HomeMy WebLinkAbout20120430.tiff INVENTORY OF ITEMS FOR CONSIDERATION Appllcavttt NOBLE ENERGY, INC. Case Nuw&.ber USR11-0026 • Subpx tt?G,or Prepared Prior to At HeRrii&g HeariAks z staff Covvthato-ts X Depotrtvuewt of Plav A,lwg services Field Check Faro. X Plavwl,i,vtg Cow(vulssiovLev Field Check, Forv& Letter to Applicant X A f fldavit o f slgvn postivtg X Legal NotlfcatiovLs Ni 2 Applicatloh, X Maps peed/ easewtevkt Certl flcate surrouvLdlvtg Pro-pert Mlotral Owvters utilities 3 Referral List awd Referrals without cov ..vvteht• North Weld County Water District, referral dated November 18, 2011 Weld County Zcnirt3 C.u,rp1a,4,, Il/ai/ oii Colorado Parks and Wildlife, referral dated December 14, 2011 µ Referrals with covvvue&ts x Weld County Department of Building Inspection, referral dated October 26, 2011 Platte Valley Fire Protection District, referral dated November 28, 2011 State of Colorado, Division of Water Resources December 5, 2011 Weld County Department of Public Works, referral dated December 13, 2011,\'January 9, 2012 Weld County Department of Public Health and Environment, referral dated December 19, 2011 Colorado Department of Transportation, email dated December 20, 2011, January 9, 10, 11, 2012 PC Exhibits x Electronic Mail from Vince Harris, Baseline Corp dated January 6, 2012, • N 0. with Draft Traffic Study dated January 2012 EXHIBIT 2012-0430 I ii 6 Electronic Mail from David Bauer, Public Works dated January 10, 2012 with attachment Memorandum dated January 9, 2012 • S L Electronic Mail from Timothy Bilobran, CDOT Region IV Access Manager dated January 11, 2012 J lo 2Ar z. S.d Electronic Mail from Vince Harris, Baseline Corp dated January 11, 2012 Electronic Mail from Heidi Hansen, Public Works dated January 11, 2012 Electronic Mail from Vince Harris, Baseline Corp dated January 12, 2012 S with attachment of Revised Traffic Study dated January 12, 2012 Electronic copy of Planning Commissioners Hearing Presentation received 5. C from Vince Harris, Baseline Corp dated January 17, 2012 Electronic Mail from Timothy Bilobran, CDOT Region IV Access Manager S a / dated January 17, 2012 regarding site access onto SH 392 from CR 57 c1` Electronic Mail from Vince Harris, Baseline Corp dated January 19, 2012 regarding core sample for CR 57 Electronic Mail from Curt Moore, Noble Energy dated January 23, 2012 S_ concerning timing of traffic study request Electronic Mail from Janet Carter, Public Works dated January 24, 2012 with timeline and attachments supporting timeline Electronic Mail from Andrei Bedoya, P.E., RMG Engineers Group, dated L January 27, 2012 regarding pavement boring and lab test results from core sample in CR 57 • Ni Electronic Mail from Vince Harris, Baseline Corp dated February 6, 2012 5, k with attachment of Revised Traffic Study Addendum dated February 2, 2012 S, Affidavit of sign posting and Photograph dated January 25, 2012 (-1.4J"41`-'1 • • i herebU certL f f that the 5 items £dewtL fled !Ivan were subv t tted to the Department of PLa vLvt i g Services at or prior to the scheduled 1>Laythin.0 Covuvu.LssiovL.ers heari.h.g. Kivu Ocibe PLah„ner • • • 1861 -2011 LAND USE APPLICATION SUMMARY SHEET WELR__C0 NTY Planner: Kim Ogle Hearing Date: January 17, 2012 Continued to: February 7, 2012 Case Number: USR11-0026 Applicant: Noble Energy, Inc 1625 Broadway Street, Denver, Colorado 80202 Representative: Vince Harris, Baseline Corporation 700 12`" Street, Suite 220, Golden, Colorado 80401 Request: A Site Specific Development Plan and a Special Review Permit for Oil and Gas Support and Service Facility (Water Supply & Storage) in the A (Agricultural) Zone District. Legal Description: Lot B of RE-5113, being part NW4 Section 26, T6N, R64W of the 61h P.M., Weld County Colorado Location: South of and adjacent to County Road 66, East of and adjacent to County Road 57 Size of Parcel: 85 Acres +/- Parcel No. 0801-26-2-00-003 and 0801-26-2-00-004 • POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The criteria for review of this Special Review Permit is listed in Section 23-2-220 of the Weld County Code. The Department of Planning Services' staff has received referral responses with comments from the following agencies: • Weld County Department of Building Inspection, referral dated October 26, 2011 • Platte Valley Fire Protection District, referral dated November 28, 2011 • State of Colorado, Division of Water Resources December 5, 2011 • Weld County Department of Public Works, referral dated December 13, 2011, January 9, 2012 • Weld County Department of Public Health and Environment, referral dated December 19, 2011 • Colorado Department of Transportation, email dated December 20, 2011, January 9, 10, 11, 2012 The Department of Planning Services' staff has received referral responses without comments from the following agencies: • North Weld County Water District, referral dated November 18, 2011 • Weld County Zoning Compliance, referral dated November 21, 2011 • Colorado Parks and Wildlife, referral dated December 14, 2011 The Department of Planning Services' staff has not received responses from the following agencies: Weld County Sheriffs Office School District RE-7 • r Colorado Department of Public Health and Environment EXHIBIT 'r North Colorado Water Conversation Board NOBLE ENERGY,INC. ' USR11-0026,page 1 LSE. 4)0 V_ i1 8 6 I - 2 0 1 1 SPECIAL REVIEW PERMIT ADMINISTRATIVE REVIEW WELD COUNTY Planner: Kim Ogle Hearing Date: January 17, 2012 Continued to: February 7, 2012 Case Number: USR11-0026 Applicant: Noble Energy, Inc 1625 Broadway Street, Denver, Colorado 80202 Representative: Vince Harris, Baseline Corporation 700 12'h Street, Suite 220, Golden, Colorado 80401 Request: A Site Specific Development Plan and a Special Review Permit for Oil and Gas Support and Service Facility(Water Supply& Storage) in the A(Agricultural) Zone District. Legal Description: Lot B of RE-5113, being part NW4 Section 26, T6N, R64W of the 6th P.M., Weld County Colorado • Location: South of and adjacent to County Road 66, East of and adjacent to County Road 57 Size of Parcel: 85 Acres +1- Parcel No. 0801-26-2-00-003 and 0801-26-2-00-004 THE DEPARTMENT OF PLANNING SERVICES'STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. It is the opinion of the Department of Planning Services' staff that the applicant has shown compliance with Section 23-2-220 of the Weld County Code as follows: A. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other applicable code provisions or ordinance in effect. Section 22-2-20.C. A.Policy 3.3. states: "Land use regulations should consider the traditional and future operational viability of water-delivery infrastructure when applications for proposed land use changes are considered." The proposed facility will utilize public water from North Weld County Water district 1.5 inch water tap that will be upsized to a four(4) inch tap. The holding pond will be approximately four acres in size and will hold an estimated thirty (30) acre feet of water. Section 22-2-20.G. A.Goal 7. states "County land use regulations should protect the individual property owner's right to request a land use change." • Section 22-2-20.G. 1. A.Policy 7.1. states "County land use regulations should support commercial and industrial uses that are directly related to, or dependent upon, agriculture, to NOBLE ENERGY,INC. USR11-0026,page 2 locate within the agricultural areas, when the impact to surrounding properties is minimal, or can be mitigated, and where adequate services are currently available or reasonably obtainable. The proposed groundwater loadout facility will support oil and gas companies in the Denver-Julesburg Basin by supplying water for their oil and gas drilling operations. Section 22-2-20.G. 2. A.Policy 7.2. states "Conversion of agricultural land to nonurban residential, commercial and industrial uses should be accommodated when the subject site is in an area that can support such development, and should attempt to be compatible with the region." The proposed facility is located approximately one (1) mile east of the Townsite of Gill and is bordered by County Road 66 and County Road 57 to the south and east respectively. The facility will be located on an 85-acre parcel. Treated water will be released into a holding pond that will be pumped to the fill station /load out facility located on site. Section 22-2-80 D. I.Goal 4. of the Weld County Code states: "All new industrial development should pay its own way." Noble Energy, Inc., and their successors will be paying for all on- site and offsite improvements associated with this use as required through the improvements agreement. Section 22-4-30.A. WA.Goal.1 states "Support the development of water that is put to beneficial use, along with associated infrastructure." The proposed fill station /load out facility will provide a valuable and indispensable service to oil and gas companies. The centralized location for load out minimizes the removal of agricultural land from production. Section 22-6-20.C.1. ECON.Policy 3.1. County activities and regulation should protect the rights of private property owners and the public health, safety and welfare, recognizing that these basic rights and protections allow the free market to prosper and grow the local economy. • B. Section 23-2-220.A.2 -- The proposed use is consistent with the intent of the A (Agricultural) Zone District. Section 23-3-40.A.2 of the Weld County Code provides for Oil and Gas Support and Service as a Use by Special Review in the A (Agricultural) Zone District. C. Section 23-2-220.A.3 -- The uses which will be permitted will be compatible with the existing surrounding land uses. The facility is located in a rural agricultural area on parcel containing no improvements. Adjacent properties are utilized for crop production, primarily corn and for confined feeding operations, including a Dairy. Oil and gas facilities are existing encumbrances on this parcel and adjacent properties. There are a few residences in the immediate area. Development Standards and Conditions of Approval will ensure that this use will be compatible with surrounding land uses. D. Section 23-2-220.A.4 -- The uses which will be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected by Chapter 22 of the Weld County Code and any other applicable code provisions or ordinances in effect, or the adopted Master Plans of affected municipalities. The site is not located within the 3-mile referral for a municipality. E. Section 23-2-220.A.5 --The application complies with Section 23-5 of the Weld County Code. The existing site is not within a recognized overlay district, including the Geologic Hazard, Flood Hazard or Airport Overlay District. The existing site is within the County Road Impact Fee Area and the Capital Expansion Impact Fee area. Effective April 25, 2011, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the Weld County Road Impact Program.(Ordinance 2011-2) • NOBLE ENERGY,INC. USR11-0026,page 3 Effective April 25, 2011, Building Permits issued on the proposed lots, will be required to • adhere to the fee structure of the County Facility Fee and Drainage Impact Fee. (Ordinance 2011-2) F. Section 23-2-220.A.6 -- The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use. The proposed facility is located on soils designated as "Prime" and Irrigated Land (Not Prime) per the 1979 Soil Conservation Service Important Farmlands of Weld County Map. The entire site has historically been in crop production. The applicant has indicated that the approximate six (6) acre site will be removed from agricultural production, with the remaining lands leased as agricultural production fields. G. Section 23-2-220.A.7 -- The Design Standards (Section 23-2-240, Weld County Code), Operation Standards (Section 23-2-250, Weld County Code), Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. SUMMARY OF USE: The load out facility proposed for Noble Energy, Inc. will be an open thirty (30) acre foot lined pond with a six island fill station that will allow the facility to develop and store water in an efficient manner. The fill station facility, including temporary water storage will occur in an area adjacent to County Roads 66 and 57. In general, the water contractor comes to the site in his tanker truck entering the facility with a keycard that allows access through the entry gate. The truck will pull forward to the filling station island and the contractor will utilize a second keypad to activate the water depot and thereby allowing the driver to fill their tanker truck. Each island is to be equipped with a 4" quick connect (this is the standard connection). The tankers fill connection is located near the bottom of the tank • (approximately chest level). The connection and on-board pump creates a vacuum that allows the truck to fill in approximately 12 minutes. The trucks that will be pumping from the pond are each equipped with their own on-board pump that will be used to draw water from the pond and fill the tankers. The coupling at each island that the tankers hook to is a quick connect hose that is connected to a piping system to pull water from the bottom of the pond. Each pipe is to be equipped with a flow meter to monitor the amount of water taken and check valve to prevent back flow. The trucks are each equipped with automatic shut off system when they have reached capacity. In the case of the back-up pump, the operator will manually shut the pump down when the truck has reached capacity. After filling operations are finished, the water contractor pulls forward to the exit gate and departs with the gate automatically closing behind the vehicle. The facility is proposed to operate 24 hours—7 days a week and will be utilized by Noble Energy and their contractors only. The facility will operate on a daily basis with 25 roundtrip(50 one way) haul trucks accessing the site. The applicant would like to be able to increase the traffic up to 400 roundtrip(800 one way) haul trucks. Some roadway and intersection safety improvements will be installed prior to operation with additional upgrades and maintenance required as the traffic increases. The Department of Planning Services' staff recommendation for approval is conditional upon the following: 1. Prior to scheduling a Public Hearing: A. The applicant shall provide a revised Traffic Study signed and stamped by a Professional Engineer licensed to practice in the State of Colorado following the checklist available on the Public Works website. This document shall be submitted to the Colorado Department • of Transportation and the Department of Public Works for review and comment. Additional conditions of approval may be required. (Department of Public Works, CDOT) NOBLE ENERGY,INC. USR11-0026,page 4 2. Prior to recording the plat: • A. The plat shall be prepared per Section 23-2-260.D of the Weld County Code. (Department of Planning Services) B. All sheets of the plat shall be labeled USR11-0026. (Department of Planning Services) C. The plat shall be amended to delineate the following: 1) The attached Development Standards. (Department of Planning Services) 2) County Road 57 is designated on the Weld County Road Classification Plan as a local gravel road, which requires 60 feet of right-of-way at full build out. The applicant shall verify the existing right-of-way and the documents creating the right-of-way and this information shall be noted on the plat. All setbacks shall be measured from the edge of future right-of-way. If the right-of-way cannot be verified, it shall be dedicated. This road is maintained by Weld County. (Department of Public Works) 3) County Road 66 is a Section Line road, with 60 feet of right-of-way, thirty (30) feet either side of section line. The applicant shall verify the existing right-of-way and the documents creating the right-of-way and this information shall be noted on the plat. All setbacks shall be measured from the edge of future right-of-way. If the right-of-way cannot be verified, it shall be dedicated. (Department of Public Works) 4) The facility has proposed two accesses for the site, an entrance and an exit. Appropriate signage is required for these accesses. Large radiuses (65 feet) are • required at the access points to allow for large trucks turning into the site. Please show the approved accesses on the Plat and label them with the Access Permit number(will be provided). (Department of Public Works) 5) Show and label the truck staging area and address questions as to how many trucks may be staged to fill at any one time. (Department of Public Works) 6) A vehicle tracking pad will be required for this site to prevent tracking of mud and debris onto the County roadway. The Public Works standard tracking pad detail consists of 100 feet of pavement and a double cattle guard at the exit of the site or 300 feet of pavement. This preferred vehicle tracking pad option shall be delineated. (Department of Public Works) 7) There are 6 filling stations and an expected 17 trucks/hour filling at the site. Please show and label enough staging areas for trucks waiting to be filled. No staging can take place on the County roadway. (Department of Public Works) 8) Identify the location of the office and MCC building. (Department of Planning Services) 9) The approved Lighting Plan. (Department of Planning Services) D. The applicant shall address the requirements (concerns) of the Weld County Department of Public Works, as stated in their referral response dated December 13, 2011 and January 9, 2012. This includes off-site improvements, on-site improvements, transportation related items, haul route signs and routes as approved by Public Works. • (Department of Public Works) E. An Improvements and Road Maintenance Agreement including paving upgrades and maintenance of the haul route is required. Any haul route improvements along with NOBLE ENERGY,INC. USR11-0026,page 5 possible improvements required at State Highway 392 will be determined after the • revised traffic study has been received and reviewed. (Departments of Public Works) F. The applicant shall obtain a Colorado Department of Transportation (CDOT) Access Permit. A copy of the approved CDOT Access Permit shall be provided to the County. (Department of Public Works) G. The applicant shall obtain a stormwater discharge permit from the Water Quality Control Division of the Colorado Department of Public Health and Environment. (Departments of Public Works) H. An individual sewage disposal system is required for the proposed facility and shall be installed according to the Weld County Individual Sewage Disposal Regulations. The septic system is required to be designed by a Colorado Registered Professional Engineer according to the Weld County Individual Sewage Disposal Regulations. (Department of Public Health and Environment) The applicant shall submit a waste handling plan, for approval, to the Environmental Health Services Division of the Weld County Department of Public Health & Environment. The plan shall include at a minimum the waste handler and facility where trash and garbage will be disposed (including the facility name, address, and phone number). (Department of Public Health and Environment) J. The applicant shall either submit a copy of an agreement with the property's mineral owner/operators stipulating that the oil and gas activities have been adequately incorporated into the design of the site or show evidence that an adequate attempt has been made to mitigate the concerns of the mineral owner/operators. Drill envelopes can be delineated on the plat in accordance with the State requirements as an attempt to • mitigate concerns. The plat shall be amended to include any possible future drilling sites. (Department of Planning Services) 3. The applicant shall submit three (3) paper copies of the plat for preliminary approval to the Weld County Department of Planning Services. (Department of Planning Services) 4. Upon completion of 1. 2., and 3. above the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within sixty (60) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 5. The Department of Planning Services respectively requests the surveyor provide a digital copy of this Use by Special Review. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are ArcView shapefiles, Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4). (Group 6 is not acceptable). This digital file may be sent to dhuerterco.weld.co.us. (Department of Planning Services) 6. Prior to the Release of Building Permits: A. A building permit application must be completed and two complete sets of plans including engineered foundation plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A geotechnical engineering report performed by a registered State of Colorado engineer shall be required. (Department of Building Inspection) B. Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2006 International Building Code; 2006 International Mechanical Code; 2006 NOBLE ENERGY,INC. USR11-0026,page 6 International Plumbing Code: 2006 International Energy Code; 2006 International Fuel • Gas Code; 2011 National Electrical Code; 2003 ANSI 117.1 Accessibility Code and Chapter 29 of the Weld County Code. (Department of Building Inspection) C. Building height shall be measured in accordance with the 2006 International Building Code for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. (Department of Building Inspection) D. Building permits are required for buildings, structures and change of use for buildings which required permits before the beginning of construction or the proposed change of use. (Department of Building Inspection) E. A building permit will be required for any new construction, alteration, or addition to any building on the property. It is recommended that a code analysis be done on the project by a design professional with experience in this area. (Department of Building Inspection) F. A plan review shall be approved and a permit must be issued prior to the start of construction. (Department of Building Inspection) G. A letter is required from the Platte Valley Fire Protection District as to whether a fire permit will be required. (Department of Building Inspection) 7. One month prior to the start of construction: • A. The applicant shall submit a grading permit showing: proposed grading, erosion control placement, typical details for all BMPs to be utilized, and a Construction Stormwater permit from the Colorado Department of Public Health and Environment. The permit must be stamped by a registered professional engineer licensed in the State of Colorado. Please note that the grading permit will not be released until the applicant has signed the improvements agreement, posted collateral, and submitted the USR plat for recording. Evidence of Department of Public Works approval shall be submitted in writing to the Weld County Department of Planning Services. (Department of Public Works) • NOBLE ENERGY,INC. USR11-0026,page 7 SITE SPECIFIC DEVELOPMENT PLAN • SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS Noble Energy Inc. USR11-0026 1. A Site Specific Development Plan and a Special Review Permit for Oil and Gas Support and Service Facility (Water Supply & Storage) in the A (Agricultural) Zone District and subject to the development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. Hauling hours (truck trips to and from the facility) shall be limited 24-hours seven-days/ week. (Department of Planning Services) 4. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) 5. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. (Department of Public Health and Environment) 6. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. • (Department of Public Health and Environment) 7. The applicant shall operate in accordance with the approved "waste handling plan", at all times. (Department of Public Health and Environment) 8. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be operated in accordance with the approved "dust abatement plan", at all times. (Department of Public Health and Environment) 9. This facility shall adhere to the maximum permissible noise levels allowed in the Commercial Zone as delineated in Section 14-9-30 of the Weld County Code. (Department of Public Health and Environment) 10. Adequate drinking, hand washing and toilet facilities shall be provided for employees and contractors of the facility, at all times. (Department of Public Health and Environment) 11. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. (Department of Public Health and Environment) 12. A permanent, adequate water supply shall be provided for drinking and sanitary purposes (North Weld County Water District). (Department of Public Health and Environment) 13. Adequate toilet facilities (portable toilets) and hand washing units shall be provided during the construction of the facility. (Department of Public Health and Environment) 14. Bottled water shall be utilized for drinking during construction of the project. (Department of Public • Health and Environment) NOBLE ENERGY,INC. USR11.0026,page. 8 15. The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code. (Department of Public Health and Environment) • 16. There shall be no parking or staging of vehicles on County roads. (Department of Public Works) 17. Pursuant to Chapter 15, Articles I and II of the Weld County Code, if noxious weeds exist on the property or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds. All vegetation, other than grasses, needs to be maintained at a maximum height of 12 inches until the area is completely developed. (Department of Public Works) 18. The historical flow patterns and run-off amounts will be maintained on site in such a manner that it will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and velocity increases, diversions, concentration and/or unplanned ponding of storm run-off. (Department of Public Works) 19. An annual road inspection will be performed in the spring to establish the condition of the haul route and surrounding roadways to determine if any road damage was caused by the operation of the loading facility. (Department of Public Works, Colorado Department of Transportation) 20. The applicant will be responsible excavate, repair, or patch any damage on the roadways to mitigate for heavy truck traffic volumes created by the loading facility. The type and method of repair will be determined by the Department Public Works. (Department of Public Works, Colorado Department of Transportation) 21. If road damage is beyond repair, the applicant will pay their proportional share for the reconstruction to restore the road. (Department of Public Works, Colorado Department of Transportation) • 22. The landscaping/screening on site shall be maintained in accordance with the approved Landscape/screening Plan. (Department of Planning Services) 23. Sources of light shall be shielded so that light rays will not shine directly onto adjacent properties where such would cause a nuisance or interfere with the use on the adjacent properties; and Neither direct nor reflected light from any light source may create a traffic hazard to operators of motor vehicles on public or private streets and no colored lights may be used which may be confused with or construed as traffic control devices. (Department of Planning Services) 24. Effective April 25, 2011, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the Weld County Road Impact Program.(Ordinance 2011-2) (Department of Planning Services) 25. Effective April 25, 2011, Building Permits issued on the proposed lots, will be required to adhere to the fee structure of the County Facility Fee and Drainage Impact Fee. (Ordinance 2011-2) (Department of Planning Services) 26. A building permit application must be completed and two complete sets of plans including engineered foundation plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A geotechnical engineering report performed by a registered State of Colorado engineer shall be required. (Department of Building Inspection) 27. Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2006 International Building Code; 2006 International Mechanical Code; 2006 International Plumbing Code: 2006 International Energy Code; 2006 International Fuel Gas Code; 2011 National . Electrical Code; 2003 ANSI 117.1 Accessibility Code and Chapter 29 of the Weld County Code. (Department of Building Inspection) NOBLE ENERGY,INC. USR11-0026,page. 9 28. Building height shall be measured in accordance with the 2006 International Building Code for the • purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. (Department of Building Inspection) 29. Building permits are required for buildings, structures and change of use for buildings which required permits before the beginning of construction or the proposed change of use. (Department of Building Inspection) 30. A building permit will be required for any new construction, alteration, or addition to any building on the property. It is recommended that a code analysis be done on the project by a design professional with experience in this area. (Department of Building Inspection) 31. A plan review shall be approved and a permit must be issued prior to the start of construction. (Department of Building Inspection) 32. A letter is required from the Platte Valley Fire Protection District as to whether a fire permit will be required. (Department of Building Inspection) 33. The Special Review activity shall not occur nor shall any building or electrical permits be issued on the property until the Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder. (Department of Planning Services) 34. The property owner or operator shall be responsible for complying with the Design Standards of • Section 23-2-240, Weld County Code. (Department of Planning Services) 35. The property owner or operator shall be responsible for complying with the Operation Standards of Section 23-2-250,Weld County Code. (Department of Planning Services) 36. Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) 37. The Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. (Department of Planning Services) 38. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. (Department of Planning Services) • NOBLE ENERGY,INC. USR11-0026,page. 1O • i66i zoii LAND USE APPLICATION SUMMARY SHEET WEL ► COUNTY L___J Planner: Kim Ogle Hearing Date: January 17,2414 Continued to: Felat92 Case Number: USR11-0026 Applicant: Noble Energy, Inc 1625 Broadway Street, Denver, Colorado 80202 Representative: Vince Harris, Baseline Corporation 700 12th Street, Suite 220, Golden, Colorado 80401 Request: A Site Specific Development Plan and a Special Review ek,for Oil and Gas Support and Service Facility (Water Supply & Storage) in the A(Agri to I)Zone District. Legal Description: Lot B of RE-5113, being part NW4 Section 26,41".R64W of the 6'h P.M., Weld County Colorado Location: South of and adjacent to County Road 66 and adjacent to County Road 57 • Size of Parcel: 85 Acres +1- el No. 0801-26-2-00-003 and 0801-26-2-00-004 • POSSIBLE ISSUES SUMMARI FROM APPLICATION MATERIALS The criteria for review of this Special Review 'it is listed in Section 23-2-220 of the Weld County Code. The Department of Planning Services' a as received referral responses with comments from the following agencies: • Weld County Depart nt a uilding Inspection, referral dated October 26, 2011 P P • Platte Valley Fire Pr 'on District, referral dated November 28, 2011 • State of Colorado, on of Water Resources December 5, 2011 • Weld County • ent of Public Works, referral dated December 13, 2011, January 9, 2012 • Weld Count rtment of Public Health and Environment, referral dated December 19, 2011 • Colorad ment of Transportation, email dated December 20, 2011, January 9, 10, 11, 2012 The Departm of Planning Services' staff has received referral responses without comments from the following .`es: • <e• t) th Weld County Water District, referral dated November 18, 2011 Weld County Zoning Compliance, referral dated November 21, 2011 • Colorado Parks and Wildlife, referral dated December 14, 2011 The Department of Planning Services' staff has not received responses from the following agencies: • Weld County Sheriff's Office School District RE-7 • 'r Colorado Department of Public Health and Environment North Colorado Water Conversation Board NOBLE ENERGY,INC. USR11-0026,page 1 • 1861 - 2011 SPECIAL REVIEW PERMIT ADMINISTRATIVE REVIEW WELD eo NTY L.---I 42 Hearing Date: Janu 012 Planner: Kim Ogle Continued to: February 7, 2012 Case Number: USR11-0026 vittD.SQ Applicant: Noble Energy, Inc 1625 Broadway Street, Denver, Colorado 80202 etiVt'' Representative:Vince Harris, Baseline Corporation 700 12th Street, Suite 220, Golden, Colorado 80401 Request: A Site Specific Development Plan and a Special R .ew ermit for Oil and Gas Support and Service Facility (Water Supply& Storage) in the ultural)Zone District. Legal Description: Lot B of RE-5113, being part NW4 Secti . . 6N, R64W of the 6th P.M., Weld County Colorado ii, Location: South of and adjacent to County Ro fast of and adjacent to County Road 57 Size of Parcel: 85 Acres +/- Parcel No. 0801-26-2-00-003 and 0801-26-2-00-004 THE DEPARTMENT OF PLANNING S. S'STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWIN E ONS: 1. The submitted materials compliance with the application requirements of Section 23-2-260 of the Weld County Co ,q 2. It is the opinis.� the Department of Planning Services' staff that the applicant has shown compliance rbl� ction 23-2-220 of the Weld County Code as follows: A. . n 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other 4 licable code provisions or ordinance in effect. Section 22-2-20.C. A.Policy 3.3. states: "Land use regulations should consider the traditional and future operational viability of water-delivery infrastructure when applications for proposed land use changes are considered." The proposed facility will utilize public water from North Weld County Water district 1.5 inch water tap that will be upsized to a four(4) inch tap. The holding pond will be approximately four acres in size and will hold an estimated thirty (30) acre feet of water. Section 22-2-20.G. A.Goal 7. states "County land use regulations should protect the individual property owner's right to request a land use change." • Section 22-2-20.G. 1. A.Policy 7.1. states "County land use regulations should support commercial and industrial uses that are directly related to, or dependent upon, agriculture, to NOBLE ENERGY,INC. USR11-0026,page 2 locate within the agricultural areas, when the impact to surrounding properties is minimal, or • can be mitigated, and where adequate services are currently available or reasonably obtainable. The proposed groundwater loadout facility will support oil and gas companies in the Denver-Julesburg Basin by supplying water for their oil and gas drilling operations. Section 22-2-20.G. 2. A.Policy 7.2. states "Conversion of agricultural land to nonurban residential, commercial and industrial uses should be accommodated when the subject site is in an area that can support such development, and should attempt to be compatible with the region." The proposed facility is located approximately one (1) mile east of the Tow ite of Gill and is bordered by County Road 66 and County Road 57 to the south �ast respectively. The facility will be located on an 85-acre parcel. Treated water will 4r. ased into a holding pond that will be pumped to the fill station /load out facility locate n . Section 22-2-80 D. (.Goal 4. of the Weld County Code states: "All new i . development should pay its own way." Noble Energy, Inc., and their successors wil aying for all on- site and offsite improvements associated with this use as required the improvements agreement. Section 22-4-30.A. WA.Goal.1 states "Support the deve t of water that is put to beneficial use, along with associated infrastructure." roposed fill station /load out facility will provide a valuable and indispensable se ei00 oil and gas companies. The centralized location for load out minimizes the remo I o gricultural land from production. Section 22-6-20.C.1. ECON.Policy 3.1. Coin`' ivities and regulation should protect the rights of private property owners and the ealth, safety and welfare, recognizing that these basic rights and protections all.. free market to prosper and grow the local economy.• B. Section 23-2-220.A.2 -- The prop ‘use is consistent with the intent of the A (Agricultural) Zone District. Section 23-3-4 . f the Weld County Code provides for Oil and Gas Support and Service as a Use by Spe eview in the A(Agricultural) Zone District. C. Section 23-2-220.A.3 uses which will be permitted will be compatible with the existing e surrounding land u facility is located in a rural agricultural area on parcel containing no improvements. A cent properties are utilized for crop production, primarily corn and for confined fee ng erations, including a Dairy. Oil and gas facilities are existing encumbran n this parcel and adjacent properties. There are a few residences in the immediat . Development Standards and Conditions of Approval will ensure that this use w' mpatible with surrounding land uses. D. 23-2-220.A.4 -- The uses which will be permitted will be compatible with future opment of the surrounding area as permitted by the existing zoning and with the future evelopment as projected by Chapter 22 of the Weld County Code and any other applicable code provisions or ordinances in effect, or the adopted Master Plans of affected municipalities. The site is not located within the 3-mile referral for a municipality. D Section 23-2-220.A.5 --The application complies with Section 23-5 of the Weld County Code. """��� The existing site is not within a recognized overlay district, including the Geologic Hazard, Flood Hazard or Airport Overlay District. The existing site is within the County Road Impact Fee Area and the Capital Expansion Impact Fee area. Effective April 25, 2011, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the Weld County Road Impact Program.(Ordinance 2011-2) • NOBLE ENERGY,INC. USR11-0026,page 3 Effective April 25, 2011, Building Permits issued on the proposed lots, will be required to • adhere to the fee structure of the County Facility Fee and Drainage Impact Fee. (Ordinance 2011-2) F. Section 23-2-220.A.6 -- The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use. The proposed facility is located on soils designated as "Prime" and Irrigated Land (Not Prime) per the 1979 Soil Conservation Service Important Farmlands of Weld County Map. The entire site has historically been in crop production. The applicant has indicated that the approximate six (6) acre site will be removed from agricultural production, with the remaining lands leas as agricultural production fields. (_•��/ G. Section 23-2-220.A.7 -- The Design Standards (Section 23-2-240, Weld Co ode), Operation Standards (Section 23-2-250, Weld County Code), Conditions oval and Development Standards ensure that there are adequate provisions for otection of health, safety, and welfare of the inhabitants of the neighborhood and Cou This recommendation is based, in part, upon a review of the application ma . submitted by the applicant, other relevant information regarding the request, and responses fro rral entities. SUMMARY OF USE: The load out facility proposed for Noble Energy, I e an open thirty (30) acre foot lined pond with a six island fill station that will allow the facilit to evelop and store water in an efficient manner. The fill station facility, including temporary wate .sto a will occur in an area adjacent to County Roads 66 and 57. In general, the water contrac • ...'�Ames to the site in his tanker truck entering the facility with a keycard that allows access throug try gate. The truck will pull forward to the filling station island and the contractor will utilize a se' •n•'keypad to activate the water depot and thereby allowing the driver to fill their tanker truck. Eac i -` is to be equipped with a 4" quick connect O (this is the standard connection). The tankers fill ion is located near the bottom otf the tank (approximately chest level). The connection and on pump creates a vacuum that allows the truck to fill in approximately 12 minutes. The trucks th I pumping from the pond are each equipped with their own on-board pump that will be used to dr ater from the pond and fill the tankers. The coupling at each island that the tankers hook to is a onnect hose that is connected to a piping system to pull water from the bottom of the pond. Eac is to be equipped with a flow meter to monitor the amount of water taken and check valve to pr ck flow. The trucks are each equipped with automatic shut off system when they have reached ap city. In the case of the back-up pump, the operator will manually shut the pump down when the tr k reached capacity. After filling operations are finished, the water contractor pulls forward to the . gate and departs with the gate automatically closing behind the vehicle. The facility is prop d to operate 24 hours—7 days a week and will be utilized by Noble Energy and their contractors onl .� Planning Commission, and the Board with a thorough explanation of the project, impacts, and offsite requirements for this project." The facility will operate on a daily basis with 25 roundtrip (50 one way) haul trucks accessing the site. The applicant would like to be able to increase the traffic up to 400 roundtrip(800 one way) haul trucks. Some • roadway and intersection safety improvements will be installed prior to operation with additional upgrades and maintenance required as the traffic increases. NOBLE ENERGY,INC. USR11-0026,page 4 The Department of Planning Services' staff recommendation for approval is conditional upon the • following: 1. Prior to scheduling a Public Hearing: A. The applicant shall provide a revised Traffic Study signed and stamped by a Professional Engineer licensed to practice in the State of Colorado following the checklist available on the Public Works website. This document shall be submitted to the Colorado Department of Transportation and the Department of Public Works for review and comment. Additional conditions of approval may be required. (Department of Public Works, C T) 2. Prior to recording the plat: lic A. The plat shall be prepared per Section 23-2-260.D of the Weld dy Code. (Department of Planning Services) B. All sheets of the plat shall be labeled USR11-0026. (Department ing Services) C. The plat shall be amended to delineate the following: 1) The attached Development Standards. (Depart..- Planning Services) 2) County Road 57 is designated on the We C.. y Road Classification Plan as a local gravel road, which requires 60 right-of-way at full build out. The applicant shall verify the existing ri.- . -way and the documents creating the right-of-way and this information sh- 1.4 noted on the plat. All setbacks shall be measured from the edge of f •ht-of-way. If the right-of-way cannot be verified, it shall be dedica his road is maintained by Weld County. • (Department of Public Wor 3) County Road 66 is a Sittn Line road, with 60 feet of right-of-way, thirty (30) feet either side of line. The applicant shall verify the existing right-of-way and the docum- t . -ating the right-of-way and this information shall be noted on the plat. „``�•-cks shall be measured from the edge of future right-of-way. If the right- -w cannot be verified, it shall be dedicated. (Department of Public Works)Cy 4) Th f cility has proposed two accesses for the site, an entrance and an exit. A riate signage is required for these accesses. Large radiuses (65 feet) are red at the access points to allow for large trucks turning into the site. Please s ow the approved accesses on the Plat and label them with the Access Permit number(will be provided). (Department of Public Works) ,le° Show and label the truck staging area and address questions as to how many trucks may be staged to fill at any one time. (Department of Public Works) 6)4roi, A vehicle tracking pad will be required for this site to prevent tracking of mud and debris onto the County roadway. The Public Works standard tracking pad detail consists of 100 feet of pavement and a double cattle guard at the exit of the site or 300 feet of pavement. This preferred vehicle tracking pad option shall be delineated. (Department of Public Works) 7) There are 6 filling stations and an expected 17-trucks/hour filling at the site. Please show and label enough staging areas for trucks waiting to be filled. No • staging can take place on the County roadway. (Department of Public Works) 8) Identify the location of the office and MCC building. (Department of Planning Services) NOBLE ENERGY,INC. USR11-0026,page 5 • 9) The approved Lighting Plan. (Department of Planning Services) D. The applicant shall address the requirements (concerns) of the Weld County Department of Public Works, as stated in their referral response dated December 13, 2011 and January 9, 2012. This includes off-site improvements, on-site improvements, transportation related items, haul route signs and routes as approved by Public Works. (Department of Public Works) E. An Improvements and Road Maintenance Agreement including paving upgrades d maintenance of the haul route is required.Any haul route improvements al h possible improvements required at State Highway 392 will be determine a the revised traffic study has been received and reviewed. (Departments of Public r ) F. The applicant shall obtain a Colorado Department of Transportation" cress Permit. A copy of the approved CDOT Access Permit shall be provided to#ia COurtt (Department of Public Works) V'v G. The applicant shall obtain a stormwater discharge permit fro ater Quality Control Division of the Colorado Department of Public Health anda ment. (Departments of Public Works) H. An individual sewage disposal system is require• for e proposed facility and shall be installed according to the Weld County Indivi. -►..ewage Disposal Regulations. The septic system is required to be designed by - , ado Registered Professional Engineer according to the Weld County Individual S: a Disposal Regulations. (Department of Public Health and Environment) ItStr The applicant shall submit a was dlinplan, for approval, to the Environmental • I. pp 9 Health Services Division of the ounty Department of Public Health & Environment. The plan shall include at a i m the waste handler and facility where trash and garbage will be disposed ing the facility name, address, and phone number). (Department of Public I nd Environment) J. The applicant shall it, r submit a copy of an agreement with the property's mineral owner/operator :''ti ating that the oil and gas activities have been adequately incorporated int`.. design of the site or show evidence that an adequate attempt has been mad mitigate the concerns of the mineral owner/operators. Drill envelopes can be delin on the plat in accordance with the State requirements as an attempt to mitig cerns. The plat shall be amended to include any possible future drilling sites. (D ent of Planning Services) 3. The a n shall submit three (3) paper copies of the plat for preliminary approval to the Weld Compartment of Planning Services. (Department of Planning Services) 4. completion of 1. 2., and 3. above the applicant shall submit a Mylar plat along with all other umentation required as Conditions of Approval. The Mylar plat shall be recorded in the office 4:2 of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within sixty (60) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 5. The Department of Planning Services respectively requests the surveyor provide a digital copy of • this Use by Special Review. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are ArcView shapefiles, Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4). (Group 6 is not acceptable). This digital file may be sent to dhuerter(c�co.weld.co.us. (Department of Planning Services) NOBLE ENERGY,INC. USR11-0026,page 6 6. Prior to the Release of Building Permits: • A. A building permit application must be completed and two complete sets of plans including engineered foundation plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A geotechnical engineering report performed by a registered State of Colorado engineer shall be required. (Department of Building Inspection) B. Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by eld County: 2006 International Building Code; 2006 International Mechanical Co , 6 International Plumbing Code: 2006 International Energy Code; 2006 Interna . I uel Gas Code; 2011 National Electrical Code; 2003 ANSI 117.1 Accessibilit o e and Chapter 29 of the Weld County Code. (Department of Building Inspection C. Building height shall be measured in accordance with the 2006 In ional Building Code for the purpose of determining the maximum building siz eight for various uses and types of construction and to determine compliance wit Bulk Requirements from Chapter 23 of the Weld County Code. Building h all be measured in accordance with Chapter 23 of the Weld County Code in o determine compliance with offset and setback requirements. Offset and setb irements are measured to the farthest projection from the building. (Department�if Qpilding Inspection) D. Building permits are required for buildings, str sand change of use for buildings which required permits before the beginnin nstruction or the proposed change of use. (Department of Building Inspection) E. A building permit will be required for ZW construction, alteration, or addition to any Ill building on the property. It is reco ed that a code analysis be done on the project by a design professional wits rience in this area. (Department of Building Inspection) F. A plan review shall b ved and a permit must be issued prior to the start of construction. (Depa f Building Inspection) G. A letter is requ m the Platte Valley Fire Protection District as to whether a fire permit will be re • d. (Department of Building Inspection) 7. One month prior t t`i start of construction: A. Th 'cant shall submit a grading permit showing: proposed grading, erosion control la nt, typical details for all BMPs to be utilized, and a Construction Stormwater rmit from the Colorado Department of Public Health and Environment. The permit ust be stamped by a registered professional engineer licensed in the State of Colorado. Please note that the grading permit will not be released until the applicant has signed the improvements agreement, posted collateral, and submitted the USR plat for recording. Evidence of Department of Public Works approval shall be submitted in writing to the RVWeld County Department of Planning Services. (Department of Public Works) • NOBLE ENERGY,INC. USR11-0026,page 7 SITE SPECIFIC DEVELOPMENT PLAN SPECIAL REVIEW PERMIT • DEVELOPMENT STANDARDS Noble Energy Inc. USR11-0026 1. A Site Specific Development Plan and a Special Review Permit for Oil and Gas Support and Service Facility (Water Supply & Storage) in the A (Agricultural) Zone District and subject to the development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of Id County Code. (Department of Planning Services) 3. Hauling hours (truck trips to and from the facility) shall be limited 24-hours seven-days/ week. (Department of Planning Services) Y 4. All liquid and solid wastes (as defined in the Solid Wastes Disposal nd Facilities Act, 30-20-100.5, C.R.S., as amended)shall be stored and removed for fin I sal in a manner that protects against surface and groundwater contamination. (Dep of Public Health and Environment) 5. No permanent disposal of wastes shall be permitted at this i This is not meant to include those wastes specifically excluded from the definition a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R. amended. (Department of Public Health and Environment) O 6. Waste materials shall be handled, stored, an i sed in a manner that controls fugitive dust, fugitive particulate emissions, blowing and other potential nuisance conditions. • (Department of Public Health and Environ 7. The applicant shall operate in accor ith the approved "waste handling plan", at all times. (Department of Public Health and nment) 8. Fugitive dust and fugitive p-•m e emissions shall be controlled on this site. The facility shall be operated in accordance t e approved "dust abatement plan", at all times. (Department of Public Health and Envirgt4'm ,n 9. This facility shall •A�l!..-re to the maximum permissible noise levels allowed in the Commercial Zone as define =7l Section 14-9-30 of the Weld County Code. (Department of Public Health and Environ 10. Adequa ing, hand washing and toilet facilities shall be provided for employees and contra of the facility, at all times. (Department of Public Health and Environment) 11. tic system located on the property must comply with all provisions of the Weld County Sire, pertaining to Individual Sewage Disposal Systems. (Department of Public Health and vironment) 1 A permanent, adequate water supply shall be provided for drinking and sanitary purposes (North Weld County Water District). (Department of Public Health and Environment) 13. Adequate toilet facilities (portable toilets) and hand washing units shall be provided during the construction of the facility. (Department of Public Health and Environment) 14. Bottled water shall be utilized for drinking during construction of the project. (Department of Public IIIHealth and Environment) NOBLE ENERGY,INC. USR11-0026,page. 8 15. The operation shall comply with all applicable rules and regulations of State and Federal • agencies and the Weld County Code. (Department of Public Health and Environment) 16. There shall be no parking or staging of vehicles on County roads. (Department of Public Works) 17. Pursuant to Chapter 15, Articles I and II of the Weld County Code, if noxious weeds exist on the property or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds. All vegetation, other than grasses, needs to be maintained at a maximum height of 12 inches until the area is completely developed. (Department of Public Works) 18. The historical flow patterns and run-off amounts will be maintained on site in such a er that it will reasonably preserve the natural character of the area and prevent property d e of the type generally attributed to run-off rate and velocity increases, diversions, con ion and/or unplanned ponding of storm run-off. (Department of Public Works) 19. An annual road inspection will be performed in the spring to establish dition of the haul route and surrounding roadways to determine if any road damage was a by the operation of the loading facility. (Department of Public Works, Colorado Depart ransportation) 20. The applicant will be responsible excavate, repair, or patch mage on the roadways to mitigate for heavy truck traffic volumes created by the loadi ility. The type and method of repair will be determined by the Department Public rks. (Department of Public Works, Colorado Department of Transportation) 21. If road damage is beyond repair, the applic O pay their proportional share for the reconstruction to restore the road. (Depart f Public Works, Colorado Department of Transportation) 411 22. The landscaping/screening on site s e maintained in accordance with the approved Landscape/screening Plan. (Depart Planning Services) 23. Sources of light shall be shield at light rays will not shine directly onto adjacent properties where such would cause a ce or interfere with the use on the adjacent properties; and Neither direct nor reflecte rom any light source may create a traffic hazard to operators of motor vehicles on publ' o private streets and no colored lights may be used which may be confused with or constr s traffic control devices. (Department of Planning Services) 24. Effective April 2 0, Building Permits issued on the proposed lots will be required to adhere to the fee struc the Weld County Road Impact Program.(Ordinance 2011-2) (Department of Planning s) 25. Effecti ril 25, 2011, Building Permits issued on the proposed lots, will be required to adhere tot structure of the County Facility Fee and Drainage Impact Fee. (Ordinance 2011-2) (ro ment of Planning Services) <t) 26 Y t building permit application must be completed and two complete sets of plans including engineered foundation plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A geotechnical engineering report performed by a registered State of Colorado engineer shall be required. (Department of Building Inspection) 27. Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2006 International Building Code; 2006 International Mechanical Code; 2006 International Plumbing Code: 2006 International Energy Code; 2006 International Fuel Gas Code; 2011 National • Electrical Code; 2003 ANSI 117.1 Accessibility Code and Chapter 29 of the Weld County Code. (Department of Building Inspection) NOBLE ENERGY,INC. USR11-0026,page. 9 • 28. Building height shall be measured in accordance with the 2006 International Building Code for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. (Department of Building Inspection) 29. Building permits are required for buildings, structures and change of use for buildingsch .) required permits before the beginning of construction or the proposed change e. (Department of Building Inspection) 30. A building permit will be required for any new construction, alteration, or additio ny building on the property. It is recommended that a code analysis be done on the y a design professional with experience in this area. (Department of Building Inspection) 31. A plan review shall be approved and a permit must be issued prior t tart of construction. (Department of Building Inspection) 32. A letter is required from the Platte Valley Fire Protection Distrito" hether a fire permit will be required. (Department of Building Inspection) 33. The Special Review activity shall not occur nor shall ateNtri ding or electrical permits be issued on the property until the Special Review plat is re be recorded in the office of the Weld County Clerk and Recorder. (Department of Plan \ ices) 34. The property owner or operator shall be re a for complying with the Design Standards of 0 Section 23-2-240, Weld County Code. (Dg ent of Planning Services) 35. The property owner or operator shat ponsible for complying with the Operation Standards of Section 23-2-250, Weld County (Department of Planning Services) 36. Necessary personnel from • - Id County Departments of Planning Services, Public Works, and Public Health and Envi I ant shall be granted access onto the property at any reasonable time in order to ensure e ctivities carried out on the property comply with the Conditions of Approval and Develop tandards stated herein and all applicable Weld County regulations. (Department of PI O g Services) 37. The Special w area shall be limited to the plans shown hereon and governed by the foregoing tiq rds and all applicable Weld County regulations. Substantial changes from the plans or tipment Standards as shown or stated shall require the approval of an amendment of the it by the Weld County Board of County Commissioners before such changes from the pla evelopment Standards are permitted. Any other changes shall be filed in the office of t artment of Planning Services. (Department of Planning Services) 38. e property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may 42 be reason for revocation of the Permit by the Board of County Commissioners. (Department of Planning Services) • NOBLE ENERGY,INC. USR11-0026,page. 10 t� • DEPARTMENT OF PLANNING SERVICES 1555 N 17th AVE GREELEY, CO 80631 WE`D N WEBSITE: www.co.weld.co.us 549 E-MAIL: kogle@co.weld.co.us PHONE: (970) 353-6100, Ext.eld. o.us 49 FAX: (970)304-6498 COLORADO December 21, 2011 VINCE HARRIS BASELINE CORPORATION 700 12TH STREET, SUITE 220 GOLDEN, CO 80401 Subject: USR11-0026 -A SITE SPECIFIC DEVELOPMENT PLAN AND A SPECIAL REVIEW PERMIT FOR OIL AND GAS SUPPORT AND SERVICE FACILITY (WATER SUPPLY & STORAGE) IN THE A (AGRICULTURAL)ZONE DISTRICT. On parcel(s)of land described as: PT W2NW4 EXC E2 SECTION 26, T6N, R64W PT LOT B REC EXEMPT RE-5113 of the 6th P.M., Weld County, Colorado. PT E2NW4 SECTION 26, T6N, R64W PT LOT B REC EXEMPT RE-5113 of the 6th P.M., Weld County, Dear Applicant: I have scheduled a meeting with the Weld County Planning Commission on January 17, 2012, at 1:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on February 15, 2012 • at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at www.we cicai ntyptannlr gcases.org If you have any questions concerning this matter, please call. Respectfully. DReasollyn: signed by Kristine Ranslem Reasona am the author of this document Location:1555 N 17th Ave Date:2011.12.21 11:32:05-07'00' Kim Ogle • Planner PLANNING COMMISSION AND BOARD OF COUNTY COMMISSIONERS' SIGN POSTING CERTIFICATE • THE LAST DAY TO POST THE SIGN IS JANUARY 6, 2011 THE SIGN SHALL BE POSTED ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW IS NOT ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE DEPARTMENT OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON THE PROPERTY AND POST A SECOND SIGN AT THE POINT AT WHICH THE DRIVEWAY (ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. I, KIM OGLE, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS POSTED ON THE PROPERTY AT LEAST TEN DAYS BEFORE THE PLANNING COMMISSIONERS HEARING AND THE BOARD OF COMMISSIONERS HEARING FOR A SITE SPECIFIC DEVELOPMENT PLAN AND A SPECIAL REVIEW PERMIT FOR OIL AND GAS SUPPORT AND SERVICE FACILITY (WATER SUPPLY &STORAGE) IN THE A (AGRICULTURAL) ZONE DISTRICT. [NOBLE ENERGY INC., C/O VINCE HARRIS WITH BASELINE CORPORATION] Kim Ogle Name of Person Posting Sign • =re of Person Posting Sign STATE OF COLORADO ss COUNTY OF WELD ) / /lam (( The foregoing instrument was subscribed and sworn to me this j if day of ,TAW( , 2012 WITNESS my hand and official seal. ,tiod Notary Public My Commission Expires: AUBUG I EXHIBIT • �r 5 t �� ,fib 0 i,. n T ,''' �b+-ai<,s- .e, w�! it � i I l:. I � I tiRFa"F_, §"�r pS�,-.„..1,e,1-- .;',,,M i 0.1. 44.1,0. pi 4.,„4..,,6,e/ /,--.....,41,r,-..J.,-).',..,-.-fc .i:St, iI i , ., „-'':J,r , ,., i, .,, , ,,,i, , c.,..,,A-i '1,...,:.,,,,,/,:..::,,,4F''''''''''''..,'''''''''''.' '''/"..'j;—.'- =''. ' ' ' . -'''''t, g h T,''''‘,'' 'L, I j •,� yq tI, M ''',';';'i'•`',; � t a '� •:.4.-5,' tv�� I .(a, Ir.'', c$x}[ At-70„..,,l,,',.., 4 '� ,� T {' + �n � ax•� A� 4 ,�t i , 1 _, 'I f 4 tillt s 7',. a i� .1 ,, � 5 4 t m : +tea t e 'I 4 4 e _4 ` i s x '',,''.''L-,- a p " • � p � i � , ��} h �T'l .:?.,,,40,...•,-z;;.,..,-.17,,,..;',.,.:,:,-,k4-.4s• ,'� '� ,-;,I7 .d x T � a. • \''l�� �� ' . �,1 ' �� P f t t .1.I I . li ," t �. r, :." as "`x- , �' ,r � r, .�0 . , Public hearir s concerning this property will be he Ord before the ` ' County •••••• • , .,',, -., 1 Planning Commission and Board of County Commissioners/ �/' �;' Both hearings will be held at: ! i '", /,..„ ,. - „ / i WELD COUNTY ADM , INISTRASIN BUILDING , � xir, Ira !. 1150 "04.‘ Street • Greeley,./CO V CO 80631 �i` " `- fl / Planning ommission Hearing wif be held on `a y '� at: , a, �� , „ " >. ,:4 Board of County :ommissioner Haring will be held on � � f•,,.1 • , ,..• 7.„ , ' ' 4hr• F ' N f Utf r \�j 20 �1„ at: #0 ',4)4.'14ekt0'\ �I i c yi ,i Applicant: 1alt„ �, l !� Request: SE i lT F E:! • 1/k i( , tf• , — r, i I // 4 _. ;,hice-..-,_ _ 1`i Z�` Case Number: U5R, ,�-OOZ4) Acres: er'�' , � ...../ ..; FOR FURTHER I JFORMATI N PLEASE CONTACT J , ,� AT THE WELD ;OUNTY DEPARTMENT OF �` / PLANNING SE't VICES, AT 970-35 -6100, ext."3 � "7 j' 00 For Additional Info mation visit www.wel ,ountyplanningcases,org .. r t, jv. 0`/ Ail', t° gyp+ �, ... _. ,i .....- ,..... `%- '' ' " �`..' � 7 � ...! '" -: r y. - '' A �` • - y +yam l I, � • f �a- PLANNING COMMISSION AND BOARD OF COUNTY COMMISSIONERS' SIGN POSTING CERTIFICATE • THE LAST DAY TO POST THE SIGN IS JANUARY 6, 2011 THE SIGN SHALL BE POSTED ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW IS NOT ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE DEPARTMENT OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON THE PROPERTY AND POST A SECOND SIGN AT THE POINT AT WHICH THE DRIVEWAY (ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. SIGN REPOSTED JANUARY 25, 2012 NOTING CASE CONTINUED BY THE PLANNING COMMISSION TO A DATE SPECIFIC HEARING DATE OF FEBRUARY 7, 2012 I, KIM OGLE, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS POSTED ON THE PROPERTY AT LEAST TEN DAYS BEFORE THE PLANNING COMMISSIONERS HEARING AND THE BOARD OF COMMISSIONERS HEARING FOR A SITE SPECIFIC DEVELOPMENT PLAN AND A SPECIAL REVIEW PERMIT FOR OIL AND GAS SUPPORT AND SERVICE FACILITY (WATER SUPPLY&STORAGE) IN THE A (AGRICULTURAL) ZONE DISTRICT. [NOBLE ENERGY INC., C/O VINCE HARRIS WITH BASELINE CORPORATION] • Kim Ogle Name of Person Posting Sign Sig t re of Person Posting Sign STATE OF COLORADO ) ss. COUNTY OF WELD ) The foregoing instrument was subscribed and sworn to me this Vday of b t , 2012 WITNESS my hand and official seal. Notary Public J u I BILLIE J, MOORS I NOTARY PUBLIC STATE OF COLORADO My Commission Expires: UJDai I L/ • ;" t ! � . itit //{{ / '\ . •i. I i - - l \ ki ti tiN /ff^^ r V i I 0 E. °' Z ` le. 0 .. , ,,, , z 0ItP. 0 rill r 0 16 ip w i . 1, 4,I, co m o0 0 0 ` t— U< 2 ; r. , N C ` Z O _C • % E.- O UW E� D N � Ov � _ 3 _ AID wo X �° . _ C CM y 3 .0 OpI'm >+ .0 ii N �..� aD Q o a r ''y • .� s rt 3, h •!n r Q � 0 L U z o J . „........,,, tA, E E �, IL p� ,�CI a� Nt I Q a 0 (Dr- c_ I I 'al 0 0 0 . W •` ON ` N Z U `M Q V U 3 I11 C Q O r? 3 a m �, N ? V I 0 F- i. cr)0 3 • cr a:I MtJ 4 ` W Q U 0 Q 01 E V Q f- w Et., L 6 • E o ,J w �- Luc � >, 7, L } }, E Usk } zQo � CC 0 6 tf 46 ,.. 0 3 .c?,, -- O CO ISI Z � °' I cwn w CM c o I C O C � Z � . � o Z 4 E z o A ° , , 0 ibo , 0 r a C v, J w i = '' Dv-c) -1 m a N 0 a Q s . t W a ls o a Q U L I / ►--a• :�- %A_ \‘. *riiir. 7 • , ziy.,, .*: . :cit. • Ay-wit › ‘( ..1.4,.; ,: ti %. . 1 - . ' *if' \ f ‘1/4, 1) 'NY tkiii .. . , ak•N , . . , ,. s , 1.:±7. \ /...toei TNI. ' t -: ,x). sP` ��� l -td A lay. a . a a r N 1 1••1 / • 4 ( jj C0 .1 ` I > C 0 ► U c 0 I Z 0 in 0 4J CD 3 re /. C, I /. y • t 'Cr - 1 I ♦ • V \` • ^ " °, • ti iti ' „ ' f 0 I . i A.., , t I • h _ I, \‘,.` • I 1'' E1 � r.. :1.i IL.) + -, I 4 .t • � -; {� ...1j ,I r ,qt. •, ' I ;'I ri1 E1,, t.. ?,;.1 d,, I. `' 'l I. , 3g /..1 ii I ' • c' ie 14 kit f•tft, ',lit 77777 .1 t ;i , ar . j f • �' . f y / I. t d4 4 ♦ r 1� • - • (((+++,,, +•ct _ i'•. , --�'• -,- Ill •� 7 J ( ' 'i It. 4 r ._- It 4 1;It Tfi j f 1_ ,` N / I. , D, 7 4 r.:,' ‘•• -,) r' ' or - , , . i . .. • „ i I t t 4; ; 4 Alt 4 4 • 4 4 t , . fir.• - ,(ilk 0 at • 1 . .. 'it ', It 01-74.- . r--------„:41:46_,:: if insit ,. . , .„.... ..L. .„.„:. , c. • "+M 4 ,f.l 7( ii,Ct L.�{ t , ' Ala � fit �•. 4 t � � . . '4.,. "1 0) 11O• Vi 4r .ier y` i 4 SY �I�f `� flit ..ctririn*t.. r 02.((• , , TS ` ._�• •1 Iir r �f;.� •'j \ �\ ` ��,-� r `.mss a....I've- ,% • I' 1 ' "I 4. - f 4 4 L'i�•K)f'l;;1 .,1 is ; 1 _-� -^r : -`=ixtit �•�7 -.% -\.' (a. e ,, • 1A 1,r . ,.,--e, - •tl'., .� 'it ,.'I►"' t i,I',' ti C ` a ' ' r I . , ',,f'. , .1 :4 fir `. - •): / C irrib esigek,e; .- __ ` I • /i •� , rh tr • t V} r •�i ` Pik, / 4 . I ii 7 i • ,,,/�el t -sue . .o: r • 1 ' + fir' ' ' 'I.• , +rc i) f, ill .Ilit ' / • P , avaa'\- •r �� SK• "!. . I fe^' r 1 l 1s` f li • ,jillilllict• il, r• +4, , ,,, ' - ..r ter- r t. ' • • • la 1 . , 4' 1'IA fe.• 44. 4 14 et I, t+ tit /F'j� 1,' } • E z • yi r _04.,v. '3 ) I I' EC \ + ' •• A Ot ,,IP ., . .11 t . ' 41 ,• + ) 1r Jff ! , '- ., Vii ~ A 1' � I 7 r1 ir r t 1 ' r 4 i ';'1 ",ri, I A V;v•A, , ,t, i 1.1 • _ f1'1 / .1 a •.I' r } ' , \ T••. w.'•,i 1 lt 1', N �•t 3 I, II- i U I ii *Illtillillic Oildif' i I 4 1'it*, ;, . , , Ai . l.C) • i . i ll i 1 t • ii ):10 o r 4- fide • sT k�• �1 • '� •:$ h i t ; •/ .� .na - . IOT , t., 5 O� -.J.7- �; f:, 11 U a+ . ; 1. , , ,1It 1�'s 'dip! f i • _ 1 ti I t 1 P , 't.1- ce .%- \ . • i �i • • ,`'i. -psi! i 4ism , `, ^^ '' f F' I`''_ I I W '`� ^ti* 1 MrT•a u-•- I I i„ i 1 , i. ILiri �r . , z 1 r / C-; - `••' .} ►s,' ,� I I f 1 .. I 4 ,t .t ill ' 1 \ i <. St N i 1 i at 1 . I , 1 alb '� ! � i ! 1' Fn. i i s ` 4 4 Ir 1 1 ; r ' ' , IP + 1 i 1 I l ' r 1 li — r J, a i' I _ I � 1 �, 1 . ! j . 213/4i744:-:J _`� I 1' ' .af (( • 'f +a , i , 4 .it r . , . ' ti eye�1 1 y \ ` ` ♦1 T` `J 11 i)Tel'. - t_ r : 4• . •, O ,�, ._ i' I „_," -' ( f-, .� t .,., c _ r I /1' _ , I; C }}f tCO �!.r. 1^yT / ID '1 ( 1 3-•.z }• -TIT I• r ♦ —`\ 1 a LCD ---r.I. (� WSJ _ 'i.• . 1� ,_,• ` _ :Jr / ( is a '`• _ —y "- :i r _ (o rT h •► I j . 1 1 ' ' y " S� i, isif. 4--J ' _ / '' , i , 0 : U j OH. t. : Nr in ' 7 �rw;G '�'^�� It, .; ,r. /j. —... \ 'll riarri,�, �, .. _ 0 t . dras,,,..-. . . l ( 4- ' - = r / _ fi � � '" ' Cr) 1 +f•- - !' t"' I ' • IV , i- 1-- I 1.c i t C r - w in • = Yom.'` . r , ` - _--' •I, 11, ' ! ' , L, 4 C`/' i ,• ,\�S •+-� ' - ill I , ':, .� I • IL r . _ • 1 j' r I _� I ''. raj �: . {, ' )• ' •`� IN I i+t 1 vRj, . jak, 4 . _ �� � 1 ill ' 1 ‘ . , ', -•1• II - I' . '• • :. -. %e .'• p 4 / • ! , ; , 1 r I a • ` 1, .y' f1f 1 - O a Ir C 7 ' (13 • t ' .. •.O�/• >•• ,. 4_, .. _ - , .• . i , . . . _ • ..p ( . , . , y , . ,... • O ......_ . . . . . . • I I • / �C.r '� C • '114 # W. . • *is' , - J- f ai • 'S. :I CO t it 1444 ii, t lit . 1 f nn W r - + / 1 J t• I. .„ . • r e. 3 li. ' - I, ti �,' r .•- r ? i 44;( 41it/' ...v....,,� r — ejli6 • -iii :. • '../ ,/� • ' ,. a • r_i a -i,a 8t `-' !� '.' -341‘. •1‘!etli^ 7 '" a fr r • Y t1) ;�yv •iiq r 4 r, r•,� ,• � • r 11 ! a' ♦7 •~ , x• Ill 1 f . ,, i.. - .' l. 1i , L�i''T� ,�-i. r ( ; lf1 y\ • 1r. ` t r. \111 ^+ � /� �1,/ ,44,111,1 . • ti''44' yl�T.'("`' ,+ .,9 • a • . � � •I ' rl. � r t1 � . ' 1 , yy , -'L' ' i 1i - ' f ii. . ail 1 7: i •♦�` t- •• f { a , 'j• {,Jv a•.,, : - . ,. • t�n .i ." f /� 1 l' }r ir" - • t �� r �~ d I i • ku. i� tie gs.• ,� . raw- ' .7.� • ' •l, ' . . r 11 IS -I'` •• J '� ��� � '•-r -Ni;re. .IP'; t. 1::A. . .: ' It' :14' ' 41:.? ° thi:ilia! ' \at PI .0i, t • ~��f7� �� '1117-y '�i.. n�•, .' •'. r '.•y � ' r ,,' � ' 11�,' %St �.i ii '' 1i .1 • •lAi. 41%444 eatilet*• 491 iii4 its 1 ii .yam ( f i 1' , ‘r:. . 1lfi'�,j • �,N,�' ' i. �s 1' II i +4i •Iit (, �'�V t r.`. � ,�' f .'r:+i' �• • r� ' ( • .,.,b.' 1 •Arigtearfr ,f , • %...._ aggire4.46Air . A b..1111P. i r T': ' 1T 0 �•se , �l7 i .� } ,� le'�'Y, C. , • • 1 :��'� j- .w iism �}i Cf L i ,ri��rr ` ,1 t • 6,1 ri• • , 1 (V vita . DC • L . . >ks.• O U C , O r • +,, • Sla • _ O 7•. . r: f�� s»•4' lbw• • . O • 4.., I.P 4. .a - • ?.'� k / r . , V; 1 t • f t - • . a, ' ' , , . 't. • w , i • . •. t • 14 0 • .,{ \'No-;A =-- 4: ,i e \ ‘4••• -_......ye..44... • j .• ,\t 41 =Mae ire. ,) v . ...t adfir : s I AI • . • . . I { ' ff I. % t1/4 t \' • II ,�• Ca , \ .. t 4 r miti*,„. A c. r,r r..... • . •A. - %HI ... .. • , ....Pk:. gii •s -, • • - _ • . ' 1 ' is .I .4 ''.Cy t ` .\. l • • • \\IN -k, . * .t - A; ` 44 2r•� II\ ' { ill ' , { - ' Y •• .k.... - • • •- • •• -III IQ---. •• �i► _ A' ` ,•)�s _, • . '\ I'Cle a 1 f ' I ^ ,. � , �]J - -•5}r• yl . •`i - � ‘�.� )• 40 k , r. a ,` ♦. ,I •I ��./ x; Vi' �,. \ ' • i I SS , i ........I \\ fri • *0.• a 'It/ 1°1. '414 r, L.- • ,! 1 i .* �4: !' lY-. ���� a . ' Y ^ , >.1•as •v �`�~7`; • . • 1• . i x� •yam.—�: ' . 1 4, • `\ .•...•.. eirC O 3rj't r>. s. '-Sc 4. -- J •. _ ,- , i c �'�` ' , ,r - IL �*\I �--J , 7 in �/ IP \ ,� 1 4 ea /•v --I -..., • •_ 1� .. ,. r A., te% -, I. St 1 9 , r 1 t d • 4' . "...". ' • , '' ..di r i,t;t4:. ie . ikt 1/2 il • I. 4n 1 • ' . Al ,,,i{ Mil i.j.. ,� 1 �� K .� • •'r. t .. , *a.7 441.47 46 ti l • • 1,g •.. :i1.e. :iicTc 1p,. SIC Tiiima � 1 I� � . ft.Y t .i �' ,.`� .• J` _«. .. }'•USW 1 isi 4\ii elite,4, 4 0 .1C Lit I ti 14 ' •! • l , 1 Few -i t '( ` \ • , �a it.. i 4. A apt ; li SRI •'�j ,;. i ' � 1 ;y P%ly` • r • r t J �'�}i ....,#)•:4;1‘ ,y ` Avg_' 0 a�'11 a'�. •• • ' 1' I'i, -,•��• r q 1/44;,�/;.--• Sr+� 0 as 1 ` r: �. �/a \. wry\R Y I ;� ,i �� r ` '. ,. fall, • ,w yy �f1 II?.• wti� .p 1 "II 4 II �1II Id .4\ .% • S••p''% .mayt" f p :, II ,,� .\ Nj1r" ` -•\�\Iy`r.tlr`•n— -..U4I's5A`�,......111'i-dJ .� ' + �jtaL 3 ♦ 'i J�4 z S- . �i k�\ • '-♦ '' 1 ` �.y "MI 11 It • .� I"pe 4 ' •a• t _ ♦'` �. '• _ �•s`"L:k\\�q�'-<C1-„ -� 3 }': ®b. bi__•/ j4 '�`y' . ••♦ ,•►• ITT( y vi� -•`' 'a` • a. 4 r T - - 1. I_ _. . . MIIUPIMMINanina.....ijiss. •-1e,r• � y•ills I I 17 411 I I $1.S5nalltir . I . ,1 0 I Ili, f r i itti .- • 1 r e: I p 1 It i E. t - I I ► r.-.ti h• ' I. L. 1 . �_ [a : •' • Ir .. : • • • • 11 t - - -_ . . Kim Ogle rom: Vince Harris[once@baselinecorp.com] ent: Thursday, December 22, 2011 3:34 PM o: Janet Carter; Kim Ogle Cc: fredlantz@comcast.net; noah@baselinecorp.com Subject: FW: NOBLE ENERGY CARPIO SITE Attachments: Traffic Impact Study Checklist [PW TRAFFIC].pdf; USR11-0026[PW GENERAL].docx Janet—we are working on the Noble water depot USR project and I am in receipt of the memo requesting a traffic study. It is attached for your reference. I saw Heidi at the BOCC mtg yesterday and she indicated we should talk to you about the scope on this and we don't have much time as we are scheduled for the January 17 PC hearing. I need to get this resolved before then and very soon. Could you call me 303-912-1900 or Fred Lantz 303-887-3714 our traffic engineer to better understand the need? Or maybe email us back if you think that will resolve this? To reiterate—we expect that nearly all the traffic would travel north to Hwy 392. Very little traffic would head south and definitely Noble will commit to NO TRAFFIC through the town of Gill. Depending on Weld Co's position, Noble would certainly entertain 100%of traffic going and coming from Hwy 392. I think we need to talk about this and the best next steps for us to take in the next 10 days for us to focus on. Thanks for your time. � st regards, ince Vincent Harris,AICP Planning Director BBaseline Corp 700 12th Street, Suite 220 Golden,Colorado 80401 Tel 303.202.5010 x217 Fax 303.940.9959 www.baselinecorp.com From: Kim Ogle [mailto:koRle@co.weld.co.us] Sent:Tuesday, December 20, 2011 5:29 AM To: 'Vince Harris' Subject: NOBLE ENERGY CARPIO SITE Vince I received the following referral late yesterday. Please see attached. To expedite I would suggest speaking directing with PW and copy me on correspondence. Thanks, and let me know if I may be of assistance. im The Environmental Health Referral is not yet in,expecting it today,tomorrow at the latest. 1 Kim Ogle Planner Ill department of Planning 1555 North 17th Avenue Greeley, Colorado 80631 Direct: 970.353.6100 x 3549 Office: 970.353.6100 x 3540 Facsimile:970.304.6498 ' 4 4 3I w E,:G.. CU JNTY U Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. I 0 2 FIELD CHECK Case Number: USR11-0026 Inspection Date: December 13, 2011 • Applicant: Noble Energy, Inc 1625 Broadway Street, Denver. Colorado 80202 Representative: Vince Harris, Baseline Corporation 700 12th Street. Suite 220, Golden, Colorado 80401 Request: A Site Specific Development Plan and a Special Review Permit for Oil and Gas Support and Service Facility (Water Supply & Storage) in the A (Agricultural) Zone District. Legal Description: Lot B of RE-5113, being part NW4 Section 26, TEN, R64W of the 6th P.M., Weld County Colorado Location: South of and adjacent to County Road 66, East of and adjacent to County Road 57 Size of Parcel: 85 Acres +/- Parcel No. 0801-26-2-00-003 and 0801-26-2-00-004 Zoning Land Use N AGRICULTURE N LARGE TRACT LAND IN AGRICULTURE, NORTHWEST IS HORIZON DAIRY E AGRICULTURE E CENTER PIVOT , RURAL RESIDENTIAL S AGRICULTURE S SMALLER TRACTS RURAL RESIDENTIAL W AGRICULTURE W SMALLER TRACTS, RURAL RESIDENTIAL • Comments: THE PROPERTY IS IN AGRIAN ROW CROP PRODUCTION WITHOUT IMPROVEMENTS. THERE IS A NATURAL DRAW THROUGH THE PROPERTY TRAVERSING NORTHWEST TO SOUTHEAST. An IRRIGATION BOX AND DITCH IS ADJACENT TO NORTH PROPERTY LINE, EAST SIDE OF CR 57. GENERALLY, THE PROPERTY SLOPES TO SOUTHEAST. COUNTY ROAD 66 DOES NOT EXIST AT THIS LOCATION. COUNTY ROAD 66 IS TO WEST OF CR 57 AND APPROXIMATELY 0.75 MILES TO EAST FROM CR 57. ROAD IS NOT PRESENT ADJACENT TO NORTH PROPERTY LINE. COUNTY ROAD 57 AND 66 ARE BOTH LOCAL GRAVEL ROADS. GOOD SIGHT DISTANCE IN BOTH DIRECTONS. NWCWD HAS WATERLINE ON NORTH SIDE OF CR 66. ONE ACTIVE USR FOR A 2000 HEAD DAIRY IS TO THE NORTHWEST, APPROXIMATELY 0.5 MILES FROM THE PROPOSED SITE LOCATION. THE TOWNSITE OF GILL IS APPROXIMATELY ONE MILE TO THE WEST Sign ure ❑ Access to Property ❑ Crops ❑ Topography ❑ Site Distance • ❑ Crop Productions ❑ Oil & Gas Structures o Ditch Note any commercial business/commercial vehicles that are operating from the site. AGRICULTURE • DEPARTMENT OF PLANNING SERVICES 1 N 17th AVE GREELELEY, CO 80631631 WEBSITE: www.co.weld.co.us ' E-MAIL: kogle@co.weld.co.us D PHONE: (970)353-6100, Ext. 3549 FAX: (970)304-6498 COLORADO November 18, 2011 VINCE HARRIS 700 12TH STREET, SUITE 220 GOLDEN, CO 80401 Subject: USR11-0026 - A SITE SPECIFIC DEVELOPMENT PLAN AND A SPECIAL REVIEW PERMIT FOR OIL AND GAS SUPPORT AND SERVICE FACILITY (WATER SUPPLY & STORAGE) IN THE A (AGRICULTURAL)ZONE DISTRICT. On parcel(s)of land described as: PT E2S2NW4 SECTION 26, T6N, R64W PT LOT A REC EXEMPT RE-5113 of the 6th P.M., Weld County, Colorado. PT W2NW4 EXC E2 SECTION 26, T6N, R64W PT LOT B REC EXEMPT RE-5113 of the 6th P.M., Weld County, Colorado. PT E2NW4 SECTION 26, T6N, R64W PT LOT B REC EXEMPT RE-5113 of the 6th P.M., Weld County, • Colorado. PT S2NW4 EXC E2 SECTION 26, T6N, R64W PT LOT A REC EXEMPT RE-5113 of the 6th P.M., Weld County, Colorado. Dear Applicant: Your application and related materials for the request described above are complete and in order at this time. I will schedule a meeting with you at the end of the review period to discuss the referral comments received by our office. If you have any questions concerning this matter, please call. Respectfully. D signedLocationally:1555 AveRanslem Location: N 17th Av Date:2011.11.18 15:19:28-07'00' Kim Ogle Planner • Kim Ogle Aliom: Kim Ogle nt: Monday, October 31, 2011 9:03 AM To: 'vince@baselinecorp.com' Cc: Rick Sehning Subject: Completeness Review for Carpio Water Depot Good morning Vince and Rick, The Departments of Public Works, Environmental Health and Planning have competed their review of the submitted documents and offer the following comments: The Department of Public Works in their comments dated October 25, 2011 state: Weld County Public Works has received the submittal application for the 7-Day Completeness Review. This phase of the planning process is a content review of the submitted materials, NOT a technical review. Comments made during this phase of the process will not be all-inclusive, and will address the critical issues of concern including but not limited to the Site Plan, Traffic Study, Preliminary Drainage Report, Geotechnical Soils Report, and Flood Hazard Development Permit. The Public Works Department will perform a detailed technical review of the project once the submittal application is deemed acceptable and is promoted to the review phase of the planning process. SITE PLAN REVIEW: The applicant has submitted 8.5 X 11 site plan sheets for review and comment. During the pre-application meetings we always ask for 4 sets, one for each department to evaluate and mark-up. eet # C-3 is identifying a structure and a vehicle tracking pad at the entrance to the proposed facility. A .,rmanent vehicle tracking pad shall be located at the exit lane. Please find attached Weld County's vehicle tracking control labeled "Access to Gravel County Roads." This tracking pad consists of rock and double cattle-guard configuration. TRAFFIC STUDY: During the pre-app, Weld County Public Works asked for a narrative estimating the number of trucks per day. This is a required item. In the application questionnaire appendix you are indicating a traffic count summary which was not submitted with the package. PRELIMINARY DRAINAGE: During the pre-app, Weld County Public Works asked for a full drainage report, a required item. In the packet, you had supplied a general drainage overview. In the appendix, you had indicated that a preliminary drainage report was included. Is this the same document? GEOTECHNICAL SOILS REPORT- SOILS INFORMATION: Sheet# C-5 (water storage pond) was supplied for review and comments. SPECIAL FLOOD HAZARD AREA: This area IS NOT in a Special Flood Hazard Area (SFHA) as determined by the Federal Emergency Management Agency (FEMA). Weld County Public Works is asking the applicant to enter into an Improvements Agreement and post collateral for all on-site and off- site improvements, including the designated haul route for the facility. "public Works does not have adequate information for reviewing this submittal lease submit the following items: • Traffic Count Summary 1 • Preliminary Drainage Report • Site Plan Sheets 24 X 36 • Access Permit Application Form-Signature and Access Pictures • The Department of Public Health and Environment returned a referral indicating that the submitted documents hold sufficient information to offer comments. The Department of Planning has reviewed the electronic application and requests the applicant provide one hard copy with original signatures and one CD of the entire application. Additionally, please provide a copy of the Deed, a current Certificate of Conveyances for the two Carpio parcels if part of the USR application, the application fee, and 24 x 36 inch maps of the project. All reports, maps and similar supporting documents should come in sets of four Also please elaborate on how the truck fill operation works. For instance who will truck the water off site? How long will it take for one truck to fill with water? Is there a redundant power source? How will the 30-acre feet pond with 4 surface acres remain fluid in inclement weather? How will the pond be secured —e.g., with netting for deterring bird events? Please coordinate with County staff for the second submittal of the documents as outlined herein. Thanks! Kim Kim Ogle Planner III • Department of Planning 1555 North 17th Avenue Greeley, Colorado 80631 Direct; 970.353.6100 x 3549 Office: 970.353.6100 x 3540 Facsimile:970.304.6498 fi 4 1:. 'CUUSN ' . u Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. • 2 • 8bi - 20II MEMORANDUM TO: Kim Ogle, Planning Services DATE: October 25, 2011 FROM: Donald Carroll, Engineering Administrator W E L O N T Y Public Works Department SUBJECT: 7 Day Completeness Review— PRE11-0016 Noble Energy- Carpio Farms Water Storage Pond Weld County Public Works has received the submittal application for the 7-Day Completeness Review. This phase of the planning process is a content review of the submitted materials, NOT a technical review. Comments made during this phase of the process will not be all-inclusive, and will address the critical issues of concern including but not limited to the Site Plan, Traffic Study, Preliminary Drainage Report, Geotechnical Soils Report, and Flood Hazard Development Permit. The Public Works Department will perform a detailed technical review of the project once the submittal application is deemed acceptable and is promoted to the review phase of the planning process. SITE PLAN REVIEW: The applicant has submitted 8.5 X 11 site plan sheets for review and comment. During the pre-application meetings we always ask for 4 sets, one for each department to evaluate and mark-up. Sheet # C-3 is identifying a structure and a vehicle tracking pad at the entrance to the proposed facility. A permanent vehicle tracking pad shall be located at the exit lane. Please find attached Weld County's vehicle tracking control labeled "Access to Gravel County Roads." This tracking pad consists of rock and double cattle-guard configuration. • TRAFFIC STUDY: During the pre-app, Weld County Public Works asked for a narrative estimating the number of trucks per day. This is a required item. In the application questionnaire appendix you are indicating a traffic count summary which was not submitted with the package. PRELIMINARY DRAINAGE: During the pre-app, Weld County Public Works asked for a full drainage report, a required item. In the packet, you had supplied a general drainage overview. In the appendix, you had indicated that a preliminary drainage report was included. Is this the same document? GEOTECHNICAL SOILS REPORT-SOILS INFORMATION: Sheet# C-5 (water storage pond)was supplied for review and comments. SPECIAL FLOOD HAZARD AREA: This area IS NOT in a Special Flood Hazard Area (SFHA) as determined by the Federal Emergency Management Agency (FEMA). Weld County Public Works is asking the applicant to enter into an Improvements Agreement and post collateral for all on-site and off-site improvements, including the designated haul route for the facility. Public Works does not have adequate information for reviewing this submittal Please submit the following items: • Traffic Count Summary • Preliminary Drainage Report • Site Plan Sheets 24 X 36 • Access Permit Application Form-Signature and Access Pictures M:\PLANNING-DEVELOPMENT REVIEW\-2011 Planning Referrals\PRE-APP&7-DAY REVIEWS\PRE11-0016 Carpio Noble\PRE11-0016 Carpio Noble Energy 7-Day.tlocx • 1861 - 2011 MEMORANDUM TO: PRE11-0016; Case File, pre-application WEL ' O NTY uDATE: August 4, 2011 FROM: Kris Ranslem, Planning Technician SUBJECT: Pre-Application Meeting prior to submitting USR for water storage Attendees: Rick Benning, Baseline Corporation Vince Harris, Baseline Corporation Don Carroll, Public Works Troy Swain, Environmental Health Frank Piacentino, Building Kim Ogle, Planning Kris Ranslem, Planning On Thursday, August 4, 2011 an informal discussion took place at the Greeley Administrative Offices Conference Room regarding a proposed water storage facility for oil and gas support • and service. (The legal description is W2NW4 Section 26, T6N, R64W of the 6th P.M.; Situs Address is 32205 CR 57) Background Information: Noble Energy is in the process to purchase the subject property for a proposed water storage pond and tank for oil and gas support and service. Discussion of the utilization of a holding pond and not a series of tanks holding treated water was discussed. The applicant's representative was not certain on the rational for supporting the pond to tank proposal. Additional information was requested should a second pre-application meeting be required. Building Department Building Permits including 2 sets of engineered foundation and plans will be required. Health Department Noble Energy has had discussions with North Weld County Water District about upgrading an existing water tap to a 4"tap near to the intersection of CR 64.5 and CR 57. A septic system designed by an engineer will be required. Water spills will need to be contained and allowed to infiltrate so water don't run-off and enter stormwater system. A Waste Handling Plan is required. For examples please visit: http://www.co.weld.co.us/Departments/PlanningZoninq/PlanningDepartrnent/ApplicationAssistance. html • A Dust Abatement Plan will be required. For examples please visit: http://www.co.weld.co.us/Departments/PlanningZoninq/PlanningDepartment/ApplicationAssistance. html • Public Works A Site Plan will be required identifying the following:access, parking, circulation,turning radius,site drainage and easements. A narrative estimating the number of trucks per day will be required. A full Drainage Report will be required. An Improvements Agreement, including tracking pads and haul route designations will be required. A Grading Permit is required if more than 1 acre is disturbed. Planning Department Additional Impact Fees will be applied at time of Building Permit, such as Road Impact, County Facilities, and Drainage fees. Staff reviewed the requirements for lighting, sign and oil and gas mineral interest notifications. Staff requested additional information o the design of the facility, for instance, why would treated potable water from North Weld County Water District be placed in a lined 4 surface acre pond to a depth of thirty(30)feet be the initial depository with a minimum 40,000 gallon tank utilized in phase two of the proposed water storage development. There were questions of safety and security, pollutants, dust and dirt, pollen, chemical and fertilizers that may migrate to the basin, birds and related animals that may impact the surface water and potentially the storage basin. The applicant indicated that these were good questions and they would follow-up, perhaps with a second pre- • application meeting prior to to form submittal Staff urged the applicant to contact staff for any questions: Planner On Call available Monday through Friday 7:30 a.m. to 4:30 p.m. The above notes are provided as a courtesy to the applicant. While we strive to identify significant issues,the above notes may not identify all issues, even major ones that may be raised during the formal review of your application. The information contained herein has been placed on file with the Department of Planning Services. End memorandum. • Hello