Loading...
HomeMy WebLinkAbout20112783.tiff Chris Gathman (prom: winterlandgoats@aol.com ent: Sunday, August 07, 2011 10:25 PM To: Chris Gathman; WinterlandGoats@aol.com Subject: Cliff Simpson/Doris Cunningham Zoning Proposal We are just followiing up to see what the status is of this property. We do still have concerns as to what we were told are their requirements and what is actually happening. Starting time is 7:00-Cars are here well before 6 a.m. Doors open and working by 6 a.m. 13 cars-Average of 18 up to 23. 2 twin axle trucks-At least 3. One of which does not have a motor. Also semi tractor trailers. Numerous shipping containers. 2 vehicles parked there continously. Appear to be painting oil well steps. Do not think they are compliant. Several weeks ago a large metal wall was painted outside, on the weekend. It was noisy and strong fumes. Did not think they could work on the weekend. Do not think this was compliant with the �ealth department. Numerous farming items and large silage bagging machine. We are very concerned that they do not appear to be following the requirements they asked for while they are appling for the special use permit. If they are not following the requirements when they are trying to apply what will make them comply if they get the permit? Are physical checks being made to the property? Thank you for your time and addressing our concerns. Dusty and Sandy Winter EXHIBIT ust-t- • 2011-2783 1 From: Steve Deines Imailto:stevede(nesngmail.com] Sent: Friday, August 26, 2011 12:20 PM To: Chris Gathman Subject: USR-1785 Chris Attached is a Word document with documentation of some of my concerns regarding Case# USR-1785. I am the property owner adjacent to this on the north side. There are several pictures with this document but there is no way to document the paint fumes we have smelled every day this week. There is painting of stairs going on in the building but all doors have been kept open and the paint smell is terrible. They have been painting all week. Aren't they supposed to have a paint booth with filters? My biggest concern is that the operators of this business are not playing by the rules now, why would they be expected to follow the rules after they get their permit. I am not opposed to a business being run here as long as the rules are followed. Steve Deines 41474 CR 33 Ault, CO 80610 970-834-2240 H 970-396-3636 C • EXHIBIT I1 USE-178S" 1 PRELIMINARY TRAFFIC STUDY Traffic at this location will see a minimal increase. The I8 employees will not all be at this location. IS employees drive automobiles or pickups to work and home at the end of the day.The company has two delivery semi trucks these semis are sometimes at the shop and sometimes remain in the field delivering products. On a biweekly basis steel will be delivered to this location by semi. The property is located on Weld County 33 a paved road. RE: The above. When I bought this property these buildings were uninhabited and the owner was not using them. For the 10 yrs I have lived at this residence the absolute most traffic ever was two or three cars per day with additional semi trucks a couple of times a week. There is now more traffic in one day then we used to have in an entire year. Minimal increase?????? • DUST ABATEMENT PLAN The drive into the location is recycled asphalt this product creates little or no dust. Should we see dust being created by our traffic we will first apply water as an abatement, should this not be effective Magnesium chloride will be applied to all dust causing areas. The drive is no longer recycled asphalt. It now is road base which is much dustier. Water has never been applied let alone mag chloride. • • 'rte r dfl- I 1 �+ ' -I vI- ",r '7+ • . '',,..^'' . 1ao+�- • 3. Explain how this proposal is consistent with the intent of Weld County Code Chapter 23. • The proposal is consistent with the intent of the Weld County Zoning Code for several reasons. The proposed use will create a productive commercial use on a property that split off from surrounding farmland, for a commercial Ag facility and has not used in this manor for several years. This proposed use will foster the county's business and economic base. This commercial use will use existing buildings that were not being used in a productive economic and legal manor. The only people accessing this building will be employees and an occasional steel supply truck. There will be no retail trade taking place at this location .The Occupants of the building are engaged in a lease purchase contract with the current owner of the building. The proposed use will make efficient use of non-urban development. The proposed use would conserve the value of the property and be the most appropriate use for these buildings and land. This use has no detrimental effect on the surrounding area and is not inconsistent with previous uses. The proposed use would help to secure economy in governmental expenditures. The county will not have to expend any financial resources what so ever associated with this use by special review. • The applicant plans to install an opaque 6 ft fence for security and visual screening. ,,, i , . . ,....4'..,,A,f wmra i' G I ' r 3v ,. ti • - -, .'y ?: Ilt r- __'-.-! 1 '.. 1 CI.A1 „t .' t•, �t 4 ti t i n aAt__ s � I t x I • t g x '2 • • �aw i This is how we are going to conserve the property value?A 6 foot fence will hide this? 1. Explain in detail the proposed use of the property. The occupants of the property propose to use the property as an oil field equipment manufacturing facility. This manufacturing will take place in the existing buildings at the location. The location of the facility will lessen miles traveled on county roads as it is close to the expanding Niobrara play. These buildings have previously housed a trucking and agricultural packaging company • j Here is the sign in the office window. C&H Excavating? Cu • • 11— _ r .1 I • uili+ _ Here are the two semi trucks and trailers?3 semis and dump truck all for C&H. Nothing to do with proposed use. And a stock trailer?Running at least 2 businesses from location. 5. Semi tractor-trailers associated with the business shall be limited to 2 (two). (Department of Planning Services) S • 11 Chris Gathman From: Phillip Brewer ent: Monday, August 29, 2011 8:24 AM To: Chris Gathman Cc: Lauren Light Subject: RE: USR-1785 Chris: Thank you for sending this exchange of notes to me. I "know" that proper applications have been sent to the CDPHE-APCD for an Air Permit. I spend some time with them in their office assisting them with the applications. The applications were to be forwarded to the APCD 2-3 weeks ago. The applications were for "stationary" spray painting(what is conducted at their site NW of Ault) and "Mobile" painting as what they do "in the field" when they are surface coating oil and gas field equipment that can't be moved to a central facility. The company, I was told, has purchased (present tense) a paint booth that is to be installed at this location NW of Ault. Re. a paint booth: A paint booth will only remove over spray particulates. Fumes from the solvents in the paints will not be removed by the booth. Solvent fumes removal does not occur from "nearly" all paints booths. Removal of solvent fumes requires other technology such as a flare, refrigerated condenser. I am not aware of any paint booth in Weld County that is required to remove solvent vapors from emissions from surface coating operations(Richie Brothers' huge ivaint and blasting booths booth do not have solvent removal systems). When I assisted them with applications, I determined that they are painting in a "Scenario 1"defined environment. The emissions point for Scenario I is less than 10 meters in elevation and it is less than 100 meters from the nearest property line. This is the "most" restrictive of the "Scenarios". As this is "Scenario I" they are required to be tracking and reporting the volumes of uses of solvents such as xylene, toluene, and MethyEthylKetone (MEK). I additionally,commented to them, that painting should be at times when the winds are from the west, north, SW or NE. This would carry emissions away from the affected, complainant. Phil J. Phillip (Phil)Brewer Environmental Specialist III Weld County Department of Public Health and Environment Environmental Health Services 1555 N 17th Avenue Greeley, CO 80631 970-356-4000, x 2227(office& messages) 970-304-6411 (Fax) 970-590-7702(c, M-F, 8 am -5pm) pbrewer@co.weld.co.us EXHIBIT • I 1p.� usQ- rms. 1 Ig4I 1411 Y. E tQ�C J'J N'Y Confidentiality Notice:This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Chris Gathman Sent: Sunday, August 28, 201.1 1:27 PM To: Bill Hall Cc: Lauren Light; Phillip Brewer Subject: RE: USR-1785 Dear Bill, If they intend to paint on the property then this information should be included in their application. This was not stated in the application. Please make sure everything that they intend to do on site is listed. I want to make sure that nothing is left out as to what they are going to be doing out there. Thanks Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue,Greeley CO.80631 Ph:(970)353-6100 ext.3537 Fax:(970)304-6498 la• ]QII� w E.o._ 'c`c'ir N 7 . Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Bill Hall [mailto:billjhallco@yahoo.com] Sent: Saturday, August 27, 2011 12:27 PM To: Chris Gathman Subject: Re: USR-1785 Chris they are following the county health department rules. They filed the proper permits for painting. I 'llget • all of the info on tuesday. Cliffs grandma died and her funeral is on Mon . Thanks Bill 2 Chris Gathman From: De Simpson [ch.excavation@yahoo.com] ent: Tuesday, August 30, 2011 3:27 PM o: Chris Gathman Cc: Bill Hall Subject: C&H Excavation - Painting permit Attachments: Painting Permit 8-20110001.pdf; Painting Permit 8-20110002.pdf; Painting Permit 8-20110003.pdf; Painting Permit 8-20110004.pdf; Painting Permit 8-20110005.pdf Mr. Gatham, Attached please find our painting permit submitted to the Colo Dept of Public Health & Environment on 8-17-11. Your attachment includes our cover letter (1 pg), completed APEN permit(3 pgs) and the Non-Criteria Reportable Air Pollutant Emission Notice Addendum. Also for your convenience I have included the following information: - During a 30 day time frame when we are painting the cross over stairs we use approximately 17.5 gallons of paint p/month and approximately 4 days p/month - We use an Electrostatic Spray gun so the over spray and loss of paint is minimal - Also, the amount of space between our cross over stairs and our neighbor to the north of us is approximately 350 ft - Also, there is a building between our cross over stairs and the neighbor to the north of us - Also, Phil Brewer, Environmental Specialist III, WC Dept of Public Health and Environment, has instructed C&H not to impede our business whatsoever while waiting to hear back on our painting permit from the State of Colorado - This gentleman to the north of us continues to trespass and harass our company in order to obtain pictures of our property In closing, you also need to know that during the months of April, May,June and the first three weeks of July of this year we did not paint any stairs at all. If you have any questions please feel free to contact us, we look forward to working with WC Planning Services to rectify this opportunity we are dealing with. De Simpson Office Manager C&H Excavation, LLC (970) 515-7693 Office (970) 515-7694 Fax (970) 371-0772 Cell WARNING: This message, and any attachments, are intended only for the use of the individual or entity to which it is addressed and may contain information that is privileged, confidential and exempt from disclosure under applicable law. If the reader of this message is not the intended recipient or employee/agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution or copying of the communication is strictly prohibited. If you receive this communication in error, please notify me immediately. • EXHIBIT 1 • August 17,2011 CO Dept of Public Health&Environment Air Pollution Control Division APCD-SS-B1 4300 Cherry Creek Drive South Denver CO 80246-1530 Re: Application for Construction Permit To Whom It May Concern: Enclosed please find C&H Excavation's application for a construction Permit. I have included the following in our packet: :- Ckq 2923 for$152.90 as stated in the application Application for Construction Permit MSDS for our Red paint,gray primer and Black paint and Xylene— I was not able to find a MSDS for MEK or Mineral Spirits Our Usage worksheet from Sherwin Williams from Jan until 8-11-11 Non Criteria Reportable Air Pollutant Emission Notice Addendum—I have filled this out to the best of my ability(which isn't much!) If you have any questions,please let me know as Cliff Simpson,the owner,is frequently out of the office and on the job site. We look forward to hearing from you at your earliest convenience..... Sincerely, De Simpson Office Manager C&H Excavation,LLC PO Box 211, Ault Co 80610 (970)515-7693 Office,7694 Fax (970)324-5870 Cliff's Cell • • Colorado Department of Public Health and Environment Air Pollution Control Division COATING,PAINTING AND VOLATILE MATERIALS USAGE OPERATIONS • Air Pollutant Emission Notice(APEN)-and-Application for Construction Permit Permit Number(if known): IPIDP-/L AIRS Number(if known): / / _ ACTION REQUIRED: ❑New Facility ❑APEN Update Only ❑Modification: Modification Type: 0 Ownership Transfer' 0 Change in Material Use U Change in Equipment. Complete all applicable sections of this form prior to submittal to the Division.Incomplete information may result in longer engineer processing times. You must submit the application tee with your APEN submittal. Note: For transfer of ownership or company name change on a permit,you must submit a proof of ownership transfer(e.g.Transfer of Ownership Form signed by the previous owner or a copy of a Bill of Sale). Company Name:L.-?rl E a/ hn`i , Lir_ -----.— 1j_ Facility Location:LIP-450 CA A'2) County: (,veld Contact Person: Cl i E S mpso 1 ��Phone: "-19' IS -�tGCJ Fax: -SIS -i tO Mailing Address: e:42:4_ r)11 t Atd-i-i rip gC,(0p E-mail Address: C , e.Yta.),(0.-tIniO' yana)•CIMf Date Facility Began or Will Begin Operation: AA! 0 I/ Normal Operation of this Source: Hours per day, Days per week, a° Weeks per year 1.Type of Tasks (v): O Automobile Coating, Metal Parts Coating O Plastic Parts Coating IIIu Others(Explain): 2. Type of Equipment Located at this Facility(attach additional sheets as needed) (Paint booths,dip-tanks,powder coating units,etc.) ----- — Year of I Control Device Unit Make Model Serial No. Instaliaiion ; Type No. ---1ia.t1__— —_ friFyy0 1li$ t_____1_—____ 111-L_. l UGC !i V-r i a i I 1 -I- I T 3 t1---- I Page 1 of 3 • 3. Paints and Volatile Materials Usage Information: a. Coating Materials Application Method: • ❑Dip.Brush,or Roller(DBR):TE'=95%; ❑Electrostatic.How Voltage(HLV):TE=90% High Volume Low Pressure Gun(HVLP):TE=65% ❑Electrostatic.Low Voltage(ELV)-TE=65% Air-Assisted Airless/Airless(AAA/A):TE=40% O Conventional Air Atomizing(CAA):TE=25% ❑Others(Describe) 'Note: -TE'means'Transfer Efficiency percent(%).'It is used to estimate particulate emissions. b. Volatile Materials Usage(you may attach additional sheets as needed)`: S/N: Name of Product Annual Usage MSDS ID or Name] (Specify Units) • • Intl I`N°"t dZ5r a{Ief�s F-1-SRC} : t {1F.rtorkl'1t�) 6in.5,ReictiFautlrfu ;mei F�vcf 2 319;14"-rtiti`71e,1Lom I�)Ct��9lfsy,��i:�-L�'tilr�liiYr t-/YsJrh 1flLc;'t I?,if_tck � F3'S _ 3 4 r• • - l I 10 Note: Materials usage will not be made part of permit conditions.Material usage is required to establish valid basis for the facility's emissions and to make accurate determination of the facility's status. If there are more than ten(1 0)products.you may attach extra sheets. Actual data should be supplied.Calculations for the total VOC and HAPs emissions must correlate with actual material usage listed above Annual air emissions fees ere based on actual emissions For new sources and existing sources requesting a modification,requested annual VOC emission limit should be supplied(see section 5 below). A c. Actual Time Spent for Materials Application I.c$_9 hours/day a Actual hours of materials application will be used in conjunction with actual or requested VOC and HAPs emissions to establish the facility's status.(i.e.Potential To Emit). 4. Powder Coatings Usage: a. Actual usage. tons per year; b. Requested Usage: tons per year c. Application Method: ; Transfer Efficiency(TE): - — d. Control Device. ; Control Efficiency(CE): Page 2 of 3 5. Air Pollutant Emissions from Coating and Volatile Materials Usage (Should be based on products usages listed above): a. Actual VOC: 1.169 tons/year, Data Year*:00 l I_ (e.g.2010). The Data Year must be given • b. Requested VOC: p2.5 tons/year c. List individual hazardous air pollutants(HAP)on the Non-Criteria Reportable Pollutants Addendum form and submit it with this APEN form. *For new sources and existing sources requesting a modification requested annual VOC emission limit should be supplied.Allow for growth when estimating your requested annual VOC emission limit.The requested total emissions below will become a permit limit. 6. Check the appropriate box below if you want: ta I want The Division to help calculate my source's air pollutant emissions based on the products usage supplied in this application. 0 A copy of the Preliminary Analysis conducted by the Division;0 To review a draft of the permit prior to issuance 7. Person Legally Authorized to Supply Data: /+ Name: (_:iic. `Jim4 Title: Ott nor • - Signature: 9" `7�-' Date: X (5 -1/ • • • Please Note: • This APEN is valid for five(5)years unless a significant change is made that causes significant increase in air pollutant emissions. A revised APEN shall be filed no less than 30 days prior to the expiration date of this APEN form. • Send this form along with 5152.90(or the current)filing fee to: Colorado Department of Public Health and Environment Air Pollution Control Division APCD-SS-B1 4300 Cherry Creek Drive South Denver.CO 80246-1530 • Businesses that emit air pollutants above certain thresholds may trigger the need to submit an APEN or obtain an Air Permit.The air permitting process begins with submission of a Construction Permit • Application form and APEN(one for each emission source)to the APCD. APEN and permit emission thresholds are based on uncontrolled actual emission rates. All permits will be issued based on the :eve:at production/operation requested on the APEN.If you have questions about"Actual"and Requested"emissions.please contact the Division. • The Division requires notification of start up of your operations. You must submit a Notice of Start-up form to the Division at least 15 days after commencing operation of the source. • Once the source begins operations,the Division may inspect the source to ensure compliance with all applicable permit conditions. • Air Pollutant Emission Notice(APEN),Construction Permit Applications forms,and other application forms are downloadabte at www.cdohe.slate.co.usiap/downloadforms.aso. • Guidance documents are available to help you una;...stand the air permitting process and environmental regulations specific to your business. These documents are available at WWW.cdphe.slate.co.us/aDistationarylibrarytitml. • Any Abrasive blasting may need separate APEN. For more information or assistance contact:Main Office; (303)692-3150 Small Business Assistance Program: (303)692-3175 or(303)692-3148 devised October 2010 ntto:/iwww.cdphe.state.co.us/apidowntoadforms.asp Page 3 of 3 • I I° qI' 1 I S.. �� - - _ - - ttc, Q D 1 1 I c7 cn 2 ❑• II p 1 _a E I I li `- U Is ❑ N L-- GI5III I nI >, ❑ -5r c? 1 a 6 e = m —`=u re W a 1. 1If' o° I o c E I I C o C9 a _I,r>I "� gw I I E O o 1' = I a :9 a Z d ti I t k . U 74 N N - " c n a E2 3 1� 1F' b1a o E E mm 11 li wU z z t, ti % i 1 ›- I O W o LL mg I Z O D v ry r ?� W y II 11 • c : OII ca LI o 5, I41III 1 71 111 7 ( 11 ca I `1 1 I .II .0 I �l O Im �I � I , . III r 1� W l U I� Q • it 07 � -JP?: rn I t. N n eC Ov •III l J ,le_ r) mmJI v,, ICI 1 IJ yI IU a d.isN I a 33 2 d' r �.i • {{11 YI CI I . _ I ' o N11 Q LIIIJI I JI (CI I1 J N I ,. LI" m T J v IIf , z i�J 'CI a `=1 N J Ilp a. a -'m J 17 I --�I '--' t II`:: jl t 5 .I. c I .E. vil Z =I 5 I CS o o J o � N N U m I S Ca_ O1 �J-A' �- w `� a )- E a • m _L-> c N o 0 O a re) .g g m ilI $ E 3I �I I IU T �n.V^ cc I-�IZ u II a U a w a i;79 ME C["o '0N Sb'd H!ld3H lb'IN3WNCN;AN3 0 M Pd Ib:Z.. C3M Ito?-L[-CM'o • Chris Gathman rom: Frank Piacentino ent: Monday, September 26, 2011 5:01 PM o: De Simpson; Chris Gathman; billjhallco@yahoo.com Cc: Jonathan Gesick Subject: RE: C&H Excavation - Painting permit De, If you are going to use a manufacture paint booth, manufacture specification and floor plan for location of booth will be required to be submitted .. If you are going to build a spray room, all requirements from the 2006 International Building and Mechanical Code will need to be submitted.An approval and comments will also be required from Eaton Fire District for either system. 2006 International Building Code [F] 416.2 Spray rooms. Spray rooms shall be enclosed with fire barriers with not less than a 1-hour fire-resistance rating. Floors shall be waterproofed and drained in an approved manner. [F] 416.2.1 Surfaces. The interior surfaces of spray rooms shall be smooth and shall be so constructed to permit the free passage of exhaust air from all parts of the interior and to facilitate washing and cleaning, and shall be so designed to confine residues within the room. Aluminum shall not be used. [F] 416.3 Spraying spaces. Spraying spaces shall be ventilated with an exhaust system to prevent the accumulation of flammable mist or vapors in accordance with the International Mechanical Code. Where such spaces are not separately enclosed, noncombustible Spray curtains shall be provided to restrict the spread of flammable vapors. F] 416.3.1 Surfaces. The interior surfaces of spraying spaces shall be smooth and continuous without edges; shall be so constructed to permit the free passage of exhaust air from all parts of the interior and to facilitate washing and cleaning; and shall be so designed to confine residues within the spraying space.Aluminum shall not be used. 2006 International Mechanical Code 502.1 General. An exhaust system shall be provided, maintained and operated as specifically required by this section and for all occupied areas where machines,vats, tanks, furnaces,forges, salamanders and other appliances,equipment and processes in such areas produce or throw off dust or particles sufficiently light to float in the air,or which emit heat, odors, fumes, spray,gas or smoke, in such quantities so as to be irritating or injurious to health or safety. 502.1.3 Equipment, appliance and service rooms. Equipment, appliance and system service rooms that house sources of odors, fumes, noxious gases, smoke, steam, dust, spray or other contaminants shall be designed and constructed so as to prevent spreading of such contaminants to other occupied parts of the building. Frank Piacentino Plans Examiner II Weld County Building Inspection 970-353-6100 Ext 3531. • 1 iB4 ' ?Ji Y: Elp__C1J N ' Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: De Simpson [mailto:ch.excavation@yahoo.com] Sent: Wednesday, August 31, 2011 11:20 AM To: Chris Gathman Subject: RE: C&H Excavation - Painting permit We are currently in the process of researching paint booths. We would like to move the painting back inside. From: Chris Gathman [mailto:cgathman@co.weld.co.us] Sent: Wednesday, August 31, 2011 11:11 AM To: De Simpson Subject: RE: C&H Excavation- Painting permit Thanks De. I forwarded this information to our Health Department and will add this to Our USR file. I had one question/clarification: Will the painting be conducted both in and outside of the existing building. Or will it be conducted outside only? Thanks! Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue,Greeley CO. 80631 Ph:(970)353-6100 ext.3537 Fax: (970)304-6498 lie ; ]0 1 1 Ei{?....C tt�jN Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: De Simpson [mailto:ch.excavation@yahoo.com] Sent:Tuesday,August 30, 2011 3:27 PM To: Chris Gathman 2 Cc: Bill Hall Subject: C&H Excavation - Painting permit �r. Gatham, Attached please find our painting permit submitted to the Colo Dept of Public Health & Environment on 8-17-11. Your attachment includes our cover letter (1 pg), completed APEN permit (3 pgs) and the Non-Criteria Reportable Air Pollutant Emission Notice Addendum. Also for your convenience I have included the following information: - During a 30 day time frame when we are painting the cross over stairs we use approximately 17.5 gallons of paint p/month and approximately 4 days p/month - We use an Electrostatic Spray gun so the over spray and loss of paint is minimal - Also, the amount of space between our cross over stairs and our neighbor to the north of us is approximately 350 ft - Also, there is a building between our cross over stairs and the neighbor to the north of us - Also, Phil Brewer, Environmental Specialist III,WC Dept of Public Health and Environment, has instructed C&H not to impede our business whatsoever while waiting to hear back on our painting permit from the State of Colorado - This gentleman to the north of us continues to trespass and harass our company in order to obtain pictures of our property In closing, you also need to know that during the months of April, May,June and the first three weeks of July of this year we did not paint any stairs at all. If you have any questions please feel free to contact us, we look forward to working with WC Planning Services to rectify this opportunity we are dealing with. ire Simpson Office Manager C&H Excavation, LLC (970) 515-7693 Office (970) 515-7694 Fax (970) 371-0772 Cell WARNING: This message, and any attachments, are intended only for the use of the individual or entity to which it is addressed and may contain information that is privileged, confidential and exempt from disclosure under applicable law. If the reader of this message is not the intended recipient or employee/agent responsible for delivering the message to the intended recipient,you are hereby notified that any dissemination, distribution or copying of the communication is strictly prohibited. If you receive this communication in error, please notify me immediately. • 3 r t � -> .r..4, i1 LP zr ihil ,. .4 i � . If1 vi - sa-4q 4 S. � • • �♦ a S. ' V *' f - A f4t• '6.; ...:;, I l al c'1 f > ♦ . .1_ . r ' J - A� f a • . / i < . I • __ ♦ V . I i ' I .� - . • ♦ n I 1- •: i -"I�1 - ,�: t •♦ - . y < • r f ♦ s"--1.' f Ft i • .1.;, J4 -r - S r 1• , • e1 • • . ' d f . _-.- T s ill ♦ If[ I1 � � 1 I .. _ . • P. 1.)I A R. Nit AFM Timberline Office 2025 Bighorn Road Fort Collins,CO 80525 • Patient: Patsy E. Deines DOB: 10/09/1951 DOS: 09/06/2011 Provider: Timothy P. Podhajsky MD 09/06/2011 Patsy Deines 41474 Weld Cnty Rd 33 Ault, CO 80610 DOB: Oct 91951 To Whom it May Concern: Mrs. Patsy Deines is a 59 year old female with a known history of migraines. Her migraines are triggered by exposures to chemicals, including paint spray. I would suggest Mrs. Deines avoid exposure to environmental chemicals as much as possible to prevent ongoing problems with migraine headaches. Please feel free to contact me at • (970) 229-9800 if any questions arise. Sincerely, Timothy PodhajsRy, MD • EXHIBIT I (n• G STATE OF COLORADO • John W.HicE. per,Governor pF Co Christopher E.Urbina,MD,MPH ,v4 Executive Director and Chief Medical Officer q, R_ . 5 Dedicated to protecting and improving the health and environment of the people of Cobrado ..'yt - . 4300 Cherry Creek Dr.S. Laboratory Services Division •rasa• Denver,Colorado 80246-1530 8100 Lowry Blvd. Phone(303)692-2000 Denver,Colorado 60230-6928 Colorado Department Located In Glendale,Colorado (303)692-3090 of Public Health http://www.cdphe state.co.us and Environment September 27,2011 Cliff Simpson C&H Excavation,LLC PO Box 211 Ault,CO 80610 Re: Permit#11WE2043 Dear Applicant: The Colorado Air Pollution Control Division has received and logged in your construction permit application for metal parts coating at the 41450 County Road 33 facility in Weld County. Your application has been assigned permit number 11WE2043 E2043 and is now ready for initial review. If you should have any questions conceming the status of your permit application,please contact me at 303.692.2285. When calling, please reference the permit number listed above. You can also research the status of your application online at http://www.cdphe.state.co.uslaplsslssPCPthhN. The next step in processing your construction permit application is to determine if all of the information we need is contained within your application. If so,we will begin our preliminary engineering analysis. If any information is missing, however,we will contact you in the near future to obtain the needed material. State law requires that the Division determine the completeness of an application within 60 days of receipt. If you do not • hear from the Division by 10/21/2011,you can assume that your application is complete. Sincerely. Paul Rusher Construction Permit Unit EXHIBIT • I (o. H USE.- -7 85 Hello