HomeMy WebLinkAbout20110174.tiff a
MEMORANDUM
(est TO: Clerk to the Board DATE: January 10, 2011
ID 0 • FROM: Wayne Howard, County Engineer/CIP
Public Works
COLORADO SUBJECT: CONSENT AGENDA ITEM
Work Order for On Call Engineering Consultant Agreement with FHU on WCR 49 Poudre River
Environmental Study in the amount of$32,190.000
Attached are two original signed Work Order Nos. FHU-14. Please return one original to Public
Works.
cc: Mike Bedell
MVFrancieVvgendaWayneHoward.doc
itA I�aZ crw✓IWC
/
apipciaLt
i e 065/
- I
Zvi �� p
2011-0174
r `
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
FELSBURG HOLT&ULLEVIG
DATED: 1-10-2011
Work Order Number: FHU-14
Project Title: WCR 49 Poudre River Environmental Study
Commencement Date: February 1,2011
Completion Date: June 1,2011
Limitations on compensation: Total amount not to exceed $32,190.00, unless otherwise modified by a
subsequent approved change order. See attached design fee breakdown.
Project Description: Assisting Weld County Public Works Department in assessing possible
environmental impacts related to a proposed new bridge crossing of the Cache la Poudre River. This
study will help identify potential environmental impacts of the proposed extension of WCR 49 between
SH 34 and WCR 60.5;wetlands, floodplain,wildlife, and historical_resources.
Scope of Services: See attached Scope of Work
Professional agrees to perform the services
identified above and on the attached forms in The attached forms are hereby accepted and
accordance with the terms and conditions incorporated herein, by this reference, and
contained herein and in the Professional Notice to Proceed is hereby given.
Services Agreement between the parties. In the
event of a conflict between or ambiguity in the
terms of the Professional Services Agreement Weld County
and this work order (including the attached
forms) the Professional Services Agreement By: Wayne Ho yard, County Engineer-CIP
shall control. Date: V/0//J
Professional: By:
Department Head
Felsburg Holt&Ullevig Date: / — / -/1._____
6300 South ruse Way, Suite 6000111 By: �
Director f Finance and Administration
By: ` ��` Date: JAN 1 2 11
Title: PY`ne i Q 4 By:
40itluttzt_
Cha rman,Weld County Commissi ers
Date: l r Date: _JAN 1 2 2011
CD
I
la. -, o g ri-_
c
of -.-..t
W 4C s &L! a
N
S
a
a
0
V S8o8�g 8S 'm o Si
Wso�Wald+aylp m N n N CO In
U Pus aei aowGS ISUO!SSWPId N N M
O coos Ncoo NN
N CO co
.441 S
Q gw to
L CO
m ssso0 W Lila/aao tram
W
NwN lA
d mam$oi m; $s
Vaei eauueS IeuwseWad 05.
N
W
NNNwNw Nm If)
N
N c0
WnoH ea!n+aS!eu0!sse)ad m N N v N N N
O
L
d
aasaasI,w,WPv v w m ,-
N
a-
t
a0 ;slluepS ltWeWualnu3 co!uaS)
sw.sAS uo!PuuoWI awdWBoae N N
CO A4!w uen3
d
t
p (Al WIWp!.S lsw.wuoinu3) R
co Peel Iquewua!nu3 4n --N m CO
U Aa!md sell
Of
a (,eau!Bu3 colon) di
WAaBeueq 10.110M mma," INy 7
o
'3'd'Buuqe, le
uued war N
>s0
C (I Iedlauud) co
3 WBIWan°'Leq 1pafad N N
O
U 3d'Ba!gosed swg3 CO
3 CO i
dO
a ~O O O N
w U I• co g fll
v m Q J
U
0 w U
w 5 0 Q
a) J E c C
•� t4.1 e y 8, o ZO in
Nw m'? 3 gg o 'y U •O
y r _ =c' 2 Re `' Q 'B
A C R F W E - - a 0
E o v y I
•y W 3=��¢ana €€ m O U
N r_ „aa 1a m E y
c e m
LL - N c-N�(TN F F N F u LL
Weld County Road 49 — Cache la Poudre River Crossing
Clean Water Act Section 404(b)(1) Analysis
Scope of Work
Project Description
In order to provide regional north/south connectivity east of Greeley, Weld
County Road 49 (WCR 49) was identified as a arterial corridor between US
Highway 34 (US 34) and State Highway 14 (SH 14). Weld County identified a
preferred alignment for this corridor in the Weld County Road 49 Arterial Corridor
Study (Felsburg Holt & Ullevig [FHU] 2004). The preferred alignment was
selected because it would best improve north/south connectivity in this portion of
Weld County. Included in this alignment is a new bridge crossing of the Cache la
Poudre River, approximately one mile west of the confluence of the Cache la
Poudre and the South Platte River.
Weld County requested that a scope of work and fee estimate be prepared to
determine if any environmental fatal flaws are associated with the preferred
alignment bridge crossing of the Cache la Poudre River, focusing on the potential
for a Clean Water Act Section 404 Individual Permit through the US Army Corps
of Engineers (USACE). Through the existing on-call services contract with Weld
County, FHU will investigate the environmental site conditions, coordinate
approximate bridge sizing, prepare alternative screening documentation
acceptable to the USACE for a preliminary Clean Water Act Section 404(b)(1)
analysis, and the coordination with various resource agencies. They include
Weld County, USACE, US Department of Interior Fish and Wildlife Service
(USFWS), and Colorado Department of Natural Resources Division of Wildlife
(CDOW).
Task 1 — Investigation of Environmental Site Conditions
Purpose
FHU will perform a preliminary analysis to identify environmental issues that may
affect the selection of the preferred alignment bridge crossing of the Cache la
Poudre River. The information gathered and compiled in this task will serve as
the basis for evaluating alternative alignments of the bridge crossing. The intent
is to utilize available information to the maximum extent possible and to conduct
new data collection only as necessary. Analyses shall be performed to identify
the potential impacts to the following resources
• Federal Threatened and Endangered species, and State listed species of
concern habitat
• Known/potential historical resources
• Wetlands and Waters of the US
Subtask 1.1
FHU will obtain existing USFWS and CDOW habitat data for Federal threatened
and endangered species and State listed species of concern. FHU will not
conduct "presence/absence" (trappings) surveys for sensitive species potentially
occurring in the project study area.
WCR 49-Clean Water Act Section 404(b)(1)analysis
Page 1 of 3
FHU will collate existing wetlands data already collected for the project area.
Because it is doubtful that right-of-entry will be obtained from property owners at
the project site, the Consultant will develop a method to estimate wetland
boundaries at the proposed site. It is anticipated that the consultant will visit
similar sites along the Cache la Poudre River where access is available to
determine wetland characteristics that may be indicative of wetland conditions at
the proposed crossing location. Additionally, the consultant will determine if
similar wetlands delineations (a field evaluation will be based upon soils,
hydrology, and vegetation according to the 1987 Corps of Engineers Wetland
Delineation Manual and Regional Supplements) within the areas of the Cache la
Poudre River crossing have previously been surveyed for wetlands. FHU will
then conduct the wetland determination using aerial photography and limited field
reconnaissance.
This information will be summarized in both graphic and tabular forms to produce
a comprehensive representation of the physical characteristics of the study area.
Subtask 1.2
In this task, all of the information compiled in Subtask 1.1 will be reviewed and
interpreted in order to identify opportunities and constraints related to potential
alternative alignments.
Task 2 — Approximate Bridge Sizing
Purpose
The purpose of this task is to develop a conceptual design for each new bridge
crossing of the Cache la Poudre River that can be used to evaluate potential
impacts to wetlands, waters of the US, Federal Threatened and Endangered
species, and State listed species of concern habitat for the preliminary Clean
Water Act Section 404(b)(1) analysis.
Weld County hydraulic staff will collect Federal Emergency Management Agency
(FEMA) and other floodplain/floodway mapping for the project area. A conceptual
design for each new bridge crossing (as identified in the Arterial Corridor Study
and subsequent revisions thereof) will be developed based on the
floodplain/floodway mapping to identify a optimal bridge span and approximate
pier locations. Weld County hydraulic staff will also develop detailed hydraulic
analysis for each crossing identified that will aid in sizing the drainage structure
required for the Cache la Poudre River.
FHU will assist County staff with developing horizontal roadway alignments as
necessary to avoid impacts to wetlands, waters of the US, and Federal
Threatened and Endangered species, and State listed species of concern habitat
identified in the project area as part of Task 1 for identified crossings of the
Cache la Poudre River. FHU will not develop vertical alignments or produce
cross-sections but will consider vertical elements as the alignments are
established to test the viability of the horizontal alignments. The roadway cross-
section for this initial effort will be a 2-lane roadway section instead of the 4-lane
arterial roadway section identified in the Weld County Road 49 Arterial Corridor
Study.
WCR 49-Clean Water Act Section 404(b)(1)analysis
Page 2 of 3
Task 3— Alternative Screening
Purpose
The purpose of this task is to prepare alternative screening documentation
acceptable to the USACE for a preliminary Clean Water Act Section 404(b)(1)
analysis. FHU will work with Weld County and USACE to prepare a purpose and
need statement for the Clean Water Act Section 404(b)(1) analysis. The
conceptual alternatives will be analyzed for purpose and need, cost (size of
bridge structure) and environmental factors (impacts to wetlands, waters of the
US, Federal Threatened and Endangered species, and State listed species of
concern habitat, and known/potential historic resources). FHU will prepare a draft
and final document for review by the USAGE, CDOW, and USFWS.
Subtask 3.1
Information on each alternative will be compiled into an evaluation matrix and
summarized in a preliminary Clean Water Act Section 404(b)(1) analysis
technical memorandum. This technical memorandum is intended to serve as a
component of an individual Clean Water Act Section 404 permit.
Task 4 - Project Coordination
Purpose
FHU will provide appropriate project management of the work to assure that the
scope, budget, and schedule are adhered to. FHU has assumed that no more
than three project coordination meetings will be required to discuss the project
and coordinate the work efforts. One of these meetings is assumed to be a
coordination meeting with the USACE.
Included in this task is one field meeting with the USACE, CDOW, and USFWS
to discuss the project alternatives and site conditions.
WCR 49-Clean Water Act Section 404(b)(1)analysis