Loading...
HomeMy WebLinkAbout20120303.tiff RESOLUTION RE: GRANT CHANGE OF ZONE, COZ11-0001, FROM THE A (AGRICULTURAL) ZONE DISTRICT TO THE 1-3 (INDUSTRIAL) ZONE DISTRICT - BIG THOMPSON INVESTMENT HOLDINGS, LLC WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, a public hearing was held on the 1st day of February, 2012, at 10:00 a.m., in the Chambers of the Board for the purpose of hearing the application of Big Thompson Investment Holdings, LLC, 1205 West Elizabeth Street, PMB #134, Fort Collins, Colorado 80521, requesting a Change of Zone, COZ11-0001, from the A (Agricultural) Zone District to the 1-3 (Industrial) Zone District for a parcel of land located on the following described real estate, to-wit: Lots A and B of Recorded Exemption #4914; being part of the W1/2 of Section 23, Township 4 North, Range 66 West of the 6th P.M., Weld County, Colorado WHEREAS, the applicant was represented by Tim Naylor, AGPROfessionals, LLC, 4350 State Highway 66, Longmont, Colorado 80504, and WHEREAS, Section 23-2-40 of the Weld County Code provides standards for review of such a Change of Zone, and WHEREAS, the Board of County Commissioners heard all the testimony and statements of those present, studied the request of the applicant and the recommendation of the Weld County Planning Commission and, having been fully informed, finds that this request shall be approved for the following reasons: 1. The applicant has complied with all the application requirements listed in Section 23-2-50 of the Weld County Code. 2. The request is in conformance with Section 23-2-40.B of the Weld County Code as follows: a. Section 23-2-40.6.1 -- That the proposal is consistent with the policies of Chapter 22 of this Code; if not, then that the zoning of the property under consideration is faulty, or that changing conditions in the area warrant a Change of Zone. b. Section 23-2-40.B.2 -- That the uses which will be allowed on the subject property by granting this Change of Zone will be compatible with the surrounding land uses. CC . GA, Pi_, Pw, H L, p,pgk ;Ac -, 2012-0303 3- I - I a PL2147 CHANGE OF ZONE (COZ11-0001) - BIG THOMPSON INVESTMENT HOLDINGS, LLC PAGE 2 c. Section 23-2-40.B.3 -- That adequate water and sewer service can be made available to serve the site. If the rezoning is approved, the applicant shall demonstrate, prior to issuance of building permits on the site, that the water and sewer services are available at the site and are adequate and appropriate to meet the development requirements. d. Section 23-2-40.B.4 --That street or highway facilities providing access to the property are adequate in size to meet the requirements of the proposed Zone District. e. Section 23-2-40.B.5 -- That, in those instances where the following characteristics are applicable to the rezoning request, the applicant had demonstrated compliance with the applicable standards: 1) Section 23-2-40.B.5.a -- If the proposed Change of Zone is located within any Overlay District identified by maps officially adopted by the County, that the applicant has demonstrated compliance with the County regulations concerning Overlay Districts. Compliance may be demonstrated in a previous public hearing or in the hearing concerning the rezoning application. 2) Section 23-2-40.B.5.b -- That the proposed rezoning will not permit the use of any area known to contain a Commercial Mineral Deposit as defined by State statutes in a manner which would interfere with the present or future extraction of such deposit by an extractor to any greater extent than under the present zoning of the property. 3) Section 23-2-40.B.5.c -- If soil conditions on the site are such that they present moderate or severe limitations to the construction of structures or facilities proposed for the site, that such limitations will be addressed by the applicant and/or the applicant's successors or assigns prior to development of the property. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the application of Big Thompson Investment Holdings, LLC, for a Change of Zone, COZ11-0001, from the A (Agricultural) Zone District to the 1-3 (Industrial) Zone District on the above referenced parcel of land be, and hereby is, granted subject to the following conditions: 1. Prior to recording the Change of Zone plat: A. The applicant shall provide the Weld County Department of Planning Services with a Statement of Taxes from the Weld County Treasurer showing no delinquent taxes exist for the original parcel. 2012-0303 PL2147 CHANGE OF ZONE (COZ11-0001) - BIG THOMPSON INVESTMENT HOLDINGS, LLC PAGE 3 B. Per Section 23-2-50.6.13 of the Weld County Code, the applicant shall provide the Weld County Department of Planning Services with evidence that the hard rock minerals have been purchased and that a Surface Use Agreement has been negotiated with the mineral interest owner(s). C. Per Section 23-2-50.B.14 of the Weld County Code, the applicant shall provide the Weld County Department of Planning Services with evidence that an agreement, or an attempt to enter into an agreement, has been made with the Western Mutual Ditch Company. 2. Prior to recording the Site Plan Review (SPR) plat: A. The drainage plan map shall be amended to show existing and proposed culverts and/or bridges, overall drainage area boundary, sub-area drainage boundaries, proposed flow arrows, and the locations of proposed detention ponds. A general vicinity map, at a scale of 1 inch = 2,000 feet, needs to be included which shows the upstream off-site drainage areas flowing onto the property. B. The Drainage Report acreages need to be consistent with acreages described in the final plat application. C. Hydrologic computations for on-site and off-site flows. The site must detain all stormwater runoff generated as a result of the proposed development. The detention pond(s) must be sized to capture the 100- year developed on-site runoff and release it at the 5-year historic runoff rate. D. The proposed grading shall be provided with the Master Drainage Report. Please note that grading permits will be required for the construction of the stormwater system (channels, ponds, swales, etcetera), access roads, building sites, and any other activities that disturb more than one acre of ground. E. If phased construction is proposed, the Master Drainage Report shall include a Master Drainage Plan for the site that addresses how it will provide the necessary construction—phase stormwater management to prevent off-site impacts by stormwater discharges. F. To protect public safety and prevent off-site damages, sufficient interim Best Management Practices (detention, erosion, and sediment control) will need to be designed, approved, and installed prior to commencement of construction. G. An On-site and Off-site Geotechnical Soils Report needs to be submitted that includes a preliminary pavement design for the roads to be constructed within the property. 2012-0303 PL2147 CHANGE OF ZONE (COZ11-0001) - BIG THOMPSON INVESTMENT HOLDINGS, LLC PAGE 4 H. The applicant shall submit a grading permit showing: proposed grading, erosion control placement, typical details for all BMPs to be utilized, and a Construction Stormwater permit from the Colorado Department of Public Health and Environment. The permit must be stamped by a registered professional engineer licensed in the State of Colorado. Please note that the grading permit will not be released until the applicant has signed the improvements agreement, posted collateral, and submitted the final plat for recording. The applicant shall enter into an Improvements Agreement for the on-site and off-site work to be done and submit collateral to and accepted by the Weld County Board of County Commissioners prior to recording of the final plat. J. No Traffic Study was submitted for this Change of Zone application. The Department of Public Works will defer the traffic study until the submittal of the Site Plan Review application documents. The detailed Traffic Study should follow the Traffic Study checklist. Roadway improvements including, but not limited to, paving of County Road 33 to U.S. Highway 85 (unless access will be from County Road 44), auxiliary lanes, widened radii, and relocation of accesses may be required by the Weld County Department of Public Works or the Colorado Department of Transportation (CDOT). In the absence of a Traffic Study, the Department of Public Works will determine appropriate triggers for the roadway improvements that mitigate such issues like site distance and large trucking traffic volumes. Once the traffic study is submitted, changes to the site layout, turn lanes, or other improvements may be required by Public Works or CDOT. The applicant should expect to fully fund the necessary roadway improvements to mitigate for the traffic generated by this development. K. An access permit cannot be granted at this time. Access requirements will be determined when the Traffic Study is reviewed with the Site Plan Review application. Access from County Road 44 will require an easement or purchase of adjacent land and should be established at Final Plat so that access and off-site requirements by the County or CDOT may be addressed. If access to County Road 44 is not established with the Final Plat application, off-site improvements to County Road 33 may be triggered. 3. The plat shall be amended to delineate the following: A. All sheets of the plat shall be labeled COZ11-0001. B. The plat shall adhere to Sections 23-2-50.C and 23-2-50.D of the Weld County Code. 2012-0303 PL2147 CHANGE OF ZONE (COZ11-0001) - BIG THOMPSON INVESTMENT HOLDINGS, LLC PAGE 5 C. All recorded easements and rights-of-way shall be shown and dimensioned on the Change of Zone plat. D. All approved accesses shall be delineated on the plat. E. County Road 33 is a local gravel road and requires 60 feet of right-of-way at full buildout. There is presently a 60-foot right-of-way. This road is maintained by Weld County. Pursuant to the definition of SETBACK in the Weld County Code (Section 23-1-90), the required setback is measured from the future right-of-way line. F. County Road 44 is an arterial road and requires 140 feet of right-of-way at full buildout. There is presently a 60-foot right-of-way. This road is maintained by Weld County. Pursuant to the definition of SETBACK in the Weld County Code (Section 23-1-90), the required setback is measured from the future right-of-way line. G. The following notes shall be delineated on the Change of Zone plat: 1. The Change of Zone allows for 1-3 (Industrial) uses which shall comply with the 1-3 (Industrial) Zone District requirements as set forth in Section 23-3-330 of the Weld County Code. 2. Any future structures or uses on the site must obtain the appropriate zoning and building permits. 3. Building permits shall be obtained prior to the construction of any new building. A plan review is required for each building. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. 4. New buildings shall conform to the requirements of the various codes adopted at the time of permit application. Currently, the following have been adopted by Weld County: 2006 International Building Code, 2006 International Mechanical Code, 2006 International Plumbing Code, 2011 National Electrical Code, and Chapter 29 of the Weld County Code. 5. Effective April 25, 2011, building permits issued on the proposed lot will be required to adhere to the fee structure of the County- Wide Road Impact Fee Program. 6. Effective April 25, 2011, building permits issued on the proposed lot will be required to adhere to the fee structure of the County Facility Fee and Drainage Impact Fee. 2012-0303 PL2147 CHANGE OF ZONE (COZ11-0001) - BIG THOMPSON INVESTMENT HOLDINGS, LLC PAGE 6 7. Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval stated herein and all applicable Weld County regulations. 8. The historical flow patterns and runoff amounts will be maintained on the site in such a manner that it will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to runoff rate and velocity increases, diversions, concentration, and/or unplanned ponding of storm runoff. 9. With a Site Plan Review submittal, the applicant shall provide a Master Drainage Report which adequately addresses the requirements listed in Section 8-11-120 of the Weld County Code. 10. A detailed Traffic Impact Study is required with the Site Plan Review application. Off-site roadway and/or intersection improvements may be required. 11. Access requirements will be determined when the Traffic Study is reviewed with the Site Plan Review application. 12. Prior to recording a Site Plan Review plat, the applicant shall enter into an Improvements Agreement for on-site and off-site Improvements. Collateral needs to be submitted to, and accepted by, the Weld County Board of County Commissioners prior to recording of the plat. 13. Prior to recording a Site Plan Review plat, the applicant shall submit a grading permit showing: proposed grading, erosion control placement, typical details for all BMPs to be utilized, and a Construction Stormwater permit from the Colorado Department of Public Health and Environment. The permit must be stamped by a registered professional engineer licensed in the State of Colorado. Please note that the grading permit will not be released until the applicant has signed the improvements agreement, posted collateral, and submitted the Site Plan Review plat for recording. 14. An On-site and Off-site Geotechnical Soils Report needs to be submitted prior to recording of the Site Plan Review that includes a preliminary pavement design for the on-site and off-site roads to be constructed. 2012-0303 PL2147 CHANGE OF ZONE (COZ11-0001) - BIG THOMPSON INVESTMENT HOLDINGS, LLC PAGE 7 15. To protect public safety and prevent off-site damages, sufficient interim Best Management Practices (detention, erosion, and sediment control) will need to be designed, approved, and installed prior to commencement of construction. 16. All future owners shall be aware of, and adhere to, the 1999 U.S. Highway 85 Access Control Plan. 17. The Weld County Right to Farm Statement, as it appears in Section 22-2-20.J.2 of the Weld County Code, shall be placed on the plat. 18. The owner, and its heirs, successors, or assigns, agrees to notify adjacent property owners within 500 feet of the property when an application for a Site Plan Review (SPR) is filed with the County. H. The applicant shall submit three (3) paper copies of the plat for preliminary approval to the Weld County Department of Planning Services. 4. Upon completion of Conditions of Approval #1 through #3 above, the applicant shall submit a Mylar plat, along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by the Department of Planning Services. The plat shall be prepared in accordance with the requirements of Section 23-2-50.C and Section 23-2-50.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within sixty (60) days from the date of the Board of County Commissioners Resolution. The applicant shall be responsible for paying the recording fee. 5. The Change of Zone plat map shall be submitted to the Department of Planning Services for recording within sixty (60) days of approval by the Board of County Commissioners. With the Change of Zone plat map, the applicant shall submit a digital file of all drawings associated with the Change of Zone application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are ArcView shapefiles or ArcGIS Personal GeoDataBase (MDB). The preferred format for Images is .tif (Group 4). (Group 6 is not acceptable). This digital file may be sent to maps@co.weld.co.us. 6. In accordance with Weld County Code Ordinance #2005-7, approved June 1, 2005, should the plat not be recorded within the required sixty (60) days from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance charge shall added for each additional three (3) month period. 2012-0303 PL2147 CHANGE OF ZONE (COZ11-0001) - BIG THOMPSON INVESTMENT HOLDINGS, LLC PAGE 8 - DRAFT The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 1st day of February, A.D., 2012. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: et.....2714 _ EXCUSED Sean P. Co y, Chair Weld County Clerk to the Board 00notiips, Wi/ m . Garcia, Pro-T- BY:& x P 7�\�' L . / 4J s�Li . �. Deputy rk to the Boar, , .p: �_��I A ;1861 Ps%� orb- Kirk'yerr p I /7 ‘ r David E. Long o my Attorney c- Dougl Rademac r Date of signature: t5-l - I 2012-0303 PL2147 Hello