HomeMy WebLinkAbout20120541.tiff MEMORANDUM
G O u N TO: Clerk to the Board DATE: March 22, 2012
FROM: Mike Bedell, Public Works Department
SUBJECT: Consent BOCC Agenda
Agreement with Mountain Constructors, Inc. for WCR 54/49 Intersection Improvements in
the amount of$959,910.75.
Bid No. B1100107
Attached are two original agreements. Please send one signed original to Public Works.
M\Francie\AgendaMlkeBedelldocx
�/. / 04 .517±1111 zC pO� 6
•
AGREEMENT
WCR 54/49 INTERSECTION IMPROVEMENTS
THIS AGREEMENT, made this 12th day of March ,2012, by and between Weld County,Colorado, hereinafter called
"Owner"and Mountain Constructors Inc. doing business as(an individual,) or (a partnership,) or (a corporation)hereinafter
called "Contractor".
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned:
1. The Contractor will commence and complete the following: WCR 54/49 INTERSECTION IMPROVEMENTS
described in the Invitation for Bids, Bid No.BI 100107.
2. The Contractor will furnish all of the material,supplies,tools,equipment,labor and other services necessary for
the construction and completion of the Project described herein.
3. The Contractor will commence the work required by the Contract Documents within ten(10)calendar days after
the Notice to Proceed and will complete the WCR 54/49 INTERSECTION IMPROVEMENTS within 120
calendar days unless the period for completion is extended otherwise by the Contract Documents.
4. The Contractor agrees to perform all of the Work described in the Contract Documents and comply with the terms
therein for the sum of$959.910.75 ,or as shown in the Bid Schedule.
5. The term"Contract Documents" means and includes the following:
(A) Invitation for Bids
(B) Instructions to Bidders
(C) Bid Proposal
(D) Bid Bond
(E) Statement of Qualifications and Subcontractors
(F) Required Project Forms
(G) Agreement
(H) Labor and Materials Payment Bond
(I) Performance Bond
(J) Notice of Award
(K) Notice to Proceed
(L) Change Order
(M) Certificate of Substantial Completion
(N) Lien Waiver
(O) Notice of Acceptance
(P) Contract,Specifications,and Drawings issued by the Weld County Public Works Department.
(Q) Colorado Department of Transportation "Standard Specifications for Road and Bridge
Construction"
(R) Colorado Department of Transportation Standard Plans"M& S Standards"
(S) Addenda:
No. One(1), dated March 6 ,2012.
No. Two(2)_, dated March 16 ,2012.
6. The Owner will pay to the Contractor in the manner and at such times as set forth by the Contract Documents,or
otherwise agreed upon in writing.
7. This Agreement shall be binding upon all parties hereto and their respective heirs,executors,administrators,
successors,and assigns.
8. Contract Appropriations: l-he Owner hereby states and af irmsthattheamountofmoneyappropriatedforthis
Contract is equal to or in excess of the Contract amount. No change order to this Contract requiring additional
compensable work to be performed, which work causes the aggregate amount payable under the Contract to
exceed the amount appropriated for the original Contract shall be issued by the Owner unless the Owner
assures the Contractor, in writing,that lawful appropriations to cover the costs of the additional work has been
made or unless such work is covered under a remedy-granting provision contained in the Contract.
IN WITNESS WHEREOF,the parties hereto have executed, or caused to be executed by their duly authorized officials,
this Agreement in two(2)copies each of which shall be deemed an original on the date first above written.
ORDERED BY: ACCEPTED BY:
THE BOARD OF WELD COUNTY COMMISSIONERS CONTRACTOR
BY � BY 421 A k
NAME Sean P. Conway NAME {("h,SP,pk kLkn4e
(P1 ase Type)
TITLE Chair TITLE --P('(,StdE' ri+-.
Date MAR 2 8 2012 ADDRESS Gaa Ma,r, S+rw
. -ou 405
‘‘; 1 • 1 4\ !lrJ ev;lle , Udo SOG5 (
01
(SEAL) ) (SEAL)
fATTEST: i ATTEST: /� (�
Weld County Clerk to the oard J
bi
C ' �4% ,��,,
BY t, //,a/c2 Abet AL-4_2 BY cprciy Ar s
Deputy Clerk/to the Board (l (Please Type)
/TITLE pz,ret See r-e,-{0.Yy
Public Works Department
1111 H Street,PO Box 758
1801. Greeley, Colorado 80632
Website: www.co.weld.co.us
Phone: (970) 356-4000, Ext. 3750
Fax: (970) 304-6497
Date March 1, 2012
To: Monica Mika, Director of Finance and Administration
From: Pat Persichino, Director of Public Works
RE: Bid number B1100107, WCR 54/49 Intersection Improvements
In accordance with the Weld County Code, the Department of Public Works recommends awarding this
project to the low bidder, Martin Marietta Materials, Inc., Fort Collins, Colorado.
Of note is the fact that the second low bid was submitted by a local Weld County Contractor, Mountain
Constructors, Inc. Mountain Constructors is headquartered in Platteville, Colorado. The difference
between the two bids is less than 1%. Section 5-40-30-A (3) of the Weld County Code states: "The
Board of County Commissioners shall give preference to resident County bidders in all cases where the
bids are competitive in price and quality". Mountain Constructors has performed well in previous road
construction projects with the County.
Sincerely,
PAT PERSICHINO
DIRECTOR
ea CdOe'
2/0 kg Page I of I 219/C9 „ 0151
Martin Marietta Materials
DATE: March 9, 2012
TO: Weld County Purchasing Department
FROM: Kenneth Ball
GM Northern Asphalt& Paving
RE: Martin Marietta Materials Inc. Impact in Weld County 111 opt U7
Overview:
• The history of Martin Marietta Materials Inc. is rooted deep in Weld County.
• Back in the early 1960s a company called Flatirons set up an asphalt plant on 25th avenue in an
aggregate mining pit just north of Greeley, Colorado. Aggregate mining along with the production
of asphalt and concrete happened at this site until the mid 1980s when the entire site was move
to 35th avenue just north of Greeley.
• In 1989 Flatirons was purchase by Western Paving. Over the next 10 years Western Mobile
conducted business up and down the front range of Colorado until they were purchased by
Lafarge North America.
• In 1998 Lafarge purchased Western Mobile operated this business until December 2011 when
Martin Marietta Materials Inc.completed an asset swap with Lafarge.
• Martin Marietta Materials Inc. is the second largest aggregate producer in the US. Martin
Marietta Materials Inc. is incorporated in North Carolina. Our corporate office in located in
Raleigh, NC. Our-Western region in located in San Antonio,TX. Our Rocky Mountain division
office in located in Westminster, Colorado. Our Northern District offices are located in Fort
Collins, Colorado and Greeley, Colorado.
• The Rocky Mountain Region employs over 650 employees all along the front range. Out of the
650 employees Martin Marietta employs about 100 are located in Weld County.
• Martin Marietta has operations at River Bend at CR 6&HWY 85 in southern Weld County. We
also have operations on HWY 119 east of Longmont, on CR 18'A just west of CR 7, 35t"avenue
north of Greeley and miscellaneous mining operations along the South Platte and Poudre Rivers.
• Over the years Martin Marietta Materials Inc.has paid all forms of taxes to Weld County greater
than$100K per year.
• As you can see Martin Marietta Materials Inc. has been and will continue to be a local business in
and around the county. We have supported many city and county functions all across the region.
We have supplied aggregate, hot mix asphalt and concrete along with the completion of
construction projects throughout the county with the highest quality for both product and services.
If you should have any questions please contact me at 970-407-3624.
WELD COUNTY PURCHASING
. w 915 10TH St Room #334, Greeley CO 80631
E-Mail: mwalters{a)co.weld.co.us
E-mail: reverett(cr�co.weld.co.us
Phone: (970) 356-4000, Ext 4222 or 4223
u N?Yc Fax: (970) 336-7226
DATE OF BID: February 23RD, 2012
REQUEST FOR: WCR 54/49 INTERSECTION IMPROVEMENTS
DEPARTMENT: Public Works Dept
BID NO: #61100107
PRESENT DATE: February 27TH, 2012
APPROVAL DATE: March 12`h' 2012
TOTAL PROJECT
VENDORS COST
MARTIN MARIETTA MATERIALS INC $ 953,037.65
1800 N Taft Hill Road
Ft Collins CO 80521
MOUNTAIN CONSTRUCTORS INC $ 959,910.75
622 Main Street
Platteville CO 80651
GERRARD EXCAVATING INC $1,007,129.30
27486 County Road 13
Loveland CO 80534
DURAN EXCAVATING INC $1,067,671.10
418 N 9`h Avenue
Greeley CO 80631
J-2 CONTRACTING COMPANY $1,069,843.35
PO Box 129
Greeley CO 80632
ZAK DIRT INC $1,084,130.10
14290 Hilltop Road
Longmont CO 80513
DON KEHN CONSTRUCTION INC $1,175,819.00
6550 South County Road 5
Ft Collins CO 80528
CONNELL RESOURCES INC $1,182.904.70
7785 Highland Meadows Pkwy Suite 100
Ft Collins CO 80528
ASPHALT SPECIALTIES $1,216,826.50
10100 Dallas Street
Henderson CO 80640
*BIDS ARE BEING REVEIWED AT THIS TIME
2012-0541