Loading...
HomeMy WebLinkAbout780725.tiff RESOLUTION RE: APPROVAL OF REQUEST FOR REVIEW OF POTABLE WATER SUPPLY SYSTEM FACILITIES BY THE CITY OF GREELEY. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, on the 26th day of April , 1978 , the Board of County Commissioners of Weld County, Colorado heard the request for review of drawings and specifications pertaining to potable water supply system facilities for the City of Greeley, in the Southeast corner of Section 16 , Township 5 North, Range 67 West, Weld County, Colorado, and WHEREAS, the Board of County Commissioners deems it advisable and in the best interest of Weld County to approve the request of the City of Greeley for review of a potable water supply system facility, and further to authorize the Chairman of the Board to sign the recommendation for approval. NOW, THEREFORE, BE IT RESOLVED by the Board of County Com- missioners of Weld County, Colorado, that the aforementioned request for approval of potable water supply system facilities for the City of Greeley, be and hereby is, granted favorable review, and the Chairman of the Board is authorized to sign the same. The above and foregoing Resolution was , on motion duly made and seconded, adopted by the following vote on the 26th day of April, A.D. , 1978 . / BOARD OF COUNTY COMMISSIONERS ATTEST: %7.ny�-"_ WELD COUNTY, COLORADO Weld County C erk and Recorder J ' �' and Clerk to the Board J � By: y� ct (/?G �-C�.�nvr-n-_n/ Deputy bounty Clerk /J API"? D AS TO FORM: &-dts..-.- County Attorney Date Presented: May 3 , 1978 ! 78007225n,,047 COLORADO DEPARTMENT OF HEP'TH -Rate April 6, 1978 Water Quality Control Divi _ 1on 4210 East 11th Avenue ' Denver, Colorado 80220 REQUEST FOR REVIEW OF DRAWINGS AND SPECIFICATIONS PERTAINING TO POTABLE WATER SUPPLY SYSTEM FACILITIES (Submit in Duplicate) From: City of Greeley, Colorado (Name of Municipality, District, Utility, or other owner) Business Address: 919 7th Street, Greeley, Colorado Phone No. (303) 353-6123 To: Colorado State Department of Public Health, Water Quality Control Division 1 . It is requested that the following drawings , specifications , reports, and de- sign information be reviewed by your Department: List of Documents: Construction Plans and Specifications for Water Storage Reservoir Additional information may be required, upon request of the Water Quality Control Division and local governmental officials. This may include (a) relationship of this facility to area-wide plan, (b) flood plain data, (c) provision for main- tenance and operation of the facility, (d) legal status (district, association, municipality) . A. INFORMATION REGARDING PROJECT SUBMITTED FOR REVIEW: 1 . Description and size of water facility:* 15 Million Gallon Water Reservoir 2. Type of Raw Water Source: Big Thompson Surface a. Location. of Intake Lake Loveland b. If wells - depth Formation 3. Location of Water Facility: S.E. Cor. Sec . 16 T 5 N R67W Weld County 4. Give distance upstream from intake of any domestic or industrial waste discharge: Not applicable 5. Elevation (MSL) of the 100 year flood Not applicable ft. MSL. (This must also be shown on the plans) . 6. Will the wells or treatment plant continue to operate during a 100 year flood? Not applicable 7. Estimated Project Cost $2,225,000 Estimated Bid Opening Date Approximately 1 June 1978 Estimated Completion Date 1 March, 1979 8. Consulting Engineer: name C-E Tec, Nelson, Haley, Patterson & Quirk, Inc. address 2021 Clubhouse Drive Registered Yes State Colorado . *Additional information may be requested by the State Health Department on design criteria, service area, etc. (Continued) B. SIGNATURE OF LOCAL GOVERNMENT OFFICIALS: Theundersigned * have reviewed the proposal for the location, construction, operation, and point of source and intake of the above-described water treatment facility, and RECOMMEND APPROVAL or DISAPPROVAL in space provided below: DATE Recommend Recommend APPROVAL DISAPPROVAL Signature for Mayor or City Manager of Municipa ity or Presi ent of Water Utility Ifrf Sig ture for Local He th Department or U���Jf{ X County Sa��\Jj tartan // Signet re for Board of County Commissioners Signature for Regional Planning Representative *Before this application will be accepted for review, the applicant must show here- on the action taken on the project by representative of the local health officials , representative of the Board of County Commissioners , the Mayor or City Manager of the municipality or President of Water Utility and the Regional Planning Official . id Date re u Signaand g Tit of Applicant ETB:bjd 1/31/78 Hello