HomeMy WebLinkAbout20111313.tiff • s 6 2 Weld County Referral
RECEIVED
16 February_
WE L DDe O T Y MAR 0 22011 �n ��_ .II � �
� \ ,
. 1-si Weld County Planning Department
GREELEY OFFICE • FEB 1 1
The Weld County Department of Planning Services has received the following ite for r1vjew N p',5LIC ,�,""
Applicant Dewain Shapley Trust Case Number l USR-1777
Please Reply By March 16, 2011 Planner Michelle Martin
Project A Site Specific Development Plan and Use by Special Review Permit for a
Telecommunication Antenna Tower(250 foot cellular tower) in the A (Agricultural)
Zone District.
Legal S2 of Section 25, T10N, R57W of the 6th P.M., Weld County, Colorado.
Location West of and adjacent to State Hwy 71; north of and adjacent to CR 112.
Parcel Number 0283 25 000007
The application is submitted to you for review and recommendation. Any comments or recommendation
• you consider relevant to this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this
date may be deemed to be a positive response to the Department of Planning Services. If you have any
further questions regarding the application, please call the Planner associated with the request. Please
note that new information may be added to applications under review during the review process.
If you desire to examine or obtain this additional information, please call the Department of
Planning Services.
You will be notified in writing of the Planning Commission date once the date is determined.
U We have reviewed the request and find that it does/does not comply with our Comprehensive Plan
because
�❑,,,// We have reviewed the request and find no conflicts with our interests.
SV' See attached letter.
Comments:
Signature L' Date a - a 8- (-)//
Agency -P1r1/,
• EXHI IT
+Weld County Planning Dept. 41555 N 17'"Ave, Greeley, CO.80631 +(970)353-6100 ext.35.. 1
2011-1313
•
• MEMORANDUM
TO: Michelle Martin, Planning Services DATE: February 24, 2011
WIiDcFROM: Donald Carroll, Engineering Administrator
COLORADO SUBJECT: USR-1777, Dewain Shapley Trust
The Weld County Public Works Department reviewed the submitted application for critical items,
including but not limited to Site Plan, Traffic Study, Preliminary Drainage Report, Geotechnical
Soils Report, and Flood Hazard Development Permit. A detailed review of these items was not
complete at this step in process. Comments made during this stage of the review process will
not be all inclusive, as revised materials are submitted other concerns or issues may arise. All
issues of concern and critical issues during further review must be resolved with the Public
Works Department.
COMMENTS:
Section Line Access: (right-of-way) State Highway 71 and WCR 112
Telecommunication Antenna Tower (250-foot cellular tower)
• REQUIREMENTS:
The access width requirements for emergency equipment (fire department) are a minimum of 20
feet. The applicant indicated that it has been cleared with the fire department and emergency
services that the width and weight capacity of the access lane shall be adequate for emergency
purposes. The applicant shall provide documentation to that effect
No traffic study is required.
Show a 30-foot right-of-way in Section 25, T10N, R57W, Book 86, Page 273 on the south side
of Section 25.
The Colorado Department of Transportation (CDOT) has jurisdiction over all accesses to the
state highways. Please contact Gloria Hice-Idler at the Greeley office (970-350-2148 or 970-
350-2163) to verify the access permit or for any additional requirements that may be needed to
obtain or upgrade the permit. (State Highway 71)
The easement shall be a graded and drained road to provide an all-weather access.
Flood Hazard Development Standards: This area is not in a Special Flood Hazard Area
(SFHA) as determined by the Federal Emergency Management Agency (FEMA).
pc: USR-1777
• M:\PLANNING-DEVELOPMENT REVIEW\USR-Use by Special Review\USR-1777\USR-1777.docx
•
rectiz..
MEMORANDUM
ITO: Michelle Martin, W.C. Planning Services
CFROM: Mary Evett, Environmental Health Services
• SUBJECT: USR-1777 Verizon Wireless (Dewain Shapley)
COLORADO
DATE: March 14, 2011
Environmental Health Services has reviewed this proposal for a 250 foot wireless
communications tower, including a 11'8" x 26' equipment shelter. As no employees will
be located at the site, permanent water and sewer is not required. Portable toilets and
hand washing units can be utilized during construction of the tower. Bottled water is
sufficient for drinking provisions during construction.
We have no objections to the proposal; however, we do recommend that the following
conditions be part of any approval:
• We recommend that the following requirements be incorporated into the permit as
development standards:
1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and
Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for
final disposal in a manner that protects against surface and groundwater
contamination.
2. No permanent disposal of wastes shall be permitted at this site. This is not
meant to include those wastes specifically excluded from the definition of a solid
waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.,
as amended.
3. Waste materials shall be handled, stored, and disposed in a manner that controls
fugitive dust, fugitive particulate emissions, blowing debris, and other potential
nuisance conditions.
4. Fugitive dust and fugitive particulate emissions shall be controlled on this site.
5. This facility shall adhere to the maximum permissible noise levels allowed in the
Non-Specified Zone as delineated in Section 14-9-30 of the Weld County Code.
• 6. Bottled water shall be utilized for drinking during construction of the project.
• 7. Adequate toilet facilities (portable toilets) and hand washing units shall be
provided during construction of the facility.
8. If applicable, the applicant shall obtain a stormwater discharge permit from the
Colorado Department of Public Health & Environment, Water Quality Control
Division.
9, The operation shall comply with all applicable rules and regulations of State and
Federal agencies and the Weld County Code.
•
•
2
I 8 6 I - 2011 DEPARTMENT OF PLANNING SERVICES
• BUILDING INSPECTION DIVISION
1555 N. 17TH AVENUE
GREELEY, CO 80631
WELD. -COUNTY
970-353-6100 EXT 3540
FAX 970-304-6498
kswanson(aco.weld.co.us
Date: March 9, 2011
Applicant: Dewain Shapley Trust
Project: A Site Specific Development Plan and Use by Special Review Permit for a
Telecommunication Antenna Tower (250 foot cellular tower) in the A (Agricultural) Zone District.
Case Number: USR-1777
Parcel Number: 0283 25 000007
1. Building permits are required for buildings, structures and towers which required permits before
• the beginning of construction.
2. Buildings, structures and towers shall conform to the requirements of the various codes
adopted at the time of acceptance of the permit application. Currently the following codes have
been adopted by Weld County: 2006 International Building Code; 2008 National Electrical Code;
and Chapter 29 of the Weld County Code.
Regards,
Ken Swanson
Weld County Building Official
970-353-6100 ext. 3548
•
Michelle Martin
From: Kristine Ranslem
"pent: Tuesday, February 22, 2011 9:07 AM
o: Michelle Martin
Subject: FW: USR-1777 Referral
FYI - see comments below.
Kristine Ranslem
Planning Technician
Weld County Planning Services
1555 N 17th Ave, Greeley CO 80631
970-353-6100 ext. 3519
Original Message
From: Marsha.Hofer@faa.gov [mailto:Marsha.Hofer@faa.gov]
Sent: Tuesday, February 22, 2011 9:00 AM
To: Kristine Ranslem
Subject: Fw: USR-1777 Referral
The FAA reviews planning and construction proposals through the submittal
of FAA Form 7460-1, Notice of Proposed Construction or Alteration. If any
portion of the proposal is located within 20,000 feet of a public use
runway (and breaks a 100:1 plane coming off the nearest point of the
nearest runway); or, is more than 200 feet above ground level at any
location, the FAA requires the project's proponent to file a Form 7460-1.
If the proposal does not meet any of the criteria above, it may still be
•necessary to file a Form 7460-1 if the structure requires an FCC license.
The FAA uses information provided on this form to conduct an airspace
analysis to determine if the proposal will pose an aeronautical hazard and
to minimize the adverse effects to aviation. FAA Form 7460-1 can be filed
electronically at www.oeaaa.faa.gov. This website also has a tool to
assist the proponent in determining whether or not they must file.
If you have questions regarding this mater, please call me.
Marsha Hofer
Program Specialist
Denver Airports District Office
(303) 342-1251
(303) 342-1260 (fax)
Forwarded by Marsha Hofer/ANM/FAA on 02/22/2011 08:59 AM
From: Linda Bruce/ANM/FAA
ANM-DEN-ADO, Denver, CO
To: Marsha Hofer/ANM/FAA@FAA
Date: 02/22/2011 08:53 AM
• Subject: Fw: USR-1777 Referral
1
Hello