Loading...
HomeMy WebLinkAbout20120836.tiff RESOLUTION RE: ACTION OF BOARD AT PROBABLE CAUSE HEARING, PCSC12-0001, CONCERNING USE BY SPECIAL REVIEW PERMIT#1431 - MARLIN NESS WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, on the 26th day of March, 2012, a Probable Cause Hearing, PCSC12-0001, was held before the Board to consider setting a Show Cause Hearing to determine whether or not Marlin Ness, 501 East 27th Street, Greeley, Colorado 80631, was in compliance with certain Conditions of Approval and Development Standards contained in Use by Special Review Permit#1431 for a RV Park and Storage and Recreation Area in the A (Agricultural) Zone District, and WHEREAS, the alleged violations were said to be occurring on property described as part of the NE1/4 of Section 21, Township 5 North, Range 65 West of the 6th P.M., Weld County, Colorado, and WHEREAS, the Department of Planning Services presented evidence of violations of the following Development Standards contained in Use by Special Review Permit #1431 for a RV Park and Storage and Recreation Area in the A (Agricultural) Zone District: In violation of Development Standard 3 - Ten modular living units are connected to on- site septic, water, and electrical systems which lack Weld County permits. In violation of Development Standard 6 - Materials, including piles of asphalt and dirt, have been stockpiled in the floodplain/floodway of the South Platte River. In violation of Development Standards 7 and 8 - Automobile batteries and piles of asphalt are being stored on the site. In violation of Development Standard 12 - An individual sewage disposal system was installed on the site without obtaining an Individual Sewage Disposal System Permit. In violation of Development Standard 14 - On-site campers and recreation vehicles are not self contained regarding water and sewage. They are connected to on-site septic and water systems which lack Weld County permits. In violation of Development Standard 15 - On-site campers, recreation vehicles, and modular living units are connected to a septic system which lacks Weld County permits. In violation of Development Standard 16 - The septic system lacks Weld County permits. Additionally, the site is within four hundred feet of an existing City of Greeley sewer line and the City of Greeley has indicated that it will provide sewer service to the site, provided the owner annexes to the City of Greeley. Q 1/4 k, !AA._ NFL 2012-0836 4 , a-`'" ia PL1699 PROBABLE CAUSE/SET SHOW CAUSE, PCSC12-0001 - MARLIN NESS (USR#1431) PAGE 2 In violation of Development Standard 20 - Materials, including piles of asphalt, have been stockpiled within the floodway of the South Platte River. In violation of Development Standard 27 - Amendments to the existing Use by Special Review Permit to address deviations from the approved uses were not sought. In violation of Development Standard 28 - The property owner has not complied with the Development Standards contained within the existing Use by Special Review permit, and WHEREAS, after hearing testimony from the Department of Planning Services, the Board finds that pursuant to the procedure as set forth in Chapter 2, Administration, of the Weld County Code there is sufficient probable cause to schedule a Show Cause Hearing to consider whether or not said Use by Special Review Permit should be revoked for failure to comply with certain Conditions of Approval and Development Standards, and WHEREAS, the Board shall hear evidence and testimony from all interested parties at said Show Cause Hearing. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that a Show Cause Hearing be scheduled to determine whether or not Use by Special Review Permit#1431, issued to Marlin Ness, should be revoked. BE IT FURTHER RESOLVED by the Board that the date for the Show Cause Hearing shall be May 2, 2012, at or about 10:00 a.m., in the Assembly Room of the Weld County Administration Building, 1150 O Street, Greeley, Colorado. BE IT FURTHER RESOLVED by the Board that the issue to be considered at said Show Cause Hearing is whether or not the permit holder is in compliance with the following Development Standards: Standard 3 - Any future structures or uses on site must obtain the appropriate Zoning and Building Permits. Standard 6 - The historical flow patterns and run-off amounts will be maintained on the site in such a manner that will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and velocity increases, diversions, concentration and/or unplanned ponding of stormwater run-off. Standard 7 - All liquid and solid wastes, as defined in the Solid Wastes Disposal Sites and Facilities Act, Section 30-20-100.5, C.R.S., shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2012-0836 PL1699 PROBABLE CAUSE/SET SHOW CAUSE, PCSC12-0001 - MARLIN NESS (USR#1431) PAGE 3 Standard 8 - No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, Section 30-20-100.5, C.R.S. Standard 12 -Any septic system located on the property must comply with all provisions of the Weld County Code pertaining to Individual Sewage Disposal Systems. Standard 14 - All campers and recreation vehicles (RV) using the facility must be fully self-contained in regard to water and sewage. Standard 15 -There shall be no disposal of sewage or any waste water at this facility. Standard 16 - Any future structures shall be served by an individual sewage disposal system that meets the minimum requirements of the County Code and a community water system. The facility shall obtain water and sewer service from the City of Greeley in the event that it is available. Standard 20 - If any work associated with this project requires the placement of dredged or fill material, or any excavation associated with a dredged or fill project, either temporary or permanent, in streams or wetlands at this location, the Department of the Army, Corps of Engineers shall be contacted by a proponent of the project for proper Department of the Army permits or changes in permit requirements pursuant to Section 404 of the Clean Water Act. Standard 27 - The Use by Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. Standard 28 - The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. 2012-0836 PL1699 PROBABLE CAUSE/SET SHOW CAUSE, PCSC12-0001 - MARLIN NESS (USR #1431) PAGE 4 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 26th day of March, A.D., 2012. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO (f' ATTEST: j L . Sean P. Cgnwa fair Weld County Clerk to the Board t f IEILa illiam F. Garcia, Pro- em r BY: Deputy S(? rk to the Boar.° Isar I` a Kirkmeyer A PRQD ,#-'" t FORM: �r am* � O(jjI N°t Ieavid E. Long ,' 'ounty Attorney EXCUSED Douglas Rademacher Date of signature: - a5-/), 2012-0836 PL1699 Hello