Loading...
HomeMy WebLinkAbout20121763.tiff 11� 186' • r r- GOUNI-TY LAND USE APPLICATION SUMMARY SHEET Planner C. Gathman Case Number: USR12-0023 Hearing Date: June 19, 2012 Applicant: Kerr-McGee Gathering LLC C/O Vince Harris Baseline Corporation Address: 700 12th Street, Suite 220, Golden, CO 80401 Request: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT FOR A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT ANY USE PERMITTED AS A USE BY RIGHT, AN ACCESSORY USE, OR A USE BY SPECIAL REVIEW IN THE COMMERCIAL OR INDUSTRIAL ZONE DISTRICTS (AN OIL AND GAS SUPPORT FACILITY (CRYOGENIC FACILITY) INCLUDING A CONTROL ROOM, CARBON BEDS, AMINE UNITS, UTILITY BUILDINGS, PDC BUILDINGS, DEHYDRATION UNITS, CRYOGENIC UNITS, REFRIGERATION UNITS, RESIDUE COMPRESSORS, VESSELS, TANKS, TOWERS &FLARE STACKS), IN THE A(AGRICULTURAL)ZONE DISTRICT • Legal Description: Part of the NW4 of Section 14, T2N, R66W of the 61h PM, Weld County, Colorado Location: South of and adjacent to County Road 22 and 1 mile east of County Road 31 Size of Parcel: +/- 116.29 Acres Parcel Number: 130914000024 POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The criteria for review of this Special Review Permit are listed in Section 23-2-220 of the Weld County Code. The Department of Planning Services' staff has received responses from the following agencies: Without Comments: Weld County Sheriffs Office, referral received 4/16/2012 With Comments: Weld County Department of Public Works, referral received 5/14/2012 Weld County Department of Public Health & Environment, referral received 5/15/2012 Weld County Department of Building Inspection, referral received 5/4/2012 Weld County Zoning Compliance, referral received 4/13/2012 Fort Lupton Fire Protection District, referrals received 4/27/2012 &6/6/2012 • Colorado Division of Water Resources, referral received 5/8/2012 2012-1763 USR12-0023, Kerr-McGee Gathering LLC, Page 1 The following agencies have not responded: • City of Fort Lupton Colorado Parks &Wildlife Northern Colorado Water Conservancy District West Greeley Soil Conservation District School District RE-3J • • USR12-0023, Kerr-McGee Gathering LLC, Page 2 • i86i SPECIAL REVIEW PERMIT ADMINISTRATIVE REVIEW Planner: C. Gathman Case Number USR12-0023 Hearing Date: June 19, 2012 Applicant: Kerr-McGee Gathering LLC C/O Vince Harris Baseline Corporation Site Address: 700 12th Street, Suite 220, Golden, CO 80401 Request: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT FOR A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT ANY USE PERMITTED AS A USE BY RIGHT, AN ACCESSORY USE, OR A USE BY SPECIAL REVIEW IN THE COMMERCIAL OR INDUSTRIAL ZONE DISTRICTS (AN OIL AND GAS SUPPORT FACILITY (CRYOGENIC FACILITY) INCLUDING A CONTROL ROOM, CARBON BEDS, AMINE UNITS, UTILITY BUILDINGS, PDC BUILDINGS, DEHYDRATION UNITS, CRYOGENIC • UNITS, REFRIGERATION UNITS, RESIDUE COMPRESSORS, VESSELS, TANKS, TOWERS &FLARE STACKS), IN THE A(AGRICULTURAL)ZONE DISTRICT Legal Description: Part of the NW4 of Section 14, T2N, R66W of the 6th PM, Weld County, Colorado Location: South of and adjacent to County Road 22 and 1 mile east of County Road 31 Size of Parcel: +/- 116.29 acres Parcel Number: 130914000024 Description of Use: This is a natural gas processing facility. The proposed facility involves an amine treatment facility which removes hydrogen sulfide and carbon dioxide from natural gas along with a cryogenic facility that helps to extract natural gas liquids from natural gas. This facility is proposed to connect to a new electrical substation facility that has been applied for under a separate USR application. THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. It is the opinion of the Department of Planning Services' staff that the applicant has shown compliance with Section 23-2-220 of the Weld County Code as follows: A. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other • applicable code provisions or ordinance in effect. USR12-0023, Kerr-McGee Gathering LLC, Page 3 Section 22-2-20 G.2. A.Policy 7.2. states: "Conversion of agricultural land to nonurban residential, commercial and industrial uses should be accommodated when the subject • site is in an area that can support such development, and should attempt to be compatible with the region." Section 22-2-20 I. A.Goal 9. States: "Reduce potential conflicts between varying land uses in the conversion of traditional agricultural lands to other land uses." Section 22-2-20 1.3. A.Policy 9.3. States: "Consider mitigation techniques to address incompatibility issues. Encourage techniques and incentives, such as but not limited to clustered development and building envelopes, to minimize impacts on surrounding agricultural land." 22-2-100 A.2. OG.Policy 1.2. states: "Oil and gas support facilities which do not rely on geology for locations should locate in commercial and industrial areas, when possible, and should be subject to review in accordance with the appropriate sections of this Code." The proposed cryogenic facility is located in an area containing existing oil & gas support facilities. A natural gas processing facility (approved under 3rd AMUSR-1002) is located to the north and two oil and gas support facilities (approved under USR-1291 and USR- 1353) a compressor station facility (approved under SUP-211), are located adjacent and to the west of the proposed site. Attached Development Standards and Conditions of Approval (Noise limits and the requirement that the applicant submit a Lighting Plan) will address and mitigate impacts on the surrounding area. B. Section 23-2-220.A.2 -- The proposed use is consistent with the intent of the Agricultural (A) Zone District. Section 23-3-40.A.2 of the Weld County Code allows oil and gas • support facilities as a Use by Special Review in the A(Agricultural) Zone District. C. Section 23-2-220.A.3 -- The uses which will be permitted will be compatible with the existing surrounding land uses. The proposed facility is located in a rural area and is adjacent to three (3) existing oil and gas support facilities and a compressor station facility. The nearest single family residences are located approximately 1/2 mile to the south of the proposed improvements associated with this facility. D. Section 23-2-220.A.4 -- The uses which will be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected by Chapter 22 of the Weld County Code and any other applicable code provisions or ordinances in effect, or the adopted Master Plans of affected municipalities. This site is located within the 3-mile referral area of the City of Fort Lupton. No referral response has been received from Fort Lupton. E. Section 23-2-220.A.5 --The application complies with Article V of the Weld County Code. The existing site is within the County Road Impact Fee Area and the Capital Expansion Impact Fee area. Effective April 25, 2011, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the Weld County Road Impact Program. (Ordinance 2011- 2) Effective April 25, 2011, Building Permits issued on the proposed lots, will be required to adhere to the fee structure of the County Facility Fee and Drainage Impact Fee. (Ordinance 2011-2) • USR12-0023, Kerr-McGee Gathering LLC, Page 4 F. Section 23-2-220.A.6 -- The applicant has demonstrated a diligent effort to conserve • prime agricultural land in the locational decision for the proposed use. The facility is proposed to be located on land designated as "Prime If Irrigated" and "Other" according to the according to the Prime and Important Farmlands Map of Weld and Larimer Counties. The parcel is not in agricultural production. Approximately 2/3rds of the site is designated as"Other". G. Section 23-2-220.A.7—There are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. 1. Prior to Recording the Plat: A. The plat shall be amended to delineate the following: 1. All sheets of the plat shall be labeled USR12-0023. (Department of Planning Services) 2. The attached Development Standards. (Department of Planning Services) 3. The plat shall be prepared in accordance with Section 23-2-260.D of the Weld County Code. (Department of Planning Services) 4. The applicant shall delineate the trash collection areas. Section 23-3-350.H of the Weld County Code addresses the issue of trash collection areas. Areas used for storage or trash collection shall be screened from adjacent public • rights-of-way and adjacent properties. These areas shall be designed and used in a manner that will prevent wind or animal scattered trash. (Department of Planning Services) 5. There is 60 feet of unmaintained section line right-of-way along the CR 33 section line (30 feet on either side of the section line). Please show and label this right of way on the Plat. (Department of Public Works) 6. Show and label the tracking control and turning radiuses at the access point(s) on the Plat. (Department of Public Works) 7. Show the approved access(es) on the Plat and label with the approved access permit number(will be provided). (Department of Public Works) 8. County Road 22 is designated on the Weld County Road Classification Plan as arterial road, which requires 140 feet of right-of-way at full build out. The applicant shall verify and delineate on the plat the existing right-of-way and the documents creating the right-of-way along with the edge of future Right-of-Way (70-feet from the centerline of County Road 22). All setbacks shall be measured from the edge of future right-of-way. If the right-of-way cannot be verified, it shall be dedicated. This road is maintained by Weld County. (Department of Public Works) 9. The approved Lighting Plan. (Department of Planning Services) 10. Setbacks from plugged and abandoned oil and gas wells. (Department of • Planning Services) 11. Setbacks from existing producing oil and gas wells and wellheads. (Department of Planning Services) USR12-0023, Kerr-McGee Gathering LLC, Page 5 12. The approved Sign Plan. (Department of Planning Services) • 13. The approved Screening Plan. (Department of Planning Services) B. The applicant shall address the requirements of the Weld County Department of Public Works as stated in their referral dated May 14, 2012. The applicant shall address the following requirements: 1. Submit access photos at the proposed accesses (looking up and down the roadway and into the site). The Traffic Engineer will review the new access request. 2. Submit a Final Drainage Report utilizing the checklist available on the Public Works website prepared by a Professional Engineer registered in the State of Colorado. 3. An improvements and road maintenance agreement is required for this site for transportation and non-transportation improvements. Public Works will provide a draft of the agreement after the Board of County Commissioners hearing for this project. (Department of Public Works) C. The applicant shall submit evidence of an Air Pollution Emission Notice (A.P.E.N.) and Emissions Permit application from the Air Pollution Control Division (APCD), Colorado Department of Health and Environment to Environmental Health Services Division of the Weld County Department of Public Health & Environment. Alternately, the applicant can provide evidence from the APCD that they are not subject to these requirements. (Department of Public Health & Environment) D. A signed copy of the Spill Prevention, Control and Countermeasure Plan shall be provided to Environmental Health Services Division of the Weld County Department of Public Health • & Environment. (Department of Public Health & Environment) E. The applicant shall submit written evidence from the Colorado Division of Water Resources, demonstrating that a well can be appropriately permitted for the industrial use. (Department of Public Health & Environment) F. The applicant shall submit a waste handling plan, for approval, to the Environmental Health Services Division of the Weld County Department of Public Health & Environment. The plan shall include at a minimum, the following: 1) The waste handler and facility where the waste will be disposed (including the facility name, address, and phone number). 2) A list of wastes which are expected to be generated on site(this should include expected volumes and types of waste generated). 3) A list of the type and volume of chemicals expected to be stored on site. 4) The waste handler and facility where the waste will be disposed (including the facility name, address, and phone number). 5) A copy of the SPCC plan. (Department of Public Health & Environment) 2. The applicant shall attempt to address the requirements of the Fort Lupton Fire Protection District, as stated in the referral response dated April 27, 2012. Written evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Fort Lupton Fire Protection District) • 3. The applicant shall submit to the Department of Planning Services with a Lighting Plan for review and approval. (Department of Planning Services) USR12-0023, Kerr-McGee Gathering LLC, Page 6 • 4. The applicant shall submit a Sign Plan to the Department of Planning Services, for all Facility identification signs, including location and size. (Department of Planning Services) 5. The applicant shall submit a screening plan for review and approval by the Department of Planning Services. The proposed use will be located closer to existing residences than the existing oil and gas facilities in the area. The screening plan shall address screening from residential properties to the south of the proposed use. (Department of Planning Services) 6. Upon completion of 1-7 above the applicant shall submit three (3) paper copies of the plat for preliminary approval to the Weld County Department of Planning Services. Upon approval of the paper copies the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within one-hundred twenty (120) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 7. In accordance with Weld County Code Ordinance 2006-7 approved June 1, 2006, should the plat not be recorded within the required one-hundred twenty (120) days from the date the Board of County Commissioners resolution a $50.00 recording continuance charge shall added for each additional 3 month period. (Department of Planning Services) 8. The Department of Planning Services respectively requests the surveyor provide a digital copy of this Use by Special Review. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are ArcView shapefiles, Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4). (Group 6 is not acceptable). • Thisdigitalfilemaybesenttomaps@co.weld.co.us. (Department of Planning Services) 9. The Special Review activity shall not occur nor shall any building or electrical permits be issued on the property until the Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder. (Department of Planning Services) 10. Prior to Construction: A. If more than 1 acre is to be disturbed, a grading permit will be required prior to the start of construction. The grading permit application must contain: an erosion and sediment control plan, a grading plan, installation details of all BMPs to be utilized, typical installation and maintenance notes for all BMPs to be utilized, and a copy of the approved CDPHE storm water permit. (Department of Public Works) 11. Prior to the Issuance of Certificate of Occupancy: A. An individual sewage disposal system is required for the proposed facility and shall be installed according to the Weld County Individual Sewage Disposal Regulations. The septic system is required to be designed by a Colorado Registered Professional Engineer according to the Weld County Individual Sewage Disposal Regulations. (Department of Public Health & Environment) • USR12-0023, Kerr-McGee Gathering LLC, Page 7 SITE SPECIFIC DEVELOPMENT PLAN SPECIAL REVIEW PERMIT • DEVELOPMENT STANDARDS Kerr-McGee Gathering, LLC USR12-0023 1. A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT FOR A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT ANY USE PERMITTED AS A USE BY RIGHT, AN ACCESSORY USE, OR A USE BY SPECIAL REVIEW IN THE COMMERCIAL OR INDUSTRIAL ZONE DISTRICTS (AN OIL AND GAS SUPPORT FACILITY (CRYOGENIC FACILITY) INCLUDING A CONTROL ROOM, CARBON BEDS, AMINE UNITS, UTILITY BUILDINGS, PDC BUILDINGS, DEHYDRATION UNITS, CRYOGENIC UNITS, REFRIGERATION UNITS, RESIDUE COMPRESSORS, VESSELS, TANKS, TOWERS & FLARE STACKS), IN THE A (AGRICULTURAL) ZONE DISTRICT. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. The number of employees shall be limited to eight (8) as stated in the application materials. (Department of Planning Services) 4. The facility operates twenty-four (24) hours a day, seven (7) days a week. (Department of Planning Services) 5. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health & Environment) • 6. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. (Department of Public Health & Environment) 7. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. (Department of Public Health & Environment) 8. The applicant shall operate in accordance with the approved "waste handling plan", at all times. (Department of Public Health & Environment) 9. The Spill Prevention, Control and Countermeasure Plan shall be available on site, at all times. (Department of Public Health & Environment) 10. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be operated in accordance with the approved "dust abatement plan", at all times. (Department of Public Health & Environment) 11. This facility shall adhere to the maximum permissible noise levels allowed in the Industrial Zone as delineated in Section 14-9-30 of the Weld County Code, or with all applicable State noise statutes and/or regulations. (Department of Public Health & Environment) 12. The operation shall comply with all applicable rules and policies regulated by the Colorado Oil and Gas Conservation Commission. (Department of Public Health & Environment) • 13. All potentially hazardous chemicals must be handled in a safe manner in accordance with product labeling and in a manner that minimizes the release of hazardous air pollutants (HAP's) and volatile organic compounds (VOC's). All chemicals must be stored secure, on an impervious surface, and in accordance with manufacturer's recommendations. (Department of Public Health USR12-0023, Kerr-McGee Gathering LLC, Page 8 & Environment) • 14. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. (Department of Public Health & Environment) 15. Adequate drinking, handwashing and toilet facilities shall be provided for employees and contractors of the facility, at all times. (Department of Public Health & Environment) 16. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. (Department of Public Health & Environment) 17. The applicant shall obtain a Colorado Discharge Permit System/CDPS permit from the Colorado Department of Public Health and Environment(CDPH&E), Water Quality Control Division, as applicable. (Department of Public Health & Environment) 18. This application is proposing a well as its source of water. The applicant should be made aware that while they may be able to obtain a well permit from the Office of the State Engineer, Division of Water Resources, the quantity of water available for usage may be limited to specific uses, i.e. domestic use only, etc. Also, the applicant should be made aware that groundwater may not meet all drinking water standards as defined by the Colorado Department of Public Health and Environment. We strongly encourage the applicant to test their drinking water prior to consumption and periodically test it over time. (Department of Public Health & Environment) 19. The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. (Department of Public Health and Environment) 20. A building permit shall be obtained prior to the construction of any new structures. Currently the • following has been adopted by Weld County: 2006 International Building Code; 2006 International Mechanical Code; 2006 International Plumbing Code; 2006 International Fuel Gas Code; and the 2011 National Electrical Code and Chapter 29 of the Weld County Code. (Department of Building Inspection) 21. Provide letter of notification from the Fort Lupton Fire Protection District prior to any new construction. (Department of Building Inspection) 22. Effective April 25, 2011, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the Weld County Road Impact Program. (Ordinance 2011-2) 23. Effective April 25, 2011, Building Permits issued on the proposed lots, will be required to adhere to the fee structure of the County Facility Fee and Drainage Impact Fee. (Ordinance 2011-2) 24. The property owner or operator shall be responsible for complying with the Design Standards of Section 23-2-240, Weld County Code. 25. The property owner or operator shall be responsible for complying with the Operation Standards of Section 23-2-250, Weld County Code. 26. Sources of light shall be shielded so that light rays will not shine directly onto adjacent properties where such would cause a nuisance or interfere with the use on the adjacent properties in accordance with the plan. Neither the direct nor reflected light from any light source may create a traffic hazard to operators of motor vehicles on public or private streets. No colored lights may be used which may be confused with or constructed as traffic control devices. (Department of Planning Services) • USR12-0023, Kerr-McGee Gathering LLC, Page 9 27. Pursuant to Chapter 15, Articles I and II of the Weld County Code, if noxious weeds exist on the property or become established as a result of the proposed development, the • applicant/landowner shall be responsible for controlling the noxious weeds. All vegetation, other than grasses, needs to be maintained at a maximum height of 12 inches until the area is completely developed. (Department of Public Works) 28. Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. 29. The historical flow patterns and runoff amounts will be maintained on site in such a manner that it will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and velocity increases, diversions, concentration and/or unplanned ponding of storm run-off. (Department of Public Works) 30. The applicant is required to comply with all Colorado Department of Health and Environment, Water Quality Control Division regulations regarding storm water quality permitting and protection and construction storm water discharges. (Department of Public Works) 31. The Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. 32. The property owner or operator shall be responsible for complying with all of the foregoing • Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. 33. WELD COUNTY'S RIGHT TO FARM: Weld County is one of the most productive agricultural counties in the United States, typically ranking in the top ten counties in the country in total market value of agricultural products sold. The rural areas of Weld County may be open and spacious, but they are intensively used for agriculture. Persons moving into a rural area must recognize and accept there are drawbacks, including conflicts with long-standing agricultural practices and a lower level of services than in town. Along with the drawbacks come the incentives which attract urban dwellers to relocate to rural areas: open views, spaciousness, wildlife, lack of city noise and congestion, and the rural atmosphere and way of life. Without neighboring farms, those features which attract urban dwellers to rural Weld County would quickly be gone forever. Agricultural users of the land should not be expected to change their long-established agricultural practices to accommodate the intrusions of urban users into a rural area. Well-run agricultural activities will generate off-site impacts, including noise from tractors and equipment; slow-moving farm vehicles on rural roads; dust from animal pens, field work, harvest and gravel roads; odor from animal confinement, silage and manure; smoke from ditch burning; flies and mosquitoes; hunting and trapping activities; shooting sports, legal hazing of nuisance wildlife; and the use of pesticides and fertilizers in the fields, including the use of aerial spraying. It is common practice for agricultural producers to utilize an accumulation of agricultural machinery and supplies to assist in their agricultural operations. A concentration of miscellaneous agricultural materials often produces a visual disparity between rural and urban areas of the County. Section 35-3.5- 102, C.R.S., provides that an agricultural operation shall not be found to be a public or private nuisance if the agricultural operation alleged to be a nuisance employs methods or practices that are commonly or reasonably associated with agricultural production. • Water has been, and continues to be, the lifeline for the agricultural community. It is unrealistic to assume that ditches and reservoirs may simply be moved "out of the way" of residential USR12-0023, Kerr-McGee Gathering LLC, Page 10 development. When moving to the County, property owners and residents must realize they cannot take water from irrigation ditches, lakes, or other structures, unless they have an • adjudicated right to the water. Weld County covers a land area of approximately four thousand (4,000) square miles in size (twice the size of the State of Delaware) with more than three thousand seven hundred (3,700) miles of state and County roads outside of municipalities. The sheer magnitude of the area to be served stretches available resources. Law enforcement is based on responses to complaints more than on patrols of the County, and the distances which must be traveled may delay all emergency responses, including law enforcement, ambulance, and fire. Fire protection is usually provided by volunteers who must leave their jobs and families to respond to emergencies. County gravel roads, no matter how often they are bladed, will not provide the same kind of surface expected from a paved road. Snow removal priorities mean that roads from subdivisions to arterials may not be cleared for several days after a major snowstorm. Services in rural areas, in many cases, will not be equivalent to municipal services. Rural dwellers must, by necessity, be more self-sufficient than urban dwellers. People are exposed to different hazards in the County than in an urban or suburban setting. Farm equipment and oil field equipment, ponds and irrigation ditches, electrical power for pumps and center pivot operations, high speed traffic, sand burs, puncture vines, territorial farm dogs and livestock, and open burning present real threats. Controlling children's activities is important, not only for their safety, but also for the protection of the farmer's livelihood. • • USR12-0023, Kerr-McGee Gathering LLC, Page 11 X63 y DEPARTMENT OF PLANNING SERVICES . "` 1555 N 17th AVE GREELEY, CO 80631 IrCii WEBSITE: www.co.weld.co.us E-MAIL: cgathman@co.weld.co.us PHONE: (970)353-6100, Ext. 3537 2- G Q J I\ T � FAX: (970) 304-6498 May 31, 2012 VINCE HARRIS 700 12TH ST, STE 220 GOLDEN, CO 80401 Subject: USR12-0023 - A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT ANY USE PERMITTED AS A USE BY RIGHT, AN ACCESSORY USE, OR A USE BY SPECIAL REVIEW IN THE COMMERCIAL OR INDUSTRIAL ZONE DISTRICTS (CONTROL ROOM, CARBON BEDS, AMINE UNITS, UTILITY BUILDINGS, PDC BUILDINGS, DEHYDRATION UNITS, CRYOGENIC UNITS, REFRIGERATION UNITS, RESIDUE COMPRESSORS, VESSELS, TANKS, TOWERS & FLARE STACKS), PROVIDED THAT THE PROPERTY IS NOT A LOT IN AN APPROVED OR RECORDED SUBDIVISION PLAT OR LOTS PARTS OF A MAP OR PLAN FILED PRIOR TO ADOPTION OF ANY REGULATIONS CONTROLLING SUBDIVISIONS. On parcel(s)of land described as: NW4 SECTION 14,T2N, R66W of the 6th P.M.,Weld County, Colorado. Dear Applicants: • I have scheduled a meeting with the Weld County Planning Commission on June 19, 2012, at 1:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on July 18, 2012 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at www.weldcountyplanningcases.orq If you have any questions concerning this matter, please call. Respectfully, Digitally signed by Kristine Ranslem • „I {{-art oatio:l am the author of this document Location:1555 ation: N 17th Ave Date:2012.05.31 09:07:38-06'00' Chris Gathman Planner • 1 1gb DEPARTMENT OF PLANNING SERVICES 1555 N 17th AVE t GREELEY, CO 80631 Ji WEBSITE: www.co.weldco.us E-MAIL: cgathman@co.weld.co.us '0! �i PHONE: (970)353-6100, Ext. 3537 �2- N T„� FAX: (970)304-6498 April 13, 2012 VINCE HARRIS BASELINE CORPORATION 700 12TH ST, STE 220 GOLDEN, CO 80401 Subject: USR12-0023 - A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT ANY USE PERMITTED AS A USE BY RIGHT, AN ACCESSORY USE, OR A USE BY SPECIAL REVIEW IN THE COMMERCIAL OR INDUSTRIAL ZONE DISTRICTS (CONTROL ROOM, CARBON BEDS, AMINE UNITS, UTILITY BUILDINGS, PDC BUILDINGS, DEHYDRATION UNITS, CRYOGENIC UNITS, REFRIGERATION UNITS, RESIDUE COMPRESSORS, VESSELS, TANKS, TOWERS & FLARE STACKS), PROVIDED THAT THE PROPERTY IS NOT A LOT IN AN APPROVED OR RECORDED SUBDIVISION PLAT OR LOTS PARTS OF A MAP OR PLAN FILED PRIOR TO ADOPTION OF ANY REGULATIONS CONTROLLING SUBDIVISIONS. On parcel(s)of land described as: NW4 SECTION 14,T2N, R66W of the 6th P.M.,Weld County, Colorado. • Dear Applicants: Your application and related materials for the request described above are complete and in order at this time. I will schedule a meeting with you at the end of the review period to discuss the referral comments received by our office. It is the policy of Weld County to refer an application of this nature to any town or municipality lying within three miles of the property in question or if the property under consideration is located within the comprehensive planning area of a town or municipality. Therefore, our office has forwarded a copy of the submitted materials to the following Planning Commission(s)for their review and comments: Fort Lupton at Phone Number 303-857-6694 Please call the listed Planning Commissions,for information regarding the date,time and place of the meeting and the review process. It is recommended that you and/or a representative be in attendance at each of the meetings described above in order to answer any questions that might arise with respect to your application. If you have any questions concerning this matter, please call. Respectfully, Digitally signed byKristine Random Peason: am the author of this document Location:1555 N a 17th Ave Date:2012.04.13 11:59:42-06'00' Chris Gathman Planner • • March 23, 2012 Mr. Chris Gathman, Planner III Weld County Department of Planning Services 1555 North 17th Avenue SELINE InD Greeley, CO 80631 ,,,,p„,.,,F,,,, RE: Completeness Review, Lancaster Cryogenic Plant Use by Special Review Dear Chris: Baseline Corporation is representing Anadarko/Kerr-McGee Gathering, LLC in the application for a Use by Special Review permit for a natural gas cryogenic processing facility. This new facility will be named the Lancaster Cryogenic Plant and is directly adjacent to Anadarko's existing facilities at the Ft. Lupton Compressor Station. We are pleased to submit this completion review packet to Weld County. Between now and when we provide the complete application submittal, the second sheet of the USR plat will be updated to better coordinate with the third plat sheet. We have some CAD work to do and it does not affect this completeness review. Attached to this letter you will find the following submittal documents: • Submittal checklist • Application form • Authorization from landowner • • USR Questionnaire • Site plan • Access permit application • Copy of Warranty Deed • Certificate of Conveyances (COC) • Affidavit of surrounding property owners • Drainage report • Traffic Study • Stormwater Management Plan We look forward to working with you on as this Use by Special Review application moves through the approval process. Please contact me if you have any questions. Sincerely, Vincent Harris, AICP Planning Manager cc. Jay Allin, Anadarko • Corporate Headquarters High Plains Rocky Mountains Downtown Golden Downtown Greeley Ski Village 700 12°i Street,Suite 220 710 110 Avenue,Suite 105 1815 Central Park Drive,#370 Golden,Colorado 80401 Greeley.Colorado 80631 Steamboat Springs,Colorado 80487 Ph 303.940.9966 Ph 970,353.7600 Ph 970.879.1825 Fax 303.940.9959 Fax 970.353.7601 Fax 866.242.9106 Letter of i • TRANSMITTALASELINE corporation planning engineering survev'ing To: Chris Gathman, Weld County Planning Address: 1555 N 17th Avenue Greeley, CO 80631 Re: Lancaster Cryogenic Plant USR Completeness Review Date: March 23, 2012 Encl.: Initial Submittal Documents Dear Chris, Please find enclosed the initial submittal for the Lancaster Cryogenic Plant USR from • Anadarko/Kerr-McGee Gathering, LLC for a completeness review. Enclosed are all the required documentation for the USR. Please let us know if you have any questions. Thank you, Ethan cc: Jay Allin, Anadarko From the desk of... Ethan Watel ®Corporate Headquarters ❑High Plains ❑Rocky Mountains Downtown Golden Downtown Greeley Ski Village 12th Street, Suite 220 710 11th Avenue, Suite 105 1815 Central Park Drive,#370 en, Colorado 80401 Greeley, Colorado 80631 Steamboat Springs, Colorado 80477 303.940.9966 Ph 970.353.7600 Ph 970.879.1825 Fax 303.940.9959 Fax 970.353.7601 Fax 866.242.9106 www.baselinecorp.com Chris Gathman m: Chris Gathman it: Monday, April 02, 2012 7:03 PM o: 'Vince Harris'; 'Ethan Watel' Subject: Lancaster Cryogenic Plant Completeness Review- PRE11-0061 Dear Vince & Ethan, Your application is complete. You can go ahead and submit the application fee ($2,500.00). Sincerely, Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue,Greeley CO. 80631 Ph: (970)353-6100 ext. 3537 Fax:(970)304-6498 ~ter I Ir , _ � L r • T V Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. • 1861 - 2011 MEMORANDUM /-= TO: PRE11-0061; Case File, pre-application WELD-CO NTY DATE: October 28, 2011 FROM: Kris Ranslem, Planning Technician SUBJECT: Pre-Application Meeting prior to submitting USR for Cryogenic Gas Treating Facility Attendees: Rick Behning, Baseline Corporation Vince Harris, Baseline Corporation Jay Allen, Anadarko Lauren Light, Environmental Health Heidi Hansen, Public Works Frank Piacentino, Building Chris Gathman, Planning Kris Ranslem, Planning • On Friday, October 28, 2011 an informal discussion took place at the Greeley Administrative Offices Conference Room regarding a proposed cryogenic gas treating facility. (The legal description is Section 14, T2N, R66W of the 6`" P.M.) Background Information: The Fort Lupton Cryogenic Plant will be located adjacent to the existing Anadarko gas production facility. Anadarko intends to purchase the remaining quarter-section. Included in the plans will be a 120 foot communication tower. Building Department Building Permits will be required for all structures. Staff recommended a pre-construction meeting to identify all the buildings and their uses. Health Department Anadarko intends to obtain a commercial well and install a septic system for the office on site. The septic system will need to be designed by an engineer and approved by the Board of Health because it is a commercial operation. An Air Emissions Permit will be required. The applicant stated that they intend to submit it to the CDPHE by November 18, 2011. A Waste Handling Plan is required. For examples please visit: http://www.co.weld.co.us/Departments/PlanningZoninq/PlanningDepartment/ApplicationAssistance. html • A Dust Abatement Plan will be required. For examples please visit: http://www.co.weld.co.us/Departments/PlanningZoninq/Planning Department/ApplicationASSistance. html • Public Works An Access Permit is required. A traffic narrative will be required including an estimated number of trips and what types of vehicles will be accessing the site. A Full Drainage Report with detention will be required. An Improvements Agreement and Road Maintenance Agreement will be required. Tracking control will require 100 feet of asphalt and double cattle guards. Planning Department There was a lengthy discussion about dividing the land through a recorded exemption or obtaining a subdivision exemption which creates an imaginary parcel for oil and gas operations. The applicant stated that at a date uncertain in the future, United Power will purchase 5 acres where they will construct their own facility. Staff urged the applicant to contact staff for any questions: Planner On Call available Monday through Friday 7:30 a.m. to 4:30 p.m. Staff explained the USR process. The USR application fee is $2500. The applicant shall submit 4 packets for a 7 day completeness review. After the 7 day completeness review the applicant will be informed of what items are still required to make the application complete. Staff requested that the applicant submit the remaining material in electronic form. Upon submittal of a completed • application it will be sent out for referral for 28 days. The applicant will then meet with their Planner to discuss the referrals and address as many of the referrals as possible. At that meeting the Planning Commission hearing will be scheduled. The Board of County Commissioners hearing typically follows approximately 3 weeks after the Planning Commission hearing. The above notes are provided as a courtesy to the applicant. While we strive to identify significant issues, the above notes may not identify all issues, even major ones that may be raised during the formal review of your application. The information contained herein has been placed on file with the Department of Planning Services. End memorandum. • WELD COUNTY • L PRE-APPLICATION REVIEW REQUEST I • The pre-application request is the preliminary review of a land use proposal. Pre-application reviews are required prior to beginning the application process; however, this review is not an application. • Pre-application reviews are held with the Weld County Departments of Public Works and the Public Health and Environment. Pre-application reviews are held Thursday and Friday of any given week in the Greeley office. To be on the pre-submittal agenda, the request and required checklist items must be received one week prior to the review date, and shall include at a minimum, a description of the property including surrounding lands and land uses, property owners name and contact information a brief narrative and a map delineating the property location, in addition to the other items listed. • The Property Information required below can be found on the Weld County Assessor website at www.co.weld.co.us Please print a copy of the Assessor's page and submit it with your pre-application review request. • Mail, fax or drop off the request and required checklist items to the address listed below, a minimum of one week prior to your preferred meeting date. • Submitting your request in a timely manner is important to get your project scheduled for review. Contact Information: Name:Vincent Harris Phone:303.202.5010 ext. 217 Fax:303.940.9959 Email:vince@baselinecorp.com • Address:700 12th Street#220 Project Description:Anadarko-Fort Lupton Station Property Information: Section-Township- Section 14, Township 02, Range 66 Zoning Ag Range Parcel Number 130914000014 Acreage Site Address Not Available on Weld CO Website Water Source Legal Description Sewer Owner Name K N Wattenburg Transmission, LLC Is this property currently in violation? I IYes IINo Case Number Friday October 28st-9AM Preferred date and time for meeting: Office Use Only !E t I _00 �P f Project Title:I K Description: Review Date: Meeting Date/Time:g cuVh I C J g/1 • Weld County Department of Planning Services Greeley Office— 1555 N 17th Ave, Greeley CO 80631 Phone: 970-353-6100 x3540 Fax: 970-304-6498 WELD COUNTY • PLEASE PROVIDE THE FOLLOWING ITEMS: To view the Weld County Code, please go to www.co.weld.co.us, ❑ Brief project narrative explaining the following: ❑ Explain, in detail, the proposed use of the property. ❑ Number of people who will use this site. ❑ Number of employees to be employed at this site ❑ Hours of operation ❑ Type and number of structures to be erected (built) on this site. ❑ Type and number of animals, if any, to be on this site ❑ Kind of vehicles (type, size, weight) that will access this site and how often ❑ If storage or warehousing is proposed, what type of items will be stored ❑ Water source on the property ❑ Sewage disposal system on the property ❑ Conceptual site plan showing all existing and future: structures, parking, roads, driveway access, drainage and landscaping • • Weld County Department of Planning Services Greeley Office— 1555 N 171h Ave, Greeley CO 80631 Phone: 970-353-6100 x3540 Far 970-304-6498 • Tom Parko, Planning Manager MSELINE Weld County Planning Department 918 10th Street corporation Greeley, CO 80631 pins. aiaa Re: Fort Lupton Cryogenic Plant October 21,2011 Pre-application meeting request—Friday October 28th at 9:00am Dear Tom: Baseline Corporation is representing Anadarko to obtain a Use by Special Review Permit for the upcoming Fort Lupton Cryogenic Plant application. Anadarko operates nearly 5,000 oil and gas wells in the Denver-Julesberg (DJ) Basin with the vast majority being located in Weld County, Colorado. All of these wells produce varying amounts of natural gas that need to be processed at cryogenic plants for distribution to Colorado energy providing agencies such as Xcel Energy. This new facility near Fort Lupton is located directly adjacent to an existing gas production facility. Natural gas from directly from the wells in the area have a variety of different gases included in them. These natural gas liquids (NGLs) need to be separated so that they can be processed and purified into finished products for sale to various energy agencies. This cryogenic plant is just one of the many processes that are required to make the raw gas directly from the field into a product that is saleable to consumers. The proposed site is located directly off of county road 22 adjacent to the existing property to the south of the road.The site is currently zoned for agriculture purposes and is surrounded by agricultural zoned properties. • I have included preliminary USR plan sheets that show the proposed new production facility. We anticipate submitting the formal application in the near future. If you have any questions or are in need of additional information please contact me at 303.202.5010 ext. 217 or vince(ribaselinecorp.com Thank you for getting us scheduled so quickly. We look forward to meeting with you Friday. Sincerely, nc/ I Vincent Harris, AICP Planning Manager Cc: Jay Allin, Anadarko Corporate Headquarters High Plains Rocky Mountains • Downtown Golden Downown Greeley Pentagon Wesl Bunnrnq 700 12'°Street. Suite 220 710 11m Avenue.Suite 105 2740 Acre Lane.Suite 205 Golden.Colorado 80401 Greeley,Colorado 80631 Steamboat Springs,Colorado 80487 Ph 303 940.9966 Ph 970.353.7600 Ph 970.879.1825 Fax 303.940.9959 Fax 970.353.7601 Fax 866.242.9106 Pagel 2 Preapp letter to Weld CO • Vicinity Map and Site Plan for the Ft. Lupton Station 7 4 . T. -- /lb.(" a• . 1 a �. ...4) ... 4 Vic) .4.ig•i , . • 4 ti ti e Air is 4 ii Existing Site• • . .4 �.: .'\ Olt aist1y..),ill ilk I • • in i CR 22 t! r a ` w -. en S V i I. a. '-� *' �� .1 • - . n 4/ m. / / t .• . io" i • II!I t ((fill r.. r • 1 II - • a ma-A ` • -anProposed Improvements Y _.• • i 4- 1. W • C. . _ ttil •' :It h 4 .-. - - 4 . I • . • a. -\ , "lc,. G0ORle earth . - in;... • Anadarko , i . , 6 .' . . . f / .. • if �f. HI _ it ru• .ISM NA i • .iii. F' • •I �li it'll t a G363 r f �� 1 t. •. t T� •.j �J F i. • 3 ] ` ' �U5R-13�,iAM i ' r I CIL S T • War: / . rte( / , } / J . A I %StillIllit • .. Co I, a r WOO ft eft. copyright 2011 Weld County Government All rights reserved. Mon Oct 24 2011 03:17:51 PM • i 5 1 s ll 3 II I : aq a 1 t I # 'k 6 c # �A W Y aiy' ° i F, tm ! li a g 9 Ii 1 a iI i 1 1 Iri OP@a 4.O -i E °r g5Q 3 '�' � �E$ `firo z I° R3 l 0 § sID PgEA il p X s li i 90 n ₹ 0 "` $ 1sF !! ! ; 5i 22 i 2i N.I awlil 4I4r1 l! - E! ! ii 4s 6€; 1�l �Y s .16 li gl l a i g P g1 P: J i § hJ: I bLii em -a¢ Y ®l 14 l ! i a Rg iii 1 ye li °y ggW§ pp 3n pa is °r al � $la 0 ;$ n f a� a I' 2 1 F !I6i i ; ll l2 1a s$ ss ;II! lluId 12s 4i it r oil iii 1 is .lp i is. i 1 Y ' 'i Ia 'I ;1188sces S �!' € k6ad i ! iii 1 a 5 §; ' ;! I ;Ga !;! iPi- II i li it ilii Ilil4 _1 !II _E _0 l' ^I f .tl dl ilil WI F - Ey T ll I j iil` U o O 'i: ie! 0 w i$g 6i e6ll lK v tfl� _, n o co aai: Qi PE Pa le e !!� x �" 8d-. apir I hi -1 ' ' li lt ',YES$ L Sia` • ¢ !B o 4i a 2,ti , I -_ . . . � -_ I . . . � _. .� I qt,..._ €€ t it V � O ` � I a � ; ; i I 11 . U) cg- I ' COIII •• ( } I W Obi EE I w wi- OI I L : it I 7dL _ _� _ 1 oµ1 I ,_ ' c CV Ul l 7 5' e II � � —1 �° I e W Q U a Z I N V __ -eBB� �-.. _ f F dLu > V9 ; H\,z,-; � H i U) > W W M vW � r rc - j C° Z I i co I W - I . W 1 I I I r %_z F cc __.-- o z F a.n,... a F r z • J f 6 U 2 is' m C O 2 R. U.6 % ' 0 SSB a. J J LL § r Clig it Y a 1 W CI O C Y 110 lg \\,,,tg 1„`1\ E 1 . €® own 1,, ,\ !® tutof • H Y a�7,3! trt : : ti., fi _ 1 ill c is. , i�® i „=y {� dl - - �. ( _ , .,,_ � 9933 o •! a � ,Io i, ' G11IoC -C = Enoe G, Ri ,9 °o � i�i o' ! 4 sq i 1 p < 64 i iii s„ u .k 7 g it LiO i ,4d }Pi , I .,ow „A„ . 4 H N Z °° ❑c f 0I �� 3 2 o o _.,no,did .._.3LI o3o- u. Z u 5 � p - O / a ,11 Z o N ❑ EL) n U Q 2 co V e„ ne a -- - r is o' o J 2 j - �, IA Co O @1 r0 ¢� = Oca to nQ (J O ¢QS C) N. z o o Ea ---------\ OOOO o SAI '❑ ❑• of a m r=iv it N9 a Ci r a:" \ ]r 1 ICS, ]m44 Ora. A 55'.tt5 n.Y' CVNil�- M Z Z It 0 Z o v co O i J0 in co J04 8 p W ' O O N O I W O w ?ON 0 O O W H U to❑(p i ' /y O Q }ce r� W L.1.. Hi W 3�N Q Ip J w r Z CCD <OO w v Q Q 0 Oren, a V Cl- 0 0 K al F ' I W W m W 1 Q O OR CO Z W W 8 I 4. W Z Z Property Profile for Account # R0286487 October 24, 2011 III Account Information Account Parcel - Space Account Type Tax Year ' Tax Area Buildings I, Actual Value I Assessed Value ! , R0286487 130914000014 Real State Assd 2011 2216 0 0 0 Legal 16118-A PT NW4 14 2 66 BEG NW COR OF SEC E663.20'SODO VE 661.95'W663.42'N661.52'TO BEG A/K/A L1 MINOR SUB#1309-14-2-MS-6 10.08A M/L(.5R) Subdivision Block • Lot Land Economic Area • Property Address I Property City I Zip I Section Township Range WELD 000000000 14 02 66 Owner Information . Account - Parcel Space - Account Type Tax Year Tax Area -Buildings 'TAGuaI Value Assessed II !! Value R0286487 130914000014 Real State Assd 2011 2216 0 0 0 Owner(s) Address Line 1 I Address Line 2 I City ST Zip _I K N 635 N 7 AVE BRIGHTON CO 80601 WATTENBERG TRANSMISSION LLC Document History Information Account I Parcel Space 1 Account Type Tax Year Tax Area Buildings I Actual Value Accrssed • I Value - R0286487 130914000014 Real State Assd 2011 2216 0 0 0 Reception Rec Date I Type Grantor Grantee Doc Fee !, Sale Date Sale Price 02327614 04/05/1993 UNKNOWN K N WATTENBERG 30.24 03/31/1993 302,400 . TRANSMISSION LT 3567237 07/18/2008 •USR K N WATTENBERG K N WATTENBERG 0.00•07/18/2008 0 TRANSMISSION LTD TRANSMISSION LLC . Building Information Account Parcel I Space ' Account Type Tax Year Tax Area T Buildings I Actual Value Assessed '.. �I Value R0286487 130914000014 Real State Assd 2011 2216 0 0 0 Valuation Information Account I Parcel I Space Account Type ' Tax Year Tax Area I Buildings ' Actual Value Assessed Value • R0286487 130914000014 Real State Assd 2011 2216 0 0 0 Type Code Description ', Actual Value I Assessed I Acres Land SgFt Value Land 8900 STATE ASSESSED LAND 0 0 10.151 442,178 0 0 10.151 442,178 Tax Authority Information Account Parcel I Space Account Type Tax Year Tax Area : Buildings Actual Value Assessed _i. ._ Value R0286487 130914000014 Real State Assd 2011 2216 0 0 0 Tax Area District ID District Name ' Current Mill I Tax Year II Levy 2216 0100 WELD COUNTY 16.804 2011 2216 0203 SCHOOL DIST RE3J 22.242 2011 2216 0506 FORT LUPTON FIRE 6.101 2011 2216 0530 FORT LUPTON FIRE(BOND 2022) 2.380 2011 2216 0700 AIMS JUNIOR COLLEGE 6.360 2011 2216 1050 HIGH PLAINS LIBRARY 3.281 2011 2216 1201 PLATTE VALLEY CONSERVATION 0.000 2011 57.168 Photo • I • �.. _ 0 '2007 - --.--•-" ,. - � _r.. � . 0 0 Property Profile for Account # R0524301 October 24, 2011 • Account Information Account • Parcel I Space Account Type Tax Year I Tax Area I Buildings I Actual Value-7 Assessed Value R0524301 130914000023 Real State Assd 2011 2216 0 0 0 Legal PT NW4 14-2-66 BEG AT NW COR N88D58'E 663.20'TO POB N88D58'E 663.20 S0D02'E 1490.35'S89D03'W 1327.36'N165.38'N89D02'E 663.63 N0D01'W 1323.91 TO BEG(.46R) WELD 000000000 Subdivision Block I Lot Land Economic Area _ 4216 4 CENTRAL Property Address Property City I Zip Section I Township I Range WELD 000000000 14 02 66 Owner Information • Account Parcel Space I Account Type Tax Year Tax Area f Buildings Actual Value Assessed I I • Value R0524301 130914000023 Real State Assd 2011 2216 0 0 0 Owner(s) II Address Line 1 Address Line 2 iCity 1 ST Zip HS GATHERING 1999 BROADWAY SUITE No.3600 DENVER CO 80202 LLC Document History Information Account • Parcel I Space ' Account Type Tax Year I Tax Area Buildings Actual Value Assessed Value R0524301 130914000023 Real State Assd 2011 2216 0 0 0 Reception • Rec Date Type Grantor L_ Grantee T-Doc Fee Sale Date Sale Price 3567005 07/17/2008 USR HS GATHERING LLC HS GATHERING LLC 0.00 07/17/2008 0 • Building Information Account I Parcel Space Account Type Tax Year Tax Area Buildings Actual Value Assessed Value R0524301 130914000023 Real State Assd 2011 2216 0 0 0 • Valuation Information Account • Parcel I Space I Account Type I Tax Year I Tax Area I Buildings Actual Value Assessed • IC Value I R0524301 130914000023 Real State Assd 2011 2216 0 0 0 Type • Code ' Description Actual Value Assessed Acres I Land SqFt Value __ _ Land 8900 STATE ASSESSED LAND 0 0 24.750 1,078,110 0 0 24.750 1,078,110 Tax Authority Information Account Parcel I Space Account Type Tax Year Tax Area Buildings I Actual Value Assessed Value • R0524301 130914000023 Real State Assd 2011 2216 0 0 0 • Tax Area District ID District Name Current Mill Tax Year Levy • 2216 0100 WELD COUNTY 16.804 2011 2216 0203 SCHOOL DIST RE3J 22.242 2011 2216 0506 FORT LUPTON FIRE 6.101 2011 2216 0530 FORT LUPTON FIRE(BOND 2022) 2.380 2011 2216 0700 AIMS JUNIOR COLLEGE 6.360 2011 2216 1050 HIGH PLAINS LIBRARY 3.281 2011 2216 1201 PLATTE VALLEY CONSERVATION 0.000 2011 57.168 • Photo • ,rill ........ .. 0. ri- i . i .. ,„,i . • 1 4 . - 4.' .4...4,119, •• iii : 1, _ . . yea a. —al* --- —diallia"."--.------ • 7/10/2012 • ...., ezi• et•iitir--";= ,, - --intik,- Ili, • : '..#w4, . -• t. \ 1 �N•:.4"pr` I;_- .L e4:,- .. . 1-2L i-t1' i * `l. y i+3 '• ...; • lir.itit..J.-2-4' 11 • kjefiallrosaliferk l . f �� a t. ' v. is f C YO ! yl, ..:I4. r 4 • tr '� t 0 • • 1 7/10/2012 • 4 ___. 1 I ` I J I' � ° ' � i { ,. Led_ _ rL ‘,M, . . 1 d - • Y-J I — _ • �- _s I. 'c,i--•'aF�:1-:„ -='rcwY ' - •r.. t. ... s.-siY'• . a "'Alt - .ot a - -�-• "-ti -?r c..+ 3.4 irk � :rte`' t • IS.IM'. s 't. '�� I f ..Y- • I .Si. ." •• 4 r .. L" ..,, • • 1 A�,1�< T sl �Y id• •r r'. • •'� .^ . ...4 t 1•' . • '•. I• • .‘ • - ` _ rya - • . . %• •• ' • 2 7/10/2012 • . I - r -; !Yfrsc • sr• - . - - hir* ' T1 Syr -NIIIIIIIIIIIIIIIIIIIH .. - • ti • 1 • FIELD CHECK inspection dates: 5/25/2012 APPLICANT: Kerr-McGee Gathering LLC CASE #: USR12-0023 REQUEST: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT FOR A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT ANY USE PERMITTED AS A USE BY RIGHT, AN ACCESSORY USE, OR A USE BY SPECIAL REVIEW IN THE COMMERCIAL OR INDUSTRIAL ZONE DISTRICTS (AN OIL AND GAS SUPPORT FACILITY (CRYOGENIC FACILITY)INCLUDING A CONTROL ROOM,CARBON BEDS,AMINE UNITS,UTILITY BUILDINGS, PDC BUILDINGS, DEHYDRATION UNITS, CRYOGENIC UNITS, REFRIGERATION UNITS, RESIDUE COMPRESSORS, VESSELS, TANKS, TOWERS&FLARE STACKS), IN THE A (AGRICULTURAL)ZONE DISTRICT. LEGAL: Part of the NW4 of Section 14, T2N, R66W of the 6th PM, Weld County, Colorado. LOCATION: South of and adjacent to County Road 22 and 1 mile east of County Road 31. PARCEL ID #: 130914000024 ACRES: +1- 116.29 acres Zoning Land Use N A N Oil and Gas Compressor Station E A E Vacant land S A S Vacant land — nearest residences approx. 1/2 mile • south W A W Existing oil and gas support/processing facilities. COMMENTS: Vacant parcel with the exception of oil and gas wells and tank batteries onsite.4. #1 am 4 Chris Gathman - Planner Ill • Hello