Lc° Federal Emergency Management Agency
.°F 4 Washington, D.C. 20472 WELD COUNTY
`4No SE August 9, 2012 COMMISSIONERS
all AUG 15 A 10: 51
CERTIFIED MAIL IN REPLY REFER TO:
RETURN RECEIPT REQUESTED Case No.: 12-08-0097R RECEIVED
Community Name: Weld County,CO
The Honorable Sean Conway Community No.: 080266
Chairman,Weld County
County Commissioners
Post Office Box 758
Greely, CO 80632
Dear Mr.Conway:
We are providing our comments with the enclosed Conditional Letter of Map Revision (CLOMR)on a proposed
project within your community that,if constructed as proposed,could revise the effective Flood Insurance Study report
and Flood Insurance Rate Map for your community.
If you have any questions regarding the floodplain management regulations for your community,the National Flood
Insurance Program(NFIP) in general,or technical questions regarding this CLOMR,please contact the Director,
Mitigation Division of the Federal Emergency Management Agency(FEMA)Regional Office in Denver,Colorado,at
(303)235-4830,or the FEMA Map Information eXchange(FMIX)toll free at 1-877-336-2627(1-877-FEMA MAP).
Additional information about the NFIP is available on our website at http://www.fema.gov/nfip.
Sincerely,
)/14(.__H F Cia--
Erin E. Cobb,CFM,Program Specialist For: Luis Rodriguez,P.E., Chief
Engineering Management Branch Engineering Management Branch
Federal Insurance and Mitigation Administration Federal Insurance and Mitigation Administration
List of Enclosures:
Conditional Letter of Map Revision Comment Document
cc: (see attached list)
1�S CC GCMi PL , PIA)
I- -12
cc-- IS 12_ gfrilla 2012-2199
Courtesy Copy List-Weld County,CO
The Honorable Dick McLean
Mayor, City of Brighton
Mr. Clayton Kimmi,P.E.,CFM
Drainage& Floodplain Engineer
Weld County Public Works
Ms. Catherine R. Gerali
District Manager
Metro Wastewater Reclamation District
Ms.Heather D. Hilgers, P.E.
Project Engineer
Jacobs
Page 1 of 6 Issue Date:August 9,2012 Case No.: 12-08-0097R CLOMR-APP
VARl y'
O
tea
,e Federal Emergency Management Agency
e Washington, D.C. 20472
':',.'"eavD ,c.9,-
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT
COMMUNITY INFORMATION PROPOSED PROJECT DESCRIPTION BASIS OF CONDITIONAL REQUEST
FILL HYDRAULIC ANALYSIS
Weld County NEW TOPOGRAPHIC DATA
Colorado FLOODWAY
(Unincorporated Areas)
COMMUNITY
COMMUNITY NO.: 080266
Northern Treatment Plant-South Platte APPROXIMATE LATITUDE&LONGITUDE: 40.006,-104.822
IDENTIFIER SOURCE: USGS QUADRANGLE DATUM: NAD 83
AFFECTED MAP PANELS
TYPE: FIRM` NO.: 0802660995C DATE: September 28, 1982 *FIRM-Flood Insurance Rate Map
FLOODING SOURCE(S)AND REACH DESCRIPTION
South Platte River—from approximately 5,260 feet downstream of Weld County Road 2(WCR 2)to just downstream of WCR 2
PROPOSED PROJECT DESCRIPTION
Flooding Source Proposed Project Location of Proposed Project
South Platte River Fill Placement From approximately 3,940 feet downstream of WCR 2 to just downstream of
WCR 2
SUMMARY OF IMPACTS TO FLOOD HAZARD DATA
Flooding Source Effective Flooding Proposed Flooding Increases Decreases
South Platte River Zone A Zone AE Yes Yes
No Floodway Floodway Yes None
No BFEs* BFEs Yes None
*BFEs-Base(1-percent-annual-chance)Flood Elevations
COMMENT
This document provides the Federal Emergency Management Agency's(FEMA's)comment regarding a request for a CLOMR for the project described above.
This document is not a final determination;it only provides our comment on the proposed project in relation to the flood hazard information shown on the effective
National Flood Insurance Program(NFIP)map. We reviewed the submitted data and the data used to prepare the effective flood hazard information for your
community and determined that the proposed project meets the minimum floodplain management criteria of the NFIP. Your community is responsible for
approving all floodplain development and for ensuring that all permits required by Federal or State/Commonwealth law have been received. State/Commonwealth,
county,and community officials,based on their knowledge of local conditions and in the interest of safety, may set higher standards for construction in the Special
Flood Hazard Area(SFHA),the area subject to inundation by the base flood. If the State/Commonwealth,county,or community has adopted more restrictive or
comprehensive floodplain management criteria,these criteria take precedence over the minimum NFIP criteria.
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)toll
free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http//www.fema.gov/nfip.
Erin E.Cobb,CFM,Program Specialist
Engineering Management Branch
Federal Insurance and Mitigation Administration 125360 PT202.BKR.12080097R.H17 104
Page 2 of 6 Issue Date:August 9,2012 Case No.: 12-08-0097R CLOMR-APP
n�r:a.Seri,
'ViU''J: Federal Emergency Management Agency
'o " Washington, D.C. 20472
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
OTHER COMMUNITIES AFFECTED BY THIS CONDITIONAL REQUEST
CID Number: 080004 Name: City of Brighton, CO
AFFECTED MAP PANELS
TYPE: FIRM* NO.: 0802660995C DATE: September 28,1982
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)toll
tree at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http://ww.v.fema.gov/nfp.
t , ?..f/4< (.. („4-d-- -
Erin E.Cobb,CFM,Program Specialist
Engineering Management Branch
Federal Insurance and Mitigation Administration 125360 PT202.BKR.12080097R.H17 104
Page 3 of 6 Issue Date:August 9,2012 Case No.: 12-08-0097R CLOMR-APP
O�'VP RT4i• ,.:
',.
Federal Emergency Management Agency
UWashington, D.C. 20472
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION
To determine the changes in flood hazards that will be caused by the proposed project,we compared the hydraulic modeling reflecting the proposed
project(referred to as the proposed conditions model)to the hydraulic modeling reflecting the existing conditions.
The table below shows the changes in the base flood water-surface elevations(WSELs).
Base Flood WSEL Comparison Table
Flooding Source:South Platte River Base Flood WSEL Location of maximum change
Change(feet)
Proposed vs. Maximum increase 0.02 Approximately 3,050 feet downstream of WCR 2
Existing Maximum decrease 0.03 Approximately 860 feet downstream of WCR 2
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)tall
free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http://www.fema.gov/nfip.
C' /2
Erin E.Cobb,CFM,Program Specialist
Engineering Management Branch
Federal Insurance and Mitigation Administration 125360 PT202.BKR.12080097R.H17 104
Page 4 of 6 Issue Date:August 9,2012 Case No.: 12-08.0O97R CLOMR-APP
.' Federal Emergency Management Agency
�y� ,e,
UWashington, D.C. 20472
` `:1.vo svw:
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION (CONTINUED)
DATA REQUIRED FOR FOLLOW-UP LOMR
Upon completion of the project,your community must submit the data listed below and request that we make a final determination on
revising the effective FIRM and FIS report. If the project is built as proposed and the data below are received,a revision to the FIRM and
FIS report would be warranted.
•Form 1,entitled"Overview&Concurrence Form." Detailed application and certification forms must be used for requesting final
revisions to the maps. Therefore,when the map revision request for the area covered by this letter is submitted,Form 1 must be included.
If as-built conditions differ from the proposed plans,please submit new forms,which can be accessed at
http://www.fema.gov/plan/prevenUfhm/dl_mt-2.shtm,or annotated copies of the previously submitted forms showing the revised
information.
•Hydraulic analyses, for as-built conditions,of the base flood and the regulatory floodway,together with a topographic work map showing
the revised floodplain and floodway boundaries.Please ensure that the revised information ties in with the current effective information at
the downstream and upstream ends of the revised reach.
•An annotated copy of the FIRM,at the scale of the effective FIRM,that shows the revised floodplain and floodway boundary delineations
shown on the submitted work map and how they tie into the floodplain and floodway boundary delineations shown on the current effective
FIRM at the downstream and upstream ends of the revised reach.
•As-built plans,certified by a registered professional engineer,of all proposed project elements.
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)toll
free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http'.//www.fema.gov/nfip.
Erin E.Cobb,CFM,Program Specialist
Engineering Management Branch
Federal Insurance and Mitigation Administration 125360 PT202.BKR.12080097R.H17 104
Page 5 of 6 Issue Date:August 9,2012 Case No.: 12-08-0097R CLOMR-APP
p.aRfy
Air
`�
t, Federal Emergency Management Agency
� `
° Washington, D.C. 20472
F!"U N) S .
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION (CONTINUED)
•A copy of the public notice distributed by your community,stating its intent to revise the regulatory floodway,or a signed statement by
your community that it has notified all affected property owners and affected adjacent jurisdictions.
•Documentation of the notification to property owners who will be affected by any widening/shifting of the base floodplain and/or any
BFE increases along South Platte River.
•A letter stating that your community will adopt and enforce the modified regulatory floodway,OR,if the State/Commonwealth has
jurisdiction over either the regulatory floodway or its adoption by your community,a copy of your community's letter to the appropriate
State/Commonwealth agency notifying it of the modification to the regulatory floodway and a copy of the letter from that agency stating its
approval of the modification.
•FEMA's fee schedule for reviewing and processing requests for conditional and final modifications to published flood information and
maps can be accessed at http://www.fema.gov/plan/prevent/Ihm/frin_fees.shtm. The fee at the time of the map revision submittal must be
received before we can begin processing the request. Payment of this fee can be made through a check or money order,made payable in
U.S. funds to the National Flood Insurance Program,or by credit card(Visa or MasterCard only). Please forward the payment,along with
the revision application,to the following address:
LOMC Clearinghouse
847 South Pickett Street
Alexandria, VA 22304
After receiving appropriate documentation to show that the project has been completed,FEMA will initiate a revision to the FIRM and FIS
report. Because the flood hazard information(i.e.,BFEs,base flood depths, SFHAs,zone designations,and/or regulatory floodways)will
change as a result of the project,a 90-day appeal period will be initiated for the revision,during which community officials and interested
persons may appeal the revised flood hazard information based on scientific or technical data.
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information exchange(FMIX)toll
free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http://www.fema.gov/nfip.
Erin E.Cobb,CFM,Program Specialist
Engineering Management Branch
Federal Insurance and Mitigation Administration 125360 PT202.BKR.12080097R.H17 104
Page 6 of 6 Issue Date:August 9,2012 Case No.: 12-08-0097R CLOMR-APP
y ':.c;''
Federal Emergency Management Agency
Washington, D.C. 20472
' Heo
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION (CONTINUED)
COMMUNITY REMINDERS
We have designated a Consultation Coordination Officer(CCO)to assist your community. The CCO will be the primary liaison between
your community and FEMA. For information regarding your CCO,please contact:
Ms.Jeanine D.Petterson
Director,Mitigation Division
Federal Emergency Management Agency,Region VIII
Denver Federal Center,Building 710
Post Office Box 25267
Denver,CO 80225-0267
(303)235-4830
Although a portion of the proposed area of revision is shown on the effective FIRM as located within the unincorporated areas of Weld
County,this area has been annexed by the City of Brighton.
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)toll
free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http://www.femagovinfip.
( ),LL. r bG tr-
Erin E.Cobb,CFM,Program Specialist
Engineering Management Branch
Federal Insurance and Mitigation Administration 125360 PT202.BKR.12080097R.H17 104
tvART4
Atalit° Federal Emergency Management Agency
9 4. Washington, D.C. 20472
�{4N0 StC August 9, 2012
CERTIFIED MAIL IN REPLY REFER TO:
RETURN RECEIPT REQUESTED Case No.: 12-08-0097R
Community Name: City of Brighton,CO
The Honorable Dick McLean Community No.: 080004
Mayor, City of Brighton
500 South 4th Avenue
Brighton, CO 80601
Dear Mayor McLean:
We are providing our comments with the enclosed Conditional Letter of Map Revision(CLOMR)on a proposed
project within your community that,if constructed as proposed,could revise the effective Flood Insurance Study report
and Flood Insurance Rate Map for your community.
If you have any questions regarding the floodplain management regulations for your community,the National Flood
Insurance Program(NFIP)in general,or technical questions regarding this CLOMR, please contact the Director,
Mitigation Division of the Federal Emergency Management Agency(FEMA)Regional Office in Denver,Colorado,at
(303)235-4830, or the FEMA Map Information eXchange(FMIX)toll free at 1-877-336-2627(1-877-FEMA MAP).
Additional information about the NFIP is available on our website at http://www.fema.gov/nfip.
Sincerely,
Erin E. Cobb,CFM, Program Specialist For: Luis Rodriguez,P.E.,Chief
Engineering Management Branch Engineering Management Branch
Federal Insurance and Mitigation Administration Federal Insurance and Mitigation Administration
List of Enclosures:
Conditional Letter of Map Revision Comment Document
cc: (see attached list)
• Courtesy Copy List-City of Brighton,CO
The Honorable Sean Conway
Chairman,Weld County
County Commissioners
Mr.James M.Landeck,P.E.
City of Brighton
Ms. Catherine R. Gerali
District Manager
Metro Wastewater Reclamation District
Ms. Heather D.Hilgers,P.E.
Project Engineer
Jacobs
Page 1 of 6 Issue Date:August 9,2012 Case No.: 12-08-0097R CLOMR-APP
nyvP RTA
Federal Emergency Management Agency
4' Washington, D.C. 20472
71 ry➢ SEC
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT
COMMUNITY INFORMATION PROPOSED PROJECT DESCRIPTION BASIS OF CONDITIONAL REQUEST
City of Brighton FILL HYDRAULIC ANALYSIS
Weld County NEW TOPOGRAPHIC DATA
Colorado FLOODWAY
COMMUNITY
COMMUNITY NO.: 080004
Northern Treatment Plant-South Platte APPROXIMATE LATITUDE 8 LONGITUDE: 40.006,-104.822
IDENTIFIER SOURCE: USGS QUADRANGLE DATUM: NAD 83
AFFECTED MAP PANELS
TYPE: FIRM" NO.: 0802660995C DATE: September 28,1982 "FIRM-Flood Insurance Rate Map
FLOODING SOURCE(S)AND REACH DESCRIPTION
South Platte River—from approximately 5,260 feet downstream of Weld County Road 2(WCR 2)to just downstream of WCR 2
PROPOSED PROJECT DESCRIPTION
Flooding Source Proposed Project Location of Proposed Project
South Platte River Fill Placement From approximately 3,940 feet downstream of WCR 2 to just downstream of
WCR 2
SUMMARY OF IMPACTS TO FLOOD HAZARD DATA
Flooding Source Effective Flooding Proposed Flooding Increases Decreases
South Platte River Zone A Zone AE Yes Yes
No Floodway Floodway Yes None
No BFEs" BFEs Yes None
'BFEs-Base(1-percent-annual-chance)Flood Elevations
COMMENT
This document provides the Federal Emergency Management Agency's(FEMA's)comment regarding a request for a CLOMR for the project described above.
This document is not a final determination;it only provides our comment on the proposed project in relation to the flood hazard information shown on the effective
National Flood Insurance Program(NFIP)map. We reviewed the submitted data and the data used to prepare the effective flood hazard information for your
community and determined that the proposed project meets the minimum floodplain management criteria of the NFIP. Your community is responsible for
approving all floodplain development and for ensuring that all permits required by Federal or State/Commonwealth law have been received. State/Commonwealth,
county,and community officials,based on their knowledge of local conditions and in the interest of safety, may set higher standards for construction in the Special
Flood Hazard Area(SFHA),the area subject to inundation by the base flood. If the State/Commonwealth,county,or community has adopted more restrictive or
comprehensive floodplain management criteria,these criteria take precedence over the minimum NFIP criteria.
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)toll
free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NAP is available on the FEMA website at http.//www.fema.gov/nfip.
Erin E.Cobb.CFM,Program Specialist
Engineering Management Branch
Federal Insurance and Mitigation Administration 125360 PT202.BKR.12080097R.H17 104
Page 2 of 6 Issue Date:August 9,2012 Case No.: 12-08-0O97R CLOMR-APP
nF<r,yr
" Federal Emergency Management Agency
°.� Washington, D.C. 20472
14ND'SSt��"
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
OTHER COMMUNITIES AFFECTED BY THIS CONDITIONAL REQUEST
CID Number: 080266 Name: Weld County, CO
AFFECTED MAP PANELS
TYPE: FIRM* NO.: 0802660995C DATE'. September 28, 1982
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)toll
free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http://w.nv.fema.gov/nfip.
7..(il4 (- ( bt!h—.
Erin E.Cobb,CFM,Program Specialist
Engineering Management Branch
Federal Insurance and Mitigation Administration 125360 PT202.BKR.12080097R.H17 104
Page 3 of 6 Issue Date:August 9,2012 Case No.: 12-08-0O97R CLOMR-APP
Okt.pJ6y
:7).441191rO.
Federal Emergency Management Agency
� -:"-• Washington, D.C. 20472
-..CL9 ND S'Eu
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION
To determine the changes in flood hazards that will be caused by the proposed project,we compared the hydraulic modeling reflecting the proposed
project(referred to as the proposed conditions model)to the hydraulic modeling reflecting the existing conditions.
The table below shows the changes in the base flood water-surface elevations(WSELs).
Base Flood WSEL Comparison Table
Flooding Source:South Platte River Base Flood WSEL Location of maximum change
Change(feet)
Proposed vs. Maximum increase 0.02 Approximately 3,050 feet downstream of WCR 2
Existing Maximum decrease 0.03 Approximately 860 feet downstream of WCR 2
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information exchange(FMIX)toll
free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http//www.fema.govinfip.
!" 7) 2
C A.{ (" C..d-G-'.—. ,
Erin E.Cobb,CFM,Program Specialist
Engineering Management Branch
Federal Insurance and Mitigation Administration 125360 PT202.BKR.12080097R.H17 104
Page 4 of 6 Issue Date:August 9,2012 Case No.: 12-08-0O97R CLOMR-APP
tiPAR ryr U^ Federal Emergency Management Agency
° Washington, D.C. 20472
4NO 5r-
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION (CONTINUED)
DATA REQUIRED FOR FOLLOW-UP LOMR
Upon completion of the project,your community must submit the data listed below and request that we make a final determination on
revising the effective FIRM and FIS report. If the project is built as proposed and the data below are received,a revision to the FIRM and
FIS report would be warranted.
•Form 1,entitled"Overview&Concurrence Form". Detailed application and certification forms must be used for requesting final
revisions to the maps. Therefore,when the map revision request for the area covered by this letter is submitted,Form I must be included.
If as-built conditions differ from the proposed plans,please submit new forms,which can be accessed at
http://www.fema.gov/plan/prevent/fhm/dl_mt-2.shtm,or annotated copies of the previously submitted forms showing the revised
information.
•Hydraulic analyses,for as-built conditions,of the base flood and the regulatory floodway,together with a topographic work map showing
the revised floodplain and floodway boundaries. Please ensure that the revised information ties in with the current effective information at
the downstream and upstream ends of the revised reach.
•An annotated copy of the FIRM,at the scale of the effective FIRM,that shows the revised floodplain and floodway boundary delineations
shown on the submitted work map and how they tie into the floodplain and floodway boundary delineations shown on the current effective
FIRM at the downstream and upstream ends of the revised reach.
•As-built plans,certified by a registered professional engineer,of all proposed project elements.
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)toll
free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http://www.fema.govinfip.
'1).! u C C, e C.-
Erin E.Cobb,CFM,Program Specialist
Engineering Management Branch
Federal Insurance and Mitigation Administration 125360 PT202.BKR.12080097R.H17 104
Page 5 of 6 Issue Date:August 9,2012 Case No.: 12.0E-0097R CLOMR-APP
Oy�A-\F�
J Meet ;
Federal Emergency Management Agency
c'. c`` Washington, D.C. 20472
J
4:4ND Sic
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION (CONTINUED)
•A copy of the public notice distributed by your community,stating its intent to revise the regulatory floodway,or a signed statement by
your community that it has notified all affected property owners and affected adjacent jurisdictions.
•Documentation of the notification to property owners who will be affected by any widening/shifting of the base floodplain and/or any
BFE increases along the South Platte River.
•A letter stating that your community will adopt and enforce the modified regulatory floodway,OR,if the State/Commonwealth has
jurisdiction over either the regulatory floodway or its adoption by your community,a copy of your community's letter to the appropriate
State/Commonwealth agency notifying it of the modification to the regulatory floodway and a copy of the letter from that agency stating its
approval of the modification.
•FEMA's fee schedule for reviewing and processing requests for conditional and final modifications to published flood information and
maps can be accessed at http://www.fema.gov/plan/prevent/thm/frm_fees.shtm. The fee at the time of the map revision submittal must be
received before we can begin processing the request. Payment of this fee can be made through a check or money order,made payable in
U.S.funds to the National Flood Insurance Program,or by credit card(Visa or MasterCard only). Please forward the payment,along with
the revision application,to the following address:
LOMC Clearinghouse
847 South Pickett Street
Alexandria,VA 22304
After receiving appropriate documentation to show that the project has been completed,FEMA will initiate a revision to the FIRM and FIS
report. Because the flood hazard information(i.e.,BFEs,base flood depths, SFHAs,zone designations,and/or regulatory floodways)will
change as a result of the project, a 90-day appeal period will be initiated for the revision,during which community officials and interested
persons may appeal the revised flood hazard information based on scientific or technical data.
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)toll
free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http://www.fema.gov/nfip.
Erin E.Cobb,CFM, Program Specialist
Engineering Management Branch
Federal Insurance and Mitigation Administration 125360 PT202.BKR.12080097R.H17 104
,Page 3 of 6 Issue Date:August 9,2012 Case No.: 12-08-0097R CLOMR-APP
'tipAR I,tv
'1' Federal Emergency Management Agency
J�j, Washington, D.C. 20472
StC"-
CONDITIONAL LETTER OF MAP REVISION
COMMENT DOCUMENT (CONTINUED)
COMMUNITY INFORMATION (CONTINUED)
COMMUNITY REMINDERS
We have designated a Consultation Coordination Officer(CCO)to assist your community. The CCO will be the primary liaison between
your community and FEMA. For information regarding your CCO,please contact:
Ms.Jeanine D.Petterson
Director,Mitigation Division
Federal Emergency Management Agency,Region VIII
Denver Federal Center,Building 710
Post Office Box 25267
Denver,CO 80225-0267
(303)235-4830
Although a portion of the proposed area of revision is shown on the effective FIRM as located within the unicorporated areas of Weld
County,this area has been annexed by the City of Brighton.
•
This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)toll
free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,847 South Pickett Street,Alexandria,VA 22304. Additional Information about
the NFIP is available on the FEMA website at http://www.fema.govinfip.
. ( [b-r
Erin E.Cobb,CFM,Program Specialist
Engineering Management Branch
Federal Insurance and Mitigation Administration 125360 PT202.BKR.12080097R.H17 104