning Commission reviewed the abovementioned proposal at
their regular meeting of August 4, 2011. The subject property is located within the Town's
Growth Management Area and is contiguous to the Town's corporate limits along the eastern
property line.
. The Town considers the micro-brewery use to be consistent with the adjacent General
Commercial zoning. The property is accessed from Windsor's 17th Street and the access
point has been planned and improved to align with the future commercial uses to the east.
Although the subject property is within the Town's Commercial Corridor Plan area, the Town
acknowledges the existing improvements and is prepared to relax some of the architectural,
landscaping and other commercial corridor plan requirements given the pattem of existing
development on the property. Town staff has informally discussed this with the applicant and
is confident that a compromise can be reached and memorialized in an annexation
agreement.
Windsor already serves the property with water and the Engineering Department has
discussed the proposed brewery with the applicants and outlined the Town's requirements
regarding changes in water usage in the attached letter dated June 10, 2011. Although
connection to the Town's sanitary sewer system is not contemplated at this time, the referral
materials state that the existing septic system needs to be evaluated to determine whether it
is sufficient for the addition of the brewery or needs to be upgraded or replaced. Therefore,
additional information regarding wastewater plans is needed from the applicant. If it is
determined that the existing septic system is not capable of handling the increased
wastewater, connection to the Town's sewer should be considered and compared to the cost
of a new or expanded septic system and/or the long-term expense of hauling wastewater to
City of Fort Collins facilities. The applicant had a design for a sewer force main prepared in
2007 that included a pump station near the southeast corner of the property and a force main
that ran to the east approximately 740 feet then north another 300 feet where it could
discharge into the Town of Windsor's sewer system.
. 301 Walnut Street•Windsor, Colorado •80550 • phone 970-674-2400 •fax 970.674-2456
www.windsorgov.com
Page 2
• Conformance with Town of Windsor Comprehensive Plan:
Section IV.C.2 of the Comprehensive Plan regarding the Growth Management Area (GMA)
states: "The GMA is intended to help define those specific areas within the planning area
where it is most logical to extend urban services in the near term,that is, within the next ten
years. Determination of the GMA boundary was based upon an analysis of utility capacity,
projected population growth, land absorption, circulation patterns, environmental constraints,
and from discussions with the Planning Commission, Town Board and citizens." Section
IV.C.6. further states, "Future development should be contiguous to the existing
community or, to help ensure that any such areas can be annexed in the future with
urban-level services, these areas must have the capability of being easily served by
existing facilities."
Section IV of the Comprehensive Plan regarding Land Use Planning includes the following
Annexation Goal: "Ensure the logical extension of the Town boundaries so that Windsor may
expand in a directed, logical and fiscally responsible manner," as well as the following
Overall Land Use Goal: "Promote the development of Windsor in an orderly manner that
will provide a well-balanced land use pattern which will provide for the efficient and
effective ongoing extension of public services and facilities."
Although the property is currently depicted as Single Family Residential and Parks, Open
Space, Mineral Extraction & Floodplains on the Town's Land Use Plan Map, the property is
located in the Town's Main Street commercial corridor and the adjacent properties are zoned
General Commercial. The proposed commercial uses are consistent with the adjacent
• zoning and land uses.
Recommendation:
Based upon the aforementioned information, the Town of Windsor Planning Commission
recommends that Weld County refer the applicants to the Town of Windsor for annexation.
Thank you for the opportunity to review this proposal.
Sincerely,
Scott Ballstadt, AICP
Chief Planner
Enclosures: Town of Windsor Land Use Map
June 10, 2011 letter regarding water service
pc: Gale Schick, Chairman, Planning Commission
Victor Tallon, Vice-Chairman, Planning Commission
Joseph Plummer, AICP, Director of Planning
Pat Weakland, applicant
.
VII oWRIER'
401
,,OA[)QQ
MEMORANDUM
Date: August 4, 2011
To: Town of Windsor Planning Commission
Via: Joseph P. Plummer, AICP, Director of Planning
From: Scott Ballstadt, AICP, Chief Planner
Subject: Weld County referral—Amended Use by Special Review (AmUSR-1251) for a
commercial greenhouse/garden center dba The Windsor Gardener and a brewery
Location: North of and adjacent to Main Street;west of and adjacent to 17th Street
Land Use Single Family Residential; and Parks, Open Space, Mineral Extraction
Depiction: and Floodplains
Item #: C-1
Background/ Discussion:
The applicants, Mr. and Mrs. Pat and Amanda Weakland, are proposing an amendment to their
existing Weld County Use by Special Review to add a brewery to the existing Windsor Gardener
facility located at the northwest corner of 17`h and Main Streets. The subject property is located
within the Town's Growth Management Area and is contiguous to the Town's corporate limits along
the eastern property line.
According to the application materials, the proposed amendment would allow for the addition of a
micro-brewery to the existing Windsor Gardener, allowing customers to sample beer made with
hops that are grown on the site. The brewery would include a tasting room and patio area
overlooking the field of hops and tours of the brewery would be offered. The proposal includes a
4,800 square foot warehouse, 1,000 square feet of which would house the brewery and the
remainder would be used for storage.
Windsor already serves the property with water and the Engineering Department has discussed
the proposed brewery with the applicants and has outlined the Town's requirements regarding
changes in water usage in the attached letter dated June 10, 2011. Additionally, although
connection to the Town's sanitary sewer system is not contemplated at this time, if it is determined
that the existing septic system is not capable of handling the increased wastewater, connection to
the Town's sewer should be considered and compared to the cost of a new or expanded septic
system or the long-term expense of hauling wastewater to City of Fort Collins facilities. Mr.
Weakland had a design for a sewer force main prepared in 2007 that included a pump station near
the southeast corner of the property and a force main that ran to the east approximately 740 feet
then north another 300 feet where it could discharge into the Town of Windsor's sewer system.
The Planning Department has reviewed the proposal and considers the micro-brewery use to be
consistent with the adjacent General Commercial zoning. The property is accessed from
Windsor's 17`h Street and the access point has been planned and improved to align with the future
commercial uses to the east. For all intents and purposes,the subject property is part of the
Town's Main Street commercial corridor and it would make sense for the existing Garden Center
and the proposed micro-brewery to be annexed into Windsor.
Page 2
Weld County referral AmUSR-1251
The existing Windsor Gardener facilities were developed in unincorporated Weld County and staff
would recommend that the Town acknowledge the existing improvements and consider relaxing
some of the architectural and other commercial corridor plan requirements given the pattern of
existing development on the property. Any agreed upon concessions could be memorialized in the
annexation agreement which ultimately requires Town Board approval. As such, Public Works
Department questions regarding the water tap and Parks and Recreation Department questions
regarding proposed landscaping could also be discussed with the applicants and addressed in the
annexation agreement.
Conformance with Comprehensive Plan:
The subject property is located within the Town's Growth Management Area and is contiguous to
the Town's corporate limits along the eastern property line. Section IV.C.2 of the Comprehensive
Plan regarding the Growth Management Area (GMA) states: "The GMA is intended to help define
those specific areas within the planning area where it is most logical to extend urban services in the
near term, that is, within the next ten years. Determination of the GMA boundary was based upon
an analysis of utility capacity, projected population growth, land absorption, circulation patterns,
environmental constraints, and from discussions with the Planning Commission,Town Board and
citizens." Section IV.C.6. further states, "Future development should be contiguous to the
existing community or, to help ensure that any such areas can be annexed in the future with
urban-level services, these areas must have the capability of being easily served by existing
facilities."
Section IV of the Comprehensive Plan regarding Land Use Planning includes the following
Annexation Goal: "Ensure the logical extension of the Town boundaries so that Windsor may
expand in a directed, logical and fiscally responsible manner," as well as the following Overall Land
Use Goal: "Promote the development of Windsor in an orderly manner that will provide a well-
balanced land use pattern which will provide for the efficient and effective ongoing extension of
public services and facilities."
Although the property is currently depicted as Single Family Residential and Parks, Open Space,
Mineral Extraction & Floodplains on the Town's Land Use Plan Map,the property is located in the
Town's Main Street commercial corridor and the adjacent properties are zoned General
Commercial. The proposed commercial uses are consistent with the adjacent zoning and land
uses.
Conformance with Vision 2025:
Annexation of the property would be consistent with the Economic Vitality vision statements, goals
and strategies of the Town of Windsor Vision 2025 document.
Recommendation: Based upon the aforementioned information, staff recommends that the
Planning Commission forward to Weld County a recommendation that the
applicants be referred to the Town of Windsor for annexation.
Enclosures: Referral application materials (including June 10, 2011 letter regarding
water service) and Land Use Map
pc: Pat and Amanda Weakland, applicants
Kim Ogle, Weld County Planner III
iJUUUU
1111
➢,,
,,,.r r
1
rik
I S t I ! 11 13 17 I G I5 1 1 n..,4•r, 13
aCR80 JW,In k. \ ( Rxu
I r(t a NN:; t
1,1
22 is.
73 24 ➢ ),I i 4.%! 711 i 2I 1 ' -' 13 = 2-1 ➢') z 21)
L.,
I —1
Fg , y '~_ti I' C C. -,1 kAr 5
('
I . -�� a 1� s ti ,
1
�. ��1 1 1. II .t�l
limttndr Hntnnrr l..� ar,j rr l.'.L�r>erne•En ail � r ' + ,as IN CR'_ir r. 2 7 2(, 717 Y C 311 "111iii:::' �,r -�jLJ]ICR 4 , .
0N' R r'1i
?•. ._.y.... ,,,,, . tt i Ilinrhr.r!{t+.t�'rtir ' •1 'T `, _._ ir\
et, ',, 1::: .... ii -35 32 L r;;..mil 3-I
A , : -.rui3r, -
z z is
•i s. IIAR.�V IlaCH 74)Jr;16 I -
!, g.-- Subject ..`., A a _
-1 I V Y I nur li,: ��
v
eN
Ip J 3 i t'2 lu r •, �^r ,
3 \ Property . I 1 ; I Si __
LCR 7 rr I _ ' 1 C K an - lam. VC. ' 72 ,a. 5,4 S% R 727
III
`-1 ,111•. 511 frf' • V fir ^7. �1 U
I//� i y�di It- P 1 ,QQ 12: �.� 8 �.. `) ,-,1 �� III s 1-2�
c''Ic I '' .I efi
. _ ! �r�
c-rI.
', ^'tip 1 _ S ( R70
3
_ r tai ' v� k rS _�~
rLCR-s2E ( • ' J
1tpet
Ili, —. . 1
a:I <=itSmilimor.#ZI ill
..._ i
',ra,yr.�ill I *22 1 p•` • •
` ; • _
'�'� ! .s Ji{ � I ~ µ X2.2 �� 1_ffi ! v_ -�1 ➢rd
]jt� a
- trr OCR 4 _ t.'• ‘‘',A‘r a .• , ,,, '..,. . • '� LA and.•' .. Mill; 1 r , N•' 111rr 1' x ��•. i x r4 :It:2 !gE
y . 1 S N( Kl,a_S3�) 1• rtn std
lig!lid/ i, - 11-** 'frit ' ,•,•1 ., t.
; ,-- .:
rail
a v„misasajli
3 34 ■ 5 Ili! lb, 36 j ail ;-. `" .
ma
1 i1 _ 14;1
C•OSSROADSBEIlliml aS ' t*
J 1 ri41 • _
2 1 h z , , likt 2
like. 1.%. i .
V f '� f ,� �r In\\ .atl�st�Fs. II
34
' =� lax IV.
10 •ff. 11 X1.2 � 7 8, ,1 `� ''in I I ➢ ' 7
��� OSLHy / Jr H •
a• - 'l'31BYP.4;S r ..
SI' > — 3d _
+r .....
1�
IS 1 7 1 h 15 1 4 13 Lii
:.,
it-AlleE\ i 4411111.w a ili Il���tIl�l.11 b qg a�9t td1:1 . a �� �� ♦, re\\,..\ \ I \\ \ , *4.,. .ii....,.4„...7...t,c_.,,,,..,..2reir.c.b.m.......iizin..1.41v.�7{t�r�` •\ - \ic71Ir mss."-i,1 4 ♦ 1►F. r XiliM alenSVS ♦ tp p 1 r�ct♦4.474 et 1
\ N.
\,,`,„
\R� 'S(9▪- 4��al11i1��11 aw�♦tl �\V�,� .tea 6 sr A\ �, .��'4.w �1
as
r-Z. •talnti l I' . ��+.. . rl a� 11 S.A 'a.. &a
[! \ ti0 I .l,'u 1:11: \wIL t� 11.sp .,..:IN ♦ z--" ikAA .i.:t•1 C, + `�
1 \\\ �i: ♦ r..` _�*zs1 �l ��1 Ia Ian I.Y111rfC 1a�1,s 1\t,11.1 a at1'!�d'r \\
// 111 \ tIft ,,!_ *�.* `!1''�7 , i_i3O�.A)s l* itrt��is a`ctli A die" Y a \
\ • -� 1`\�7) 'INS 1 1 - �t ..^ . � .A �.. roiit nl pit► �\•
uu � a,c.,C
r01"--- ".�. �♦ L 1Al`= a l.�ir \ '. aafa. a6a1► f a1�r
� Y: .,., l a.. v.., ♦ 9�"Y is tiro
�tl61 .ta` ,���a 1�\\ahiiti`\.l,ll\\6'�t,g66ta wt �i �s SLl.M►. .�
6-
-0 ��� Ni. lauiaYtFa 1 ip1�A11rA. ♦1131111a�►y6 ♦..�oo.aa.,at*� : I
\e 44 11 U ♦ d1Rp+ .rrt r 'I'iAue�j� • ,as. 44 4ATIB 1:o iti• +� , 1• �.0 i 1� . .may. .S.•�a \�
1 it AAAI �\ Q� JI ♦a6t.w1♦.�oq►.M1`_h X04-4 +� \\\ \
c \ 14. 4-s. 4. 11 ,1 \\►wn°fuaw3tF► 61611.1.6 'RIB \ \ \
m ♦ G _I. 4 eT7n1�?sP �1„I it sa �V is -=' ,. 11Leo \ \.
t"r ♦.� , ��`\`� k fk . ,e 0 ,..'►."'E awl 1 1 ` \\U
•\\ °K 1.4iiiltot,e. , `\`\` �k\Il.♦ lk,%♦r6fl . i+ , i i 1..6111�\'i
• ••\ r 11 \ 1 ,. f.1 f/ p ` •\\\.
\\• 1� cif �� t�1 . A�l .f4'�,�a�.h� o \ \
\\• \ 1 ��� a t�.N♦ ti1�4t1.i1 3.\ via . 1
I. \ \\ r I�Zl�h <4..I ,Afy,14 ( I r,a,''li"e',� I.Iil1�J11i\:ILM► \` 6_
\1\ \ it �.G ,".er,••R� Ll.���j.\A11C� " • r •.••11 �N.r• -it I
f Ifll .,Octal►� w \11�\\\�1\\, � i �rq JI.e a , v�'�� \
s.\\\� , \\\\\\ i, ' --6'r\♦'ad'i. +aU�i��•, +yf .. .ftd moist ,�4\�\ \\
` \ \\\\ r" 11�,, frVVflb4"t�� ' V i ?r¢.�- i >,^. 1`VrC\t6► ,1� a`' \\\\.
\ ` \\ \� S 156 a"V S DI A dr,.S6 �..'114k�,a.Ur 6 , \\\\\ \� r
• \ \ \\\ r▪ ! ►b�i�,y� • 'l.IiIYStFa�.a6 wtr e rMi
".••\,•',:•::•'• '\; � \\• O:441:124'.�.�1;►�iri�`L{i1 .N\1.1'F�.Itlae l.'1n ��c� ��"t , 101
Aitkc
ki
4.t...,tr:svgic..,y4.zt,iivritlaton,iitilKit-,,tial-A,No
h, \,► 14 . \ lI � Iuvl affil fns'≥\
'a 11N4 . . �>t Y, l a3N� `u.++`1P ♦. . .,, iI . r .� Ne; ��p .Ir1.1, �,.l.rSr+6..k'i•...w•s ♦ice dp+I I r r g-.+\iv,'. ♦kleliil iL .aft
,,♦ t 6 �\ a� ►fit► \.! sr-♦ ... "I1117,� �
!\, �� ♦ •4IA��'.i ♦t- i I ` \w\-It r �\�► 1��`\�'� �V:.i 41'!Sk"5A.;1�1�a\i1.�� A♦
' AQ t.♦ie,O7lis. %S.,b 4i,i6.r11 II �'i • 6 111,\. \ \ \ \
f •• • u r ! . e V
n• ♦ I.a ' ht. H iN/6 M
• 4, *ohm.7 inn,L% ra • i
`itl QI�y��.�Y1n are rl��� 1rWild \\
\\\i _ \\ °? \
47 \\ \\ \\\\\\\
... --¢L 210 ' --- ". EL IAD
•
•
Imo; ���r I ---1--- ----.7•""-'•--f&,:-..),,,,,,4' . .
��iR II�. , — j'
��•,„ I `fir 1` _� �►� �= � �l11! ���� �.� Y,'
I �Itll i 1 =i ►� >ti�r�� 11118 � `
l
f _ 111 I1��
! l.
i •
' +�
'�; 5. !11 ,
I 1, ''I\i'\...._.,---------j-P-" ._ .., " - •• • •
i____. , ,
•
-41
i 1 11
i Jr,_ '• •
•
>•
)''''• .. • • •E r -
Lo
m •• •
. • /.•
,...-"":".'""I'T'er"-,..„ ,.- LiEe fill'I . .
•
I [ / e� as I� ��
0_
03
c 6,
m
a. .c
L •
o
U a,
M io 1
a v y t
LL ❑
I7-:.
7 o c •
EID c9
N B
I
11 t
" RECEIVED
Sumbit by Email
JUL 0 8 2011
1 8 6 1 2 0 1 1 Weld County Planning Department
• GREELEY OFFICE
._ Weld County Referral
June 24, 2011
WELD- _-COUNTY
The Weld County Department of Planning Services has received the following item for review:
Applicant Pat&Amanda Weakland Case Number AmUSR-1251
Please Reply By July 23, 2011 Planner Kim Ogle
Project A Site Specific Development Plan and an Amended Use by Special Review Permit
for a Commercial Greenhouse/Garden Center dba The Windsor Gardener, and a
Brewery pursuant to the provisions of Article 47, Title 12 of the Colorado Revised
Statutes, in the A(Agricultural)Zone District.
Legal Lot B RE-1425; Part E2SE4 of Section 18, T6N, R67W of the 6th P.M., Weld
County, Colorado.
Location North of and adjacent to State Highway 392; West of and adjacent to 17th Street,
Windsor.
Parcel Number 0807 18 300006
• The application is submitted to you for review and recommendation. Any comments or recommendation
you consider relevant to this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this
date may be deemed to be a positive response to the Department of Planning Services. If you have any
further questions regarding the application, please call the Planner associated with the request. Please
note that new information may be added to applications under review during the review process.
If you desire to examine or obtain this additional information, please call the Department of
Planning Services.
You will be notified in writing of the Planning Commission date once the date is determined.
I I We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
because
® We have reviewed the request and find no conflicts with our interests.
See attached letter.
Comments:
Signature fat -Uuhee. Date /c'5%i1
• Agency V.viisio n eP hhlzr"Ret5rAwrer,
9Weld County Planning Dept. 41555 N 17th Ave,Greeley,CO.80631 9(970)353-6100 ext.3540 9(970)304-6498 fax
I
'w OFD ZO,p DEPARTMENT OF NATURAL RESOURCES
y7 T 9° DIVISION OF WATER RESOURCES
iii , r.
P :m>y * John W.Hickenlooper
s 18
76
Y Governor
-- - Mike King
June 30, 2011 Executive Director
Dick Wolfe,P.E.
Director/State Engineer
Kim Ogle
Weld County Planning Department
1555 N 171h Ave
Greeley, CO 80631
Re: Case No. AmUSR-1251
Applicant: Pat&Amanda Weakland
E1/2 SE'/., Sec. 18, T6N, R67W, 6th P.M.
Water Division 1,Water District 3
Dear Mr. Ogle:
We have reviewed the above referenced application for a Site Specific Development Plan and
Amended Use by Special Review Permit for a hop farm and brewery operation on a ten acre parcel. The
applicant intends to conduct tours of the hop farm and brewery, which will have a tasting room and patio.
The property will also contain a greenhouse and warehouse,The submitted material does not appear to
qualify as a "subdivision" as defined in § 30-28-101(10)(a), C.R.S. Therefore, pursuant to the State
Engineer's March 4, 2005 and March 11, 2011 memorandums to county planning directors, this office will
only perform a cursory review of the referral information and provide comments. The comments will not
address the adequacy of the water supply plan for this property or the ability of the water supply plan to
• satisfy any County regulations or requirements.
There is an existing residence located on the property, which will continue to be served by the
Town of Windsor and a domestic well, operating under permit no. 247465-A. Water from the well may be
used for ordinary household purposes inside one single-family dwelling, the irrigation of 0.75 acres of
home gardens and lawns, and the watering of domestic animals. The applicants have stated that there
will be no change in the use of the well as a result of this proposal.
Water for the brewery and tap room will be provided by the Town of Windsor. A letter from the
Town of Windsor dated June 10, 2011 indicates that water is currently provided to the property through a
'/. inch water service, and that raw water is allocated to the property in the amount of 1 unit of Colorado-
Big Thompson (CBT) project water, which on average yields 195,000 gallons per year. The letter
indicates that additional water is available with the dedication of additional water rights or cash-in-lieu,
currently $10,000 per 326,000 gallons. The applicant also owns two shares in the Cache La Poudre
Irrigation Ditch #2, and '/% share of an irrigation well, which is proposed to be used for dust control
purposes during construction at the site.
So long as the well with permit no. 247465-A is used in accordance with its permitted conditions,
and with the Town of Windsor as the water supplier for the brewery and tap room, this office has no
objection to the proposal. If you or the applicant have any questions in this matter please contact Sarah
Brucker of this office at(303) 866-3581.
Sincerely,
an Williams, P.E.
d
. Water Resources Engineer
Office of the State Engineer
1313 Sherman Street, Suite 818 •Denver, CO 80203 • Phone:303-866-3581 •Fax:303-866-3589
http://water.state.co.us
Sumbit by Email
1861 - 2011
• ✓ _. Weld County Referral
June 24, 2011
WELD -COUNTY
The Weld County Department of Planning Services has received the following item for review:
Applicant Pat&Amanda Weakland Case Number AmUSR-1251
Please Reply By July 23, 2011 Planner Kim Ogle
Project A Site Specific Development Plan and an Amended Use by Special Review Permit
for a Commercial Greenhouse/Garden Center dba The Windsor Gardener, and a
Brewery pursuant to the provisions of Article 47, Title 12 of the Colorado Revised
Statutes, in the A(Agricultural)Zone District.
Legal Lot B RE-1425; Part E2SE4 of Section 18, T6N, R67W of the 6th P.M., Weld
County, Colorado.
Location North of and adjacent to State Highway 392; West of and adjacent to 17`h Street,
Windsor.
Parcel Number 0807 18 300006
• The application is submitted to you for review and recommendation. Any comments or recommendation
you consider relevant to this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this
date may be deemed to be a positive response to the Department of Planning Services. If you have any
further questions regarding the application, please call the Planner associated with the request. Please
note that new information may be added to applications under review during the review process.
If you desire to examine or obtain this additional information, please call the Department of
Planning Services.
You will be notified in writing of the Planning Commission date once the date is determined.
pi We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
because
We have reviewed the request and find no conflicts with our interests.
See attached letter.
Comments: Typically CDOT would request additional traffic information, but because the intersection of 17th Street and SH 392
was recently constructed with auxiliary lanes, it is unlikely that this proposal will significantly impact that intersection.
CDOT has no comment regarding access. I would like to mention that this area has had drainage issues in the past.
CDOT is confident that the County will address them.
Signature Gloria Hice-Idler Date 6/27/11
Agency CDOT Permits
•
+Weld County Planning Dept. +1555 N 17'"Ave,Greeley,CO.80631 4(970)353-6100 ext.3540 4(970)304-6498 fax
•
• Sumbit by Email
1861 - 2011
/ _ _• Weld County Referral
W E L DEC O U N T Y June 24, 2011
The Weld County Department of Planning Services has received the following item for review:
Applicant Pat &Amanda Weakland j Case Number AmUSR-1251
Please Reply By July 23, 2011 • L �
I
Planner Kim Ogle
Project A Site Specific Development Plan and an Amended Use by Special Review Permit
for a Commercial Greenhouse/Garden Center dba The Windsor Gardener, and a
Brewery pursuant to the provisions of Article 47, Title 12 of the Colorado Revised
Statutes, in the A(Agricultural)Zone District.
Legal Lot B RE-1425; Part E2SE4 of Section 18, T6N, R67W of the 6th P.M., Weld
County, Colorado.
Location North of and adjacent to State Highway 392; West of and adjacent to 17th Street,
I Windsor.
Parcel Number 0807 18 300006
The application is submitted to you for review and recommendation. Any comments or recommendation
.
you consider relevant to this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this
date may be deemed to be a positive response to the Department of Planning Services. If you have any
further questions regarding the application, please call the Planner associated with the request. Please
note that new information may be added to applications under review during the review process.
If you desire to examine or obtain this additional information, please call the Department of
Planning Services.
You will be notified in writing of the Planning Commission date once the date is determined.
' 1 We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
because
We have reviewed the request and find no conflicts with our interests.
See attached letter.
Comments: The Site Specific Development Plan Application for Plat Amendment dated June 16,2011 addresses flood hazard
protection for the site, including erosion, septic,and building pad protection. Additional aspects of the project
required for local approval under floodplain management regulations adopted for the National Flood Insurance
Program should be coordinated with the local floodplain administrator, Clay Kimmi, PE, CFM, at 970-304-6496.
Such aspects may include providing the as-built certified lowest floor or floodproofing elevation.
Signature Michael K. Gease, CFM Date 7/22/11
Agency FEMA Region VIII, Mitigation Division
•
+Weld County Planning Dept. +1555 N 17'"Ave,Greeley,CO.80631 +(970)353-6100 ext.3540 4(970)304-6498 fax