HomeMy WebLinkAbout20121527.tiff INVENTORY OF ITEMS FOR CONSIDERATION
• AppLCcavut NOBLE ENERGY—DILLARD CaseNuvubev USR12-0014
FAMILY TRUST
sub✓etated ov Prepared
Prior to At
rteariwg r+eariowg
1 Proposed Avuewdvin.ewts to staff Report IVSRX12-0014 Nobbe EwevguU, x
wc.
2 NobLe Ev,erg j, iwc. PresevutatLoK,yegavdLwg cuvvv tLvs Field rvjectbow X
lac lbt� - 06/05/12
•
herebu cevtbfu that the itevus LdewtbfLed hevebw weve subvwbtted to the nepavtvv.ewt of ALP ANL Ing
sevvbces at or prior to the scheduled PLawwLwg CovwiMLssLowers heavtvvc.
K.Lvs& Ogbe ❑ Plawwer
•
&?/a —/5a
�S6, MEMORANDUM
To: Planning Commissioners
11
From: Kim Ogle, Planning Services
0 0 N T' J Subject: Proposed amendments to the Staff Report
USRX12-0014 Noble Energy, Inc.
Date: June 5, 2012
The Department of Planning Services is proposing the following amendments to the Staff Report for Noble
energy, Inc. Case Number USRX12-0014:
Condition of Approval 1.E.3
Intersecting County Roads 80 and 55 are designated on the Weld County Road Classification Plan as
gravel roads, which require 60 feet of right-of-way at full build out.The applicant shall verify the existing right-
of-way and the documents creating the right-of-way and this information shall be noted on the plat. All setbacks
shall be measured from the edge of future right-of-way. If the right-of-way cannot be verified, it shall be
dedicated. These roads are maintained by Weld County. (Department of Public Works)
Amended Text:
Intersecting County Roads 80 and 55 are designated on the Weld County Road Classification Plan as
gravel roads, which require 60 feet of right-of-way at full build out. These roads are maintained by Weld
County. (Department of Public Works)
Condition of Approval E.6, page 5
• Please show the retention and drainage facilities to be within a drainage easement which has been
described on the plat and labeled as a "No Build or Storage Area". (Department of Public Works)
Amended Text:
Please show the detention and drainage facilities to be within a drainage easement which has been
described on the plat and labeled as a "No Build or Storage Area". (Department of Public Works)
Condition of Approval 6.E -- Prior to the Release of Building Permits:
Detailed plans for the concrete secondary containment structure for all storage and processing tanks shall
be submitted. Secondary containment volume shall provide containment for the entire contents of the
largest single tank plus sufficient freeboard to allow for precipitation.
Amended Text:
Detailed plans for the concrete secondary containment structure for all storage and processing tanks shall
be submitted. Secondary containment volume shall provide containment for the entire contents of the
largest single tank plus sufficient freeboard to allow for precipitation. The WCDPHE will consider
containment structures other than concrete provided a Colorado Registered Professional Engineer proves
a certification indicating that the proposed structure meets or exceeds the expected function of a concrete
structure in regard to containment, spills and unintended releases.
Development Standard No, 18:
The operation shall comply with all applicable State noise statutes and/or regulations. (Department of
Public Health and Environment)
Amended Text
Delete Development Standard No. 18 as Development Standard No.7 addresses the Noise requirements
• SERVICE,TEAMWORK,INTEGRITY,QUALITY
EXHIBIT
2012-1527 b/5/2oIT
0sa- t2--cal¢
Development Standard No. 21:
The property owner will be responsible excavate, repair, or patch any damage on the haul route to •
mitigate for heavy truck traffic volumes created by the construction of the facility. The type and method of
repair will be determined by the Department Public Works. The applicant will also be required to provide
dust abatement during the construction of the facility. (Department of Public Works)
Amended Text:
The property owner will be responsible excavate, repair, or patch any damage to County Road right-of-
way on the haul route to mitigate for heavy truck traffic volumes. The type and method of repair will be
determined by the Department Public Works. The applicant will also be required to provide dust
abatement during the construction of the facility. (Department of Public Works)
Development Standard No. 27:
A building permit will be required for the future office structure and any new construction, alternation, or
addition to any buildings or structures on the property. It is recommended that a code analysis be done on
the project by a design professional with experience in this area. (Department of Building Inspection)
Amended Text:
A building permit will be required for the future office structure and any new construction, alternation, or
addition to any occupied buildings or structures on the property. A code analysis shall be done on the
project by a design professional with experience in this area. (Department of Building Inspection)
•
•
SERVICE,TEAMWORK,INTEGRITY,QUALITY
e
6/4/2012
•
USE BY SPECIAL REVIEW FOR NOBLE ENERGY
CUMMINS FIELD INJECTION FACILITY
WELD COUNTY PLANNING COMMISSION JUNE 5, 2012
1111111.-.4
?ISM rlC 11 noble
hi L energy
INTRODUCTIONS
Noble Energy
• Greg Pickerel
Facilities Engineer
• Land Owner
• Dillard Family LLC
Consultants: Tetra Tech
• Julie Cozad. Land Planning Manager
• Katlic* Mark. Civil Engineering
NOBLE ENERGY COMPANY OVERVIEW
• Noble Energy has been engaged in crude oil and
natural gas exploration and development activities
throughout the onshore US since 1932 and in the Gulf
of Mexico since 1968.
• Noble Energy is an S&P 500 company with reserves of
1.2 billion barrels of oil equivalent and assets totaling
over $16 billion at year-end 2011.
• in the DJ basin. our activity is focused on liquid-rich
production from the Wottenberg field where we are
growing a horizontal drilling program while
maintaining a vertical drilling program. Over 85
horizontal wells were drilled in 2011 and plans are to
drill twice that amount in 2012. The Company holds
over 860,000 net acres in the brooder DJ basin.
•
EXHIBIT
(o / Sjjo12
n 1
f"
EJS1Z (Z- OO I4
• 6/4/2012
•
VICINITY MAP
re--11, ,
..____ •• 4t.
A
VICINITY PHOTOS
• tr
1 4
it r, - .
+' k *la'
VICINITY PHOTOS
J ,
-...t' 4- ` _. ,
'4
.4..4. \ ♦ ♦
4
1
t •/ l.l a\dpi.Pi. i . 1,9 ' .
..' .
•
2
r
6/4/2012
Ill
SITE PHOTOS
t equipment
_. eq," ,,� on slte
r. r
I easm.
a— i 4.1., A , r .....*i
air, . rI :IE
ti . .' 3 -
•'E.tfr J' i - _ V.h1-,.- ~.
SITE PHOTOS
eir
• r1
•
USR SITE MAP
• ��--�-.• +. T
a ►-^* "
h M
AMM
. Lira)
•
44
`\ 1
•
3
•
6/4/2012
•
PROJECT OVERVIEW AND SCHEDULE
•Oil and Gas support facility including:
• Injection well and secondary recovery of produced water for
Noble's wafer only(non-commerclah and awriated sflucrures
• Expected flow directly from pipelines In the Cummins Field Plea.
3500-6.000 barrels/day
• 24 hours/day 7 days/week
• Reduces truck traffic by approximately 23 bucks/day
• Unmanned facility
•Access from constructed lease road from WCR 80 and
WCR 55 with Surface Use Agreements and Easements
•Site location
•Schedule: 6-8 months to construct to begin as soon as
USR is approved
CONDITIONS AND DEVELOPMENT
STANDARDS
• Meets the Intent of the Weld County Code
• Comprehensive Plan
•Zoning
• • Compatibility
•Specific Condition and Development Standards
• Generally agree with Conditions and Standards,but request
some modncaflons
• carillon of Approval I.E.3)(Page 4)
• cwdli n of Pwovd I.E.6)(Page5)
• Development Standards:11.1e and 21
REQUEST FOR APPROVAL
On behalf of Noble Energy we request a
recommendation of approval from Planning
Commission to the Board of County
Commissioners since the project meets Weld
County Code requirements.
•
4
6/4/2012
•
ECONOMICS OF OIL AND GAS IN
COLORADO
In 2010, the oil and gas industry was a source of
$31 .9 billion/year in economic activity in Colorado,
$20 billion in attributable to drilling and extraction
(CU Leeds School of Business)
Employs more than 40,000 people directly
Over 47,000 active Oil and Gas wells
Increase to property tax revenues in Weld County
Increase of property values in some areas
QUESTIONS?
li) TI 'RA flu. 1 �� nenIer
GGenergy
romma
•
•
•
5
Hello