Loading...
HomeMy WebLinkAbout20112646.tiff • Exhibit F Evidence of Adequate Water Supply During construction, the contractor will be required to provide drinking water. DCP meet with Mr. John Zadel, General Manager, and Mr. Stan Linker, Operations Manager,for the Central Weld County Water District regarding the District's ability to supply potable water for the proposed La Salle Gas Plant. At this time it is not anticipated that there will be any issues. DCP is in the process of applying for a water tap. DCP has also checked with the Northern Colorado Water Conservancy District to confirm whether or not the property has been included in their district and in the Municipal Sub- district. The property has been included in the area covered by the Colorado Big Thompson project, but not in the Municipal Sub-district. DCP will partition for inclusion once ownership of the property has been transferred to DCP. • • 2011-2646 • Exhibit G Evidence of Adequate Sewage Disposal During construction the contractor will be required to provide and maintain sanitary facilities. Post-construction, a septic system will be used. A company has been hired to design the system and will be applying for the permit prior to construction. • • Hello