HomeMy WebLinkAbout20130901.tiffRESOLUTION RE: APPROVE AGREEMENT FOR RELOCATION OF HEADGATE AND RELATED FACILITIES AND AUTHORIZE CHAIR TO SIGN - FARMERS INDEPENDENT DITCH COMPANY (FIDCO) WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with an Agreement for Relocation of Headgate and Related Facilities between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Farmer's Independent Ditch Company (FIDCO), with terms and conditions being as stated in said agreement, and WHEREAS, after review, the Board deems it advisable to approve said irrigation relocation agreement, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Agreement for Relocation of Headgate and Related Facilities between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Farmers Independent Ditch Company (FIDCO) be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said agreement. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 10th day of April, A.D., 2013. BOARD OF CO�JJ1TY COMMISSIONERS WELD COU Y, OLORADO ATTEST: Weld County Clerk to the Board BY: Deputy Cle to the Boar APPROVED AS TO FORM zQ� 861 ' ounty 't orney Date of signature9 R 18 2013 (au, -7-2Pw �l (D l uglas (61_3 o demachr, Pr�a o -T m J can P. Conway ` it i L S — - dike Freeman ?EXCUSED Barbara Kirkmeyer 2013-0901 EG0068 MEMORANDUM TO: Clerk to the Board DATE: April 8, 2013 FROM: Mike Bedell, P.E., Public Works Department SUBJECT: BOCC Agenda Agreement for relocation of headgate and related facilities with Farmers Independent Ditch Company for the WCR 42/29A Bridge replacement and intersection alignment in the amount of $17,287.84. Attached are two, duplicate original agreements. Please return one signed original agreement to the Public Works Department. M 'FcancieAAgendaMlkelledell- l dote 2013-0901 BOARD OF COUNTY COMMISSIONERS REVIEW/WORK SESSION REQUEST RE: FIDCO Irrigation Relocation Agreement for Bridge 42/29A Replacement DEPARTMENT: PUBLIC WORKS DATE: 3/29/13 PERSON REQUESTING: Wayne Howard, P.E. County Engineer Brief description of the problem/issue: The proposed replacement of Bridge 42/29A and associated realignment of the WCR 42/29 intersection requires some utility and irrigation facility relocations. Farmers Independent Ditch Company (FIDCO) is required to relocate an existing irrigation head -gate and pump station. These items are located within an area owned by FIDCO and will be relocated downstream to a location which no longer conflicts with a concrete box culvert the County is planning to construct. FIDCO has agreed to perform this work at the projects expense, utilizing their construction contractor (Quality Well & Pump). This Irrigation Relocation Agreement entails reimbursement of the estimated costs in the amount of $17,287.84. This project has been budgeted in 2013 and these proposed irrigation relocation costs have been planned for in the project budget. Stephanie Arries has reviewed the agreement. What options exist for the Board: The Board can choose to sign or not to sign the attached FIDCO Irrigation Relocation Agreement. The concrete box culvert construction cannot proceed without relocating the irrigation facilities in conflict with the road/bridge improvements. If the Agreement is approved, Quality Well & Pump will perform the relocation work and the County will reimburse FIDCO for the costs involved. Recommendation to the Board: Public Works recommends signing the FIDCO Irrigation Relocation Agreement. They are willing to complete the work prior to this upcoming irrigation season. William F. Garcia, Chair Approve Schedule Recommendation Work Session Comments Douglas Rademacher `-CL C ( r4 -e-- V1 13o^r Sean P. Conway Mike Freeman rem Barbara Kirkmeyer Attachments: FIDCO Irrigation Relocation Agreement for Bridge 42/29A Replacement "Sese, 1Dpcs eD '-\ I c \ \ a • °` `-t �3oCC h -r -v w - • YOB . A-n"PC_t\eo II_i U' S r" jr-i d n LL rti�� LL �Ant�� C asz-E5WotAoL. tact ro `'cat O A Tl\E Mike Bedell From: Sent: To: Cc: Subject: Barbara Kirkmeyer Monday, April 08, 2013 8:19 AM David Bauer Douglas Rademacher; Sean Conway; Mike Bedell; Jennifer Fuller; William Garcia; Mike Freeman Re: FIDCO Ditch Agreement Work Session Request I'm okay with going to agenda now. Thanks for the info Barb Sent from my iPhone On Apr 5, 2013, at 3:41 PM, "David Bauer" <dbauer(dco.weld.co.us> wrote: > Commissioners Kirkmeyer and Rademacher, > Jennifer alerted us that you had questions about the costs for this ditch agreement with Farmers Independent Ditch (FIDCO). Please see the attached previously sent with the backup material. This agreement covers just relocation of a head gate and pump on the ditch. Later in this project we will be back to the Board with an agreements covering ROW purchase, and relocation of a portion of the ditch itself. > We had viewed this irrigation relocation work as being similar to other utility relocation work or railroad work where the owner of what is being relocated specifies what they wish to be done. We usually try to work with their own maintenance staff or their contractors to define the scope of the work so we don't get swept into solving pre-existing problems. > This ditch company (FIDCO) has a preferred and proven contractor which they use for all work on their irrigation system. We'll be reimbursing the ditch company for costs associated with relocating the headgate and pump. FIDCO initially submitted a lump -sum cost for the work specified in the Agreement. Mike Bedell telephoned them to requested a detailed cost breakdown from their contractor, and requested them to show how they arrived at their final amount (see attached). Mike then checked the material unit prices and quantities to make sure they were reasonable with comparable other projects we've had. For one of the high -dollar items, the $4,000 water pump, he went on the internet to make sure it really costs that much. The labor and equipment rates were compared to time & materials on similar work we did in the past and these costs were also comparable to those to CDOT's website that has their cost data. All this analysis showed that these costs are reasonable. > Another consideration is that using FIDCO's preferred contractor, who knows their accepted approaches (their request), gives us an arms length relationship should there be future concerns on the performance of the reconstructed items. > Please advise if you wish to discuss further or if this can go on the agenda. > David Bauer, P.E., CFM > Director - Weld County Public Works Department > P.O. Box 758 > Greeley, Colorado 80632 > (970) 304-6496 >[cid:image003.1pg@010E3214.147DB340] > Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. > <0600_001.pdf> > <image003.jpg> 2 AGREEMENT FOR RELOCATION OF HEADGATE AND RELATED FACILITIES BETWEEN FARMERS INDEPENDENT DITCH COMPANY and WELD COUNTY (WCR 42 and WCR 29 INTERSECTION BRIDGE REPLACEMENT) THIS AGREEMENT, made by and entered into th•is [o diltay of Q( 1� , 2013, by and between FARMERS INDEPENDENT DITCH COMPANY, a Colorado non-profit corporation with an office located at 3005 West 29th Street, Suite Gl, Greeley, Colorado 80634, (hereinafter referred to as "FIDCO") and THE COUNTY OF WELD, a political subdivision of the State of Colorado, by and through the Board of County Commissioners of the County of Weld, at P.O. Box 758, 1150 "O" Street, Greeley, CO 80632 (hereinafter referred to as "County"). WITNESSETH: WHEREAS, the County has requested FIDCO to relocate one headgate and one pump station (hereinafter referred to as the "Facilities"), from their current locations in the vicinity of the intersection of Weld County Road 42 and Weld County Road 29 in preparation of a previously approved improvements project (hereinafter known as "Project") , and WHEREAS, FIDCO is willing to relocate said Facilities, which are located in its ditch on property it currently owns, and WHEREAS, County is willing to pay for the expenses incurred by FIDCO as a result of the relocation of the Facilities, as more specifically set forth in this Agreement, and WHEREAS, the parties acknowledge that a significant portion of the work necessary to relocate the Facilities has been accomplished. NOW, THEREFORE, for and in consideration of the mutual covenants and agreements hereinafter contained, the parties hereby agree as follows: I. FIDCO RIGHTS and RESPONSIBILITIES 1. FIDCO Facilities Relocation: FIDCO shall relocate one headgate and one pump station at the locations reflected on page 1 of Exhibits A and B. All work necessary to accomplish the Facilities relocation projects has been and shall continue to be performed in accordance with FIDCO specifications, in accordance with accepted engineering practices, and in compliance with all applicable Weld County, State of Colorado and Federal laws, rules and regulations. 2. Relocation Not to Conflict with Improvements: FIDCO agrees, and County has confirmed, that the new locations of the relocated FIDCO Facilities shall not and do not conflict with the proposed roadway improvements or other utility relocations as shown on the Project Drawings attached as Exhibit A. FIDCO must locate any other utilities in the area prior to construction of the Facilities. 3. Timing of Ditch Relocation: FIDCO has accomplished a significant portion of this relocation project in order to meet the demands of its participants in the 2013 1 a7/3- -- o9d/ irrigation season. The parties agree that the work shall be completed prior to the commencement of County's Project. 4. Reliance on FIDCO Expertise: County and FIDCO recognize that County is relying solely on FIDCO or its authorized agent, to perform the relocation of the Facilities in a manner which will ensure the future integrity of the ditch and the road improvements to be constructed by the County. Therefore, as part of its assurances under this Agreement, FIDCO affirms that it has sufficient liability insurance, (as more fully described in Paragraphs I.6 and III.8 below), to satisfy any claim of negligence, intentional wrongful acts or other acts or omissions which may arise as a result of any failure of the road caused by an improper relocation of the Facilities. 5. FIDCO Warranty: FIDCO warrants that all work performed under this Agreement will be performed in a manner consistent with the professional standards governing such work and the provisions of this Agreement and shall conform to the performance standards and requirements set forth herein and in Exhibit A. 6. FIDCO's Responsibility to Indemnify: FIDCO shall defend and indemnify County, its officers and agents, from and against loss or liability arising from FIDCO's acts, errors or omissions in seeking to perform its obligations under this Agreement. FIDCO shall provide necessary workers' compensation insurance at FIDCOs own cost and expense. Following the execution of this Agreement and for a period of twelve (12) months following the completion of the project, FIDCO shall include the County, its officers and agents, as additional named insureds on a property, casualty, and liability insurance policy, at a minimum of $1,000,000 coverage limit per occurrence, $300,000 per person. 7. Test Results: Upon completion of the work and if applicable, FIDCO shall submit to County originals of any test results, reports, etc., generated during completion of this work. Acceptance by County of reports and incidental material furnished under this Agreement shall not in any way relieve FIDCO of responsibility for the quality and accuracy of the work. Acceptance by the County of, or reimbursement for, any of the work performed under this Agreement shall not be construed as a waiver of any of the County's rights under this Agreement or under the law generally. II. COUNTY RIGHTS and RESPONSIBILITIES 1. Estimates of Relocation Expenses: County has agreed to reimburse FIDCO for the expenses incurred by FIDCO in accordance with this facilities relocation as set forth in the Estimate of Costs, (a copy of which is attached hereto as Exhibit C and made a part hereof by this reference). 2. Payment of Estimated Expenses: FIDCO has estimated the total cost of the Facilities relocation expenses to be Seventeen Thousand Two Hundred Eighty -Seven and 84/100 Dollars ($17,287.84), which includes specific work outlined in the attached Exhibit C, the cost estimate. If final actual costs of relocation are less than the estimated amount, FIDCO shall invoice the County for the actual costs. If the final relocation costs exceed the attached estimate, County shall pay those reasonable additional expenses for which it believes it has responsibility. County has paid the attorney fees incurred by FIDCO in the negotiation of this 2 Agreement, (as set forth in the attached Exhibit D, and will pay those reasonable additional fees for which it believes it has responsibility. 3. County to Stake Right -of -Way: County shall establish and continue to stake the County right-of-way and easements within the work area prior to relocation of the Facilities. County shall verify the relocation to confirm that said relocation is clear of Project construction work. III. MISCELLANEOUS 1. Board of County Commissioners of Weld County Approval: This Agreement shall not be valid until it has been approved by the Board of County Commissioners of Weld County, Colorado or its designee. 2. Agreement Binding: This writing, together with the exhibits, constitutes the entire Agreement between the parties hereto with respect to the subject matter herein, and shall be binding upon said parties their officers, employees, agents, and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 3. No Third Party Beneficiary: It is expressly understood and agreed that the enforcement of the terms and conditions of this Agreement, and all rights of action relating to such enforcement, shall be strictly reserved to the undersigned parties, and nothing in this Agreement shall give or allow any claim or right of action whatsoever by any other person not included in this Agreement. It is the express intention of the undersigned parties that any entity other than the undersigned parties receiving services or benefits under this Agreement shall be an incidental beneficiary only. 4. Time of the Essence: Time is of the essence in each and all of the provisions of this Agreement. 5. Fund Availability: This Agreement assumes that the relocation of the ditch will be completed on or before the end of the County's fiscal year. Financial obligations of the Board of County Commissioners of Weld County payable after the current fiscal year are contingent upon funds for that purpose being appropriated, budgeted and otherwise made available. By execution of this Agreement, County does not warrant that funds will be available to fund this Agreement beyond the current fiscal year. 6. Severability: If any term or condition of this Agreement shall be held to be invalid, illegal, or unenforceable, this Agreement shall be construed and enforced without such provision, to the extent that this Agreement is then capable of execution within the original intent of the parties. 7. Attorneys Fees/Legal Costs: In the event of a dispute between County and FIDCO, concerning this Agreement, the parties agree that Weld County shall not be liable to or responsible for the payment of attorney fees and/or legal costs incurred by or on behalf of FIDCO. 3 8. Subrogation Waiver: All insurance policies required to be maintained under the terms of this Agreement or which are in any way related to this Agreement which are secured and maintained by FIDCO shall include clauses stating that each carrier shall waive all rights of recovery, under subrogation or otherwise, against Weld County, its officers, employees, agents, or volunteers. 9. Governmental Immunity: No term or condition of this contract shall be construed or interpreted as a waiver, express or implied, of any of the immunities, rights, benefits, protections or other provisions, of the Colorado Governmental Immunity Act §§24-10- 101 et seq., as applicable now or hereafter amended. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, two duplicate originals of this Agreement, each of which shall be deemed an original, on the date first written above. FARMERS INDEPENDENT DITCH COMPANY By: Ds Name (Printed)irq n/X A. FG (Gt.b. 7' r, Title: /""he vc ATTEST: Weld County Clerk to the Board BY. Deputy Clerk to t e Boar 54 t G,. 20)3 Date BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO William F. Garcia, Chair APR 1 0 2013 4 0yj2/S-- O9O/ z O U It cn F— Z O a O F- 0 I CD CD Proiect NodCode a \ ` \ • \ ' \ • �.• o \` `‘ I1 N(13 n Q' I m N N Q' cr :7 m ? Nix 2 mcaoa WCR42&WCR29 PRELIM. BOX COMPARISON 6 r N i O • '^ 1 al in $t cal a saa wu 7"fl taS L \ I I 1-) N CO O N 03 11-J Cr . 1 t %LT • `1 � N •z \ �'a ONo CC 6a N , W LCD v v LLOcc Q r u - z O As Constructed WELD COUNTY i f lt;fj :-%-:, -1 1 - j 1 i 1 ayv►... �.—_ —�" `'4 ` �` �� �� ' Aler a & { �• , iir 1 \• r 1 z 2 Cr e m F Tr1111.4 iv c.± ' � _ m N 0 � -J{ I I ` \ r. O 0 m 0 ' , r vn CO v) III Om• p owa Cf 0 dLu I ' ; \ s \ 1 Computer File Information CA�I�r 0.14!7 Ine1S M f a 1 m z cc 0 ® Q Q a w� N , . co { \ W 1 { \ Q •1 B too in r 1 N N i O z O 0 a H 2 O 0 LL O 2 LL C QUALITY WELL AND PUMP 23275 US HWY 85 LA SALLE, CO 80645 Phone # 970-353-3118 Fax # 970-284-6445 Bill To TERRY WIEDEMAN 13434 WCR 42 PLATTEVILLE, CO 80651 EXHIBIT I Invoice Due Date Date Invoice # 2/22/2013 2/22/2013 2013-307 ❑Please check box if address is incorrect or has changed, and indicate change(s) on reverse side. New e-mail address? Enter here: QUALITY WELL AND PUMP 23275 US HWY 85 970-737-2298 Balance Due PI NAME DITA('II AND RETURN TOP PORTION WITH YOUR PAYMENT. LA SALLE, CO 80645 P.O. No. Terms Project Rep Due on receipt Qty Item Description Unit Price Amount 8 P70 -SALES INSTALLED NEW CONCRETE DROP BOX, LIFT PUMP, OVERFLOW, DISCHARGE MANIFOLD AND ELECTRICAL LINE PER CUSTOMER SPECIFICATIONS. 3/4" X 2" BOLTS 1.56 12.48 56 P70 -SALES 3/4° NUTS 0.60 3160 16 P70 -SALES 3/4" X 3" BOLT 2.10 33.60 16 P70 -SALES 3/4" FLAT WASHER 0.36 5.76 32 P70 -SALES 3/4' X 4-1/2" BOLT 2.94 94.08 2 2953-08041 PIP VANSTONE FLANGE 100# 8" 113.76 227.52 2 3016-0801 PIP 90 ELBOW 125# 8" 164.26 328.52 20 008-125PIP PIP PVC PIPE 125# 8" 5.00 100.00 7 F083-00-08 STEEL FLANGE IPS 8" 29.50 206.50 4 F083-80-08 RANGE GASKET 8" 5.58 22.32 1 FTIS45LL080 STEEL SCH40 IPS 45 ELBOW 8" 106.81 106.81 1 FTIS90L080 STEEL SCH40 IPS 90 ELBOW 8" 163.55 163.55 1 FTISTEE080 STEEL SCH40IFS TEE 8" 204.75 204.75 2 114583030 NIPPLE GALV .75"X3" L26 2.52 2 TMBV075 BALL VALVE BRASS .75" 13.13 26.26 2 F085-080-05 BUTTERFLY VALVE LEVER OP 8" 285.00 570.00 10 TMSTL800188 STEEL CASING 8".188 WALL 24.33 243.30 1 1124G NAVIGATOR VALVE M X F OD 12" 536.77 536.77 2 P1007-48 RINGLOCK COUPLER DEEP BLK 10" 40.58 81.16 2 FTISCON100080 STEEL 50140 IPS REDUCER 10"X8" 123.75 247.50 2 P70 -SALES 12" CORRUGATED PIPE 13.04 26.08 500 P45 -PURCHASE UNDERGROUND ELECTRICAL PURCHASE 4.72 2,360.00 Total Payments/Credits Balance Due The tine to the merchandise and personal property covered by this Invoice shall remain vested in Quality Well and Pump, LLC until the purchase price Is paid in full. Customer agrees to pay a service charge computed at a periodic rate of 1.5% per month (16%APR) applied to all past due amounts after deducting current payments/credlts. Page 1 Customer Signature: Phone # Fax # QUALITY WELL AND PUMP 23275 US HWY 85 LA SALLE, CO 80645 970-353.3118 970-284-6445 Bill To TERRY WIEDEMAN 13434 WCR 42 PLATTEVILLE, CO 80651 Invoice Due Date Date Invoice # 2/22/2013 2/22/2013 2013-307 ❑Please check box if address is incorrect or has changed, and indicate change(s) on reverse side. New e-mail address? Enter here: 970-737-2298 Balance Due $17,287.84 QUALITY WELL AND PUMP 23275 US HWY 85 I'I I,\51.Ilh'IA('ll AND ILF.itJRN TOI' PORtIOiN WITH YOUR PAYMENT. LA SALLE, CO 80645 P.O. No. Terms Project Rep Due on receipt Qty Item Description Unit Price Amount 1 P20 -PURCHASE 5HP FISHER PUMP 4,011.00 4,011.00 1 P20 -PURCHASE 15"X48" 101C FLAT BACK HEAD GATE 939.00 939.00 1 P90 -PURCHASE ELECTRICAL PARTS MISC. 110.88 110.88 500 43 WIRE TRENCHING AND INSTALL 1.25 625.00 1 P20 -PURCHASE CONCRETE DROP BOX 3,250.00 3,250.00 3 40 LABOR (WELDING) 95.00 285.00 4 40 LABOR (PIPE AND FITTINGS) 80.00 320.00 8 46 BACKHOE SERVICE - PER HR 135.00 1,080.00 1 MI.40 MOBILIZATION 275.00 275.00 1 90 ELECTRICAL SERVICES - LABOR 758.88 758.88 Total $17,287.84 Payments/Credits $0.00 Balance Due $17,287.84 The title to the merchandise and personal property Covered by this invoice shall remain vested In Qualty Well and Pump, LAC until the purchase price is paid in lull. Customer agrees to pay a service charge computed at a periodic rate of 1.5% per month (18%APR) applied to al past due amounts after deducting current payments/credits. Page 2 Customer Signature: EXHIBIT LAWRENCE JONES CUSTER GRASMICK LLP Attorneys at Law 5245 Ronald Reagan Blvd., Suite 1 Johnstown, CO 80534 1 Invoice submitted to: Leon Sievers, PLS, SRNVA Right of Way Agent/Land Surveyor Weld County Public Works Dept. 1111 H. Street, P.O. Box 758 Greeley CO 80632 February 04, 2013 In Reference To:Farmers Independent Ditch Company Strear Ditch Relocation WCR 42/49 bridge project Previous balance Amount $887.75 Balance due $887.75 PLEASE MAKE CHECKS PAYABLE TO LAWRENCE JONES CUSTER GRASMICK LLP. PLEASE NOTE THE NEW TELEPHONE NUMBER (970)622-8181. DUE UPON RECEIPT. 1.5% PER MONTH INTEREST CHARGED ON ALL PAST DUE BILLS. REFLECTS ONLY PAYMENTS AND CHARGES THROUGH ABOVE DATE. LAWRENCE JONES CUSTER GRASMICK LLP Attorneys at Law 5245 Ronald Reagan Blvd., Suite 1 Johnstown, CO 80534 Invoice submitted to: Leon Sievers, PLS, SR/WA Right of Way Agent/Land Surveyor Weld County Public Works Dept. 1111 H. Street, P.O. Box 758 Greeley CO 80632 November 14, 2012 In Reference To:Farmers Independent Ditch Company Strear Ditch Relocation WCR 42/29 bridge project Invoice #41050 Professional Services Hours Amount 10/25/2012 BG Review email from Moana and David regarding potential County modifications/alterations to ditch and provide comments on what would be needed. DPJ Instructions to Moana regarding Weld County relocation of Easement. 10/26/2012 DPJ Work on ditch relocation matter for County; Email to Anne Korbe; Review title documents; Email from Anne; Email to Anne. 10/29/2012 DPJ Email from Weld County regarding ditch relocation; Review map; Consult with Andy. PAJ Review emails regarding Weld County potential relocation of ditch segment. 10/30/2012 PAJ Review email, map re: proposed ditch re -alignment. Confer with David re: ditch survey issues. Confer with David re: items relevant to attorneys report. DPJ Consult with Andy regarding ditch relocation. 10/31/2012 DPJ Meeting with Frank and Rick regarding County relocation of ditch. For professional services rendered Balance due 79.50 0.30 26.50 0.10 331.25 1.25 79.50 0.30 26.50 0.10 132.50 0.50 39.75 0.15 39.75 0.15 2.85 $755.25 $755.25 (970)6224181 LAWRENCE JONES CUSTER GRASMICK LLP Attorneys at Law 5245 Ronald Reagan Blvd., Suite 1 Johnstown, CO 80534 Invoice submitted to: Leon Sievers, PLS, SR/WA Right of Way Agent/Land Surveyor Weld County Public Works Dept. 1111 H. Street, P.O. Box 758 Greeley CO 80632 December 06, 2012 In Reference To:Farmers Independent Ditch Company Strear Ditch Relocation WCR 42/29 bridge project Invoice #41095 Professional Services Hours Amount 11/14/2012 DPJ Teleconference with LeorGeivers regarding County Ditch Relocation. 11/26/2012 DPJ Email to Leon Seivers. For professional services rendered Previous balance Balance due PLEASE MAKE CHECKS PAYABLE TO PLEASE NOTE THE NEW TELEPHONE LAWRENCE JONES CUSTER GRASMICK LLP. NUMBER (970)622.8181. 66.25 0.25 26.50 0.10 0.35 $92.75 $755.25 $848.00 DUE UPON RECEIPT. 1.5% PER MONTH INTEREST CHARGED ON ALL PAST DUE BILLS. REFLECTS ONLY PAYMENTS AND CHARGES THROUGH ABOVE DATE. LAWRENCE JONES CUSTER GRASMICK LLP Attorneys at Law 5245 Ronald Reagan Blvd., Suite 1 Johnstown, CO 80534 Invoice submitted to: Leon Sievers, PLS, SR/WA Right of Way Agent/Land Surveyor Weld County Public Works Dept. 1111 H. Street, P.O. Box 758 Greeley CO 80632 January 04, 2013 In Reference Tofarmers Independent Ditch Company Strear Ditch Relocation WCR 42/29 bridge project Invoice #41298 Professional Services Hours Amount 12/11/2012 DPJ Email from Frank regarding relocation. 12/19/2012 DPJ Email with Stephanie Arries. For professional services rendered Previous balance Balance due PLEASE MAKE CHECKS PAYABLE TO LAWRENCE JONES CUSTER GRASMICK LLP. PLEASE NOTE THE NEW TELEPHONE NUMBER (970)622.8181. 13.25 0.05 26.50 0.10 0.15 $39.75 $848.00 $887.75 DUE UPON RECEIPT. 1.5% PER MONTH INTEREST CHARGED ON ALL PAST DUE BILLS. REFLECTS ONLY PAYMENTS AND CHARGES THROUGH ABOVE DATE. Hello