Loading...
HomeMy WebLinkAbout20110899.tiff Esther Gesick From: Kim Ogle Sent: Friday, April 01, 2011 1:28 PM To: Esther Gesick Cc: Christie Peters Subject: FW: 4th AmUSR-877 - Longmont Distel - Hours Variance Attachments: 110331_Distel Hours Variance Itr-Weld Co.pdf Please add to file, thanks! Please let me know if you have any questions. Kim Kim Ogle Planner III Department of Planning 1555 North 17th Avenue Greeley, Colorado 80631 Direct: 970.353.6100 x 3549 Office: 970.353.6100 x 3540 Facsimile:970.304.6498 ' 84 2 I W 'C t.7 N 7Y u Confidentiality Notice:This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Connie.Davis@aqgregate-us.com fmailto:Connie.Davis@aggregate-us.comj Sent: Thursday, March 31, 2011 4:37 PM To: Kim Ogle Cc: Bethany Salzman; Mike.Refer@aggregate-us.com; Wes.Stearns@aggregate-us.com; Mike.Alteraott@aggregate- us.com; Rob.Wise@aggregate-us.com; Lu.Toxvard@aggregate-us.com;jim.lonnberg@aggregate-us.com; Ernie.Chastain@aggregate-us.com Subject: 4th AmUSR-877 - Longmont Distel - Hours Variance Hello Kim -attached is a letter of notification regarding a temporary variance from the Longmont Distel USR permit limitation of daylight hours of operation to accommodate a public works project on 1-25, which requires night operation of the Longmont asphalt plant and hauling of asphalt and aggregate material to the job site. The project is projected to commence around April 24. The original hard copy of this notice is being mailed to you. Please let me know if you have any questions or need additional information. Thanks- Connie N. Davis, Land Advisor Aggregate Industries-WCR, Inc. 2011-0899 Cmimu,ri/WI MS '-f/W" t pL.04Log Phone: (970) 396-5252 P. O. Box 337231, Greeley, CO 80633 2 March 31, 2011 Mr. Kim Ogle We ld County Planning Services 1555 North 17"' Avenue Greeley,CO 8063 I AGGREGATE Re: Temporary Variance-Flours of Operation INDUSTRIES 4"'AmUSR877— Longmont Distel Operations Dear Kim: Aggregate Industries(Al) has been awarded the contract for Colorado Department of Transportation (CDOT) Project No. IM 0253-216.as noted in the enclosed notice of award from CDOT dated January 25. 2011. The project includes rbbilization, asphalt paving, shouldering and other associated work on portions of 1-25 in Weld County as noted below. which requires mandatory night work in order to maintain the least disruption to traffic flow. In order to accommodate the terms of this public works project. Al needs to exercise a temporary'variance from the Longmont Distel USR permit limitation of daylight hours of operation to allow night operation of the asphalt plant.truck loading and hauling of material to the project site. The following provides summary information related to this project: CDOT Project: IM 0253-216 General Contractor: Aggregate Industries-W'CR, Inc. Project Location: 1-25 — MP 249.4-MP 250.4: I-25 -- MP 252.2 to MP 252.3: 1-25 —MP 256.6-257.8 Project Description: Rubblization. asphalt paving, shouldering, median embankment, cable barrier replacement. guardrail replacement. erosion control, seeding. edge drains, and restriping. Project Dates(apx.): April 24, 2011 through October 31. 2011 Estimated Tons: 111W— 31.913 tons SMA — 11.781 tons Class 6 Base— 12.946 tons Filter Rock - 558 tons Natural Fines — 14.000 tons Night Truck Haul: Approximately 50 round-trip truck trips/night. Project includes hackhaul of concrete and asphalt millings. Night Plant Operation: It is estimated that the hot plant will run at night for 4 or more hours. Contacts: CDOT: Scott Ellis. Resident Engineer-(970)622-1267 Miranda Lange. Project Engineer- (970)622-1285 Aggregate Industries: Mike Altergott, Project Manager-(303) 716-5368: Cell-(303)435-2068 Rob Wise, Project Manager—(303) 716-5333: Cell (303) 570-2168 Ernie Chastain. Project Superintendent -(303)472-3967 Paving is to be conducted generally between 9:00 p.m. and 5:00 a.m., with possible weekend operations if Aggregate Industries West Central Region,Inc. 1707 Cole Blvd.. Suite 100 Golden, CO 80401 An Equal Opportunity Employer Telephone:303-985-1070 9 AGGREGATE INDUSTRIES Mr.Kim Ogle. Weld Count> Planning Services March 31.20I I Page Two required by CDOT. Approximately 1200 tons of asphalt per night will be processed. Asphalt and/or aggregate material will be loaded out and hauled to the project site. requiring approximately 50 round-trip truck hauls per night. Operation of the hot plant will include use of a loader to feed the plant. and on nights when aggregate materials are hauled to the site, a loader will be used to load out from stockpiled material to haul trucks. Al does not propose deviation from the primary haul route designated in the permit for the plant. The primary haul route from the Longmont Distel plant is Weld County Road 20-1/2 east to Weld County Road 7. then north on Weld County Road 7 to Hwy. 119. Al has entered into road maintenance and improvements agreements with Weld County Public Works which include long-term repairs and maintenance of the designated haul routes and Al is committed to continued adherence to the terms of those agreements. If you have any questions or need any additional information please contact me at(970)396-5252. Inquiries regarding this project may also be directed to the project contacts as listed above. Very truly yours. Connie N. Davis Land Advisor Enclosures Ec: Bethany Salzman. Weld County Planning Aggregate Industries— Mike Refer Wes Stearns Mike Altergott Rob Wise Ernie Chastain Jim Lonnberg Lu Toxvard STATE OF COLORADO DEPARTMENT OF TRANSPORTATION 7`) P OT Contracts and Market Analysis Branch IM 0253-216 —.- 4201 East Arkansas Avenue,4°Floor 1Q5 Ri°°ir"u°"34 South Gips Denver,Colorado 80222 Project Code 17843 Telephone(303)757-9738 Facsimile(303)757-9888 January 25,2011 Aggregate Industries-WCR,Inc. 1707 Cole Blvd.,Suite 100 Golden,CO 80401 This is confirming notice, for record, that on January 25, 2011 you were awarded the contract for the construction of project IM 0253-216,on the basis of the bid as submitted. At the bid opening briefing held on January 13, 2011, the following people were present: Jill Sweeney, Mike Attergott. The work and the contract time will commence as authorized in writing by the Chief Engineer in the"Notice to Proceed". No work is to begin until the "Notice to Proceed" is received from the Department of Transportation. If contract item 625 and/or 629 were a part of your bid proposal for this project, surveyors and/or Engineers' Professional Liability insurance is required for the amount of not less than $1,000,000 in the aggregate, as indicated in subsection 107.15, fourth paragraph of the Standard Specifications for Road and Bridge Construction. See the specifications for additional insurance requirements which includes,but are not limited to: shop drawings, mix designs, contractor performed design work, change orders, and approved value engineering change proposals. A pre-construction conference will be set by the resident engineer. Glenn Frieler is the Resident Engineer on the project. Sincerely yours, RICHARD OTT Award Officer In accordance with the Aggregate Industries Distel Pit regulations, all drivers must abide by the following: The loader has the right-of-way. There is a 15-mph speed limit anywhere within the Distel Operation. While in the pit, drivers must not get out of their truck unless absolutely necessary, and then a hardhat and reflector vest must be worn. When a truck is in loading position, under no circumstance should a driver get out of his/her truck Do not tarp or do paperwork in the pit or on the scale. If you need to, do so in the tarping area south of the scale. Drivers must come to a complete stop before entering onto the scale. Approach and exit the scale slowly. Trucks must be maintained to DOT operating standards All trucks must have operating back-up alarms No truck will be allowed into the pit after hours without specific authorization The use of jake brakes is not permitted in the pit If you are a visitor in any other type of vehicle, you must check in with the scale house before entering the pit, and a hardhat, reflector vest and vehicle beacon must be used. If drivers do not adhere to these regulations, it could result in a suspension from the pit. Thank you for your cooperation. Hello