HomeMy WebLinkAbout790928.tiff RESOLUTIGN
RE: MODIFICATION OF NORMAL WORKING HOURS TO INCREASE PRODUCTIVE
TIME IN THE ROAD AND BRIDGE DEPARTMENT.
WHEREAS, the Board of County Commissioners of Weld County,
Colorado, pursuant to Colorado statute and the Weld County Home
Rule Charter, is vested with the authority of administering the
affairs of Weld County, Colorado, and
WHEREAS, the present statuts of working hours for the Weld
County Road and Bridge Department is eight (8) hours per day,
forty (40) hours per week, such working hours to be from 8:00
o'clock a.m. to 5: 00 o'clock p.m. , and
WHEREAS, the Board has been informed that the present sta-
tus of working hours for the Road and Bridge Department does not
maximize productive hours within the Department since the most
productive hours can be attained during the summer months from
May through' October, and
WHEREAS, the Weld County Engineer and the Personnel Director
have presented a plan whereby certain divisions of the Weld County
Road and Bridge Department would be employed for a maximum of ten
(10) hours a day, fifty (50) hours per week during the months of
a
May through October, such time in excess of forty (40) hours per
week to be normally reimbursed at the rate of one and one-half (1')
times during the winter months of November through April until
such time as all overtime accumulated during the summer months
is used up, and
WHEREAS, the Board feels that it is in the best interests of
Weld County to institute such plan.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commis-
sioners of Weld County, Colorado that the following policy shall
be instituted within the Road and Bridge Department of Weld County:
1. That the Division of Construction Bridge, and Paving and
Aggregate shall, during the months of May through October ,
have a normal work day of ten (10) hours per day and a
normal work week of fifty (50) hours per week; and the
L . '
4'?^ i�,3 790928
r'1
r ,
• Weld County Engineer may, at his discretion, reduce
the number of hours worked per day or the number of
hours worked per week so as to maximize productive
hours.
2. All Divisions other than Construction, Bridge , and
Paving and Aggregate within the Road and Bridge Depart-
ment shall have a normal work day of eight (8) hours
per day and a normal work week of forty (40) hours per
week, except that the Weld County Engineer shall have
the discretion to increase the hours normally worked
per day and normally worked per week so as to increase
the operating efficiency of such Division.
3. Such hours of employment of the Road and Bridge Depart-
ment employees may, at the discretion of the Weld County
Engineer, begin prior to 8: 00 o'clock a.m. and end later
than 5 :00 o'clock p.m. so as to reach a maximum scheduling
capability.
4. Compensation time. Within the operational requirement of
the Road and Bridge Department, overtime accumulated during
the summer hours shall normally be taken during the months
of November through April, during which time the employees
of the Road and Bridge Department shall work only twenty-
five (25) hours per week until such time as all overtime
accumulated during the summer months has expired.
5. Employees in the Constructicn, Bridge, and Paving and
Aggregate Divisions shall, during the week that contains
the holiday July 4 , not work during the such week but
accumulated overtime shall be used in its place.
The above and foregoing Resolution was, on motion duly made
and seconded, adopted by the following vote on the 7th day of
March, A.D. , 1979.
BOARD OF COUNTY COMMISSIONERS
ATTEST: 7110,,AAAA27-tiveliwtoniW LD COUNTY, COLORADO
Weld County Clerk and Recorder
Clerk to the Board 2
u
eputy County JerkC'.J
A vED AS TO �at�lV"` /. Y/� / 31/r77 �1/
71 L onard Roe absent
County Attorney
DATE PRESENTED: MARCH 7, 1979
Hello