Loading...
HomeMy WebLinkAbout20113156.tiff TO 11W OF Gllcres t RA//I COLO DO Leaning Toward the Future 304 8`t' Street •PO Box 128 • Gilcrest. Colorado 80623 •(970) 737--2426 •(970) 737=2427—FAX December 5, 2011 Dick Wolfe State Engineer Colorado Division of Water Resources 1313 Sherman Street, Room 821 Denver, CO 80203 Dear Mr. Wolfe; As you know, the Town of Gilcrest is experiencing difficulties in the operation of our Wastewater Treatment facility. These difficulties have been created by groundwater that has no historical precedent. With assistance from your permitting section, we have been able to construct a temporary solution which we hope will stem the problem in the short-term. As we are a small community, our fiscal resources are quite limited. The short-term solution will require approximately $21,000 to construct and it is unknown what the electrical utility costs will be to run the pumps necessary to expel the water to the South Platte River. Our ability to hire engineering assistance is non-existent. Therefore, we hope to work with you and your staff in reviewing this situation and to determine a long-term solution. To this end, we would like to meet with you and your staff to discuss how best to address our concerns. We would like to meet prior to the end of the year in order to understand what and how you might be able to assist. Thank you for your attention to this request and we look forward to working with you in the future. Sincerely, Linda Martin Town Administrator cc: Mayor Warne and Gilcrest Board of Trustees Weld County Commissioners , Weld County Sheriff Don Sandoval, Department of Local Affairs tPnm1:U'u QCt c-\O'T la-la- I 1 P( , rw 2011-3156 /6)- 9- 11 Hello