Loading...
HomeMy WebLinkAbout20121737.tiff RESOLUTION RE: EXPRESSION OF SUPPORT FOR THE CHATFIELD RESERVOIR STORAGE REALLOCATION PROJECT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the U. S. Army Corps of Engineers has determined that Chatfield Reservoir, located in Douglas and Jefferson Counties, can safely store an additional 20,600 acre feet of water beyond that currently held without jeopardizing the reservoir's flood control purposes, and WHEREAS, the Reservoir's current authorized purposes include flood control, recreation, fish and wildlife, and water supply, and the reallocation of storage space has been authorized since 1986, and WHEREAS, the Draft Integrated Feasibility Report (FR)/Environmental Impact Statement (EIS) for the Chatfield Reservoir Storage Reallocation Study has been prepared by the U. S. Army Corps of Engineers in cooperation with the State of Colorado and in consultation with 15 prospective water users groups and many other interested parties, and WHEREAS, the Chatfield Study has been supported by the Colorado Congressional Delegation (FY2007—FY2012 appropriations bills and numerous joint letters), the Colorado General Assembly (SJR 07-019), and the Colorado Water Conservation Board (serving as non- federal sponsor for the study, January 2010 resolution, and allocation of $13 million to assist with implementation), and WHEREAS, storing more water in Chatfield Reservoir will make better use of an existing facility and capture additional runoff flowing down the South Platte River and Plum Creek without pumping, and WHEREAS, allocating that added storage space to entities holding current water rights to that water will prevent the loss of as much as 20,600 acre feet of South Platte River water in wet years to out-of state-flows, and WHEREAS, in a drought year like this one, the added water storage space in Chatfield (along with aggressive water conservation efforts) could make the difference in having enough water for municipal, industrial, agricultural, and environmental purposes, and WHEREAS, as discussed in the Colorado Water Conservation Board (CWCB) and "Statewide Water Supply Initiative" (SWSI) Study, there is an anticipated water supply shortage or gap of approximately 99,000 to 360,000 acre feet per year in the South Platte River Basin over the next 40 years, and WHEREAS, the water providers who contract and pay for use of the water storage space in Chatfield Reservoir have agreed to undertake and pay for needed mitigation of environmental impacts and to undertake and pay for modification of recreation facilities as needed, and �t-t' 2012-1737 g l It .I a BC0043 EXPRESSION OF SUPPORT FOR THE CHATFIELD RESERVOIR STORAGE REALLOCATION PROJECT PAGE 2 WHEREAS, numerous agricultural irrigation wells in Weld County have been severely curtailed or completely shut off due to downstream senior water rights and the low supply of water, and under such circumstances the Chatfield Reservoir has provided "augmentation water" to alleviate this urgent need for irrigation water, and WHEREAS, increased storage in the Chatfield Reservoir will further assist farmers in Weld County during times of drought by enabling the increased supply of "augmentation water" available to said farmers. NOW THEREFORE BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that it hereby expresses its support for the U.S. Army Corps of Engineers Tentatively Recommended Plan in the Draft Integrated FR/EIS on the Chatfield Reservoir Storage Reallocation Project and directs that this Resolution be delivered to the U. S. Army Corps of Engineers to made part of the record of public comments on this Draft Integrated FR/EIS. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, urges the U. S. Army Corps of Engineers to complete its final review of the project and issue a Record of Decision in a timely manner so that additional water can be stored in Chatfield Reservoir as soon as possible. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 11th day of July, A.D., 2012. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST:.�G 7 Sean P. Conway, Chair Weld County Clerk to the Board EXCUSED ^ illiam F. Garcia, P -Tem BY: fl* •tr \\. / / Deputy Cie to the"Board Ai11R j)JY -A & O a r.'a Kirkmey rrC' �R* ED '. : ' •RM: :r. t�i�..,pp Lori •`"'��avid . Lon ounty Attorney 016.5 cx ren Dougls Rademacher Date of signature: 5 J5 /a 2012-1737 BC0043 Hello