HomeMy WebLinkAbout20122204.tiff NOTICE
The Board of County Commissioners of Weld County, Colorado, on August 22, 2012,
conditionally approved a Site Specific Development Plan and Use by Special Review Permit,
USR12-0033, for the property and purpose described below. Conditional approval of this plan
creates a vested property right pursuant to Article 68 of Title 24, C.R.S., for a period of three
years.
DOCKET#: 2012-57
APPLICANT:
Kerr-McGee/Robert Wamer/Anadarko E&P Company LP
c/o Tri-State Generation and Transmission Association, Inc.
1100 West 116th Avenue, Westminster, Colorado 80234
LEGAL DESCRIPTION: Part of the W1/2 SE1/4 and part of the NW1/4 of Section 14,
Township 2 North, Range 66 West; part of the NE1/4 of Section 14, Township 2 North, Range
64 West; and part of the E1/2 of Section 23, Township 2 North, Range 66 West of the 6th P.M.,
Weld County, Colorado
TYPE AND INTENSITY OF APPROVED USE: For a Major Facility of a Public Utility (a 115-kV
substation and an approximately 1.5-mile long 115-kV transmission line to connect the Xcel
Hudson-Fort Lupton transmission line into the proposed substation) in the A (Agricultural) Zone
District
SIZE OF PARCEL: 6.0 acres, more or less
Failure to abide by the terms and conditions of approval will result in a forfeiture of the vested
property right.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
DATED: September 21, 2012
PUBLISHED: September 26, 2012, in the Fort Lupton Press
(7.5b/o2 -;?Oy
PROOF OF PUBLICATION
FORT LUPTON PRESS
STATE OF COLORADO
COUNTY OF WELD SS.
I, Christopher L. Harrop, do solemnly swear that I am the NOTICE
Managing Editor of the Fort Lupton Press that the same The Board of County Commissioners
is a weekly newspaper printed and published in the County of Weld
2, l2d Cou12, ctyondbonado,lly on August
ed
of Weld, State of Colorado, and has a general circulation a Site Specific Development Plan
and Use by Special Review Permit,
therein; that said newspaper has been published USR12-0033, for the property
continuously and uninterruptedly in said county of Weld for and purpose described below.
P Y and purpose
approval of this plan
a period of more than fifty-two consecutive weeks prior to I creates a vested property right
pursuant to Article 68 of Tide 24,
the first publication of the annexed legal notice or C.R.S.,for a period of three years.
DOCKET#:advertisement; that said newspaper has been admitted to APPLICANT:2012-57
Kerr-McGee/Robert Wamer/
the United States mails as second-class matter under the Anadarko ESP Company LP
rovisions of the act of March 3, 1879, or an amendments
P Y c/o Tri-State Generation andTransmission Association,Inc.
thereof, and that said newspaper is a weekly newspaper 1100 West 116th Avenue,
Westminster,Colorado 80234
duly qualified for publishing legal notices and LEGAL DESCRIPTION: Part of the
W1/2 SEt/4 and part of the NW1/4
advertisements within the meaning of the laws of the State of Section 14, Township 2 North,
of Colorado. That the annexed legal notice or Range 66 West; part of the NE1/4
g of Section 14, Township 2 North,
advertisement was published in the regular and entire Range 64 West;and part of the E1/2
of Section 23, Township 2 North,
issue of every number of said weekly newspaper for the Range 66 West of the 6th P.M.,Weld
period of ONE consecutive insertion(s); and that the TYPEryC AND doINTENSITY OF
first publication of said notice was in the issue of APor
Facility ofED USE:a Public Utility For(a 1 5aIkV
newspaper, dated 26th day of SEPTEMBER 2012, and substation and an approximately
1.5-mile long 115-kV transmission
the last on the 26th day of SEPTEMBER 2012 line to connect the Xcel Hudson-
Fort Lupton transmission line into
the proposed substation) in the A
Agncultural)Zone District
SIZE OF PARCEL: 6.0 acres,
more or less
Managing Editor, Subscribed and sworn b re me, Failure to abide by the terms and
this 26th day of SEPTEMBER 2012 conditions of approval will result in
a forfeiture of the vested property
right.
BOARD OF COUNTY
/ L4ty1nc
COMMIMMISSIONERS.
WELD COUNTY,COLORADO
DATED: September 21,2012
. PUBLISHED: September 26,2012,
in the Fort Lupton Press
. �
. c.
My Commission Expires y,O. Q2/2014
Notice
Pursuant to the zoning laws of the State of Colorado and the Weld County Code, a public hearing will be
held before the Weld County Planning Commission and the Board of County Commissioners in the Hearing Room,
Weld County Administration Building, 1150 O Street, Greeley, Colorado, at the times specified below.
The complete case file may be examined by calling the Department of Planning Services at (970) 353-6100
to make arrangements with the case planner, or at the office of the Clerk to the Board of County Commissioners,
Weld County Administration Building, 1150 O Street, Greeley, Colorado 80631. E-Mail messages sent to an
individual Commissioner may not be included in the case file. To ensure inclusion of your E-Mail correspondence into
the case file prior to the Planning Commission hearing, please call the Department of Planning Services to
obtain the appropriate contact information. For inclusion of any correspondence prior to the Board of
Commissioners hearing E-mail egesick@co.weld.co.us.
If a court reporter is desired for either hearing, please advise the Department of Planning Services or the
Clerk to the Board's Office, in writing, at least five days prior to the hearing. The cost of engaging a court reporter
shall be borne by the requesting party. In accordance with the Americans with Disabilities Act, if special
accommodations are required in order for you to participate in this hearing, please contact the Department of
Planning Services at (970) 353-6100 Ext. 3519, or the Clerk to the Board's Office at (970) 336-7215, Ext. 4226, prior
to the day of the hearing. All cases scheduled before the Planning Commission or Board of County Commissioners
are subject to continuance, due to lack of quorum or otherwise. Contact the Department of Planning Services or the
Clerk to the Board's Office at the numbers above,for hearing continuance information.
DOCKET#: 2012-57
PLANNING COMMISSION DATE:August 7, 2012
TIME: 1:30 p.m.
BOARD OF COMMISSIONERS DATE: August 22, 2012
TIME: 10:00 a.m.
CASE#: USR12-0033
APPLICANT: KERR-MCGEE GATHERING LLC
PLANNER: Chris Gathman
REQUEST: A Site Specific Development Plan and Use by Special Review Permit for a Major Facility of a Public
Utility (A 115-kV Substation and an approximately 1.5 mile long 115-kV Transmission Line to connect the XCEL
Hudson-Fort Lupton Transmission line into the proposed substation) in the A (Agricultural)Zone District.
LEGAL DESCRIPTION: Part of the W2SE4 and Part of the NW4 of Section 14, T2N, R66W; Part of the E2 Section
23, T2N, R66W; Part of the NE4 of Section 14, T2N, R66W of the 6th P.M.,Weld County, Colorado.
LOCATION: Substation: South of and adjacent to CR 22 and approximately 1.5 miles east of CR 31. Power Line:
Running South of and adjacent to County Road 22 to approximately 1/2 mile north of County Road 18 and
approximately 1.5 miles east of County Road 31. (See Legal Description for precise location.)
DATED: July 20,2012
PUBLISHED: July 25, 2012, in the Ft. Lupton Press
PROOF OF PUBLICATION
FORT LUPTON PRESS
STATE OF COLORADO
COUNTY OF WELD SS.
I, Christopher L. Harrop, do solemnly swear that I am the
Managing Editor of the Fort Lupton Press that tha came is a weekly newspaper printed and p - -
of Weld, State of Colorado, and ha
therein; that said newspaper : fS. •
continuously and uninterruptedly in : i
a period of more than fifty-two cons
the first publication of the annE I
•
advertisement; that said newspaper
the United States mails as second
•
provisions of the act of March 3, 187 •
• ,
thereof, and that said newspaper it
duly qualified for publishing 1 — •
advertisements within the meaning r l
of Colorado. That the annexf i .I
advertisement was published in t 1
issue of every number of said wee • I
period of ONE consecutive inse J 1'
first publication of said notice p x
newspaper, dated 25th day of JULY
the 25th day of JULY
�201122-
i
Managing Editor, Subscribed ant,
this 25th •
Notice If a court reporter is desired for APPLICANT: KERR-MCGEE
Pursuant to the zoning laws of the either hearing, please advise the GATHERING LLC
State of Colorado and the Weld Department of Planning Services PLANNER:Chris Gathman
County Code, a public hearing will or the Clerk to the Board's Office, REQUEST: A Site Specific
be held before the Weld County in writing, at least five days prior to Development Plan and Use by
Planning Commission and the the hearing. The cost of engaging Special Review Permit for a Major
i Board of County Commissioners a court reporter shall be bome by Facility of a Public Utility(A 115-kV
in the Hearing Room,Weld County the requesting party. In accordance Substation and an approximately
Administration Building, 1150 O with the Americans with Disabilities 1.5 mile long 115-kV Transmission
Street, Greeley Colorado, at the Act, if special accommodations are Line to connect the XCEL Hudson-
times specified below required in order for you to participate Fort Lupton Transmission line into
The complete case file may be in this hearing, please contact the the proposed substation) in the A
' examined by calling the Department Department of Planning Services (A ncultural)Zone District.
of Planning Services at (970) at(970)353-6100 Ext.3519,or the LEGAL DESCRIPTION: Part of
353-6100 to make arrangements Clerk to the Board's Office at(970) the W2SE4 and Part of the NW4
My Commission Expires : 0: with the case planner, or at the 336-7215.Ext.4226.prior to the day of Section 14, T2N, R66W: Part
office of the Clerk to the Board of the hearing.All cases scheduled of the E2 Section 23, T2N. R66W;
of County Commissioners, Weld before the Planning Commission or Part of the NE4 of Section 14,T2N,
County Administration Building, Board of County Commissioners are R66W of the 6th P.M..Weld County.
1150 O Street. Greeley, Colorado subject to continuance, due to lack Colorado.
80631. E-Mail messages sent to of quorum or otherwise.Contact the LOCATION:Substation:South
an individual Commissioner may Department of Planning Services of and adjacent to CR 22 and
not be included in the case file To or the Clerk to the Board's Office approximately 1.5 miles east of CR
ensure inclusion of your E-Mail at the numbers above, for hearing 31. Power Line:Running South of
correspondence into the case file continuance information. and adjacent to County Road 22
prior Planning DepartmentCounty Road
approximately 1/2 mile north of
hearing,please call the PLANNING COMMISSION DATE: 18 and approximately
of Planning Services to obtain the August 7,2012 1.5 miles east of County Road 31.
appropriate contact information.For TIME:1:30 p.m. (See Legal Description for precise
inclusion of any correspondence BOARD OF COMMISSIONERS location.)
prior to the Board of Commissioners DATE:August 22,2012 DATED:July 20,2012
hearing E-mail egesick@co.weld. TIME: 10:00 a.m. • PUBLISHED:July 25,2012,in the
co.us. CASE#:USR12-0033 Ft.Lupton Press
Hello